AGUA ALTERNATIVA 01DETALLE COSTO GG

COSTO DIRECTO 2,225,332.74 MANO DE OBRA CALIFICADA 276,913.31 27,691GASTOS GENERALES 333,675.29 MANO DE OBRA NO CALIFICADA 514,268 51,427UTILIDAD 222,533.27 MATERIALES 1,121,752.49 112,175

SUBCONTRATOS 84,615.00EQUIPOS 227,901.75 22,790

SUB TOTAL 2,781,541.30 2,225,450I.G.V. 500,677

TOTAL DE EJECUCION DE OBRA 3,282,219667599.822

791180.89

UTITLIDADES SUBTOTAL IGV TOTAL27,691 332,296 59,813 392,10951,427 617,121 111,082 728,203

112,175 1,346,103 242,299 1,588,402

22,790 273,482 49,227 322,7093,031,423

791180.89

AGUA ALTERNATIVA 02DETALLE COSTO GG

COSTO DIRECTO 1,180,117 MANO DE OBRA CALIFICADA 141,614 14,161GASTOS GENERALES 118,012 MANO DE OBRA NO CALIFICA 212,421 21,242UTILIDAD 118,012 MATERIALES 708,070 70,807

EQUIPOS 118,012 11,801SUB TOTAL 1,416,140 1,180,117I.G.V. 254,905

TOTOAL DE EJECUCION DE OBRA 1,671,046354035.1

354,035

UTITLIDADES SUBTOTAL IGV TOTAL14,161 169,937 30,589 200,52521,242 254,905 45,883 300,78870,807 849,684 152,943 1,002,62711,801 141,614 25,491 167,105

1,671,046

DESAGUE ALTERNATIVA 01DETALLE COSTO GG UTITLIDADES SUBTOTAL IGV TOTAL

COSTO DIRECTO 1,756,239 MANO DE OBRA CALIFICADA 210,749 21,075 21,075 252,898 45,522 298,420GASTOS GENERALES 175,624 MANO DE OBRA NO CALIFICA 316,123 31,612 31,612 379,348 68,283 447,630UTILIDAD 175,624 MATERIALES 1,053,743 105,374 105,374 1,264,492 227,609 1,492,100

EQUIPOS 175,624 17,562 17,562 210,749 37,935 248,683SUB TOTAL 2,107,486 1,756,239 2,486,834I.G.V. 379,348

TOTAL DE EJECUCION DE OBRA 2,486,834526871.568

DESAGUE ALTERNATIVA 02DETALLE COSTO GG

COSTO DIRECTO 1,972,543 MANO DE OBRA CALIFICADA 236,705 23,671GASTOS GENERALES 197,254 MANO DE OBRA NO CALIFICA 355,058 35,506UTILIDAD 197,254 MATERIALES 1,183,526 118,353

EQUIPOS 197,254 19,725SUB TOTAL 2,367,051 1,972,543I.G.V. 426,069

TOTOAL DE EJECUCION DE OBRA 2,793,120591762.75591762.75

UTITLIDADES SUBTOTAL IGV TOTAL23,671 284,046 51,128 335,17435,506 426,069 76,692 502,762

118,353 1,420,231 255,642 1,675,87219,725 236,705 42,607 279,312

2,793,120

COSTOS DE INVERSION ALTERNATIVA I A PRECIOS DE MERCADO COSTOS DE INVERSION ALTERNATIVA II A PRECIOS DE MERCADO

DETALLE MEDIDA CANTIDAD PRECIO TOTAL

EXPEDIENTE TECNICO Estudio 1 164,110.94 164,111 EXPEDIENTE TECNICO

COSTO DIRECTO 3,282,219 3,293,707 COSTO DIRECTO

Componente 1: Obras Civiles 3,282,219 3,282,219 Componente 1: Obras Civiles

Acción 1.1: Construcción de la infraestructura de agua Y DESAGUE 3,282,219 3,282,219

Obras civiles Glb 1 3,282,219 3,282,219 Obras civiles

Acción 1.2: Construcción de la infraestructura de desague 0 Acción 1.2: Construcción de la infraestructura de desague

Obras civiles Glb 1 0 0 Obras civiles

11,488

Acción 2.1: Talleres de Capacitación 11,488 Acción 2.1: Talleres de Capacitación

Educacion Sanitaria Glb 1 5,744 5,744 Educacion Sanitaria

Capacitacion JASS Glb 1 5,744 5,744 Capacitacion JASS

MONITOREO AMBIENTAL Glb 1 22,975.53 22,976 MONITOREO AMBIENTAL

SUPERVICION Glb 1 164,110.94 164,111 SUPERVICION

TOTAL PRESUPUESTO 3,633,416 3,644,904 TOTAL PRESUPUESTO

Fuente: Elaboración Propia. Fuente: Elaboración Propia.

Acción 1.1: Construcción de la infraestructura de agua Y DESAGUE

Componente 2: Capacitación al personal responsable la Operación y Mantenimiento

Componente 2: Capacitación al personal responsable la Operación y Mantenimiento

COSTOS DE INVERSION ALTERNATIVA II A PRECIOS DE MERCADO

MEDIDA CANTIDAD PRECIO TOTAL

Estudio 1 178,567 178,567

4,553,450

4,464,166

1,671,046

Glb 1 1,671,046 1,671,046

2,793,120

Glb 1 2,793,120 2,793,120

89,284

89,284

Glb 1 44,642 44,642

Glb 1 44,642 44,642

Glb 1 133,925 133,925

Glb 1 178,567 178,567

5,044,509

Cod. COMPONENTE / ACTIVIDAD

AVANCE FINANCIERO PROGRAMADO (Expresado en %)

TOTALAÑO 2016

1 EXPEDIENTE TECNICO 100 100

2 INSTALACIÓN DE AGUA 25 25 25 25 100

INSTALACION DE ALCANTARILLADO 25 25 25 25 100

3 CAPACITACIONES 50 50 100

5 MONITOREO AMBIENTAL 25 25 25 25 100

6 SUPERVISION 25 25 25 25 100

BIMESTRE 1

BIMESTRE 2

BIMESTRE 3

BIMESTRE 4

BIMESTRE 5

Cod. COMPONENTE / ACTIVIDAD

AVANCE FINANCIERO PROGRAMADO (Expresado en nuevos soles)

AÑO 2016

BIMESTRE 1 BIMESTRE 2 BIMESTRE 3 BIMESTRE 4 BIMESTRE 5

1 EXPEDIENTE TECNICO 164,111

2 INSTALACIÓN DE AGUA 820,555 820,555 820,555 820,555

INSTALACION DE ALCANTARILLADO 0 0 0 0

3 CAPACITACIONES 5,744 5,744

5 MONITOREO AMBIENTAL 5,744 5,744 5,744 5,744

6 SUPERVISION 41,028 41,028 41,028 41,028

TOTAL 164110.94 867,326 867,326 873,070 873,070

Avance mensual programado (%) 5% 24% 24% 24% 24%

Avance mensual progr. Acumulado (%) 5% 28% 52% 76% 100%

Fuente de financiamiento: Canon sobre canon

TOTAL

164,111

3,282,219

0

11,488

22,976

164,111

3,644,904

COSTOS DE INVERSION ALTERNATIVA I A PRECIOS SOCIALES

MED. CANT. PRECIO TOTAL

EXPEDIENTE TECNICO Estudio 1 164,111 164,111 0.909 149,177

COSTO DIRECTO 2,236,938 1,697,658

Componente 1: Obras Civiles 2,225,450 1,687,928

2,225,450 1,687,928

Materiales de construcción Glb 1 1,121,752 1,121,752 0.840 942,649

Equipos para la construcción Glb 1 227,902 227,902 0.840 191,514

Mano de obra calificada Glb 1 276,913 276,913 0.764 211,546

Mano de obra no calificada Glb 1 514,268 514,268 0.571 293,867

Subcontrats Glb 1 84,615 84,615 0.571 48,351

Acción 1.2: Construcción de la infraestructura de desague 0 0

Materiales de construcción Glb 1 0 0 0.840 0

Equipos para la construcción Glb 1 0 0 0.840 0

Mano de obra calificada Glb 1 0 0 0.764 0

Mano de obra no calificada Glb 1 0 0 0.571 0

11,488 9,730

Acción 2.1: Talleres de Capacitación 11,488 9,730

Educacion Sanitaria Glb 1 5,744 5,744 0.847 4,865

Capacitacion JASS Glb 1 5,744 5,744 0.847 4,865

MONITOREO AMBIENTAL Glb 1 22,976 22,976 0.909 20,885

SUPERVICION Glb 1 164,111 164,111 0.909 149,177

TOTAL PRESUPUESTO 2,588,135 2,016,896

Fuente: Elaboracion Propia.

1500

ALTERNATIVA AGUA

PRECIOS PRIVADOS Aumento en la Inversion Precios Privados

2,225,450 10% 20% 30% 40%

222,545 445,090 667,635 890,180

2,447,995 2,670,540 2,893,085 3,115,630

Disminución en la Inversion Precios Privados

10% 20% 30% 40%

222,545 445,090 667,635 890,180

2,002,905 1,780,360 1,557,815 1,335,270

PRECIOS SOCIALES Aumento en la Inversion Precios Sociales

1,687,928 10% 20% 30% 40%

168,793 337,586 506,378 675,171

1,856,720 2,025,513 2,194,306 2,363,099

FACTOR DE CORRECION

COSTOS A PRECIOS SOCIALES

Acción 1.1: Construcción de la infraestructura de agua Y DESAGUE

Componente 2: Capacitación al personal responsable la Operación y Mantenimiento

Disminución en la Inversion Precios Sociales

10% 20% 30% 40%

168,793 337,586 506,378 675,171

1,519,135 1,350,342 1,181,549 1,012,757

ALTERNATIVA DESAGUE

PRECIOS PRIVADOS Aumento en la Inversion Precios Privados

0 10% 20% 30% 40%

0 0 0 0

0 0 0 0

Disminución en la Inversion Precios Privados

10% 20% 30% 40%

0 0 0 0

0 0 0 0

PRECIOS SOCIALES Aumento en la Inversion Precios Sociales

0 10% 20% 30% 40%

0 0 0 0

0 0 0 0

Disminución en la Inversion Precios Sociales

10% 20% 30% 40%

0 0 0 0

0 0 0 0

COSTOS DE INVERSION ALTERNATIVA II A PRECIOS SOCIALES

MED. CANT. PRECIO TOTAL

EXPEDIENTE TECNICO Estudio 1 178,567 178,567 0.909

COSTO DIRECTO 9,352,829 4,553,450

Componente 1: Obras Civiles 4,464,166

1,671,046

Materiales de construcción Glb 1 1,002,627 1,002,627 0.840

Equipos para la construcción Glb 1 167,105 167,105 0.840

Mano de obra calificada Glb 1 200,525 200,525 0.764

Mano de obra no calificada Glb 1 300,788 300,788 0.571

Acción 1.2: Construcción de la infraestructura de desague 2,793,120

Materiales de construcción Glb 1 1,675,872 1,675,872 0.840

Equipos para la construcción Glb 1 279,312 279,312 0.840

Mano de obra calificada Glb 1 335,174 335,174 0.764

Mano de obra no calificada Glb 1 502,762 502,762 0.571

89,284

Acción 2.1: Talleres de Capacitación 89,284

Educacion Sanitaria Glb 1 44,642 44,642 0.847

Capacitacion JASS Glb 1 44,642 44,642 0.847

MONITOREO AMBIENTAL Glb 1 133,925 133,925 0.909

SUPERVICION Glb 1 178,567 178,567 0.909

TOTAL PRESUPUESTO 5,044,509

Fuente: Elaboracion Propia.

PRECIOS PRIVADOS 350000

1,671,046 750000

1100000

33000

PRECIOS SOCIALES

1,308,037

FACTOR DE CORRECION

Acción 1.1: Construcción de la infraestructura de agua Y DESAGUE

Componente 2: Capacitación al personal responsable la Operación y Mantenimiento

PRECIOS PRIVADOS

2,793,120

PRECIOS SOCIALES

2,186,358

COSTOS DE INVERSION ALTERNATIVA II A PRECIOS SOCIALES

162,317

3,570,018

3,494,395

1,308,037

842,544

140,424

153,190

171,879

2,186,358

1,408,296

234,716

256,054

287,293

75,624

75,624

37,812

37,812

121,738

162,317

4,016,391

COSTOS A PRECIOS SOCIALES

DETALLE AÑO 0 AÑO 1 AÑO 2 AÑO 3 AÑO 4 AÑO 5 AÑO 6 AÑO 7 AÑO 8

Numero de familias 1000 1012 1024 1036 1049 1061 1074 1087 1100

m3/mes 10.50 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63

Costo x m3 de agua 0.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

0.00 42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50

Beneficios por recursos liberados (S/./fam. / mes) 55 55 55 55 55 55 55 55 55

Beneficios brutos totales (S/. Fam/mes) 55.00 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50

BENEFICIOS BRUTOS AÑO (S/.) INCL. IGV 0.00 516,169 522,363 528,631 534,975 541,394 547,891 554,466 561,119

BENEFICIOS BRUTOS AÑO (S/.) SIN. IGV 0.00 437,431 442,680 447,992 453,368 458,809 464,314 469,886 475,525

Beneficios por incremento del consumo de agua (S/. Fam. Mes)

C6
AUTOR: ES LA MULTIPLICACION DEL COSTO M3 DE AGUA * CONSUMO DE AGUA POR FAMILIA
B7
AUTOR: DATO OBTENIDO DE CAMPO, ES EL COSTO PROMEDIO DE AGUA QUE COMPRAN

AÑO 9 AÑO 10 AÑO 11 AÑO 12 AÑO 13 AÑO 14 AÑO 15 AÑO 16 AÑO 17 AÑO 18 AÑO 19 AÑO 20

1113 1127 1140 1154 1168 1182 1196 1210 1225 1240 1254 1269

10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63 10.63

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50 42.50

55 55 55 55 55 55 55 55 55 55 55 55

12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50

567,853 574,667 581,563 588,542 595,604 602,751 609,984 617,304 624,712 632,208 639,795 647,472

481,231 487,006 492,850 498,764 504,749 510,806 516,936 523,139 529,417 535,770 542,199 548,705

11,589,462.60

9,821,578.47

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA AGUA - ALTERNATIVA 1

PARTIDA DESCRIPCIÓN CANT. UNID. MET.

COSTOS (S/.)

PARTIDAUNIT. (S/.) TOTAL (S/.)

1 OPERACIÓN 9,000.00 1

1.1 Personal de operación y mant.. 3 Mes 12 750.00 9,000.00 1.1

2 MANTENIMIENTO 10,900.00 2

2.1 Materiales y accesorios 1 Glb 1 1000 1,000.00 2.1

2.2 Vestuario 1 Glb 1 1500 1,500.00 2.2

2.3 Cloración mensual 1 Mes 12 500 6,000.00 2.3

2.4 Gastos Admministrativos 1 Mes 12 200 2,400.00 2.4

COSTO TOTAL S/. 19,900.00 COSTO TOTAL S/.

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA AGUA - ALTERNATIVA 2

PARTIDA

1

1.1

2

2.1

2.2

2.3

2.4

COSTO TOTAL S/.

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA AGUA - ALTERNATIVA 1

DESCRIPCIÓN CANT. UNID. MET.

COSTOS (S/.)

UNIT. (S/.) F.C.

OPERACIÓN 26,000 23,660

Personal de operación y mant.. 5 Mes 8 650 26,000 0.91 23,660

MANTENIMIENTO 39,000 32,760

Materiales y accesorios 1 Glb 1 10,000 10,000 0.84 8,400

Vestuario 1 Glb 1 5,000 5,000 0.84 4,200

Cloración mensual 1 Mes 12 1,000 12,000 0.84 10,080

Gastos Admministrativos 1 Mes 12 1,000 12,000 0.84 10,080

COSTO TOTAL S/. 65,000 56,420

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA AGUA - ALTERNATIVA 2

DESCRIPCIÓN CANT. UNID. MET.COSTOS (S/.)

UNIT. (S/.) F.C.

OPERACIÓN 129,600 117,936

Operador de mantenimiento 12 Mes 12 900 129,600 0.91 117,936

MANTENIMIENTO 44,000 36,960

Materiales y accesorios 1 Glb 1 15,000 15,000 0.84 12,600

Vestuario 1 Glb 1 5,000 5,000 0.84 4,200

Cloración mensual 1 Mes 12 1,000 12,000 0.84 10,080

Gastos Admministrativos 1 Mes 12 1,000 12,000 0.84 10,080

COSTO TOTAL S/. 173,600 154,896

PRECIOS DE MERCADO

PRCIOS SOCIALES

PRECIOS DE MERCADO

PRCIOS SOCIALES

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA ALCANTARILLADO COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA ALCANTARILLADO - ALTERNATIVA 1

PARTIDA DESCRIPCIÓN CANT. UNID. MET.

COSTOS (S/.)

PART.UNIT. (S/.) TOTAL (S/.)

1 OPERACIÓN 10,200.00 1

1.1 Personal de operación y mant.. 2 Mes 12 850.00 10,200.00 1.1

2 MANTENIMIENTO 4,900.00 2

2.1 Materiales y accesorios 1 Glb 1 1000 1,000.00 2.1

2.2 Vestuario 1 Glb 1 1500 1,500.00 2.2

2.3 Cloración mensual 1 Mes 12 0 0.00 2.3

2.4 Gastos Admministrativos 1 Mes 12 200 2,400.00 2.4

COSTO TOTAL S/. 15,100.00 COSTO TOTAL S/.

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA ALCANTARILLADO - ALTERNATIVA 2

PART.

1

1.1

2

2.1

2.2

2.3

2.4

COSTO TOTAL S/.

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA ALCANTARILLADO - ALTERNATIVA 1

DESCRIPCIÓN CANT. UNID. MET.

COSTOS (S/.)

F.C.

OPERACIÓN 43,200 39,312

Personal de operación y mant.. 4 Mes 12 900 43,200 0.91 39,312

MANTENIMIENTO 27,000 22,680

Materiales y accesorios 1 Glb 1 10,000 10,000 0.84 8,400

Vestuario 1 Glb 1 5,000 5,000 0.84 4,200

Cloración mensual 1 Mes 12 0 0 0.84 0

Gastos Admministrativos 1 Mes 12 1,000 12,000 0.84 10,080

COSTO TOTAL S/. 70,200 61,992

COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO PARA ALCANTARILLADO - ALTERNATIVA 2

DESCRIPCIÓN CANT. UNID. MET.COSTOS (S/.)

F.C.

OPERACIÓN 129,600 117,936

Operador de mantenimiento 12 Mes 12 900 129,600 0.91 117,936

MANTENIMIENTO 32,000 26,880

Materiales y accesorios 1 Glb 1 15,000 15,000 0.84 12,600

Vestuario 1 Glb 1 5,000 5,000 0.84 4,200

Cloración mensual 1 Mes 12 0 0 0.84 0

Gastos Admministrativos 1 Mes 12 1,000 12,000 0.84 10,080

COSTO TOTAL S/. 161,600 144,816

UNIT. (S/.)

PRECIOS DE MERCADO

PRCIOS SOCIALES

UNIT. (S/.)

PRECIOS DE MERCADO

PRCIOS SOCIALES

1

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

1 Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

1.2 Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

2 Costos de Mantenimiento 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

2.1 Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

2.2 Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

2.3 Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2.4 Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIO SOCIAL

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

1 Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

1.2 Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

2 Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

2.1 Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

2.2 Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

2.3 Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2.4 Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS PRIVADOS)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,282,218.73

1 Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

1.2 Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

2 Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

2.1 Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

2.2 Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

2.3 Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

2.4 Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS PRIVADOS)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

1 Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

1.2 Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

2 Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

2.1 Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

2.2 Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

2.3 Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

2.4 Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS SOCIALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

1 Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

1.2 Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

2 Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

2.1 Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

2.2 Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

2.3 Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

2.3 Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS SOCIALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

1 Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

1.2 Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

2 Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

2.1 Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

2.2 Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

2.3 Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

2.4 Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO, AGUA - ALTERNATIVA I (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 Inversion Total 2,225,450

1.1 Costos de Oper. Y Mant. Incrementales 45,100 45,100 45,100 45,100 45,100

2 Ingresos

2.1 Ingresos brutos por servicios de agua 516,169 522,363 528,631 534,975 541,394

2.2 Ingresos netos -2,225,450 471,069 477,263 483,531 489,875 496,294

3 Valor Actual de Costos (VACP) 2,481,482

4 Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II 0.00

FLUJO DE CAJA A PRECIO DE MERCADO, AGUA - ALTERNATIVA II (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 Inversion Total S/. 1,671,046

1.1 Costos de Oper. Y Mant. Incrementales 173,600 173,600 173,600 173,600 173,600

2 Ingresos

2.1 Ingresos brutos por servicios de agua 516,169 522,363 528,631 534,975 541,394

2.2 Ingresos netos S/. -1,671,046 342,569 348,763 355,031 361,375 367,794

3 Valor Actual de Costos (VAP) S/. 1,862,869

4 Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL DEL AGUA , ALTERNATIVA I (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 Inversion Total 1,687,928

1.1 Costos de Oper. Y Mant. Incrementales 39,074 43,190 43,190 43,190 43,190

2 Ingresos

2.1 Ingresos brutos por servicios de agua 437,431 442,680 447,992 453,368 458,809

2.2 Ingresos netos -1,687,928 398,357 399,490 404,802 410,178 415,619

3 Valor Actual de Costos (VACS) S/. 2,259,409

4 Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL, AGUA - ALTERNATIVA II (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 Inversion Total 1,308,037

1.1 Costos de Oper. Y Mant. Incrementales 154,896 154,896 154,896 154,896 154,896

2 Ingresos

2.1 Ingresos brutos por servicios de agua 437,431 442,680 447,992 453,368 458,809

2.2 Ingresos netos -1,308,037 282,535 287,784 293,096 298,472 303,913

3 Valor Actual de Costos (VACS) 1,615,810

4 Tasa Social de Descuento 9%

Analisis Costo - Beneficio del Proyecto de agua Alternativa I : Evaluacion Privada

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 MODULO DE INVERSION 2,225,450

2 Costos de operación y mantenmiento 65,000 65,000 65,000 65,000 65,000

3 Evaluación

3.1 COSTOS TOTALES -2,225,450 451,169 457,363 463,631 469,975 476,394

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

3.3 COSTOS ACTUALIZADOS (S/. 2,225,450) 413,916 384,953 358,008 332,942 309,624

3.4 VANP S/. 2,299,824

VANP S/. 2,299,824

3.5 TIR 11%

3.6 NUMERO DE BENEFICIARIOS 1000

3.7 C/B 1.03

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Beneficio del Proyecto de agua, Alternativa II : Evaluacion Privada

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 MODULO DE INVERSION 1,308,037

2 Costos de operación y mantenmiento 173,600 173,600 173,600 173,600 173,600

3 Evaluación

3.1 COSTOS TOTALES -1,308,037 342,569 348,763 355,031 361,375 367,794

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

3.3 COSTOS ACTUALIZADOS -1,308,037 314,283 293,547 274,149 256,007 239,041

3.4 VANP 2,225,878

VANP 2,225,878

3.5 TIR 17%

3.6 NUMERO DE BENEFICIARIOS 1000

3.7 C/B 1.70

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Beneficio del Proyecto del agua, Alternativa I : Evaluación Social

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 MODULO DE INVERSION 1,687,928

2 Costos de operación y mantenmiento 56,420 56,420 56,420 56,420 56,420

3 Evaluación

3.1 COSTOS TOTALES -1,687,928 381,011 386,260 391,572 396,948 402,389

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

3.3 COSTOS ACTUALIZADOS -1,687,928 349,551 325,107 302,366 281,208 261,525

3.4 VANS S/. 2,134,861.86

VANS S/. 2,134,861.86

3.5 TIR 13%

3.6 NUMERO DE BENEFICIARIOS 1000

3.7 C/B 1.26

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Beneficio del Proyecto del agua, Alternativa II : Evaluación Social

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

1 MODULO DE INVERSION 1,308,037

2 Costos de operación y mantenmiento 154,896 154,896 154,896 154,896 154,896

3 Evaluación

3.1 COSTOS TOTALES -1,308,037 282,535 287,784 293,096 298,472 303,913

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

3.3 COSTOS ACTUALIZADOS -1,308,037 259,206 242,222 226,324 211,445 197,522

3.4 VANS 1,615,810

3.5 TIR 13%

3.6 NUMERO DE BENEFICIARIOS 1000

3.7 C/B 1.24

3.8 TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CB CB CB

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos 1.01 1.23 0.98 1.00 0.95 0.97

Aumentos de los costos de inversión 0.85 0.87 0.69 0.72 0.56 0.59

Aumento del número de beneficiarios 0.85 1.12 0.85 1.06 0.85 1.06

Fuente: Elaboración Propia

El índice de coeficiente de efectividad ante la variación del 10, 20, 30 % de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CB CB CB

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1.06 1.09 1.09 1.12 1.11 1.15

Disminución de los costos de inversión 1.26 1.29 1.54 1.58 1.90 1.94

Disminución del número de beneficiarios 1.03 1.06 1.03 1.06 1.03 1.06

Fuente: Elaboración Propia

El índice de coeficiente de efectividad ante la variación del 10, 20, 30 % de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

INDICADORES DE EVALUACION SOCIAL

INDICADORES DE EVALUACION ALTERNATIVA I ALTERNATIVA II FACTOR DE CORRECCION 9%

VACS S/. 2,134,862 S/. 1,615,810

PA 1000 1000

CB 1.26 1.24

COSTOSAÑOS

Año 1 Año 2 Año 3 Año 4 Año 5

SIN PROYECTO Costos de Operación 9,000 9,000 9,000 9,000 9,000

Costos de Mantenim 10,900 10,900 10,900 10,900 10,900

CON PROYECTO Costos de Operación 26,000 26,000 26,000 26,000 26,000

Costos de Mantenim 39,000 39,000 39,000 39,000 39,000

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO, AGUA - ALTERNATIVA I (COSTOS INCREMENTALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100

547,891 554,466 561,119 567,853 574,667 581,563 588,542 595,604 602,751 609,984

502,791 509,366 516,019 522,753 529,567 536,463 543,442 550,504 557,651 564,884

FLUJO DE CAJA A PRECIO DE MERCADO, AGUA - ALTERNATIVA II (COSTOS INCREMENTALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600

547,891 554,466 561,119 567,853 574,667 581,563 588,542 595,604 602,751 609,984

374,291 380,866 387,519 394,253 401,067 407,963 414,942 422,004 429,151 436,384

FLUJO DE CAJA A PRECIO SOCIAL DEL AGUA , ALTERNATIVA I (COSTOS INCREMENTALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

43,190 43,190 43,190 43,190 43,190 43,190 43,190 43,190 43,190 43,190

464,314 469,886 475,525 481,231 487,006 492,850 498,764 504,749 510,806 516,936

421,124 426,696 432,335 438,041 443,816 449,660 455,574 461,559 467,616 473,746

FLUJO DE CAJA A PRECIO SOCIAL, AGUA - ALTERNATIVA II (COSTOS INCREMENTALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896

464,314 469,886 475,525 481,231 487,006 492,850 498,764 504,749 510,806 516,936

309,418 314,990 320,629 326,335 332,110 337,954 343,868 349,853 355,910 362,040

Analisis Costo - Beneficio del Proyecto de agua Alternativa I : Evaluacion Privada

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000 65,000

482,891 489,466 496,119 502,853 509,667 516,563 523,542 530,604 537,751 544,984

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299 0.275

287,932 267,754 248,986 231,527 215,289 200,185 186,137 173,072 160,920 149,619

Analisis Costo - Beneficio del Proyecto de agua, Alternativa II : Evaluacion Privada

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600 173,600

374,291 380,866 387,519 394,253 401,067 407,963 414,942 422,004 429,151 436,384

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299 0.275

223,177 208,347 194,483 181,525 169,415 158,099 147,526 137,649 128,422 119,804

Analisis Costo - Beneficio del Proyecto del agua, Alternativa I : Evaluación Social

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

56,420 56,420 56,420 56,420 56,420 56,420 56,420 56,420 56,420 56,420

407,894 413,466 419,105 424,811 430,586 436,430 442,344 448,329 454,386 460,516

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299 0.275

243,214 226,180 210,335 195,595 181,884 169,131 157,269 146,235 135,973 126,429

Analisis Costo - Beneficio del Proyecto del agua, Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896 154,896

309,418 314,990 320,629 326,335 332,110 337,954 343,868 349,853 355,910 362,040

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299 0.275

184,496 172,310 160,913 150,254 140,287 130,968 122,257 114,115 106,505 99,394

40%

CB

PRIVADO SOCIAL

0.93 0.94 C/B SOCIAL 1.010.45 0.47 1.26 0.251.03 1.06 1.52

40%

CB

PRIVADO SOCIAL

1.14 1.18

2.39 2.43

1.03 1.06

400

12000

90000

90

AÑOS

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14 Año 15

9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000 9,000

10,900 10,900 10,900 10,900 10,900 10,900 10,900 10,900 10,900 10,900

26,000 26,000 26,000 26,000 26,000 26,000 26,000 26,000 26,000 26,000

39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000 39,000

2

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

45,100 45,100 45,100 45,100 45,100 1.1

2

617,304 624,712 632,208 639,795 647,472 2.1

572,204 579,612 587,108 594,695 602,372 2.2

3

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

173,600 173,600 173,600 173,600 173,600 1.1

2

617,304 624,712 632,208 639,795 647,472 2.1

443,704 451,112 458,608 466,195 473,872 2.2

3

4

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

43,190 43,190 43,190 43,190 43,190 1.1

2

523,139 529,417 535,770 542,199 548,705 2.1

479,949 486,227 492,580 499,009 505,515 2.2

3

4

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896 154,896 154,896 154,896 154,896 1.1

2

523,139 529,417 535,770 542,199 548,705 2.1

368,243 374,521 380,874 387,303 393,809 2.2

3

4

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

65,000 65,000 65,000 65,000 65,000

552,304 559,712 567,208 574,795 582,472

0.252 0.231 0.212 0.194 0.178

139,109 129,334 120,245 111,792 103,931

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

173,600 173,600 173,600 173,600 173,600

443,704 451,112 458,608 466,195 473,872

0.252 0.231 0.212 0.194 0.178

111,756 104,240 97,222 90,670 84,553

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420 56,420 56,420 56,420 56,420 2

3

466,719 472,997 479,350 485,779 492,285 3.1

0.252 0.231 0.212 0.194 0.178 3.2

117,552 109,297 101,619 94,479 87,839 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896 154,896 154,896 154,896 154,896 2

3

368,243 374,521 380,874 387,303 393,809 3.1

0.252 0.231 0.212 0.194 0.178 3.2

92,749 86,542 80,743 75,326 70,268 3.3

3.4

3.5

3.6

3.7

3.8

AÑOS

Año 16 Año 17 Año 18 Año 19 Año 20

9,000 9,000 9,000 9,000 9,000

10,900 10,900 10,900 10,900 10,900

26,000 26,000 26,000 26,000 26,000

39,000 39,000 39,000 39,000 39,000

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 3,282,218.73

Costos de Operación 28,600.00 28,600.00 28,600.00 28,600.00

Personal de operación y mant.. 28,600.00 28,600.00 28,600.00 28,600.00

Costos de Mantenimiento 42,900.00 42,900.00 42,900.00 42,900.00

Materiales y accesorios 11,000.00 11,000.00 11,000.00 11,000.00

Vestuario 5,500.00 5,500.00 5,500.00 5,500.00

Cloración mensual 13,200.00 13,200.00 13,200.00 13,200.00

Gastos Admministrativos 13,200.00 13,200.00 13,200.00 13,200.00

Total de Operación y Mantenimiento 71,500.00 71,500.00 71,500.00 71,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Operación 26,026.00 26,026.00 26,026.00 26,026.00

Personal de operación y mant.. 26,026.00 26,026.00 26,026.00 26,026.00

Costos de Mantenimiento 36,036.00 36,036.00 36,036.00 36,036.00

Materiales y accesorios 9,240.00 9,240.00 9,240.00 9,240.00

Vestuario 4,620.00 4,620.00 4,620.00 4,620.00

Cloración mensual 11,088.00 11,088.00 11,088.00 11,088.00

Gastos Admministrativos 11,088.00 11,088.00 11,088.00 11,088.00

Total de Operación y Mantenimiento 62,062.00 62,062.00 62,062.00 62,062.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 51,600.00 51,600.00 51,600.00 51,600.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52

Ingresos netos -2,225,450.13 464,568.58 470,762.60 477,030.95 483,374.52

Valor Actual de Costos (VACP) S/. 2,422,146.92

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52

Ingresos netos -1,671,045.67 374,468.58 380,662.60 386,930.95 393,274.52

Valor Actual de Costos (VAP) S/. 2,154,089.30

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 44,716.00 44,716.00 44,716.00 44,716.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24

Ingresos netos -1,687,927.63 392,715.00 397,964.17 403,276.33 408,652.24

Valor Actual de Costos (VACS) S/. 2,241,702.36

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24

Ingresos netos -1,308,036.83 299,881.00 305,130.17 310,442.33 315,818.24

Valor Actual de Costos (VACS) S/. 1,774,153.75

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 71,500.00 71,500.00 71,500.00 71,500.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 444,668.58 450,862.60 457,130.95 463,474.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -2,225,450.13 407,952.82 379,482.03 352,988.97 328,337.04

VANS S/. 2,240,488.86

VANS S/. 2,240,488.86

TIR 11%

NUMERO DE BENEFICIARIOS 1000

C/B 1.01

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 71,500.00 71,500.00 71,500.00 71,500.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 444,668.58 450,862.60 457,130.95 463,474.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 407,952.82 379,482.03 352,988.97 328,337.04

VANS S/. 3,157,902.15 3,157,902.15

TIR 24%

NUMERO DE BENEFICIARIOS 1000

NUMERO DE BENEFICIARIOS 2.41

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,687,927.63

Costos de operación y mantenmiento 1,687,927.63 62,062.00 62,062.00 62,062.00 62,062.00

Evaluación

COSTOS TOTALES -1,687,927.63 375,369.00 380,618.17 385,930.33 391,306.24

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,687,927.63 344,375.23 320,358.70 298,009.03 277,211.20

VANS S/. 2,083,358.61 2,083,358.61

VANS S/. 2,083,358.61

TIR 13%

NUMERO DE BENEFICIARIOS 1000

C/B 1.23

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES -1,308,036.83 282,535.00 287,784.17 293,096.33 298,472.24

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 259,206.42 242,222.18 226,324.14 211,445.26

VANS S/. 1,615,809.99 1,615,809.99

TIR 13% 0.901

NUMERO DE BENEFICIARIOS 1000

CE S/. 1,615.81

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Aumentos de costos operativos S/. 1.01 S/. 1.23

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00

28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00

42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00

11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00

5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00

13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00

13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00

26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00

36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00

9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00

4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00

11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00

11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00

62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00

541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15

489,794.22 496,290.95 502,865.64 509,519.23 516,252.66 523,066.89 529,962.89 536,941.65 544,004.15

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15

399,694.22 406,190.95 412,765.64 419,419.23 426,152.66 432,966.89 439,862.89 446,841.65 453,904.15

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00

458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28

414,092.66 419,598.36 425,170.13 430,808.77 436,515.06 442,289.84 448,133.91 454,048.11 460,033.28

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28

321,258.66 326,764.36 332,336.13 337,974.77 343,681.06 349,455.84 355,299.91 361,214.11 367,199.28

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

469,894.22 476,390.95 482,965.64 489,619.23 496,352.66 503,166.89 510,062.89 517,041.65 524,104.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

305,399.00 284,056.36 264,198.74 245,723.38 228,534.55 212,543.13 197,666.13 183,826.26 170,951.58

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

469,894.22 476,390.95 482,965.64 489,619.23 496,352.66 503,166.89 510,062.89 517,041.65 524,104.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

305,399.00 284,056.36 264,198.74 245,723.38 228,534.55 212,543.13 197,666.13 183,826.26 170,951.58

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00

396,746.66 402,252.36 407,824.13 413,462.77 419,169.06 424,943.84 430,787.91 436,702.11 442,687.28

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

257,858.11 239,849.94 223,093.77 207,503.02 192,997.08 179,500.87 166,944.47 155,262.76 144,395.14

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

303,912.66 309,418.36 314,990.13 320,628.77 326,335.06 332,109.84 337,953.91 343,868.11 349,853.28

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

197,522.37 184,496.06 172,310.39 160,912.77 150,253.73 140,286.78 130,968.24 122,257.05 114,114.67

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

C/E SOCIAL S/. 0.99

S/. 1.23 S/. 0.25

S/. 1.48

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

3

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 1

28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 28,600.00 2,600.00 1.2

42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 42,900.00 2

11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 1,000.00 2.1

5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 500.00 2.2

13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 1,200.00 2.3

13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 1,200.00 2.4

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 factor de correccion 1

26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 26,026.00 0.91 1.2

36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 36,036.00 factor de correccion 2

9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 0.84 2.1

4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 0.84 2.2

11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 0.84 2.3

11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 0.84 2.4

62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.4

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00 51,600.00

2

602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

551,151.39 558,384.41 565,704.22 573,111.88 580,608.42 588,194.92 595,872.46 2.2

3

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 141,700.00 141,666.00 141,666.00 141,666.00

602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46

461,051.39 468,284.41 475,604.22 483,011.88 490,542.42 498,128.92 505,806.46

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00 44,716.00

2

510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

466,090.27 472,219.94 478,423.17 484,700.84 491,053.85 497,483.08 503,989.47 2.2

3

4

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47

373,256.27 379,385.94 385,589.17 391,866.84 398,219.85 404,649.08 411,155.47

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

531,251.39 538,484.41 545,804.22 553,211.88 560,708.42 568,294.92 575,972.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

158,975.10 147,834.46 137,471.58 127,832.43 118,866.67 110,527.49 102,771.28

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00 71,500.00

531,251.39 538,484.41 545,804.22 553,211.88 560,708.42 568,294.92 575,972.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

158,975.10 147,834.46 137,471.58 127,832.43 118,866.67 110,527.49 102,771.28

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 62,062.00 2

3

448,744.27 454,873.94 461,077.17 467,354.84 473,707.85 480,137.08 486,643.47 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

134,285.14 124,880.20 116,131.40 107,993.17 100,423.10 93,381.70 86,832.23 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 2

3

355,910.27 362,039.94 368,243.17 374,520.84 380,873.85 387,303.08 393,809.47 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

106,504.89 99,393.74 92,749.32 86,541.72 80,742.87 75,326.45 70,267.77 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 3,282,218.73

Costos de Operación 31,200.00 31,200.00 31,200.00 31,200.00

Personal de operación y mant.. 31,200.00 31,200.00 31,200.00 31,200.00

Costos de Mantenimiento 46,800.00 46,800.00 46,800.00 46,800.00

Materiales y accesorios 12,000.00 12,000.00 12,000.00 12,000.00

Vestuario 6,000.00 6,000.00 6,000.00 6,000.00

Cloración mensual 14,400.00 14,400.00 14,400.00 14,400.00

Gastos Admministrativos 14,400.00 14,400.00 14,400.00 14,400.00

Total de Operación y Mantenimiento 78,000.00 78,000.00 78,000.00 78,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Operación 28,392.00 28,392.00 28,392.00 28,392.00

Personal de operación y mant.. 28,392.00 28,392.00 28,392.00 28,392.00

Costos de Mantenimiento 39,312.00 39,312.00 39,312.00 39,312.00

Materiales y accesorios 10,080.00 10,080.00 10,080.00 10,080.00

Vestuario 5,040.00 5,040.00 5,040.00 5,040.00

Cloración mensual 12,096.00 12,096.00 12,096.00 12,096.00

Gastos Admministrativos 12,096.00 12,096.00 12,096.00 12,096.00

Total de Operación y Mantenimiento 67,704.00 67,704.00 67,704.00 67,704.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 58,100.00 58,100.00 58,100.00 58,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52

Ingresos netos -2,225,450.13 458,068.58 464,262.60 470,530.95 476,874.52

Valor Actual de Costos (VACP) S/. 2,362,811.37

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 50,358.00 50,358.00 50,358.00 50,358.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24

Ingresos netos -1,687,927.63 387,073.00 392,322.17 397,634.33 403,010.24

Valor Actual de Costos (VACS) S/. 2,190,199.11

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 78,000.00 78,000.00 78,000.00 78,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 438,168.58 444,362.60 450,630.95 456,974.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -2,225,450.13 401,989.52 374,011.11 347,969.78 323,732.27

VANS S/. 2,181,153.31

S/. 2,181,153.31

TIR 11%

NUMERO DE BENEFICIARIOS 1000

C/B 0.98

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 78,000.00 78,000.00 78,000.00 78,000.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 438,168.58 444,362.60 450,630.95 456,974.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 401,989.52 374,011.11 347,969.78 323,732.27

VANS S/. 3,098,566.61 S/. 3,098,566.61

TIR 24%

NUMERO DE BENEFICIARIOS 1000

CE S/. 3,098.57

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,687,927.63

Costos de operación y mantenmiento 1,687,927.63 67,704.00 67,704.00 67,704.00 67,704.00

Evaluación

COSTOS TOTALES -1,687,927.63 369,727.00 369,727.00 369,727.00 369,727.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,687,927.63 339,199.08 311,191.82 285,497.08 261,923.93

VANS S/. 1,687,142.15 S/. 1,687,142.15

VANS S/. 1,687,142.15

TIR 11%

NUMERO DE BENEFICIARIOS 1000

C/B 1.00

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES -1,308,036.83 361,272.58 367,466.60 373,734.95 380,078.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 331,442.73 309,289.28 288,591.95 269,257.21

VANS S/. 2,396,617.96 S/. 2,396,617.96

TIR 18%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,396.62

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Aumentos de costos operativos S/. 0.98 S/. 1.00

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00

46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00

14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00

28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00

12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00

67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00

541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15

483,294.22 489,790.95 496,365.64 503,019.23 509,752.66 516,566.89 523,462.89 530,441.65 537,504.15

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00

458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28

408,450.66 413,956.36 419,528.13 425,166.77 430,873.06 436,647.84 442,491.91 448,406.11 454,391.28

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

463,394.22 469,890.95 476,465.64 483,119.23 489,852.66 496,666.89 503,562.89 510,541.65 517,604.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

301,174.45 280,180.62 260,643.02 242,461.25 225,541.77 209,797.46 195,147.16 181,515.28 168,831.42

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

463,394.22 469,890.95 476,465.64 483,119.23 489,852.66 496,666.89 503,562.89 510,541.65 517,604.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

301,174.45 280,180.62 260,643.02 242,461.25 225,541.77 209,797.46 195,147.16 181,515.28 168,831.42

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00

369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

240,297.18 220,456.13 202,253.33 185,553.51 170,232.58 156,176.68 143,281.36 131,450.79 120,597.05

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

386,498.22 392,994.95 399,569.64 406,223.23 412,956.66 419,770.89 426,666.89 433,645.65 440,708.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

251,197.32 234,330.05 218,578.28 203,869.74 190,136.72 177,315.76 165,347.44 154,176.09 143,749.59

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

S/. 0.00

S/. 0.00

S/. 0.00

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

4

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 1

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 5,200.00 1.2

46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 46,800.00 2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2,000.00 2.1

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 1,000.00 2.2

14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 2,400.00 2.3

14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 14,400.00 2,400.00 2.4

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 factor de correccion 1

28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 28,392.00 0.91 1.2

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 factor de correccion 2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.1

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.2

12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 0.84 2.3

12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 12,096.00 0.84

67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00 58,100.00

2

602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

544,651.39 551,884.41 559,204.22 566,611.88 574,108.42 581,694.92 589,372.46 2.2

3

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 141,700.00 141,666.00 141,666.00 141,666.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00 50,358.00

2

510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

460,448.27 466,577.94 472,781.17 479,058.84 485,411.85 491,841.08 498,347.47 2.2

3

4

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

524,751.39 531,984.41 539,304.22 546,711.88 554,208.42 561,794.92 569,472.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

157,030.00 146,049.96 135,834.43 126,330.45 117,488.72 109,263.31 101,611.48

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00 78,000.00

524,751.39 531,984.41 539,304.22 546,711.88 554,208.42 561,794.92 569,472.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

157,030.00 146,049.96 135,834.43 126,330.45 117,488.72 109,263.31 101,611.48

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 67,704.00 2

3

369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 369,727.00 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

110,639.50 101,504.13 93,123.05 85,433.99 78,379.81 71,908.08 65,970.72 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 2

3

447,855.39 455,088.41 462,408.22 469,815.88 477,312.42 484,898.92 492,576.46 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

134,019.14 124,939.08 116,466.65 108,561.85 101,187.24 94,307.83 87,890.86 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 3,282,218.73

Costos de Operación 33,800.00 33,800.00 33,800.00 33,800.00

Personal de operación y mant.. 33,800.00 33,800.00 33,800.00 33,800.00

Costos de Mantenimiento 50,700.00 50,700.00 50,700.00 50,700.00

Materiales y accesorios 13,000.00 13,000.00 13,000.00 13,000.00

Vestuario 6,500.00 6,500.00 6,500.00 6,500.00

Cloración mensual 15,600.00 15,600.00 15,600.00 15,600.00

Gastos Admministrativos 15,600.00 15,600.00 15,600.00 15,600.00

Total de Operación y Mantenimiento 84,500.00 84,500.00 84,500.00 84,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Operación 30,758.00 30,758.00 30,758.00 30,758.00

Personal de operación y mant.. 30,758.00 30,758.00 30,758.00 30,758.00

Costos de Mantenimiento 42,588.00 42,588.00 42,588.00 42,588.00

Materiales y accesorios 10,920.00 10,920.00 10,920.00 10,920.00

Vestuario 5,460.00 5,460.00 5,460.00 5,460.00

Cloración mensual 13,104.00 13,104.00 13,104.00 13,104.00

Gastos Admministrativos 13,104.00 13,104.00 13,104.00 13,104.00

Total de Operación y Mantenimiento 73,346.00 73,346.00 73,346.00 73,346.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 0.00 0.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 64,600.00 64,600.00 64,600.00 64,600.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52

Ingresos netos -2,225,450.13 451,568.58 457,762.60 464,030.95 470,374.52

Valor Actual de Costos (VACP) S/. 2,303,475.82

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 56,000.00 56,000.00 56,000.00 56,000.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24

Ingresos netos -1,687,927.63 381,431.00 386,680.17 391,992.33 397,368.24

Valor Actual de Costos (VACS) S/. 2,138,695.85

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 84,500.00 84,500.00 84,500.00 84,500.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 431,668.58 437,862.60 444,130.95 450,474.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -2,225,450.13 396,026.22 368,540.19 342,950.58 319,127.51

VANS S/. 2,121,817.76

S/. 2,121,817.76

TIR 10%

NUMERO DE BENEFICIARIOS 1000

C/B 0.95

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 84,500.00 84,500.00 84,500.00 84,500.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 431,668.58 437,862.60 444,130.95 450,474.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 396,026.22 368,540.19 342,950.58 319,127.51

VANS S/. 3,039,231.06 S/. 3,039,231.06

TIR 23%

NUMERO DE BENEFICIARIOS 1000

CE S/. 3,039.23

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,687,927.63

Costos de operación y mantenmiento 1,687,927.63 73,346.00 73,346.00 73,346.00 73,346.00

Evaluación

COSTOS TOTALES -1,687,927.63 364,085.00 364,085.00 364,085.00 364,085.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,687,927.63 334,022.93 306,443.06 281,140.42 257,926.99

VANS S/. 1,635,638.89 S/. 1,635,638.89

VANS S/. 1,635,638.89

TIR 11%

NUMERO DE BENEFICIARIOS 1000

C/B 0.97

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13

VANS S/. 2,308,262.48 S/. 2,308,262.48

TIR 19%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,308.26

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Aumentos de costos operativos S/. 0.95

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00

33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00

50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00

13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00

6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00

30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00

42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00

10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00

5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00

13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00

13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00

73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00

541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15

476,794.22 483,290.95 489,865.64 496,519.23 503,252.66 510,066.89 516,962.89 523,941.65 531,004.15

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00

458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28

402,808.66 408,314.36 413,886.13 419,524.77 425,231.06 431,005.84 436,849.91 442,764.11 448,749.28

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

456,894.22 463,390.95 469,965.64 476,619.23 483,352.66 490,166.89 497,062.89 504,041.65 511,104.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

296,949.89 276,304.88 257,087.30 239,199.12 222,548.99 207,051.79 192,628.20 179,204.31 166,711.26

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

456,894.22 463,390.95 469,965.64 476,619.23 483,352.66 490,166.89 497,062.89 504,041.65 511,104.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

296,949.89 276,304.88 257,087.30 239,199.12 222,548.99 207,051.79 192,628.20 179,204.31 166,711.26

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00

364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

236,630.27 217,091.99 199,166.96 182,721.98 167,634.85 153,793.44 141,094.90 129,444.86 118,756.75

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

396,578.22 403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

257,748.63 240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

S/. 0.97

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

5

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 1

33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 33,800.00 7,800.00 1.2

50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 50,700.00 2

13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 3,000.00 2.1

6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 1,500.00 2.2

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 3,600.00 2.3

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 3,600.00 2.4

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 factor de correccion 1

30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 30,758.00 0.91 1.2

42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 42,588.00 factor de correccion 2

10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 0.84 2.1

5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 0.84 2.2

13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 0.84 2.3

13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 13,104.00 0.84 2.4

73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

2.4

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00 64,600.00

2

602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

538,151.39 545,384.41 552,704.22 560,111.88 567,608.42 575,194.92 582,872.46 2.2

3

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 153,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00 56,000.00

2

510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

454,806.27 460,935.94 467,139.17 473,416.84 479,769.85 486,199.08 492,705.47 2.2

3

4

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

518,251.39 525,484.41 532,804.22 540,211.88 547,708.42 555,294.92 562,972.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

155,084.90 144,265.46 134,197.27 124,828.47 116,110.76 107,999.13 100,451.68

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00 84,500.00

518,251.39 525,484.41 532,804.22 540,211.88 547,708.42 555,294.92 562,972.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

155,084.90 144,265.46 134,197.27 124,828.47 116,110.76 107,999.13 100,451.68

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 73,346.00 2

3

364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 364,085.00 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

108,951.15 99,955.18 91,702.00 84,130.28 77,183.74 70,810.77 64,964.01 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

-144,816.00 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

-43,335.68 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,282,218.73

Costos de Operación 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00

Personal de operación y mant.. 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00

Costos de Mantenimiento 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00

Materiales y accesorios 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00

Vestuario 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

Cloración mensual 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Gastos Admministrativos 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Total de Operación y Mantenimiento 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00

Personal de operación y mant.. 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00

Costos de Mantenimiento 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00

Materiales y accesorios 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00

Vestuario 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

Cloración mensual 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00

Gastos Admministrativos 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00

Total de Operación y Mantenimiento 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,225,450.13 445,068.58 451,262.60 457,530.95 463,874.52 470,294.22

Valor Actual de Costos (VACP) S/. 2,244,140.28

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 375,789.00 381,038.17 386,350.33 391,726.24 397,166.66

Valor Actual de Costos (VACS) S/. 2,087,192.60

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 425,168.58 431,362.60 437,630.95 443,974.52 450,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 390,062.91 363,069.27 337,931.39 314,522.74 292,725.34

VANS S/. 2,062,482.22

S/. 2,062,482.22

TIR 10%

NUMERO DE BENEFICIARIOS 1000

C/B 0.93

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 425,168.58 431,362.60 437,630.95 443,974.52 450,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 390,062.91 363,069.27 337,931.39 314,522.74 292,725.34

VANS S/. 2,979,895.51 S/. 2,979,895.51

TIR 23%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,979.90

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,687,927.63

Costos de operación y mantenmiento 1,687,927.63 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00

Evaluación

COSTOS TOTALES -1,687,927.63 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 328,846.79 301,694.30 276,783.76 253,930.06 232,963.35

VANS S/. 1,584,135.64 S/. 1,584,135.64

VANS S/. 1,584,135.64

TIR 11%

NUMERO DE BENEFICIARIOS 1000

C/B 0.94

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES -1,308,036.83 361,272.58 367,466.60 373,734.95 380,078.52 386,498.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 331,442.73 309,289.28 288,591.95 269,257.21 251,197.32

VANS S/. 2,216,246.73 S/. 2,216,246.73

TIR 18%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,216.25

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00

36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00

54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00

14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00

33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00

45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00

11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00

14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00

78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

71,100.00 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

476,790.95 483,365.64 490,019.23 496,752.66 503,566.89 510,462.89 517,441.65 524,504.15 531,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

61,642.00 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

402,672.36 408,244.13 413,882.77 419,589.06 425,363.84 431,207.91 437,122.11 443,107.28 449,164.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

456,890.95 463,465.64 470,119.23 476,852.66 483,666.89 490,562.89 497,541.65 504,604.15 511,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

272,429.14 253,531.58 235,936.99 219,556.21 204,306.12 190,109.24 176,893.33 164,591.10 153,139.80

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

456,890.95 463,465.64 470,119.23 476,852.66 483,666.89 490,562.89 497,541.65 504,604.15 511,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

272,429.14 253,531.58 235,936.99 219,556.21 204,306.12 190,109.24 176,893.33 164,591.10 153,139.80

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00

358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

213,727.85 196,080.59 179,890.45 165,037.11 151,410.20 138,908.44 127,438.93 116,916.45 107,262.80

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

392,994.95 399,569.64 406,223.23 412,956.66 419,770.89 426,666.89 433,645.65 440,708.15 -154,896.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

234,330.05 218,578.28 203,869.74 190,136.72 177,315.76 165,347.44 154,176.09 143,749.59 -46,352.08

MAGNITUD

40%

CE

PRIVADO SOCIAL

S/. 0.93 S/. 0.94

MAGNITUD

40%

CE

PRIVADO SOCIAL

6

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 1

36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 36,400.00 10,400.00 1.2

54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 54,600.00 2

14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 4,000.00 2.1

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 2,000.00 2.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 4,800.00 2.3

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 4,800.00 3.3

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 factor de correccion 1

33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 33,124.00 0.91 1.2

45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 45,864.00 factor de correccion 2

11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 0.84 2.1

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 0.84 2.2

14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 0.84 2.3

14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 0.84 2.4

78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

71,100.00 71,100.00 71,100.00 71,100.00 71,100.00 71,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

538,884.41 546,204.22 553,611.88 561,108.42 568,694.92 576,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 141,666.00 141,666.00 141,666.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

61,642.00 61,642.00 61,642.00 61,642.00 61,642.00 61,642.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

455,293.94 461,497.17 467,774.84 474,127.85 480,557.08 487,063.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

518,984.41 526,304.22 533,711.88 541,208.42 548,794.92 556,472.46

0.275 0.252 0.231 0.212 0.194 0.178

142,480.96 132,560.12 123,326.50 114,732.80 106,734.94 99,291.88

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

91,000.00 91,000.00 91,000.00 91,000.00 91,000.00 91,000.00

518,984.41 526,304.22 533,711.88 541,208.42 548,794.92 556,472.46

0.275 0.252 0.231 0.212 0.194 0.178

142,480.96 132,560.12 123,326.50 114,732.80 106,734.94 99,291.88

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 78,988.00 2

3

358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 358,443.00 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

98,406.24 90,280.95 82,826.56 75,987.67 69,713.46 63,957.30 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 2

3

455,088.41 462,408.22 469,815.88 477,312.42 484,898.92 492,576.46 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

124,939.08 116,466.65 108,561.85 101,187.24 94,307.83 87,890.86 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,856,720.39 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,124,412.85

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,077,279.39

S/. 2,077,279.39

TIR 9%

NUMERO DE BENEFICIARIOS 1000

CE 0.85

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 3,217,237.70 S/. 3,217,237.70

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 3,217.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,856,720.39

Costos de operación y mantenmiento 1,856,720.39 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -1,856,720.39 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,856,720.39 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,621,355.89 S/. 1,621,355.89

VANS S/. 1,621,355.89

TIR 10%

NUMERO DE BENEFICIARIOS 1000

C/B 0.87

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES -1,308,036.83 361,272.58 367,466.60 373,734.95 380,078.52 386,498.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 331,442.73 309,289.28 288,591.95 269,257.21 251,197.32

VANS S/. 2,216,246.73 S/. 2,216,246.73

TIR 18%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,216.25

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión S/. 0.85 S/. 0.87

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

392,994.95 399,569.64 406,223.23 412,956.66 419,770.89 426,666.89 433,645.65 440,708.15 -154,896.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

234,330.05 218,578.28 203,869.74 190,136.72 177,315.76 165,347.44 154,176.09 143,749.59 -46,352.08

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

7

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.4

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 141,666.00 141,666.00 141,666.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 2

3

455,088.41 462,408.22 469,815.88 477,312.42 484,898.92 492,576.46 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

124,939.08 116,466.65 108,561.85 101,187.24 94,307.83 87,890.86 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,670,540.16

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,025,513.15

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,670,540.16

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52

Ingresos netos -2,670,540.16 471,068.58 477,262.60 483,530.95 489,874.52

Valor Actual de Costos (VACP) S/. 2,036,392.44

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 2,025,513.15

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24

Ingresos netos -2,025,513.15 398,357.00 403,606.17 408,918.33 414,294.24

Valor Actual de Costos (VACS) S/. 1,955,620.09

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 2,670,540.16

II. Costos de operación y mantenmiento 2,670,540.16 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,670,540.16 451,168.58 457,362.60 463,630.95 469,974.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -2,670,540.16 413,916.12 384,952.95 358,008.16 332,941.80

VANS S/. 1,854,734.38

S/. 1,854,734.38

TIR 8%

NUMERO DE BENEFICIARIOS 1000

CE 0.69

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80

VANS S/. 3,217,237.70 S/. 3,217,237.70

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 3,217.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 2,025,513.15

Costos de operación y mantenmiento 2,025,513.15 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -2,025,513.15 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -2,025,513.15 349,551.37 320,689.33 294,210.40 269,917.80

VANS S/. 1,452,563.13 S/. 1,452,563.13

VANS S/. 1,452,563.13

TIR 8%

NUMERO DE BENEFICIARIOS 1000

C/B 0.72

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES -1,308,036.83 361,272.58 367,466.60 373,734.95 380,078.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708

COSTOS ACTUALIZADOS -1,308,036.83 331,442.73 309,289.28 288,591.95 269,257.21

VANS S/. 2,216,246.73 S/. 2,216,246.73

TIR 18%

NUMERO DE BENEFICIARIOS 1000

CE S/. 2,216.25

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Aumentos de costos operativos

Aumentos de los costos de inversión S/. 0.69 S/. 0.72

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15

496,294.22 502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28

419,734.66 425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 5 Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

386,498.22 392,994.95 399,569.64 406,223.23 412,956.66 419,770.89 426,666.89 433,645.65 440,708.15

0.650 0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326

251,197.32 234,330.05 218,578.28 203,869.74 190,136.72 177,315.76 165,347.44 154,176.09 143,749.59

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

MAGNITUD

30% 40%

CE CE

SOCIAL PRIVADO SOCIAL

8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

557,651.39 564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 153,700.00 141,666.00 141,666.00 141,666.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

471,732.27 477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.299 0.275 0.252 0.231 0.212 0.194 0.178

160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 2

3

-154,896.00 455,088.41 462,408.22 469,815.88 477,312.42 484,898.92 492,576.46 3.1

0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

-46,352.08 124,939.08 116,466.65 108,561.85 101,187.24 94,307.83 87,890.86 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,893,085.17

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,194,305.92

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,194,305.92

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,194,305.92 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 1,786,827.33

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,893,085.17

II. Costos de operación y mantenmiento 2,893,085.17 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,893,085.17 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,893,085.17 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,632,189.37

S/. 1,632,189.37

TIR 6%

NUMERO DE BENEFICIARIOS 1000

CE 0.56

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 1,744.40

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 2,194,305.92

Costos de operación y mantenmiento 2,194,305.92 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -2,194,305.92 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,194,305.92 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,283,770.37

VANS S/. 1,283,770.37

TIR 7%

NUMERO DE BENEFICIARIOS 1000

C/B 0.59

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES 1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 2,412,840.65

TIR 19%

NUMERO DE BENEFICIARIOS 4095

CE S/. 589.22

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión 1 1

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

9

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.275 0.252 0.231 0.212 0.194 0.178 3.2

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,115,630.18

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,363,098.68

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,363,098.68

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,363,098.68 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 1,618,034.56

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 3,115,630.18

II. Costos de operación y mantenmiento 3,115,630.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -3,115,630.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -3,115,630.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,409,644.35

S/. 1,409,644.35

TIR 5%

NUMERO DE BENEFICIARIOS 1000

CE 0.45

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 1,744.40

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 2,363,098.68

Costos de operación y mantenmiento 2,363,098.68 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -2,363,098.68 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,363,098.68 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,114,977.60

VANS S/. 1,114,977.60

TIR 6%

NUMERO DE BENEFICIARIOS 1500

C/B 0.47

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

MODULO DE INVERSION 1,308,036.83

Costos de operación y mantenmiento 1,308,036.83 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

Evaluación

COSTOS TOTALES 1,308,036.83 361,272.58 367,466.60 373,734.95 380,078.52 386,498.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 331,442.73 309,289.28 288,591.95 269,257.21 251,197.32

VANS S/. 2,497,258.76

TIR 18%

NUMERO DE BENEFICIARIOS 4095

CE S/. 609.83

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

392,994.95 399,569.64 406,223.23 412,956.66 419,770.89 426,666.89 433,645.65 440,708.15 -154,896.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

234,330.05 218,578.28 203,869.74 190,136.72 177,315.76 165,347.44 154,176.09 143,749.59 -46,352.08

MAGNITUD

40%

CE

PRIVADO SOCIAL

0.45 0

MAGNITUD

40%

CE

PRIVADO SOCIAL

10

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 36,960.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 141,666.00 141,666.00 141,666.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

137,550.00 137,550.00 137,550.00 137,550.00 137,550.00 137,550.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

154,896.00 154,896.00 154,896.00 154,896.00 154,896.00 154,896.00

455,088.41 462,408.22 469,815.88 477,312.42 484,898.92 492,576.46

0.275 0.252 0.231 0.212 0.194 0.178

124,939.08 116,466.65 108,561.85 101,187.24 94,307.83 87,890.86

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 408,437.00 413,686.17 418,998.33 424,374.24 429,814.66

Valor Actual de Costos (VACS) S/. 2,056,252.77

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,077,279.39

S/. 2,077,279.39

TIR 9%

NUMERO DE BENEFICIARIOS 1600 100

CB 0.85

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 1,744.40

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31

VANS S/. 1,882,164.40

VANS S/. 1,882,164.40

TIR 13%

NUMERO DE BENEFICIARIOS 1,600 100

C/B 1.12

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 2,412,840.65

TIR 19%

NUMERO DE BENEFICIARIOS 1500

CE 1,608.56

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

28,994.00 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

435,320.36 440,892.13 446,530.77 452,237.06 458,011.84 463,855.91 469,770.11 475,755.28 481,812.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

233,194.78 213,940.17 196,275.38 180,069.16 165,201.06 151,560.61 139,046.43 127,565.53 117,032.60

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

11

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

28,994.00 28,994.00 28,994.00 28,994.00 28,994.00 28,994.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

487,941.94 494,145.17 500,422.84 506,775.85 513,205.08 519,711.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.275 0.252 0.231 0.212 0.194 0.178

107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 1,964,237.03

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,077,279.39

S/. 2,077,279.39

TIR 9%

NUMERO DE BENEFICIARIOS 1700 200

CB 0.85

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 1000

CE S/. 1,744.40

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,700 200

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 2,412,840.65

TIR 19%

NUMERO DE BENEFICIARIOS 4095

CE 589.22

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

12

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 1,964,237.03

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,077,279.39

S/. 2,077,279.39

TIR 9%

NUMERO DE BENEFICIARIOS 1800 300

CB 0.85

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 4905

CE S/. 355.64

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,800 300

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 2,412,840.65

TIR 19%

NUMERO DE BENEFICIARIOS 4095

CE 589.22

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00 153,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

13

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 44,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

173,600.00 173,600.00 173,600.00 173,600.00 173,600.00 173,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

153,700.00 153,700.00 153,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,447,995.14 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,258,937.45

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 1,964,237.03

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,299,824.40

S/. 2,299,824.40

TIR 11%

NUMERO DE BENEFICIARIOS 1900 400

CB 1.03

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 1,744,396.61

TIR 25%

NUMERO DE BENEFICIARIOS 4905

CE S/. 355.64

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,900 400

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,308,036.83

II. Costos de operación y mantenmiento 1,308,036.83 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 1,308,036.83 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,308,036.83 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 2,412,840.65

TIR 19%

NUMERO DE BENEFICIARIOS 4095

CE 589.22

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

1 1

MAGNITUD

40%

CE

PRIVADO SOCIAL

14

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

Personal de operación y mant.. 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

Costos de Mantenimiento 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00

Materiales y accesorios 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Vestuario 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00

Cloración mensual 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00

10,800.00 10,800.00 10,800.00 10,800.00 10,800.00

Total de Operación y Mantenimiento 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00

Personal de operación y mant.. 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00

Costos de Mantenimiento 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00

Materiales y accesorios 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00

Vestuario 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00

Cloración mensual 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00

9,072.00 9,072.00 9,072.00 9,072.00 9,072.00

Total de Operación y Mantenimiento 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Oper. Y Mant. Incrementales 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -3,644,903.91 477,568.58 483,762.60 490,030.95 496,374.52 502,794.22

Valor Actual de Costos (VACP) S/. 1,121,364.23

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 403,999.00 409,248.17 414,560.33 419,936.24 425,376.66

Valor Actual de Costos (VACS) S/. 2,015,740.28

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 457,668.58 463,862.60 470,130.95 476,474.52 482,894.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 419,879.43 390,423.87 363,027.35 337,546.56 313,848.11

VANS S/. 2,359,159.95

S/. 2,359,159.95

TIR 11%

NUMERO DE BENEFICIARIOS 4905

CB 1.06

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 457,668.58 463,862.60 470,130.95 476,474.52 482,894.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 419,879.43 390,423.87 363,027.35 337,546.56 313,848.11

VANS S/. 5,117,916.31

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,043.41

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 354,727.52 325,438.09 298,567.06 273,914.73 251,297.92

VANS S/. 1,841,651.91

VANS S/. 1,841,651.91

TIR 12%

NUMERO DE BENEFICIARIOS 4095

C/B 1.09

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1% 0.901

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mues

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1 1

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mues

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00

10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00

10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00

21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00

29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00

7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00

3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00

9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00

9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00

50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

38,600.00 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

509,290.95 515,865.64 522,519.23 529,252.66 536,066.89 542,962.89 549,941.65 557,004.15 564,151.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

33,432.00 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

430,882.36 436,454.13 442,092.77 447,799.06 453,573.84 459,417.91 465,332.11 471,317.28 477,374.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

489,390.95 495,965.64 502,619.23 509,352.66 516,166.89 523,062.89 530,041.65 537,104.15 544,251.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

291,807.83 271,310.19 252,247.64 234,520.11 218,034.47 202,704.05 188,448.21 175,191.90 162,865.31

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

489,390.95 495,965.64 502,619.23 509,352.66 516,166.89 523,062.89 530,041.65 537,104.15 544,251.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

291,807.83 271,310.19 252,247.64 234,520.11 218,034.47 202,704.05 188,448.21 175,191.90 162,865.31

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

386,653.00 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

230,548.55 211,512.43 194,048.10 178,025.78 163,326.40 149,840.74 137,468.57 126,117.95 115,704.54

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 457,935.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 137,035.55

MAGNITUD

40%

CE

PRIVADO SOCIAL

C/E SOCIAL S/. 0.10

S/. 0.12 S/. 0.02

S/. 0.15

MAGNITUD

40%

CE

PRIVADO SOCIAL

15

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 1

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 2,600.00 1.2

35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 35,100.00 2

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1,000.00 2.1

4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 500.00 2.2

10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 1,200.00 2.3

10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 10,800.00 1,200.00

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 factor de correccion 1

21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 21,294.00 0.91 1.2

29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 29,484.00 factor de correccion 2

7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 0.84 2.1

3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 0.84 2.2

9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 0.84 2.3

9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 9,072.00 0.84

50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

38,600.00 38,600.00 38,600.00 38,600.00 38,600.00 38,600.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

571,384.41 578,704.22 586,111.88 593,608.42 601,194.92 608,872.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

33,432.00 33,432.00 33,432.00 33,432.00 33,432.00 33,432.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

483,503.94 489,707.17 495,984.84 502,337.85 508,767.08 515,273.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

551,484.41 558,804.22 566,211.88 573,708.42 581,294.92 588,972.46

0.275 0.252 0.231 0.212 0.194 0.178

151,403.45 140,745.89 130,836.38 121,622.59 113,055.86 105,090.88

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

58,500.00 58,500.00 58,500.00 58,500.00 58,500.00 58,500.00

551,484.41 558,804.22 566,211.88 573,708.42 581,294.92 588,972.46

0.275 0.252 0.231 0.212 0.194 0.178

151,403.45 140,745.89 130,836.38 121,622.59 113,055.86 105,090.88

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

50,778.00 50,778.00 50,778.00 50,778.00 50,778.00 50,778.00

386,653.00 386,653.00 386,653.00 386,653.00 386,653.00 386,653.00

0.275 0.252 0.231 0.212 0.194 0.178

106,150.96 97,386.20 89,345.14 81,968.01 75,200.01 68,990.84

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Operación 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00

Personal de operación y mant.. 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00

Costos de Mantenimiento 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00

Materiales y accesorios 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00

Vestuario 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00

Cloración mensual 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00

9,600.00 9,600.00 9,600.00 9,600.00 9,600.00

Total de Operación y Mantenimiento 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Operación 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00

Personal de operación y mant.. 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00

Costos de Mantenimiento 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00

Materiales y accesorios 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00

Vestuario 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00

Cloración mensual 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00

8,064.00 8,064.00 8,064.00 8,064.00 8,064.00

Total de Operación y Mantenimiento 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 3,644,903.91

Costos de Oper. Y Mant. Incrementales 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -3,644,903.91 484,068.58 490,262.60 496,530.95 502,874.52 509,294.22

Valor Actual de Costos (VACP) S/. 1,180,699.77

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -2,016,896.21 409,641.00 414,890.17 420,202.33 425,578.24 431,018.66

Valor Actual de Costos (VACS) S/. 2,067,243.54

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 464,168.58 470,362.60 476,630.95 482,974.52 489,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 425,842.73 395,894.79 368,046.55 342,151.33 318,072.66

VANS S/. 2,418,495.50

S/. 2,418,495.50

TIR 12%

NUMERO DE BENEFICIARIOS 4905

CB 1.09

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 464,168.58 470,362.60 476,630.95 482,974.52 489,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 425,842.73 395,894.79 368,046.55 342,151.33 318,072.66

VANS S/. 5,063,480.02

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,032.31

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 359,903.67 330,186.85 302,923.72 277,911.67 254,964.83

VANS S/. 1,893,155.16

VANS S/. 1,893,155.16

TIR 13%

NUMERO DE BENEFICIARIOS 4095

C/B 1.12

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1 1

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00

20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00

8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00

4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00

9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00

9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00

18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00

26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00

6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00

3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00

8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00

8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00

45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

32,100.00 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

515,790.95 522,365.64 529,019.23 535,752.66 542,566.89 549,462.89 556,441.65 563,504.15 570,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

27,790.00 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

436,524.36 442,096.13 447,734.77 453,441.06 459,215.84 465,059.91 470,974.11 476,959.28 483,016.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

495,890.95 502,465.64 509,119.23 515,852.66 522,666.89 529,562.89 536,541.65 543,604.15 550,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

295,683.57 274,865.91 255,509.77 237,512.89 220,780.14 205,223.02 190,759.19 177,312.06 164,810.41

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

495,890.95 502,465.64 509,119.23 515,852.66 522,666.89 529,562.89 536,541.65 543,604.15 550,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

295,683.57 274,865.91 255,509.77 237,512.89 220,780.14 205,223.02 190,759.19 177,312.06 164,810.41

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

392,295.00 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

233,912.69 214,598.80 196,879.63 180,623.51 165,709.65 152,027.20 139,474.49 127,958.25 117,392.89

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

S/. 0.00

S/. 0.00

S/. 0.00

MAGNITUD

40%

CE

PRIVADO SOCIAL

16

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 1

20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 5,200.00 1.2

31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 31,200.00 2

8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 2,000.00 2.1

4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 4,000.00 1,000.00 2.2

9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 2,400.00 2.3

9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 9,600.00 2,400.00

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 factor de correccion 1

18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 18,928.00 0.91 1.2

26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 26,208.00 factor de correccion 2

6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 0.84 2.1

3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 3,360.00 0.84 2.2

8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 0.84 2.3

8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 8,064.00 0.84

45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

32,100.00 32,100.00 32,100.00 32,100.00 32,100.00 32,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

577,884.41 585,204.22 592,611.88 600,108.42 607,694.92 615,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

27,790.00 27,790.00 27,790.00 27,790.00 27,790.00 27,790.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

489,145.94 495,349.17 501,626.84 507,979.85 514,409.08 520,915.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

557,984.41 565,304.22 572,711.88 580,208.42 587,794.92 595,472.46

0.275 0.252 0.231 0.212 0.194 0.178

153,187.95 142,383.04 132,338.35 123,000.55 114,320.04 106,250.68

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

52,000.00 52,000.00 52,000.00 52,000.00 52,000.00 52,000.00

557,984.41 565,304.22 572,711.88 580,208.42 587,794.92 595,472.46

0.275 0.252 0.231 0.212 0.194 0.178

153,187.95 142,383.04 132,338.35 123,000.55 114,320.04 106,250.68

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,136.00 45,136.00 45,136.00 45,136.00 45,136.00 45,136.00

392,295.00 392,295.00 392,295.00 392,295.00 392,295.00 392,295.00

0.275 0.252 0.231 0.212 0.194 0.178

107,699.90 98,807.25 90,648.85 83,164.08 76,297.32 69,997.55

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00

Personal de operación y mant.. 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00

Costos de Mantenimiento 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00

Materiales y accesorios 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

Vestuario 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00

Cloración mensual 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Total de Operación y Mantenimiento 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00

Personal de operación y mant.. 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00

Costos de Mantenimiento 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00

Materiales y accesorios 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

Vestuario 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00

Cloración mensual 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00

7,056.00 7,056.00 7,056.00 7,056.00 7,056.00

Total de Operación y Mantenimiento 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,225,450.13 490,568.58 496,762.60 503,030.95 509,374.52 515,794.22

Valor Actual de Costos (VACP) S/. 2,659,489.10

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 415,283.00 420,532.17 425,844.33 431,220.24 436,660.66

Valor Actual de Costos (VACS) S/. 2,447,715.38

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 470,668.58 476,862.60 483,130.95 489,474.52 495,894.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 431,806.03 401,365.71 373,065.74 346,756.09 322,297.22

VANS S/. 2,477,831.04

S/. 2,477,831.04

TIR 12%

NUMERO DE BENEFICIARIOS 1500

CB 1.11

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 470,668.58 476,862.60 483,130.95 489,474.52 495,894.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 431,806.03 401,365.71 373,065.74 346,756.09 322,297.22

VANS S/. 5,009,043.74

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,021.21

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 365,079.81 334,935.61 307,280.37 281,908.60 258,631.74

VANS S/. 1,944,658.42

VANS S/. 1,944,658.42

TIR 13%

NUMERO DE BENEFICIARIOS 1500

C/B 1.15

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,772,082.96

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,165.34

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1 1

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00

18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00

27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00

16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00

22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00

7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00

7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00

39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

25,600.00 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

522,290.95 528,865.64 535,519.23 542,252.66 549,066.89 555,962.89 562,941.65 570,004.15 577,151.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

22,148.00 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

442,166.36 447,738.13 453,376.77 459,083.06 464,857.84 470,701.91 476,616.11 482,601.28 488,658.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

502,390.95 508,965.64 515,619.23 522,352.66 529,166.89 536,062.89 543,041.65 550,104.15 557,251.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

299,559.31 278,421.63 258,771.90 240,505.67 223,525.81 207,741.98 193,070.16 179,432.23 166,755.51

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

502,390.95 508,965.64 515,619.23 522,352.66 529,166.89 536,062.89 543,041.65 550,104.15 557,251.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

299,559.31 278,421.63 258,771.90 240,505.67 223,525.81 207,741.98 193,070.16 179,432.23 166,755.51

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

397,937.00 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

237,276.83 217,685.16 199,711.16 183,221.25 168,092.89 154,213.66 141,480.42 129,798.55 119,081.24

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

17

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 1

18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 18,200.00 7,800.00 1.2

27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 27,300.00 2

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 3,000.00 2.1

3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 3,500.00 1,500.00 2.2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 3,600.00 2.3

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 3,600.00

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 factor de correccion 1

16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 16,562.00 0.91 1.2

22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 22,932.00 factor de correccion 2

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 0.84 2.1

2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 2,940.00 0.84 2.2

7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 0.84 2.3

7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 7,056.00 0.84

39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

25,600.00 25,600.00 25,600.00 25,600.00 25,600.00 25,600.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

584,384.41 591,704.22 599,111.88 606,608.42 614,194.92 621,872.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

22,148.00 22,148.00 22,148.00 22,148.00 22,148.00 22,148.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

494,787.94 500,991.17 507,268.84 513,621.85 520,051.08 526,557.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

564,484.41 571,804.22 579,211.88 586,708.42 594,294.92 601,972.46

0.275 0.252 0.231 0.212 0.194 0.178

154,972.44 144,020.19 133,840.33 124,378.51 115,584.22 107,410.48

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,500.00 45,500.00 45,500.00 45,500.00 45,500.00 45,500.00

564,484.41 571,804.22 579,211.88 586,708.42 594,294.92 601,972.46

0.275 0.252 0.231 0.212 0.194 0.178

154,972.44 144,020.19 133,840.33 124,378.51 115,584.22 107,410.48

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,494.00 39,494.00 39,494.00 39,494.00 39,494.00 39,494.00

397,937.00 397,937.00 397,937.00 397,937.00 397,937.00 397,937.00

0.275 0.252 0.231 0.212 0.194 0.178

109,248.84 100,228.30 91,952.57 84,360.15 77,394.64 71,004.25

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

Personal de operación y mant.. 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

Costos de Mantenimiento 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

Materiales y accesorios 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Vestuario 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00

Cloración mensual 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00

7,200.00 7,200.00 7,200.00 7,200.00 7,200.00

Total de Operación y Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00

Personal de operación y mant.. 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00

Costos de Mantenimiento 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00

Materiales y accesorios 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Vestuario 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00

Cloración mensual 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00

6,048.00 6,048.00 6,048.00 6,048.00 6,048.00

Total de Operación y Mantenimiento 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,225,450.13 497,068.58 503,262.60 509,530.95 515,874.52 522,294.22

Valor Actual de Costos (VACP) S/. 2,718,824.65

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 420,925.00 426,174.17 431,486.33 436,862.24 442,302.66

Valor Actual de Costos (VACS) S/. 2,499,218.63

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 477,168.58 483,362.60 489,630.95 495,974.52 502,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 437,769.34 406,836.63 378,084.93 351,360.86 326,521.77

VANS S/. 2,537,166.59

S/. 2,537,166.59

TIR 12%

NUMERO DE BENEFICIARIOS 1500

CB 1.14

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 477,168.58 483,362.60 489,630.95 495,974.52 502,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 437,769.34 406,836.63 378,084.93 351,360.86 326,521.77

VANS S/. 5,824,508.85

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,187.46

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 370,255.96 339,684.37 311,637.03 285,905.54 262,298.66

VANS S/. 1,996,161.67

VANS S/. 1,996,161.67

TIR 13%

NUMERO DE BENEFICIARIOS 1500

C/B 1.18

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00

7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00

7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00

14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00

19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00

6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00

6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00

33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

19,100.00 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

528,790.95 535,365.64 542,019.23 548,752.66 555,566.89 562,462.89 569,441.65 576,504.15 583,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

16,506.00 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

447,808.36 453,380.13 459,018.77 464,725.06 470,499.84 476,343.91 482,258.11 488,243.28 494,300.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

508,890.95 515,465.64 522,119.23 528,852.66 535,666.89 542,562.89 549,541.65 556,604.15 563,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

303,435.04 281,977.36 262,034.03 243,498.45 226,271.48 210,260.94 195,381.14 181,552.39 168,700.61

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

508,890.95 515,465.64 522,119.23 528,852.66 535,666.89 542,562.89 549,541.65 556,604.15 563,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

303,435.04 281,977.36 262,034.03 243,498.45 226,271.48 210,260.94 195,381.14 181,552.39 168,700.61

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

403,579.00 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,640.97 220,771.53 202,542.69 185,818.98 170,476.13 156,400.12 143,486.35 131,638.85 120,769.59

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

1 1

18

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 1

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 10,400.00 1.2

23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 23,400.00 2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 4,000.00 2.1

3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 2,000.00 2.2

7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 4,800.00 2.3

7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 7,200.00 4,800.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 factor de correccion 1

14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 14,196.00 0.91 1.2

19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 19,656.00 factor de correccion 2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.1

2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 2,520.00 0.84 2.2

6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 0.84 2.3

6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 6,048.00 0.84

33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

19,100.00 19,100.00 19,100.00 19,100.00 19,100.00 19,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

590,884.41 598,204.22 605,611.88 613,108.42 620,694.92 628,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

16,506.00 16,506.00 16,506.00 16,506.00 16,506.00 16,506.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

500,429.94 506,633.17 512,910.84 519,263.85 525,693.08 532,199.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

570,984.41 578,304.22 585,711.88 593,208.42 600,794.92 608,472.46

0.275 0.252 0.231 0.212 0.194 0.178

156,756.94 145,657.35 135,342.30 125,756.47 116,848.41 108,570.28

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

570,984.41 578,304.22 585,711.88 593,208.42 600,794.92 608,472.46

0.275 0.252 0.231 0.212 0.194 0.178

156,756.94 145,657.35 135,342.30 125,756.47 116,848.41 108,570.28

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

33,852.00 33,852.00 33,852.00 33,852.00 33,852.00 33,852.00

403,579.00 403,579.00 403,579.00 403,579.00 403,579.00 403,579.00

0.275 0.252 0.231 0.212 0.194 0.178

110,797.79 101,649.35 93,256.28 85,556.22 78,491.95 72,010.96

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,002,905.12

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,519,134.86

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,519,134.86

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,519,134.86 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,461,998.38

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,002,905.12

II. Costos de operación y mantenmiento 2,002,905.12 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,002,905.12 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,002,905.12 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,522,369.42

S/. 2,522,369.42

TIR 13%

NUMERO DE BENEFICIARIOS 1000

CB 1.26

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 1000

CE S/. 5,172.35

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,519,134.86

II. Costos de operación y mantenmiento 1,519,134.86 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,519,134.86 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,519,134.86 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,958,941.42

VANS S/. 1,958,941.42

TIR 14%

NUMERO DE BENEFICIARIOS 1500

C/B 1.29

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 1 1

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

19

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,780,360.10

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,350,342.10

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,350,342.10

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,350,342.10 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,630,791.14

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,780,360.10

II. Costos de operación y mantenmiento 1,780,360.10 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -1,780,360.10 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,780,360.10 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,744,914.43

S/. 2,744,914.43

TIR 16%

NUMERO DE BENEFICIARIOS 1500

CB 1.54

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,350,342.10

II. Costos de operación y mantenmiento 1,350,342.10 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,350,342.10 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,350,342.10 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 2,127,734.18

VANS S/. 2,127,734.18

TIR 17%

NUMERO DE BENEFICIARIOS 1500

C/B 1.58

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muest

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 2 2

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muest

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

20

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,557,815.09

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,181,549.34

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,557,815.09

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -1,557,815.09 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 3,149,117.50

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,181,549.34

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,181,549.34 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,799,583.90

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,557,815.09

II. Costos de operación y mantenmiento 1,557,815.09 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -1,557,815.09 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,557,815.09 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,967,459.44

S/. 2,967,459.44

TIR 19%

NUMERO DE BENEFICIARIOS 1500

CB 1.90

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 1500

CE S/. 3,448.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,181,549.34

II. Costos de operación y mantenmiento 1,181,549.34 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,181,549.34 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,181,549.34 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 2,296,526.94

VANS S/. 2,296,526.94

TIR 21%

NUMERO DE BENEFICIARIOS 1500

C/B 1.94

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mu

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 2 2

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mu

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

21

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,335,270.08

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,012,756.58

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,012,756.58

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,012,756.58 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,968,376.67

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,335,270.08

II. Costos de operación y mantenmiento 1,335,270.08 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -1,335,270.08 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,335,270.08 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 3,190,004.46

S/. 3,190,004.46

TIR 24%

NUMERO DE BENEFICIARIOS 1500

CB 2.39

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,012,756.58

II. Costos de operación y mantenmiento 1,012,756.58 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,012,756.58 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,012,756.58 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 2,465,319.71

VANS S/. 2,465,319.71

TIR 26%

NUMERO DE BENEFICIARIOS 1500

C/B 2.43

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

2 2

22

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,293,205.62

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,299,824.40

S/. 2,299,824.40

TIR 11%

NUMERO DE BENEFICIARIOS 1350 150

CB 1.03

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,400 100

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 1500

CE 3,265.05

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

23

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,293,205.62

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,299,824.40

S/. 2,299,824.40

TIR 11%

NUMERO DE BENEFICIARIOS 1300 200

CB 1.03

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,300 200

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

24

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -5,044,508.85 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. -337,576.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66

Ingresos netos -1,687,927.63 398,357.00 403,606.17 408,918.33 414,294.24 419,734.66

Valor Actual de Costos (VACS) S/. 2,293,205.62

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,299,824.40

S/. 2,299,824.40

TIR 11%

NUMERO DE BENEFICIARIOS 1200 300

CB 1.03

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,200 300

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 1 1

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

464,314.36 469,886.13 475,524.77 481,231.06 487,005.84 492,849.91 498,764.11 504,749.28 510,806.27

425,240.36 430,812.13 436,450.77 442,157.06 447,931.84 453,775.91 459,690.11 465,675.28 471,732.27

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

25

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

2

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46 2.2

3

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

2

516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,861.94 484,065.17 490,342.84 496,695.85 503,125.08 509,631.47 2.2

3

4

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

Total de Operación y Mantenimiento 17,346.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22

Ingresos netos -2,225,450.13 471,068.58 477,262.60 483,530.95 489,874.52 496,294.22

Valor Actual de Costos (VACP) S/. 2,481,482.46

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

Ingresos

Ingresos brutos por servicios de agua 0.00 0.00 0.00 0.00 0.00

Ingresos netos -1,687,927.63 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00

Valor Actual de Costos (VACS) S/. -2,044,616.42

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

Inversion Total 1,308,036.83

Costos de Oper. Y Mant. Incrementales 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,225,450.13 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -2,225,450.13 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 2,299,824.40

S/. 2,299,824.40

TIR 11%

NUMERO DE BENEFICIARIOS 1100 400

CB 1.03

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -5,044,508.85 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55

VANS S/. 5,172,352.59

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,054.51

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES -1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01

VANS S/. 1,790,148.66

VANS S/. 1,790,148.66

TIR 12%

NUMERO DE BENEFICIARIOS 1,100 400

C/B 1.06

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650

COSTOS ACTUALIZADOS -4,016,391.02 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63

VANS S/. 4,897,569.25

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,195.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30%

CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

547,890.95 554,465.64 561,119.23 567,852.66 574,666.89 581,562.89 588,541.65 595,604.15 602,751.39

502,790.95 509,365.64 516,019.23 522,752.66 529,566.89 536,462.89 543,441.65 550,504.15 557,651.39

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00 141,700.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

Periodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion PrivadaPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

482,890.95 489,465.64 496,119.23 502,852.66 509,666.89 516,562.89 523,541.65 530,604.15 537,751.39

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

287,932.09 267,754.47 248,985.51 231,527.33 215,288.80 200,185.09 186,137.23 173,071.74 160,920.20

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

227,184.41 208,426.06 191,216.57 175,428.05 160,943.16 147,654.28 135,462.64 124,277.65 114,016.19

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

Año 6 Año 7 Año 8 Año 9 Año 10 Año 11 Año 12 Año 13 Año 14

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

403,074.95 409,649.64 416,303.23 423,036.66 429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00

0.596 0.547 0.502 0.460 0.422 0.388 0.356 0.326 0.299

240,340.42 224,092.38 208,928.55 194,777.83 181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68

MAGNITUD

40%

CE

PRIVADO SOCIAL

MAGNITUD

40%

CE

PRIVADO SOCIAL

1 1

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

10,900.00 10,900.00 10,900.00 10,900.00 10,900.00 10,900.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

19,900.00 19,900.00 19,900.00 19,900.00 19,900.00 19,900.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91

9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 9,156.00 factor de correccion

840.00 840.00 840.00 840.00 840.00 840.00 0.84

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84

2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 2,016.00 0.84

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

45,100.00 45,100.00 45,100.00 45,100.00 45,100.00 45,100.00

609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46

564,884.41 572,204.22 579,611.88 587,108.42 594,694.92 602,372.46

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

141,700.00 141,700.00 141,700.00 131,586.00 131,586.00 131,586.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,074.00 39,074.00 39,074.00 39,074.00 39,074.00 39,074.00

0.00 0.00 0.00 0.00 0.00 0.00

-39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00 -39,074.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

127,470.00 127,470.00 127,470.00 127,470.00 127,470.00 127,470.00

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.275 0.252 0.231 0.212 0.194 0.178

149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.275 0.252 0.231 0.212 0.194 0.178

104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

Periodo

Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.275 0.252 0.231 0.212 0.194 0.178

127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

1

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

1 Costos de Operación 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00

1.2 Personal de operación y mant.. 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00

2 Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

2.1 Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

2.2 Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIO SOCIAL

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

1 Costos de Operación 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

1.2 Personal de operación y mant.. 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

2 Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

2.1 Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

2.2 Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 61,992.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS PRIVADOS)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

1 Costos de Operación 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00

1.2 Personal de operación y mant.. 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00

2 Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

2.1 Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

2.2 Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS PRIVADOS)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,793,120.18

1 Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

1.2 Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

2 Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

2.1 Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

2.2 Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS SOCIALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

1 Costos de Operación 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

1.2 Personal de operación y mant.. 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

2 Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

2.1 Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

2.2 Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.3 Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS SOCIALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

1 Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

1.2 Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

2 Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

2.1 Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

2.2 Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

2.3 Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.4 Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO, ALCANTARILLADO - ALTERNATIVA I (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 Inversion Total 0.00

1.1 Costos de Oper. Y Mant. Incrementales 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00

2 Ingresos

2.1 Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

2.2 Ingresos netos 0.00 445,968.58 452,162.60 458,430.95 464,774.52 471,194.22 477,690.95 484,265.64 490,919.23 497,652.66

3 Valor Actual de Costos (VACP) S/. 4,477,806.10

4 Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II 0.00

FLUJO DE CAJA A PRECIO DE MERCADO, ALCANTARILLADO - ALTERNATIVA II (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 Inversion Total 1,671,045.67

1.1 Costos de Oper. Y Mant. Incrementales 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

2 Ingresos

2.1 Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

2.2 Ingresos netos -1,671,045.67 354,568.58 360,762.60 367,030.95 373,374.52 379,794.22 386,290.95 392,865.64 399,519.23 406,252.66

3 Valor Actual de Costos (VAP) S/. 1,972,411.35

4 Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL, ALCANTARILLADO, ALTERNATIVA I (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 Inversion Total 0.00

1.1 Costos de Oper. Y Mant. Incrementales 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00

2 Ingresos

2.1 Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

2.2 Ingresos netos 0.00 375,439.00 380,688.17 386,000.33 391,376.24 396,816.66 402,322.36 407,894.13 413,532.77 419,239.06

3 Valor Actual de Costos (VACS) S/. 3,771,925.23

4 Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL, ALCANTARILLADO - ALTERNATIVA II (COSTOS INCREMENTALES)

Item PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 Inversion Total 2,186,358.00

1.1 Costos de Oper. Y Mant. Incrementales 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

2 Ingresos

2.1 Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

2.2 Ingresos netos -2,186,358.00 292,615.00 297,864.17 303,176.33 308,552.24 313,992.66 319,498.36 325,070.13 330,708.77 336,415.06

3 Valor Actual de Costos (VACS) S/. 829,504.56

4 Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 MODULO DE INVERSION 0

2 Costos de operación y mantenmiento 70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200

3 Evaluación

3.1 COSTOS TOTALES 0 445,969 452,163 458,431 464,775 471,194 477,691 484,266 490,919 497,653

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

3.3 COSTOS ACTUALIZADOS 0 409,145 380,576 353,993 329,258 306,244 284,832 264,910 246,376 229,133

3.4 VANP 4,477,806

VANP 4,477,806

3.5 TIR Err:523

3.6 NUMERO DE BENEFICIARIOS 1500

3.7 CE S/. 2,985

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 MODULO DE INVERSION 2,793,120

2 Costos de operación y mantenmiento 161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600

3 Evaluación

3.1 COSTOS TOTALES -2,793,120 354,569 360,763 367,031 373,375 379,794 386,291 392,866 399,519 406,253

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

3.3 COSTOS ACTUALIZADOS -2,793,120 325,292 303,647 283,415 264,508 246,840 230,333 214,911 200,505 187,050

3.4 VANP 850,337

VANP 850,337

3.5 TIR 3%

3.6 NUMERO DE BENEFICIARIOS 1500

3.7 CE S/. 567

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 MODULO DE INVERSION 0

2 Costos de operación y mantenmiento 61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992

3 Evaluación

3.1 COSTOS TOTALES 0 375,439 380,688 386,000 391,376 396,817 402,322 407,894 413,533 419,239

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

3.3 COSTOS ACTUALIZADOS 0 344,439 320,418 298,063 277,261 257,904 239,892 223,132 207,538 193,029

3.4 VANS 3,771,925

3.5 TIR Err:523

3.6 NUMERO DE BENEFICIARIOS 1500

3.7 CE S/. 2,515

3.8 TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

Item PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

1 MODULO DE INVERSION 2,186,358

2 Costos de operación y mantenmiento 144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816

3 Evaluación

3.1 COSTOS TOTALES -2,186,358 292,615 297,864 303,176 308,552 313,993 319,498 325,070 330,709 336,415

3.2 FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

3.3 COSTOS ACTUALIZADOS -2,186,358 268,454 250,706 234,108 218,586 204,074 190,506 177,824 165,972 154,895

3.4 VANS 829,505

3.5 TIR 4%

3.6 NUMERO DE BENEFICIARIOS 1500

3.7 CE S/. 553

3.8 TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos S/. 3,054 S/. 2,511 S/. 3,019 S/. 2,256 S/. 2,889 S/. 2,285 S/. 2,846 S/. 2,168 C/E SOCIALAumentos de los costos de inversión S/. 1,385 S/. 1,081 S/. 1,236 S/. 968 S/. 2,132 S/. 1,657 S/. 2,268 S/. 1,760 S/. 2,515Aumento del número de beneficiarios S/. 340 S/. 235 S/. 1,641 S/. 1,123 S/. 1,550 S/. 1,123 S/. 1,308 S/. 1,019

Fuente: Elaboración Propia

El índice de coeficiente de efectividad ante la variación del 10, 20 y 30 % de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 762 536 753 526 1,561 1,205 1,530 1,177

Disminución de los costos de inversión 1,521 1,188 1,385 1,085 1,249 981 1,113 878

Disminución del número de beneficiarios 1,841 1,435 1,912 1,490 2,071 1,614 2,260 1,761

Fuente: Elaboración Propia

El índice de coeficiente de efectividad ante la variación del 10, 20 y 30 % de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

INDICADORES DE EVALUACION SOCIALINDICADORES DE EVALUACION ALTERNATIVA I ALTERNATIVA II FACTOR DE CORRECCION 9%

VACS S/. 3,771,925 S/. 829,505PA 1500 1500CE S/. 2,515 S/. 553

COSTOSAÑOS

Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9SIN PROYECTO Costos de Operación 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200

Costos de Mantenimient 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000CON PROYECTO Costos de Operación 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200

Costos de Mantenimient 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000

2

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 1

43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 factor de correccion 1

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.4

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 1

43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 43,200.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA - ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 factor de correccion 1

39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 39,312.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA - ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO, ALCANTARILLADO - ALTERNATIVA I (COSTOS INCREMENTALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 70,200.00 1.1

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

504,466.89 511,362.89 518,341.65 525,404.15 532,551.39 539,784.41 547,104.22 554,511.88 562,008.42 569,594.92 577,272.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 1.1

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

413,066.89 419,962.89 426,941.65 434,004.15 441,151.39 448,384.41 455,704.22 463,111.88 470,608.42 478,194.92 485,872.46 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL, ALCANTARILLADO, ALTERNATIVA I (COSTOS INCREMENTALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 61,992.00 1.1

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

425,013.84 430,857.91 436,772.11 442,757.28 448,814.27 454,943.94 461,147.17 467,424.84 473,777.85 480,207.08 486,713.47 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL, ALCANTARILLADO - ALTERNATIVA II (COSTOS INCREMENTALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 1.1

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

342,189.84 348,033.91 353,948.11 359,933.28 365,990.27 372,119.94 378,323.17 384,600.84 390,953.85 397,383.08 403,889.47 2.2

3

4

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200 70,200

504,467 511,363 518,342 525,404 532,551 539,784 547,104 554,512 562,008 569,595 577,272

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

213,092 198,170 184,288 171,376 159,364 148,191 137,799 128,133 119,142 110,780 103,003

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600 161,600

413,067 419,963 426,942 434,004 441,151 448,384 455,704 463,112 470,608 478,195 485,872

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

174,484 162,749 151,793 141,563 132,013 123,099 114,778 107,013 99,766 93,004 86,695

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992 61,992 2

3

425,014 430,858 436,772 442,757 448,814 454,944 461,147 467,425 473,778 480,207 486,713 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

179,530 166,972 155,288 144,418 134,306 124,899 116,149 108,009 100,438 93,395 86,845 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816 144,816 2

3

342,190 348,034 353,948 359,933 365,990 372,120 378,323 384,601 390,954 397,383 403,889 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

144,545 134,875 125,841 117,403 109,521 102,161 95,288 88,871 82,880 77,287 72,066 3.3

3.4

3.5

3.6

3.7

3.8

S/. 2,011.69

S/. 502.92

S/. 3,017.54

AÑOSAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,20027,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,00043,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,200 43,20027,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00

Personal de operación y mant.. 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00

Costos de Mantenimiento 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00

Materiales y accesorios 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00

Vestuario 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00

Total de Operación y Mantenimiento 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,793,120.18

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20

Personal de operación y mant.. 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20

Costos de Mantenimiento 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00

Materiales y accesorios 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00

Vestuario 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00

Total de Operación y Mantenimiento 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos 0.00 474,848.58 481,042.60 487,310.95 493,654.52 500,074.22 506,570.95 513,145.64 519,799.23 526,532.66

Valor Actual de Costos (VACP) S/. 4,741,438.50

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos -1,671,045.67 384,068.58 390,262.60 396,530.95 402,874.52 409,294.22 415,790.95 422,365.64 429,019.23 435,752.66

Valor Actual de Costos (VAP) S/. 2,242,004.09

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos 0.00 390,141.80 395,390.97 400,703.13 406,079.04 411,519.46 417,025.16 422,596.93 428,235.57 433,941.86

Valor Actual de Costos (VACS) S/. 3,906,140.41

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos -2,186,358.00 307,945.00 313,194.17 318,506.33 323,882.24 329,322.66 334,828.36 340,400.13 346,038.77 351,745.06

Valor Actual de Costos (VACS) S/. 969,445.17

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

III. Evaluación

COSTOS TOTALES 0.00 457,348.58 463,542.60 469,810.95 476,154.52 482,574.22 489,070.95 495,645.64 502,299.23 509,032.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 419,585.85 390,154.53 362,780.25 337,319.87 313,640.13 291,617.03 271,135.14 252,087.04 234,372.78

VANS S/. 4,581,688.95

VANS S/. 4,581,688.95

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 3,054.46

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 457,348.58 463,542.60 469,810.95 476,154.52 482,574.22 489,070.95 495,645.64 502,299.23 509,032.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,793,120.18 419,585.85 390,154.53 362,780.25 337,319.87 313,640.13 291,617.03 271,135.14 252,087.04 234,372.78

VANS S/. 1,788,568.77 1,788,568.77

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,192.38

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 0.00

Costos de operación y mantenmiento 0.00 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20

Evaluación

COSTOS TOTALES 0.00 374,811.80 380,060.97 385,373.13 390,749.04 396,189.46 401,695.16 407,266.93 412,905.57 418,611.86

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 343,864.03 319,889.71 297,578.77 276,816.47 257,495.96 239,517.70 222,788.96 207,223.38 192,740.53

VANS S/. 3,766,199.81 3,766,199.81

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,510.80

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -2,186,358.00 292,615.00 297,864.17 303,176.33 308,552.24 313,992.66 319,498.36 325,070.13 330,708.77 336,415.06

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,186,358.00 268,454.13 250,706.31 234,107.75 218,586.18 204,073.68 190,506.43 177,824.50 165,971.58 154,894.84

VANS S/. 829,504.56 829,504.56

TIR 4% 0.901

NUMERO DE BENEFICIARIOS 1500

CE S/. 553.00

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos S/. 3,054.46 S/. 2,510.80 C/E SOCIALAumentos de los costos de inversión S/. 2,510.80Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

3

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 1

30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 30,320.00 4,320.00 1.2

28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 28,500.00 2

11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 1,000.00 2.1

5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 5,500.00 500.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 13,200.00 1,200.00 2.4

58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 factor de correccion 1

27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 27,591.20 0.91 1.2

35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 35,028.00 factor de correccion 2

9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 9,240.00 0.84 2.1

4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 4,620.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 11,088.00 0.84 2.4

62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.4

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00 41,320.00

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

533,346.89 540,242.89 547,221.65 554,284.15 561,431.39 568,664.41 575,984.22 583,391.88 590,888.42 598,474.92 606,152.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 131,586.00 131,586.00 131,586.00

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46

442,566.89 449,462.89 456,441.65 463,504.15 470,651.39 477,884.41 485,204.22 492,611.88 500,622.42 508,208.92 515,886.46

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20 47,289.20

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

439,716.64 445,560.71 451,474.91 457,460.08 463,517.07 469,646.74 475,849.97 482,127.64 488,480.65 494,909.88 501,416.27 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47

357,519.84 363,363.91 369,278.11 375,263.28 381,320.27 387,449.94 393,653.17 399,930.84 406,283.85 412,713.08 419,219.47

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

515,846.89 522,742.89 529,721.65 536,784.15 543,931.39 551,164.41 558,484.22 565,891.88 573,388.42 580,974.92 588,652.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

217,899.30 202,580.04 188,334.44 175,087.53 162,769.55 151,315.60 140,665.29 130,762.43 121,554.76 112,993.62 105,033.78

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00 58,820.00

515,846.89 522,742.89 529,721.65 536,784.15 543,931.39 551,164.41 558,484.22 565,891.88 573,388.42 580,974.92 588,652.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

217,899.30 202,580.04 188,334.44 175,087.53 162,769.55 151,315.60 140,665.29 130,762.43 121,554.76 112,993.62 105,033.78

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 62,619.20 2

3

424,386.64 430,230.71 436,144.91 442,130.08 448,187.07 454,316.74 460,519.97 466,797.64 473,150.65 479,579.88 486,086.27 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

179,265.50 166,728.53 155,064.66 144,213.39 134,118.40 124,727.23 115,991.06 107,864.41 100,304.97 93,273.33 86,732.81 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

342,189.84 348,033.91 353,948.11 359,933.28 365,990.27 372,119.94 378,323.17 384,600.84 390,953.85 397,383.08 403,889.47 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

144,544.69 134,874.57 125,840.84 117,402.55 109,521.29 102,161.08 95,288.17 88,870.94 82,879.77 77,286.90 72,066.36 3.3

3.4

3.5

3.6

3.7

3.8

S/. 2,008.64

S/. 502.16

S/. 3,012.96

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00

Personal de operación y mant.. 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00

Costos de Mantenimiento 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00

Materiales y accesorios 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Vestuario 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,793,120.18

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40

Personal de operación y mant.. 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40

Costos de Mantenimiento 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00

Materiales y accesorios 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Vestuario 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos 0.00 469,028.58 475,222.60 481,490.95 487,834.52 494,254.22 500,750.95 507,325.64 513,979.23 520,712.66

Valor Actual de Costos (VACP) S/. 4,688,310.36

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos 0.00 385,958.60 391,207.77 396,519.93 401,895.84 407,336.26 412,841.96 418,413.73 424,052.37 429,758.66

Valor Actual de Costos (VACS) S/. 3,867,953.88

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

III. Evaluación

COSTOS TOTALES 0.00 451,528.58 457,722.60 463,990.95 470,334.52 476,754.22 483,250.95 489,825.64 496,479.23 503,212.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 414,246.40 385,255.95 358,286.15 333,196.83 309,857.53 288,146.75 267,951.40 249,166.18 231,693.09

VANS S/. 4,528,560.81

S/. 4,528,560.81

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 3,019.04

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 451,528.58 457,722.60 463,990.95 470,334.52 476,754.22 483,250.95 489,825.64 496,479.23 503,212.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,793,120.18 414,246.40 385,255.95 358,286.15 333,196.83 309,857.53 288,146.75 267,951.40 249,166.18 231,693.09

VANS S/. 1,735,440.63 S/. 1,735,440.63

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,156.96

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 0.00

Costos de operación y mantenmiento 0.00 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40

Evaluación

COSTOS TOTALES 0.00 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 340,026.24 311,950.67 286,193.28 262,562.64 240,883.16 220,993.72 202,746.53 186,005.99 170,647.70

VANS S/. 3,383,300.07 S/. 3,383,300.07

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,255.53

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -2,186,358.00 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22 403,074.95 409,649.64 416,303.23 423,036.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,186,358.00 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63 240,340.42 224,092.38 208,928.55 194,777.83

VANS S/. 1,610,312.53 S/. 1,610,312.53

TIR 8%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,073.54

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos S/. 3,019.04 S/. 2,255.53

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

4

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 1

34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 34,640.00 8,640.00 1.2

30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2,000.00 2.1

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 1,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.4

64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 factor de correccion 1

31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 31,522.40 0.91 1.2

35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 35,280.00 factor de correccion 2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.1

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00 47,140.00

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

527,526.89 534,422.89 541,401.65 548,464.15 555,611.39 562,844.41 570,164.22 577,571.88 585,068.42 592,654.92 600,332.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 131,586.00 131,586.00 131,586.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40 51,472.40

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

435,533.44 441,377.51 447,291.71 453,276.88 459,333.87 465,463.54 471,666.77 477,944.44 484,297.45 490,726.68 497,233.07 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

510,026.89 516,922.89 523,901.65 530,964.15 538,111.39 545,344.41 552,664.22 560,071.88 567,568.42 575,154.92 582,832.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

215,440.87 200,324.60 186,265.23 173,189.17 161,027.93 149,717.79 139,199.41 129,417.59 120,320.95 111,861.69 103,995.31

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00 64,640.00

510,026.89 516,922.89 523,901.65 530,964.15 538,111.39 545,344.41 552,664.22 560,071.88 567,568.42 575,154.92 582,832.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

215,440.87 200,324.60 186,265.23 173,189.17 161,027.93 149,717.79 139,199.41 129,417.59 120,320.95 111,861.69 103,995.31

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 66,802.40 2

3

370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 370,628.60 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

156,557.52 143,630.76 131,771.34 120,891.13 110,909.30 101,751.65 93,350.14 85,642.33 78,570.94 72,083.43 66,131.59 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

429,850.89 436,746.89 443,725.65 450,788.15 457,935.39 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

181,573.66 169,253.77 157,759.88 147,037.47 137,035.55 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

S/. 0.00

S/. 0.00

S/. 0.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 17,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00

Personal de operación y mant.. 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00

Costos de Mantenimiento 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00

Materiales y accesorios 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00

Vestuario 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00

Total de Operación y Mantenimiento 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,793,120.18

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60

Personal de operación y mant.. 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60

Costos de Mantenimiento 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00

Materiales y accesorios 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00

Vestuario 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos

Total de Operación y Mantenimiento 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 68,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos 0.00 447,608.58 447,802.60 454,070.95 460,414.52 466,834.22 473,330.95 479,905.64 486,559.23 493,292.66

Valor Actual de Costos (VACP) S/. 4,443,510.23

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos 0.00 390,847.40 396,096.57 401,408.73 406,784.64 412,225.06 417,730.76 423,302.53 428,941.17 434,647.46

Valor Actual de Costos (VACS) S/. 3,912,581.52

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

III. Evaluación

COSTOS TOTALES 0.00 430,108.58 436,302.60 442,570.95 448,914.52 455,334.22 461,830.95 468,405.64 475,059.23 481,792.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 394,595.02 367,227.17 341,745.98 318,022.36 295,936.00 275,374.70 256,233.92 238,416.21 221,830.72

VANS S/. 4,333,027.36

S/. 4,333,027.36

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,888.68

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 430,108.58 436,302.60 442,570.95 448,914.52 455,334.22 461,830.95 468,405.64 475,059.23 481,792.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,793,120.18 394,595.02 367,227.17 341,745.98 318,022.36 295,936.00 275,374.70 256,233.92 238,416.21 221,830.72

VANS S/. 1,539,907.18 S/. 1,539,907.18

TIR 6%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,026.60

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 0.00

Costos de operación y mantenmiento 0.00 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60

Evaluación

COSTOS TOTALES 0.00 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 344,511.37 316,065.48 289,968.33 266,025.99 244,060.54 223,908.75 205,420.88 188,459.52 172,898.64

VANS S/. 3,427,927.70 S/. 3,427,927.70

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,285.29

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

Evaluación

COSTOS TOTALES -2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94

VANS S/. 1,521,957.05 S/. 1,521,957.05

TIR 8%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,014.64

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos S/. 2,888.68 S/. 2,285.29

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

5

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00 11,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 1

38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 38,960.00 12,960.00 1.2

47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 47,100.00 2

13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 3,000.00 2.1

6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 6,500.00 1,500.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 15,600.00 3,600.00 2.4

86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 factor de correccion 1

35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 35,453.60 0.91 1.2

26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 26,460.00 factor de correccion 2

10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 10,920.00 0.84 2.1

5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 5,460.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

2.4

61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

2.4

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00 74,560.00

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

500,106.89 507,002.89 513,981.65 521,044.15 528,191.39 535,424.41 542,744.22 550,151.88 557,648.42 565,234.92 572,912.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 121,506.00 121,506.00 121,506.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60 46,583.60

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

440,422.24 446,266.31 452,180.51 458,165.68 464,222.67 470,352.34 476,555.57 482,833.24 489,186.25 495,615.48 502,121.87 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

488,606.89 495,502.89 502,481.65 509,544.15 516,691.39 523,924.41 531,244.22 538,651.88 546,148.42 553,734.92 561,412.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

206,392.83 192,023.65 178,649.67 166,202.42 154,618.07 143,837.18 133,804.36 124,468.00 115,780.05 107,695.72 100,173.32

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00 86,060.00

488,606.89 495,502.89 502,481.65 509,544.15 516,691.39 523,924.41 531,244.22 538,651.88 546,148.42 553,734.92 561,412.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

206,392.83 192,023.65 178,649.67 166,202.42 154,618.07 143,837.18 133,804.36 124,468.00 115,780.05 107,695.72 100,173.32

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 61,913.60 2

3

375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 375,517.40 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

158,622.61 145,525.33 133,509.47 122,485.76 112,372.25 103,093.81 94,581.48 86,772.00 79,607.34 73,034.25 67,003.90 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 2

3

439,930.89 446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

185,831.56 173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00

Personal de operación y mant.. 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00

Costos de Mantenimiento 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00

Materiales y accesorios 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00

Vestuario 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Total de Operación y Mantenimiento 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,793,120.18

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Operación 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80

Personal de operación y mant.. 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80

Costos de Mantenimiento 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00

Materiales y accesorios 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00

Vestuario 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00

Total de Operación y Mantenimiento 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos 0.00 440,588.58 446,782.60 453,050.95 459,394.52 465,814.22 472,310.95 478,885.64 485,539.23 492,272.66

Valor Actual de Costos (VACP) S/. 4,428,694.52

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0.00

Costos de Oper. Y Mant. Incrementales 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos 0.00 371,544.20 376,793.37 382,105.53 387,481.44 392,921.86 398,427.56 403,999.33 409,637.97 415,344.26

Valor Actual de Costos (VACS) S/. 3,736,371.37

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

III. Evaluación

COSTOS TOTALES 0.00 423,088.58 429,282.60 435,550.95 441,894.52 448,314.22 454,810.95 461,385.64 468,039.23 474,772.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 388,154.66 361,318.57 336,325.25 313,049.22 291,373.48 271,188.91 252,393.74 234,893.10 218,598.52

VANS S/. 4,268,944.97

S/. 4,268,944.97

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,845.96

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 423,088.58 429,282.60 435,550.95 441,894.52 448,314.22 454,810.95 461,385.64 468,039.23 474,772.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,793,120.18 388,154.66 361,318.57 336,325.25 313,049.22 291,373.48 271,188.91 252,393.74 234,893.10 218,598.52

VANS S/. 1,475,824.79 S/. 1,475,824.79

TIR 6%

NUMERO DE BENEFICIARIOS 1500

CE S/. 983.88

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 0.00

Costos de operación y mantenmiento 0.00 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80

Evaluación

COSTOS TOTALES 0.00 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS 0.00 326,802.02 299,818.36 275,062.72 252,351.12 231,514.79 212,398.89 194,861.36 178,771.89 164,010.91

VANS S/. 3,251,717.56 S/. 3,251,717.56

TIR Err:523

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,167.81

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -2,186,358.00 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22 403,074.95 409,649.64 416,303.23 423,036.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,186,358.00 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63 240,340.42 224,092.38 208,928.55 194,777.83

VANS S/. 1,429,941.31 S/. 1,429,941.31

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 953.29

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos S/. 2,845.96 S/. 2,167.81

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

6

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 1

43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 43,280.00 17,280.00 1.2

49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 49,800.00 2

14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 4,000.00 2.1

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 2,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 4,800.00 3.3

93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.4

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 factor de correccion 1

39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 39,384.80 0.91 1.2

41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 41,832.00 factor de correccion 2

11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 11,760.00 0.84 2.1

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 14,112.00 0.84 2.4

81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00 75,580.00

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

499,086.89 505,982.89 512,961.65 520,024.15 527,171.39 534,404.41 541,724.22 549,131.88 556,628.42 564,214.92 571,892.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 131,586.00 131,586.00 131,586.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80 65,886.80

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

421,119.04 426,963.11 432,877.31 438,862.48 444,919.47 451,049.14 457,252.37 463,530.04 469,883.05 476,312.28 482,818.67 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

481,586.89 488,482.89 495,461.65 502,524.15 509,671.39 516,904.41 524,224.22 531,631.88 539,128.42 546,714.92 554,392.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

203,427.51 189,303.17 176,153.82 163,912.65 152,517.36 141,909.92 132,036.23 122,845.87 114,291.85 106,330.40 98,920.74

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00 93,080.00

481,586.89 488,482.89 495,461.65 502,524.15 509,671.39 516,904.41 524,224.22 531,631.88 539,128.42 546,714.92 554,392.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

203,427.51 189,303.17 176,153.82 163,912.65 152,517.36 141,909.92 132,036.23 122,845.87 114,291.85 106,330.40 98,920.74

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 81,216.80 2

3

356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 356,214.20 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

150,468.73 138,044.70 126,646.52 116,189.46 106,595.84 97,794.35 89,719.59 82,311.55 75,515.18 69,279.98 63,559.62 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,856,720.39 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06 445,915.84

Valor Actual de Costos (VACS) S/. 2,106,009.70

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 2,077,279.39

S/. 2,077,279.39

TIR 9%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,384.85

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 1,732,154.35 S/. 1,732,154.35

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,154.77

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 1,856,720.39

Costos de operación y mantenmiento 1,856,720.39 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -1,856,720.39 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,856,720.39 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16

VANS S/. 1,621,355.89 S/. 1,621,355.89

TIR 10%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,080.90

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -2,186,358.00 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22 403,074.95 409,649.64 416,303.23 423,036.66 429,850.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63 240,340.42 224,092.38 208,928.55 194,777.83 181,573.66

VANS S/. 1,429,941.31 S/. 1,429,941.31

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 953.29

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión S/. 1,384.85 S/. 1,080.90

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

7

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.4

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

436,746.89 443,725.65 450,788.15 -144,816.00 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

169,253.77 157,759.88 147,037.47 -43,335.68 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,670,540.16

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,025,513.15

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,670,540.16

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66

Ingresos netos -2,670,540.16 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66

Valor Actual de Costos (VACP) S/. 2,014,483.93

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,025,513.15

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06

Ingresos netos -2,025,513.15 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06

Valor Actual de Costos (VACS) S/. 1,937,216.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,670,540.16

II. Costos de operación y mantenmiento 2,670,540.16 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,670,540.16 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,670,540.16 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33

VANS S/. 1,854,734.38

S/. 1,854,734.38

TIR 8%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,236.49

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES -2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33

VANS S/. 1,732,154.35 S/. 1,732,154.35

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,154.77

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,025,513.15

Costos de operación y mantenmiento 2,025,513.15 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES -2,025,513.15 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,025,513.15 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05

VANS S/. 1,452,563.13 S/. 1,452,563.13

TIR 8%

NUMERO DE BENEFICIARIOS 1500

CE S/. 968.38

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES -2,186,358.00 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22 403,074.95 409,649.64 416,303.23 423,036.66

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460

COSTOS ACTUALIZADOS -2,186,358.00 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63 240,340.42 224,092.38 208,928.55 194,777.83

VANS S/. 1,429,941.31 S/. 1,429,941.31

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 953.29

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión S/. 1,236.49 S/. 968.38

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES) COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

574,666.89 581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

527,166.89 534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 131,586.00 131,586.00 131,586.00

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

487,005.84 492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

445,915.84 451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

509,666.89 516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

215,288.80 200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PeriodoItem

Año 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

509,666.89 516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

215,288.80 200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

160,943.16 147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación SocialPeriodo

ItemAño 10 Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 2

3

429,850.89 436,746.89 443,725.65 450,788.15 -144,816.00 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46 3.1

0.422 0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

181,573.66 169,253.77 157,759.88 147,037.47 -43,335.68 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,893,085.17

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,194,305.92

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,194,305.92

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,194,305.92 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06 445,915.84

Valor Actual de Costos (VACS) S/. 1,768,424.18

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,893,085.17

II. Costos de operación y mantenmiento 2,893,085.17 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,893,085.17 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,893,085.17 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,198,569.39

TIR 6%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,132.38

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,106,858.39

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,071.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 2,194,305.92

Costos de operación y mantenmiento 2,194,305.92 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES 2,194,305.92 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,194,305.92 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16

VANS S/. 2,485,631.62

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,657.09

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

Evaluación

COSTOS TOTALES 2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 3,134,221.77

TIR 8%

NUMERO DE BENEFICIARIOS 4095

CE S/. 765.38

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión 2,132 1,657

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

9

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 2

3

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 3.1

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13 3.3

3.4

3.5

3.6

3.7

3.8

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

1

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 2

3

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46 3.1

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178 3.2

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02 3.3

3.4

3.5

3.6

3.7

3.8

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,115,630.18

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,363,098.68

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,363,098.68

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,363,098.68 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06 445,915.84

Valor Actual de Costos (VACS) S/. 1,599,631.42

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 3,115,630.18

II. Costos de operación y mantenmiento 3,115,630.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 3,115,630.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -3,115,630.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,402,739.13

TIR 5%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,268.49

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,106,858.39

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,071.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 2,363,098.68

Costos de operación y mantenmiento 2,363,098.68 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

Evaluación

COSTOS TOTALES 2,363,098.68 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,363,098.68 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16

VANS S/. 2,640,487.36

TIR 6%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,760.32

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

MODULO DE INVERSION 2,186,358.00

Costos de operación y mantenmiento 2,186,358.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

Evaluación

COSTOS TOTALES 2,186,358.00 371,352.58 377,546.60 383,814.95 390,158.52 396,578.22 403,074.95 409,649.64 416,303.23 423,036.66 429,850.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 340,690.44 317,773.42 296,375.56 276,398.13 257,748.63 240,340.42 224,092.38 208,928.55 194,777.83 181,573.66

VANS S/. 3,218,639.88

TIR 7%

NUMERO DE BENEFICIARIOS 4095

CE S/. 785.99

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión 2,268 1,760

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

10

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 26,880.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 131,586.00 131,586.00 131,586.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00 129,486.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00 144,816.00

436,746.89 443,725.65 450,788.15 -144,816.00 465,168.41 472,488.22 479,895.88 487,392.42 494,978.92 502,656.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

169,253.77 157,759.88 147,037.47 -43,335.68 127,706.42 119,005.50 110,891.06 103,324.14 96,268.29 89,689.44

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,037,849.62

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 0.00 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS 0.00 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 544,362.82

TIR Err:523

NUMERO DE BENEFICIARIOS 1600 150

CE 340.23

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,106,858.39

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,071.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 0.00

II. Costos de operación y mantenmiento 0.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 0.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS 0.00 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 388,088.81

TIR Err:523

NUMERO DE BENEFICIARIOS 1,650 150

CE 235.21

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,186,358.00

II. Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 3,134,221.77

TIR 8%

NUMERO DE BENEFICIARIOS 1500

CE 2,089.48

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 340 235

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

11

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

3.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06 445,915.84

Valor Actual de Costos (VACS) S/. 1,945,833.88

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 2,790,229.92

TIR 9%

NUMERO DE BENEFICIARIOS 1700 300

CE 1641.31

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,106,858.39

TIR 7%

NUMERO DE BENEFICIARIOS 1500

CE S/. 2,071.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16

VANS S/. 2,021,064.38

TIR 12%

NUMERO DE BENEFICIARIOS 1,800 300

CE 1,122.81

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,186,358.00

II. Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 3,134,221.77

TIR 8%

NUMERO DE BENEFICIARIOS 4095

CE 765.38

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1,641 1,123

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

12

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 3.3

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 3.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gastos Admministrativos 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 468,668.58 474,862.60 481,130.95 487,474.52 493,894.22 500,390.95 506,965.64 513,619.23 520,352.66 527,166.89

Valor Actual de Costos (VACP) S/. 2,237,028.94

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 396,341.00 401,590.17 406,902.33 412,278.24 417,718.66 423,224.36 428,796.13 434,434.77 440,141.06 445,915.84

Valor Actual de Costos (VACS) S/. 1,945,833.88

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,447,995.14

II. Costos de operación y mantenmiento 2,447,995.14 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,447,995.14 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,447,995.14 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 2,790,229.92

TIR 9%

NUMERO DE BENEFICIARIOS 1800 450

CE 1550.13

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 451,168.58 457,362.60 463,630.95 469,974.52 476,394.22 482,890.95 489,465.64 496,119.23 502,852.66 509,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 413,916.12 384,952.95 358,008.16 332,941.80 309,623.55 287,932.09 267,754.47 248,985.51 231,527.33 215,288.80

VANS S/. 3,106,858.39

TIR 7%

NUMERO DE BENEFICIARIOS 4905

CE S/. 633.41

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 349,551.37 320,689.33 294,210.40 269,917.80 247,631.01 227,184.41 208,426.06 191,216.57 175,428.05 160,943.16

VANS S/. 2,021,064.38

TIR 12%

NUMERO DE BENEFICIARIOS 1,800 450

CE 1,122.81

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,186,358.00

II. Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 3,134,221.77

TIR 8%

NUMERO DE BENEFICIARIOS 4095

CE 765.38

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1,550 1,123

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

13

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 39,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 32,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00 161,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 32,760.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00 47,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

534,062.89 541,041.65 548,104.15 555,251.39 562,484.41 569,804.22 577,211.88 584,708.42 592,294.92 599,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 144,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00 41,090.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

451,759.91 457,674.11 463,659.28 469,716.27 475,845.94 482,049.17 488,326.84 494,679.85 501,109.08 507,615.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00

516,562.89 523,541.65 530,604.15 537,751.39 544,984.41 552,304.22 559,711.88 567,208.42 574,794.92 582,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

200,185.09 186,137.23 173,071.74 160,920.20 149,618.95 139,108.73 129,334.40 120,244.63 111,791.67 103,931.08

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00 56,420.00

381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00 381,011.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

147,654.28 135,462.64 124,277.65 114,016.19 104,602.01 95,965.15 88,041.42 80,771.95 74,102.70 67,984.13

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,856,720.39

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,447,995.14

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,447,995.14 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. 2,346,571.49

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,671,045.67

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,037,849.62

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,485,562.43

TIR 12%

NUMERO DE BENEFICIARIOS 1900 600

CE 1308.19

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,793,120.18

II. Costos de operación y mantenmiento 2,793,120.18 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,793,120.18 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,793,120.18 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 3,006,360.64

TIR 7%

NUMERO DE BENEFICIARIOS 4905

CE S/. 612.92

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,936,646.27

TIR 13%

NUMERO DE BENEFICIARIOS 1,900 600

CE 1,019.29

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,186,358.00

II. Costos de operación y mantenmiento 2,186,358.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 2,186,358.00 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,186,358.00 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 3,134,221.77

TIR 8%

NUMERO DE BENEFICIARIOS 4095

CE 765.38

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios 1,308 1,019

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

14

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00

Personal de operación y mant.. 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00

Costos de Mantenimiento 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00

Materiales y accesorios 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Vestuario 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80

Personal de operación y mant.. 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80

Costos de Mantenimiento 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00

Materiales y accesorios 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00

Vestuario 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Oper. Y Mant. Incrementales 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -3,644,903.91 486,488.58 492,682.60 498,950.95 505,294.52 511,714.22 518,210.95 524,785.64 531,439.23 538,172.66 544,986.89

Valor Actual de Costos (VACP) S/. 1,202,790.85

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 411,612.20 416,861.37 422,173.53 427,549.44 432,989.86 438,495.56 444,067.33 449,705.97 455,412.26 461,187.04

Valor Actual de Costos (VACS) S/. 2,085,237.73

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 3,644,903.91

II. Costos de operación y mantenmiento 3,644,903.91 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

III. Evaluación

COSTOS TOTALES 3,644,903.91 468,988.58 475,182.60 481,450.95 487,794.52 494,214.22 500,710.95 507,285.64 513,939.23 520,672.66 527,486.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -3,644,903.91 430,264.75 399,951.69 371,768.47 345,565.94 321,205.33 298,557.58 277,502.62 257,928.77 239,732.15 222,816.16

VANS S/. 3,739,072.20

TIR 3%

NUMERO DE BENEFICIARIOS 4905

CE S/. 762.30

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 468,988.58 475,182.60 481,450.95 487,794.52 494,214.22 500,710.95 507,285.64 513,939.23 520,672.66 527,486.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 430,264.75 399,951.69 371,768.47 345,565.94 321,205.33 298,557.58 277,502.62 257,928.77 239,732.15 222,816.16

VANS S/. 5,023,113.43

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,024.08

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,016,896.21

II. Costos de operación y mantenmiento 2,016,896.21 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80

III. Evaluación

COSTOS TOTALES 2,016,896.21 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,016,896.21 363,561.65 333,542.80 306,002.57 280,736.30 257,556.24 236,290.13 216,779.93 198,880.67 182,459.33 167,393.88

VANS S/. 2,194,976.99

TIR 9%

NUMERO DE BENEFICIARIOS 4095

CE S/. 536.01

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR 0% 0.901

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos C/E SOCIALAumentos de los costos de inversión S/. 0.09Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mues

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 762 536

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mues

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

15

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 1

21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 21,680.00 4,320.00 1.2

25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 25,500.00 2

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1,000.00 2.1

4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 4,500.00 500.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 factor de correccion 1

19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 19,728.80 0.91 1.2

21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 21,420.00 factor de correccion 2

7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 7,560.00 0.84 2.1

3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 3,780.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00 29,680.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

551,882.89 558,861.65 565,924.15 573,071.39 580,304.41 587,624.22 595,031.88 602,528.42 610,114.92 617,792.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80 25,818.80

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

467,031.11 472,945.31 478,930.48 484,987.47 491,117.14 497,320.37 503,598.04 509,951.05 516,380.28 522,886.67 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

534,382.89 541,361.65 548,424.15 555,571.39 562,804.41 570,124.22 577,531.88 585,028.42 592,614.92 600,292.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

207,090.92 192,472.86 178,884.25 166,252.78 154,511.22 143,597.05 133,452.13 124,022.36 115,257.48 107,110.72

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00 47,180.00

534,382.89 541,361.65 548,424.15 555,571.39 562,804.41 570,124.22 577,531.88 585,028.42 592,614.92 600,292.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

207,090.92 192,472.86 178,884.25 166,252.78 154,511.22 143,597.05 133,452.13 124,022.36 115,257.48 107,110.72

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80 41,148.80

396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20 396,282.20

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

153,572.37 140,892.08 129,258.79 118,586.05 108,794.54 99,811.50 91,570.19 84,009.35 77,072.79 70,708.98

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 468,015.39 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 140,051.95 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

S/. 0.07

S/. 0.02

S/. 0.11

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Operación 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00

Personal de operación y mant.. 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00

Costos de Mantenimiento 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00

Materiales y accesorios 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00

Vestuario 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Operación 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60

Personal de operación y mant.. 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60

Costos de Mantenimiento 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00

Materiales y accesorios 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00

Vestuario 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 3,644,903.91

Costos de Oper. Y Mant. Incrementales 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -3,644,903.91 492,208.58 498,402.60 504,670.95 511,014.52 517,434.22 523,930.95 530,505.64 537,159.23 543,892.66 550,706.89

Valor Actual de Costos (VACP) S/. 1,255,006.13

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,016,896.21

Costos de Oper. Y Mant. Incrementales 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -2,016,896.21 416,719.40 421,968.57 427,280.73 432,656.64 438,097.06 443,602.76 449,174.53 454,813.17 460,519.46 466,294.24

Valor Actual de Costos (VACS) S/. 2,131,859.04

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 3,644,903.91

II. Costos de operación y mantenmiento 3,644,903.91 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

III. Evaluación

COSTOS TOTALES 3,644,903.91 474,708.58 480,902.60 487,170.95 493,514.52 499,934.22 506,430.95 513,005.64 519,659.23 526,392.66 533,206.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -3,644,903.91 435,512.46 404,766.10 376,185.36 349,618.13 324,922.94 301,968.23 280,631.65 260,799.44 242,365.80 225,232.35

VANS S/. 3,691,168.27

TIR 3%

NUMERO DE BENEFICIARIOS 4905

CE S/. 752.53

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 474,708.58 480,902.60 487,170.95 493,514.52 499,934.22 506,430.95 513,005.64 519,659.23 526,392.66 533,206.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 435,512.46 404,766.10 376,185.36 349,618.13 324,922.94 301,968.23 280,631.65 260,799.44 242,365.80 225,232.35

VANS S/. 4,975,209.50

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,014.31

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,016,896.21

II. Costos de operación y mantenmiento 2,016,896.21 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60

III. Evaluación

COSTOS TOTALES 2,016,896.21 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,016,896.21 368,247.15 337,841.42 309,946.26 284,354.37 260,875.57 239,335.38 219,573.75 201,443.80 184,810.83 169,551.22

VANS S/. 2,152,205.14

TIR 9%

NUMERO DE BENEFICIARIOS 4095

CE S/. 525.57

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 753 526

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

16

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 1

17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 17,360.00 8,640.00 1.2

24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 24,100.00 2

8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 2,000.00 2.1

4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 4,100.00 900.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 factor de correccion 1

15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 15,797.60 0.91 1.2

20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 20,244.00 factor de correccion 2

6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 6,720.00 0.84 2.1

3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 3,444.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00 23,960.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

557,602.89 564,581.65 571,644.15 578,791.39 586,024.41 593,344.22 600,751.88 608,248.42 615,834.92 623,512.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60 20,711.60

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

472,138.31 478,052.51 484,037.68 490,094.67 496,224.34 502,427.57 508,705.24 515,058.25 521,487.48 527,993.87 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

540,102.89 547,081.65 554,144.15 561,291.39 568,524.41 575,844.22 583,251.88 590,748.42 598,334.92 606,012.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

209,307.61 194,506.52 180,749.99 167,964.47 156,081.58 145,037.75 134,773.86 125,234.97 116,369.96 108,131.34

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00 41,460.00

540,102.89 547,081.65 554,144.15 561,291.39 568,524.41 575,844.22 583,251.88 590,748.42 598,334.92 606,012.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

209,307.61 194,506.52 180,749.99 167,964.47 156,081.58 145,037.75 134,773.86 125,234.97 116,369.96 108,131.34

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60 36,041.60

401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40 401,389.40

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

155,551.58 142,707.87 130,924.65 120,114.36 110,196.66 101,097.85 92,750.32 85,092.04 78,066.09 71,620.27

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

S/. 0.00

S/. 0.00

S/. 0.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00

Personal de operación y mant.. 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00

Costos de Mantenimiento 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00

Materiales y accesorios 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00

Vestuario 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40

Personal de operación y mant.. 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40

Costos de Mantenimiento 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80

Materiales y accesorios 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00

Vestuario 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,225,450.13 497,858.58 504,052.60 510,320.95 516,664.52 523,084.22 529,580.95 536,155.64 542,809.23 549,542.66 556,356.89

Valor Actual de Costos (VACP) S/. 2,726,036.20

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,687,927.63 421,767.80 427,016.97 432,329.13 437,705.04 443,145.46 448,651.16 454,222.93 459,861.57 465,567.86 471,342.64

Valor Actual de Costos (VACS) S/. 2,506,912.17

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 480,358.58 486,552.60 492,820.95 499,164.52 505,584.22 512,080.95 518,655.64 525,309.23 532,042.66 538,856.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 440,695.94 409,521.59 380,548.20 353,620.73 328,595.05 305,337.14 283,722.40 263,634.99 244,967.22 227,618.97

VANS S/. 2,341,599.40

TIR 12%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,561.07

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 480,358.58 486,552.60 492,820.95 499,164.52 505,584.22 512,080.95 518,655.64 525,309.23 532,042.66 538,856.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 440,695.94 409,521.59 380,548.20 353,620.73 328,595.05 305,337.14 283,722.40 263,634.99 244,967.22 227,618.97

VANS S/. 4,927,891.81

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,004.67

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20

III. Evaluación

COSTOS TOTALES 1,687,927.63 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 372,878.71 342,090.56 313,844.55 287,930.78 264,156.68 242,345.58 222,335.39 203,977.42 187,135.25 171,683.72

VANS S/. 1,808,119.70

TIR 14%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,205.41

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,694,067.76

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,146.29

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1,561 1,205

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

17

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 1

13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 13,040.00 12,960.00 1.2

22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 22,770.00 2

7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 7,000.00 3,000.00 2.1

3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 3,770.00 1,230.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 factor de correccion 1

11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 11,866.40 0.91 1.2

19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 19,126.80 factor de correccion 2

5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 5,880.00 0.84 2.1

3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 3,166.80 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00 18,310.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

563,252.89 570,231.65 577,294.15 584,441.39 591,674.41 598,994.22 606,401.88 613,898.42 621,484.92 629,162.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20 15,663.20

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

477,186.71 483,100.91 489,086.08 495,143.07 501,272.74 507,475.97 513,753.64 520,106.65 526,535.88 533,042.27 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

545,752.89 552,731.65 559,794.15 566,941.39 574,174.41 581,494.22 588,901.88 596,398.42 603,984.92 611,662.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

211,497.17 196,515.29 182,592.90 169,655.21 157,632.72 146,460.81 136,079.43 126,432.73 117,468.83 109,139.48

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00 35,810.00

545,752.89 552,731.65 559,794.15 566,941.39 574,174.41 581,494.22 588,901.88 596,398.42 603,984.92 611,662.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

211,497.17 196,515.29 182,592.90 169,655.21 157,632.72 146,460.81 136,079.43 126,432.73 117,468.83 109,139.48

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20 30,993.20

406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80 406,437.80

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

157,508.00 144,502.75 132,571.33 121,625.07 111,582.64 102,369.39 93,916.87 86,162.27 79,047.95 72,521.06

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00

Personal de operación y mant.. 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00

Costos de Mantenimiento 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00

Materiales y accesorios 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Vestuario 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20

Personal de operación y mant.. 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20

Costos de Mantenimiento 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28

Materiales y accesorios 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Vestuario 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,225,450.13 503,456.58 509,650.60 515,918.95 522,262.52 528,682.22 535,178.95 541,753.64 548,407.23 555,140.66 561,954.89

Valor Actual de Costos (VACP) S/. 2,777,137.80

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,687,927.63 426,772.52 432,021.69 437,333.85 442,709.76 448,150.18 453,655.88 459,227.65 464,866.29 470,572.58 476,347.36

Valor Actual de Costos (VACS) S/. 2,552,597.99

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 485,956.58 492,150.60 498,418.95 504,762.52 511,182.22 517,678.95 524,253.64 530,907.23 537,640.66 544,454.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 445,831.72 414,233.31 384,870.88 357,586.50 332,233.37 308,675.04 286,784.69 266,444.43 247,544.69 229,983.63

VANS S/. 2,294,717.20

TIR 13%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,529.81

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 485,956.58 492,150.60 498,418.95 504,762.52 511,182.22 517,678.95 524,253.64 530,907.23 537,640.66 544,454.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 445,831.72 414,233.31 384,870.88 357,586.50 332,233.37 308,675.04 286,784.69 266,444.43 247,544.69 229,983.63

VANS S/. 5,648,748.85

TIR 0%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,151.63

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48

III. Evaluación

COSTOS TOTALES 1,687,927.63 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 377,470.20 346,302.93 317,709.11 291,476.25 267,409.41 245,329.73 225,073.15 206,489.13 189,439.56 173,797.77

VANS S/. 1,766,206.10

TIR 14%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,177.47

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos 1,530 1,177

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos 1,530 1,177

Disminución de los costos de inversión

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

18

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 1

8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 8,720.00 17,280.00 1.2

21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 21,492.00 2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 4,000.00 2.1

3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 3,492.00 1,508.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 0.00 2.3

30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 factor de correccion 1

7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 7,935.20 0.91 1.2

18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 18,053.28 factor de correccion 2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.1

2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 2,933.28 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00 12,712.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

568,850.89 575,829.65 582,892.15 590,039.39 597,272.41 604,592.22 611,999.88 619,496.42 627,082.92 634,760.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48 10,658.48

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

482,191.43 488,105.63 494,090.80 500,147.79 506,277.46 512,480.69 518,758.36 525,111.37 531,540.60 538,046.99 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

551,350.89 558,329.65 565,392.15 572,539.39 579,772.41 587,092.22 594,499.88 601,996.42 609,582.92 617,260.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

213,666.58 198,505.58 184,418.84 171,330.39 159,169.58 147,870.78 137,372.97 127,619.47 118,557.58 110,138.33

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00 30,212.00

551,350.89 558,329.65 565,392.15 572,539.39 579,772.41 587,092.22 594,499.88 601,996.42 609,582.92 617,260.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

213,666.58 198,505.58 184,418.84 171,330.39 159,169.58 147,870.78 137,372.97 127,619.47 118,557.58 110,138.33

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48 25,988.48

411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52 411,442.52

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

159,447.49 146,282.10 134,203.76 123,122.72 112,956.62 103,629.93 95,073.33 87,223.24 80,021.32 73,414.05

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,002,905.12

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,519,134.86

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,519,134.86

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,519,134.86 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,535,610.97

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,002,905.12

II. Costos de operación y mantenmiento 2,002,905.12 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,002,905.12 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,002,905.12 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,281,392.69

TIR 14%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,520.93

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 1500

CE S/. 3,381.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,519,134.86

II. Costos de operación y mantenmiento 1,519,134.86 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,519,134.86 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,519,134.86 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,781,790.52

TIR 15%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,187.86

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 1,521 1,188

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestr

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

19

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,780,360.10

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,350,342.10

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,350,342.10

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,350,342.10 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,704,403.73

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,780,360.10

II. Costos de operación y mantenmiento 1,780,360.10 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 1,780,360.10 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,780,360.10 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,077,222.96

TIR 17%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,384.82

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,350,342.10

II. Costos de operación y mantenmiento 1,350,342.10 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,350,342.10 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,350,342.10 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,626,934.78

TIR 18%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,084.62

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muest

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 1,385 1,085

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muest

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

20

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,557,815.09

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,181,549.34

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,181,549.34

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,181,549.34 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,873,196.50

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,557,815.09

II. Costos de operación y mantenmiento 1,557,815.09 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 1,557,815.09 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,557,815.09 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 1,873,053.22

TIR 20%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,248.70

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 1500

CE S/. 3,381.24

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,181,549.34

II. Costos de operación y mantenmiento 1,181,549.34 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,181,549.34 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,181,549.34 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,472,079.03

TIR 22%

NUMERO DE BENEFICIARIOS 1500

CE S/. 981.39

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mu

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 1,249 981

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no mu

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

21

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,335,270.08

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,012,756.58

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,012,756.58

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,012,756.58 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 3,041,989.26

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,335,270.08

II. Costos de operación y mantenmiento 1,335,270.08 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 1,335,270.08 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,335,270.08 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 1,668,883.48

TIR 25%

NUMERO DE BENEFICIARIOS 1500

CE S/. 1,112.59

TASA SOCIAL DE DESCUENTO 9%

#REF!

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,012,756.58

II. Costos de operación y mantenmiento 1,012,756.58 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,012,756.58 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,012,756.58 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,317,223.29

TIR 27%

NUMERO DE BENEFICIARIOS 1500

CE S/. 878.15

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE S/. 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión 1,113 878

Disminución del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

22

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,687,927.63 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,366,818.21

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,485,562.43

TIR 12%

NUMERO DE BENEFICIARIOS 1350 150

CE 1841.16

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,936,646.27

TIR 13%

NUMERO DE BENEFICIARIOS 1,350 150

CE 1,434.55

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 1500

CE 3,208.77

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 1,841 1,435

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no muestra

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

23

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,687,927.63 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,366,818.21

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,485,562.43

TIR 12%

NUMERO DE BENEFICIARIOS 1300 300

CE 1911.97

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,936,646.27

TIR 13%

NUMERO DE BENEFICIARIOS 1,300 300

CE 1,489.73

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 1,912 1,490

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

24

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -5,044,508.85 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. -249,942.22

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 437,431.00 442,680.17 447,992.33 453,368.24 458,808.66 464,314.36 469,886.13 475,524.77 481,231.06 487,005.84

Ingresos netos -1,687,927.63 406,421.00 411,670.17 416,982.33 422,358.24 427,798.66 433,304.36 438,876.13 444,514.77 450,221.06 455,995.84

Valor Actual de Costos (VACS) S/. 2,366,818.21

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,485,562.43

TIR 12%

NUMERO DE BENEFICIARIOS 1200 450

CE 2071.30

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,936,646.27

TIR 13%

NUMERO DE BENEFICIARIOS 1,200 450

CE 1,613.87

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 2,071 1,614

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

25

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 1.2

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 2

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 2.1

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 2.2

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 2.3

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2.4

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion 1

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91 1.2

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion 2

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84 2.1

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84 2.2

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84 2.3

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.4

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 1.2

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 2

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 2.3

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 1.2

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 2

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 2.1

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.3

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion 1

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91 1.2

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion 2

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84 2.3

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

0

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion 1

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91 1.2

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion 2

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84 2.1

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84 2.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84 2.3

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

2

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46 2.1

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46 2.2

3

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

2

492,849.91 498,764.11 504,749.28 510,806.27 516,935.94 523,139.17 529,416.84 535,769.85 542,199.08 548,705.47 2.1

461,839.91 467,754.11 473,739.28 479,796.27 485,925.94 492,129.17 498,406.84 504,759.85 511,189.08 517,695.47 2.2

3

4

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

PeriodoItem

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Personal de operación y mant.. 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

Costos de Mantenimiento 0 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

Materiales y accesorios 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

Vestuario 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

Cloración mensual 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

Gastos Admministrativos 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

Total de Operación y Mantenimiento 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 0

Costos de Operación 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Personal de operación y mant.. 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00

Costos de Mantenimiento 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00

Materiales y accesorios 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00

Vestuario 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00

Cloración mensual 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00

Gastos Admministrativos 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 15,330.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Operación 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Personal de operación y mant.. 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

Costos de Mantenimiento 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

Materiales y accesorios 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

Total de Operación y Mantenimiento 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS PRIVADOS)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Operación 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Personal de operación y mant.. 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

Costos de Mantenimiento 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

Materiales y accesorios 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

Vestuario 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Fuente: Elaboración Propia

COSTOS DE OPERACIÓN Y MANTENIMIENTO PARA AGUA, ALTERNATIVA I (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Operación 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Personal de operación y mant.. 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00

Costos de Mantenimiento 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00

Materiales y accesorios 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00

Total de Operación y Mantenimiento 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO, PARA AGUA, ALTERNATIVA II (PRECIOS SOCIALES)

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 4,016,391.02

Costos de Operación 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Personal de operación y mant.. 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00

Costos de Mantenimiento 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00

Materiales y accesorios 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00

Vestuario 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00

Cloración mensual 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total de Operación y Mantenimiento 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

ALTERNATIVA I

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,225,450.13

Costos de Oper. Y Mant. Incrementales 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

Ingresos

Ingresos brutos por servicios de agua 516,168.58 522,362.60 528,630.95 534,974.52 541,394.22 547,890.95 554,465.64 561,119.23 567,852.66 574,666.89

Ingresos netos -2,225,450.13 480,668.58 486,862.60 493,130.95 499,474.52 505,894.22 512,390.95 518,965.64 525,619.23 532,352.66 539,166.89

Valor Actual de Costos (VACP) S/. 2,569,116.50

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO DE MERCADO ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 5,044,508.85

Costos de Oper. Y Mant. Incrementales 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00

Valor Actual de Costos (VACS) Err:504

Tasa Social de Descuento 9%

ALTERNATIVA I

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA I (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 1,687,927.63

Costos de Oper. Y Mant. Incrementales 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

Ingresos

Ingresos brutos por servicios de agua 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Ingresos netos -1,687,927.63 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00

Valor Actual de Costos (VACS) S/. -1,971,003.83

Tasa Social de Descuento 9%

Fuente: Elaboración Propia

ALTERNATIVA II

FLUJO DE CAJA A PRECIO SOCIAL ALTERNATIVA II (COSTOS INCREMENTALES) - AGUA

PartidaPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

Inversion Total 2,186,358.00

Costos de Oper. Y Mant. Incrementales 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Valor Actual de Costos (VACP) Err:504

Tasa Social de Descuento 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 2,225,450.13

II. Costos de operación y mantenmiento 2,225,450.13 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 2,225,450.13 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -2,225,450.13 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 2,485,562.43

TIR 12%

NUMERO DE BENEFICIARIOS 1100 600

CE 2259.60

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluacion Privada

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 5,044,508.85

II. Costos de operación y mantenmiento 5,044,508.85 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

III. Evaluación

COSTOS TOTALES 5,044,508.85 463,168.58 469,362.60 475,630.95 481,974.52 488,394.22 494,890.95 501,465.64 508,119.23 514,852.66 521,666.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -5,044,508.85 424,925.30 395,053.11 367,274.36 341,442.90 317,422.73 295,087.30 274,318.88 255,007.91 237,052.47 220,357.73

VANS S/. 5,071,854.84

TIR -1%

NUMERO DE BENEFICIARIOS 4905

CE S/. 1,034.02

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa I : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 1,687,927.63

II. Costos de operación y mantenmiento 1,687,927.63 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

III. Evaluación

COSTOS TOTALES 1,687,927.63 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -1,687,927.63 358,799.08 329,173.47 301,994.01 277,058.72 254,182.31 233,194.78 213,940.17 196,275.38 180,069.16 165,201.06

VANS S/. 1,936,646.27

TIR 13%

NUMERO DE BENEFICIARIOS 1,100 600

CE 1,760.59

TASA SOCIAL DE DESCUENTO 9%

Analisis Costo - Efectividad del Proyecto Alternativa II : Evaluación Social

PartidasPeriodo

Año 0 Año 1 Año 2 Año 3 Año 4 Año 5 Año 6 Año 7 Año 8 Año 9 Año 10

I. MODULO DE INVERSION 4,016,391.02

II. Costos de operación y mantenmiento 4,016,391.02 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

III. Evaluación

COSTOS TOTALES 4,016,391.02 381,432.58 387,626.60 393,894.95 400,238.52 406,658.22 413,154.95 419,729.64 426,383.23 433,116.66 439,930.89

FACTOR DE ACTUALIZACION 1.00 0.917 0.842 0.772 0.708 0.650 0.596 0.547 0.502 0.460 0.422

COSTOS ACTUALIZADOS -4,016,391.02 349,938.14 326,257.55 304,159.17 283,539.06 264,299.94 246,350.80 229,606.49 213,987.36 199,418.94 185,831.56

VANS S/. 4,813,151.14

TIR -1%

NUMERO DE BENEFICIARIOS 4095

CE 1,175.37

TASA SOCIAL DE DESCUENTO 9%

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Aumentos de costos operativos

Aumentos de los costos de inversión

Aumento del número de beneficiarios

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

ALTERNATIVA I : ANALISIS DE SENSIBILIDAD

ESCENARIO OPTIMISTA

VARIACION

MAGNITUD

10% 20% 30% 40%

CE CE CE CE

PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL PRIVADO SOCIAL

Disminución de costos operativos

Disminución de los costos de inversión

Disminución del número de beneficiarios 2,260 1,761

Fuente: Elaboración Propia

* El índice de coeficiente de efectividad ante la variación del 10, 20, 30 y 40% de las variables explicativas no m

Cambios sustanciales y los valores reportados se encuentra dentro de lo permisible.

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA - PRECIOS PRIVADOS

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00 9,000.00

8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00

1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00

1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00

6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00 6,000.00

2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00 2,400.00

17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00

COSTOS DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO PARA AGUA A PRECIO SOCIAL

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 factor de correccion

8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 8,190.00 0.91

7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 7,140.00 factor de correccion

840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 840.00 0.84

1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 1,260.00 0.84

5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 5,040.00 0.84

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00 13,230.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00 26,000.00

27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00 27,000.00

10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00 129,600.00

20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00

15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00

5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00 149,600.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 factor de correccion

23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 23,660.00 0.91

22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 22,680.00 factor de correccion

8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 0.84

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84

10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 10,080.00 0.84

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 factor de correccion

117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 117,936.00 0.91

16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 16,800.00 factor de correccion

12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 12,600.00 0.84

4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 4,200.00 0.84

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.84

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00 35,500.00

581,562.89 588,541.65 595,604.15 602,751.39 609,984.41 617,304.22 624,711.88 632,208.42 639,794.92 647,472.46

546,062.89 553,041.65 560,104.15 567,251.39 574,484.41 581,804.22 589,211.88 596,708.42 604,294.92 611,972.46

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 132,100.00 121,506.00 121,506.00 121,506.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00 31,010.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

-31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00 -31,010.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00 119,406.00

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00 53,000.00

528,562.89 535,541.65 542,604.15 549,751.39 556,984.41 564,304.22 571,711.88 579,208.42 586,794.92 594,472.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

204,835.48 190,403.65 176,985.89 164,511.16 152,913.41 142,131.17 132,107.28 122,788.56 114,125.55 106,072.25

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00 46,340.00

391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00 391,091.00

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

151,560.61 139,046.43 127,565.53 117,032.60 107,369.36 98,504.00 90,370.64 82,908.84 76,063.16 69,782.71

Periodo

Año 11 Año 12 Año 13 Año 14 Año 15 Año 16 Año 17 Año 18 Año 19 Año 20

134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00 134,736.00

446,826.89 453,805.65 460,868.15 -134,736.00 475,248.41 482,568.22 489,975.88 497,472.42 505,058.92 512,736.46

0.388 0.356 0.326 0.299 0.275 0.252 0.231 0.212 0.194 0.178

173,160.10 161,343.67 150,325.35 -40,319.27 130,473.77 121,544.34 113,220.28 105,461.04 98,228.74 91,488.02

TALLERES DE CAPACITACIÓN PARA EL PERSONAL DE OPERACIÓN Y MANTENIMIENTO ALTERNATIVA 1

ITEM DETALLE CANT. MEDIDA

1 Edducacion Sanitaria 1 TALLER 5,744 5,744

2 Capacitación JASS 1 TALLER 5,744 5,744

TOTAL 11,488

TALLERES DE CAPACITACIÓN PARA EL PERSONAL DE OPERACIÓN Y MANTENIMIENTO ALTERNATIVA 2

ITEM DETALLE CANT. MEDIDA

1 Edducacion Sanitaria 1 TALLER 44,642 44,642

2 Capacitación JASS 1 TALLER 44,642 44,642

TOTAL 89,284

PRECIO UNIT. (S/.)

PRECIO TOTAL (S/.)

PRECIO UNIT. (S/.)

PRECIO TOTAL (S/.)

Unidad Formuladora

Nombre Municipalidad Distrital de Quillo

Sector Gobiernos Locales

Persona Responsable de formular Ing. Nilton Tomas Méndez Cotrina

Persona Responsable de Unidad Formuladora Raúl Sebastian Olivera Baltazar

Unidad Formuladora

Cargo :

Formuladora

Dirección :

Urbano

Correo Electrónico

Teléfono

Unidad Ejecutora

Nombre

Quillo

Sector :

Responsable Ing. Felix Francisco Boyer

Cruz

Cargo

Económico

Dirección

Urbano

Correo Electrónico

Teléfono

945980996

043-412063

Responsable Unidad

Plaza de Armas S/N Casco

Municipalidad Distrital de

Gobiernos Locales

Gerente de Desarrollo

Plaza de Armas S/N Casco