HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
09
09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 Area 87.74 175.481.00 87.74 87.74
09.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 Area 87.74 175.481.00 87.74 87.74
09.01.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION m2 Area 87.74 175.481.00 87.74 87.74
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.60 M. m3 19.44 38.88Z-1 6.00 1.20 1.20 1.50 12.96
Z-2 3.00 1.20 1.20 1.50 6.48
09.02.02 m3 25.97 51.95EJE 1-1/A-B 1.00 0.50 1.73 1.50 1.30
EJE 1-1/B-C 1.00 0.50 1.73 1.50 1.30
EJE 1-2/B-C 1.00 0.40 0.40 1.50 0.24
EJE 2-2/A-B 1.00 0.50 1.73 1.50 1.30
EJE 2-2/B-C 1.00 0.50 1.73 1.50 1.30
EJE 2-3/A-B 1.00 0.40 1.68 1.50 1.01
EJE 2-3/B-C 1.00 0.50 1.48 1.50 1.11
EJE 2-3/B-C 1.00 0.50 2.08 1.50 1.56
EJE 3-3/A-B 1.00 0.40 1.73 1.50 1.04
EJE 3-3/B-C 1.00 0.50 1.73 1.50 1.30
EJE A-A/1-2 1.00 0.50 3.17 1.50 2.38
EJE A-A/2-3 1.00 0.40 2.93 1.50 1.76
EJE A-B/1-2 1.00 0.50 1.43 1.50 1.07
EJE A-B/1-2 1.00 0.50 2.03 1.50 1.52
EJE A-B/2-3 1.00 0.40 0.63 1.50 0.38
EJE B-C/1-2 1.00 0.50 1.80 1.50 1.35
EJE B-C/1-2 1.00 0.50 1.78 1.50 1.34
EJE B-C/2-3 1.00 0.40 0.40 1.50 0.24
EJE B-C/2-3 1.00 0.50 0.48 1.50 0.36
EJE C-C/1-2 1.00 0.50 3.17 1.50 2.38
EJE C-C/2-3 1.00 0.40 2.93 1.50 1.76
09.02.03 m354.49
108.99
Incluye Esponjamiento (20% ) 1.20 45.41 54.49
09.02.04 NIVELACION Y COMPACTADO DE SUB-BASE m2 30.28 60.55Z-1 6.00 1.20 1.20 8.64
Z-2 3.00 1.20 1.20 4.32
EJE 1-1/A-B 1.00 0.50 1.73 0.87
EJE 1-1/B-C 1.00 0.50 1.73 0.87
EJE 1-2/B-C 1.00 0.40 0.40 0.16
EJE 2-2/A-B 1.00 0.50 1.73 0.87
EJE 2-2/B-C 1.00 0.50 1.73 0.87
EJE 2-3/A-B 1.00 0.40 1.68 0.67
EJE 2-3/B-C 1.00 0.50 1.48 0.74
EJE 2-3/B-C 1.00 0.50 2.08 1.04
EJE 3-3/A-B 1.00 0.40 1.73 0.69
EJE 3-3/B-C 1.00 0.50 1.73 0.87
EJE A-A/1-2 1.00 0.50 3.17 1.59
EJE A-A/2-3 1.00 0.40 2.93 1.17
EJE A-B/1-2 1.00 0.50 1.43 0.72
EJE A-B/1-2 1.00 0.50 2.03 1.02
EJE A-B/2-3 1.00 0.40 0.63 0.25
EJE B-C/1-2 1.00 0.50 1.80 0.90
EJE B-C/1-2 1.00 0.50 1.78 0.89
EJE B-C/2-3 1.00 0.40 0.40 0.16
EJE B-C/2-3 1.00 0.50 0.48 0.24
EJE C-C/1-2 1.00 0.50 3.17 1.59
EJE C-C/2-3 1.00 0.40 2.93 1.17
09.02.05 m244.38
88.76
SSHH MUJERES 1.00 Area= 22.85 22.85
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
MÓDULO DE SERVICIOS HIGIÉNICOS (1 MODULO 1 PISO + 1 MOD. 2 PISOS)
EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO HASTA 1.30M
ELIMINACION CON VOLQUETE DE MATERIAL EXCEDENTE (D=2.0 KM)
AFIRMADO CON MATERIAL DE PRESTAMO E=25CM EN PISOS Y VEREDAS
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
SSHH VARONES 1.00 Area= 21.53 21.53
09.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CONCRETO 1:10 +30% P.G. EN FALSA ZAPATA m3 7.78 15.55Z-1 6.00 1.20 1.20 0.60 5.18
Z-2 3.00 1.20 1.20 0.60 2.59
09.03.02 m212.96
25.92
Z-1 6.00 1.20 1.20 8.64
Z-2 3.00 1.20 1.20 4.32
09.03.03 CONCRETO CIMIENTO CORRIDO 1:10 +30% P.G. m3 8.66 17.32EJE 1-1/A-B 1.00 0.50 1.73 0.50 0.43
EJE 1-1/B-C 1.00 0.50 1.73 0.50 0.43
EJE 1-2/B-C 1.00 0.40 0.40 0.50 0.08
EJE 2-2/A-B 1.00 0.50 1.73 0.50 0.43
EJE 2-2/B-C 1.00 0.50 1.73 0.50 0.43
EJE 2-3/A-B 1.00 0.40 1.68 0.50 0.34
EJE 2-3/B-C 1.00 0.50 1.48 0.50 0.37
EJE 2-3/B-C 1.00 0.50 2.08 0.50 0.52
EJE 3-3/A-B 1.00 0.40 1.73 0.50 0.35
EJE 3-3/B-C 1.00 0.50 1.73 0.50 0.43
EJE A-A/1-2 1.00 0.50 3.17 0.50 0.79
EJE A-A/2-3 1.00 0.40 2.93 0.50 0.59
EJE A-B/1-2 1.00 0.50 1.43 0.50 0.36
EJE A-B/1-2 1.00 0.50 2.03 0.50 0.51
EJE A-B/2-3 1.00 0.40 0.63 0.50 0.13
EJE B-C/1-2 1.00 0.50 1.80 0.50 0.45
EJE B-C/1-2 1.00 0.50 1.78 0.50 0.45
EJE B-C/2-3 1.00 0.40 0.40 0.50 0.08
EJE B-C/2-3 1.00 0.50 0.48 0.50 0.12
EJE C-C/1-2 1.00 0.50 3.17 0.50 0.79
EJE C-C/2-3 1.00 0.40 2.93 0.50 0.59
09.03.04 m3 8.56 17.13EJE 1-1/A-B 1.00 0.25 2.68 0.90 0.60
EJE 1-1/B-C 1.00 0.25 2.68 0.90 0.60
EJE 1-2/A-B 1.00 0.15 0.40 0.90 0.05
EJE 1-2/A-B 1.00 0.15 0.65 0.90 0.09
EJE 1-2/A-B 2.00 0.15 3.00 0.90 0.81
EJE 1-2/B-C 1.00 0.15 0.25 0.90 0.03
EJE 1-2/B-C 2.00 0.15 0.80 0.90 0.22
EJE 1-2/B-C 2.00 0.15 3.00 0.90 0.81
EJE 2-2/A-B 1.00 0.25 2.68 0.90 0.60
EJE 2-2/B-C 1.00 0.25 2.68 0.90 0.60
EJE 2-3/A-B 1.00 0.15 1.75 0.90 0.24
EJE 2-3/B-C 2.00 0.15 3.30 0.90 0.89
EJE 3-3/A-B 1.00 0.25 2.68 0.90 0.60
EJE 3-3/B-C 1.00 0.25 2.68 0.90 0.60
EJE A-A/1-2 1.00 0.15 2.45 0.90 0.33
EJE A-A/2-3 1.00 0.15 0.90 0.90 0.12
EJE A-A/2-3 1.00 0.15 1.13 0.90 0.15
EJE A-B/2-3 1.00 0.15 0.75 0.90 0.10
EJE B-C/2-3 1.00 0.15 0.45 0.90 0.06
EJE B-C/2-3 1.00 0.15 0.50 0.90 0.07
EJE B-C/2-3 1.00 0.15 0.60 0.90 0.08
EJE C-C/1-2 1.00 0.15 3.43 0.90 0.46
EJE C-C/2-3 1.00 0.15 3.18 0.90 0.43
09.03.05 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 76.72 153.43EJE 1-1/A-B 2.00 2.68 0.90 4.82
EJE 1-1/B-C 2.00 2.68 0.90 4.82
EJE 1-2/A-B 2.00 0.40 0.90 0.72
EJE 1-2/A-B 2.00 0.65 0.90 1.17
EJE 1-2/A-B 2.00 3.00 0.90 5.40
EJE 1-2/B-C 2.00 0.25 0.90 0.45
EJE 1-2/B-C 2.00 0.80 0.90 1.44
EJE 1-2/B-C 2.00 3.00 0.90 5.40
EJE 2-2/A-B 2.00 2.68 0.90 4.82
EJE 2-2/B-C 2.00 2.68 0.90 4.82
EJE 2-3/A-B 2.00 1.75 0.90 3.15
SOLADO PARA ZAPATA DE ( e= 3') MEZCLA 1.10 CEMENTO - HORMIGON
CONCRETO PARA SOBRECIMIENTO DE 1:8 CEM-HOR 25% P.M.
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
EJE 2-3/B-C 2.00 3.30 0.90 5.94
EJE 3-3/A-B 2.00 2.68 0.90 4.82
EJE 3-3/B-C 2.00 2.68 0.90 4.82
EJE A-A/1-2 2.00 2.45 0.90 4.41
EJE A-A/2-3 2.00 0.90 0.90 1.62
EJE A-A/2-3 2.00 1.13 0.90 2.03
EJE A-B/2-3 2.00 0.75 0.90 1.35
EJE B-C/2-3 2.00 0.45 0.90 0.81
EJE B-C/2-3 2.00 0.50 0.90 0.90
EJE B-C/2-3 2.00 0.60 0.90 1.08
EJE C-C/1-2 2.00 3.43 0.90 6.17
EJE C-C/2-3 2.00 3.18 0.90 5.72
09.04 OBRAS DE CONCRETO ARMADO
09.04.01 ZAPATAS
09.04.01.01 ACERO DE REFUERZO FY=4200 KG/CM2. kgVer metrado de acero en zapatas 194.18 388.37
09.04.01.02 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 6.48 12.96Z-1 6.00 1.20 1.20 0.50 4.32
Z-2 3.00 1.20 1.20 0.50 2.16
09.04.02 VIGAS DE CIMENTACION
09.04.02.01 ACERO DE REFUERZO FY=4200 KG/CM2.. kgVer metrado de acero en viga de cimentación 448.53 897.05
09.04.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION m2 # elementos 27.68 55.36VC-101 2.00 1.00 6.10 0.40 4.88
VC-101 2.00 2.00 5.60 0.40 8.96
VR-101 2.00 2.00 8.65 0.40 13.84
09.04.02.03 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 m3 3.46 6.92VC-101 1.00 0.25 6.10 0.40 0.61
VC-101 2.00 0.25 5.60 0.40 1.12
VR-101 2.00 0.25 8.65 0.40 1.73
09.04.03 COLUMNAS Y PLACAS
09.04.03.01 ACERO DE REFUERZO FY=4200 KG/CM2. kgVer metrado de acero en columnas 862.65 2587.94
09.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 47.58 142.74C-1 2.00 0.25 0.40 3.95 10.27
C-1 4.00 0.25 0.40 4.10 21.32
C-2 3.00 0.25 0.25 5.33 15.99
09.04.03.03 CONCRETO PARA COLUMNAS F'C=210 KG/CM2 m3 3.43 10.29C-1 2.00 0.25 0.40 3.95 0.79
C-1 4.00 0.25 0.40 4.10 1.64
C-2 3.00 0.25 0.25 5.33 1.00
09.04.04 VIGAS
09.04.04.01 ACERO DE REFUERZO FY=4200 KG/CM2.. kgVer metrado de acero en viga 540.15 1620.45
09.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 37.47 112.40V-101 6.00 0.25 3.30 0.40 15.84
V-102 2.00 0.25 4.20 0.50 10.50
V-102 2.00 0.25 4.45 0.50 11.13
09.04.04.03 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 4.14 12.43V-101 6.00 0.25 3.30 0.40 1.98
V-102 2.00 0.25 4.20 0.50 1.05
V-102 2.00 0.25 4.45 0.50 1.11
09.04.05 LOSA ALIGERADA
09.04.05.01 m2250.40
751.20
ALEROS 4.00 Area= 2.58 10.32
SSHH MUJERES 2.00 Area= 18.07 36.14
SSHH VARONES 12.00 Area= 17.00 203.94
09.04.05.02 und2,085.83
6257.50
8.33 250.40 2,085.83
09.04.05.03 ACERO DE REFUERZO FY=4200 KG/CM2. kg 327.18 981.55Acero de Refuerzo en Viguetas ø 3/8" 28.00 10.85 0.56 170.13
Acero de Refuerzo en Viguetas (Intermedios) ø 1/2" 28.00 2.45 0.99 67.91
Acero de Refuerzo en Viguetas (Bastones Extremos) ø 3/8" 28.00 3.71 0.56 58.17
Acero de Temperatura ø 1/4" 17.00 8.28 0.22 30.97
09.04.05.04 CONCRETO F'C=210 KG/CM2. PARA LOSAS ALIGERADAS m3 21.91 65.73m3/m2
1.00 0.0875 Area= 250.40 21.91
09.04.06 COLUMNETAS Y VIGUETAS DE CONFINAMIENTO
09.04.06.01 ACERO DE REFUERZO FY=4200 KG/CM2.. kgVer metrado de acero en columneta y viguetas 37.14 111.43
09.04.06.02 ENCOFRADO Y DESENCOFRADO m2 24.86 74.57
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
CL-1 8.00 0.15 0.25 3.39 21.70
CL-2 1.00 0.15 0.25 3.95 3.16
09.04.06.03 CONCRETO EN COLUMNETAS F'C=175 KG/CM2 m3 1.17 3.50CL-1 8.00 0.15 0.25 3.39 1.02
CL-2 1.00 0.15 0.25 3.95 0.15
09.05 MUROS Y TABIQUES DE ALBAÑILERIA
09.05.01 MURO DE LADRILLO KK ARCILLA CABEZA M:1:5 E=1.5 CM m2 45.26 135.77EJE 1-1/A-B 1.00 2.68 2.71 7.26
EJE 1-1/B-C 1.00 2.68 2.71 7.26
EJE 2-2/A-B 1.00 2.68 2.71 7.26
EJE 2-2/B-C 1.00 2.68 2.71 7.26
EJE 3-3/A-B 1.00 2.68 2.71 7.26
EJE 3-3/B-C 1.00 2.68 2.71 7.26
Area
MT 1-1/A-B 1.00 0.28 0.28
MT 1-1/B-C 1.00 0.28 0.28
MT 2-2/A-B 1.00 0.28 0.28
MT 2-2/B-C 1.00 0.28 0.28
MT 3-3/A-B 1.00 0.28 0.28
MT 3-3/B-C 1.00 0.28 0.28
09.05.02 MURO DE LADRILLO KK ARCILLA SOGA M:1:5 E=1.5 CM m2 51.48 154.45EJE 1-2/A-B 1.00 0.40 1.80 0.72
EJE 1-2/A-B 1.00 0.65 1.80 1.17
EJE 1-2/B-C 1.00 0.25 1.80 0.45
EJE 1-2/B-C 1.00 0.40 1.80 0.72
EJE 1-2/B-C 1.00 0.40 1.80 0.72
EJE 2-3/A-B 1.00 1.75 1.80 3.15
EJE 2-3/B-C 1.00 1.65 1.80 2.97
EJE 2-3/B-C 1.00 1.65 1.80 2.97
EJE A-A/1-2 1.00 2.45 2.09 5.12
EJE A-A/2-3 1.00 0.90 2.64 2.38
EJE A-A/2-3 1.00 1.13 2.09 2.36
EJE A-B/1-2 1.00 1.50 1.80 2.70
EJE A-B/1-2 1.00 1.50 1.80 2.70
EJE A-B/2-3 1.00 0.75 1.80 1.35
EJE B-C/1-2 1.00 1.50 1.80 2.70
EJE B-C/1-2 1.00 1.50 1.80 2.70
EJE B-C/2-3 1.00 0.45 1.80 0.81
EJE B-C/2-3 1.00 0.50 1.80 0.90
EJE B-C/2-3 1.00 0.60 1.80 1.08
EJE C-C/1-2 1.00 3.43 2.09 7.17
EJE C-C/2-3 1.00 3.18 2.09 6.65
09.06 REVOQUES Y ENLUCIDOS
09.06.01 m2 250.40 751.20ALEROS 4.00 Area= 2.58 10.32
SSHH MUJERES 2.00 Area= 18.07 36.14
SSHH VARONES 12.00 Area= 17.00 203.94
09.06.02 TARRAJEO EN MURO INTERIOR MEZCLA 1:5, E=1.50CM m2 96.74 290.22EJE 1-1/A-B 1.00 2.68 2.71 7.26
EJE 1-1/B-C 1.00 2.68 2.71 7.26
EJE 2-2/A-B 1.00 2.68 2.71 7.26
EJE 2-2/B-C 1.00 2.68 2.71 7.26
EJE 3-3/A-B 1.00 2.68 2.71 7.26
EJE 3-3/B-C 1.00 2.68 2.71 7.26
Area
MT 1-1/A-B 1.00 0.28 0.28
MT 1-1/B-C 1.00 0.28 0.28
MT 2-2/A-B 1.00 0.28 0.28
MT 2-2/B-C 1.00 0.28 0.28
MT 3-3/A-B 1.00 0.28 0.28
MT 3-3/B-C 1.00 0.28 0.28
EJE 1-2/A-B 1.00 0.40 1.80 0.72
EJE 1-2/A-B 1.00 0.65 1.80 1.17
EJE 1-2/B-C 1.00 0.25 1.80 0.45
EJE 1-2/B-C 1.00 0.40 1.80 0.72
EJE 1-2/B-C 1.00 0.40 1.80 0.72
EJE 2-3/A-B 1.00 1.75 1.80 3.15
EJE 2-3/B-C 1.00 1.65 1.80 2.97
TARRAJEO DE CIELORAZOS CON MEZCLA DE CEMENTO ARENA
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
EJE 2-3/B-C 1.00 1.65 1.80 2.97
EJE A-A/1-2 1.00 2.45 2.09 5.12
EJE A-A/2-3 1.00 0.90 2.64 2.38
EJE A-A/2-3 1.00 1.13 2.09 2.36
EJE A-B/1-2 1.00 1.50 1.80 2.70
EJE A-B/1-2 1.00 1.50 1.80 2.70
EJE A-B/2-3 1.00 0.75 1.80 1.35
EJE B-C/1-2 1.00 1.50 1.80 2.70
EJE B-C/1-2 1.00 1.50 1.80 2.70
EJE B-C/2-3 1.00 0.45 1.80 0.81
EJE B-C/2-3 1.00 0.50 1.80 0.90
EJE B-C/2-3 1.00 0.60 1.80 1.08
EJE C-C/1-2 1.00 3.43 2.09 7.17
EJE C-C/2-3 1.00 3.18 2.09 6.65
09.06.03 TARRAJEO EN MURO EXTERIORES MEZCLA 1:5, E=1.50CM m2 96.74 290.22Idem 09.06.02 1.00 96.74 96.74
09.06.04 m247.58
142.74
C-1 2.00 0.25 0.40 3.95 10.27
C-1 4.00 0.25 0.40 4.10 21.32
C-2 3.00 0.25 0.25 5.33 15.99
09.06.05 TARRAJEO DE VIGAS MEZCLA 1:5, E=1.50CM m2 37.47 112.40V-101 6.00 0.25 3.30 0.40 15.84
V-102 2.00 0.25 4.20 0.50 10.50
V-102 2.00 0.25 4.45 0.50 11.13
09.06.06 VESTIDURA DE DERRAMES CON MORTERO 1:5 m 43.86 131.58PUERTAS
P-1 1.00 Perimet= 6.58 6.58
P-2 1.00 Perimet= 4.40 4.40
P-3 1.00 Perimet= 4.30 4.30
VENTANAS
V-1 1.00 Perimet= 7.06 7.06
V-2 1.00 Perimet= 3.90 3.90
V-3 1.00 Perimet= 9.06 9.06
V-4 1.00 Perimet= 8.56 8.56
09.06.07 BRUÑA DE 1CM AULAS m 87.04 261.12En Fachada hacia al patio (Primer Piso) 1.00 Perimet= 20.77 20.77
En Fachada Posterior (Primer Piso) 1.00 Perimet= 20.35 20.35
En Fachada Laterales (Primer Piso) 2.00 Perimet= 22.96 45.92
09.07 PISOS Y PAVIMENTOS
09.07.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 44.38 88.76SSHH MUJERES 1.00 Area= 22.85 22.85
SSHH VARONES 1.00 Area= 21.53 21.53
09.07.02 CONTRAPISO DE 40 MM m2 44.38 133.14SSHH MUJERES 1.00 Area= 22.85 22.85
SSHH VARONES 1.00 Area= 21.53 21.53
09.07.03 PISO CERAMICO DE 30X30CM m2 44.38 133.14SSHH MUJERES 1.00 Area= 22.85 22.85
SSHH VARONES 1.00 Area= 21.53 21.53
09.07.04 ENCOFRADO DE VEREDAS m2 6.70 13.40
VEREDA 1.00 perimet= 67.00 0.10 6.70
09.07.05 VEREDA DE CEM:HORM 1:8, E= 4" m2 29.30 58.60
VEREDA 1.00 Area= 29.30 29.30
09.07.06 BRUÑA DE VEREDA, E=1.0CM m 97.60 195.20
Frontal Longitud= 33.60 33.60
Posterior Longitud= 31.20 31.20
Lateral Longitud= 32.80 32.80
09.07.07 JUNTAS DE DILATACION EN VEREDAS m 7.80 15.60
Frontal Longitud= 3.75 3.75
Posterior Longitud= 2.85 2.85
Lateral Longitud= 1.20 1.20
09.07.08 JUNTAS SISMICA m 31.07 62.14CL-1 8.00 3.39 27.12
CL-2 1.00 3.95 3.95
09.08 ENCHAPADOS, ZOCALOS Y CONTRAZOCALOS
09.08.01 CONTRAZÓCALO DE CEMENTO S/COLOREAR, H = 0.3M m 30.00 60.00Frontal 8.90 8.90
Posterior 8.90 8.90
TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 X1.5 CM. EN COLUMNAS
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
Laterales 12.20 12.20
09.08.02 m 70.80 212.40SSHH MUJERES 1.00 Perimet.= 36.30 36.30
SSHH VARONES 1.00 Perimet.= 34.50 34.50
09.08.03 ZOCALO DE MAYOLICA BLANCA DE 30X30CM m2 127.44 382.32SSHH MUJERES 1.00 Perimet.= 36.30 1.80 65.34
SSHH VARONES 1.00 Perimet.= 34.50 1.80 62.10
09.09 TECHOS Y CUBIERTAS
09.09.01 COBERTURA LIVIANA CON TEJA ANDINA. m2 91.83 183.66
TECHO 1.00 Area= 44.28 44.28
TECHO 1.00 Area= 47.55 47.55
09.09.02 CUMBRERA EN DOSAGUAS m 10.10 20.201.00 10.10 10.10
09.10 CARPINTERIA DE MADERA
09.10.01 PUERTA DE MADERA APANELADA m2 8.82 26.46
P-3 7.00 0.70 1.80 8.82
09.11 CARPINTERIA METALICA
09.11.01 PUERTA METALICA und 4.00 12.00
P-1 2.00 2.00
P-2 2.00 2.00
09.11.02 VENTANA METALICA m2 6.65 19.95
V-1 1.00 2.98 0.55 1.64
V-2 1.00 1.40 0.55 0.77
V-3 1.00 3.98 0.55 2.19
V-4 1.00 3.73 0.55 2.05
02.11.03 BARANDA DE TUBO Fe ml 4.00 8.002.00 2.00 4.00
09.12 CERRAJERIA
09.12.01 BISAGRA CAPUCHINA DE 4" X4" und 44.00 132.00
P-1 2.00 Cant= 4.00 8.00
P-2 2.00 Cant= 4.00 8.00
P-3 7.00 Cant= 4.00 28.00
09.12.02 BISAGRA CAPUCHINA DE 2 1/2" X 2 1/2" und 8.00 24.00
V-1 1.00 Cant= 2.00 2.00
V-2 1.00 Cant= 2.00 2.00
V-3 1.00 Cant= 2.00 2.00
V-4 1.00 Cant= 2.00 2.00
09.12.03 CERRADURA DE 3 GOLPES PARA PUERTA und 11.00 33.00
P-1 2.00 2.00
P-2 2.00 2.00
P-3 7.00 7.00
09.12.04 CHAPA PARA PUERTAS INTERIORES und 4.00 12.00
P-1 2.00 2.00
P-2 2.00 2.00
09.13 PINTURA
09.13.01 PINTURA EN CIELO RASOS Y VIGAS AL LATEX m2 287.87 863.60
Tarrajeo en cielo raso 1.00 250.40 250.40
Tarrajeo en vigas 1.00 37.47 37.47
09.1302 PINTURA EN MUROS INTERIORES AL LATEX m2 96.74 290.22
Tarrajeo en muros interiores 1.00 96.74 96.74
09.13.03 PINTURA EN MUROS EXTERIORES AL LATEX m2 96.74 290.22
Tarrajeo en muros exteriores 1.00 96.74 96.74
09.13.04 m247.58
142.74
Tarrajeo en columna interior y exterior 1.00 47.58 47.58
09.13.05 PINTURA EN DERRAMES AL LATEX m 43.86 131.58PUERTAS
P-1 1.00 Perimet= 6.58 6.58
P-2 1.00 Perimet= 4.40 4.40
P-3 1.00 Perimet= 4.30 4.30
VENTANAS
V-1 1.00 Perimet= 7.06 7.06
V-2 1.00 Perimet= 3.90 3.90
V-3 1.00 Perimet= 9.06 9.06
V-4 1.00 Perimet= 8.56 8.56
09.13.06 m30.00
90.00
Frontal 8.90 8.90
CONTRAZOCALO DE LOSETA CORRIENTE CLARA DE 10X30 CM
PINTURA EN SUPERFICIE INTERIOR Y EXTERIOR DE COLUMNAS AL LATEX
PINTURA ESMALTE SINTETICO 2 MANOS EN ZOCALO Y CONTRAZOCALO
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
Posterior 8.90 8.90
Laterales 12.20 12.20
09.13.07 ACABADO EN CARPINTERIA DE MADERA m2 17.28 51.84P-1 2.00 1.00 2.79 5.58
P-2 2.00 0.80 1.80 2.88
P-3 7.00 0.70 1.80 8.82
09.14 INSTALACIONES ELECTRICAS
09.14.01 SALIDA PARA CENTROS DE LUZ pto 6.00 18.006.00 6.00
09.14.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto 2.00 6.002.00 2.00
09.14.03 POZO-CONEXION A TIERRA und 1.00 3.001.00 1.00
09.14.04 TABLERO DE DISTRIBUCION TD-07 und 1.00 3.001.00 1.00
09.14.05 ARTEFACTOS LUMINARIAS EN EXTERIOR und 2.00 6.002.00 2.00
09.14.06 ARTEFACTOS LUMINARIAS EN INTERIOR und 4.00 12.004.00 4.00
09.15 INSTALACIONES SANITARIAS
09.15.01 INSTALACION DE AGUA
09.15.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 23.00 69.0023.00 23.00
09.15.01.02 VALVULA COMPUERTA DE 1/2" und 4.00 12.004.00 4.00
09.15.01.03 REDUCCION PVC SAP 1" - 3/4" und 4.00 12.004.00 4.00
09.15.01.04 REDUCCION PVC SAP 3/4" - 1/2" und 4.00 12.004.00 4.00
09.15.02 INSTALACION DE DESAGUE
09.15.02.01 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 16.00 48.0016.00 16.00
09.15.02.02 SALIDA DE PVC SAL PARA SUMIDERO DE 2" pto 4.00 12.004.00 4.00
09.15.02.03 REGISTRO DE BRONCE CROMADO 4" pto 4.00 12.004.00 4.00
09.15.02.04 REGISTRO DE BRONCE CROMADO 2" pto 4.00 12.004.00 4.00
09.15.02.05 VENTILACION CON TUBERIA PVC SAL DE 4" und 8.00 24.008.00 8.00
09.15.02.06 INSTALACION DE APARATOS SANITARIOS. und 8.00 24.008.00 8.00
09.15.02.07 ACCESORIOS EN URINARIO und 14.00 42.0014.00 14.00
09.15.02.07 ACCESORIOS EN LAVADERO und 1.00 3.001.00 1.00
09.16 SISTEMA DE EVACUACIÓN PLUVIAL
Canaleta Longitudinal al Módulo 2.00 9.60 19.20
Canaleta TRANSVERSAL AL Módulo 2.00 11.50 23.00
09.16.01 BAJADA PLUVIAL Long. Total = 42.20
09.16.01.01 TUBERIA PVC SAP Φ 4" ml 4.00 9.00 36.00 36.00 108.00
09.16.01.02 ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL m3 4.00 3.00 12.00 12.00 36.00
09.16.01.03 CONCRETO EN COLUMNETA EVACUACION PLUVIAL m3 4.00 0.25 0.25 1.80 0.45 0.45 1.35
09.16.01.04 ACERO EN COLUMNETAS EVACUACION PLUVIAL kg Nº colum. Nº veces Long. kg 54.21 162.62Varillas de Acero corrugado de FY=4200 Kg/cm2, Φ1/2" 4.00 4.00 2.10 1.00 33.60
Varillas de Acero corrugado de FY=4200 Kg/cm2, estribos Φ3/8" 4.00 8.00 1.15 0.56 20.61
09.16.01.05m2
2.00 1.00 0.200.40 0.40
1.20
09.16.02 CANALETA PERIMETRAL DE CONCRETO
09.16.02.01 m3 6.65 19.94
Excavación 1.00 0.45 42.20 0.35 6.65
ENCOFRADO T DESENCOFRADO EN COLUMNETAS DE CANALETAS PLUVIALES
EXCAVACION DE ZANJAS PARA CANALETA PLUVIAL DE CONCRETO
HOJA DE METRADOS - (01MODULO 1 PISO + 01 MODULO 2 PISOS)
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
ITEM DESCRIPCION UND # VECES ANCHO LARGO ALTO PARCIAL TOTAL
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI, PROVINCIA DE FAJARDO, REGION AYACUCHO”
09.16.02.02 ELIMINACION DE EXCES DE CORTE CON VOLQUETE m3 8.64 25.92
Excavación 1.00 Vol. Corte 6.65 Esp. 30% 8.64
09.16.02.03 CONCRETO EN CANALETA PLUVIAL PISO F'C=175 KG/CM2 m3 4.09 12.28
Base 1.00 0.25 42.20 0.10 1.06
Laterales 2.00 0.12 42.20 0.30 3.04
09.16.02.04 ENCOFRADO T DESENCOFRADO DE CANALETAS PLUVIALES m2 42.90 128.71
4.00 42.20 0.20 33.76
09.16.02.05 JUNTAS ASFALTICAS m 16.14 48.43
14.07 0.65 9.14
09.16.02.06 REJILLA CON PLATINA METALICA - CRUCE CANALETAS m 7.00 21.00
7.00 1.00 7.00
09.17 FLETE TERRESTRE AYACUCHO - HUANCAPI
09.17.01 FLETE TERRESTRE kg 216,394.33 216394.33
METRADOS DE ACERO MÓDULO DE SS.HH.
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
METRADO DE ACERO ZAPATAS
Posición Diámetro
Número
Peso (kg) NúmeroBarras
1 5/8'' 1.16 12 13.92 1.55 6 129.456
2 5/8'' 1.16 12 13.92 1.55 3 64.728
194.184
METRADO DE ACERO DE VC-101
Posición Diámetro
Número
Peso (kg) NúmeroBarras
11 5/8'' 6.28 2 12.56 1.55 3 58.404
12 5/8'' 6.36 2 12.72 1.55 3 59.148
13 3/8'' 1.2 42 50.4 0.56 3 84.672
202.224
METRADO DE ACERO DE VR-101
Posición Diámetro
Número
Peso (kg) NúmeroBarras
1 5/8'' 9.16 2 18.32 1.55 2 56.792
2 5/8'' 9.12 2 18.24 1.55 2 56.544
3 3/8'' 1.12 106 118.72 0.56 2 132.9664
246.3024
METRADO DE ACERO C-1
Posición Diámetro
Número
Peso (kg) NúmeroBarras
1 5/8'' 5.31 4 21.24 1.55 6 197.532
2 5/8'' 5.44 4 21.76 1.55 6 202.368
3 1/2'' 5.33 2 10.66 0.99 6 63.3204
4 1/2'' 5.45 2 10.9 0.99 6 64.746
5 3/8'' 1.2 48 57.6 0.56 6 193.536
721.5024
METRADO DE ACERO C-2
Posición Diámetro
Número
Peso (kg) NúmeroBarras
6 1/2'' 6.08 2 12.16 0.99 3 36.1152
7 1/2'' 6.08 2 12.16 0.99 3 36.1152
8 3/8'' 6.11 1 6.11 0.56 3 10.2648
9 3/8'' 6.11 1 6.11 0.56 3 10.2648
10 3/8'' 0.9 32 28.8 0.56 3 48.384
141.144
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI,
PROVINCIA DE FAJARDO, REGION AYACUCHO”
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
METRADOS DE ACERO MÓDULO DE SS.HH.
REGIÓN :AYACUCHO
PROVINCIA :FAJARDO
DISTRITO :HUANCAPI
LUGAR :HUANCAPI
FECHA :SETIEMBRE DEL 2014
PROYECTO:
"MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL INSTITUTO SUPERIOR TECNOLOGICO PÚBLICO PERU COREA DEL SUR DEL DISTRITO DE HUANCAPI,
PROVINCIA DE FAJARDO, REGION AYACUCHO”
METRADO DE ACERO V-101
Posición Diámetro
Número
Peso (kg) NúmeroBarras
14 1/2'' 1.37 2 2.74 0.99 3 8.1378
15 3/8'' 0.89 2 1.78 0.56 3 2.9904
16 3/8'' 1.53 * 7 10.71 0.56 3 17.9928
17 1/2'' 4.96 2 9.92 0.99 3 29.4624
18 1/2'' 4.74 2 9.48 0.99 3 28.1556
19 3/8'' 1.2 44 52.8 0.56 3 88.704
21 3/8'' 1.44 * 9 12.96 0.56 3 21.7728
22 1/2'' 5.06 2 10.12 0.99 3 30.0564
23 1/2'' 1.62 2 3.24 0.99 3 9.6228
24 1/2'' 5.01 2 10.02 0.99 3 29.7594
* Average length 266.6544
METRADO DE ACERO V-102
Posición Diámetro
Número
Peso (kg) NúmeroBarras
3 3/8'' 1.12 106 118.72 0.56 2 132.9664
4 1/2'' 9.17 2 18.34 0.99 2 36.3132
5 1/2'' 9.14 2 18.28 0.99 2 36.1944
205.474
METRADO DE ACERO V-103
Posición Diámetro
Número
Peso (kg) NúmeroBarras
6 1/2'' 10.37 2 20.74 0.99 1 20.5326
7 1/2'' 10.34 2 20.68 0.99 1 20.4732
8 3/8'' 0.72 67 48.24 0.56 1 27.0144
68.0202
METRADO DE ACERO CC-1
Posición Diámetro
Número
Peso (kg) NúmeroBarras
1 3/8'' 1.43 4 5.72 0.56 9 28.8288
2 1/4'' 0.7 6 4.2 0.22 9 8.316
37.1448
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)
Longitud (m)
Subtotal (m)
Peso Total (kg)