Hoja1conceptoconcreto hecho en obraclasificacionagregado maximocomento TONarena M3grava M3agua M3MATERIAL$RENDIMIENTOCANT. ALAMB. REC.$CANTIDADf'c= km/cm2revenimientoVARILLATONKG/JORKG1008 A 10 CM3/4''0.260.50.680.1953/8''$13,750.001200.085$13.751.051 1/2''0.2540.470.70.191/2''$13,750.001450.09$13.751.0512 A 15 CM3/4''0.2860.50.680.2155/8''$13,750.001600.095$13.751.051 1/2''0.280.470.70.213/4''$13,750.001850.1$13.751.051508 A 10 CM3/4''0.3230.480.670.211"$13,750.002000.105$13.751.051 1/2''0.3030.450.70.212 A 15 CM3/4''0.3540.480.670.231/4''$13,000.000.08$13.001 1/2''0.3380.450.70.222008 A 10 CM3/4''0.3550.470.650.1951 1/2''0.3370.440.680.18512 A 15 CM3/4''0.3910.470.650.2151 1/2''0.3730.440.680.2052508 A 10 CM3/4''0.4230.4650.640.191 1/2''0.40.4350.670.1812 A 15 CM3/4''0.4670.4650.640.211 1/2''0.4450.4350.670.2

conceptoPASTAS CEMENTO BLANCO-POLVO MARMOLclasificacioncemento blanco TONplovo marmol TONagua M3

prop. 1:30.542.10.28prop. 1:40.442.20.275prop. 1:50.382.30.272

conceptoPASTAS CEMENTO BLANCO-CAL-POLVO MARMOLclasificacioncemento blanco TONcalhidra TONpolvo marmol TONagua M3

P 1:1:60.270.1252.10.28P 1:1:80.220.12.20.278P 1:1:100.190.0852.30.276P 1:1:120.1350.0752.40.274

conceptoMEZCLA CALIDRA ARENAclasificacionCalhidra TONarena M3agua M3

P 1:30.2510.27P 1:40.21.070.26P 1:50.171.130.255P 1:60.1451.180.25P 1:70.1251.220.245P 1:80.111.250.24P 1:90.11.270.235P 1:100.091.2850.23

conceptoMEZCLA MORTERO ARENAclasificacionmortero TONarena M3agua M3

P 1:40.31.150.29P 1:50.261.20.285P 1:60.2251.240.28P 1:71.951.270.275P 1:80.171.290.27

conceptoMEZCLA CEMENTO ARENAclasificacionCemento TONarena M3agua M3

P 1:20.610.275P 1:30.511.10.272P 1:40.431.20.266P 1:50.361.150.261P 1:60.31.190.257P 1:70.251.240.252P 1:80.211.30.246

conceptoMEZCLA CEMENTO-CALHIDRA-ARENAclasificacionCemento TONcalhidra M3arena M3agua M3

P 1:1:40.30.1510.28P 1:1:60.2550.1251.050.279P 1:1:80.2150.11.0950.278P 1:1:100.180.0851.0650.275P 1:1:120.150.0751.1850.273

Hoja2DESCRIBCION:FABRICACION DE CONCRETO f'c = 100kg/cm2 CON T.M.A. 3/4'', HECHO EN OBRA ; CO REVOLVEDORA 1 SACO

CONCEPTOSUNCANTCUIMPORTEMATERIALEScemento grisTON0.25$3,000.00$750.00arenonM30.3$260.00$78.00grava 3/4"M30.85$260.00$221.00aguaM30.21$10.00$2.10SUBTOTAL$1,051.10

DESCRIBCION:FABRICACION DE CONCRETO f'c = 150kg/cm2 CON T.M.A. 3/4'', HECHO EN OBRA ; CO REVOLVEDORA 1 SACO

CONCEPTOSUNCANTCUIMPORTEMATERIALEScemento grisTON0.3$3,000.00$900.00arenonM30.3$260.00$78.00grava 3/4"M30.85$260.00$221.00aguaM30.21$10.00$2.10SUBTOTAL$1,201.10

DESCRIBCION:FABRICACION DE CONCRETO f'c = 200kg/cm2 CON T.M.A. 3/4'', HECHO EN OBRA ; CO REVOLVEDORA 1 SACO

CONCEPTOSUNCANTCUIMPORTEMATERIALEScemento grisTON0.35$3,000.00$1,050.00arenonM30.3$260.00$78.00grava 3/4"M30.85$260.00$221.00aguaM30.21$10.00$2.10SUBTOTAL$1,351.10

DESCRIBCION:FABRICACION DE CONCRETO f'c = 250kg/cm2 CON T.M.A. 3/4'', HECHO EN OBRA ; CO REVOLVEDORA 1 SACO

CONCEPTOSUNCANTCUIMPORTEMATERIALEScemento grisTON0.4$3,000.00$1,200.00arenonM30.3$260.00$78.00grava 3/4"M30.85$260.00$221.00aguaM30.21$10.00$2.10SUBTOTAL$1,501.10

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:3

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.51$3,000.00$1,530.00arena finaM31.1$260.00$286.00aguaM30.272$10.00$2.72SUBTOTAL$1,818.72

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.43$3,000.00$1,290.00arena finaM31.2$260.00$312.00aguaM30.266$10.00$2.66SUBTOTAL$1,604.66

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:5

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.36$3,000.00$1,080.00arena finaM31.15$260.00$299.00aguaM30.261$10.00$2.61SUBTOTAL$1,381.61

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.3$3,000.00$900.00arena finaM31.19$260.00$309.40aguaM30.257$10.00$2.57SUBTOTAL$1,211.97

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.3$1,800.00$540.00arena finaM31.15$260.00$299.00aguaM30.29$10.00$2.90SUBTOTAL$841.90

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:5

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.26$1,800.00$468.00arena finaM31.2$260.00$312.00aguaM30.285$10.00$2.85SUBTOTAL$782.85

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.225$1,800.00$405.00arena finaM31.24$260.00$322.40aguaM30.28$10.00$2.80SUBTOTAL$730.20

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-CAL-ARENA EN PROPORCION 1:1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.3$1,800.00$540.00arena finaM31$260.00$260.00aguaM30.28$10.00$2.80calhidraTON0.15$1,300.00$195.00SUBTOTAL$997.80DESCRPPCION: ELABORACION DE MORTERO CEMENTO-CAL-ARENA EN PROPORCION 1:1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.255$1,800.00$459.00arena finaM31.05$260.00$273.00aguaM30.279$10.00$2.79calhidraTON0.125$1,300.00$162.50SUBTOTAL$897.29

Hoja3DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:3

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.51$3,000.00$1,530.00arena finaM31.1$260.00$286.00aguaM30.272$10.00$2.72SUBTOTAL$1,818.72

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.43$3,000.00$1,290.00arena finaM31.2$260.00$312.00aguaM30.266$10.00$2.66SUBTOTAL$1,604.66

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:5

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.36$3,000.00$1,080.00arena finaM31.15$260.00$299.00aguaM30.261$10.00$2.61SUBTOTAL$1,381.61

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-ARENA EN PROPORCION 1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALEScementoTON0.3$3,000.00$900.00arena finaM31.19$260.00$309.40aguaM30.257$10.00$2.57SUBTOTAL$1,211.97

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.3$1,800.00$540.00arena finaM31.15$260.00$299.00aguaM30.29$10.00$2.90SUBTOTAL$841.90

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:5

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.26$1,800.00$468.00arena finaM31.2$260.00$312.00aguaM30.285$10.00$2.85SUBTOTAL$782.85

DESCRPPCION: ELABORACION DE MORTERO MORTERO-ARENA EN PROPORCION 1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.225$1,800.00$405.00arena finaM31.24$260.00$322.40aguaM30.28$10.00$2.80SUBTOTAL$730.20

DESCRPPCION: ELABORACION DE MORTERO CEMENTO-CAL-ARENA EN PROPORCION 1:1:4

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.3$1,800.00$540.00arena finaM31$260.00$260.00aguaM30.28$10.00$2.80calhidraTON0.15$1,300.00$195.00SUBTOTAL$997.80DESCRPPCION: ELABORACION DE MORTERO CEMENTO-CAL-ARENA EN PROPORCION 1:1:6

CONCEPTOSUNCANTCUIMPORTEMATERIALESmorteroTON0.255$1,800.00$459.00arena finaM31.05$260.00$273.00aguaM30.279$10.00$2.79calhidraTON0.125$1,300.00$162.50SUBTOTAL$897.29

Hoja4SUMINISTRO Y HABILITADO DE ALAMBRON DE 1/4'', INCLUYE MAT., M. DE O., EQ. Y HERR.UN=KG$24.67CONCEPTOSUNCANT.C.U.IMPORTEMATERIALalambron 1/4''kg1.05$13.00$13.65alambre recocidokg0.08$20.00$1.60subtotal$15.25MANO DE OBRAUNCANT.C.U.IMPORTEcuad.= .01 sob. + of. Fierreo + ayud. Gral.JOR0.01$915.00$9.15

subtotal$9.15REND= KG/JOR100JOR/KG =0.01EQUIPO. Y HERR.UNCANT.C.U.IMPORTEherramienta menor%3.00%$9.15$0.27subtotal$0.27COSTO BASICO DEL ALAMBRON$24.67

SUMINISTRO Y HABILITADO DE VARILLA DE 3/8'', INCLUYE MAT., M. DE O., EQ. Y HERR.UN=KG$23.99CONCEPTOSUNCANT.C.U.IMPORTEMATERIALvarilla 3/8"kg1.05$13.75$14.44alambre recocidokg0.085$20.00$1.70subtotal$16.14MANO DE OBRAcuad.= .01 sob. + of. Fierreo + ayud. Gral.JOR0.0083333333$915.00$7.63

subtotal$7.63REND= KG/JOR120JOR/KG =0.0083333333EQUIPO. Y HERR.herramienta menor%3.00%$7.63$0.23subtotal$0.23COSTO BASICO DEL ALAMBRON$23.99

Hoja5VALUCION Y COSTO DE MADERA EN CIMBRA DE ZAPATA 1 X1 MCONCEPTOCANTIDADFACTOR DE CONTACTOCANTIDADFACTOR DE DESPERDICIOCANTIDADFACTOR DE USOCANTIDADP.U.IMPORTEP.T.P.T./M2P.T./M2P.T./M2/USOS/P.T.$/M2/USOduelas41/.201/51212.1875854526510.93792726281.213.12551271530.202.6251025431$15.00$39.383.657yugos41/.201/5240.43.50013672415.0017.50068362051.221.00082034450.204.2001640689$15.00$63.003.657 costo basico de cimbra p/zapata$102.38

VALUCION Y COSTO DE MADERA EN CIMBRA DE CONTRATRABE 30 X30X40 CM CONCEPTOCANTIDADFACTOR DE CONTACTOCANTIDADFACTOR DE DESPERDICIOCANTIDADFACTOR DE USOCANTIDADP.U.IMPORTEP.T.P.T./M2P.T./M2P.T./M2/USOS/P.T.$/M2/USOduelas81/.81/51418.751.2510.941.213.130.202.63$15.00$39.383.657yugos41/.81/5240.756.561.258.201.29.840.201.97$15.00$29.533.657 separadores21/.8 1/5240.652.841.253.551.24.270.200.85$15.00$12.803.657madrinas41/.81/52418.751.2510.941.213.130.202.6251025431$15.00$39.383.657pie derecho81/.8440.517.501.2521.881.226.250.205.2502050861$15.00$78.753.657arrastres4140.73.061.253.831.24.590.200.9187858901$15.00$13.783.657costo basico de cimbra p/dado$213.62

Hoja6descripcion: Dala de desplante de concreto armao de seccion 15 x 15 cm, f'c= 250 kg/cm2 armada con 4 varilllas de 3/8 y estribos de 1/4 a cada 20 cm enincluye material, mano de obra, equipo y herr. Y todos los trabajos necesarios acabado comun

conceptounidadcantidadp.u.importemateriales

mano de obracua.(0.1)sob. + (1)ayu.jor0.3333333333377.22125.740.1656.565.6501311.57311.57377.22rend. 3 m3/ jor130.3333333333subtotal125.74equipo y herramienta

depreciacion de la palajor0.0021500.31500depreciacion de picojor0.0012150.21511000subtotal0.515

costos basicosno hay0

total126.255DESCRIPCION: ZAPATA DE CONCRETO ARMADO DE 1.0 X 1.0M CON F'C=200kg/cm2 Y VARILLA 3/8"@ 15 cms EN AMBOS SENTIDOS Y DADO DE CONCRETO DE 30 X 30 X 40 cm , 4 VARILLAS DE 3/8 Y ESTRIBOS @ 10 cms

CONCEPTOUNCANT.CUIMPORTEMATERIALclavo 2 1/2 "kg0.7220$14.40clavo 4"kg0.420$8.00

subtotal$22.40MANO DE OBRAcua.(0.1)sob.+(1)of.alb. + (1)ayu.jor0.625887.82554.88750.1656.565.651510.6510.61311.57311.57887.82rend. 1.6 m3/ jor11.60.625subtotal554.8875EQUIPO Y HERRAMIENTAherramienta menor%3.00%554.8875$16.65

COSTO BASICOsuministro y habilitado de acero 1/4"kg0.68$24.67$16.78suministro y habilitado de acero 3/8"kg2.39$23.99$57.34sum y hab. De cimbra p/zapatam20.2$102.38$20.48sum. Yhab. De cimbra p/dadom20.8$213.62$170.89fabricad de concreto f'c= 200kg/cm2m20.1$1,351.10$135.11subtotal$400.60costo directo$994.53LIMPIEZA Y DESAPALME DEL TERRENO

CONCEPTOUNCANT.CUIMPORTEMATERIALESMANO DE OBRACUAD.: (.1)SOB. + (1) PEON =JOR0.004358.291.433160.1656.565.651292.64292.64REND= 250 M2/JOR12500.004EQUIPO Y HERRAMIENTAherramienta menor%3.00%1.433160.0429948COSTOS BASICOSFABRICAION DE PRETIL EN AZOTEA A BASE DE TABIQUE ROJO RECOCIDO 7X14X28CM JUNTEADO CON MORTERO CEMENTO-CAL-ARENA PROP. 1:1:5 HECHO A MANO INCLUYE MAT., M. DE O., EQ. Y HER. Y TRABAJOS NECESARIOS

CONCEPTOUNCANT.CUIMPORTEMATERIALtabique rojo recocido 7x14x28cmpza38.863.36130.5696MANO DE OBRAcua.(0.1)sob.+(1)of.alb. + (1)ayu.jor0.0142857143887.8212.68314285710.1656.565.651510.6510.61311.57311.57887.82rend. 70 m2/ jor1700.0142857143subtotal12.6831428571EQUIPO Y HERRAMIENTA%3.00%12.68314285710.3804942857herramienta menorsubtotal0.3804942857COSTOS BASICOfabr. de mort. cem-cal-arena 1:1:5m30.038897.2934.09702