MEMORIA DE CALCULOS
ESTUDIO ESTRUCTURAL
ANALISIS Y DISEÑO
PROYECTO
CONTRUCCION EDIFICACION JORGE ARTURO VERGARA ALFONSO
SANTA ROSA DEL SUR, BOLIVAR
Calculo
Ing. JAIR PINEDA CELIS
ENERO 2014
BOGOTA D.C
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 2/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
NOMBRE DEL PROYECTO HOTEL JORGE ARTUTO VERGARA
DIRECCION CARRERA 13 N° 11 -56 BARRIO CENTRO
USO VIVIENDA COMERCIAL
PROPIETARIO HOTEL JORGE ARTUTO VERGARA
NUMERO DE NIVELES : Tres Pisos
AREA DE CONSTRUCCION : 900 metros cuadrados ( aproximadamente)
SISTEMA DE CALCULO : SISMICO : Fuerza Horizontal Equivalente
: ESTRUCTURAL : Elementos finitos Etabs V.8
INGENIERO CALCULISTA : JAIR PINEDA CELIS
MATRICULA : 60202-106123 STD
NORMA : NSR - 10 ( Norma Colombiana)
ESPECIFICACIONES : CONCRETO :f̀ c = 21 Mpa ( Cimientos,placas, vigas)
f`c = 21 Mpa ( Columnas)
: ACERO :f̀ y = 420 Mpa>= Nº4 o mayor
f`y = 240 Mpa = Nº2 o Nº 3
SISTEMA ESTRUCTURAL : Porticos en concreto reforzado
MATERIAL ESTRUCTURAL : Concreto reforzado
DISIPACION DE ENERGIA : Moderada ( DMO)
CONSTRUCCION CUBIERTA : Placa teja eternit
PORTICO : En concreto reforzado
CIMENTACION
GRADO DE IRREGULARIDAD DE LA ESTRUCTURA
5,0
1,0
0,9
B
1,0
I
Intermedia
F.H.E.
TIPO DE PERFIL DE SUELO
COEFICCINETE DE SITIO (S)
GRUPO DE USO
ZONA DE AMENAZA SISMICA
PROCEDIMIENTO DE ANALISIS SISMICO
MEMORIAS DE DISEÑO ESTRUCTURAL
: Zapatas aisladas con viga de cimentacion
COEFICIENTE DE CAPACIDAD DE DISIPACION DE ENERGIA (Ro)
IRREGULARIDAD EN PLANTA (
IRREGULARIDAD EN ALTURa (
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 3/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Gravedad (m / s2 ) 9,8066
0,05
0,35 0,28
0,60 0,10 0,60
PESO DE LA PLACA ALIGERADA ( en kgf / m2
) DENSIDAD DE LO MATERIALES ( en kgf / m3 )
( No incluye acabados ni muros divisorios )
Loseta Superior 120 Concreto reforzado 244,73 2.400
Loseta Inferior 48 Concreto simple 244,73 2.400
Mortero de pega 244,73 2.400
Casetón 21,0
189,0000
PESO DE LA PLACA 189 kgf / m2
Weight per unit Volume (kgf /m)
0,02
CORTE TIPICO DE LA PLACA ALIGERADA DE ENTREPISO( No se indica el refuerzo )
168,000000000000
Nivel 0,00 +9,20
Nº Area Peso Longitud Base Ancho Altura Densidad W
m2 kgf/m2m b (m) a (m) h (m) kgf/m3
kgf
Placa de entrepiso 300,00 189 56700,000
Acabados 300,00 80 24000,000
Acabados 0,000
Muros Divisorios 0,00 0,15 2,60 1300,00 0,000
Muros de Fachada 0,00 0,15 2,60 1300,00 0,000
Casetón 300,00 21,00 6300,000
VG20x30 2400 83,70 0,20 0,30 12052,800
VG30x30 2400 78,40 0,30 0,30 16934,400
VTA10x28 10 2400 18,44 0,10 0,28 12391,68
BORDE 15X30 1 2400 18,44 0,15 0,30 1991,520
COL20X45 16 2400 0,20 0,45 2,95 10195,200
COL20X35 4 2400 0,20 0,35 2,95 1982,400
,
TOTAL (kgf / m)
PESO TOTAL DE LA CUBIERTA
42 548
Descripción
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 4/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Nivel 0,00 + 6,30
Nº Area Peso Longitud Base Ancho Altura Densidad W
m2 kgf/m2m b (m) a (m) h (m) kgf/m3
kgf
Placa de entrepiso 300,00 189,00 56700,00
Acabados 300,00 80,00 0,03 720,00
0,00
Muros Divisorios 52,78 0,15 2,60 1300 26759,46
Muros de Fachada 75,40 0,15 2,60 1300 38227,80
Casetón 300,00 21,00 6300,00
VG20x35 2400 83,70 0,20 0,35 14061,60
VG30x35 2400 78,40 0,30 0,35 19756,80
VTA10x28 10 2400 18,44 0,10 0,33 14604,48
BORDE 15X35 1 2400 18,44 0,15 0,35 2323,44
V ESC 20X35 1 2400 23,50 0,20 0,35 3948,00
COL20X45 12 2400 0,20 0,45 2,95 7646,40
COL20X35 4 2400 0,30 0,35 2,95 2973,60
TOTAL (kgf / m)
PESO TOTAL DEL TERCER PISO
Descripción
194 22
Nivel 0,00 + 3,30
Nº Area Peso Longitud Base Ancho Altura Densidad W
m2
kgf/m2
m b (m) a (m) h (m) kgf/m3
kgf
Placa de entrepiso 300,00 189,00 56700,00
Acabados 300,00 80,00 0,03 720,00
0,00
Muros Divisorios 52,78 0,15 2,60 1300 26759,46
Muros de Fachada 75,40 0,15 2,60 1300 38227,80
Casetón 300,00 21,00 6300,00
VG20X35 2400 83,70 0,20 0,35 14061,60
VG30X35 2400 78,40 0,30 0,35 19756,80
VTA10x33 10 2400 18,44 0,10 0,33 14604,48
BORDE 15X35 1 2400 18,44 0,15 0,35 2323,44
V ESC 20X35 1 2400 23,50 0,20 0,35 3948,00
COL20X45 12 2400 0,20 0,45 3,30 8553,60
COL20X35 4 2400 0,30 0,35 3,30 3326,40
TOTAL (kgf / m)
PESO TOTAL DEL SEGUNDO PISO
Descripción
195 282
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 5/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
########
CUBIERTA 136.459,20 #¡REF! PISO 3 162.306,75 CUBIERTA 136.459,20
Teja Eternit 56.700,00 Placa de Entrepiso 56.700,00 Dead 353,86 kgf/m2
Muros 0,00 Muros 32.493,63 CM 101,00 kgf/m2
Casetón 6.300,00 Casetón 6.300,00 CV 180,00 kgf/m2
Impermeabilizacion 24.000,00 Acabados de piso 720,00Vigas 43.370,40 Vigas 54.694,32 PISO 2 162.306,75Columnas 6.088,80 Columnas 11.398,80 Dead 409,31 kgf/m2
Escalera Escalera CM 131,71 kgf/m2
CV 500,00 kgf/m2
PISO 2 70.436,94
Placa de Entrepiso 18.085,38 PISO 3 162.306,75Muros 17.358,67 Dead 409,31 kgf/m2
Casetón 2.301,78 CM 131,71 kgf/m2
Acabados de piso 225,48 CV 500,00 kgf/m2
Vigas 23.800,44
Columnas 8.665,20
Escalera
298.765,95 kgf
336.569,58 kgf
PESO TOTAL DE EDIFICIOPESO TOTAL DE EDIFICIO PARA ETABS CARGAS APLICADAS EN LA
PLACA kg/m2
PESO TOTAL DE EDIFICIO PARA ETABS
PESO TOTAL DE EDIFICIO
Aa S I hn Ct
0,150 1,00 1,10 9,20 0,047
TC TL Ta = 0,248
0,48 2,40 Sa = 0,413
ESPECTRO DE DISE O
V = Sa * g * M = Sa * W
CORTANTE SISMICO EN LA BASE
0,0
0,1
0,1
0,2
0,2
0,3
0,3
0,4
0,4
0,5
0 1 2 3 4 5 6 7 8
S a ( g )
T (s)
ESPECTRO ELASTICO DE DISEÑO
Series1
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 6/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
DATOS ENTRADA:
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 1
M A T E R I A L P R O P E R T Y D A T A
MATERIAL MATERIAL DESIGN MATERIAL MODULUS OF POISSON'S THERMALSHEARNAME TYPE TYPE DIR/PLANE ELASTICITY RATIO COEFFMODULUS
STEEL Iso Steel All 2,039E+10 0,3000 1,1700E-057841930445CONC3000PSI Iso Concrete All 1811430000,0 0,2000 9,9000E-06754762500,0OTHER Iso None All 2,039E+10 0,3000 1,1700E-057841930445
M A T E R I A L P R O P E R T Y M A S S A N D W E I G H T
MATERIAL MASS PER WEIGHT PERNAME UNIT VOL UNIT VOL
STEEL 7,9814E+02 7,8334E+03CONC3000PSI 2,4470E+02 2,4000E+03OTHER 7,9814E+02 7,8334E+03
M A T E R I A L D E S I G N D A T A F O R S T E E L M A T E R I A L S
MATERIAL STEEL STEEL STEELNAME FY FU COST ($)
STEEL 35153481,31 45699525,70 27679906,54
M A T E R I A L D E S I G N D A T A F O R C O N C R E T E M A T E R I A L S
DISEÑO SISMICO DE EDIFICIOSFUERZA HORIZONTAL EQUIVALENTE: según NSR-10
VIVIENDA HOTEL HUMBERTO TC TL F´c
0,480 2,4 210
ZONA DE AMENAZA SISMICA INTERMEDIAALTURA DEL EDIFICIO 9,20 Ta K Sa
ACELERACION PICO EFECTIVA Aa 0,15 0,423 1,000 0,413
COEFICIENTE DE IMPORTANCIA I 1,10
COEFICIENTE DE SITIO S 1,00 Vs
R 4,5 152.296,19
NIVEL AREA Hi Hi^k Wi Wi*Hi^k sum Cv Fi Vi
m^2 m m (WihI^k)
CUBIERTA 300,00 9,20 9,20 136.459,20 1.255.424,64 1.255.424,64 0,506 77.026,23 77.026,23
PISO 3 300,00 6,30 6,30 162.306,75 1.022.532,53 2.277.957,17 0,412 62.737,20 139.763,44
PISO 2 300,00 3,30 2,90 70.436,94 204.267,11 2.482.224,28 0,082 12.532,75 152.296,19
900,00 369.202,89 2.482.224,28
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 7/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
MATERIAL LIGHTWEIGHT CONCRETE REBAR REBAR LIGHTWTNAME CONCRETE FC FY FYS REDUC FACT
CONC3000PSI No 2100000,000 42000000,0024000000,000 N/A
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 2
F R A M E S E C T I O N P R O P E R T Y D A T A
MATERIAL SECTION SHAPE NAME OR NAME CONCCONCFRAME SECTION NAME NAME IN SECTION DATABASE FILE COLBEAM
ConcCol CONC3000PSI Rectangular YesConcBm CONC3000PSI RectangularYesCOL20X45 CONC3000PSI Rectangular YesVCUB20X30 CONC3000PSI RectangularYesVCUB30X30 CONC3000PSI RectangularYesVIG20X35 CONC3000PSI Rectangular
YesVIG30X35 CONC3000PSI RectangularYesVIGBORDE15X30 CONC3000PSI RectangularYesVIGBORDE15X35 CONC3000PSI RectangularYesVIGESC20X30 CONC3000PSI RectangularYesVESC20X35 CONC3000PSI RectangularYesVTA10X33 CONC3000PSI RectangularYesCOL20X45-2 CONC3000PSI Rectangular YesVTA10X28 CONC3000PSI RectangularYes
F R A M E S E C T I O N P R O P E R T Y D A T A
SECTION FLANGE FLANGE WEBFLANGE FLANGEFRAME SECTION NAME DEPTH WIDTH TOP THICK TOP THICK WIDTHBOT THICK BOT
ConcCol 0,4572 0,4572 0,0000 0,00000,0000 0,0000ConcBm 0,4572 0,3048 0,0000 0,00000,0000 0,0000COL20X45 0,4500 0,2000 0,0000 0,00000,0000 0,0000VCUB20X30 0,3000 0,2000 0,0000 0,00000,0000 0,0000VCUB30X30 0,3000 0,3000 0,0000 0,0000
0,0000 0,0000VIG20X35 0,3500 0,2000 0,0000 0,00000,0000 0,0000VIG30X35 0,3500 0,3000 0,0000 0,00000,0000 0,0000VIGBORDE15X30 0,3000 0,1500 0,0000 0,00000,0000 0,0000VIGBORDE15X35 0,3500 0,1500 0,0000 0,00000,0000 0,0000VIGESC20X30 0,3000 0,2000 0,0000 0,00000,0000 0,0000
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 8/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
VESC20X35 0,3500 0,2000 0,0000 0,00000,0000 0,0000VTA10X33 0,3300 0,1000 0,0000 0,00000,0000 0,0000COL20X45-2 0,4500 0,2500 0,0000 0,00000,0000 0,0000VTA10X28 0,2800 0,1000 0,0000 0,00000,0000 0,0000
F R A M E S E C T I O N P R O P E R T Y D A T A
SECTION TORSIONAL MOMENTS OF INERTIASHEAR AREASFRAME SECTION NAME AREA CONSTANT I33 I22A2 A3
ConcCol 0,2090 0,0062 0,0036 0,00360,1742 0,1742ConcBm 0,1394 0,0025 0,0024 0,00110,1161 0,1161COL20X45 0,0900 0,0009 0,0015 0,00030,0750 0,0750VCUB20X30 0,0600 0,0005 0,0005 0,00020,0500 0,0500
VCUB30X30 0,0900 0,0011 0,0007 0,00070,0750 0,0750VIG20X35 0,0700 0,0006 0,0007 0,00020,0583 0,0583VIG30X35 0,1050 0,0015 0,0011 0,00080,0875 0,0875VIGBORDE15X30 0,0450 0,0002 0,0003 0,00010,0375 0,0375VIGBORDE15X35 0,0525 0,0003 0,0005 0,00010,0438 0,0438VIGESC20X30 0,0600 0,0005 0,0005 0,00020,0500 0,0500VESC20X35 0,0700 0,0006 0,0007 0,00020,0583 0,0583VTA10X33 0,0330 0,0001 0,0003 0,00000,0275 0,0275COL20X45-2 0,1125 0,0015 0,0019 0,0006
0,0938 0,0938VTA10X28 0,0280 0,0001 0,0002 0,00000,0233 0,0233
F R A M E S E C T I O N P R O P E R T Y D A T A
SECTION MODULI PLASTIC MODULIRADIUS OF GYRATIONFRAME SECTION NAME S33 S22 Z33 Z22R33 R22
ConcCol 0,0159 0,0159 0,0239 0,02390,1320 0,1320ConcBm 0,0106 0,0071 0,0159 0,01060,1320 0,0880COL20X45 0,0068 0,0030 0,0101 0,0045
0,1299 0,0577VCUB20X30 0,0030 0,0020 0,0045 0,00300,0866 0,0577VCUB30X30 0,0045 0,0045 0,0068 0,00680,0866 0,0866VIG20X35 0,0041 0,0023 0,0061 0,00350,1010 0,0577VIG30X35 0,0061 0,0053 0,0092 0,00790,1010 0,0866VIGBORDE15X30 0,0023 0,0011 0,0034 0,00170,0866 0,0433
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 9/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
VIGBORDE15X35 0,0031 0,0013 0,0046 0,00200,1010 0,0433VIGESC20X30 0,0030 0,0020 0,0045 0,00300,0866 0,0577VESC20X35 0,0041 0,0023 0,0061 0,00350,1010 0,0577VTA10X33 0,0018 0,0006 0,0027 0,00080,0953 0,0289COL20X45-2 0,0084 0,0047 0,0127 0,00700,1299 0,0722VTA10X28 0,0013 0,0005 0,0020 0,00070,0808 0,0289
F R A M E S E C T I O N W E I G H T S A N D M A S S E S
TOTAL TOTALFRAME SECTION NAME WEIGHT MASS
ConcCol 0,0000 0,0000ConcBm 11879,6975 1211,2342COL20X45 28339,2000 2889,4176VCUB20X30 10517,0400 1072,2999VCUB30X30 15949,4400 1626,1783VIG20X35 25268,0400 2576,2872
VIG30X35 37215,3600 3794,4161VIGBORDE15X30 1045,4400 106,5913VIGBORDE15X35 3948,8400 402,6171VIGESC20X30 3332,1600 339,7415VESC20X35 5204,6400 530,6564VTA10X33 60679,0800 6186,7379COL20X45-2 17712,0000 1805,8860VTA10X28 24646,2720 2512,8928
C O N C R E T E C O L U M N D A T A
REINF CONFIGURATION REINF NUM BARS NUMBARS BARFRAME SECTION NAME LONGIT LATERAL SIZE/TYPE 3DIR/2DIRCIRCULAR COVER
ConcCol Rectangular Ties #9/Design 3/3N/A 0,0457COL20X45 Rectangular Ties #5/Design 2/4N/A 0,0400COL20X45-2 Rectangular Ties #5/Design 2/5N/A 0,0400
C O N C R E T E B E A M D A T A
TOP BOT TOP LEFT TOP RIGHT BOTLEFT BOT RIGHTFRAME SECTION NAME COVER COVER AREA AREAAREA AREA
ConcBm 0,0457 0,0457 0,000 0,0000,000 0,000VCUB20X30 0,0300 0,0300 0,000 0,0000,000 0,000VCUB30X30 0,0300 0,0300 0,000 0,0000,000 0,000VIG20X35 0,0350 0,0350 0,000 0,0000,000 0,000VIG30X35 0,0350 0,0350 0,000 0,0000,000 0,000VIGBORDE15X30 0,0300 0,0300 0,000 0,0000,000 0,000
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 10/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
VIGBORDE15X35 0,0350 0,0350 0,000 0,0000,000 0,000VIGESC20X30 0,0300 0,0300 0,000 0,0000,000 0,000VESC20X35 0,0350 0,0350 0,000 0,0000,000 0,000VTA10X33 0,0330 0,0330 0,000 0,0000,000 0,000VTA10X28 0,0280 0,0280 0,000 0,0000,000 0,000
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 3
S T A T I C L O A D C A S E S
STATIC CASE AUTO LAT SELF WT NOTIONAL NOTIONALCASE TYPE LOAD MULTIPLIER FACTOR DIRECTION
DEAD DEAD N/A 1,0000LIVE LIVE N/A 0,0000MUERTA SUPER DEAD N/A 0,0000DERIVAX0 QUAKE USER_COEFF 0,0000DERIVAX1 QUAKE USER_COEFF 0,0000DERIVAY0 QUAKE USER_COEFF 0,0000
DERIVAY1 QUAKE USER_COEFF 0,0000SISMOX0 QUAKE USER_COEFF 0,0000SISMOX1 QUAKE USER_COEFF 0,0000SISMOY0 QUAKE USER_COEFF 0,0000SISMOY1 QUAKE USER_COEFF 0,0000
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 20140:18 PAGE 4
L O A D I N G C O M B I N A T I O N S
COMBO CASE SCALECOMBO TYPE CASE TYPE FACTOR
CM ADD DEAD Static 1,0000MUERTA Static 1,0000
COMB1 ADD CM Combo 1,4000
LIVE Static 1,7000COMB2 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static 1,0000
COMB3 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static 1,0000
COMB4 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static 1,0000
COMB5 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static 1,0000
COMB6 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static -1,0000
COMB7 ADD CM Combo 1,0500
LIVE Static 1,2800SISMOX1 Static -1,0000
COMB8 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static -1,0000
COMB9 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static -1,0000
COMB10 ADD CM Combo 0,9000SISMOX0 Static 1,0000
COMB11 ADD CM Combo 0,9000SISMOX1 Static 1,0000
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 11/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
COMB12 ADD CM Combo 0,9000SISMOY0 Static 1,0000
COMB13 ADD CM Combo 0,9000SISMOY1 Static 1,0000
COMB14 ADD CM Combo 0,9000SISMOX0 Static -1,0000
COMB15 ADD CM Combo 0,9000SISMOX1 Static -1,0000
COMB16 ADD CM Combo 0,9000SISMOY0 Static -1,0000
COMB17 ADD CM Combo 0,9000SISMOY1 Static -1,0000
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 12/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia12
VERIFICACION DE DERIVAS
Story Point Load UX UY UZ RX RY RZ DX DY DERIVA CUMPLE
STORY3 4 DERIVAX0 0,0242 0,002 0,0003 0,00013 0,00163 -0,00016 0,0061 0,0004 0,006113101 OK
STORY2 4 DERIVAX0 0,0181 0,0016 0,0003 0,00013 0,00233 -0,00013 0,009 0,0007 0,009027181 OK
STORY1 4 DERIVAX0 0,0091 0,0009 0,0002 0,00021 0,00302 -0,00007 0,0091 0,0009 0,009144397 OK
BASE 4 DERIVAX0STORY3 5 DERIVAX0 0,0251 0,002 0,0003 -0,00005 0,00164 -0,00016 0,0063 0,0004 0,006312686 OK
STORY2 5 DERIVAX0 0,0188 0,0016 0,0003 -0,0001 0,00236 -0,00013 0,0093 0,0007 0,009326307 OK
STORY1 5 DERIVAX0 0,0095 0,0009 0,0002 -0,00015 0,00307 -0,00007 0,0095 0,0009 0,009542536 OK
BASE 5 DERIVAX0
STORY3 6 DERIVAX0 0,0257 0,002 0,0003 -0,0002 0,00169 -0,00016 0,0064 0,0004 0,006412488 OK
STORY2 6 DERIVAX0 0,0193 0,0016 0,0003 -0,0003 0,00244 -0,00013 0,0095 0,0007 0,009525755 OK
STORY1 6 DERIVAX0 0,0098 0,0009 0,0002 -0,00045 0,00322 -0,00007 0,0098 0,0009 0,00984124 OK
BASE 6 DERIVAX0
STORY3 7 DERIVAX0 0,0242 0,0015 0 -0,00008 0,00133 -0,00016 0,0061 0,0003 0,006107373 OK
STORY2 7 DERIVAX0 0,0181 0,0012 0 -0,00014 0,00199 -0,00013 0,009 0,0005 0,009013878 OK
STORY1 7 DERIVAX0 0,0091 0,0007 0 -0,00023 0,00244 -0,00007 0,0091 0,0007 0,009126883 OK
BASE 7 DERIVAX0
STORY3 8 DERIVAX0 0,0251 0,0015 -0,0001 -0,00004 0,00137 -0,00016 0,0063 0,0003 0,006307139 OKSTORY2 8 DERIVAX0 0,0188 0,0012 -0,0001 -0,00007 0,00207 -0,00013 0,0093 0,0005 0,009313431 OK
STORY1 8 DERIVAX0 0,0095 0,0007 0 -0,00011 0,00256 -0,00007 0,0095 0,0007 0,009525755 OK
BASE 8 DERIVAX0
STORY3 9 DERIVAX0 0,0257 0,0015 0 -0,00001 0,00137 -0,00016 0,0064 0,0003 0,006407027 OK
STORY2 9 DERIVAX0 0,0193 0,0012 0 -0,00003 0,00208 -0,00013 0,0095 0,0005 0,009513149 OK
STORY1 9 DERIVAX0 0,0098 0,0007 0 -0,00003 0,00257 -0,00007 0,0098 0,0007 0,009824968 OK
BASE 9 DERIVAX0
STORY3 10 DERIVAX0 0,0242 0,0009 -0,0001 -0,00008 0,00137 -0,00016 0,0061 1E-04 0,00610082 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 13/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia13
STORY2 10 DERIVAX0 0,0181 0,0008 -0,0001 -0,00013 0,00205 -0,00013 0,009 0,0004 0,009008885 OK
STORY1 10 DERIVAX0 0,0091 0,0004 0 -0,00019 0,00255 -0,00007 0,0091 0,0004 0,009108787 OK
BASE 10 DERIVAX0
STORY3 11 DERIVAX0 0,0251 0,0009 -0,0001 -0,00001 0,00139 -0,00016 0,0063 1E-04 0,006300794 OK
STORY2 11 DERIVAX0 0,0188 0,0008 -0,0001 -0,00005 0,00212 -0,00013 0,0093 0,0004 0,009308598 OK
STORY1 11 DERIVAX0 0,0095 0,0004 0 -0,00004 0,00264 -0,00007 0,0095 0,0004 0,009508417 OK
BASE 11 DERIVAX0
STORY3 12 DERIVAX0 0,0257 0,0009 -0,0001 0,00004 0,00145 -0,00016 0,0064 1E-04 0,006400781 OK
STORY2 12 DERIVAX0 0,0193 0,0008 -0,0001 0,00006 0,0022 -0,00013 0,0095 0,0004 0,009508417 OK
STORY1 12 DERIVAX0 0,0098 0,0004 -0,0001 0,00006 0,00277 -0,00007 0,0098 0,0004 0,00980816 OK
BASE 12 DERIVAX0
STORY3 13 DERIVAX0 0,0242 0,0003 0 -0,00001 0,00141 -0,00016 0,0061 0,0001 0,00610082 OK
STORY2 13 DERIVAX0 0,0181 0,0002 0 -0,00003 0,0021 -0,00013 0,009 0,0001 0,009000556 OK
STORY1 13 DERIVAX0 0,0091 0,0001 0 -0,00004 0,00264 -0,00007 0,0091 0,0001 0,009100549 OK
BASE 13 DERIVAX0
STORY3 14 DERIVAX0 0,0251 0,0003 0 0,00002 0,00146 -0,00016 0,0063 0,0001 0,006300794 OK
STORY2 14 DERIVAX0 0,0188 0,0002 0 0,0001 0,00208 -0,00013 0,0093 0,0001 0,009300538 OK
STORY1 14 DERIVAX0 0,0095 0,0001 0 0,00005 0,00275 -0,00007 0,0095 0,0001 0,009500526 OK
BASE 14 DERIVAX0
STORY3 15 DERIVAX0 0,0257 0,0003 0,0001 -0,00004 0,0015 -0,00016 0,0064 0,0001 0,006400781 OK
STORY2 15 DERIVAX0 0,0193 0,0002 0 -0,00017 0,0021 -0,00013 0,0095 0,0001 0,009500526 OK
STORY1 15 DERIVAX0 0,0098 0,0001 0 -0,0001 0,00284 -0,00007 0,0098 0,0001 0,00980051 OK
BASE 15 DERIVAX0
STORY3 16 DERIVAX0 0,0242 -0,0004 0 0,00001 0,0014 -0,00016 0,0061 -0,0001 0,00610082 OK
STORY2 16 DERIVAX0 0,0181 -0,0003 0 0,00004 0,00208 -0,00013 0,009 -0,0001 0,009000556 OK
STORY1 16 DERIVAX0 0,0091 -0,0002 0 0,00004 0,00261 -0,00007 0,0091 -0,0002 0,009102198 OK
BASE 16 DERIVAX0
STORY3 17 DERIVAX0 0,0251 -0,0004 0 0,00001 0,00146 -0,00016 0,0063 -0,0001 0,006300794 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 14/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia14
STORY2 17 DERIVAX0 0,0188 -0,0003 0 -0,00004 0,00208 -0,00013 0,0093 -0,0001 0,009300538 OK
STORY1 17 DERIVAX0 0,0095 -0,0002 0 0,00003 0,00273 -0,00007 0,0095 -0,0002 0,009502105 OK
BASE 17 DERIVAX0
STORY3 18 DERIVAX0 0,0257 -0,0004 0 -0,00001 0,00148 -0,00016 0,0064 -0,0001 0,006400781 OK
STORY2 18 DERIVAX0 0,0193 -0,0003 0 0,0001 0,0021 -0,00013 0,0095 -0,0001 0,009500526 OK
STORY1 18 DERIVAX0 0,0098 -0,0002 0 0,00002 0,00278 -0,00007 0,0098 -0,0002 0,009802041 OK
BASE 18 DERIVAX0
STORY3 19 DERIVAX0 0,0242 -0,001 0 0,00002 0,00137 -0,00016 0,0061 -0,0002 0,006103278 OK
STORY2 19 DERIVAX0 0,0181 -0,0008 0 0,00008 0,00204 -0,00013 0,009 -0,0004 0,009008885 OK
STORY1 19 DERIVAX0 0,0091 -0,0004 0 0,00012 0,00254 -0,00007 0,0091 -0,0004 0,009108787 OK
BASE 19 DERIVAX0
STORY3 20 DERIVAX0 0,0251 -0,001 0,0001 0,00008 0,00133 -0,00016 0,0063 -0,0002 0,006303174 OK
STORY2 20 DERIVAX0 0,0188 -0,0008 0,0001 0,00006 0,00214 -0,00013 0,0093 -0,0004 0,009308598 OK
STORY1 20 DERIVAX0 0,0095 -0,0004 0 0,00007 0,00266 -0,00007 0,0095 -0,0004 0,009508417 OK
BASE 20 DERIVAX0
STORY3 21 DERIVAX0 0,0257 -0,001 0,0001 0,00001 0,00141 -0,00016 0,0064 -0,0002 0,006403124 OK
STORY2 21 DERIVAX0 0,0193 -0,0008 0,0001 0,00002 0,00215 -0,00013 0,0095 -0,0004 0,009508417 OK
STORY1 21 DERIVAX0 0,0098 -0,0004 0 0,00006 0,0027 -0,00007 0,0098 -0,0004 0,00980816 OK
BASE 21 DERIVAX0
STORY3 22 DERIVAX0 0,0242 -0,0015 0 -0,00003 0,00135 -0,00016 0,0061 -0,0002 0,006103278 OK
STORY2 22 DERIVAX0 0,0181 -0,0013 0 0,00015 0,00204 -0,00013 0,009 -0,0006 0,009019978 OK
STORY1 22 DERIVAX0 0,0091 -0,0007 0 0,00023 0,00251 -0,00007 0,0091 -0,0007 0,009126883 OK
BASE 22 DERIVAX0
STORY3 23 DERIVAX0 0,0251 -0,0015 0 0,00004 0,00131 -0,00016 0,0063 -0,0002 0,006303174 OK
STORY2 23 DERIVAX0 0,0188 -0,0013 0 0,00008 0,00212 -0,00013 0,0093 -0,0006 0,009319335 OK
STORY1 23 DERIVAX0 0,0095 -0,0007 0 0,0001 0,00262 -0,00007 0,0095 -0,0007 0,009525755 OK
BASE 23 DERIVAX0
STORY3 24 DERIVAX0 0,0257 -0,0015 0 0,00003 0,00141 -0,00016 0,0064 -0,0002 0,006403124 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 15/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia15
STORY2 24 DERIVAX0 0,0193 -0,0013 0 0,00004 0,00213 -0,00013 0,0095 -0,0006 0,009518929 OK
STORY1 24 DERIVAX0 0,0098 -0,0007 0 0,00008 0,00266 -0,00007 0,0098 -0,0007 0,009824968 OK
BASE 24 DERIVAX0
STORY3 25 DERIVAX0 0,0242 -0,0022 -0,0002 0,00007 0,00182 -0,00016 0,0061 -0,0004 0,006113101 OK
STORY2 25 DERIVAX0 0,0181 -0,0018 -0,0002 -0,00014 0,00235 -0,00013 0,009 -0,0008 0,009035486 OK
STORY1 25 DERIVAX0 0,0091 -0,001 -0,0001 -0,00004 0,00305 -0,00007 0,0091 -0,001 0,00915478 OK
BASE 25 DERIVAX0
STORY3 26 DERIVAX0 0,0251 -0,0022 -0,0003 0,00003 0,00176 -0,00016 0,0063 -0,0004 0,006312686 OK
STORY2 26 DERIVAX0 0,0188 -0,0018 -0,0002 0,00012 0,00236 -0,00013 0,0093 -0,0008 0,009334345 OK
STORY1 26 DERIVAX0 0,0095 -0,001 -0,0002 0,00021 0,00325 -0,00007 0,0095 -0,001 0,009552487 OK
BASE 26 DERIVAX0
STORY3 27 DERIVAX0 0,0257 -0,0022 -0,0002 0,00015 0,00176 -0,00016 0,0064 -0,0004 0,006412488 OK
STORY2 27 DERIVAX0 0,0193 -0,0018 -0,0002 0,0003 0,00247 -0,00013 0,0095 -0,0008 0,009533625 OK
STORY1 27 DERIVAX0 0,0098 -0,001 -0,0001 0,00034 0,00337 -0,00007 0,0098 -0,001 0,009850888 OK
BASE 27 DERIVAX0
STORY3 4 DERIVAX1 0,0268 -0,0046 0,0003 0,00035 0,00178 0,00035 0,0067 -0,0011 0,006789698 OK
STORY2 4 DERIVAX1 0,0201 -0,0035 0,0003 0,0005 0,00255 0,00027 0,0099 -0,0016 0,01002846 OK
STORY1 4 DERIVAX1 0,0102 -0,0019 0,0002 0,00072 0,00336 0,00014 0,0102 -0,0019 0,010375452 OK
BASE 4 DERIVAX1
STORY3 5 DERIVAX1 0,0249 -0,0046 0,0003 0,00014 0,00163 0,00035 0,0063 -0,0011 0,006395311 OK
STORY2 5 DERIVAX1 0,0186 -0,0035 0,0003 0,00022 0,00234 0,00027 0,0092 -0,0016 0,009338094 OK
STORY1 5 DERIVAX1 0,0094 -0,0019 0,0002 0,00027 0,00304 0,00014 0,0094 -0,0019 0,009590099 OK
BASE 5 DERIVAX1
STORY3 6 DERIVAX1 0,0234 -0,0046 0,0003 0 0,00157 0,00035 0,0059 -0,0011 0,006001666 OK
STORY2 6 DERIVAX1 0,0175 -0,0035 0,0003 0,00003 0,00225 0,00027 0,0087 -0,0016 0,008845903 OK
STORY1 6 DERIVAX1 0,0088 -0,0019 0,0002 -0,00002 0,00292 0,00014 0,0088 -0,0019 0,009002777 OK
BASE 6 DERIVAX1
STORY3 7 DERIVAX1 0,0268 -0,0034 -0,0001 0,0001 0,00145 0,00035 0,0067 -0,0008 0,006747592 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 16/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia16
STORY2 7 DERIVAX1 0,0201 -0,0026 -0,0001 0,00015 0,00219 0,00027 0,0099 -0,0012 0,009972462 OK
STORY1 7 DERIVAX1 0,0102 -0,0014 0 0,00017 0,00271 0,00014 0,0102 -0,0014 0,01029563 OK
BASE 7 DERIVAX1
STORY3 8 DERIVAX1 0,0249 -0,0034 -0,0001 0,00013 0,00136 0,00035 0,0063 -0,0008 0,006350591 OK
STORY2 8 DERIVAX1 0,0186 -0,0026 -0,0001 0,0002 0,00206 0,00027 0,0092 -0,0012 0,009277931 OK
STORY1 8 DERIVAX1 0,0094 -0,0014 0 0,00026 0,00254 0,00014 0,0094 -0,0014 0,009503683 OK
BASE 8 DERIVAX1
STORY3 9 DERIVAX1 0,0234 -0,0034 0 0,00015 0,00127 0,00035 0,0059 -0,0008 0,00595399 OK
STORY2 9 DERIVAX1 0,0175 -0,0026 0 0,00022 0,00191 0,00027 0,0087 -0,0012 0,008782369 OK
STORY1 9 DERIVAX1 0,0088 -0,0014 0 0,0003 0,00233 0,00014 0,0088 -0,0014 0,008910668 OK
BASE 9 DERIVAX1
STORY3 10 DERIVAX1 0,0268 -0,0022 -0,0001 0,00003 0,0015 0,00035 0,0067 -0,0005 0,006718631 OK
STORY2 10 DERIVAX1 0,0201 -0,0017 -0,0001 0,00005 0,00224 0,00027 0,0099 -0,0008 0,009932271 OK
STORY1 10 DERIVAX1 0,0102 -0,0009 -0,0001 0,00004 0,00284 0,00014 0,0102 -0,0009 0,010239629 OK
BASE 10 DERIVAX1
STORY3 11 DERIVAX1 0,0249 -0,0022 -0,0001 0,00009 0,00138 0,00035 0,0063 -0,0005 0,00631981 OK
STORY2 11 DERIVAX1 0,0186 -0,0017 -0,0001 0,00012 0,0021 0,00027 0,0092 -0,0008 0,009234717 OK
STORY1 11 DERIVAX1 0,0094 -0,0009 0 0,00018 0,00262 0,00014 0,0094 -0,0009 0,009442987 OK
BASE 11 DERIVAX1
STORY3 12 DERIVAX1 0,0234 -0,0022 -0,0001 0,00014 0,00134 0,00035 0,0059 -0,0005 0,005921149 OK
STORY2 12 DERIVAX1 0,0175 -0,0017 -0,0001 0,00022 0,00202 0,00027 0,0087 -0,0008 0,008736704 OK
STORY1 12 DERIVAX1 0,0088 -0,0009 -0,0001 0,00027 0,00251 0,00014 0,0088 -0,0009 0,008845903 OK
BASE 12 DERIVAX1
STORY3 13 DERIVAX1 0,0268 -0,0007 0 0,00003 0,00154 0,00035 0,0067 -0,0001 0,006700746 OK
STORY2 13 DERIVAX1 0,0201 -0,0006 0 0,00002 0,0023 0,00027 0,0099 -0,0003 0,009904544 OK
STORY1 13 DERIVAX1 0,0102 -0,0003 0 0,00004 0,00293 0,00014 0,0102 -0,0003 0,010204411 OK
BASE 13 DERIVAX1
STORY3 14 DERIVAX1 0,0249 -0,0007 0 0,00004 0,00145 0,00035 0,0063 -0,0001 0,006300794 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 17/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia17
STORY2 14 DERIVAX1 0,0186 -0,0006 0 0,00015 0,00206 0,00027 0,0092 -0,0003 0,00920489 OK
STORY1 14 DERIVAX1 0,0094 -0,0003 0 0,00011 0,00273 0,00014 0,0094 -0,0003 0,009404786 OK
BASE 14 DERIVAX1
STORY3 15 DERIVAX1 0,0234 -0,0007 0,0001 -0,00001 0,00138 0,00035 0,0059 -0,0001 0,005900847 OK
STORY2 15 DERIVAX1 0,0175 -0,0006 0,0001 -0,00011 0,00193 0,00027 0,0087 -0,0003 0,008705171 OK
STORY1 15 DERIVAX1 0,0088 -0,0003 0 -0,00004 0,00257 0,00014 0,0088 -0,0003 0,008805112 OK
BASE 15 DERIVAX1
STORY3 16 DERIVAX1 0,0268 0,0007 0 -0,00003 0,00153 0,00035 0,0067 0,0001 0,006700746 OK
STORY2 16 DERIVAX1 0,0201 0,0006 0 -0,00003 0,00228 0,00027 0,0099 0,0003 0,009904544 OK
STORY1 16 DERIVAX1 0,0102 0,0003 0 -0,00005 0,0029 0,00014 0,0102 0,0003 0,010204411 OK
BASE 16 DERIVAX1
STORY3 17 DERIVAX1 0,0249 0,0007 0 -0,00002 0,00145 0,00035 0,0063 0,0001 0,006300794 OK
STORY2 17 DERIVAX1 0,0186 0,0006 0 -0,0001 0,00207 0,00027 0,0092 0,0003 0,00920489 OK
STORY1 17 DERIVAX1 0,0094 0,0003 0 -0,00005 0,00271 0,00014 0,0094 0,0003 0,009404786 OK
BASE 17 DERIVAX1
STORY3 18 DERIVAX1 0,0234 0,0007 0 -0,00004 0,00136 0,00035 0,0059 0,0001 0,005900847 OK
STORY2 18 DERIVAX1 0,0175 0,0006 0 0,00004 0,00193 0,00027 0,0087 0,0003 0,008705171 OK
STORY1 18 DERIVAX1 0,0088 0,0003 0 -0,00006 0,00252 0,00014 0,0088 0,0003 0,008805112 OK
BASE 18 DERIVAX1
STORY3 19 DERIVAX1 0,0268 0,0021 0,0001 -0,0001 0,0015 0,00035 0,0067 0,0005 0,006718631 OK
STORY2 19 DERIVAX1 0,0201 0,0016 0,0001 -0,00011 0,00224 0,00027 0,0099 0,0007 0,009924717 OK
STORY1 19 DERIVAX1 0,0102 0,0009 0 -0,00014 0,00283 0,00014 0,0102 0,0009 0,010239629 OK
BASE 19 DERIVAX1
STORY3 20 DERIVAX1 0,0249 0,0021 0,0001 -0,00003 0,00132 0,00035 0,0063 0,0005 0,00631981 OK
STORY2 20 DERIVAX1 0,0186 0,0016 0,0001 -0,00012 0,00212 0,00027 0,0092 0,0007 0,009226592 OK
STORY1 20 DERIVAX1 0,0094 0,0009 0 -0,00016 0,00263 0,00014 0,0094 0,0009 0,009442987 OK
BASE 20 DERIVAX1
STORY3 21 DERIVAX1 0,0234 0,0021 0 -0,00009 0,0013 0,00035 0,0059 0,0005 0,005921149 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 18/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia18
STORY2 21 DERIVAX1 0,0175 0,0016 0 -0,00014 0,00198 0,00027 0,0087 0,0007 0,008728115 OK
STORY1 21 DERIVAX1 0,0088 0,0009 0 -0,00015 0,00244 0,00014 0,0088 0,0009 0,008845903 OK
BASE 21 DERIVAX1
STORY3 22 DERIVAX1 0,0268 0,0033 0 -0,00018 0,00147 0,00035 0,0067 0,0008 0,006747592 OK
STORY2 22 DERIVAX1 0,0201 0,0025 0 -0,00015 0,00224 0,00027 0,0099 0,0011 0,009960924 OK
STORY1 22 DERIVAX1 0,0102 0,0014 0 -0,00016 0,00279 0,00014 0,0102 0,0014 0,01029563 OK
BASE 22 DERIVAX1
STORY3 23 DERIVAX1 0,0249 0,0033 0 -0,00012 0,0013 0,00035 0,0063 0,0008 0,006350591 OK
STORY2 23 DERIVAX1 0,0186 0,0025 0 -0,00019 0,00211 0,00027 0,0092 0,0011 0,009265528 OK
STORY1 23 DERIVAX1 0,0094 0,0014 0 -0,00026 0,0026 0,00014 0,0094 0,0014 0,009503683 OK
BASE 23 DERIVAX1
STORY3 24 DERIVAX1 0,0234 0,0033 0 -0,00014 0,0013 0,00035 0,0059 0,0008 0,00595399 OK
STORY2 24 DERIVAX1 0,0175 0,0025 0 -0,00022 0,00196 0,00027 0,0087 0,0011 0,008769265 OK
STORY1 24 DERIVAX1 0,0088 0,0014 0 -0,00026 0,00241 0,00014 0,0088 0,0014 0,008910668 OK
BASE 24 DERIVAX1
STORY3 25 DERIVAX1 0,0268 0,0047 -0,0002 -0,00017 0,00198 0,00035 0,0067 0,0011 0,006789698 OK
STORY2 25 DERIVAX1 0,0201 0,0036 -0,0002 -0,00055 0,00257 0,00027 0,0099 0,0016 0,01002846 OK
STORY1 25 DERIVAX1 0,0102 0,002 -0,0001 -0,00057 0,00338 0,00014 0,0102 0,002 0,010394229 OK
BASE 25 DERIVAX1
STORY3 26 DERIVAX1 0,0249 0,0047 -0,0002 -0,00019 0,00175 0,00035 0,0063 0,0011 0,006395311 OK
STORY2 26 DERIVAX1 0,0186 0,0036 -0,0002 -0,00023 0,00234 0,00027 0,0092 0,0016 0,009338094 OK
STORY1 26 DERIVAX1 0,0094 0,002 -0,0002 -0,00028 0,00323 0,00014 0,0094 0,002 0,009610411 OK
BASE 26 DERIVAX1
STORY3 27 DERIVAX1 0,0234 0,0047 -0,0002 -0,00008 0,00163 0,00035 0,0059 0,0011 0,006001666 OK
STORY2 27 DERIVAX1 0,0175 0,0036 -0,0002 -0,00005 0,00228 0,00027 0,0087 0,0016 0,008845903 OK
STORY1 27 DERIVAX1 0,0088 0,002 -0,0002 -0,00016 0,00305 0,00014 0,0088 0,002 0,009024411 OK
BASE 27 DERIVAX1
STORY3 4 DERIVAY0 0,0036 0,0529 0,0002 -0,00171 0,00019 0,00071 0,0007 0,011 0,01102225 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 19/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia19
STORY2 4 DERIVAY0 0,0029 0,0419 0,0002 -0,00277 0,00031 0,00057 0,0014 0,018 0,018054362 OK
STORY1 4 DERIVAY0 0,0015 0,0239 0,0002 -0,00399 0,00049 0,0003 0,0015 0,0239 0,023947025 OK
BASE 4 DERIVAY0
STORY3 5 DERIVAY0 -0,0003 0,0529 0,0001 -0,00159 -0,00001 0,00071 0 0,011 0,011 OK
STORY2 5 DERIVAY0 -0,0003 0,0419 0,0001 -0,00258 -0,00002 0,00057 -0,0002 0,018 0,018001111 OK
STORY1 5 DERIVAY0 -0,0001 0,0239 0,0001 -0,00362 -0,00003 0,0003 -0,0001 0,0239 0,023900209 OK
BASE 5 DERIVAY0
STORY3 6 DERIVAY0 -0,0033 0,0529 -0,0003 -0,00151 -0,00017 0,00071 -0,0007 0,011 0,01102225 OK
STORY2 6 DERIVAY0 -0,0026 0,0419 -0,0003 -0,00244 -0,00029 0,00057 -0,0012 0,018 0,018039956 OK
STORY1 6 DERIVAY0 -0,0014 0,0239 -0,0002 -0,00336 -0,00046 0,0003 -0,0014 0,0239 0,023940969 OK
BASE 6 DERIVAY0
STORY3 7 DERIVAY0 0,0036 0,0553 0,0002 -0,00197 0,00015 0,00071 0,0007 0,0115 0,011521285 OK
STORY2 7 DERIVAY0 0,0029 0,0438 0,0002 -0,00318 0,00026 0,00057 0,0014 0,0189 0,018951781 OK
STORY1 7 DERIVAY0 0,0015 0,0249 0,0001 -0,00466 0,00039 0,0003 0,0015 0,0249 0,02494514 OK
BASE 7 DERIVAY0
STORY3 8 DERIVAY0 -0,0003 0,0553 0,0001 -0,0018 -0,00001 0,00071 0 0,0115 0,0115 OK
STORY2 8 DERIVAY0 -0,0003 0,0438 0,0001 -0,00292 -0,00003 0,00057 -0,0002 0,0189 0,018901058 OK
STORY1 8 DERIVAY0 -0,0001 0,0249 0,0001 -0,00415 -0,00004 0,0003 -0,0001 0,0249 0,024900201 OK
BASE 8 DERIVAY0
STORY3 9 DERIVAY0 -0,0033 0,0553 -0,0003 -0,00172 -0,00013 0,00071 -0,0007 0,0115 0,011521285 OK
STORY2 9 DERIVAY0 -0,0026 0,0438 -0,0003 -0,00277 -0,00024 0,00057 -0,0012 0,0189 0,018938057 OK
STORY1 9 DERIVAY0 -0,0014 0,0249 -0,0002 -0,00387 -0,00035 0,0003 -0,0014 0,0249 0,024939326 OK
BASE 9 DERIVAY0
STORY3 10 DERIVAY0 0,0036 0,0577 0,0002 -0,0019 0,00015 0,00071 0,0007 0,012 0,012020399 OK
STORY2 10 DERIVAY0 0,0029 0,0457 0,0002 -0,00309 0,00028 0,00057 0,0014 0,0197 0,019749684 OK
STORY1 10 DERIVAY0 0,0015 0,026 0,0001 -0,00447 0,00042 0,0003 0,0015 0,026 0,026043233 OK
BASE 10 DERIVAY0
STORY3 11 DERIVAY0 -0,0003 0,0577 0,0001 -0,00173 -0,00002 0,00071 0 0,012 0,012 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 20/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia20
STORY2 11 DERIVAY0 -0,0003 0,0457 0,0001 -0,00284 -0,00004 0,00057 -0,0002 0,0197 0,019701015 OK
STORY1 11 DERIVAY0 -0,0001 0,026 0,0001 -0,00398 -0,00006 0,0003 -0,0001 0,026 0,026000192 OK
BASE 11 DERIVAY0
STORY3 12 DERIVAY0 -0,0033 0,0577 -0,0003 -0,00176 -0,00013 0,00071 -0,0007 0,012 0,012020399 OK
STORY2 12 DERIVAY0 -0,0026 0,0457 -0,0003 -0,00287 -0,00025 0,00057 -0,0012 0,0197 0,019736514 OK
STORY1 12 DERIVAY0 -0,0014 0,026 -0,0002 -0,00401 -0,00037 0,0003 -0,0014 0,026 0,026037665 OK
BASE 12 DERIVAY0
STORY3 13 DERIVAY0 0,0036 0,0607 0,0002 -0,00209 0,00016 0,00071 0,0007 0,0125 0,012519585 OK
STORY2 13 DERIVAY0 0,0029 0,0482 0,0002 -0,00342 0,00028 0,00057 0,0014 0,0209 0,020946837 OK
STORY1 13 DERIVAY0 0,0015 0,0273 0,0001 -0,00497 0,00043 0,0003 0,0015 0,0273 0,027341178 OK
BASE 13 DERIVAY0
STORY3 14 DERIVAY0 -0,0003 0,0607 0,0001 -0,00185 0 0,00071 0 0,0125 0,0125 OK
STORY2 14 DERIVAY0 -0,0003 0,0482 0,0001 -0,00304 -0,00004 0,00057 -0,0002 0,0209 0,020900957 OK
STORY1 14 DERIVAY0 -0,0001 0,0273 0,0001 -0,00427 -0,00003 0,0003 -0,0001 0,0273 0,027300183 OK
BASE 14 DERIVAY0
STORY3 15 DERIVAY0 -0,0033 0,0607 -0,0004 -0,0017 -0,00017 0,00071 -0,0007 0,0125 0,012519585 OK
STORY2 15 DERIVAY0 -0,0026 0,0482 -0,0003 -0,00282 -0,00024 0,00057 -0,0012 0,0209 0,020934421 OK
STORY1 15 DERIVAY0 -0,0014 0,0273 -0,0002 -0,00389 -0,00044 0,0003 -0,0014 0,0273 0,027335874 OK
BASE 15 DERIVAY0
STORY3 16 DERIVAY0 0,0036 0,0637 0,0002 -0,00226 0,00015 0,00071 0,0007 0,0132 0,013218548 OK
STORY2 16 DERIVAY0 0,0029 0,0505 0,0002 -0,0037 0,00028 0,00057 0,0014 0,0219 0,021944703 OK
STORY1 16 DERIVAY0 0,0015 0,0286 0,0001 -0,00541 0,00042 0,0003 0,0015 0,0286 0,028639309 OK
BASE 16 DERIVAY0
STORY3 17 DERIVAY0 -0,0003 0,0637 0,0001 -0,00206 -0,00002 0,00071 0 0,0132 0,0132 OK
STORY2 17 DERIVAY0 -0,0003 0,0505 0,0001 -0,00337 -0,00002 0,00057 -0,0002 0,0219 0,021900913 OK
STORY1 17 DERIVAY0 -0,0001 0,0286 0,0001 -0,00478 -0,00004 0,0003 -0,0001 0,0286 0,028600175 OK
BASE 17 DERIVAY0
STORY3 18 DERIVAY0 -0,0033 0,0637 -0,0003 -0,00196 -0,00014 0,00071 -0,0007 0,0132 0,013218548 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 21/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia21
STORY2 18 DERIVAY0 -0,0026 0,0505 -0,0003 -0,00321 -0,00024 0,00057 -0,0012 0,0219 0,021932852 OK
STORY1 18 DERIVAY0 -0,0014 0,0286 -0,0002 -0,00448 -0,00037 0,0003 -0,0014 0,0286 0,028634245 OK
BASE 18 DERIVAY0
STORY3 19 DERIVAY0 0,0036 0,0665 0,0002 -0,00234 0,00015 0,00071 0,0007 0,0137 0,013717872 OK
STORY2 19 DERIVAY0 0,0029 0,0528 0,0002 -0,00387 0,00027 0,00057 0,0014 0,023 0,023042569 OK
STORY1 19 DERIVAY0 0,0015 0,0298 0,0001 -0,00564 0,00041 0,0003 0,0015 0,0298 0,029837728 OK
BASE 19 DERIVAY0
STORY3 20 DERIVAY0 -0,0003 0,0665 0,0001 -0,00214 -0,00002 0,00071 0 0,0137 0,0137 OK
STORY2 20 DERIVAY0 -0,0003 0,0528 0,0001 -0,00353 -0,00003 0,00057 -0,0002 0,023 0,02300087 OK
STORY1 20 DERIVAY0 -0,0001 0,0298 0,0001 -0,00499 -0,00004 0,0003 -0,0001 0,0298 0,029800168 OK
BASE 20 DERIVAY0
STORY3 21 DERIVAY0 -0,0033 0,0665 -0,0004 -0,00206 -0,00014 0,00071 -0,0007 0,0137 0,013717872 OK
STORY2 21 DERIVAY0 -0,0026 0,0528 -0,0003 -0,00336 -0,00025 0,00057 -0,0012 0,023 0,023031283 OK
STORY1 21 DERIVAY0 -0,0014 0,0298 -0,0002 -0,00468 -0,00037 0,0003 -0,0014 0,0298 0,029832868 OK
BASE 21 DERIVAY0
STORY3 22 DERIVAY0 0,0036 0,069 0,0002 -0,00203 0,00012 0,00071 0,0007 0,0142 0,014217243 OK
STORY2 22 DERIVAY0 0,0029 0,0548 0,0002 -0,00407 0,00028 0,00057 0,0014 0,0239 0,023940969 OK
STORY1 22 DERIVAY0 0,0015 0,0309 0,0002 -0,00578 0,0004 0,0003 0,0015 0,0309 0,030936386 OK
BASE 22 DERIVAY0
STORY3 23 DERIVAY0 -0,0003 0,069 0,0001 -0,00206 -0,00002 0,00071 0 0,0142 0,0142 OK
STORY2 23 DERIVAY0 -0,0003 0,0548 0,0001 -0,00369 -0,00002 0,00057 -0,0002 0,0239 0,023900837 OK
STORY1 23 DERIVAY0 -0,0001 0,0309 0,0001 -0,0052 -0,00004 0,0003 -0,0001 0,0309 0,030900162 OK
BASE 23 DERIVAY0
STORY3 24 DERIVAY0 -0,0033 0,069 -0,0004 -0,00217 -0,00013 0,00071 -0,0007 0,0142 0,014217243 OK
STORY2 24 DERIVAY0 -0,0026 0,0548 -0,0003 -0,00347 -0,00025 0,00057 -0,0012 0,0239 0,023930107 OK
STORY1 24 DERIVAY0 -0,0014 0,0309 -0,0002 -0,00486 -0,00036 0,0003 -0,0014 0,0309 0,030931699 OK
BASE 24 DERIVAY0
STORY3 25 DERIVAY0 0,0036 0,0718 0,0002 -0,00237 0,00021 0,00071 0,0007 0,0147 0,014716657 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 22/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia22
STORY2 25 DERIVAY0 0,0029 0,0571 0,0002 -0,00397 0,0003 0,00057 0,0014 0,025 0,025039169 OK
STORY1 25 DERIVAY0 0,0015 0,0321 0,0001 -0,00557 0,00041 0,0003 0,0015 0,0321 0,032135028 OK
BASE 25 DERIVAY0
STORY3 26 DERIVAY0 -0,0003 0,0718 0,0001 -0,0022 -0,00002 0,00071 0 0,0147 0,0147 OK
STORY2 26 DERIVAY0 -0,0003 0,0571 0,0001 -0,0036 -0,00004 0,00057 -0,0002 0,025 0,0250008 OK
STORY1 26 DERIVAY0 -0,0001 0,0321 0,0001 -0,00534 -0,00004 0,0003 -0,0001 0,0321 0,032100156 OK
BASE 26 DERIVAY0
STORY3 27 DERIVAY0 -0,0033 0,0718 -0,0004 -0,00228 -0,00018 0,00071 -0,0007 0,0147 0,014716657 OK
STORY2 27 DERIVAY0 -0,0026 0,0571 -0,0003 -0,00343 -0,00024 0,00057 -0,0012 0,025 0,025028783 OK
STORY1 27 DERIVAY0 -0,0014 0,0321 -0,0002 -0,00511 -0,00047 0,0003 -0,0014 0,0321 0,032130515 OK
BASE 27 DERIVAY0
STORY3 4 DERIVAY1 -0,0038 0,0718 0,0002 -0,00235 -0,00022 -0,00074 -0,0009 0,0151 0,015126797 OK
STORY2 4 DERIVAY1 -0,0029 0,0567 0,0002 -0,00384 -0,00032 -0,00057 -0,0013 0,0247 0,024734187 OK
STORY1 4 DERIVAY1 -0,0016 0,032 0,0001 -0,00547 -0,00048 -0,00032 -0,0016 0,032 0,032039975 OK
BASE 4 DERIVAY1
STORY3 5 DERIVAY1 0,0003 0,0718 0,0001 -0,00214 0,00002 -0,00074 0,0001 0,0151 0,015100331 OK
STORY2 5 DERIVAY1 0,0002 0,0567 0,0001 -0,0035 0,00003 -0,00057 0,0001 0,0247 0,024700202 OK
STORY1 5 DERIVAY1 0,0001 0,032 0,0001 -0,00483 0,00006 -0,00032 0,0001 0,032 0,032000156 OK
BASE 5 DERIVAY1
STORY3 6 DERIVAY1 0,0033 0,0718 -0,0004 -0,00207 0,00018 -0,00074 0,0007 0,0151 0,015116216 OK
STORY2 6 DERIVAY1 0,0026 0,0567 -0,0003 -0,00337 0,00026 -0,00057 0,0012 0,0247 0,024729133 OK
STORY1 6 DERIVAY1 0,0014 0,032 -0,0002 -0,00461 0,00039 -0,00032 0,0014 0,032 0,03203061 OK
BASE 6 DERIVAY1
STORY3 7 DERIVAY1 -0,0038 0,0693 0,0002 -0,00248 -0,00019 -0,00074 -0,0009 0,0145 0,014527904 OK
STORY2 7 DERIVAY1 -0,0029 0,0548 0,0002 -0,00402 -0,00028 -0,00057 -0,0013 0,0238 0,023835478 OK
STORY1 7 DERIVAY1 -0,0016 0,031 0,0001 -0,00582 -0,0004 -0,00032 -0,0016 0,031 0,031041263 OK
BASE 7 DERIVAY1
STORY3 8 DERIVAY1 0,0003 0,0693 0,0001 -0,00228 0,00001 -0,00074 0,0001 0,0145 0,014500345 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 23/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia23
STORY2 8 DERIVAY1 0,0002 0,0548 0,0001 -0,0037 0,00002 -0,00057 0,0001 0,0238 0,02380021 OK
STORY1 8 DERIVAY1 0,0001 0,031 0,0001 -0,00521 0,00003 -0,00032 0,0001 0,031 0,031000161 OK
BASE 8 DERIVAY1
STORY3 9 DERIVAY1 0,0033 0,0693 -0,0004 -0,00216 0,00016 -0,00074 0,0007 0,0145 0,014516887 OK
STORY2 9 DERIVAY1 0,0026 0,0548 -0,0003 -0,0035 0,00024 -0,00057 0,0012 0,0238 0,023830233 OK
STORY1 9 DERIVAY1 0,0014 0,031 -0,0002 -0,00484 0,00035 -0,00032 0,0014 0,031 0,031031597 OK
BASE 9 DERIVAY1
STORY3 10 DERIVAY1 -0,0038 0,0668 0,0003 -0,0022 -0,0002 -0,00074 -0,0009 0,0139 0,013929106 OK
STORY2 10 DERIVAY1 -0,0029 0,0529 0,0002 -0,0036 -0,00028 -0,00057 -0,0013 0,023 0,02303671 OK
STORY1 10 DERIVAY1 -0,0016 0,0299 0,0002 -0,00515 -0,0004 -0,00032 -0,0016 0,0299 0,029942779 OK
BASE 10 DERIVAY1
STORY3 11 DERIVAY1 0,0003 0,0668 0,0001 -0,00202 0 -0,00074 0,0001 0,0139 0,01390036 OK
STORY2 11 DERIVAY1 0,0002 0,0529 0,0001 -0,00332 0,00001 -0,00057 0,0001 0,023 0,023000217 OK
STORY1 11 DERIVAY1 0,0001 0,0299 0,0001 -0,00462 0,00001 -0,00032 0,0001 0,0299 0,029900167 OK
BASE 11 DERIVAY1
STORY3 12 DERIVAY1 0,0033 0,0668 -0,0004 -0,00204 0,00018 -0,00074 0,0007 0,0139 0,013917615 OK
STORY2 12 DERIVAY1 0,0026 0,0529 -0,0003 -0,00332 0,00025 -0,00057 0,0012 0,023 0,023031283 OK
STORY1 12 DERIVAY1 0,0014 0,0299 -0,0002 -0,00461 0,00038 -0,00032 0,0014 0,0299 0,029932758 OK
BASE 12 DERIVAY1
STORY3 13 DERIVAY1 -0,0038 0,0636 0,0002 -0,00219 -0,0002 -0,00074 -0,0009 0,0132 0,013230646 OK
STORY2 13 DERIVAY1 -0,0029 0,0504 0,0002 -0,00357 -0,0003 -0,00057 -0,0013 0,0219 0,021938551 OK
STORY1 13 DERIVAY1 -0,0016 0,0285 0,0001 -0,00519 -0,00043 -0,00032 -0,0016 0,0285 0,028544877 OK
BASE 13 DERIVAY1
STORY3 14 DERIVAY1 0,0003 0,0636 0,0001 -0,00193 0,00002 -0,00074 0,0001 0,0132 0,013200379 OK
STORY2 14 DERIVAY1 0,0002 0,0504 0,0001 -0,00316 0 -0,00057 0,0001 0,0219 0,021900228 OK
STORY1 14 DERIVAY1 0,0001 0,0285 0,0001 -0,00445 0,00004 -0,00032 0,0001 0,0285 0,028500175 OK
BASE 14 DERIVAY1
STORY3 15 DERIVAY1 0,0033 0,0636 -0,0004 -0,00178 0,00015 -0,00074 0,0007 0,0132 0,013218548 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 24/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia24
STORY2 15 DERIVAY1 0,0026 0,0504 -0,0003 -0,00298 0,00024 -0,00057 0,0012 0,0219 0,021932852 OK
STORY1 15 DERIVAY1 0,0014 0,0285 -0,0002 -0,00408 0,00031 -0,00032 0,0014 0,0285 0,028534365 OK
BASE 15 DERIVAY1
STORY3 16 DERIVAY1 -0,0038 0,0605 0,0002 -0,00215 -0,0002 -0,00074 -0,0009 0,0125 0,012532358 OK
STORY2 16 DERIVAY1 -0,0029 0,048 0,0002 -0,0035 -0,0003 -0,00057 -0,0013 0,0208 0,020840585 OK
STORY1 16 DERIVAY1 -0,0016 0,0272 0,0001 -0,00514 -0,00043 -0,00032 -0,0016 0,0272 0,027247018 OK
BASE 16 DERIVAY1
STORY3 17 DERIVAY1 0,0003 0,0605 0,0001 -0,00195 0,00001 -0,00074 0,0001 0,0125 0,0125004 OK
STORY2 17 DERIVAY1 0,0002 0,048 0,0001 -0,0032 0,00002 -0,00057 0,0001 0,0208 0,02080024 OK
STORY1 17 DERIVAY1 0,0001 0,0272 0,0001 -0,00454 0,00003 -0,00032 0,0001 0,0272 0,027200184 OK
BASE 17 DERIVAY1
STORY3 18 DERIVAY1 0,0033 0,0605 -0,0003 -0,00186 0,00018 -0,00074 0,0007 0,0125 0,012519585 OK
STORY2 18 DERIVAY1 0,0026 0,048 -0,0003 -0,00304 0,00024 -0,00057 0,0012 0,0208 0,020834587 OK
STORY1 18 DERIVAY1 0,0014 0,0272 -0,0002 -0,00426 0,00038 -0,00032 0,0014 0,0272 0,027236006 OK
BASE 18 DERIVAY1
STORY3 19 DERIVAY1 -0,0038 0,0576 0,0002 -0,00201 -0,0002 -0,00074 -0,0009 0,0118 0,011834272 OK
STORY2 19 DERIVAY1 -0,0029 0,0458 0,0002 -0,00333 -0,00029 -0,00057 -0,0013 0,0198 0,019842631 OK
STORY1 19 DERIVAY1 -0,0016 0,026 0,0001 -0,00489 -0,00041 -0,00032 -0,0016 0,026 0,026049184 OK
BASE 19 DERIVAY1
STORY3 20 DERIVAY1 0,0003 0,0576 0,0001 -0,00184 0,00001 -0,00074 0,0001 0,0118 0,011800424 OK
STORY2 20 DERIVAY1 0,0002 0,0458 0,0001 -0,00303 0,00002 -0,00057 0,0001 0,0198 0,019800253 OK
STORY1 20 DERIVAY1 0,0001 0,026 0,0001 -0,00432 0,00003 -0,00032 0,0001 0,026 0,026000192 OK
BASE 20 DERIVAY1
STORY3 21 DERIVAY1 0,0033 0,0576 -0,0003 -0,00177 0,00017 -0,00074 0,0007 0,0118 0,011820744 OK
STORY2 21 DERIVAY1 0,0026 0,0458 -0,0003 -0,00289 0,00025 -0,00057 0,0012 0,0198 0,01983633 OK
STORY1 21 DERIVAY1 0,0014 0,026 -0,0002 -0,00406 0,00036 -0,00032 0,0014 0,026 0,026037665 OK
BASE 21 DERIVAY1
STORY3 22 DERIVAY1 -0,0038 0,055 0,0002 -0,00159 -0,00021 -0,00074 -0,0009 0,0112 0,011236103 OK
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 25/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia25
STORY2 22 DERIVAY1 -0,0029 0,0438 0,0002 -0,00321 -0,00029 -0,00057 -0,0013 0,0189 0,018944656 OK
STORY1 22 DERIVAY1 -0,0016 0,0249 0,0001 -0,00464 -0,00041 -0,00032 -0,0016 0,0249 0,024951353 OK
BASE 22 DERIVAY1
STORY3 23 DERIVAY1 0,0003 0,055 0,0001 -0,00163 0,00001 -0,00074 0,0001 0,0112 0,011200446 OK
STORY2 23 DERIVAY1 0,0002 0,0438 0,0001 -0,0029 0,00002 -0,00057 0,0001 0,0189 0,018900265 OK
STORY1 23 DERIVAY1 0,0001 0,0249 0,0001 -0,00414 0,00003 -0,00032 0,0001 0,0249 0,024900201 OK
BASE 23 DERIVAY1
STORY3 24 DERIVAY1 0,0033 0,055 -0,0003 -0,00171 0,00017 -0,00074 0,0007 0,0112 0,011221854 OK
STORY2 24 DERIVAY1 0,0026 0,0438 -0,0003 -0,00275 0,00025 -0,00057 0,0012 0,0189 0,018938057 OK
STORY1 24 DERIVAY1 0,0014 0,0249 -0,0002 -0,00389 0,00035 -0,00032 0,0014 0,0249 0,024939326 OK
BASE 24 DERIVAY1
STORY3 25 DERIVAY1 -0,0038 0,052 0,0002 -0,00169 -0,00024 -0,00074 -0,0009 0,0105 0,010538501 OK
STORY2 25 DERIVAY1 -0,0029 0,0415 0,0002 -0,00281 -0,00034 -0,00057 -0,0013 0,0179 0,017947145 OK
STORY1 25 DERIVAY1 -0,0016 0,0236 0,0001 -0,00403 -0,00055 -0,00032 -0,0016 0,0236 0,023654175 OK
BASE 25 DERIVAY1
STORY3 26 DERIVAY1 0,0003 0,052 0,0001 -0,00157 0,00001 -0,00074 0,0001 0,0105 0,010500476 OK
STORY2 26 DERIVAY1 0,0002 0,0415 0,0001 -0,0026 0,00001 -0,00057 0,0001 0,0179 0,017900279 OK
STORY1 26 DERIVAY1 0,0001 0,0236 0 -0,00392 0,00004 -0,00032 0,0001 0,0236 0,023600212 OK
BASE 26 DERIVAY1
STORY3 27 DERIVAY1 0,0033 0,052 -0,0003 -0,00162 0,0002 -0,00074 0,0007 0,0105 0,010523307 OK
STORY2 27 DERIVAY1 0,0026 0,0415 -0,0003 -0,00244 0,00031 -0,00057 0,0012 0,0179 0,017940178 OK
STORY1 27 DERIVAY1 0,0014 0,0236 -0,0002 -0,00369 0,00044 -0,00032 0,0014 0,0236 0,023641489 OK
BASE 27 DERIVAY1
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 26/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
26
ANALISIS
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 2014 0:19 PAGE 1
L O A D I N G C O M B I N A T I O N S
COMBO CASE SCALECOMBO TYPE CASE TYPE FACTOR
CM ADD DEAD Static 1,0000MUERTA Static 1,0000
COMB1 ADD CM Combo 1,4000LIVE Static 1,7000
COMB2 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static 1,0000
COMB3 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static 1,0000
COMB4 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static 1,0000
COMB5 ADD CM Combo 1,0500
LIVE Static 1,2800SISMOY1 Static 1,0000
COMB6 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX0 Static -1,0000
COMB7 ADD CM Combo 1,0500LIVE Static 1,2800SISMOX1 Static -1,0000
COMB8 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY0 Static -1,0000
COMB9 ADD CM Combo 1,0500LIVE Static 1,2800SISMOY1 Static -1,0000
COMB10 ADD CM Combo 0,9000SISMOX0 Static 1,0000
COMB11 ADD CM Combo 0,9000SISMOX1 Static 1,0000
COMB12 ADD CM Combo 0,9000SISMOY0 Static 1,0000
COMB13 ADD CM Combo 0,9000SISMOY1 Static 1,0000
COMB14 ADD CM Combo 0,9000SISMOX0 Static -1,0000
COMB15 ADD CM Combo 0,9000SISMOX1 Static -1,0000
COMB16 ADD CM Combo 0,9000SISMOY0 Static -1,0000
COMB17 ADD CM Combo 0,9000SISMOY1 Static -1,0000
ETABS v9.7.0 File:DISEÑO JORGE ARTURO VERGARA PLACA DISEÑO Units:Kgf-m enero 21, 2014 0:19 PAGE 2
S U P P O R T R E A C T I O N S
STORY POINT LOAD FX FY FZ MX MY MZ
BASE 4 CM 71,76 555,12 19167,81 -543,003 64,356 -1,404BASE 4 COMB1 212,29 1324,79 40406,77 -1292,369 189,276 -3,049BASE 4 COMB2 -982,72 932,24 28103,15 -884,626 -2174,966 1,017BASE 4 COMB3 -1130,57 1038,07 28081,59 -1063,590 -2463,798 -9,150BASE 4 COMB4 -41,89 62,70 28546,50 585,337 -258,319 -16,755BASE 4 COMB5 386,89 -243,98 28608,40 1103,800 578,669 12,685BASE 4 COMB6 1301,82 1058,16 32586,84 -1057,058 2459,464 -5,597BASE 4 COMB7 1449,67 952,33 32608,40 -878,094 2748,296 4,570
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 27/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
27
BASE 4 COMB8 360,99 1927,70 32143,49 -2527,021 542,816 12,175BASE 4 COMB9 -67,80 2234,38 32081,59 -3045,484 -294,171 -17,265BASE 4 COMB10 -1077,69 436,65 15009,19 -402,487 -2259,294 2,043BASE 4 COMB11 -1225,53 542,48 14987,62 -581,451 -2548,126 -8,124BASE 4 COMB12 -136,85 -432,89 15452,54 1067,476 -342,647 -15,728BASE 4 COMB13 291,93 -739,57 15514,44 1585,939 494,341 13,711BASE 4 COMB14 1206,86 562,57 19492,87 -574,919 2375,136 -4,571BASE 4 COMB15 1354,70 456,75 19514,44 -395,955 2663,968 5,596
BASE 4 COMB16 266,02 1432,11 19049,52 -2044,882 458,488 13,201BASE 4 COMB17 -162,76 1738,79 18987,62 -2563,345 -378,499 -16,239
BASE 5 CM -41,69 -242,16 40883,75 256,478 -19,419 -2,483BASE 5 COMB1 50,77 -643,76 85521,72 684,080 88,147 -5,392BASE 5 COMB2 -1487,14 -552,21 61159,27 628,033 -2988,813 1,799BASE 5 COMB3 -1472,63 -333,03 61283,80 266,876 -2959,582 -16,182BASE 5 COMB4 69,06 -2347,76 63468,72 3589,199 119,910 -29,631BASE 5 COMB5 26,99 -2982,87 63111,66 4635,418 35,196 22,434BASE 5 COMB6 1563,93 -415,23 67289,68 400,000 3121,711 -9,898BASE 5 COMB7 1549,43 -634,41 67165,16 761,156 3092,480 8,083BASE 5 COMB8 7,73 1380,32 64980,24 -2561,167 12,988 21,532BASE 5 COMB9 49,80 2015,43 65337,30 -3607,386 97,702 -30,533BASE 5 COMB10 -1563,05 -286,44 33730,17 344,847 -3072,739 3,614BASE 5 COMB11 -1548,55 -67,26 33854,70 -16,310 -3043,508 -14,367BASE 5 COMB12 -6,85 -2081,99 36039,62 3306,013 35,984 -27,816BASE 5 COMB13 -48,92 -2717,09 35682,56 4352,232 -48,730 24,249
BASE 5 COMB14 1488,02 -149,46 39860,58 116,814 3037,785 -8,084BASE 5 COMB15 1473,51 -368,63 39736,06 477,971 3008,554 9,898BASE 5 COMB16 -68,18 1646,09 37551,14 -2844,353 -70,938 23,347BASE 5 COMB17 -26,11 2281,20 37908,20 -3890,572 13,776 -28,719
BASE 6 CM 38,47 -296,85 16882,07 303,518 70,324 -1,404BASE 6 COMB1 181,62 -661,43 33110,67 681,134 242,496 -3,049BASE 6 COMB2 -1100,81 -508,15 22617,38 546,546 -2316,888 1,017BASE 6 COMB3 -966,26 -396,02 22516,28 361,315 -2056,021 -9,150BASE 6 COMB4 314,76 -1478,21 27435,70 2116,389 542,340 -16,755BASE 6 COMB5 -75,43 -1803,14 27725,45 2652,977 -213,596 12,685BASE 6 COMB6 1373,99 -485,44 27104,37 476,662 2681,478 -5,597BASE 6 COMB7 1239,45 -597,57 27205,47 661,892 2420,612 4,570BASE 6 COMB8 -41,58 484,62 22286,05 -1093,181 -177,749 12,175BASE 6 COMB9 348,61 809,55 21996,31 -1629,770 578,186 -17,265BASE 6 COMB10 -1202,78 -278,52 12950,37 308,108 -2435,892 2,043BASE 6 COMB11 -1068,23 -166,39 12849,27 122,878 -2175,025 -8,124BASE 6 COMB12 212,79 -1248,58 17768,69 1877,951 423,336 -15,728BASE 6 COMB13 -177,40 -1573,51 18058,44 2414,540 -332,600 13,711BASE 6 COMB14 1272,02 -255,81 17437,36 238,224 2562,474 -4,571BASE 6 COMB15 1137,48 -367,94 17538,46 423,455 2301,608 5,596BASE 6 COMB16 -143,55 714,25 12619,04 -1331,619 -296,753 13,201BASE 6 COMB17 246,64 1039,18 12329,30 -1868,208 459,182 -16,239
BASE 7 CM 15,36 759,88 22851,16 -743,835 9,782 -1,404BASE 7 COMB1 33,25 1868,03 49913,68 -1826,473 16,035 -3,049BASE 7 COMB2 -1337,05 1386,71 37782,90 -1338,078 -2517,818 1,017BASE 7 COMB3 -1508,56 1464,01 37935,65 -1469,802 -2829,541 -9,150BASE 7 COMB4 -215,34 470,42 36159,09 211,371 -426,154 -16,755BASE 7 COMB5 281,88 246,38 35721,09 592,997 477,062 12,685BASE 7 COMB6 1387,00 1420,07 37193,05 -1406,249 2541,884 -5,597BASE 7 COMB7 1558,50 1342,77 37040,29 -1274,526 2853,607 4,570BASE 7 COMB8 265,29 2336,36 38816,86 -2955,699 450,220 12,175
BASE 7 COMB9 -231,94 2560,40 39254,86 -3337,325 -452,996 -17,265BASE 7 COMB10 -1348,21 667,21 20860,97 -635,366 -2521,047 2,043BASE 7 COMB11 -1519,71 744,51 21013,72 -767,090 -2832,770 -8,124BASE 7 COMB12 -226,49 -249,08 19237,15 914,083 -429,383 -15,728BASE 7 COMB13 270,73 -473,12 18799,15 1295,709 473,833 13,711BASE 7 COMB14 1375,85 700,57 20271,11 -703,538 2538,655 -4,571BASE 7 COMB15 1547,35 623,27 20118,36 -571,814 2850,378 5,596BASE 7 COMB16 254,14 1616,86 21894,93 -2252,987 446,991 13,201BASE 7 COMB17 -243,09 1840,90 22332,93 -2634,613 -456,225 -16,239
BASE 8 CM 37,32 -392,57 43656,98 410,481 57,024 -2,483BASE 8 COMB1 77,28 -968,19 97318,07 1016,336 113,801 -5,392
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 28/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
28
BASE 8 COMB2 -1707,50 -777,85 73654,59 847,723 -3202,035 1,799BASE 8 COMB3 -1689,53 -623,11 73726,07 587,270 -3169,450 -16,182BASE 8 COMB4 85,45 -2614,42 72247,39 3914,014 135,770 -29,631BASE 8 COMB5 33,35 -3062,86 72042,46 4668,565 41,354 22,434BASE 8 COMB6 1823,57 -676,91 72535,45 679,379 3372,936 -9,898BASE 8 COMB7 1805,60 -831,65 72463,97 939,832 3340,352 8,083BASE 8 COMB8 30,62 1159,66 73942,64 -2386,913 35,132 21,532BASE 8 COMB9 82,72 1608,11 74147,58 -3141,463 129,548 -30,533
BASE 8 COMB10 -1731,95 -403,79 39850,85 453,605 -3236,164 3,614BASE 8 COMB11 -1713,98 -249,05 39922,33 193,151 -3203,579 -14,367BASE 8 COMB12 61,00 -2240,35 38443,66 3519,896 101,640 -27,816BASE 8 COMB13 8,90 -2688,80 38238,72 4274,446 7,224 24,249BASE 8 COMB14 1799,12 -302,85 38731,72 285,260 3338,807 -8,084BASE 8 COMB15 1781,15 -457,58 38660,23 545,714 3306,223 9,898BASE 8 COMB16 6,17 1533,72 40138,91 -2781,031 1,003 23,347BASE 8 COMB17 58,27 1982,17 40343,84 -3535,581 95,419 -28,719
BASE 9 CM 44,23 -352,05 17668,81 360,973 75,899 -1,404BASE 9 COMB1 96,10 -870,01 38036,79 894,046 159,743 -3,049BASE 9 COMB2 -1408,01 -685,55 28932,48 720,918 -2614,135 1,017BASE 9 COMB3 -1252,84 -603,12 28711,19 584,106 -2333,317 -9,150BASE 9 COMB4 293,35 -1648,15 30751,29 2316,377 521,623 -16,755BASE 9 COMB5 -156,50 -1887,00 31385,77 2712,721 -292,037 12,685BASE 9 COMB6 1552,36 -621,69 28200,95 622,437 2854,064 -5,597BASE 9 COMB7 1397,19 -704,11 28422,24 759,250 2573,247 4,570
BASE 9 COMB8 -149,00 340,91 26382,14 -973,022 -281,693 12,175BASE 9 COMB9 300,85 579,77 25747,66 -1369,365 531,966 -17,265BASE 9 COMB10 -1440,38 -348,77 16267,70 374,116 -2665,791 2,043BASE 9 COMB11 -1285,21 -266,35 16046,41 237,304 -2384,973 -8,124BASE 9 COMB12 260,98 -1311,37 18086,51 1969,575 469,967 -15,728BASE 9 COMB13 -188,86 -1550,22 18720,99 2365,919 -343,692 13,711BASE 9 COMB14 1519,99 -284,91 15536,17 275,636 2802,408 -4,571BASE 9 COMB15 1364,82 -367,33 15757,45 412,448 2521,591 5,596BASE 9 COMB16 -181,37 677,69 13717,36 -1319,824 -333,349 13,201BASE 9 COMB17 268,48 916,54 13082,87 -1716,167 480,310 -16,239
BASE 10 CM 202,94 775,80 26874,66 -756,972 191,290 -1,404BASE 10 COMB1 471,13 1891,96 58501,12 -1844,409 439,728 -3,049BASE 10 COMB2 -964,79 1414,37 44473,67 -1367,511 -2157,611 1,017BASE 10 COMB3 -1131,53 1465,88 44615,57 -1454,140 -2464,731 -9,150BASE 10 COMB4 126,02 418,39 42407,89 295,136 -95,849 -16,755BASE 10 COMB5 609,47 269,13 42001,07 546,110 794,034 12,685BASE 10 COMB6 1672,59 1428,30 43400,81 -1403,718 2818,215 -5,597BASE 10 COMB7 1839,33 1376,80 43258,91 -1317,089 3125,335 4,570BASE 10 COMB8 581,78 2424,29 45466,59 -3066,365 756,453 12,175BASE 10 COMB9 98,33 2573,55 45873,41 -3317,339 -133,430 -17,265BASE 10 COMB10 -1136,04 691,26 24723,62 -663,171 -2315,753 2,043BASE 10 COMB11 -1302,78 742,76 24865,52 -749,800 -2622,872 -8,124BASE 10 COMB12 -45,23 -304,72 22657,84 999,476 -253,991 -15,728BASE 10 COMB13 438,22 -453,99 22251,02 1250,449 635,892 13,711BASE 10 COMB14 1501,33 705,19 23650,76 -699,378 2660,074 -4,571BASE 10 COMB15 1668,08 653,68 23508,86 -612,749 2967,193 5,596BASE 10 COMB16 410,53 1701,17 25716,54 -2362,025 598,312 13,201BASE 10 COMB17 -72,92 1850,43 26123,37 -2612,999 -291,571 -16,239
BASE 11 CM 424,16 -494,23 51789,33 516,371 431,337 -2,483BASE 11 COMB1 973,31 -1228,62 113574,99 1285,551 980,794 -5,392BASE 11 COMB2 -995,38 -959,51 85973,92 1023,764 -2512,983 1,799
BASE 11 COMB3 -977,84 -857,22 86011,64 853,250 -2480,823 -16,182BASE 11 COMB4 746,72 -2941,69 84495,93 4300,655 775,613 -29,631BASE 11 COMB5 695,89 -3238,12 84387,75 4794,638 682,428 22,434BASE 11 COMB6 2457,57 -886,57 84630,16 907,871 3986,391 -9,898BASE 11 COMB7 2440,03 -988,86 84592,43 1078,386 3954,231 8,083BASE 11 COMB8 715,47 1095,61 86108,15 -2369,019 697,795 21,532BASE 11 COMB9 766,30 1392,04 86216,32 -2863,003 790,980 -30,533BASE 11 COMB10 -1344,72 -481,28 47282,28 522,680 -2861,483 3,614BASE 11 COMB11 -1327,19 -378,99 47320,00 352,166 -2829,323 -14,367BASE 11 COMB12 397,37 -2463,46 45804,28 3799,571 427,112 -27,816BASE 11 COMB13 346,55 -2759,88 45696,11 4293,554 333,927 24,249BASE 11 COMB14 2108,22 -408,34 45938,51 406,787 3637,891 -8,084
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 29/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
29
BASE 11 COMB15 2090,69 -510,63 45900,79 577,302 3605,730 9,898BASE 11 COMB16 366,12 1573,84 47416,51 -2870,103 349,295 23,347BASE 11 COMB17 416,95 1870,27 47524,68 -3364,087 442,480 -28,719
BASE 12 CM -22,56 -249,35 13107,45 261,622 11,270 -1,404BASE 12 COMB1 -120,50 -588,66 25946,83 620,334 -49,837 -3,049BASE 12 COMB2 -1495,13 -468,75 20361,16 503,565 -2698,432 1,017BASE 12 COMB3 -1346,85 -415,04 20164,29 414,744 -2424,281 -9,150
BASE 12 COMB4 123,52 -1481,01 21714,68 2182,387 357,296 -16,755BASE 12 COMB5 -306,38 -1636,66 22279,13 2439,702 -437,059 12,685BASE 12 COMB6 1313,86 -415,65 18603,76 428,430 2623,290 -5,597BASE 12 COMB7 1165,58 -469,36 18800,63 517,252 2349,139 4,570BASE 12 COMB8 -304,79 596,61 17250,24 -1250,391 -432,438 12,175BASE 12 COMB9 125,10 752,26 16685,79 -1507,707 361,917 -17,265BASE 12 COMB10 -1424,80 -250,97 12675,41 273,027 -2650,717 2,043BASE 12 COMB11 -1276,52 -197,26 12478,54 184,206 -2376,567 -8,124BASE 12 COMB12 193,85 -1263,23 14028,93 1951,849 405,011 -15,728BASE 12 COMB13 -236,04 -1418,88 14593,38 2209,165 -389,344 13,711BASE 12 COMB14 1384,19 -197,86 10918,01 197,893 2671,004 -4,571BASE 12 COMB15 1235,91 -251,57 11114,88 286,714 2396,854 5,596BASE 12 COMB16 -234,46 814,40 9564,49 -1480,929 -384,724 13,201BASE 12 COMB17 195,43 970,04 9000,04 -1738,244 409,631 -16,239
BASE 13 CM -61,09 894,26 27957,11 -871,318 -64,190 -1,404BASE 13 COMB1 -138,57 2198,79 61416,14 -2142,007 -150,221 -3,049
BASE 13 COMB2 -1390,13 1648,40 46072,13 -1602,462 -2569,170 1,017BASE 13 COMB3 -1553,00 1664,56 46094,05 -1629,716 -2872,547 -9,150BASE 13 COMB4 -330,23 620,04 44501,01 134,754 -537,323 -16,755BASE 13 COMB5 142,03 573,21 44438,19 213,715 341,736 12,685BASE 13 COMB6 1181,96 1655,37 46183,12 -1615,973 2343,483 -5,597BASE 13 COMB7 1344,84 1639,21 46161,20 -1588,719 2646,861 4,570BASE 13 COMB8 122,07 2683,72 47754,23 -3353,189 311,637 12,175BASE 13 COMB9 -350,20 2730,56 47817,06 -3432,150 -567,422 -17,265BASE 13 COMB10 -1341,02 801,35 25105,90 -777,431 -2514,098 2,043BASE 13 COMB11 -1503,90 817,51 25127,82 -804,684 -2817,475 -8,124BASE 13 COMB12 -281,13 -227,01 23534,79 959,786 -482,251 -15,728BASE 13 COMB13 191,13 -273,84 23471,96 1038,746 396,808 13,711BASE 13 COMB14 1231,06 808,32 25216,89 -790,942 2398,555 -4,571BASE 13 COMB15 1393,94 792,16 25194,97 -763,688 2701,933 5,596BASE 13 COMB16 171,17 1836,67 26788,01 -2528,158 366,709 13,201BASE 13 COMB17 -301,09 1883,51 26850,83 -2607,118 -512,350 -16,239
BASE 14 CM -162,76 -509,11 56671,75 537,646 -136,574 -2,483BASE 14 COMB1 -356,25 -1249,97 124148,02 1320,901 -305,684 -5,392BASE 14 COMB2 -1942,41 -959,56 92935,86 1019,076 -3429,336 1,799BASE 14 COMB3 -1925,60 -925,93 92962,44 963,915 -3397,869 -16,182BASE 14 COMB4 -237,70 -3046,05 92167,32 4482,042 -176,913 -29,631BASE 14 COMB5 -286,46 -3143,50 92091,16 4641,850 -268,097 22,434BASE 14 COMB6 1407,28 -918,56 93549,75 965,618 2970,136 -9,898BASE 14 COMB7 1390,47 -952,18 93523,16 1020,779 2938,669 8,083BASE 14 COMB8 -297,43 1167,93 94318,29 -2497,348 -282,287 21,532BASE 14 COMB9 -248,67 1265,38 94394,45 -2657,156 -191,103 -30,533BASE 14 COMB10 -1821,33 -478,70 50697,63 510,611 -3322,652 3,614BASE 14 COMB11 -1804,52 -445,08 50724,22 455,450 -3291,186 -14,367BASE 14 COMB12 -116,62 -2565,19 49929,09 3973,577 -70,230 -27,816BASE 14 COMB13 -165,38 -2662,64 49852,93 4133,385 -161,414 24,249BASE 14 COMB14 1528,36 -437,70 51311,52 457,152 3076,819 -8,084BASE 14 COMB15 1511,54 -471,33 51284,94 512,314 3045,353 9,898
BASE 14 COMB16 -176,35 1648,79 52080,06 -3005,813 -175,603 23,347BASE 14 COMB17 -127,59 1746,24 52156,22 -3165,622 -84,419 -28,719
BASE 15 CM 56,89 -340,27 21483,69 355,304 88,145 -1,404BASE 15 COMB1 187,43 -839,41 43395,03 876,757 248,120 -3,049BASE 15 COMB2 -1240,17 -629,24 32230,06 660,600 -2451,730 1,017BASE 15 COMB3 -1093,29 -612,29 32208,21 632,554 -2178,929 -9,150BASE 15 COMB4 326,58 -1746,65 35401,72 2486,298 553,780 -16,755BASE 15 COMB5 -99,30 -1795,79 35464,42 2567,550 -236,691 12,685BASE 15 COMB6 1521,95 -632,01 32940,83 656,767 2824,643 -5,597BASE 15 COMB7 1375,07 -648,97 32962,67 684,813 2551,842 4,570BASE 15 COMB8 -44,80 485,39 29769,16 -1168,931 -180,867 12,175
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 30/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
30
BASE 15 COMB9 381,08 534,53 29706,46 -1250,182 609,603 -17,265BASE 15 COMB10 -1329,86 -304,85 18979,94 321,690 -2558,856 2,043BASE 15 COMB11 -1182,98 -287,90 18958,09 293,644 -2286,055 -8,124BASE 15 COMB12 236,89 -1422,26 22151,60 2147,389 446,654 -15,728BASE 15 COMB13 -188,99 -1471,40 22214,30 2228,640 -343,817 13,711BASE 15 COMB14 1432,26 -307,62 19690,71 317,857 2717,517 -4,571BASE 15 COMB15 1285,38 -324,58 19712,55 345,903 2444,716 5,596BASE 15 COMB16 -134,49 809,78 16519,04 -1507,841 -287,993 13,201
BASE 15 COMB17 291,39 858,92 16456,34 -1589,092 502,477 -16,239BASE 16 CM -6,09 921,80 27119,29 -895,454 -10,969 -1,404BASE 16 COMB1 -17,39 2280,05 59834,53 -2215,726 -32,966 -3,049BASE 16 COMB2 -1310,10 1718,51 44867,20 -1674,468 -2491,741 1,017BASE 16 COMB3 -1474,14 1701,50 44829,51 -1645,358 -2796,237 -9,150BASE 16 COMB4 -242,63 649,35 43317,85 144,214 -452,554 -16,755BASE 16 COMB5 232,98 698,63 43425,90 59,885 429,741 12,685BASE 16 COMB6 1283,97 1707,39 45013,23 -1654,780 2442,188 -5,597BASE 16 COMB7 1448,00 1724,40 45050,92 -1683,890 2746,684 4,570BASE 16 COMB8 216,49 2776,55 46562,58 -3473,463 403,001 12,175BASE 16 COMB9 -259,12 2727,27 46454,53 -3389,134 -479,294 -17,265BASE 16 COMB10 -1302,52 835,18 24334,34 -815,752 -2476,837 2,043BASE 16 COMB11 -1466,55 818,18 24296,66 -786,642 -2781,333 -8,124BASE 16 COMB12 -235,04 -233,98 22785,00 1002,930 -437,650 -15,728BASE 16 COMB13 240,57 -184,70 22893,05 918,601 444,645 13,711BASE 16 COMB14 1291,56 824,06 24480,38 -796,064 2457,093 -4,571
BASE 16 COMB15 1455,59 841,07 24518,07 -825,174 2761,589 5,596BASE 16 COMB16 224,08 1893,23 26029,73 -2614,747 417,906 13,201BASE 16 COMB17 -251,53 1843,94 25921,68 -2530,418 -464,389 -16,239
BASE 17 CM 23,02 -533,61 53579,04 568,215 43,191 -2,483BASE 17 COMB1 38,81 -1284,53 118958,65 1368,821 76,576 -5,392BASE 17 COMB2 -1654,67 -953,24 89444,19 1008,246 -3150,915 1,799BASE 17 COMB3 -1637,66 -987,64 89422,90 1066,152 -3119,260 -16,182BASE 17 COMB4 54,32 -3123,16 88396,76 4633,739 105,642 -29,631BASE 17 COMB5 5,00 -3023,49 88457,75 4465,998 13,916 22,434BASE 17 COMB6 1712,92 -976,71 89252,30 1048,357 3265,873 -9,898BASE 17 COMB7 1695,91 -942,31 89273,59 990,451 3234,219 8,083BASE 17 COMB8 3,94 1193,21 90299,73 -2577,135 9,316 21,532BASE 17 COMB9 53,26 1093,54 90238,74 -2409,394 101,043 -30,533BASE 17 COMB10 -1663,08 -468,52 48317,09 491,338 -3169,522 3,614BASE 17 COMB11 -1646,07 -502,91 48295,79 549,244 -3137,868 -14,367BASE 17 COMB12 45,91 -2638,44 47269,65 4116,831 87,034 -27,816BASE 17 COMB13 -3,41 -2538,77 47330,65 3949,090 -4,692 24,249BASE 17 COMB14 1704,51 -491,98 48125,19 531,449 3247,266 -8,084BASE 17 COMB15 1687,50 -457,59 48146,48 473,543 3215,611 9,898BASE 17 COMB16 -4,47 1677,94 49172,62 -3094,044 -9,291 23,347BASE 17 COMB17 44,85 1578,27 49111,63 -2926,303 82,435 -28,719
BASE 18 CM 30,57 -402,24 21896,51 420,111 62,680 -1,404BASE 18 COMB1 55,00 -1021,31 46443,88 1064,513 119,973 -3,049BASE 18 COMB2 -1358,93 -760,15 34956,35 788,325 -2566,647 1,017BASE 18 COMB3 -1211,09 -778,33 34998,93 818,609 -2292,921 -9,150BASE 18 COMB4 253,19 -1903,06 37422,38 2680,284 482,760 -16,755BASE 18 COMB5 -175,46 -1850,36 37300,19 2592,562 -310,387 12,685BASE 18 COMB6 1441,50 -774,52 34802,34 811,246 2746,797 -5,597BASE 18 COMB7 1293,66 -756,33 34759,76 780,962 2473,070 4,570BASE 18 COMB8 -170,62 368,39 32336,31 -1080,712 -302,610 12,175BASE 18 COMB9 258,03 315,70 32458,51 -992,990 490,537 -17,265
BASE 18 COMB10 -1372,70 -354,83 19783,87 366,639 -2600,310 2,043BASE 18 COMB11 -1224,87 -373,01 19826,45 396,923 -2326,584 -8,124BASE 18 COMB12 239,41 -1497,74 22249,90 2258,598 449,097 -15,728BASE 18 COMB13 -189,23 -1445,04 22127,70 2170,876 -344,050 13,711BASE 18 COMB14 1427,73 -369,20 19629,86 389,561 2713,133 -4,571BASE 18 COMB15 1279,89 -351,01 19587,27 359,277 2439,407 5,596BASE 18 COMB16 -184,39 773,71 17163,83 -1502,398 -336,273 13,201BASE 18 COMB17 244,26 721,02 17286,02 -1414,676 456,874 -16,239
BASE 19 CM -41,06 853,99 25137,98 -824,961 -44,810 -1,404BASE 19 COMB1 -102,18 2106,51 55170,04 -2036,526 -115,007 -3,049BASE 19 COMB2 -1399,48 1596,39 41116,78 -1555,394 -2578,221 1,017
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 31/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
31
BASE 19 COMB3 -1566,50 1547,77 41000,91 -1472,305 -2885,609 -9,150BASE 19 COMB4 -310,22 473,37 39683,87 356,255 -517,957 -16,755BASE 19 COMB5 174,03 614,28 40016,14 115,544 372,705 12,685BASE 19 COMB6 1245,95 1568,73 41755,80 -1504,582 2405,404 -5,597BASE 19 COMB7 1412,97 1617,35 41871,67 -1587,671 2712,792 4,570BASE 19 COMB8 156,69 2691,76 43188,70 -3416,231 345,139 12,175BASE 19 COMB9 -327,56 2550,85 42856,43 -3175,519 -545,522 -17,265BASE 19 COMB10 -1359,67 782,43 22304,67 -767,871 -2532,141 2,043
BASE 19 COMB11 -1526,70 733,81 22188,80 -684,782 -2839,529 -8,124BASE 19 COMB12 -270,41 -340,60 20871,77 1143,778 -471,877 -15,728BASE 19 COMB13 213,84 -199,69 21204,04 903,067 418,785 13,711BASE 19 COMB14 1285,76 754,76 22943,69 -717,059 2451,484 -4,571BASE 19 COMB15 1452,78 803,38 23059,56 -800,148 2758,871 5,596BASE 19 COMB16 196,50 1877,79 24376,60 -2628,708 391,219 13,201BASE 19 COMB17 -287,75 1736,88 24044,33 -2387,997 -499,443 -16,239
BASE 20 CM -46,70 -499,49 48437,24 540,526 -24,275 -2,483BASE 20 COMB1 -128,34 -1216,77 107801,33 1314,960 -85,158 -5,392BASE 20 COMB2 -1816,35 -879,94 80444,97 931,268 -3307,357 1,799BASE 20 COMB3 -1799,05 -978,00 80400,37 1096,270 -3275,423 -16,182BASE 20 COMB4 -70,07 -3162,06 79965,44 4744,873 -14,715 -29,631BASE 20 COMB5 -120,22 -2877,90 80093,37 4266,877 -107,244 22,434BASE 20 COMB6 1623,47 -948,26 81492,25 1044,455 3179,319 -9,898BASE 20 COMB7 1606,17 -850,21 81536,85 879,454 3147,385 8,083BASE 20 COMB8 -122,81 1333,86 81971,79 -2769,150 -113,323 21,532
BASE 20 COMB9 -72,66 1049,70 81843,86 -2291,154 -20,794 -30,533BASE 20 COMB10 -1761,94 -415,39 43069,88 429,879 -3265,185 3,614BASE 20 COMB11 -1744,64 -513,44 43025,28 594,881 -3233,251 -14,367BASE 20 COMB12 -15,66 -2697,50 42590,34 4243,485 27,457 -27,816BASE 20 COMB13 -65,81 -2413,35 42718,28 3765,489 -65,072 24,249BASE 20 COMB14 1677,87 -483,70 44117,16 543,067 3221,490 -8,084BASE 20 COMB15 1660,58 -385,65 44161,76 378,065 3189,557 9,898BASE 20 COMB16 -68,40 1798,41 44596,69 -3270,539 -71,151 23,347BASE 20 COMB17 -18,25 1514,26 44468,76 -2792,543 21,378 -28,719
BASE 21 CM -3,67 -387,73 18856,96 408,818 29,555 -1,404BASE 21 COMB1 -18,96 -959,52 40529,70 1009,885 48,417 -3,049BASE 21 COMB2 -1447,27 -702,80 30010,63 729,083 -2652,122 1,017BASE 21 COMB3 -1296,37 -754,69 30173,00 815,425 -2375,432 -9,150BASE 21 COMB4 199,38 -1904,42 33193,23 2718,819 430,694 -16,755BASE 21 COMB5 -238,11 -1754,03 32727,72 2468,697 -371,007 12,685BASE 21 COMB6 1418,75 -738,94 30867,03 788,318 2724,788 -5,597BASE 21 COMB7 1267,85 -687,04 30704,67 701,976 2448,099 4,570BASE 21 COMB8 -227,89 462,68 27684,44 -1201,418 -358,028 12,175BASE 21 COMB9 209,60 312,30 28149,95 -951,296 443,673 -17,265BASE 21 COMB10 -1436,31 -330,89 16543,07 338,319 -2661,855 2,043BASE 21 COMB11 -1285,41 -382,78 16705,43 424,661 -2385,166 -8,124BASE 21 COMB12 210,34 -1532,51 19725,66 2328,054 420,960 -15,728BASE 21 COMB13 -227,15 -1382,13 19260,15 2077,933 -380,741 13,711BASE 21 COMB14 1429,71 -367,03 17399,47 397,553 2715,054 -4,571BASE 21 COMB15 1278,81 -315,14 17237,10 311,211 2438,365 5,596BASE 21 COMB16 -216,93 834,59 14216,87 -1592,182 -367,761 13,201BASE 21 COMB17 220,56 684,21 14682,38 -1342,061 433,940 -16,239
BASE 22 CM 49,55 851,78 25778,80 -820,040 42,868 -1,404BASE 22 COMB1 108,35 2074,69 56124,44 -1998,989 88,704 -3,049BASE 22 COMB2 -1252,52 1576,26 42337,59 -1537,365 -2436,027 1,017BASE 22 COMB3 -1420,79 1499,17 42223,60 -1406,240 -2744,616 -9,150
BASE 22 COMB4 -153,38 405,05 40358,04 456,670 -366,201 -16,755BASE 22 COMB5 334,47 628,47 40684,85 76,802 527,940 12,685BASE 22 COMB6 1415,29 1540,96 41966,91 -1466,124 2569,251 -5,597BASE 22 COMB7 1583,55 1618,06 42080,91 -1597,249 2877,840 4,570BASE 22 COMB8 316,14 2712,17 43946,46 -3460,160 499,425 12,175BASE 22 COMB9 -171,71 2488,75 43619,66 -3080,291 -394,715 -17,265BASE 22 COMB10 -1289,31 784,26 23386,26 -773,656 -2464,058 2,043BASE 22 COMB11 -1457,57 707,16 23272,26 -642,532 -2772,647 -8,124BASE 22 COMB12 -190,17 -386,96 21406,71 1220,379 -394,232 -15,728BASE 22 COMB13 297,68 -163,53 21733,52 840,510 499,908 13,711BASE 22 COMB14 1378,50 748,96 23015,58 -702,416 2541,220 -4,571BASE 22 COMB15 1546,77 826,05 23129,58 -833,541 2849,809 5,596
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 32/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
32
BASE 22 COMB16 279,36 1920,17 24995,13 -2696,451 471,394 13,201BASE 22 COMB17 -208,49 1696,74 24668,33 -2316,583 -422,747 -16,239
BASE 23 CM 159,10 -495,78 49968,90 542,178 174,865 -2,483BASE 23 COMB1 375,44 -1183,41 110748,95 1293,500 402,301 -5,392BASE 23 COMB2 -1453,85 -835,21 83313,92 883,124 -2956,602 1,799BASE 23 COMB3 -1436,37 -988,64 83238,26 1141,515 -2924,495 -16,182BASE 23 COMB4 308,32 -3213,62 82166,10 4859,466 351,411 -29,631
BASE 23 COMB5 257,64 -2768,98 82383,27 4110,923 258,376 22,434BASE 23 COMB6 2017,91 -942,79 83049,46 1060,270 3560,980 -9,898BASE 23 COMB7 2000,43 -789,36 83125,12 801,880 3528,873 8,083BASE 23 COMB8 255,74 1435,62 84197,28 -2916,071 252,967 21,532BASE 23 COMB9 306,42 990,97 83980,11 -2167,528 346,001 -30,533BASE 23 COMB10 -1592,69 -392,41 45104,24 399,388 -3101,413 3,614BASE 23 COMB11 -1575,21 -545,85 45028,58 657,778 -3069,306 -14,367BASE 23 COMB12 169,48 -2770,82 43956,41 4375,729 206,600 -27,816BASE 23 COMB13 118,81 -2326,18 44173,59 3627,186 113,566 24,249BASE 23 COMB14 1879,07 -499,99 44839,78 576,533 3416,169 -8,084BASE 23 COMB15 1861,60 -346,56 44915,44 318,143 3384,062 9,898BASE 23 COMB16 116,91 1878,41 45987,60 -3399,808 108,156 23,347BASE 23 COMB17 167,58 1433,77 45770,43 -2651,265 201,191 -28,719
BASE 24 CM 113,16 -408,25 19190,71 431,932 142,598 -1,404BASE 24 COMB1 261,04 -1009,89 41430,49 1065,848 319,339 -3,049BASE 24 COMB2 -1251,06 -729,00 31197,25 753,139 -2462,271 1,017
BASE 24 COMB3 -1098,83 -810,50 31382,48 888,646 -2184,294 -9,150BASE 24 COMB4 412,35 -1984,05 33888,41 2830,476 636,766 -16,755BASE 24 COMB5 -29,00 -1747,86 33357,27 2437,930 -168,670 12,685BASE 24 COMB6 1643,22 -788,41 31034,15 848,345 2941,984 -5,597BASE 24 COMB7 1490,99 -706,91 30848,92 712,839 2664,007 4,570BASE 24 COMB8 -20,19 466,64 28342,99 -1228,992 -157,053 12,175BASE 24 COMB9 421,16 230,45 28874,13 -836,445 648,383 -17,265BASE 24 COMB10 -1345,29 -337,72 17353,19 341,136 -2573,789 2,043BASE 24 COMB11 -1193,06 -419,22 17538,42 476,642 -2295,812 -8,124BASE 24 COMB12 318,12 -1592,77 20044,35 2418,473 525,248 -15,728BASE 24 COMB13 -123,23 -1356,58 19513,21 2025,926 -280,188 13,711BASE 24 COMB14 1548,99 -397,14 17190,09 436,342 2830,466 -4,571BASE 24 COMB15 1396,76 -315,63 17004,86 300,835 2552,489 5,596BASE 24 COMB16 -114,42 857,91 14498,93 -1640,995 -268,571 13,201BASE 24 COMB17 326,93 621,73 15030,07 -1248,449 536,865 -16,239
BASE 25 CM 15,49 681,42 20626,97 -647,651 9,909 -1,404BASE 25 COMB1 -51,59 1589,10 45113,01 -1509,738 -66,053 -3,049BASE 25 COMB2 -1171,09 1246,98 35580,05 -1212,451 -2357,226 1,017BASE 25 COMB3 -1319,84 1136,45 35549,77 -1025,535 -2646,940 -9,150BASE 25 COMB4 -271,19 -39,17 32153,06 935,229 -480,191 -16,755BASE 25 COMB5 160,23 281,16 32239,68 393,743 359,345 12,685BASE 25 COMB6 1093,28 1140,40 32184,97 -1055,703 2257,676 -5,597BASE 25 COMB7 1242,03 1250,93 32215,25 -1242,619 2547,390 4,570BASE 25 COMB8 193,38 2426,55 35611,96 -3203,383 380,640 12,175BASE 25 COMB9 -238,03 2106,23 35525,34 -2661,897 -458,895 -17,265BASE 25 COMB10 -1118,24 666,57 20261,81 -661,260 -2298,533 2,043BASE 25 COMB11 -1267,00 556,04 20231,54 -474,344 -2588,247 -8,124BASE 25 COMB12 -218,34 -619,58 16834,82 1486,420 -421,497 -15,728BASE 25 COMB13 213,07 -299,25 16921,45 944,934 418,038 13,711BASE 25 COMB14 1146,12 559,99 16866,74 -504,512 2316,369 -4,571BASE 25 COMB15 1294,88 670,52 16897,01 -691,428 2606,083 5,596BASE 25 COMB16 246,22 1846,14 20293,73 -2652,192 439,333 13,201
BASE 25 COMB17 -185,19 1525,81 20207,10 -2110,706 -400,202 -16,239
BASE 26 CM -593,41 -485,33 35356,66 537,917 -553,268 -2,483BASE 26 COMB1 -1456,56 -1116,91 78288,15 1240,875 -1370,342 -5,392BASE 26 COMB2 -2533,34 -773,41 61176,44 817,530 -4001,116 1,799BASE 26 COMB3 -2517,86 -994,71 61067,35 1187,182 -3970,941 -16,182BASE 26 COMB4 -1067,39 -3265,70 57806,02 4983,658 -979,718 -29,631BASE 26 COMB5 -1112,27 -2624,40 58118,73 3912,802 -1067,151 22,434BASE 26 COMB6 344,82 -904,53 56425,13 1046,652 1942,099 -9,898BASE 26 COMB7 329,34 -683,23 56534,23 676,999 1911,924 8,083BASE 26 COMB8 -1121,13 1587,77 59795,56 -3119,477 -1079,299 21,532BASE 26 COMB9 -1076,25 946,46 59482,84 -2048,621 -991,866 -30,533
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 33/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
33
BASE 26 COMB10 -1973,15 -371,24 34196,65 369,565 -3469,549 3,614BASE 26 COMB11 -1957,67 -592,54 34087,55 739,217 -3439,374 -14,367BASE 26 COMB12 -507,20 -2863,53 30826,22 4535,693 -448,151 -27,816BASE 26 COMB13 -552,08 -2222,23 31138,93 3464,837 -535,584 24,249BASE 26 COMB14 905,01 -502,36 29445,33 598,686 2473,665 -8,084BASE 26 COMB15 889,53 -281,06 29554,43 229,034 2443,491 9,898BASE 26 COMB16 -560,94 1989,94 32815,76 -3567,442 -547,732 23,347BASE 26 COMB17 -516,06 1348,63 32503,05 -2496,586 -460,299 -28,719
BASE 27 CM -303,05 -205,04 13820,92 233,134 -260,134 -1,404BASE 27 COMB1 -731,51 -491,52 29322,52 557,567 -641,051 -3,049BASE 27 COMB2 -1731,31 -345,31 23681,42 369,650 -2926,956 1,017BASE 27 COMB3 -1604,09 -459,13 23825,51 559,833 -2673,181 -9,150BASE 27 COMB4 -372,88 -1638,09 24774,97 2523,916 -123,022 -16,755BASE 27 COMB5 -741,89 -1308,24 24361,95 1972,970 -858,459 12,685BASE 27 COMB6 632,23 -393,18 20361,02 468,060 1963,752 -5,597BASE 27 COMB7 505,01 -279,36 20216,93 277,878 1709,977 4,570BASE 27 COMB8 -726,19 899,60 19267,47 -1686,206 -840,183 12,175BASE 27 COMB9 -357,19 569,76 19680,49 -1135,260 -104,745 -17,265BASE 27 COMB10 -1454,52 -160,60 14099,03 160,616 -2679,474 2,043BASE 27 COMB11 -1327,30 -274,42 14243,11 350,798 -2425,699 -8,124BASE 27 COMB12 -96,09 -1453,38 15192,57 2314,881 124,460 -15,728BASE 27 COMB13 -465,10 -1123,53 14779,55 1763,936 -610,977 13,711BASE 27 COMB14 909,02 -208,47 10778,62 259,025 2211,234 -4,571BASE 27 COMB15 781,80 -94,65 10634,54 68,843 1957,458 5,596
BASE 27 COMB16 -449,40 1084,31 9685,08 -1895,240 -592,701 13,201BASE 27 COMB17 -80,40 754,47 10098,10 -1344,295 142,737 -16,239
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 34/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia34
DIAGRAMAS ESTRUCTURA
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 35/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia35
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 36/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia36
DISEÑO ESTRUCTURAL
CUBIERTA
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 37/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia37
TERCER PISO
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 38/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia38
SEGUNDO PISO
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 39/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia39
PORTICO 2 PORTICO 3
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 40/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia40
PORTICO 4 PORTICO 5
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 41/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia41
PORTICO 6 PORTICO 7
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 42/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia42
PORTICO 8 PORTICO 9
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 43/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia43
PORTICO A
PORTICO B
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 44/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305 Celular 3182096245Jairpinedacelis@gmail.com – Bogotá D.C - Colombia44
PORTICO C
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 45/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
45
VIGA 202 VIGA 203
VIGA 205 VIGA 206
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 46/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
46
VIGA 208
VIGA 209
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 47/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
CALCULO CIMENTACION
Columna b= 20 h= 45 Pu= 126 Ton
Presion Adm 24 Ton/m2
F`c 280 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Columnas 5
Profundidad 60 cmb 1
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 149,94 Ton
NO REQUIERE PEDESTAL
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 24 cms
h = 30 cms
Reacciones del Suelo
N piso
0,6
L
h
L
σutil
0,2
ZAPATA Z1
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 48/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Carga de servicio = 82
Area de la zapata = 3,41 m2
Lado de la zapata = 1,85 m
Se asume = 1,9 m Area = 3,61 m2
Presion ult. del suelo = 34,9 Ton/m2
Revision del espesor asumido para la zapata
Cortante en dos direcciones, punzonamiento
Pu
h+dd/2 d/2
b+d
d
d = 21 cms
bo = 214 cms
Vu = 116,56 Ton
d > 35 cm
d > 24 cm
Cortante en una direccion, flexion
51,5 cm
Pu
d
d d
d h
1,9
La fuerza cortante critica
b
σutil
1,9
b
σutil
b
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 49/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Vu = σutil * B * (H/2-h/2-d)
Vu = 34,90 * 1,9 * 0,515
Vu = 34,15 Ton
d =
0.53*ф*√F`c*B
d =
d = 23,8450 cm < 21 cm
Diseño a flexion
0,725 m
Pu
d h
1,9
Mu = σutil * B * (H/2-h/2) 2̂/2
Mu = 34,90 * 1,9 * 0,263
Mu = 17,43 Ton-m
Para
b = 190
d = 21
k = 0,0208
Cuantia = 0,0033
As = 82,99 cm2 65,09
Se colocaran 13 Nº 9 cada 15 cm en ambas direcciones
1,9 b
σutil
H-h/2
Seccion critica
Vu
34153
1432,28
b
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 50/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
,
Columna b= 20 h= 45 Pu= 109 Ton
Presion Adm 24 Ton/m2
F`c 280 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Columnas 5
Profundidad 60 cm
b 1
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 149,94 Ton
NO REQUIERE PEDESTAL
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 24 cms
h = 30 cms
Reacciones del Suelo
N piso
0,6
L
h
L
ZAPATA Z2
0,2
σutil
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 51/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Carga de servicio = 71
Area de la zapata = 2,95 m2
Lado de la zapata = 1,72 m
Se asume = 1,7 m Area = 2,89 m2
Presion ult. del suelo = 37,72 Ton/m2
Revision del espesor asumido para la zapata
Cortante en dos direcciones, punzonamiento
Pu
h+dd/2 d/2
b+d
d
d = 21 cms
bo = 214 cms
Vu = 98,79 Ton
d > 30 cm
d > 20 cm CUMPLE
Cortante en una direccion, flexion
41,5 cm
Pu
d
d d
d h
1,7
La fuerza cortante critica
b
σutil
b
1,7 b
σutil
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 52/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Vu = σutil * B * (H/2-h/2-d)
Vu = 37,72 * 1,7 * 0,415
Vu = 26,61 Ton
d =0.53*ф*√F`c*B
d =
d = 20,7636 cm < 21 cm CUMPLE
Diseño a flexion
0,625 m
Pu
d h
1,7
Mu = σutil * B * (H/2-h/2) 2̂/2
Mu = 37,72 * 1,7 * 0,195
Mu = 12,52 Ton-m
Para
b = 170
d = 21
k = 0,0167
Cuantia = 0,0033
As = 59,63 cm2 46,78
Se colocaran 12 Nº 8 cada 15 cm en ambas direcciones
Vu
26609
1281,51
b
H-h/2
1,7 b
Seccion critica
σutil
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 53/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Columna b= 20 h= 45 Pu= 55 Ton
Donde Pu = 1,2 * Rmax
Rmax= 24 Ton/cm2
Presion Adm 24 Ton/m2
F`c 210 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Column 3,5
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 112 Ton
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 34 cms
H = 40 cms
Reacciones del Suelo
P= 55 Ton
0,225 0,225
20 B
e= 0,575
45
c.g. h
σmax
0,225 1,375
ZAPATA MEDIANERA Z3
L
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 54/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Col 36,67 Ton
σsuelo = Presion Ad * Fs
σsuelo = 24 * 1,5
σsuelo = 36 Ton / m2
Area de la Zapata 36,67 = 1,53 m2
24
Para que exista un equilibrio estatico se requiere una dimension L = 1,6
B > 1,0 m
Valor de B para σ util del suelo
B = 1,9 m
Revision del espesor asumido para la zapata
Se analiza la direccion mas larga, la cual es la critica
Vu = 1/2 * σutil * L * Zo
0,34
0,2 B = 1,9 0,34 0,51
0,450,85
0,2 0,855
1,6
Vu = 14,8 Ton/m
фVc = 0.53* ф * √F`c * L* d=
фVc = 35,51 Ton < Vu
Diseño a flexion en la direccion larga
La seccion critica corresponde al borde de la zapata en la cual,
Mu = σutil * 1,6 0,85 2̂
*
2 2
0,51
0,855
ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a
la carga Pu.
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 55/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Mu = 10,52 ton-m
b = 160 cm
d = 34 cm
K = 0,00569
cuatia = 0,0033
As = 31,0 cm2
Colocar 8 Nº 7 cada 26 cms
Diseño a flexion en la direccion Corta
0,45 1,15
h
σmaxσ= 28,8
Mborde = 0,46 Ton-m
b = 191,0
d = 34,00
K = 0,0000
cuantia = 0,0033
As = 21,4 cm2
Colocar 8 Nº 6 cada 21 cms
1,60
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 56/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Columna b= 20 h= 45 Pu= 45 Ton
Donde Pu = 1,2 * Rmax
Rmax= 24 Ton/cm2
Presion Adm 24 Ton/m2
F`c 210 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Column 3,5
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 112 Ton
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 24 cms
H = 30 cms
Reacciones del Suelo
P= 45 Ton
0,225 0,225
20 B
e= 0,475
45
c.g. h
σmax
0,225 1,175
ZAPATA MEDIANERA Z4
L
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 57/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Col 30,00 Ton
σsuelo = Presion Ad * Fs
σsuelo = 24 * 1,5
σsuelo = 36 Ton / m2
Area de la Zapata 30,00 = 1,25 m2
24
Para que exista un equilibrio estatico se requiere una dimension L = 1,4
B > 0,9 m
Valor de B para σ util del suelo
B = 1,8 m
Revision del espesor asumido para la zapata
Se analiza la direccion mas larga, la cual es la critica
Vu = 1/2 * σutil * L * Zo
0,24
0,2 B = 1,8 0,24 0,55
0,450,79
0,2 0,793
1,4
Vu = 13,9 Ton/m
фVc = 0.53* ф * √F`c * L* d=
фVc = 21,94 Ton < Vu
Diseño a flexion en la direccion larga
La seccion critica corresponde al borde de la zapata en la cual,
Mu = σutil * 1,4 0,79 2̂
*
2 2
0,55
0,793
ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a
la carga Pu.
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 58/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Mu = 7,92 ton-m
b = 140 cm
d = 24 cm
K = 0,00982
cuatia = 0,0033
As = 33,0 cm2
Colocar 9 Nº 7 cada 21 cms
Diseño a flexion en la direccion Corta
0,45 0,95
h
σmaxσ= 25,2
Mborde = 0,38 Ton-m
b = 178,6
d = 24,00
K = 0,0000
cuantia = 0,0033
As = 14,1 cm2
Colocar 8 Nº 5 cada 18,5 cms
1,40
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 59/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Columna b= 20 h= 45 Pu= 40 Ton
Donde Pu = 1,2 * Rmax
Rmax= 24 Ton/cm2
Presion Adm 24 Ton/m2
F`c 210 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Column 3,5
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 112 Ton
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 24 cms
H = 30 cms
Reacciones del Suelo
P= 40 Ton
0,225 0,225
20 B
e= 0,475
45
c.g. h
σmax
0,225 1,175
ZAPATA MEDIANERA Z5
L
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 60/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Col 26,67 Ton
σsuelo = Presion Ad * Fs
σsuelo = 24 * 1,5
σsuelo = 36 Ton / m2
Area de la Zapata 26,67 = 1,11 m2
24
Para que exista un equilibrio estatico se requiere una dimension L = 1,4
B > 0,8 m
Valor de B para σ util del suelo
B = 1,6 m
Revision del espesor asumido para la zapata
Se analiza la direccion mas larga, la cual es la critica
Vu = 1/2 * σutil * L * Zo
0,24
0,2 B = 1,6 0,24 0,45
0,450,69
0,2 0,694
1,4
Vu = 11,4 Ton/m
фVc = 0.53* ф * √F`c * L* d=
фVc = 21,94 Ton < Vu
Diseño a flexion en la direccion larga
La seccion critica corresponde al borde de la zapata en la cual,
Mu = σutil * 1,4 0,69 2̂
*
2 2
0,45
0,694
ais, la resultante de la reaccion del terreno cae en el tercio medio y es colineal y opuesta a
la carga Pu.
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 61/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Mu = 6,06 ton-m
b = 140 cm
d = 24 cm
K = 0,00752
cuatia = 0,0033
As = 25,3 cm2
Colocar 9 Nº 6 cada 19 cms
Diseño a flexion en la direccion Corta
0,45 0,95
h
σmaxσ= 25,2
Mborde = 0,34 Ton-m
b = 158,7
d = 24,00
K = 0,0000
cuantia = 0,0033
As = 12,6 cm2
Colocar 7 Nº 5 cada 22 cms
1,40
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 62/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Columna b= 20 h= 45 Pu= 35 Ton
Presion Adm 24 Ton/m2
F`c 210 Kg/cm2
Fy 4200 Kg/cm2
ф 0,7
ф 0,85
Fs 1,5
Sep. Columnas 3,5
Profundidad 80 cm
b 1
Revision de la presion en contacto
Pumax< ф*0.85*F´c*Ag
Pumax Col 112,46 Ton
NO REQUIERE PEDESTAL
Calculo del area de la zapata y la presion ultima del suelo σutil
Se asume d = 24 cms
h = 30 cms
Reacciones del Sue lo
N piso
0,8
L
h
L
Carga de servicio = 23
Area requerida de la zapata = 0,9 m2
Lado de la zapata = 0,97 m
Se asume = 1,2 m Area = 1,44 m2
CUMPLE
ZAPATA Z6
0,2
σutil
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 63/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
Presion ult. del suelo = 24,31 Ton/m2
Revision del espesor asumido para la zapata
Cortante en dos direcciones, punzonamiento
Pu
h+d
d/2 d/2
b+d
d
d = 21 cms
bo = 214 cms
Vu = 28,42 Ton
d > 10 cm CUMPLE
d > 7 cm CUMPLE
Cortante en una direccion, flexion
16,5 cm
Pu
d
d
d
1,2
La fuerza cortante critica
Vu = σutil * B * (H/2-h/2-d)
Vu = 24,31 * 1,2 * 0,165
Vu = 4,81 Ton
d =
0.53*ф*√F`c*B
d =
b
σutil
b
1,2
σutil
Vu
4813
783,40
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 64/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
d = 6,1431 cm < 21 cm CUMPLE
Diseño a flexion
0,375 m
Pu Pu
d h
1,2
Mu = σutil * B * (H/2-h/2) 2̂/2
Mu = 24,31 * 1,2 * 0,07
Mu = 2,05 Ton-m
Para
b = 120
d = 21
k = 0,0039
Cuantia = 0,0033
As = 8,316 cm2
Se colocaran 7 Nº 4 cada 18.5 cm en ambas direcciones
b
H-h/2
1,2 b
Seccion critica
σutil
7/26/2019 Memorias Jorge Arturo Vergar Enero 2014
http://slidepdf.com/reader/full/memorias-jorge-arturo-vergar-enero-2014 65/66
DISEÑO EDIFICACION JORGE ARTURO VERGARA ALFONSO Ing. JAIR PINEDA CELISSANTA ROSA, SUR DE BOLIVAR M.P. 68202-106123 STD
Calle 10 B N° 88 A – 27 Torre 5 Apto 604 Conjunto Reserva de San Agustín 1 Tel: (1) 4689305Celular 3182096245
Jairpinedacelis@gmail.com – Bogotá D.C - Colombia
MEMORIA DE RESPONSABILIDAD
SeñoresOFICINA DE PLANEACIONMUNICIPIO DE SANTA ROSA
BOLIVAR
Yo, JAIR PINEDA CELIS , ingeniero civil con Matrícula Profesional Nº 68202-106123 STD, debidamente registrado en el Consejo Profesional de Ingeniería de
Cundinamarca, presento los cálculos y Diseños Estructurales elaborados de
acuerdo a los requerimientos de la NORMA COLOMBIANA DE DISEÑO YCONSTRUCCIÓN SISMO RESISTENTE LEY 400 DE 1997 (MODIFICA LEY1229 DE 2008, DECRETO 926 DE 2010 Y DECRETO 092 DE ENERO DE2011, para el proyecto CONSTRUCCION DE EDIFICACION JORGE ARTURO
VERGARA ALFONSO ubicado en el municipio de SANTA ROSA DEL SUR,BOLIVAR. Declaro que asumo la responsabilidad por los perjuicios que causa de
ellos puedan deducirse, exonerando a esta Curaduría Urbana de cualquier
responsabilidad.
Acepto y reconozco que la revisión efectuada por esta oficina no constituye una
aprobación al Diseño Estructural, sino una verificación del cumplimiento de la
NORMA COLOMBIANA DE DISEÑO Y CONSTRUCCIÓN SISMO
RESISTENTE NSR-10.
Atentamente,
JAIR PINEDA CELISING. CIVIL U.I.SMP No. 68202-106123 STD