CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
PRESUPUESTO MODIFICADO
1
E.391.S/C
M2 4,000.00 130.92 2,846.01 372,599.63 0.00 0.00 2,846.01 372,599.63 1,153.99 151,080.37 COLOCACION DE PANEL METALICO PARA CUBIERTA DE TECHO
2
E.391.233.005
M2 3,110.00 65.47 0.00 0.00 0.00 0.00 0.00 0.00 3,110.00 203,611.70
3
E.S/C.
PZA 50.00 406.31 0.00 0.00 0.00 0.00 0.00 0.00 50.00 20,315.50
4
E.411.041.010
M2 340.50 201.49 0.00 0.00 0.00 0.00 0.00 0.00 340.50 68,607.35
5
E.411.041.015
M2 650.00 159.10 111.20 17,691.92 0.00 0.00 111.20 17,691.92 538.80 85,723.08
6
E.411.042.015
M2 2,850.00 174.92 694.32 121,450.45 0.00 0.00 694.32 121,450.45 2,155.68 377,071.55
7
E.412.102.003
M2 750.00 189.29 36.08 6,829.58 0.00 0.00 36.08 6,829.58 713.92 135,137.92
8
E.412.102.001
M2 2,900.00 213.19 200.00 42,638.00 0.00 0.00 200.00 42,638.00 2,700.00 575,613.00
9
E.S/C.
M2 866.00 201.03 0.00 0.00 0.00 0.00 0.00 0.00 866.00 174,091.98
10
E.412.110.007
M2 200.00 296.42 0.00 0.00 0.00 0.00 0.00 0.00 200.00 59,284.00
11
E.414.094.050
M2 200.00 253.93 0.00 0.00 0.00 0.00 0.00 0.00 200.00 50,786.00
12
E.411.085.409
M2 40.00 237.83 0.00 0.00 0.00 0.00 0.00 0.00 40.00 9,513.20
SUB-TOTAL ACUMULADOS 561,209.59 0.00 561,209.59 1,910,835.64
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 1/9
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
SUMINISTRO TTRANSPORTE Y COLOCACION DE LAMINAS DE ALUMINIO PARA CUBIERTAS DE TECHO PERFILES NERVADO SIN CORRUGACIONES MENORES INTERNERVIOS ACABODO REPUJADO TIPO ESTUCO,ESPESOR 0.5mm
SUMINISTRO TRANSPORTE Y COLOCACION DE PELDANOS PREFAFRICADOS DE CONCRETO ACABADO OBRA LIMPIA
CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO, ACABADO CORRIENTE, E=10 CMS. NO INCLUYE MACHONES, DINTELES Y BROCALES
CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO, ACABADO CORRIENTE, E=15 CMS. NO INCLUYE MACHONES, DINTELES Y BROCALES
CONSTRUCCION DE PAREDES DE BLOQUES DE CONCRETO, ACABADO OBRA LIMPIA 1 CARA , E=15 CMS. NO INCLUYE MACHONES, DINTELES Y BROCALES
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO LISO. INCLUYE FRISO BASE
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON MORTERO A BASE DE CAL, ACABADO RUSTICO . INCLUYE FRISO BASE
SUMINISTRO Y COLOCACION DE FRISO IMPERMEABILIZANTE CON HIDROFUGO MARCA SIKA O SIMILAR INCLUYE LIMPIEZA DE LA SUPERFICIE PARA EL ADITIVO ADHERENCIA
CONSTRUCCION DE REVESTIMIENTO INTERIOR EN PAREDES CON BALDOSAS DE CERAMICA NACIONAL, ACABADO NATURAL,INCLUYE FRISO BASE
CONSTRUCCION DE REVESTIMIENTO DE PISOS CON BALDOSAS DE CERAMICA NACIONAL ACABADO NATURAL. INCLUYE MORTERO BASE.
TABIQUE ENTAMBORADO DE LAMINA DE YESO (DRY WALL) E=1/2", JUNTA INVISIBLE. INCLUYE ESTRUCTURA DE ACERO GALVANIZADO DE 2 1/2" CALIBRE 26 -E= 9 CM.
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 561,209.59 0.00 561,209.59 1,910,835.64
13
E.419.321.006
M2 60.00 460.47 0.00 0.00 0.00 0.00 0.00 0.00 60.00 27,628.20
14
E.414.074.032
M2 450.00 215.51 0.00 0.00 0.00 0.00 0.00 0.00 450.00 96,979.50
15
E.414.012 S/C
M2 200.00 120.60 0.00 0.00 0.00 0.00 0.00 0.00 200.00 24,120.00
16
E.412.119.167
M2 1,500.00 28.16 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 42,240.00 RODAPIE DE VINIL H:10cm e=1,6mm.
17
E.437 .011.S/C1
M2 23.60 689.25 0.00 0.00 0.00 0.00 0.00 0.00 23.60 16,266.30
18
E.437.011.261
M2 17.20 3,909.75 0.00 0.00 0.00 0.00 0.00 0.00 17.20 67,247.70
19
E.437.011.315
M2 3.36 1,299.12 0.00 0.00 0.00 0.00 0.00 0.00 3.36 4,365.04
20
E.437,011,S/C2
M2 30.10 689.25 8.40 5,789.70 0.00 0.00 8.40 5,789.70 21.70 14,956.73
21
E.437.011.S/C3
M2 45.60 689.25 0.00 0.00 0.00 0.00 0.00 0.00 45.60 31,429.80
22
E.437.011.S/C4
M2 80.80 689.25 0.00 0.00 0.00 0.00 0.00 0.00 80.80 55,691.40
23
E.437.011.S/C5
M2 10.00 689.25 0.00 0.00 0.00 0.00 0.00 0.00 10.00 6,892.50
SUB-TOTAL ACUMULADOS 566,999.29 0.00 566,999.29 2,306,758.39
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 2/9
CIELO RASO DE YESO TEXTURIZADA e=1/4", JUNTA VISIBLE, INCLUYE SUSPENSION
CONSTRUCCION DE REVESTIMIENTO DE PISOS CON BALDOSAS DE VINIL e=3.2mm ACABADO NATURAL NO INCLUYE MORTERO O PISP BASE
CONSTRUCCION DE REVESTIMIENTO DE PISOS CON MORTERODE CEMENTO ACABADO RAYADO (ESPONJA)
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DELAMINAS ENTAMBORADAS DE HIERRO (TIPO P-21).SEGUN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE PERFILES DE ALUMINIO Y VIDRIO. INCLUYENDO VIDRIO Y MARCO QUE CONFORMA LA ESTRUCTURA DE LA PUERTA. PUERTA TIPO P-2. SEGUN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS SENCILLA DE HIERRO Y ROMANILLA FIJA DE HIERRO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-31) SEGÚN PROYECTO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-32) SEGÚN PROYECTO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-33) SEGÚN PROYECTO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-34) SEGÚN PROYECTO
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 566,999.29 0.00 566,999.29 2,306,758.39
24
E.437,011,S/C6
M2 36.00 689.25 0.00 0.00 0.00 0.00 0.00 0.00 36.00 24,813.00
25
E.437.011.S/C7
M2 28.25 689.25 0.00 0.00 0.00 0.00 0.00 0.00 28.25 19,471.31
26
E.437.011.S/C8
M2 16.00 689.25 0.00 0.00 0.00 0.00 0.00 0.00 16.00 11,028.00
27
E.437.071.115
M 145.50 139.43 12.60 1,756.82 0.00 0.00 12.60 1,756.82 132.90 18,530.25
28
E.437.028.242
M2 1.68 2,084.21 0.00 0.00 0.00 0.00 0.00 0.00 1.68 3,501.47
29 E.437.029.S/C
M2 17.10 1,432.05 0.00 0.00 0.00 0.00 0.00 0.00 17.10 24,488.06
30
E.437.023.231
M2 5.28 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 5.28 19,048.13
31
E.437.023.S/C
M2 1.60 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 1.60 5,772.16
32
E.437.023.S/C
M2 1.20 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 1.20 4,329.12
33
E.437.023.S/C
M2 14.84 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 14.84 53,536.78
34
E.437.023.S/C2
M2 5.00 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 5.00 18,038.00
35
E.437.023.S/C3
M2 3.80 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 3.80 13,708.88
36
E.437.023.S/C4
M2 21.56 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 21.56 77,779.86
SUB-TOTAL ACUMULADOS 568,756.10 0.00 568,756.10 2,600,803.40
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 3/9
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-35) SEGÚN PROYECTO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-36) SEGÚN PROYECTO
SUMINISTRO TRANSPORTE Y COLOCACION DE PUERTAS BATIENTES DE LAMINAS ENTAMBORADAS DE HIERRO (TIPOP-37) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE MARCOS DE CHAPA DOBLADA DE HIERRO, EN PAREDES DE 15 CM DE ESPESOR.
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS DE ROMANILLA DE PERFILES DE ALUMINIO ANODIZADO (PALETAS DE ALUMINIO)CM DE ESPESOR.
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS PIVOTANTES DE PERFILES DE ALUMINIO Y VIDRIO SIN INCLUIR VIDRIO (TIPO-5) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -7) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -8) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -9) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -10) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -11) SEGÚN PROYECTO
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -12) SEGÚN PROYECTO
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 568,756.10 0.00 568,756.10 2,600,803.40
37
E.437.023.S/C5
M2 7.65 3,607.60 0.00 0.00 0.00 0.00 0.00 0.00 7.65 27,598.14
38
E.463.200.503
M2 2,700.00 52.60 0.00 0.00 0.00 0.00 0.00 0.00 2,700.00 142,020.00
39
E.463,200503T
M2 2,350.00 54.48 787.85 42,922.07 0.00 0.00 787.85 42,922.07 2,350.00 128,028.00
40
E.461.000.500
M2 1,280.00 57.89 0.00 0.00 0.00 0.00 0.00 0.00 1,280.00 74,099.20 ESMALTE EN PAREDES. INCLUYENDO FONDO ANTIALCALINO.
41
E.461.000.701
M2 783.34 57.14 0.00 0.00 0.00 0.00 0.00 0.00 783.34 44,760.05 ESMALTE EN PUERTAS METALICAS
42
E.461.000.801
M2 145.50 31.54 0.00 0.00 0.00 0.00 0.00 0.00 145.50 4,589.07 ESMALTE EN MARCOS METALICOS.
43
E.461.000.401
M2 760.50 55.81 760.50 42,443.51 0.00 0.00 760.50 42,443.51 760.50 42,443.51 ESMALTE EN CERCHA METALICOS.
44
E,765,013,S/C1
M2 320.00 83.12 0.00 0.00 0.00 0.00 0.00 0.00 320.00 26,598.40 PINTURA BASE EXPOXICA EN LOSA DE CONCRETO
45
E.611.081.025
M 28.66 118.32 0.00 0.00 0.00 0.00 0.00 0.00 28.66 3,391.05
46
E.611.071.019
M 52.16 95.65 19.50 1,865.18 0.00 0.00 19.50 1,865.18 52.16 4,989.10
47
E.611.081.025
M 7.65 305.83 0.00 0.00 0.00 0.00 0.00 0.00 7.65 2,339.60
48
E.631.010.025
PZA 5.00 226.48 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,132.40
SUB-TOTAL ACUMULADOS 655,986.85 0.00 655,986.85 3,102,791.92
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 4/9
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS CORREDERAS DE PERFILES DE ALUMINIO, CON PAÑO FIJO. SIN INCLUIR VIDRIO.(TIPO -13) SEGÚN PROYECTO
PINTURA DE CAUCHO INTERIOR EN PAREDES. INCLUYE FONDO ANTIALCALINO
PINTURA DE CAUCHO EXTERIOR EN PAREDES. INCLUYE FONDO ANTIALCALINO
TUBERIA AGUAS CLARAS, DE PVC ASTM SOLDADA P/AGUA CALIENTE, DIAMETRO 1 PLG(25 MM), EMBUTIDA O ENTERRADA. INCLUYE CONEXIONES.
TUBERIA AGUAS CLARAS, DE PVC ASTM SOLDADA P/AGUA FRIA,DIAMETRO 3/4 PLG(19 MM), EMBUTIDA O ENTERRADA. INCLUYE CONEXIONES.
TUBERIA AGUAS CLARAS, DE PVC ASTM SOLDADA P/AGUA CALIENTE, DIAMETRO 1 PLG(25 MM), EMBUTIDA O ENTERRADA. INCLUYE CONEXIONES.
SUMINISTRO, TRANSPORTE Y COLOCACION DE LLAVE DE PASO, TIPO COMPUERTA, DE BRONCE, DIAMETRO 1 PLG (25 MM).
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 655,986.85 0.00 655,986.85 3,102,791.92
49
E.631.001.019
PZA 12.00 193.44 0.00 0.00 0.00 0.00 0.00 0.00 12.00 2,321.28
50
E.631.010.013
PZA 20.00 122.44 0.00 0.00 0.00 0.00 0.00 0.00 20.00 2,448.80
51
E.622.051.051
PTO 25.00 292.94 0.00 0.00 0.00 0.00 0.00 0.00 25.00 7,323.50
52
E.622.051.102
PTO 10.00 449.62 0.00 0.00 0.00 0.00 0.00 0.00 10.00 4,496.20
53
E.622.041.051
PTO 25.00 280.40 0.00 0.00 0.00 0.00 0.00 0.00 25.00 7,010.00
54
E.622.050.102
PTO 3.00 645.43 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,936.29
55
E.612.111.051
M 86.83 183.54 3.00 550.62 0.00 0.00 3.00 550.62 83.83 15,386.16
56
E.612.081.102
M 51.77 141.85 0.00 0.00 0.00 0.00 0.00 0.00 51.77 7,343.57
57
E.612.081.152
M 9.50 200.38 0.00 0.00 0.00 0.00 0.00 0.00 9.50 1,903.61
58 E.612.112,051
M 40.00 200.74 0.00 0.00 0.00 0.00 0.00 0.00 40.00 8,029.60
59
E.612.081.102
M 30.00 141.85 0.00 0.00 0.00 0.00 0.00 0.00 30.00 4,255.50
60 E.742.221.120
PTO 87.00 115.44 0.00 0.00 0.00 0.00 0.00 0.00 87.00 10,043.28
61
E.542.121.S/C
PZA 86.00 906.36 0.00 0.00 0.00 0.00 0.00 0.00 86.00 77,946.96
62
E.542.121.S/C
PZA 2.00 843.11 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,686.22
SUB-TOTAL ACUMULADOS 656,537.47 0.00 656,537.47 3,254,922.89
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 5/9
SUMINISTRO, TRANSPORTE Y COLOCACION DE LLAVE DE PASO, TIPO COMPUERTA, DE BRONCE,DIAMETRO 3/4 plg (13 mm).
SUMINISTRO, TRANSPORTE DE LLAVE DE PASO TIPO COMPUERTA ,DE BRONCE , DIAMETRO 1/2"(19mm)
PUNTO DE AGUAS RESIDUALES DE PVC D= 2 " (51MM), E= 3.2 MM, EMBUTIDA O ENTERRADA, INCLUYE CONEXIONES.
PUNTO DE AGUAS RESIDUALES DE PVC D= 4 ", EMBUTIDA O ENTERRADA, INCLUYE CONEXIONES.
PUNTO DE AGUAS RESIDUALES DE PVC D= 2 ", (51mm) NORMAL e=1,8mm.EMBUTIDA O ENTERRADA, INCLUYE CONEXIONES.
PUNTO DE AGUAS RESIDUALES DE PVC D= 4 "(102mm),e=3,2mm COLGANTE, INCLUYE CONEXIONES.
TUBERÍA DE AGUAS RESIDUALES, PVC,ASTM, DIAMETRO 2" (51MM) E= 2,92 MM EMBUTIDA O ENTERRADA, INCLUYE CONEXIONES.
TUBERIA AGUAS RESIDUALES,PVC,DIAMETRO 4 PLG (102MM),E=3.2MM EMBUTIDA O ENTERRADA. INCLUYE CONEXIONES.
TUBERÍA DE AGUAS RESIDUALES, PVC, DIAMETRO 6" (152MM) E= 3.3 MM EMBUTIDA O ENTERRADA, INCLUYE CONEXIONES.
TUBERIA AGUAS RESIDUALES, PVC,ASTM,DIAMETRO 2 PLG (51 MM),E=2,92MM FIJA A LA SUPERFICIE. INCLUYE CONEXIONES.
TUBERIA AGUAS RESIDUALES,PVC,DIAMETRO 4 PLG (102MM),E=3.2MM
SUMINISTRO E INSTALACION DE PUNTO DE TOMACORRIENTES DE 120V, 1 FASE, USO OFICINA
SUMINISTRO E INSTALACION DE PUNTOS DE TOMACORRIENTE DE 120V DE UNA FASE USO INDUSTRIAL
SUMINISTRO E INSTALACION DE PUNTOS DE TOMACORRIENTE DE 208V DOS FASE USO INDUSTRIAL
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 656,537.47 0.00 656,537.47 3,254,922.89
63
E.611.081.013
M 2.05 146.83 0.00 0.00 0.00 0.00 0.00 0.00 2.05 301.00
64
S/C
SG 1.00 736,172.20 0.00 0.00 0.00 0.00 0.00 0.00 1.00 736,172.20 VARIACION DE PRECIOS 10%
65
E.437.028.S/C
M2 830.00 2,104.48 728.70 1,533,534.58 0.00 0.00 728.70 1,533,534.58 101.30 213,183.82
66 E.437.013.214
M2 255.00 2,206.45 193.47 426,881.88 0.00 0.00 193.47 426,881.88 61.53 135,762.87
67 E.451.111.206
M2 830.00 620.25 0.00 0.00 0.00 0.00 0.00 0.00 830.00 514,807.50
68 E.511.111.019
M 600.00 36.03 0.00 0.00 0.00 0.00 0.00 0.00 600.00 21,618.00
69
R.122.300.000
M2 3,100.00 18.63 0.00 0.00 0.00 0.00 0.00 0.00 3,100.00 57,753.00 LIMPIEZA INICIAL DE LA OBRA PARA COMENZAR LOS TRABAJOS.
70
M.800.511.200
M3 24.60 678.28 24.60 16,685.69 0.00 0.00 24.60 16,685.69 0.00 0.00
71
E.511.111.051
M 200.00 84.26 0.00 0.00 0.00 0.00 0.00 0.00 200.00 16,852.00
72
E.132.421.000
M2 100.00 129.55 0.00 0.00 0.00 0.00 0.00 0.00 100.00 12,955.00 DEMOLICION A MANO DE PAREDES DE BLOQUES
73
E.903.141.015
M3*km 9,870.00 2.75 1,500.00 4,125.00 8,370.00 23,017.50 9,870.00 27,142.50 0.00 0.00
74
E.461.000.101
M2 800.00 76.69 800.00 61,352.00 0.00 0.00 800.00 61,352.00 0.00 0.00 ESMALTE EN COLUMNAS METALICAS.
75
M. 461.000.201
M2 3,000.00 91.39 1,529.39 139,770.95 0.00 0.00 1,529.39 139,770.95 1,470.61 134,399.05 ESMALTE EN VIGAS METALICAS DE ALMA LLENA.
76
E.391.S/C
M2 1,939.90 614.67 1,500.00 922,005.00 439.90 270,393.33 1,939.90 1,192,398.33 0.00 0.00
SUB-TOTAL ACUMULADOS 3,760,892.57 293,410.83 4,054,303.40 5,098,727.33
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 6/9
TUBERIA DE AGUAS CLARAS, DE PVC CPVC SOLDADA PARA AGUA CALIENTE, DIAMETRO 1/2" (13mm), ASTM, EMBUTIDA O ENTERRADA. INCLUYE CONEXIONES.
SUMINISTRO, TRANSPORTE Y COLOCACION DE VENTANAS DE PAÑO FIJO CON PERFILES DE ALUMINIO
SUMINISTRO, TRANSPORTE Y COLOCACION DE PUERTAS CORREDERAS O PORTONES DE PERFILES DE HIERRO (REJA), INCLUYE ESTRUCTURA DE SOPORTE
VIDRIOS PLANOS, LISOS, TRANSPARENTES DE COLOR, NO REBORDADOS e=6mm INCLUYE ELEMENTOS DE FIJACION.
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA. DIAMETRO 3/4" (19mm)
LIMPIEZA Y MANTENIMIENTO DE CANALES DE CONCRETO ARMADO DE SECCION GRANDE
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA, DIAMETRO 2" (51mm)
TRANSPORTE NO URBANO EN CAMIONES , DE TIERRA, AGREGADOS Y ESCOMBROS MEDIDO EN ESTADO SUELTO, A DISTANCIAS MAYORES A 14km Y HASTA 15km INCLUYE.
SUMINSTRO, TRANSPORTE E INSTALACION DE LAMINAS DE ACERO GALVANIZADO CAL. 22.
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 3,760,892.57 293,410.83 4,054,303.40 5,098,727.33
77
E.318.000.011
M2 67.69 1,091.81 0.00 0.00 0.00 0.00 0.00 0.00 67.69 73,904.62
78
M.322.S/C
M3 4.00 1,370.59 0.00 0.00 0.00 0.00 0.00 0.00 4.00 5,482.36
79
E.802.S/C
KG 180.00 20.75 0.00 0.00 0.00 0.00 0.00 0.00 180.00 3,735.00
80
E.S/C
M2 17.00 331.86 0.00 0.00 0.00 0.00 0.00 0.00 17.00 5,641.62
81
E.511.111.076
M3 200.00 106.40 0.00 0.00 0.00 0.00 0.00 0.00 200.00 21,280.00
82
E.618.S/C
M 850.00 64.97 0.00 0.00 0.00 0.00 0.00 0.00 850.00 55,224.50 PRUEBA HIDROSTASTICA, DE SISTEMA CONTRA INCENDIO EXISTENTE.
83
E.511.111.025
M 150.00 42.50 0.00 0.00 0.00 0.00 0.00 0.00 150.00 6,375.00
84
E.S/C
M2 1,500.00 40.91 0.00 0.00 0.00 0.00 0.00 0.00 1,500.00 61,365.00 FIJACION DE LAMINA GALVANIZADA (ACERAL) EXISTENTE.
85
E.S/C
M 700.00 35.61 537.53 19,141.44 0.00 0.00 537.53 19,141.44 162.47 5,785.56
86
E.012.400.000
PTO 60.00 209.76 0.00 0.00 0.00 0.00 0.00 0.00 60.00 12,585.60
87
M.361.S/C.01
PLG 8,500.00 47.20 4,500.00 212,400.00 0.00 0.00 4,500.00 212,400.00 4,000.00 188,800.00 REMOCION DE SOLDADURA EXISTENTE
88
M.361.S/C.02
PLG 8,500.00 31.17 4,500.00 140,265.00 0.00 0.00 4,500.00 140,265.00 4,000.00 124,680.00
89
M.361.S/C.03
PLG 8,500.00 89.58 4,500.00 403,110.00 0.00 0.00 4,500.00 403,110.00 4,000.00 358,320.00 RESOLDADURA EN ESTRUCTURA EXISTENTE
SUB-TOTAL ACUMULADOS 4,535,809.01 293,410.83 4,829,219.85 6,021,906.59
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 7/9
MORTERO (GROUT) PARA NIVELACION DE BASES DE ESTRUCTURAS (e=5cm).
CONCRETO DE Fc 180 kgf/cm2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE BASE DE TRANSFORMADORES CON ESPESOR VARIABLE.
SUMINISTRO,PREPARACION Y COLOCACION DE MALLA COMO ACERO DE REFUERZO PARA EL CONCRETO ARMADO CORRESPONDIENTE DE BASE DE TRANSFORMADOR
ENCOFRADO DE MADERA TIPO RECTO , ACABADO CORRIENTE EN CANALES Y BASES DE TRANSFORMADORES.
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA PVC, EMBUTIDA D=3" (76mm)
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA. DIATETRO 1" (25mm)
SUMINSTRO Y COLOCACION DE FLEJES METALICOS EN BASE DE VENTANAS Y BORDES DE TECHO.
REPLANTEO DE COORDENADAS PARA UBICACIÓN DE ELEMENTOS CONSTRUCTIVOS EN OBRA
SANEAMIENTO REPERFILAMIENTO Y ACONDICIONAMIENTO DE LA ZONA A RESOLDAR
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 4,535,809.01 293,410.83 4,829,219.85 6,021,906.59
90
E.361.621.122
KG 4,000.00 28.58 626.40 17,902.51 0.00 0.00 626.40 17,902.51 3,373.60 96,417.49
91
E.361.521.000
KGF 4,000.00 5.25 626.40 3,288.60 0.00 0.00 626.40 3,288.60 3,373.60 17,711.40
92
E.416.012.150
M2 330.00 163.67 0.00 0.00 0.00 0.00 0.00 0.00 330.00 54,011.10
93
E.420.100.103
M2 330.00 311.66 0.00 0.00 0.00 0.00 0.00 0.00 330.00 102,847.80
94
E.S/C
KG 100,000.00 42.77 85,751.25 3,667,580.96 0.00 0.00 85,751.25 3,667,580.96 14,248.75 609,419.04
95
E.S/C
KG 100,000.00 20.92 86,983.49 1,819,694.61 0.00 0.00 86,983.49 1,819,694.61 13,016.51 272,305.39
96
E.361.511.000
KG 100,000.00 10.22 97,131.93 992,688.32 0.00 0.00 97,131.93 992,688.32 2,868.07 29,311.68
97
E.334.000.120
M3 36.28 1,498.36 6.24 9,349.77 0.00 0.00 6.24 9,349.77 30.04 45,010.73
98
E.352.110.210
KG 1,566.04 18.62 916.79 17,070.63 0.00 0.00 916.79 17,070.63 649.25 12,089.03
99
E.352.120.210
KG 2,000.00 13.65 80.79 1,102.78 0.00 0.00 80.79 1,102.78 1,919.21 26,197.22
100
E.342.010.114
M2 348.00 248.89 72.60 18,069.41 10.56 2,628.28 83.16 20,697.69 264.84 65,916.03
101
E.322.000.S/C
M3 144.00 2,248.76 144.00 323,821.44 0.00 0.00 144.00 323,821.44 0.00 0.00
102
E.138.750.S/C
KG 1,600.00 18.48 1,600.00 29,568.00 0.00 0.00 1,600.00 29,568.00 0.00 0.00
103
E.341.010.114
M2 40.00 168.14 23.92 4,021.91 0.00 0.00 23.92 4,021.91 16.08 2,703.69
SUB-TOTAL ACUMULADOS 11,439,967.97 296,039.11 11,736,007.08 7,355,847.18
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 8/9
SUMINISTRO, FABRICACION, LIMPIEZA Y SISTEMA DE PROTECCION DE SISTEMA DE PISO SOFITO METALICO (ENCOFRADO COLABORANTE) SEGÚN ESPECIFICACIONES.
MONTALE DE SISTEMA DE PISO SOFITO METALICO (ENCOFRADO COLABORANTE)
CONSTRUCCION DE PENDIENTES EN LOSAS HORIZONTALES CON MORTERO DE CEMENTO ARENA,e=5cm PROMEDIO.
IMPERMEABILIZACION EN LOSAS O PLACA HORIZONTALES DE CONCRETO VACIADO EN SITIO TRANSITABLE CON MANTO ASFALTIO e= 3mm EN CALIENTE ACABADO DE LOSETA DE CONCRETO PREFABRICADO
SUMINISTRO DE PERFILES DE ACERO IMPORTADOS PARA LA FABRICACION DE ESTRUCTURA, NO INCLUIR TRANSPORTE
FABRICACION DE PERFILES DE ACERO, PARA LA FABRICACION DE ESTRUCTURA. NO INCLUYE TRANSPORTE
MONTALE DE ESTRUCTURA METALICA DE ACERO CON CONEXIONES SOLDADAS
CONCRETO DE Fc 200 kg/cm2 A LOS 28 DIAS ACABADO CORRIENTE PARA LA CONSTRUCCION DE MACHONES VIGAS DE CORONA, DINTELES, ARRIONTRAMIENTO DE PAREDES
SUMINISTRO PREPARACION Y COLOCACION DE ACERO DE REFUERZO RAT=2.100 kg/CM2 UTILIZANDO CABILLAS DE DIAMETRO IGUAL O INFERIOR A 3/8" PARA SUPERESTRUCTURA
SUMINISTRO PREPARACION Y COLOCACION DE ACERO DE REFUERZO RAT=2.100 kg/CM2 UTILIZANDO CABILLAS DE DIAMETRO IGUAL O INFERIOR A 1/2"A 7/8" PARA SUPERESTRUCTURA
ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN MACHONES,VIGAS DE CORONA DINTELES
CONCRETO PREMEZCLADO DE Fc 280 kgf/cm2 A LOS 28 DIAS, ACABADO CORRIENTE, PARA LA CONSTRUCCION DE LA LOSA DE FUNDACION
SUMINISTRO, TRANSPORTE, PREPARACION Y COLOCACION DE MALLA DE ACERO DE REFUERZO TIPO SIMALLA D-513, PARA LA CONSTRUCCION DE LOSA
ENCOFRADO DE MADERA TIPO RECTO ACABADO CORRIENTE EN BASES DE PAVIMENTO Y LOSAS DE FUNDACION
CORPORACION DE INDUSTRIAS INTERMEDIAS DE VENEZUELA VALUACION Nº:
RELACION DE OBRA EJECUTADA TRES (3)
CONSTRUCCION DE LA II ETAPA DELAS UNIDADES DE INYECCION M6,M7,M8,M9 Y M10 DEL COMPLEJO INDUSTRIAL PROCESADOR DE PLASTICO (QUIMO 107) CONTRATO Nº: CO/CORPIVENSA/AJ/2012-038"
CONTRATISTA: CONSTRUCTORA DEL ALBA BOLIVARIANA, C.A DE FECHA:
ETAPA II PARA LA CONSTRUCCION DE UNIDAD DE INYECCION MODULO (10) DEL COMPLEJO AUTOPARTE YARE, UBICADO EN EL MUNICIPIO SIMON BOLIVAR,DEL ESTADO MIRANDA RESOLUCION Nº:
PERIODO DE EJECUCION: DESDE 01/12/20112 HASTA: 1/31/2013 FECHA: 1/31/2013
CONCEPTO UNIDAD
SEGÚN PRESUPUESTO ORIGINAL OBRA EJECUTADA EN EL PERÍODO OBRA POR EJECUTAR
NOMBRE DE LA OBRA:
OBJETO DEL CONTRATO:
OBRA ACUMULADA HASTA LA VALUACION ANTERIOR
TOTAL ACUMULADO HASTA ESTA VALUACION
CANTIDAD APROBADA
(1)
PRECIO UNITARIO (2)
CANTIDAD (3)
TOTAL (BS)
CANTIDAD (4)
TOTAL (BS)
CANTIDAD5=(3+4)
TOTALBS.
CANTIDAD 6=(1-5)
MONTOBS
VIENEN 11,439,967.97 296,039.11 11,736,007.08 7,355,847.18
104
E.319.100.000
M3 120.00 160.85 61.20 9,844.02 0.00 0.00 61.20 9,844.02 58.80 9,457.98
105
M.511.111.019
M3 700.00 37.26 0.00 0.00 0.00 0.00 0.00 0.00 700.00 26,082.00
106
E.711.111.025
M 50.00 43.92 0.00 0.00 0.00 0.00 0.00 0.00 50.00 2,196.00
107
E.511.111.051
M 90.00 84.26 0.00 0.00 0.00 0.00 0.00 0.00 90.00 7,583.40
108
E.711.111.076
M 110.00 106.40 0.00 0.00 0.00 0.00 0.00 0.00 110.00 11,704.00
109
E.461.S/C
M2 900.00 55.81 823.68 45,969.58 0.00 0.00 823.68 45,969.58 76.32 4,259.42 ESMALTE EN CORREAS
110
E.S/C
ML 500.00 56.30 0.00 0.00 0.00 0.00 0.00 0.00 500.00 28,150.00 PRUEBAS HIDROSTATICAS
SUB-TOTAL ACUMULADOS 11,495,781.57 296,039.11 11,791,820.68 7,445,279.98
POR LA LA CONTRATISTA POR CORPIVENSA
CONTRATISTA INGENIERO RESIDENTE ING. INSPECTOR
FIRMA: FIRMA: FIRMA:
NOMBRE: LUIS ALBERTO RODRIGUEZ PERERA NOMBRE: ISAAC PONCE DE LEON BRAVO NOMBRE: RENNY MOLINET
C.I.: E-089758 C.I.No.: 18.043.057 C.I.No.: 16.817.653
C.I.V.: CIV No.: 204.528 CIV No.:
PAGINA 9/9
CONSTRUCCION DE BASE DE PIEDRA PICADA CORRESPONDIENTE A OBRAS PREPARATIVAS
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA, DIAMETRO 3/4" (19mm)
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA, DIAMETRO 1" (25mm)
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA, DIAMETRO 2" (51mm)
INSTALACION ELECTRICA DE TUBERIA PLASTICA RIGIDA LIVIANA, PVC, EMBUTIDA, DIAMETRO 3" (76mm)