CUADRO DE VAR.EJERCICIO N 01OBRA: CONSERVACION Y MEJORAS DE
TRAMOS DE COLECTORES DE AGUA SERVIDAS EN TUBERIAS DE PVC DE 8" A
40" DE DIAMETRO Y SUSTITUCION DE TROS DE ACUEDUCTOSCUADRO DE
VARIACION DE OBRA N 01PRESUPUESTO ORIGINALOBRAS
EXTRASAUMENTOSDISMINUCIONESMODIFICADO N 01N PARTIDADESCRIPCION DE
LA PARTIDAUNIDADCANTIDADP.UMONTO (Bs)CONTIDADMONTO (Bs)CANTIDAD
MONTOS (Bs)CANTIDADMONTO (Bs) CANTMONTO (Bs)1REPLANTEO
AUXILIARKM42773.24000.59706.343.59706.342DEMOLICION DE CONCRETO EN
ACERAS ESPM2112.6318.920052.63995.7596601135.23DEMOLICION DE
CONCRETO EN ACERAS ESPM2455.723.4100155.73644.93730070234DEMOLICION
DE CONCRETO EN CALZADASM210.418.91009.6181.53620378.25DEMOLICION DE
CONCRETO EN CALZADASM279.323.4100079.31856.4136DEMOLICION DE
CONCRETO EN CALZADASM2196.329.280096.32819.66410029287DEMOLICION DE
CONCRETO EN CALZADASM2130.0931.080030.09935.197210031088DEMOLICION
DE CONCRETO EN CALZADASM260.7235.440010.72379.91685017729DEMOLICION
DE CONCRETO EN ACERAS ESPM27.815.810012.2192.88220316.210DEMOLICION
DE CONCRETO EN ACERAS
ESPM21151.8918.0200448.118074.942216002883211DEMOLICION DE CONCRETO
EN ACERAS ESPM2488.3621.82000488.3610656.015212DEMOLICION DE
CONCRETO EN ACERAS
ESPM2285.5226.6600164.484385.03684501199713DEMOLICION DE CONCRETO
EN ACERAS ESPM21090.39300001090.3932711.714EXC. DE ZANJA A MAQ. EN
TIERRA CON PROFM310543.2628.3900010543.26299323.151415EXC. DE ZANJA
A MAQ. EN TIERRA CON M326.9225.78002473.0863756.002425006445016EXC.
DE ZANJA CON PROF ENTRE 0,00 Y
2,50M32072.16140.6800972.16136763.4688110015474817EXC. DE ZANJA A
MAQ. EN TIERRA A MANO CONM37.8194.920092.217971.6241001949218S.T.C
GRANZON, PREV, HUMEDECIDO YM3474583.590004745396634.5519S.T.C
GRANZON DE MATERIAL DE
PRESTAMOM3709.1599.400259.1525759.514504473020S.T.C ARENA DULCE,
COMPACTADAS CONM33152.8476.24002152.84164132.521610007624021S.T.C
ARENA DULCE, ESTABILIZADA CONM37.4297.740007.42725.230822S.T.C RDC
AUTONIVELMENTEM320.42344.82000.42144.8244206896.423S.T.C GRANZON
ESTABILIZADO CONM32145100.9200555550.6220022202424RELLENO COMP
MATERIALM3455.7317.0800494.278442.13169501622625RELLENO COMP.
HIDRAULICAMENTE CON MATM37.853.830007.8419.87426RELLENO COMP.
HIDRAULICAMENTE CON MATM36.561.310006.5398.51527BOTE SIN ARREGLO
(ENTRE 0-10KM)M312408.521.5100012408.5266906.83528COLOCACION DE
TUBERIA DE P.V.C
D=6"ML1016.6320.530083.371711.586111002258329COLOCACION DE TUBERIA
DE P.V.C D=6"ML2631.6726.530002631.6769818.205130COLOCACION DE
TUBERIA DE P.V.C D=6"ML1212.3328.7500212.336104.4875100028750SUB
TOTAL247029.8099214623.15811802785.8295IVA (0.00%)TOTAL EN
Bsf1802785.8
1
2
3
4
5
6
7
8
9
10
A
B
C
D
N PARTIDA
1
2
3
4
DEMOLICION DE CONCRETO EN ACERAS ESP
DEMOLICION DE CONCRETO EN ACERAS ESP
DEMOLICION DE CONCRETO EN CALZADAS
REPLANTEO AUXILIAR
DESCRIPCION DE LA PARTIDA
EJERCICIO N 01
OBRA: CONSERVACION Y MEJORAS DE TRAMOS DE COLECTORES DE AGUA
SERVIDAS EN TUBERIAS DE PVC DE 8" A 40" DE DIAMETRO Y SUSTITUCION
DE TROS DE ACUEDUCTOS
CUADRO DE VARIACION DE OBRA N 01