Flete

Post on 16-Dec-2015

213 views 0 download

description

Flete

Transcript of Flete

FLETE.XLS

XXXXXXX

&APgina &P

XXXXXX0

&APgina &P

XXXXXX1

&APgina &P

XXXXXX2

&APgina &P

resultsCALCULO DEL FLETEPROYECTO : CONSTRUCCION DE LA LOSA DEPORTIVA EN EL BARRIO DENUEVA ESPERANZA DISTRITO DE MASIN - HUARI - ANCASHUBICACIN :REGION: ANCASH / DEPART. : ANCASH / PROV. : HUARI. / DIST. : MASIN1- DATOS GENERALESA-POR PESOMATERIALESUNIDADCANTIDADPESO.UNIT.PESO.TOTALCEMENTOBL.1,263.0042.5053,677.50FIERRO, CLAV. ETCKG59.151.0059.15MADERAP2867.901.501,301.85TRIPLAYPLN0.007.560.00LADRILLOUN0.004.500.00EXPLOSIVOKG0.001.000.00NITRATOKG0.001.000.00CALAMINAUN0.000.210.00TUBER. Fo Fo 1 1/2 "KG0.002.000.00GEOTEXTILM2.0.000.330.00YESOBL11.605.0058.00OTROSKG350.001.00350.00GEOMEMBRANAM2.0.001.220.000.000.00PESO TOTAL55,446.50B-POR VOLUMENEN AGREGADOS SON PUESTOS EN OBRADESCRIPC.UNIDADSIN IGVARENAM393.00PIEDRA SELECCIONADAM390.00HORMIGN+ARENA GRUESAM346.30MADERAP2867.90GRAVAM30.00PIEDRA PARTIDA0.0038.0VOLUMEN TOTAL.231.35CAPACIDAD DEL CAMION (M3)6.00NUMERO DE VIAJES0.0038.56REDONDEO0.0039.00EN TUBERIAUNIDAD DE (2.20 M. x 6.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJEMLNo de tubosNo VIAJESTubo 3/4"5,040.00U0.000.000.00Tub, 1"3,360.00U0.000.000.00Tub,1 1/2"1,690.00U0.000.000.00Tub 2:"994.00U0.000.000.00Tub, 3"470.00U0.000.000.00Tub 4":259.00U0.000.000.00Tub 6:" U-PVC110.00U0.000.000.00Tub 8" HDPE65.00U748.80124.801.92Tub 6'; HDPE160.00U1,229.07204.851.28Tub 8'; HDPE80.00U1,805.13300.863.766.0NUMERO TOTAL DE VIAJES6.960.96REDONDEO0.00TUBERIA EN VOLUMEN02- FLETE TERRESTREHUARAZ - MASINUNIDAD DE TRANSPORTECAPACIDAD DEL CAMION ( M3 )6.00COSTO POR VIAJE S/.1,200.000.00CAPACIDAD DEL CAMION (KG)6,000.00FLETE POR KG0.20SIN IGVFLETE POR PESO11,089.30FLETE POR VOLUMEN8,352.00AGREGADOS0.00TUBERIA0.00COSTO TOTAL FLETE TERR.19,441.30FLETE POR PESO =Peso Total * Flete por pesoFLETE POR VOLUMEN=No viajes*costo por viaje3.A- FLETE EN ACEMILA MATERIALES3.B- FLETE EN ACEMILA AGREGADOSTIEMPOKILOMETRAJECostos de transporte por viajeCostos de transporte por viajeAcemila S/.0.00Acemila S/.0.00Peon S/.0.00Acemila S/.0.00CantidadUnidades deCapacidad deNmero deFlete noCargaCargaViajesAfecto a IGVPeso total tubera de agua02800.000.00Cantidad total tubera HDPE63121631.000.00Peso total tubera desague PVC02800.000.00Numero bolsas de cemento1,263.00111,263.000.00Peso resto de materiales1,769.0016029.480.00Agregados Total en Kilos370,160.001606,169.330.00Piedra grande y peq. de la zona01600.000.00COSTO TOTAL DEL FLETE EN ACEMILA S/.0.00RESUMEN FLETE TOTALSIN IGVTOTALFLETE TERRESTRE19,441.30FLETE EN ACEMILA0.00FLETES TOTALES S/.19,441.3019,441.30

&APgina &P