01 Metrado Caseta de Control - Estructuras-1

download 01 Metrado Caseta de Control - Estructuras-1

of 78

description

caseta de control

Transcript of 01 Metrado Caseta de Control - Estructuras-1

RES. ESTRPLANILLA DE METRADOS (ESTRUCTURAS) RESUMENProy.: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I. E. CATOLICO BILINGE ISOLINA CLOTET DE FERNADINI - SANTA BARBARA"

Respon.: SUB GERENCIA DE ESTUDIOS - EQUIPO TECNICOProvincia: HUANCAVELICAFecha:JULIO - 2009Distrito: HUANCAVELICAFormula: 01 AREA PEDAGOGICA NIVEL PRIMARIALocalidad: SANTA BARBARA

ITEMPARTIDADESCRIPCION UBICACINCANTLARGOANCHOALTOPARCTOTALUND

"01""ESTRUCTURAS"

01.01TRABAJOS PROVICIONALES01.01.01Sealizacin con cinta de seguridad105.00ML1.00 105.00105.0001.02TRABAJOS PRELIMINARES01.02.01Limpieza de Terreno Manual379.32M2AULASEJE 1 - 3TRAMO A-G1.00 25.7012.30316.11ESCALERAEJE 1 - 3'TRAMO H-I1.00 4.9012.9063.21

01.02.02Trazo, niveles y replanteo preliminar379.32M2AULASEJE 1 - 3TRAMO A-G1.00 25.7012.30316.11ESCALERAEJE 1 - 3'TRAMO H-I1.00 4.9012.9063.2101.02.03Trazo, niveles y replanteo durante el proceso379.32M2AULASEJE 1 - 3TRAMO A-G1.00 25.7012.30316.11ESCALERAEJE 1 - 3'TRAMO H-I1.00 4.9012.9063.21

01.02.04Transporte de Equipos y Herramientas1.00GLB1.00 1.00

01.02.05Corte de terreno94.82M3ESCALERAEJE 1 - 3'TRAMO H-I1.00 4.9012.901.5094.82

01.03MOVIMIENTO DE TIERRAS01.03.01Excavacion de zanjas para cimientos34.63M3AULASCORTE 1 - 1EJE ATRAMO 1- 31.00 5.300.500.902.39CORTE 1 - 1EJE C y ETRAMO 1-32.00 5.130.500.904.62CORTE 6 - 6EJE GTRAMO 1-31.00 5.300.500.902.39CORTE 2 - 2EJE 3TRAMO A-B1.00 2.300.400.900.83TRAMO B-C1.00 2.250.400.900.81TRAMO C-D1.00 2.250.400.900.81TRAMO D-E1.00 2.250.400.900.81TRAMO E-F1.00 2.250.400.900.81TRAMO G-H1.00 1.850.400.900.67CORTE 2 - 2EJE 1-1TRAMO A-B1.00 1.880.400.900.68TRAMO B-C1.00 1.800.400.900.65TRAMO C-D1.00 1.800.400.900.65TRAMO D-E1.00 1.800.400.900.65TRAMO E-F1.00 1.800.400.900.65TRAMO G-H1.00 1.630.400.900.59

CAJA DE ESCALERASCORTE 5 - 5EJE H-ITRAMO 1-3'2.00 2.150.502.405.162.00 2.700.502.406.48CORTE 5-5EJE 3'-3'TRAMO H-I1.00 1.350.500.900.61CORTE 1 - 1EJE ENTRE 2-3TRAMO H-I1.00 3.350.500.901.51CORTE 5-5EJE ENTRE 1-2TRAMO H-I1.00 3.000.500.901.35CORTE 2-2EJE ENTRE 1-2TRAMO H-I1.00 0.930.400.900.33CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-1TRAMO H-I1.00 1.680.400.900.60CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-2TRAMO H-I1.00 1.930.400.800.62

01.03.02Excavacion para zapatas de 1.0m a 1.80m de profundidad135.25M3ZAPATA ( Z - 1 )EJE 3EJE A1.00 1.801.501.804.86ZAPATA ( Z - 2 )EJE 1EJE A1.00 2.201.901.807.52ZAPATA ( Z - 3 )EJE 3-3EJE B-C-D-E-F5.00 1.951.651.8028.96ZAPATA ( Z - 4 )EJE 1 -1EJE B-C-D-E-F5.00 2.402.101.8045.36ZAPATA ( Z - 5 )EJE 1 y 3EJE G2.00 2.701.351.8013.12FALSA ZAPATAZAPATA ( Z - 5 )EJE 1 y 3EJE G2.00 2.701.351.6011.66

ESCALERAZAPATA ( Z - 6 )EJE 1-3'EJE H-I4.00 1.601.501.8017.28ZAPATA ( Z - 7 )EJE 2- 2EJE H-I2.00 1.501.201.806.48

01.03.03Excavacion para cunetas hasta 0.45m18.13M3CUNETAS FRONTAL Y POSTERIOREjes 1-1 Y 3-3Entre Ejes A-G2.00 30.000.500.5015.00CUNETA LATERALESEjes A-AEntre Ejes 1-1 AL 3-31.00 12.500.500.503.13

01.03.04Relleno con material propio77.27M3CIMIENTOSCORTE 1 - 1EJE ATRAMO 1- 31.00 5.300.250.100.13CORTE 1 - 1EJE C y ETRAMO 1-32.00 5.130.250.100.26CORTE 6 - 6EJE GTRAMO 1-31.00 5.300.250.100.13CORTE 2 - 2EJE 3TRAMO A-B1.00 2.300.250.100.06TRAMO B-C1.00 2.250.250.100.06TRAMO C-D1.00 2.250.250.100.06TRAMO D-E1.00 2.250.250.100.06TRAMO E-F1.00 2.250.250.100.06TRAMO G-H1.00 1.850.250.100.05CORTE 2 - 2EJE 1-1TRAMO A-B1.00 1.880.250.100.05TRAMO B-C1.00 1.800.250.100.05TRAMO C-D1.00 1.800.250.100.05TRAMO D-E1.00 1.800.250.100.05TRAMO E-F1.00 1.800.250.100.05TRAMO G-H1.00 1.630.250.100.04

CAJA DE ESCALERASCORTE 5 - 5EJE H-ITRAMO 1-3'2.00 2.150.250.100.112.00 3.250.250.100.16CORTE 5-5EJE 3'-3'TRAMO H-I1.00 1.350.250.100.03CORTE 1 - 1EJE ENTRE 2-3TRAMO H-I1.00 3.350.250.100.08CORTE 5-5EJE ENTRE 1-2TRAMO H-I1.00 3.000.250.100.08CORTE 2-2EJE ENTRE 1-2TRAMO H-I1.00 0.930.250.100.02CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-1TRAMO H-I1.00 1.680.400.100.07CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-2TRAMO H-I1.00 1.930.400.100.08

ZAPATASZAPATA ( Z - 1 )EJE 3EJE A1.00 1.801.501.102.97ZAPATA ( Z - 2 )EJE 1EJE A1.00 2.201.901.104.60ZAPATA ( Z - 3 )EJE 3-3EJE B-C-D-E-F5.00 1.951.651.1017.70ZAPATA ( Z - 4 )EJE 1 -1EJE B-C-D-E-F5.00 2.402.101.1027.72ZAPATA ( Z - 5 )EJE 1 y 3EJE G2.00 2.701.351.108.02

ESCALERAZAPATA ( Z - 6 )EJE 1-3'EJE H-I4.00 1.601.501.1010.56ZAPATA ( Z - 7 )EJE 2- 2EJE H-I2.00 1.501.201.103.96

01.03.05Nivelacion Interior, apisonado con equipo339.10M2AULA 01EJE 1-3TRAMO A-B-C1.00 7.607.5557.38AULA 02EJE 1-3TRAMO C-D-E1.00 7.607.5557.38AULA 03EJE 1-3TRAMO E-F-G1.00 7.607.5557.38PASADIZOEJE 1-1TRAMO A-G1.00 25.202.9073.08VEREDA DE CIRCULACIONEJE A-ATRAMO 1-31.00 7.801.5011.70VEREDA DE CIRCULACIONEJE 3-3TRAMO A-G1.00 25.201.5037.80

CAJA DE ESCALERAEJE 1-2TRAMO H-I1.00 3.001.955.85SS.HHEJE ENTRE 2-3'TRAMO H-I1.00 3.853.0011.55HALLEJE ENTRE 2-3TRAMO H-I1.00 3.852.409.24CTO. DE LIMPIEZAEJE ENTRE 1-2TRAMO H-I1.00 2.801.784.98VEREDA DE CIRCULACIONEJE 1TRAMO H-I1.00 4.402.9012.76

01.03.06Acarreo manual de material excedente hasta una distancia promedio de 30.0 m1.00 134.31134.31134.31M3

01.03.07Eliminacion de material excedente con equipo pesado1.00 134.31134.31134.31M3

01.04OBRAS DE CONCRETO SIMPLE01.04.01Solado de concreto C:H 1:12, e=4'', para zapatas61.37M2ZAPATA ( Z - 1 )EJE 3EJE A1.00 1.801.502.70ZAPATA ( Z - 2 )EJE 1EJE A1.00 2.201.904.18ZAPATA ( Z - 3 )EJE 3-3EJE B-C-D-E-F5.00 1.951.6516.09ZAPATA ( Z - 4 )EJE 1 -1EJE B-C-D-E-F5.00 2.402.1025.20

ESCALERAZAPATA ( Z - 6 )EJE 1-3'EJE H-I4.00 1.601.509.60ZAPATA ( Z - 7 )EJE 2- 2EJE H-I2.00 1.501.203.60

01.04.02Concreto para cimientos corridos C:H 1:10 + 30% P.G.31.07M3CORTE 1 - 1EJE A-A TRAMO 1- 31.00 7.350.500.802.94CORTE 6 - 6EJE G-GTRAMO 1- 31.00 7.350.500.802.94CORTE 2 - 2EJE 3-3TRAMO A-B Y F-G2.00 3.580.400.802.29CORTE 2 - 2EJE 3-3TRAMO B-C-D-F4.00 3.600.400.804.61

CORTE 2 - 2EJE 1-1TRAMO A-B Y F-G2.00 3.580.400.802.29CORTE 2 - 2EJE 3-3TRAMO B-C-D-F4.00 3.600.400.804.61

CAJA DE ESCALERASCORTE 5-5EJE H-ITRAMO 1-3'2.00 7.700.500.806.16CORTE 5-5EJE 3'-3'TRAMO H-I1.00 3.850.500.801.54CORTE 1 - 1EJE ENTRE 2-3TRAMO H-I1.00 3.350.500.801.34CORTE 5-5EJE ENTRE 1-2TRAMO H-I1.00 3.000.500.801.20CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-1TRAMO H-I1.00 1.680.400.800.54CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-2TRAMO H-I1.00 1.930.400.800.62

01.04.03Concreto en sobrecimientos C:H 1:8 + 25% P.M4.82M3CORTE 1 - 1EJE A-A TRAMO 1- 31.00 6.750.250.450.76CORTE 2 - 2EJE 3-3TRAMO A-B Y F-G2.00 3.580.150.450.48CORTE 2 - 2EJE 3-3TRAMO B-C-D-F4.00 3.600.150.450.97CORTE 6 - 6EJE G-GTRAMO 1-31.00 6.750.250.450.76CORTE 2 - 2EJE 1-1TRAMO A-B Y F-G2.00 3.580.150.450.48CORTE 2 - 2EJE 3-3TRAMO B-C-D-F4.00 3.600.150.450.97

CAJA DE ESCALERASCORTE 1 - 1EJE ENTRE 2-3TRAMO H-I1.00 2.950.250.450.33CORTE 2-2EJE ENTRE 1-2TRAMO H-I1.00 0.930.150.450.06

01.04.04Encofrado y desencofrado en sobrecimientos h=0.45m54.45M2CORTE 1 - 1EJE A-A TRAMO 1- 32.00 6.750.456.08CORTE 2 - 2EJE 3-3TRAMO A-B Y F-G4.00 3.580.456.44CORTE 2 - 2EJE 3-3TRAMO B-C-D-F8.00 3.600.4512.96CORTE 6 - 6EJE G-GTRAMO 1-32.00 6.750.456.08CORTE 2 - 2EJE 1-1TRAMO A-B Y F-G4.00 3.580.456.44CORTE 2 - 2EJE 3-3TRAMO B-C-D-F8.00 3.600.4512.96

CAJA DE ESCALERASCORTE 1 - 1EJE ENTRE 2-3TRAMO H-I2.00 2.950.452.66CORTE 2-2EJE ENTRE 1-2TRAMO H-I2.00 0.930.450.84

01.04.05Falso piso de concreto C:H- de e=4''266.06M2AULAS 01, 02, 03Ejes A-A, C-CEntre Ejes 1-1 AL 3-33.00 7.557.40167.61PASADIZO3.00 8.002.5060.00

SS.HH.Ejes H-H, I-IEntre Ejes 1-1 AL 3'-3'1.00 3.853.0011.55HALL1.00 3.852.9011.17DEPOSITO1.00 2.701.804.86PASADIZO1.00 4.352.5010.88

01.04.06VEREDAS01.04.06.01Vereda de concreto Pulido de 4" sin colorear y bruado13.63M3VEREDA POSTERIOREjes 3-3Entre Ejes A-G1.00 23.702.500.2011.85VEREDAS LATERALESEjes A-AEntre Ejes 1-1 AL 3-31.00 8.901.000.201.78

01.04.06.02Encofrado y desencofrado de veredas32.60M2VEREDA POSTERIOREjes 3-3Entre Ejes A-G1.00 23.7023.70VEREDAS LATERALESEjes A-AEntre Ejes 1-1 AL 3-31.00 8.908.90

01.04.07CUNETAS DE CONCRETO 01.04.07.01Concreto en cunetas F'c=140 Kg/cm25.80M3CUNETAS FRONTAL Y POSTERIOREjes 1-1 Y 3-3Entre Ejes A-G2.00 30.00AREA CAD0.084.80CUNETA LATERALESEjes A-AEntre Ejes 1-1 AL 3-31.00 12.50AREA CAD0.081.00

01.04.07.02Encofrado y desencofrado34.10M2CUNETAS FRONTAL Y POSTERIOREjes 1-1 Y 3-3Entre Ejes A-G4.00 9.750.3011.704.00 9.750.207.80

CUNETA LATERALESEjes A-AEntre Ejes 1-1 AL 3-34.00 7.300.308.764.00 7.300.205.84

01.04.08PODIUM DE CONCRETO01.04.08.01Concreto en Podium F'c=140 Kg/cm29.19M3AULAS 01-066.00 AREA7.660.209.19

01.04.08.02Encofrado y desencofrado en podium44.70M2AULAS 01-066.00 AREA7.4544.70

01.05OBRAS DE CONCRETO ARMADO01.05.01ZAPATAS52.86M301.05.01.01Concreto en zapatas F'c=210 Kg/cm2ZAPATA ( Z - 1 )EJE 3EJE A1.00 1.801.500.601.62ZAPATA ( Z - 2 )EJE 1EJE A1.00 2.201.900.602.51ZAPATA ( Z - 3 )EJE 3-3EJE B-C-D-E-F5.00 1.951.650.609.65ZAPATA ( Z - 4 )EJE 1 -1EJE B-C-D-E-F5.00 2.402.100.6015.12ZAPATA ( Z - 5 )EJE 1 y 3EJE G2.00 2.701.350.604.37FALSA ZAPATAZAPATA ( Z - 5 )EJE 1 y 3EJE G2.00 2.701.351.6011.66

ESCALERAZAPATA ( Z - 6 )EJE 1-3'EJE H-I4.00 1.601.500.605.76ZAPATA ( Z - 7 )EJE 2- 2EJE H-I2.00 1.501.200.602.16

01.05.01.02AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOS0.00KG

01.05.02SOBRECIMIENTO REFORZADO01.05.02.01Concreto en sobrecimiento reforzado F'c=175 Kg/cm211.85M3CAJA DE ESCALERASCORTE 5-5EJE H-ITRAMO 1-3'2.00 7.700.251.957.51CORTE 5-5EJE 3'-3'TRAMO H-I1.00 3.850.251.951.88CORTE 5-5EJE ENTRE 1-2TRAMO H-I1.00 3.000.251.951.46CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-1TRAMO H-I1.00 1.680.401.501.01

01.05.02.02Encofrado y desencofrado de sobrecimientos reforzados91.80M2CAJA DE ESCALERASCORTE 5-5EJE H-ITRAMO 1-3'4.00 7.701.9560.06CORTE 5-5EJE 3'-3'TRAMO H-I2.00 3.851.9515.02CORTE 5-5EJE ENTRE 1-2TRAMO H-I2.00 3.001.9511.70CIMIENTO DE CAJA ESCALERAEJE ENTRE 1-1TRAMO H-I2.00 1.681.505.03

01.05.02.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

01.05.03COLUMNAS01.05.03.01Concreto en columnas F'c=210 Kg/cm226.75M31 PISOCOLUMNA ( C - 1 )EJE A Y GTRAMO 32.00 0.600.304.001.44EJE A Y GTRAMO 12.00 0.600.304.001.44COLUMNA ( C - 2 ) EJE A Y GTRAMO 35.00 0.600.304.003.60EJE A Y GTRAMO 15.00 0.600.304.003.60ESCALERACOLUMNA ( C - 3 ) EJE H-ITRAMO 1-3'2.00 0.500.255.601.402.00 0.500.255.601.40COLUMNA ( C - 4 ) EJE H-IEJE 2-22.00 0.400.255.601.12

2 PISOCOLUMNA ( C - 1 )EJE A Y GTRAMO 32.00 0.600.302.951.06EJE A Y GTRAMO 12.00 0.600.302.951.062.00 0.600.301.640.59COLUMNA ( C - 2 ) EJE A Y GTRAMO 35.00 0.600.303.202.88EJE A Y GEJE 15.00 0.600.303.202.885.00 0.600.301.641.48ESCALERACOLUMNA ( C - 3 ) EJE H-ITRAMO 1-3'2.00 0.500.253.000.752.00 0.500.253.000.751.00 0.500.253.000.38COLUMNA ( C - 4 ) EJE H-IEJE 2-22.00 0.400.254.600.92

01.05.03.02Encofrado y desencofrado de columnas223.38M21 PISOCOLUMNA ( C - 1 )EJE A Y GTRAMO 32.00 1.404.0011.20EJE A Y GTRAMO 11.00 1.404.005.601.00 1.554.006.20COLUMNA ( C - 2 ) EJE A Y GTRAMO 33.00 1.504.0018.002.00 1.304.0010.40EJE A Y GTRAMO 13.00 1.504.0018.002.00 1.404.0011.20ESCALERACOLUMNA ( C - 3 ) EJE H-ITRAMO 1-3'2.00 1.255.6014.002.00 1.305.6014.56COLUMNA ( C - 4 ) EJE H-IEJE 2-22.00 0.805.608.96

2 PISOCOLUMNA ( C - 1 )EJE A Y GTRAMO 32.00 1.403.008.40EJE A Y GTRAMO 11.00 1.404.406.161.00 1.554.406.82COLUMNA ( C - 2 ) EJE A Y GTRAMO 33.00 1.503.0013.502.00 1.303.007.80EJE A Y GTRAMO 13.00 1.504.4019.802.00 1.404.4012.32ESCALERACOLUMNA ( C - 3 ) EJE H-ITRAMO 12.00 1.253.007.50TRAMO 3'2.00 1.306.0015.60COLUMNA ( C - 4 ) EJE H-IEJE 2-22.00 0.804.607.36

01.05.03.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

01.05.04COLUMNETAS DE AMARRE01.05.04.01Concreto en columnetas de amarre F'c= 175Kg/cm26.70M31 PISOCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G12.00 0.150.153.000.81COLUMNA ( C - A1 ) EJE 3-3TRAMO A-G12.00 0.150.153.000.81COLUMNA ( C - A1 ) EJE A-C-E-GTRAMO 1-38.00 0.250.153.000.902 PISOCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G12.00 0.150.153.000.81COLUMNA ( C - A1 ) EJE 3-3TRAMO A-G12.00 0.150.154.651.26COLUMNA ( C - A1 ) EJE A-C-E-GTRAMO 1-38.00 0.250.154.651.40COLUMNETAS SOPORTE PARA BARANDASCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G8.00 0.300.251.200.72

01.05.04.02Encofrado y desencofrado de columnetas de Amarre106.53M21 PISOCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G12.00 0.453.0016.20COLUMNA ( C - A1 ) EJE 3-3TRAMO A-G12.00 0.453.0016.20COLUMNA ( C - A1 ) EJE A-C-E-GTRAMO 1-38.00 0.453.0010.802 PISOCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G12.00 0.453.0016.20COLUMNA ( C - A1 ) EJE 3-3TRAMO A-G12.00 0.454.6525.11COLUMNA ( C - A1 ) EJE A-C-E-GTRAMO 1-38.00 0.454.6516.74COLUMNETAS SOPORTE PARA BARANDASCOLUMNA ( C - A1 ) EJE 1-1TRAMO A-G8.00 0.551.205.28

01.05.04.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

01.05.05VIGAS01.05.05.01Concreto en vigas F'c=210 Kg/cm285.38M31 PISOV P 101 (.30 X .60)EJE A - GTRAMO 1-37.00 10.30 0.300.6012.98V S 101 (.25 X .40)EJE 1 -3TRAMO A-G2.00 23.65 0.250.404.73V.G. - 101 (.15 X .60)VOLADOTRAMO A-G1.00 23.65 0.150.602.13Caja de EscaleraVP - 102 (.25 X .50)ENTRE EJE H-ITRAMO 1-32.00 11.25 0.250.502.81VS - 102 (.25 X .40)ENTRE EJE 1-1TRAMO H-I1.00 4.35 0.250.400.44VS - 103 (.25 X .40)ENTRE EJE 3-3TRAMO H-I1.00 4.35 0.250.400.44V.G. - 102 (.15 X .60)VOLADOTRAMO H-I1.00 4.35 0.150.600.39EN LOSA DESCANSO Y SS.HH PRIMER PISOVP' - 101 (.25 X .30)ENTRE EJE H-ITRAMO 2-32.00 5.25 0.250.300.79VS' - 101 (.25 X .30)ENTRE EJE 2-2TRAMO H-I1.00 4.35 0.250.300.33ENTRE EJE 3-3TRAMO H-I1.00 4.35 0.250.300.33

2 PISOV -P 201 (.30 X .45)EJE A-C-E-GTRAMO 1-34.00 10.30 0.300.455.56V -S 201 (.25 X .40)EJE 1 -3TRAMO A-G2.00 24.65 AREA0.115.32V.M. (.30 X H=VAR.)VOLADOEJE B-D-F3.00 3.00 AREA 2.2620.34Caja de EscaleraVP - 203 (.25 X .40)ENTRE EJE H-ITRAMO 1-32.00 8.50 0.250.401.70VS - 203 (.25 X .40)ENTRE EJE 1-1TRAMO H-I2.00 4.35 0.250.400.87V.B. - 202 (.15 X .45)VOLADOTRAMO H-I1.00 4.35 AREA0.070.30VM' - (.25 X H= VAR.)EJE H-IVOLADO1.00 2.40 AREA2.405.76EN LOSA DEPOSITO SEGUNDO PISOVP' - 201 (.25 X .30)ENTRE EJE H-ITRAMO 2-32.00 5.25 0.250.300.79VS' - 201 (.25 X .30)ENTRE EJE 2-2TRAMO H-I1.00 4.35 0.250.300.33ENTRE EJE 3-3TRAMO H-I1.00 4.35 0.250.300.33

2 PISO LOSA EN AULASV -P 202 (.30 X .60)EJE A - GTRAMO 1-37.00 8.60 0.300.6010.84V -S 202 (.25 X .30)EJE 1 -3TRAMO A-G2.00 24.65 AREA0.083.94

Caja de EscaleraVP - 204 (.25 X .50)ENTRE EJE H-ITRAMO 1-32.00 11.60 0.250.502.90VS - 204 (.25 X .30) EJE 3'TRAMO H-I1.00 4.35 AREA0.080.35VS - 205 (.25 X .30) EJE 2'TRAMO H-I1.00 4.35 AREA0.080.35VS - 206 (.25 X .30) EJE 1'TRAMO H-I1.00 4.35 AREA0.080.35

01.05.05.02Encofrado y desencofrado de vigas449.26M21 PISOV -P 101 (.30 X .60)friso exteriorEJE A Y GTRAMO 1-32.00 10.30 0.6012.36friso interiorEJE A-GTRAMO 1-312.00 10.30 0.4049.44fondoEJE B-D-FTRAMO 1-33.00 6.70 0.306.03fondoVOLADOEJE A-G7.00 2.40 0.305.04V - S 101 (.25 X .40)friso exteriorEJE 1 -1TRAMO A-G12.00 3.65 0.4017.52friso interiorEJE 1 -1TRAMO A-G12.00 3.65 0.208.76fondoEJE 1 -1TRAMO A-G12.00 3.65 0.2510.95

V.G. - 103 (.15 X .60)friso exteriorVOLADOTRAMO A-G1.00 23.65 0.6014.19friso interiorVOLADOTRAMO A-G6.00 3.65 0.408.76fondoVOLADOTRAMO C-D-E-F-G-H-I6.00 3.65 0.153.29

Caja de EscaleraVP - 102 (.25 X .50)friso exteriorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.5011.25friso interiorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.5011.25VS -103 (.25 X .40)friso exteriorENTRE EJE 1-3'TRAMO H-I1.00 4.35 0.401.74friso exteriorENTRE EJE 1-3'TRAMO H-I1.00 4.35 0.200.87friso interiorENTRE EJE 1-1TRAMO H-I2.00 3.85 0.403.08FondoENTRE EJE 1-1TRAMO H-I1.00 3.85 0.250.96

V.G. - 102 (.15 X .60)friso exteriorVOLADOTRAMO A-G1.00 4.35 0.602.61friso interiorVOLADOTRAMO A-G6.00 4.35 0.4010.44fondoVOLADOTRAMO C-D-E-F-G-H-I6.00 4.35 0.153.92

2 PISOV -P 201 (.30 X .45)friso exteriorEJE A Y GTRAMO 1-32.00 6.70 0.608.04friso interiorEJE A-C-E-GTRAMO 1-36.00 6.70 0.6024.12

V -M (.30 X .H=VARIABLE)friso exteriorVOLADOEJE A-G2.00 AREA2.264.52friso interiorVOLADOEJE A-G12.00 AREA1.7621.12fondoVOLADOEJE A-G6.00 2.40 0.304.32

V - S 201 (.25 X .40)friso exteriorEJE 1 -1TRAMO A-G12.00 3.65 0.4017.52friso interiorEJE 1 -1TRAMO A-G12.00 3.65 0.208.76fondoEJE 1 -1TRAMO A-G12.00 3.65 0.2510.95

Caja de EscaleraVP - 203 (.25 X .40)friso exteriorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.409.00friso interiorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.409.00VS -203 (.25 X .40)friso exteriorENTRE EJE 1-3'TRAMO H-I1.00 4.35 0.401.74friso exteriorENTRE EJE 1-3'TRAMO H-I1.00 4.35 0.401.74friso interiorENTRE EJE 1-1TRAMO H-I2.00 3.85 0.403.08FondoENTRE EJE 1-1TRAMO H-I1.00 3.85 0.250.96

V.B. - 202 (.15 X .45)friso exteriorVOLADOTRAMO A-G1.00 4.35 0.602.61friso interiorVOLADOTRAMO A-G6.00 4.35 0.4010.44fondoVOLADOTRAMO C-D-E-F-G-H-I6.00 4.35 0.153.922 PISO VIGAS LOSA AULASV -P 202 (.30 X .60)friso exteriorEJE A Y GTRAMO 1-32.00 8.60 0.6010.32friso interiorEJE A-GTRAMO 1-312.00 8.60 0.4344.38fondoEJE B-D-FTRAMO 1-33.00 6.70 0.306.03fondoVOLADOEJE A-G7.00 2.40 0.305.04V - S 202 (.25 X .30)friso exteriorEJE 1 -1TRAMO A-G12.00 3.65 0.3013.14friso interiorEJE 1 -1TRAMO A-G12.00 3.65 0.135.69fondoEJE 1 -1TRAMO A-G12.00 3.65 0.2510.95

Caja de EscaleraVP - 204 (.25 X .50)friso exteriorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.5011.25friso interiorENTRE EJE H-ITRAMO 1-3'2.00 11.25 0.5011.25VS -204-205-206 (.25 X .30)friso exteriorENTRE EJE 1-3'TRAMO H-I3.00 4.35 0.303.92friso interiorENTRE EJE 1-1TRAMO H-I6.00 3.85 0.133.00

01.05.05.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOS2,327.31KG

01.05.06VIGUETAS DE AMARRE01.05.06.01Concreto en viguetas de amarre F'c= 175 Kg/cm22.21M31 PISOVIGUET. S/MUROEJE 1 - 1TRAMO A-B, C-D y E-F3.00 3.60 0.150.150.24EJE 1 - 1TRAMO B-C, D-E Y F-G3.00 2.50 0.150.150.17

VIGUET. S/MUROEJE 3 - 3TRAMO A-B, C-D y E-F3.00 3.60 0.150.150.24EJE 3 - 3TRAMO B-C, D-E Y F-G3.00 3.60 0.150.150.242 PISOVIGUET. S/MUROEJE 1 - 1TRAMO A-B, C-D y E-F6.00 3.60 0.150.150.49EJE 1 - 1TRAMO B-C, D-E Y F-G6.00 2.50 0.150.150.34

VIGUET. S/MUROEJE 3 - 3TRAMO A-B, C-D y E-F3.00 3.60 0.150.150.24EJE 3 - 3TRAMO B-C, D-E Y F-G3.00 3.60 0.150.150.24

01.05.06.02Encofrado y desencofrado de viguetas de amarre29.43M21 PISOVIGUET. S/MUROEJE 1 - 1TRAMO A-B, C-D y E-F6.00 3.60 0.153.24EJE 1 - 1TRAMO B-C, D-E Y F-G6.00 2.50 0.152.25

VIGUET. S/MUROEJE 3 - 3TRAMO A-B, C-D y E-F6.00 3.60 0.153.24EJE 3 - 3TRAMO B-C, D-E Y F-G6.00 3.60 0.153.242 PISOVIGUET. S/MUROEJE 1 - 1TRAMO A-B, C-D y E-F12.00 3.60 0.156.48EJE 1 - 1TRAMO B-C, D-E Y F-G12.00 2.50 0.154.50

VIGUET. S/MUROEJE 3 - 3TRAMO A-B, C-D y E-F6.00 3.60 0.153.24EJE 3 - 3TRAMO B-C, D-E Y F-G6.00 3.60 0.153.24

01.05.06.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOS130.07KG

01.05.07VIGA CANAL01.05.07.01Concreto en viga canal4.14M3Viga CanalEJE 1 Y 3TRAMO A-G2.00 23.70 Area0.083.79ESCALERAEJE 1 TRAMO H-I1.00 4.35 Area0.080.35

01.05.07.02Encofrado y desencofrado 62.10M2Viga CanalEJE 1 Y 3TRAMO A-G2.00 23.70 1.2056.88ESCALERAEJE 1 TRAMO H-I1.00 4.35 1.205.22

01.05.07.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

01.05.08LOSAS ALIGERADAS01.05.08.01Concreto en losas Aligeradas F'c = 210Kg/cm250.16M31 PISOAula 01, 02, 03Concreto en losa Aligerada TRAMO A-GTRAMO 1-31.00 23.70 10.300.0512.21CONCRETO EN VIGUETASTRAMO A-BTRAMO 1-218.00 3.60 0.100.150.97TRAMO B-CTRAMO 1-218.00 3.60 0.100.150.97TRAMO C-DTRAMO 1-218.00 3.60 0.100.150.97TRAMO D-ETRAMO 1-218.00 3.60 0.100.150.97TRAMO E-FTRAMO 1-218.00 3.60 0.100.150.97TRAMO F-GTRAMO 1-218.00 3.60 0.100.150.97PASADIZOTRAMO A-BTRAMO 1-25.00 3.60 0.100.150.27TRAMO B-CTRAMO 1-25.00 3.60 0.100.150.27TRAMO C-DTRAMO 1-25.00 3.60 0.100.150.27TRAMO D-ETRAMO 1-25.00 3.60 0.100.150.27TRAMO E-FTRAMO 1-25.00 3.60 0.100.150.27TRAMO F-GTRAMO 1-25.00 3.60 0.100.150.27Concreto en losa Aligerada PASADIZO ESCALERA1.00 4.35 2.900.050.63CONCRETO EN VIGUETASTRAMO H-IVoladizo5.00 3.85 0.100.150.292 PISOAulaS 04-05-06Concreto en losa Aligerada TRAMO A-GTRAMO 1-31.00 24.70 8.600.0510.62CONCRETO EN VIGUETASTRAMO A-BTRAMO 1-318.00 3.60 0.100.150.97TRAMO B-CTRAMO 1-318.00 3.60 0.100.150.97TRAMO C-DTRAMO 1-318.00 3.60 0.100.150.97TRAMO D-ETRAMO 1-318.00 3.60 0.100.150.97TRAMO E-FTRAMO 1-318.00 3.60 0.100.150.97TRAMO F-GTRAMO 1-318.00 3.60 0.100.150.97

VOLADOTRAMO 1-318.00 1.00 0.100.150.27PASADIZO Concreto en losa Aligerada TRAMO A-GTRAMO 1-31.00 24.70 2.500.053.09CONCRETO EN VIGUETASTRAMO A-BTRAMO 1-36.00 3.60 0.100.150.32TRAMO B-CTRAMO 1-36.00 3.60 0.100.150.32TRAMO C-DTRAMO 1-36.00 3.60 0.100.150.32TRAMO D-ETRAMO 1-36.00 3.60 0.100.150.32TRAMO E-FTRAMO 1-36.00 3.60 0.100.150.32TRAMO F-GTRAMO 1-36.00 3.60 0.100.150.32

ESCALERASConcreto en losa Aligerada TRAMO H-ITRAMO 2-31.00 5.00 3.850.050.96CONCRETO EN VIGUETASTRAMO H-ITRAMO 2-312.00 3.85 0.100.150.69

ESCALERASConcreto en losa Aligerada TRAMO H-IVOLADO1.00 3.85 2.900.050.56CONCRETO EN VIGUETASTRAMO H-IVOLADO5.00 3.85 0.100.150.29

ESCALERASConcreto en losa Aligerada TRAMO H-ITRAMO 2-31.00 5.25 3.850.051.01CONCRETO EN VIGUETASTRAMO H-ITRAMO 2-313.00 3.85 0.100.150.75

ESCALERASConcreto en losa Aligerada TRAMO H-ITRAMO 1-3'1.00 11.00 3.850.052.12CONCRETO EN VIGUETASTRAMO H-ITRAMO 1-3'25.00 3.85 0.100.151.44

01.05.08.02Encofrado y desencofrado de losas aligeradas557.19M21 PISOAula 01-02-03 FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 7.40 3.60 26.64 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 7.40 3.60 26.64 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 7.40 3.60 26.64 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 7.40 3.60 26.64 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 7.40 3.60 26.64 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 7.40 3.60 26.64

Pasadizo en Aulas FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 3.60 2.40 8.64 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 3.60 2.40 8.64 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 3.60 2.40 8.64 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 3.60 2.40 8.64 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 3.60 2.40 8.64 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 3.60 2.40 8.64Pasadizo en Escalera FONDO DE LOSA SUPERIORTRAMO H - IPAZADIZO1.00 3.85 2.509.632 PISOAula 04-05-06 FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 8.30 3.60 29.88 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 8.30 3.60 29.88 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 8.30 3.60 29.88 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 8.30 3.60 29.88 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 8.30 3.60 29.88 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 8.30 3.60 29.88

Pasadizo en Aulas FONDO DE LOSA SUPERIORTRAMO A-BVOLADO1.00 3.60 2.50 9.00 FONDO DE LOSA SUPERIORTRAMO B-CVOLADO1.00 3.60 2.50 9.00 FONDO DE LOSA SUPERIORTRAMO C-DVOLADO1.00 3.60 2.50 9.00 FONDO DE LOSA SUPERIORTRAMO D-EVOLADO1.00 3.60 2.50 9.00 FONDO DE LOSA SUPERIORTRAMO E-FVOLADO1.00 3.60 2.50 9.00 FONDO DE LOSA SUPERIORTRAMO F-GVOLADO1.00 3.60 2.50 9.00Pasadizo en Escalera FONDO DE LOSA SUPERIORTRAMO H - IPAZADIZO1.00 3.85 2.509.63

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 2-31.00 5.00 3.8519.25

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-IVOLADO1.00 3.85 2.9011.17

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 2-31.00 5.25 3.8520.21

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 1-3'1.00 11.00 3.8542.35

01.05.08.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

01.05.08.04Ladrillo hueco de arcilla 15x30x30 cm p/techo Alig.2,345.37UND1 PISOAula 01-02-03Und*m2 FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 7.40 3.60 8.33221.91 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 7.40 3.60 8.33221.91 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 7.40 3.60 8.33221.91 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 7.40 3.60 8.33221.91 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 7.40 3.60 8.33221.91 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 7.40 3.60 8.33221.91

Pasadizo en Aulas FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 3.60 2.40 8.3371.97 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 3.60 2.40 8.3371.97 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 3.60 2.40 8.3371.97 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 3.60 2.40 8.3371.97 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 3.60 2.40 8.3371.97 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 3.60 2.40 8.3371.97Pasadizo en Escalera FONDO DE LOSA SUPERIORTRAMO H - IPAZADIZO1.00 3.85 2.508.3380.182 PISOPasadizo en Escalera FONDO DE LOSA SUPERIORTRAMO H - IPAZADIZO1.00 3.85 2.508.3380.18

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 2-31.00 5.00 3.858.33160.35

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-IVOLADO1.00 3.85 2.908.3393.00

ESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 2-31.00 5.25 3.858.33168.37

01.05.08.05Ladrillo hueco de arcilla 12x30x30 cm p/techo Alig.2,296.00UND2 PISOAula 04-05-06 FONDO DE LOSA SUPERIORTRAMO A-BTRAMO 1-31.00 8.30 3.60 8.33248.90 FONDO DE LOSA SUPERIORTRAMO B-CTRAMO 1-31.00 8.30 3.60 8.33248.90 FONDO DE LOSA SUPERIORTRAMO C-DTRAMO 1-31.00 8.30 3.60 8.33248.90 FONDO DE LOSA SUPERIORTRAMO D-ETRAMO 1-31.00 8.30 3.60 8.33248.90 FONDO DE LOSA SUPERIORTRAMO E-FTRAMO 1-31.00 8.30 3.60 8.33248.90 FONDO DE LOSA SUPERIORTRAMO F-GTRAMO 1-31.00 8.30 3.60 8.33248.90

Pasadizo en Aulas FONDO DE LOSA SUPERIORTRAMO A-BVOLADO1.00 3.60 2.50 8.3374.97 FONDO DE LOSA SUPERIORTRAMO B-CVOLADO1.00 3.60 2.50 8.3374.97 FONDO DE LOSA SUPERIORTRAMO C-DVOLADO1.00 3.60 2.50 8.3374.97 FONDO DE LOSA SUPERIORTRAMO D-EVOLADO1.00 3.60 2.50 8.3374.97 FONDO DE LOSA SUPERIORTRAMO E-FVOLADO1.00 3.60 2.50 8.3374.97 FONDO DE LOSA SUPERIORTRAMO F-GVOLADO1.00 3.60 2.50 8.3374.97Pasadizo en EscaleraESCALERAS FONDO DE LOSA SUPERIORTRAMO H-ITRAMO 1-3'1.00 11.00 3.858.33352.78

01.05.09ESCALERAS01.05.09.01Concreto en Escalera F'c= 210Kg/cm27.93M3Cimiento en caja escalera1.00 2.05 0.402.101.72TRAMO 1Losa en Tramo 11.00 3.05 1.930.150.88PELDAOS (AREA CAD TRIANG)10.00 0.03 1.930.58TRAMO 2Losa en Tramo 21.00 3.60 1.930.151.04PELDAOS (AREA CAD TRIANG)10.00 0.03 1.930.58TRAMO 3Losa en Tramo 31.00 3.60 1.930.151.04PELDAOS (AREA CAD TRIANG)10.00 0.03 1.930.58TRAMO 4Losa en Tramo 41.00 3.25 1.930.150.94PELDAOS (AREA CAD TRIANG)10.00 0.03 1.930.58

01.05.09.02Encofrado y desencofrado de escalera48.76M2TRAMO 1Fondo de Losa en Tramo 11.00 3.05 1.935.87Laterales2.00 3.05 0.332.01CONTRAPASOS10.00 1.930.183.47TRAMO 2Fondo de Losa en Tramo 21.00 3.60 1.936.93Laterales2.00 3.60 0.332.38CONTRAPASOS10.00 1.930.183.47TRAMO 3Fondo de Losa en Tramo 31.00 3.60 1.936.93Laterales2.00 3.60 0.332.38CONTRAPASOS10.00 1.930.183.47TRAMO 4Fondo de Losa en Tramo 41.00 3.25 1.936.26Laterales2.00 3.25 0.332.15CONTRAPASOS10.00 1.930.183.47

01.05.09.03AceroFY=4,200KG/CM2, Grado 60VER CUADRO DE METRADOSERROR:#REF!KG

ESTRUCTURASHOJA DE METRADOS DE AVANCE DE OBRAPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ESTRUCTURASDISTRITO : YAULIPROVINCIA : YAULIDEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : MARZO 2015CODIGO DESCRIPCIONUNIDCANTVECESDIMENSIONESMETRADOLARGOANCHOALTOPARCIALTOTAL1ESTRUCTURAS1 TRABAJOS PRELIMINARES1 LIMPIEZA PRELIMINAR DE TERRENO M2140.00 BLOQUE -VEREDA1.00 14.0010.00140.00

1 TRAZO, NIVELACION Y REPLANTEO INICIALM2140.001.00 14.0010.00140.00

1 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOM2140.001.00 14.0010.00140.00

1 MOVIMIENTO DE TIERRAS1 EXCAVACION PARA ZAPATAS DE 1.65 m DE PROFUNDIDAD EN TERRENO NORMALM367.85NORMALZAP 19.00 2.002.001.6559.40ZAP 22.00 1.601.601.658.45

1 EXCAVACION PARA CIMIENT0S HASTA 1.00 DE PROFUNDIDAD EN TERRENO NORMALM325.51EJE A-A1.00 5.910.700.953.93EJE C-C1.00 5.910.700.953.93EJE 1-11.00 3.500.700.952.33EJE 2-21.00 3.500.700.952.33EJE 4-41.00 3.500.700.952.33PARA CANALETA TIPO I1.00 17.400.800.608.35

1 RELLENO COMPACTADO CON MATERIAL PROPIO M30.86 RELLENO EN CIEMIENTOSM3EJE A-A1.00 9.770.230.100.22EJE C-C1.00 9.770.230.100.22EJE 1-11.00 6.280.230.100.14EJE 2-21.00 6.280.230.100.14EJE 4-41.00 6.280.230.100.14

1 RELLENO COMPACTADO CON MATERIAL PRESTAMOM362.37RELLENO EN ZAPATASCOL 14.00 AREA2.431.3012.64

COL 24.00 AREA2.101.3010.92

COL 31.00 AREA3.001.303.90

COL 42.00 AREA2.201.305.72

RELLENO EN CIMIENTOSM3EJE A-A1.00 9.770.230.100.22EJE C-C1.00 9.770.230.100.22EJE 1-11.00 6.280.230.100.14EJE 2-21.00 6.280.230.100.14EJE 4-41.00 6.280.230.100.14

RELLENO EN EN SALA DE BATERIAS1.00 AREA8.880.151.33

RELLENO EN EN SALA DE INSTALACIONES1.00 AREA9.880.151.48

RELLENO EN EN SALA DE CONTROL1.00 AREA66.000.159.90

EXTERIOR VEREDAS1.00 AREA66.280.159.94

NIVELACION INTERIOR Y APISONADO MANUALM2128.70SALA DE BATERIAS1.00 AREA18.4218.42SALA DE CONTROL1.00 AREA66.2866.28EXTERIOR VEREDAS1.00 AREA44.0044.001 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) R=25 m3/diaM3116.701.25 VOL93.36116.701 OBRAS DE CONCRETO SIMPLE1SOLADOS1.030101SOLADOS PARA ZAPATAS E=4" CONCRETO C:H 1:10M241.78ZAP 19.00 2.002.0036.00ZAP 22.00 1.701.705.78

1VEREDA 1.030201VEREDA EXTERIOR H=0.10 m.M244.00exterior 1.00 44.001.0044.00

1.030202ENCOFRADO VEREDAS h=0.10 m.M219.50exterior 30.00 6.500.1019.50

1CIMIENTOS1.030301 CONCRETO CIMIENTOS CORRIDOS MECLA 1:8 + 30% PIEDRA MEDIANAM329.601.00 12.450.700.806.97EJE B-B1.00 2.000.700.801.12EJE C-C1.00 12.450.700.806.97EJE 1-11.00 7.050.700.803.95EJE 2-21.00 7.050.700.803.95EJE 4-41.00 7.050.700.803.95

1.030302 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOSM2100.08EJE A-A1.00 12.450.809.961.00 11.050.808.84EJE B-B2.00 2.000.803.20EJE C-C1.00 12.450.809.961.00 11.050.808.84EJE 1-11.00 8.450.806.761.00 7.051.8012.69EJE 2-22.00 7.050.8011.28EJE 4-41.00 8.450.806.761.00 7.051.8012.691FALSO PISO E=0.15 m1.030401CONCRETO CIMIENTOS CORRIDOS ME|ZCLA 1:8 CEMENTO-HORMIGON 30% PIEDRAM284.70SALA DE BATERIAS E INSTALACIONES1.00 AREA18.4218.42SALA DE CONTROL1.00 AREA66.2866.28

1OBRAS DE CONCRETO ARMADO1ZAPATAS1.040101CONCRETO PARA ZAPATAS f'c=210 kg/cm2 M318.50ZAP 19.00 2.002.000.4516.20ZAP 22.00 1.601.600.452.30

1.040102 ACERO PARA ZAPATAS fy=4,200 kg/cm2 KG568.74

1SOBRE CIMIENTO ARMADO1.040201 CONCRETO f'c=210 kg/cm2 SOBRECIMIENTO ARMADOM35.78EJE A-A ENTRE 1-21.00 1.950.250.600.29EJE A-A ENTRE 2-31.00 3.900.250.600.59EJE A-A ENTRE 3-41.00 3.900.250.600.59EJE C-C ENTRE 1-21.00 1.950.250.600.29EJE C-C ENTRE 2-31.00 3.900.250.600.59EJE C-C ENTRE 3-41.00 3.900.250.600.59EJE 1-1 ENTRE A-B1.00 1.880.250.600.28EJE 1-1 ENTRE A-B1.00 1.000.250.300.08EJE 1-1 ENTRE B-C1.00 2.000.250.300.15EJE 1-1 ENTRE B-C1.00 0.880.250.600.13EJE 2-2 ENTRE A-B1.00 3.130.250.600.47EJE 2-2 ENTRE B-C1.00 2.000.250.300.15EJE 2-2 ENTRE B-C1.00 0.880.250.600.13EJE 4-4 ENTRE A-B1.00 3.130.250.600.47EJE 4-4 ENTRE B-C1.00 3.130.250.600.47

1.040202ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO ARMADOM246.24EJE A-A ENTRE 1-22.00 1.950.602.34EJE A-A ENTRE 2-32.00 3.900.604.68EJE A-A ENTRE 3-42.00 3.900.604.68EJE C-C ENTRE 1-22.00 1.950.602.34EJE C-C ENTRE 2-32.00 3.900.604.68EJE C-C ENTRE 3-42.00 3.900.604.68EJE 1-1 ENTRE A-B2.00 1.880.602.26EJE 1-1 ENTRE A-B2.00 1.000.300.60EJE 1-1 ENTRE B-C2.00 2.000.301.20EJE 1-1 ENTRE B-C2.00 0.880.601.06EJE 2-2 ENTRE A-B2.00 3.130.603.76EJE 2-2 ENTRE B-C2.00 2.000.301.20EJE 2-2 ENTRE B-C2.00 0.880.601.06EJE 4-4 ENTRE A-B2.00 3.130.603.76EJE 4-4 ENTRE B-C2.00 3.130.603.76

1.040203 ACERO F'Y=4200 KG/CM2 SOBRECIMIENTO ARMADOKG364.54

1COLUMNAS1.040301CONCRETO COLUMNAS f'c=210 kg/cm2M317.27C-14.00 AREA0.19 5.454.09

C-24.00 AREA0.25 6.756.75

C-31.00 AREA0.30 5.451.64

C-42.00 AREA0.13 6.751.69

C-A3.00 AREA0.06 6.751.27

C-A3.00 AREA0.06 5.451.02

1.040302ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASM2157.18C-14.00 AREA1.50 5.0530.30

C-24.00 AREA2.00 6.3550.80

C-31.00 AREA2,95.055.05

C-42.00 AREA2.90 6.3536.83

C-A3.00 AREA1.00 6.3519.05

C-A3.00 AREA1.00 5.0515.15

1.040303 ACERO F'Y=4200 KG/CM2 GRADO 60 P/COLUMNASKG2,577.05

1 VIGAS1.040401CONCRETO VIGAS f'c=210 kg/cm2 M313.2329.56705266.10345Eje 1-116.557548VP 101 ( 25 X 50 ) 2.00 AREA2.190.251.1016.557548VP 105A ( 25 X 30 ) 2.00 4.00 0.250.300.60

Eje 2-2VP 101 ( 25 X 50 ) 2.00 AREA2.190.251.10VP 105A ( 25 X 30 ) 2.00 4.00 0.250.300.60

Eje 3-3VCH ( 20 X 40 ) 2.00 4.00 0.200.400.64

Eje 4-4VP 101 ( 25 X 50 ) 2.00 AREA2.190.251.10VP 105A ( 25 X 30 ) 2.00 4.00 0.250.300.60

Eje A-AVP 103 ( 25 X 50 ) 1.00 AREA6.400.251.60VP 105A ( 25 X 30 ) 1.00 12.00 0.250.300.90

Eje B-BVP104 ( 25 X 80 ) 1.00 AREA10.000.252.50

Eje C-CVP 103 ( 25 X 50 ) 1.00 AREA6.400.251.60VP 105A ( 25 X 30 ) 1.00 12.00 0.250.300.90

1.040402ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASM2133.43Eje 1-1VP 101 ( 25 X 50 ) 4.00 AREA2.198.762.00 5.50 0.252.75VP 105A ( 25 X 30 ) 4.00 4.00 0.304.802.00 4.00 0.25Eje 2-2VP 101 ( 25 X 50 ) 4.00 AREA2.198.762.00 5.50 0.252.75VP 105A ( 25 X 30 ) 4.00 4.00 0.304.802.00 4.00 0.25Eje 3-3VCH ( 20 X 40 ) 4.00 4.00 0.406.402.00 4.00 0.201.60Eje 4-4VP 101 ( 25 X 50 ) 4.00 AREA2.198.762.00 5.50 0.252.75VP 105A ( 25 X 30 ) 4.00 4.00 0.304.802.00 4.00 0.25Eje A-AVP 103 ( 25 X 50 ) 2.00 AREA6.4012.801.00 14.00 0.253.50VP 105A ( 25 X 30 ) 2.00 12.00 0.307.201.00 12.00 0.253.00Eje B-BVP104 ( 25 X 80 ) 2.00 AREA10.0020.001.00 14.00 0.253.50Eje C-CVP 103 ( 25 X 50 ) 2.00 AREA6.4012.801.00 14.00 0.253.50VP 105A ( 25 X 30 ) 2.00 12.00 0.307.201.00 12.00 0.253.00

1.040403ACERO DE REFUERZO F'Y=4200 KG/CM2 P/VIGASKGVER CUADRO DE METRADOS2,327.31

1LOSAS MACIZAS1.040501CONCRETO EN LOSA MACIZA f'c=210 kg/cm2M312.71SALA DE BATERIAS E INSTALACIONES1.00 AREA18.420.152.76SALA DE CONTROL1.00 AREA66.280.159.94

1.040502ENCOFRADO DE LOSAS MACIZAM28.54SALA DE BATERIAS1.00 PER12.150.151.82SALA DE INSTALACIONES1.00 PER12.150.151.82SALA DE CONTROL1.00 PER32.600.154.89

1.040503ACERO fy=4200 kg/cm2 GRADO 60 P/LOSAS MACISASKG 3/8"428.80SALA DE BATERIAS15.00 2.65FACTOR0.5622.2639.754.4166666667510.00 3.83FACTOR0.5621.4538.34.25555555565SALA DE INSTALACIONES15.00 2.65FACTOR0.5622.2639.754.4166666667510.00 3.83FACTOR0.5621.4538.34.25555555565SALA DE CONTROL30.00 9.00FACTOR0.56151.20270303036.00 7.50FACTOR0.56151.2027030351CANALETA TIPO I851.040601CONCRETO EN CANAL TIPO I f'c=210 kg/cm2M33.64FONDO DE CANAL1.00 17.400.800.101.39MUROS DE CANAL2.00 17.400.100.551.91

1.040602ENCOFRADO DE CANAL TIPO IM21.15MURO INTERIOR1.00 PER0.550.55MURO INTERIOR1.00 PER0.600.60

1.040603ACERO fy=4200 kg/cm2 GRADO 60 P/CANAL TIPO IKG 3/8"208.21LONGITUDINAL10.00 18.00FACTOR0.56100.80REFUERZ079.00 2.00FACTOR0.5688.48

1LOSAS ALIGERADAS1.040701CONCRETO EN LOSA ALIGERADA f'c=175 kg/cm2M312.07PRIMER TECHOPAO 14.00 5.130.850.203.49

PAO 22.00 5.132.500.205.13

PAO 32.00 5.134.300.208.82

PAO 42.00 5.134.300.208.82

DISMINUYENDO LADRILLOS -14.77PRIMER TECHO und/m2Volumen Ladrillo Hueco (m3)14.77PAO 14.00 8.33 5.130.850.011.96

PAO B2.00 8.33 5.132.500.012.88

PAO C2.00 8.33 5.134.300.014.96

PAO D2.00 8.33 5.134.300.014.96

1.040702ENCOFRADO LOSAS ALIGERADAS TECHO A DOS AGUAS h=3.00 m.AL CENTROM2144.46PAO 14.00 5.130.8517.44

PAO B2.00 5.132.5025.65

PAO C2.00 5.134.3044.12

PAO D2.00 5.134.3044.12

1.040703ACERO fy=4200 kg/cm2 GRADO 60 P/LOSAS ALIGERADASKG748.49

1.040704LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADOUND1,148.704.00 8.33 5.130.85145.29

2.00 8.33 5.132.50213.66

2.00 8.33 5.134.30367.50

2.00 8.33 5.134.30367.50

ARQUITECTURAHOJA DE METRADOSPROYECTO : CONSTRUCCION DEL COMPLEJO POLIDEPORTIVO DEL DISTRITO DE RIO NEGRO"FORMULA : DUCHAS Y VESTUARIOS PARA PISCINADISTRITO : RIO NEGROPROVINCIA : SATIPODEPARTAMENTO : JUNINCLIENTE : MUNICIPALIDAD DISTRITAL DE RIO NEGROFECHA : ABRIL 2013CODIGO DESCRIPCIONUNIDCANTVECESDIMENSIONESMETRADOLARGOANCHOALTOPARCIALTOTAL5.02ARQUITECTURA05.02.01 MUROS Y TABIQUERIA DE ALBAILERIA05.02.01.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO -CAL-ARENAM2106.10EJE 11.00 1.282.753.521.00 2.862.005.721.00 0.860.750.651.00 2.872.005.74EJE 31.00 2.602.957.671.00 1.142.953.361.00 0.752.952.21EJE 51.00 2.872.005.74INTERIORES1.00 1.252.953.691.00 3.322.006.641.00 1.712.955.04EJE E-E1.00 2.852.005.702.00 0.400.750.60INTERIORES1.00 1.502.954.431.00 2.832.958.35EJE C-C1.00 2.342.756.441.00 0.372.751.02INTERIOR1.00 1.252.753.441.00 4.202.7511.551.00 0.992.752.721.00 0.612.751.68EJE A-A1.00 4.352.008.701.00 2.000.751.5005.02.02 REVOQUES Y REVESTIMIENTOS05.02.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO- ARENA151.51MUROS DE SOGA1.00 1.682.754.621.00 3.262.006.52EJE 11.00 1.260.750.951.00 3.372.006.741.00 2.602.957.671.00 1.142.953.36EJE 31.00 0.752.952.211.00 3.922.7510.781.00 3.372.006.74EJE 51.00 1.502.954.431.00 3.722.007.44INTERIORES1.00 1.710.951.621.00 3.352.759.212.00 3.932.7521.62EJE E-E2.00 0.400.750.601.00 1.652.954.871.00 3.302.959.74INTERIORES1.00 0.372.751.021.00 2.942.758.09EJE C-C1.00 1.502.754.131.00 4.702.7512.93INTERIOR1.00 1.092.753.001.00 0.612.751.681.00 4.852.009.701.00 2.500.751.88EJE A-A05.02.02.02 TARRAJEO EN EXTERIORES ACABADO DE CEMENTO - ARENAM2112.44EJE 11.00 1.682.754.621.00 3.262.006.521.00 1.260.750.951.00 3.372.006.74EJE 31.00 2.602.957.671.00 1.142.953.361.00 0.752.952.21EJE 51.00 3.922.7510.78SEGUNDO PISO1.00 3.922.7510.781.00 3.372.006.741.00 3.722.007.441.00 1.710.951.62EJE E-E1.00 3.352.759.212.00 3.932.7521.622.00 0.400.750.60EJE A-A1.00 4.852.009.701.00 2.500.751.88

05.02.02.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA59.94EJE 13.00 0.922.757.59EJE 31.00 0.532.751.462.00 0.802.754.40EJE 51.00 0.632.751.731.00 0.952.752.611.00 1.262.753.47

EJE 12.00 1.262.756.93EJE 31.00 1.262.753.471.00 1.262.753.47EJE 51.00 1.262.753.471.00 1.262.753.47EJE 11.00 1.260.901.13EJE 31.00 1.260.901.13EJE 51.00 1.260.901.13COLUMNAS DE SOPORTE PARA TOBOGAN1.00 1.267.008.821.00 1.264.505.67

05.02.02.04 TARRAJEO SUPERFICIE DE VIGAS M231.05

EJE 11.00 4.40.532.331.00 3.460.531.831.00 3.370.531.79EJE 31.00 4.410.552.431.00 4.40.652.86EJE 51.00 3.460.531.831.00 4.430.652.88EJE A-A3.920.530.534.40.650.65EJE C-C3.920.530.534.40.650.65EJE E-E4.40.530.53EJE A-A1.00 3.920.532.081.00 4.40.652.86EJE C-C1.00 3.920.532.081.00 4.40.652.86EJE E-E1.00 4.40.532.3305.02.02.05 VESTIDURA DE DERRAMES Ml64.38P-14.001.202.7526.80V-12.000.800.856.60V-22.002.870.7514.48V-33.002.000.7516.50

05.02.02.06REVESTIMIENTO DE GRADAS CON MORTERO 1:4x2cm PULIDO MEZCLA 1:2x1CMML28.90PRIMER PISO18.00 0.8515.30SEGUNDO PISO16.00 0.8513.60

05.02.02.07 BRUAS DE 1"ML55.47EJE 11.00 10.1610.166.00 212.00EJE 51.00 2.872.871.00 3.323.322.00 24.00EJE A-A1.00 3.923.922.00 24.001.00 4.354.352.00 24.00EJE E-E1.00 2.852.852.00 24.00

05.02.02.07TARRAJEO PRIMARIOM2122.87V. DAMAS1.00 16.411.8029.54S.H. DAMAS1.00 16.121.8029.02V. VARONES1.00 20.791.8037.42S.H. VARONES1.00 14.941.8026.89

05.02.03 CIELO RASOSM2131.3005.02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO - ARENAPRIMER PISOVESTIDORES DAMAS1.00 AREA17.9317.93S.H. DAMAS1.00 AREA17.7317.73VETIDORES VARONES1.00 AREA19.8819.88S.H. VARONES1.00 AREA17.3717.371.00 AREA7.767.76VOLADO EJE A-A1.00 AREA1.761.76VOLADO EJE E-E1.00 AREA0.540.54VOLADO EJE 1-11.00 AREA0.990.99VOLADO EJE 5-51.00 AREA0.950.95SEGUNDO PISO1.00 AREA46.3946.3905.02.04 PISOS Y PAVIMENTOS05.02.04.01 CONTRAPISO DE 40 mmM2213.89VESTIDORES DAMAS1.00 AREA17.9317.93S.H. DAMAS1.00 AREA17.7317.73VETIDORES VARONES1.00 AREA19.8819.88S.H. VARONES1.00 AREA17.3717.371.00 AREA7.767.76SEGUNDO PISO CONTRAPISO DE 40 mm1.00 AREA86.6886.68TERCER PISO CONTRAPISO DE 40 mm1.00 AREA46.5446.54

M2213.8905.02.04.02 PISO DE CERMICO 30x30 ANTIDESLIZANTE ALTO TRANS.VESTIDORES DAMAS1.00 AREA17.9317.93S.H. DAMAS1.00 AREA17.7317.73VETIDORES VARONES1.00 AREA19.8819.88S.H. VARONES1.00 AREA17.3717.371.00 AREA7.767.76SEGUNDO PISO PISO DE CERMICO 30x30 ANTIDESLIZANTE ALTO TRANS.1.00 AREA86.6886.68TERCER PISO PISO DE CERMICO 30x30 ANTIDESLIZANTE ALTO TRANS.1.00 AREA46.5446.54

05.02.05 CONTRAZOCALOSML28.9705.02.05.01 ZOCALO DE CEMENTO SIN COLOREAR H=0.30m. PULIDO, E=15mm., MEZCLA 1:5 C:AFRONTIS1.00 11.7511.75POSTERIOR1.00 8.808.80LATERAL DER.1.00 3.573.57LATERAL IZQ.1.00 4.854.85

05.02.06REVESTIMIENTOS05.02.06.01REVESTIMIENTO DE GRADAS CON CON MORTERO 1:4x2 CM PULIDO MEZCLA 1:2x1CMM3AREA26.3826.3826.38

05.02.06.02REVESTIMIENTO CON CERAMICO 0.20 x 0.30M2127.71V. DAMAS1.00 16.411.8029.54S.H. DAMAS1.00 16.121.8029.02V. VARONES1.00 20.791.8037.42S.H. VARONES1.00 14.941.8026.89S.H. DAMAS1.00 3.430.602.061.00 3.430.100.34S.H. VARONES1.00 3.490.602.09S.H. DAMAS1.00 3.490.100.35

05.02.07 CARPINTERIA METALICA Y HERRERIAUND4.0005.02.07.01 PUERTA DE METAL P-1 DE 2.20 x 1.20 m. SEGUN DISEO INCL. INSTALACIONP-1UND4.0014.0005.02.07.02 PUERTA DE METAL P-2 DE 1.85 x 0.60 m. SEGUN DISEO INCL. INSTALACIONP-214.00

05.02.07.03 VENTANA DE VIDRIO SISTEMA PIVOT SEGUN DISEOM237.58V-12.000.800.856.60V-22.002.870.7514.48V-33.002.000.7516.50

05.02.07.04TABIQUERIA DE MICA 3MM C/ ESTRUCTURA DE ALUMINIO H=1.80MM232.26V. DAMAS3.001.291.857.164.000.401.852.96S.H. DAMAS2.001.501.855.553.000.371.852.05V. VARONES2.001.201.854.444.000.301.852.22S.H. VARONES2.001.501.855.553.000.421.852.33

05.02.07.05BARANDA DE TUBO FIERRO GALVANIZADOML61.45ESCALERA1.00 4.644.64

ESCALERA1.00 2.952.95PASADIZO1.00 32.4932.49PASADIZO1.00 21.3721.37

05.02.08 CERRAJERIA05.02.08.01 CHAPA DE PARCHE 3 GOLPESPZA4.00P - 14.00 4.0005.02.08.02 CERROJO DE 3" PARA PUERTAS DE SS.HH.PZA14.00P - 214.00 14.00

05.02.08.03 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"UND54.00P - 14.00 3.0012.0005.02.08.04 BISAGRA CAPUCHINA DE 2 1/2" X 2 1/2"UND42.00P - 214.00 3.0042.00

05.02.09 VIDRIOS, CRISTALES Y SIMILARES06.02.09.01 VIDRIOS TEMPLADO DE 6.00mm TRANSPARENTEP216.79P -12.00 1.200.651.56

05.02.10 PINTURA05.02.10.01 PINTURA EN MUROS INTERIORES 02 MANOSM2151.51EJE 11.00 1.682.754.621.00 3.262.006.521.00 1.260.750.951.00 3.372.006.74EJE 31.00 2.602.957.671.00 1.142.953.361.00 0.752.952.21EJE 51.00 3.922.7510.781.00 3.372.006.74INTERIORES1.00 1.502.954.431.00 3.722.007.441.00 1.710.951.62EJE E-E1.00 3.352.759.212.00 3.932.7521.622.00 0.400.750.60INTERIORES1.00 1.652.954.871.00 3.302.959.74EJE C-C1.00 0.372.751.021.00 2.942.758.09INTERIOR1.00 1.502.754.131.00 4.702.7512.931.00 1.092.753.001.00 0.612.751.68EJE A-A1.00 4.852.009.701.00 2.500.751.88

05.02.10.02 PINTURA EN MUROS EXTERIORES 02 MANOSM2112.44EJE 11.00 1.682.754.621.00 3.262.006.521.00 1.260.750.951.00 3.372.006.74EJE 31.00 2.602.957.671.00 1.142.953.361.00 0.752.952.21EJE 51.00 3.922.7510.78SEGUNDO PISO1.00 3.922.7510.781.00 3.372.006.741.00 3.722.007.441.00 1.710.951.62EJE E-E1.00 3.352.759.212.00 3.932.7521.622.00 0.400.750.60EJE A-A1.00 4.852.009.701.00 2.500.751.88

05.02.10.03 PINTURA EN COLUMNAS C/ LATEX LAVABLEM259.94EJE 13.00 0.922.757.59EJE 31.00 0.532.751.462.00 0.802.754.40EJE 51.00 0.632.751.731.00 0.952.752.611.00 1.262.753.47

EJE 12.00 1.262.756.93EJE 31.00 1.262.753.471.00 1.262.753.47EJE 51.00 1.262.753.471.00 1.262.753.47EJE 11.00 1.260.901.13EJE 31.00 1.260.901.13EJE 51.00 1.260.901.13COLUMNAS DE SOPORTE PARA JUEGOS1.00 1.267.008.821.00 1.264.505.67

05.02.10.04 PINTURA EN VIGAS C/ LATEX LAVABLEM231.05EJE 11.00 4.40.532.331.00 3.460.531.831.00 3.370.531.79EJE 31.00 4.410.552.431.00 4.40.652.86EJE 51.00 3.460.531.831.00 4.430.652.88EJE A-A3.920.530.534.40.650.65EJE C-C3.920.530.534.40.650.65EJE E-E4.40.530.53EJE A-A1.00 3.920.532.081.00 4.40.652.86EJE C-C1.00 3.920.532.081.00 4.40.652.86EJE E-E1.00 4.40.532.33

05.02.10.05 PINTURA EN DERRAMES C/ LATEX LAVABLEML64.38P-14.001.202.7526.80V-12.000.800.856.60V-22.002.870.7514.48V-33.002.000.7516.50

05.02.10.06 PINTURA EN BRUAS ML55.47EJE 11.00 10.1610.166.00 212.00EJE 51.00 2.872.871.00 3.323.322.00 24.00EJE A-A1.00 3.923.922.00 24.001.00 4.354.352.00 24.00EJE E-E1.00 2.852.852.00 24.00

05.02.10.07 PINTURA EN CIELO RASO AL LATEX M2131.30PRIMER PISOVESTIDORES 1.00 AREA17.9317.93S.H.1.00 AREA17.7317.73VETIDORES1.00 AREA19.8819.88S.H.1.00 AREA17.3717.371.00 AREA7.767.76VOLADO EJE A-A1.00 AREA1.761.76VOLADO EJE E-E1.00 AREA0.540.54VOLADO EJE 1-11.00 AREA0.990.99VOLADO EJE 5-51.00 AREA0.950.95SEGUNDO PISO1.00 AREA46.3946.39

05.02.10.08 PINTURA DE CONTRAZOCALOS CON ESMALTE ECONOMICOM228.97FRONTIS1.00 11.7511.75POSTERIOR1.00 8.808.80LATERAL DER.1.00 3.573.57LATERAL IZQ.1.00 4.854.85

05.02.10.09 PINTURA ESMALTE SINTETICO EN CARPINTERIA METALICA Y HERRERIAM220.82P - 12.001.202.205.28P - 214.000.601.8515.54

05.02.11JUNTAS06.02.11.01 JUNTA DE CONSTRUCCION CON TEKNOPORTM20.90GENERAL9.00 AREA0.100.90

SANITARIASHOJA DE METRADOSPROYECTO : CONSTRUCCION DEL COMPLEJO POLIDEPORTIVO DEL DISTRITO DE RIO NEGRO I ETAPA"FORMULA : DUCHAS Y VESTUARIOS PARA PISCINADISTRITO : RIO NEGROPROVINCIA : SATIPODEPARTAMENTO : JUNINCLIENTE : MUNICIPALIDAD DISTRITAL DE RIO NEGROFECHA : MAYO 2013CODIGO DESCRIPCIONUNIDCANTVECESDIMENSIONESMETRADOLARGOANCHOALTOPARCIALTOTAL5.03INSTALACIONES SANITARIAS

05.03.01 APARATOS Y ACCESORIOS SANITARIOS05.03.01.01 INODORO TANQUE BAJO BLANCOUnd.6.003.00 3.003.00 3.00

05.03.01.02OVALIN DE LOSA BLANCAUnd.6.003.00 3.003.00 3.00

05.03.01.03URINARIO DE LOZA DE PICO BLANCOUnd.3.003.00 3.0005.03.01.04COLOCACION DE APARATOS SANITARIOSUnd.15.00

05.03.01.05ESPEJOS FIJOSUnd.3.003.00 3.0005.03.02 SISTEMA DE AGUA FRIA05.03.02.01 SALIDA PARA AGUA05.03.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"Pto23.0023.00 23.0006.03.02.02 REDES DE DISTRIBUCION06.03.02.02.01 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAPml33.851.00 33.85 33.8505.03.02.03 ACCESORIOS05.03.02.03.01 CODO 90 PVC-SAP 1/2" PARA AGUAPza18.0018.00 18.00

05.03.02.03.02 TEE PVC-SAP 1/2"Pza9.009.00 9.00

05.03.02.04 VALVULAS06.03.02.04.01 VALVULA DE COMPUERTA DE BRONCE UNION ROSCADA 1/2"Pza1.001.00 1.00

05.03.03 DESAGUE Y VENTILACION05.03.03.01SALIDAS DE DESAGUE06.03.03.01.01 SALIDA DE PVC SEL PARA DESAGUE DE 2" Pto10.0010.00 10.00

05.03.03.01.02 SALIDA DE PVC SEL PARA DESAGUE DE 4"Pto4.004.00 4.00

05.03.03.01.03 SALIDA DE VENTILACION EN PVC SAL 2"Pto2.002.00 2.00

05.03.03.02 REDES DE DISTRIBUCION05.03.03.02.01 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 4"ml14.891.00 14.8914.89

05.03.03.02.02 RED DE DISTRIBUCION PVC SAL PARA DESAGUE 2"ml47.771.00 47.7747.77

05.03.03.02.03 RED DE VENTILACION PVC SAL PARA DESAGUE 2"ml3.981.00 3.98 3.98

05.03.03.03 ACCESORIOS CODOS05.03.03.03.01 CODO PVC-SAP 2" * 90Pza9.009.00 9.00

05.03.03.03.02 CODO SANITARIO PVC-SAP 4"Pza6.006.00 6.00

TEES05.03.03.03.03 TEE PVC-SAL 2" * 2"Pza2.002.00 2.00

YEES05.03.03.03.04 YEE PVC-SAL DE 2"Pza14.0014.00 14.00

05.03.03.03.05 YEE PVC-SAL DE 4" - 2"Pza9.009.00 9.00

05.03.03.03.06 YEE PVC-SAL DE 4"Pza5.005.00 5.00

05.03.03.03.07 SUMIDERO DE 2" Pza11.0011.00 11.00

05.03.03.03.08 REGISTROS DE BRONCE DE 4"Pza2.002.00 2.00

05.03.03.03.09 SOMBRERO VENTILACION PVC DE 2"Pza2.002.00 2.0005.03.03.04 CAMARAS DE INSPECCION05.03.03.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" und2.00 2.002.00

INST. ELECTRICASHOJA DE METRADOSPROYECTO : CONSTRUCCION DEL COMPLEJO POLIDEPORTIVO DEL DISTRITO DE RIO NEGRO"FORMULA : DUCHAS Y VESTUARIOS PARA PISCINADISTRITO : RIO NEGROPROVINCIA : SATIPODEPARTAMENTO : JUNINCLIENTE : MUNICIPALIDAD DISTRITAL DE RIO NEGROFECHA : ABRIL 2013EXPEDIENTE TCNICO CONSTRUCCION DEL COMPLEJO POLIDEPORTIVO DEL DISTRITO DE RIO NEGRO"DISTRITO : RIO NEGROPROVINCIA : SATIPODEPARTAMENTO : JUNINCLIENTE : MUNICIPALIDAD DISTRITAL DE RIO NEGROFECHA : ABRIL 2013CODIGO DESCRIPCIONUNIDCANTVECESDIMENSIONESMETRADOLARGOANCHOALTOPARCIALTOTAL05.04INSTALACIONES ELECTRICAS05.04.01INSTALACIONES ELECTRICAS 05.04.01SALIDA PARA CENTRO DE LUZPTO13.00SS.HH.V 1.002.002.00Vestidores V. + Duchas1.005.005.00SS.HH.D1.002.002.00Vestidores D.1.002.002.00Pasadizo1.002.002.0005.04.02SALIDA PARA INTERRUPTOR SIMPLEPTO6.00SS.HH.V 1.001.001.00Vestidores V.1.005.005.0005.04.03SALIDA PARA INTERRUPTOR DOBLEPTO3.00SS.HH.V 1.001.001.00SS.HH.D1.001.001.00Vestidores D.1.001.001.0005.04.04SALIDA P/TOMACORRIENTE DOBLE, CON LINEA TIERRAPTO4.00SS.HH.V 1.002.002.00SS.HH.D1.002.002.0005.04.02CANALIZADORES Y/O TUBERIAS05.04.02.01TUBO PVC SEL 20 mm2ML73.35STD-3 A C-8 (+interruptores)1.001.0054.8554.85STD-3 A C-9 1.001.0018.5018.5005.04.03CONDUCTORES Y/O CABLES THW , NH-80, 05.04.03.01CABLE NH-80 , 2x1x4+1x2.5mm ML55.50STD-3 A C-9, 2x4 mm21.002.0018.5037.00STD-3 A C-9, 1x2.5 mm21.001.0018.5018.5005.04.03.02CABLE NH - 80, 2x1x2.5+1x2.5mmML164.55STD-3 A C-8 (+interruptores)1.003.0054.85164.5505.04.04ARTEFACTOS ELECTRICOS05.04.04.01ARTEFACTO CIRCULAR 1xTLE32W CON TAPAUNID7.00SS.HH.V 1.002.002.00Vestidores V. 1.001.001.00SS.HH.D1.002.002.00Vestidores D.1.002.002.0005.04.04.02EQUIPO BRAQUET C/FAROLAS ACRILICAS LAMP. 1x32W, 220 V. UNID5.00Duchas1.005.005.0005.04.04.03Master LED 7W / GU10. UNID2.00Pasadizo1.002.002.0005.04.05TABLEROS Y CUCHILLAS05.04.05.01SUB TABLERO DE DISTRIBUCION (STD-3 )UNID1.001.001.001.0005.04.06SISTEMAS DE CONDUCTOS05.04.06.01CAJA DE PASE 150 X 150 X 100 MM1.00P/instalaciones ElectricosUNID1.001.001.00

Acero_ ZAPATASHOJA DE METRADOSPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN ZAPATASDISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015ITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT DE ELEMENTOSN DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"

01.05.02.01ACERO FY=4,200KG/CM2, GRADO 60ZAPATAS MODULO VESTUARIOZ - 1HORZ.5/8"2.008.009.00144.00VERT.5/8"2.008.009.00144.00

Z - 2HORZ.5/8"1.607.002.0022.40VERT.5/8"1.607.002.0022.40

TOTAL (ML)0.000.00332.800.000.000.00TOTAL (KG)4.042.261.601.020.580.250.000.00532.480.000.000.00585.73

ACER SOBREPLANILLA DE METRADOS ACERO (SOBRE CIEMIENTO) PROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN SOBRECIMIENTODISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015

ITEMPARTIDADESCRIPCIONTIPO LONGITUD PARCIAL (ML)CANT. DE ELEM.N DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"

01.05.05.03ACERO FY= 4200KG/CM2 / GRADO 60

PRIMER NIVELsobreciemiento( 25 X 60 ) ACERO PRINCIPAL SUP. 1/2"40.00 4.00 1.00 160.00 ESTRIBOS 3/8"1.45 200.00 1.00 290.00

TOTAL (ML)0.00.00.0160.00 290.00 0.0TOTAL (KG)4.04 2.26 1.60 1.02 0.58 0.25 0.00.00.0163.20 168.20 0.0364.54

364.54

ACER COLUMNAHOJA DE METRADOSPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN COLUMNASDISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015ITEMPARTIDADESCRIPCIONTIPO LONG PARCIALCANT ELEM.N DE VECES 1/4" 3/4" 5/8" 1/2" 3/8"

01.05.04.01ACERO FY=4200KG/CM2 GRADO 60PRIMER NIVEL

C1ACERO LONGITUDINAL 5/8"6.00 12.00 4.00 288.00ESTRIBOS 3/8"1.30 28.00 8.00 291.20C-2ACERO LONGITUDINAL 5/8"6.00 19.00 1.00 114.00ESTRIBOS 3/8"1.30 28.00 3.00 109.20C-2ACERO LONGITUDINAL 5/8"6.75 19.00 3.00 384.75ESTRIBOS 3/8"1.30 36.00 9.00 421.20C-3ACERO LONGITUDINAL 5/8"6.00 21.00 1.00 126.00ESTRIBOS 3/8"1.34 28.00 2.00 75.04 3/8"1.80 28.00 1.00 50.40C-4ACERO LONGITUDINAL 5/8"5.50 12.00 2.00 132.00ESTRIBOS 3/8"1.34 22.00 2.00 58.96 3/8"1.05 22.00 2.00 46.20COLUMNETACAACERO LONGITUDINAL 3/8"6.75 4.00 3.00 81.00ESTRIBOS 8 mm0.80 28.00 3.00 CAACERO LONGITUDINAL 3/8"6.00 4.00 1.00 24.00ESTRIBOS 8 mm0.80 28.00 1.00

TOTAL (ML)0.00.01,044.75 0.01,157.20 TOTAL (KG)0.26 2.26 1.60 1.02 0.58 0.00.01,671.60 0.0671.18 2,577.05

ACE VIGAHOJA DE METRADOSPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN VIGASDISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015ITEMPARTIDADESCRIPCIONTIPO LONGITUD PARCIAL (ML)CANT. DE ELEM.N DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"

1.040403ACERO FY= 4200KG/CM2 / GRADO 60

PORTICO 1-1VIGAS PERALTADASVP 101 - 102 ( 25 X 50 ) 78.12 52.00 5/8"68.00 70.00 1.60 112.00 ACERO PRINCIPAL SUP. 5/8"5.60 2.00 2.00 22.40 22.40 2.49 2.99 4.00 20.27 28.00 1/2"200.00 205.00 1.02 209.10 ACERO PRINCIPAL SUP. 1/2"5.60 1.00 2.00 11.20 11.20 1.24 1.49 2.00 111.68 95.00 3/8"164.00 170.00 0.58 98.60 ACERO PRINCIPAL INF. 5/8"6.10 2.00 2.00 24.40 24.40 2.71 3.25 4.00 6.00 3/4"6.00 6.00 2.26 13.56 ACERO PRINCIPAL SUP. 1/2"6.10 1.00 2.00 12.20 12.20 1.36 1.63 4.00 1/4"60.00 60.00 0.25 15.00 REFUERZO 1/2"2.00 2.00 2.00 8.00 8.00 0.89 1.07 0.0448.26 ESTRIBOS 3/8"1.25 28.00 2.00 70.00 70.00 7.78 9.33 10.00 7.226.90 ESTRIBOS 3/8"0.66 10.00 2.00 13.20 13.20 1.47 1.76 2.00 26.89560.00.00.0VP 105 ( 25 X 30 ) 0.00.00.0Viga de amarreACERO PRINCIPAL SUP. 5/8"9.00 4.00 1.00 36.00 4.00 4.80 0.50 5.00 40.00 1/2"ESTRIBOS 3/8"1.25 20.00 2.00 50.00 5.56 6.67 4.00 7.00 59.00 3/8"16.00 5/8"PORTICO 2-2VP 101 - 102 ( 25 X 50 ) ACERO PRINCIPAL SUP. 5/8"5.60 2.00 2.00 22.40 2.49 2.99 4.00 Viga BordeACERO PRINCIPAL SUP. 1/2"5.60 1.00 2.00 11.20 1.24 1.49 2.00 12.00 1/2"ACERO PRINCIPAL INF. 5/8"6.10 2.00 2.00 24.40 2.71 3.25 4.00 6.00 1/4"ACERO PRINCIPAL SUP. 1/2"6.10 1.00 2.00 12.20 1.36 1.63 4.00 REFUERZO 1/2"2.00 2.00 2.00 8.00 0.89 1.07 0.0losa aligeradaESTRIBOS 3/8"1.25 28.00 2.00 70.00 7.78 9.33 10.00 120 1/2"ESTRIBOS 3/8"0.66 10.00 2.00 13.20 1.47 1.76 2.00 10 3/8"0.00.00.060 1/4"VA 105 ( 25 X 30 ) 0.00.00.0ACERO PRINCIPAL SUP. 5/8"9.00 4.00 1.00 36.00 4.00 4.80 4.00 5.00 ESTRIBOS 3/8"1.25 20.00 2.00 50.00 5.56 6.67 4.00 7.00 0.00.00.0PORTICO 3-30.00.0VCH( 40 X 20 ) ACERO PRINCIPAL 5/8"9.00 8.00 2.00 144.00 16.00 19.20 9.00 16.00 ESTRIBOS 3/8"1.30 36.00 2.00 93.60 10.40 12.48 13.00 13.00 0.00.00.00.0PORTICO 4-40.00.0VP 101 - 102 ( 25 X 50 ) 0.00.0ACERO PRINCIPAL SUP. 5/8"5.60 2.00 2.00 22.40 2.49 2.99 4.00 ACERO PRINCIPAL SUP. 1/2"5.60 1.00 2.00 11.20 1.24 1.49 2.00 ACERO PRINCIPAL INF. 5/8"6.10 2.00 2.00 24.40 2.71 3.25 4.00 ACERO PRINCIPAL SUP. 1/2"6.10 1.00 2.00 12.20 1.36 1.63 4.00 REFUERZO 1/2"2.00 2.00 2.00 8.00 0.89 1.07 0.0ESTRIBOS 3/8"1.25 28.00 2.00 70.00 7.78 9.33 10.00 ESTRIBOS 3/8"0.66 10.00 2.00 13.20 1.47 1.76 2.00

VA 105 ( 25 X 30 ) ACERO PRINCIPAL SUP. 5/8"9.00 4.00 1.00 36.00 4.00 4.80 4.00 5.00 ESTRIBOS 3/8"1.25 20.00 2.00 50.00 5.56 6.67 4.00 7.00 PORTICO A-A( 25 X 50 ) ACERO PRINCIPAL SUP. 5/8"14.13 2.00 1.00 28.26 3.14 3.77 4.00 ACERO PRINCIPAL SUP. 1/2"12.42 1.00 1.00 12.42 1.38 1.66 2.00 ACERO PRINCIPAL INF. 5/8"12.40 2.00 1.00 24.80 2.76 3.31 4.00 ACERO PRINCIPAL INF. 1/2"12.40 1.00 1.00 12.40 1.38 1.65 2.00 REFUERZO 1/2"2.05 1.00 1.00 2.05 0.23 0.27 0.0ESTRIBOS 3/8"1.25 82.00 1.00 102.50 11.39 13.67 14.00 ESTRIBOS 3/8"0.66 36.00 1.00 23.76 2.64 3.17 3.00 VA 105 ( 25 X 30 ) ACERO PRINCIPAL SUP. 5/8"18.00 4.00 1.00 72.00 8.00 9.60 4.00 10.00 ESTRIBOS 3/8"1.25 63.00 1.00 78.75 8.75 10.50 4.00 11.00

PORTICO B-B( 25 X 80 ) ACERO PRINCIPAL SUP. 5/8"12.64 3.00 1.00 37.92 4.21 5.06 6.00 12.00ACERO PRINCIPAL SUP. 5/8"13.63 2.00 1.00 27.26 3.03 3.63 4.00 ACERO PRINCIPAL SUP. 5/8"12.42 1.00 1.00 12.42 1.38 1.66 2.00 2.00 ACERO PRINCIPAL INF. 3/4"15.25 3.00 1.00 45.75 5.08 6.10 6.00 6.00 REFUERZO 1/2"2.05 2.00 1.00 4.10 0.46 0.55 0.0ESTRIBOS 3/8"2.05 82.00 1.00 168.10 18.68 22.41 22.00 25.00ESTRIBOS 3/8"0.66 36.00 1.00 23.76 2.64 3.17 3.00

VA 105 ( 25 X 30 ) ACERO PRINCIPAL SUP. 5/8"9.00 4.00 1.00 36.00 4.00 4.80 4.00 5.00 ESTRIBOS 3/8"1.25 17.00 1.00 21.25 2.36 2.83 4.00 3.00

PORTICO C-C( 25 X 50 ) ACERO PRINCIPAL SUP. 5/8"14.13 2.00 1.00 28.26 3.14 3.77 4.00 ACERO PRINCIPAL SUP. 1/2"12.42 1.00 1.00 12.42 1.38 1.66 2.00 ACERO PRINCIPAL INF. 5/8"12.40 2.00 1.00 24.80 2.76 3.31 4.00 ACERO PRINCIPAL INF. 1/2"12.40 1.00 1.00 12.40 1.38 1.65 2.00 REFUERZO 1/2"2.05 1.00 1.00 2.05 0.23 0.27 0.0ESTRIBOS 3/8"1.25 82.00 1.00 102.50 11.39 13.67 14.00 ESTRIBOS 3/8"0.66 36.00 1.00 23.76 2.64 3.17 3.00

VA 105 ( 25 X 30 ) ACERO PRINCIPAL SUP. 5/8"18.00 4.00 1.00 72.00 8.00 9.60 4.00 10.00 ESTRIBOS 3/8"1.25 63.00 1.00 78.75 8.75 10.50 4.00 11.00

TOTAL (ML)0.045.75 756.12 152.04 1,116.33 0.0TOTAL (KG)4.04 2.26 1.60 1.02 0.58 0.25 0.0103.40 1,209.79 155.08 647.47 0.02,327.31

2,327.31

ACERO VAHOJA DE METRADOSPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN VIGUETAS DE BORDEDISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015ITEMPARTIDADESCRIPCIONTIPO LONG. PARCIAL (ML)CANT. DE ELEM.N DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"

ERROR:#REF!ACERO FY= 4200KG/CM2 / GRADO 60

VIGA DE BORDE11.11 HORIZONTAL ACERO LONGITUDINAL 3/8"10.502.00 2.00 42.00 4.67 ESTRIVOS 1/4"0.301.00 50.00 15.00 1.67 VERTICALACERO LONGITUDINAL 3/8"14.502.00 2.00 58.00 6.44 ESTRIIVOS 1/4"0.301.00 70.00 21.00 2.33

105.00 TOTAL (ML)0.00.00.00.0100.00 36.00 111.00 TOTAL (KG)4.04 2.26 1.60 1.02 0.58 0.25 0.00.00.00.058.00 9.00 12.00 73.70 6.00

ALIGERADOHOJA DE METRADOSPROYECTO AMPLIACIN SUBESTACIN POMACOCHA 220/50 KVFORMULA: ACERO EN VIGUETASDISTRITO : YAULIPROVINCIA : OROYADEPARTAMENTO : JUNINCLIENTE : VOLCAN COMPAIA MINERA S.A.A.FECHA : FEBRERO 2015ITEMPARTIDADESCRIPCIONTIPO LONG. PARCIAL (ML)CANT. DE ELEM.N DE VECES 1" 3/4" 5/8" 1/2" 3/8" 1/4"

ACERO FY=4200KG/CM2,GRADO 60

AULAS DE 2 NIVELESTECHO 01PAOSVIGUETASACERO LONGITUDINAL 1/2"5.71 2.00 30.00 342.60 38.07 41.873333333356.686666666760 1/2"REFUERZO INF. 3/8"2.41 2.00 30.00 144.60 16.07 17.673333333317.673333333310 3/8"REFUERZO INF. 1/2"4.04 1.00 30.00 121.20 13.47 14.813333333360.377777777860 1/2"60 1/4"TEMPERATURAPAO 1 1/4"0.90 4.00 19.00 68.40 7.60 8.368PAO 2 1/4"2.50 2.00 19.00 95.00 10.56 11.611111111112PAO 3 1/4"4.30 2.00 19.00 163.40 18.16 19.971111111120PAO 4 1/4"4.40 2.00 19.00 167.20 18.58 20.43555555562060

TOTAL (ML)0.00.00.0463.80 144.60 494.00 20.52 TOTAL (KG)4.04 2.26 1.60 1.02 0.58 0.25 0.00.00.0473.08 83.87 123.50 748.49 748.49

Hoja1