1. METRADO

Click here to load reader

  • date post

    15-Sep-2015
  • Category

    Documents

  • view

    220
  • download

    1

Embed Size (px)

Transcript of 1. METRADO

metradoPLANILLA DE METRADOSObra: PROCESO CONSTRUCTIVO DE LA I.E.I. N 22/MX-P NIO JESUS .Lugar: DISTRITO DE CANGALLO, PROVINCIA DE CANGALLO - AYACUCHOSub presupuestoMODULO AULAItemPartidasUnidadN Elem.N veceslargoAnchoAlturasub totalTotal01TRABAJOS PRELIMINARES01.01TRAZO Y REPLANTEOm2ZAPATAS304.27ZAPATA 1461.701.5563.24ZAPATA 2411.601.459.28ZAPATA 3431.251.2018.00ZAPATA 4441.401.4031.36ZAPATA 5421.801.7024.48ZAPATA 6411.651.6010.56ZAPATA 7431.001.0012.00CIMIENTOSEJE 14119.100.4030.56EJE 34119.100.4030.56JE 4 y 5425.900.4018.88EJES A y G425.750.5023.00EJES D418.560.5017.12EJES C,E423.610.4011.55ENTRE EJES C-D Y D-E421.150.403.6802MOVIMIENTO DE TIERRAS02.01EXCAVACION PARA ZAPATASm3337.84EXCAVACION PARA ZAPATAS incluyendo falzas zapatasZAPATA 1461.701.552.00126.48ZAPATA 2411.601.452.0018.56ZAPATA 3431.251.202.0036.00ZAPATA 4441.401.402.0062.72ZAPATA 5421.801.702.0048.96ZAPATA 6411.651.602.0021.12ZAPATA 7431.001.002.0024.0002.02EXCAVACION DE ZANJA PARA CIMIENTO CORRIDOm3EXCAVACION DE ZANJA PARA CIMIENTO CORRIDO85.96EJES 1 Y 3tramos a - b , f - g441.440.401.1010.14tramos b-c , e -f441.400.401.109.86tramos c - d, d-e441.450.401.1010.21EJES 4tramos c - d, d-e (VC-2)421.450.401.105.10EJES 4tramos c - d, d-e422.700.400.857.34EJES 5tramos c - d, d-e422.100.401.006.72EJES A y Gtramo 1-2421.670.501.107.35tramo 2-3421.700.501.107.48EJE Dtramo 1-2411.900.501.104.18tramo 2-3411.930.501.104.25tramo 4-5411.950.501.104.29EJE C y Etramo 4-5421.850.401.005.92ENTRE EJES C-D Y D-ETRAMO 4- 5421.150.400.853.132.03EXCAVACIN MANUAL PARA BASE DE FALSO PISOm3rea42.11area construida total incluyendo veredas y SSHH41.00210.570.0542.112.04ACARREO MANUAL DE MATERIAL EXCEDENTEm3coef. Esponj605.69volumen de material excavado11.30465.92605.692.05MATERIAL DE PRESTAMO LIGANTEm3porcent incidvolumen total37.7420% de material excavado10.20188.7037.742.06CLASIFICACION Y PREPARADO DE MATERIAL PARA BASE CON MAQUINARIAm3coef. Esponj245.3120% de material excavado10.201.30188.7049.06material propio excavado10.801.30188.70196.252.07RELLENO CON MATERIAL CLASIFICADOM3188.70volumen total excavado por zapatas11337.84337.84descuento en Z1(de area de columna+cimiento + VC x altura)4-60.741.10-19.54descuento en Z2(de area de columna+cimiento + VC x altura)4-10.861.10-3.78descuento en Z3(de area de columna+cimiento + VC x altura)4-30.621.10-8.18descuento en Z4(de area de columna+cimiento + VC x altura)4-40.701.10-12.32descuento en Z5(de area de columna+cimiento + VC x altura)421.091.109.59descuento en Z6(de area de columna+cimiento + VC x altura)4-11.271.10-5.59descuento en Z7-eje C y E (de area de columna+cimiento + VC x altura)4-20.441.10-3.87descuento en Z7 -eje D (de area de columna+cimiento + VC x altura)4-10.581.10-2.55descuento de falzas zapatas y zapatas (volumen total)1-1152.03-152.03relleno costado de VC4390.400.250.457.02relleno para base de falso piso41210.570.0542.112.08NIVELACION Y COMPACTADO MANUAL DE BASEm2rea842.28area construida total incluyendo veredas y SSHH41210.57842.282.09ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIAm3volumen409.44material acarreado605.69605.69material de relleno-10.8188.701.30-196.2503OBRAS DE CONCRETO SIMPLE03.01FALSA ZAPATA MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm367.57ZAPATA 1461.701.550.4025.30ZAPATA 2411.601.450.403.71ZAPATA 3431.251.200.407.20ZAPATA 4441.401.400.4012.54ZAPATA 5421.801.700.409.79ZAPATA 6411.651.600.404.22ZAPATA 7431.001.000.404.8003.02CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm380.84EJE 14119.100.400.6519.86EJE 34119.100.400.6519.86JE 4 y 5425.900.400.6512.27EJES A y G425.750.500.6514.95EJES D418.560.500.6511.13EJES C,E423.610.400.657.51ENTRE EJES C-D Y D-E421.150.400.652.39DESCUENTO DE C1 (EJE 1 y 3)4-41.000.160.65-1.66DESCUENTO DE C2(EJE 1)4-51.000.150.65-1.95DESCUENTO DE C2 (EJE 2 INTERSECTADO CON EJES B y F)4-21.000.150.65-0.78DESCUENTO DE C2 (EJE 1 INTERSECTADO CON EJES C , D y E)4-31.000.190.65-1.48DECUENTO DE C3 (EJE 2)4-31.000.070.65-0.51DESCUENTO DE C4(EJES 4 Y 5)4-61.000.050.65-0.753.03SOLADO PARA VIGAS DE CIMENTACIN (E=10CM ) MEZCLA 1:10m35.40EJE 4422.700.255.4003.04ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOSm2241.66EJE 1 Y 3 (ENTRE A -B Y F-G )444.800.4030.72EJE 1 (ENTRE B -C Y E-F )422.500.408.00EJE 3 (ENTRE B -C Y E-F )422.900.409.28EJE 1 (ENTRE C-D Y D-E )424.900.4015.68EJE 3 (ENTRE C-D Y D-E )424.900.4015.68EJE 4'446.000.6057.60EJE 5425.700.4018.24EJE A Y G (ENTRE 1 Y 2)425.160.4016.51EJE A Y G (ENTRE 2 Y 3)424.780.4015.30EJE D4116.820.4026.91EJE C Y E424.020.4012.86ENTRE C-D Y D-E (PARALELO A ESTOS EJES)423.100.6014.8803.05CONCRETO PARA SOBRECIMIENTO DE 1:8+25% PMm317.41EJE 1 Y 3 (ENTRE A -B Y F-G )442.400.120.401.84EJE 1 (ENTRE B -C Y E-F )421.250.120.400.48EJE 3 (ENTRE B -C Y E-F )421.450.120.400.56EJE 1 (ENTRE C-D Y D-E )422.450.120.400.94EJE 3 (ENTRE C-D Y D-E )422.450.120.400.94EJE 4'443.000.120.603.46EJE 5422.850.120.401.09EJE A Y G (ENTRE 1 Y 2)422.580.220.401.82EJE A Y G (ENTRE 2 Y 3)422.390.220.401.68EJE D418.410.220.402.96EJE C Y E421.950.120.400.75ENTRE C-D Y D-E (PARALELO A ESTOS EJES)421.550.120.600.8904OBRAS DE CONCRETO ARMADO04.01ZAPATAS04.01.01ACERO FY= 4200 KG/CM2kg2,552.99ver hoja de metrados de acero de zapatas4638.252552.9904.01.02CONCRETO EN ZAPATAS F'C= 210 KG/CM2m384.46ZAPATA 1461.701.550.5031.62ZAPATA 2411.601.450.504.64ZAPATA 3431.251.200.509.00ZAPATA 4441.401.400.5015.68ZAPATA 5421.801.700.5012.24ZAPATA 6411.651.600.505.28ZAPATA 7431.001.000.506.0004.02VIGAS DE CIMENTACION04.02.01ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACIONm2214.68VC-1 EJE 1 Y 3 (ENTRE A -B Y F-G )444.800.4534.56VC-1 EJE 1 y 3 (ENTRE B -C Y E-F )444.900.4535.28VC-1 EJE 1 Y 3 (ENTRE C-D Y D-E )444.900.4535.28VC-2 EJE 4425.700.3515.96VC-2 EJE 5425.700.3515.96VC-1 EJE A Y G (ENTRE 1 Y 2)425.160.4518.58VC-1 EJE A Y G (ENTRE 2 Y 3)424.780.4517.21VC-1 EJE D (ENTRE 1 Y 3)4110.420.4518.76VC-2 EJE D (ENTRE 4 Y 5)415.500.357.70VC-2 EJE C Y E425.500.3515.4004.02.02ACERO FY= 4200 KG/CM2kg3,330.19VER DETALLES DE HOJA DE METRADO41832.553330.1904.02.03CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2m323.61VC-1 EJE 1 Y 3 (ENTRE A -B Y F-G )442.400.220.453.80VC-1 EJE 1 y 3 (ENTRE B -C Y E-F )442.450.220.453.88VC-1 EJE 1 Y 3 (ENTRE C-D Y D-E )442.450.220.453.88VC-2 EJE 4422.850.220.351.76VC-2 EJE 5422.850.220.351.76VC-1 EJE A Y G (ENTRE 1 Y 2)422.580.220.452.04VC-1 EJE A Y G (ENTRE 2 Y 3)422.390.220.451.89VC-1 EJE D (ENTRE 1 Y 3)415.210.220.452.06VC-2 EJE D (ENTRE 4 Y 5)412.750.220.350.85VC-2 EJE C Y E422.750.220.351.6904.03COLUMNAS04.03.01ACERO FY= 4200 KG/CM2kg9,443.07VER DETALLES DE HOJA DE METRADO412,360.779443.0704.03.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm2679.61C1 (EJES 1 Y 3)441.884.63139.27C2 (EJES 1 Y 3)4102.184.63403.74C3 (EJE 2)431.046.0074.88C4(EJES 4 )430.663.6228.67C4(EJES 5)430.883.1333.0504.03.03CONCRETO EN COLUMNAS F'C=210 KG/CM2m3Seccion55.71C1 (EJES 1 Y 3)440.164.6311.85C2 (EJES 1 Y 3)4100.194.6335.19C3 (EJE 2)430.300.226.004.75C4(EJES 4 )430.220.223.622.10C4(EJES 5)430.220.223.131.8204.04VIGAS04.04.01ENCOFRADO Y DESENCOFRADO EN VIGASm2493.95PARA AULASVC-101 (EJE 2)4118.980.4030.37VB-101429.470.3526.52VB-1024220.820.73121.59VP-101 (EJE B , C , E y F)449.000.5883.52VP-102 (EJE A , D y G VIGA EN LOSA SIN ALERO)436.520.3628.17VP-102 (EJE A , D y G VIGA EN LOSA-ALERO)432.380.5816.56VP-102(EJE A , D y G VIGA HORIZONTAL)436.030.4028.94VP-103 (EJES 1 y 3)4216.480.6585.70PARA SSHHVP-104 (EJE D)412.850.404.56VP-104 (VANO DE PUERTAS EN EJES C y E )422.850.7216.42VP-105425.760.9242.39VB-103415.760.409.2204.04.02ACERO FY= 4200 KG/CM2kg9,152.71VER DETALLES DE HOJA DE METRADO412,288.189152.7104.04.03CONCRETO EN VIGAS F'C=210 KG/CM2m370.97PARA AULASVC-101 (EJE 2)4118.980.101.007.29VB-101429.470.150.202.27VB-1024220.820.061.009.99VP-101449.940.220.3813.30VP-102 (TRAMO INCLINADO)439.940.220.389.97VP-102 (TRAMO HORIZONTAL)436.470.220.203.42VP-1034220.500.111.0017.22PARA SSHH0.00VP-104432.850.220.352.63VP-105 (EJE 5)416.420.220.351.98VP-105 (EJE 4)416.420.220.351.98VB-103415.760.200.200.9204.05CANALETA DE DRENAJE PLUVIAL04.05.01ENCOFRADO Y DESENCOFRADO PARA CANALETAS DE DRENAJE PLUVIALm2115.34PARA AULAS4220.820.6099.94PARA SSHH416.420.6015.4104.05.02ACERO DE REFUERZO FY=4200 KG/CM2 PARA CANALETASkg381.78VER DETALLES DE HOJA DE METRADO4195.45381.7804.05.03CONCRETO F'C=175 KG/CM2 PARA CANALETAm39.61PARA AULAS4220.820.051.008.33PARA SSHH416.420.051.001.2804.06LOSA ALIGERADA04.06.01ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADASm2760.46PARA AULASALEROS (PARALELO A VB-101)443.260.8544.34ALEROS (PARALELO A VB-102)4121.462.88201.83ALEROS DE ESQUINA441.460.8519.86PAOS ENTRE EJES 1 Y 34123.262.88450.66PARA SSHH421.902.8843.7804.06.02LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA LOSA ALIGERADAund6,380.13PARA AULASFacor ladrillos X M^2ALEROS (PARALELO A VB-101)443.260.858.40372.42ALEROS (PARALELO A VB-102)4121.462.888.401695.38ALEROS DE ESQUINA441.460.858.40166.79PAOS ENTRE EJES 1 Y 34123.262.888.403785.56PARA SSHH421.862.888.40359.9804.06.03ACERO DE REFUERZO FY=4200 KG/CM2 PARA LOSA ALIGERADAkg4,423.46VER DETALLES DE HOJA DE METRADO411,105.874423.4604.06.04CONCRETO EN LOSA ALIGERADA F'C=175 KG/CM2m365.78PARA AULASALEROS (PARALELO A VB-101)443.260.850.208.87ALEROS (PARALELO A VB-102)4121.462.880.2040.37ALEROS DE ESQUINA441.460.850.203.97PAOS ENTRE EJES 1 Y 34123.262.880.2090.13PARA SSHH421.862.880.208.57DESCUENTO DE VOLUMEN DE LADRILLOS1-6,3800.300.300.15-86.1304.07COLUMNETAS DE CONFINAMIENTO04.07.01ACERO FY= 4200 KG/CM2kg576.56VER DETALLES DE HOJA DE METRADO41144.14576.5604.07.02ENCOFRADO Y DESENCOFRADO EN COLUMNASm245.85EJE 14120.480.7316.82EJE 3480.480.7311.21EJE 5440.482.3217.8204.07.03CONCRETO EN COLUMNAS F'C=210 KG/CM2m31.38EJE 14120.120.120.730.50EJE 3480.120.120.730.34EJE 5440.120.122.320.5304.08VIGUETAS DE CONFINAMIENTO04.08.01ENCOFRADO Y DESENCOFRADO EN VIGASm221.36EJE 1 y 3 (ENTRE A-B Y F-G)442.080.206.66EJE 1 (ENTRE B-C y E-F)420.940.201.50EJE 1 (ENTRE C-D y D-E)422.130.203.41EJE 3 (ENTRE B-C y E-F)421.140.