1. Valorización y Adicional

Post on 18-Dec-2015

83 views 9 download

description

modelo de valorización de avance obras

Transcript of 1. Valorización y Adicional

Valorizacion Abril 2015VALORIZACION ADICIONAL Y DEDUCTIVO VINCULANTE DE OBRA N 01Nombre del Proyecto:PRESUPUESTO ORIGINALS/.2'157,490.00Supervisor :Ing:N de Contrato.Modalidad del ContratoMONTO DEL CONTRATOS/.2'016,294.16Mes valoriz :ABRIL DEL 2015Contratista :Suma AlzadaMONTO DEL ADELANTOS/.0.00ITEMPRESUPUESTO CONTRACTUALAVANCE ACUMULADO ANTERIORAVANCE ACTUALAVANCE ACUMULADO ACTUALSALDO POR VALORIZARDESCRIPCIONU.MMETR.P.UTOTALMETR.VALORIZ.%METR.VALORIZ.%METR.VALORIZ.%METRADOVALORIZ.%S/.S/.S/.S/.S/.metrado Adicionalsaldo metradoAdicio. S/.SISTEMA DE AGUA POTABLE4RED DE ADUCCION Y DISTRIBUCION4.01TRAZO Y REPLANTEO PRELIMINARm407.002.25915.75407.00915.75100.00%407.00915.75100.00%0.00.00.00%4070.04.02TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOm407.001.69687.83407.00687.83100.00%407.00687.83100.00%0.00.00.00%4070.04.03EXCAVACION DE ZANJA EN MATERIAL ROCA SUELTAm3130.243.62471.47130.24471.47100.00%130.24471.47100.00%0.00.00.00%130.240.04.04REFINE Y NIVELACION DE ZANJASm407.005.432,210.01407.002,210.01100.00%407.002,210.01100.00%0.00.00.00%4070.04.05CAMA DE APOYO PARA TUBERIASm348.845.86286.2048.84286.20100.00%48.84286.20100.00%0.00.00.00%48.840.04.07INSTALACION DE TUBERIA PVC SAP 2" Cl:10m407.0013.195,368.33407.005,368.33100.00%407.005,368.33100.00%0.00.00.00%4070.04.10PRUEBA HIDRAULICA DE LA REDm407.003.451,404.15407.001,404.15100.00%407.001,404.15100.00%0.00.00.00%4070.04.11RELLENO CON MATERIAL PROPIO SELECCIONADOm381.4010.41847.3781.40847.37100.00%81.40847.37100.00%0.00.00.00%81.40.04.12VALVULAS DE CIERRE04.12.01LIMPIEZA DE TERRENO MANUAL'm23.242.638.523.248.52100.00%3.248.52100.00%0.00.00.00%3.240.004.12.02TRAZO Y REPLANTEOm23.242.257.293.247.29100.00%3.247.29100.00%0.00.00.00%3.240.004.12.03EXCAVACION DE MATERIAL ROCA SUELTOm33.743.6213.543.7413.54100.00%3.7413.54100.00%0.00.00.00%3.740.004.12.04CONCRETO FC=175 KG/CM2m31.44402.09579.011.44579.01100.00%1.44579.01100.00%0.00.00.00%1.440.004.12.05ENCOFRADO Y DESENCOFRADOm228.8039.721,143.9428.801,143.94100.00%28.801,143.94100.00%0.00.00.00%28.80.004.12.06TARRAJEO EXTERIOR CON CEMENTO - ARENAm228.8020.76597.8928.80597.89100.00%28.80597.89100.00%0.00.00.00%28.80.004.12.07Accesorios y Valvula de cierre de 2"und9.00114.381,029.429.001,029.42100.00%9.001,029.42100.00%0.00.00.00%90.004.12.08TAPA METALICA DE ALUMINIO 0.40x0.40x1/4" INC. MARCOund9.0039.55355.959.00355.95100.00%9.00355.95100.00%0.00.00.00%90.04.13CORTE ROTURA Y REPOSIC DE PAVIMENTO RIGIDO F'C=210KG/CM2 DE 8"04.13.01CORTE Y ROTURA DE PAVIMENTO RIGIDO DE 8"m2142.2523.883,396.93142.253,396.93100.00%142.253,396.93100.00%0.00.00.00%142.250.004.13.02ELIMINACION DE DESMONTE EN TERRENO NORMAL D=5 KM C/MAQm328.4512.79363.8828.45363.88100.00%28.45363.88100.00%0.00.00.00%28.450.004.13.03BASE DE MATERIAL GRANULAR COMPACTADO C/EQUIPOm221.3411.01234.9521.34234.95100.00%21.34234.95100.00%0.00.00.00%21.340.004.13.04CONCRETO F'C=210 KG/CM2m228.45410.1211,667.9128.4511,667.91100.00%28.4511,667.91100.00%0.00.00.00%28.450.0SISTEMA DE ALCANTARILLADO9.00.00INSTALACION DE BUZONES ( 95 UND)9.08.00ENCOFRADO Y DESENCOFRADO EN MEDIA CAAM254.1527.891,510.2454.151,510.24100.00%54.151,510.24100.00%0.00.00.00%54.150.09.09.00TARRAJEO Y PULIDO DE SUPERFICIE INTERIOR Y MEDIA CAAM2128.8231.434,048.81128.824,048.81100.00%128.824,048.81100.00%0.00.00.00%128.820.022.00LECHO DE SECADO22.08.00FILTRO22.08.01FILTRO DE ARE NA GRUESAM36.63104.01689.590.00.00.00%0.00.00.00%6.63689.59100.00%6.636.6322.08.02FILTRO DE GRAVA 1/16" A 1/4"M33.09107.01330.660.00.00.00%0.00.00.00%3.09330.66100.00%3.093.0922.08.03FILTRO DE GRAVA 1/4" A 7/8"M311.05107.011,182.460.00.00.00%0.00.00.00%11.051,182.46100.00%11.0511.0529.00.00EXPLANACION DE PLATAFORMA EN PLANTA DE TRTAMIENTO29.01.00APERTURA DE CORTE DE MATERIAL ROCA FIJA EN PLATAFORMAM39,767.833.6235,358.179,767.8335,358.12100.00%9,767.8335,358.12100.00%0.00.050.00%9767.830.029.02.00NIVELACION Y ELIMINACION DE MATERIAL EXCEDENTE + 15% DE ESPONJAMIENTO D= 1.5 KmM38,538.9310.6090,512.634,080.2643,250.756047.78%4,080.2643,250.7647.78%4,458.6747,261.8752.22%8538.934,458.67TOTAL COSTO DIRECTO165222.900.00115758.28115758.2849464.63GASTOS GENERALES10.00%16,522.290.011,575.8311,575.834,946.46UTILIDADES10.00%16,522.290.011,575.8311,575.834,946.46SUBTOTAL PRESUPUESTO198,267.480.0138,909.93138,909.9359,357.55IGV (18%)18.00%35,688.150.025,003.7925,003.7910,684.36COSTO TOTAL DE LA OBRA233,955.630.0163,913.72163,913.7270,041.91Retencion de fiel cumplimiento (10% PT)0.00%0.00.00.00.0TOTAL A PAGAR0.0163,913.72163,913.7270,041.91PORCENTAJE DE AVANCE0.00%70.06%70.06%29.94%APROBACIONRESIDENTE DE OBRASUPERVISOR DE OBRAENTIDAD