FLETECALCULO DEL FLETE - NARANJO MAYOOBRA :"MEJORAMIENTO Y
AMPLIACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO EN 10 CASEROS
DEL DISTRITO DE CHOROPAMPA, PROVINCIA DE CHOTA -
CAJAMARCAElaboracinNARANJO MAYO, DISTRITO DE CHOROPAMPAFechaENERO,
20141.- DATOS GENERALESA.- POR PESOMATERIALESUNIDADCANTIDADPESO
PESO UNIT. TOTALCEMENTO PORTLAND TIPO IBLS321.5542.5013665.88MADERA
TORNILLOP2486.901.50730.35ESTACA DE NADERA TORNILLO
TRATADAP2654.551.50981.83ACERO DE CONSTRUCCIN F'Y=4200
KG/CM2KG1083.801.001083.80ALAMBRE NEGRO RECOCIDO BWG N
16KG96.451.0096.45CLAVOS PARA
MADERAKG12.181.0012.18YESOBLS65.4628.001832.88OTROSGLOBAL1.005000.005000.00PESO
TOTAL MATERIALES23403.3635.61B.- POR VOLUMENUNIDAD DE ( 2.20 m. *
3.00 m. ) DE CARROCERIA CON H = 1.50 m.0.240.7320.672CLASE DE
TUBERIA CAPACIDAD DEL CAMION EN TUBOS / VIAJEMLMLNo VOLUMEN POR
TUBERIA0.384tuberiatubosM3No VIAJES2.028TUBERIA PVC SAP CLASE 10,
1"400106.05617.68106.050.04TUBERIA PVC SAP CLASE 10,
3/4"4002848.656474.782848.651.19TUBERIA PVC SAP CLASE 10,
1/2"4005559.76926.625559.702.32NUMERO TOTAL DE
VIAJES3.55REDONDEO42.- FLETE TERRESTREMATERIALESUNIDAD QUE DA
COMPROBANTECAPACIDAD DEL CAMION ( M3 )10COSTO POR VIAJE
S/.1100CAPACIDAD DEL CAMION ( KG )10000FLETE POR KG0.11AFECTO
IGVSIN IGVFLETE POR PESO MATERIALES2574.37FLETE POR PESO = Peso
Total * Flete por PesoFLETE POR VOLUMENTUBERIAS4400.00FLETE POR
VOLUMEN = No Viajes * Costos por ViajeCOSTO TOTAL FLETE
TERR.6974.37RESUMEN DE FLETEFLETEAFECTO SIN TOTAL DE IGVIGVFLETE
FLETE TERRESTRE
S./6974.376974.376974.379818.90646465.80167147.2743283.5333689.88