VIAJES / 8TN 4 pre x mral kgS./ X VIAJE 3600 0.2 28125S./ X TN 2531.25
sulfuroshua-inq S/. 3,600.00inq-naz 2531.25
cargui y desc 800carg-naz 0moliend 0analis 150SACOS 203.7viatic 480
retorno 400camioneta 750
S/. 8,914.95 S/. 3,634.99
GASTO TOTAL
S/. 14,539.95
DESCUENTOSMAQUILA X TN TN TOTAL $ TOTAL SOLES
$26.00 28.125 $731.25 S/. 2,193.75
34.5 30.5% CU % DE CONC TN DE CONC DÓLAR SOLES
5 17.25 4.85 $5,821.88 S/. 17,465.63
PAGO TOTAL S/. 17,465.63GASTO TOTAL S/. -14,539.95MAQUILA S/. -2,193.75
LIQ POR CU S/. 731.92LIQ POR AU S/. 3,881.25 S/. 168.75
TOTAL GAN S/. 4,613.17
nos toca por persona
CHALCOPY Contiene el 34.5% de cobre, el 30.5% de hierro y el 35% de azufre
pre totalS/. 5,625.00
35, el 30.5% de hierro y el 35% de azufre
Nro Viajes
RESUMEN DE MOVIMIENTOS PROYECTO GEOMIN EIRL
REALIZADO POR:ALBERTO GARCIA MENDOZARICHARD HUAYCOCHEA CARBAJAL
VIAJES / 8TN 4 3.75COST X VIAJE S/. 900.00 pre x mral kg pre totalS./ X VIAJE a inq S/. 3,600.00 0.2 28125 S/. 5,625.00preci por tn a naz S/. 90.00 toneladas a llevar 30S./ X VIAJE a naz S/. 2,700.00
%CASTIGOsulfuros
BRUTO A COMPRAR 6.25%hua-inq S/. 3,600.00inq-naz S/. 2,700.00 30000 100%cargui y desc S/. 800.00 kg de Castigo 1875carg-naz S/. 0.00moliend S/. 0.00
analis S/. 150.00 POR SOCIO:SACOS S/. 203.70 S/. 3,677.18 viatic S/. 480.00retorno S/. 400.00 SON VARIABLEScamioneta S/. 750.00
S/. 9,083.70
GASTO TOTAL:S/. 14,708.70
DESCUENTOS POR MAQUILAMAQUILA X TN TN TOTAL $ TOTAL SOLES
$26.00 28.125 $731.25 S/. 2,193.75
34.5% CU % DE CONC TN DE CONC DÓLAR SOLES
5 17.25 4.85 $5,821.88 S/. 17,465.63
PAGO TOTAL S/. 17,465.63GASTO TOTAL S/. -14,708.70MAQUILA S/. -2,193.75
LIQ POR CU S/. 563.17LIQ POR AU S/. 3,881.25TOTAL GAN S/. 4,444.42
CHALCOPY Contiene el 34.5% de cobre, el 30.5% de hierro y el 35% de azufre