2. Cronograma Valorizado Actualizado a Val 6

14
Página 1 Nro Item Descripción Und. Metrado MES 1 MES 02 MES 03 MES CRONOGRAMA VALORIZADO ACTUALIZADO DE OBRA "INSTALACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERIO MASARAY, DISTRITO DE CALLERIA, PROVINCIA CORONEL PORTILLO, UCAYALI" Precio (S/.) Presupuesto (S/.) 1 01 TRABAJOS PRELIMINARES 2 01.01 CARTEL DE OBRA 2.40x3.60 und 1.00 784.37 784.37 784.37 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 3 01.02 ALQUILER DE ALMACEN Y OFICINA mes 3.00 250.00 750.00 225.00 S/. 262.50 0.00 S/. 75.00 0.00 S/. 0.00 93.75 4 01.03 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS ton 85.88 140.00 12,023.20 4,208.12 S/. 3,606.96 1,202.32 S/. 0.00 0.00 S/. 0.00 2,404.64 5 01.04 SEGURIDAD Y SALUD 0.00 6 01.04.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN EL T und 1.00 350.00 350.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 280.00 7 01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL und 2.00 840.00 1,680.00 336.00 S/. 504.00 336.00 S/. 168.00 0.00 S/. 0.00 84.00 8 01.04.03 EQUIPOS DE PROTECCION COLECTIVA und 1.00 77.17 77.17 15.43 S/. 23.15 15.43 S/. 7.72 0.00 S/. 0.00 3.86 9 01.04.04 SEÑALIZACION TEMPORAL DE SEGURIDAD und 1.00 207.38 207.38 41.48 S/. 62.21 41.48 S/. 20.74 0.00 S/. 0.00 10.37 10 01.04.05 CAPACITACION EN SEGURIDAD Y SALUD und 1.00 870.00 870.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 696.00 11 01.04.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD und 1.00 400.00 400.00 80.00 S/. 120.00 80.00 S/. 40.00 0.00 S/. 0.00 20.00 12 02 ESTRUCTURA DE TANQUE ELEVADO DE CONCRETO ARMADO V=14 M3 13 02.01 TRABAJOS PRELIMINARES 14 02.01.01 LIMPIEZA DE TERRENO MANUAL m2 25.00 0.95 23.75 23.75 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 15 02.01.02 TRAZO NIVELES Y REPLANTEO m2 25.00 3.95 98.75 0.00 S/. 98.75 0.00 S/. 0.00 0.00 S/. 0.00 0.00 16 02.02 MOVIMIENTO DE TIERRAS 17 02.02.01 EXCAVACION DE ZANJA MANUAL m3 75.00 38.02 2,851.50 0.00 S/. 2,851.50 0.00 S/. 0.00 0.00 S/. 0.00 0.00 18 02.02.02 BASE GRANULAR E=0.10m, COMO ELEMENTO FILTRANTE m2 25.00 41.35 1,033.75 0.00 S/. 1,033.75 0.00 S/. 0.00 0.00 S/. 0.00 0.00 19 02.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 56.37 17.49 985.91 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 788.73 20 02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 24.22 4.56 110.44 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 88.35 21 02.03 OBRAS DE CONCRETO SIMPLE 22 02.03.01 SOLADO PARA ZAPATAS E= 0.10 m2 25.00 40.69 1,017.25 0.00 S/. 1,017.25 0.00 S/. 0.00 0.00 S/. 0.00 0.00 23 02.04 OBRAS DE CONCRETO ARMADO 24 02.04.01 ZAPATAS 25 02.04.01.01 CONCRETO F'c= 210 KG/cm2 EN ZAPATAS m3 8.41 391.14 3,289.49 0.00 S/. 3,289.49 0.00 S/. 0.00 0.00 S/. 0.00 0.00 26 02.04.01.02 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 423.69 5.09 2,156.58 1,078.29 S/. 1,078.29 0.00 S/. 0.00 0.00 S/. 0.00 0.00 27 02.04.02 ESCALERA 28 02.04.02.01 CONCRETO FC=210 KG/CM2, EN ESCALERA m3 0.71 520.61 369.63 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 369.63 29 02.04.02.02 ENCOFRADO Y DESENCOFRADO EN ESCALERA m2 3.32 37.99 126.13 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 126.13 30 02.04.02.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 35.17 5.09 179.02 0.00 S/. 0.00 17.90 S/. 17.90 0.00 S/. 0.00 179.02 31 02.04.03 COLUMNAS 32 02.04.03.01 CONCRETO F'c= 210 KG/cm2 PARA COLUMNAS m3 6.76 520.61 3,519.32 0.00 S/. 0.00 703.86 S/. 2,287.56 527.90 S/. 0.00 0.00 33 02.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 77.28 43.48 3,360.13 0.00 S/. 0.00 672.03 S/. 2,184.08 504.02 S/. 0.00 0.00 34 02.04.03.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 1,091.83 5.09 5,557.41 1,111.48 S/. 1,111.48 555.74 S/. 2,222.96 555.74 S/. 0.00 0.00 35 02.04.04 VIGAS Y DINTELES 36 02.04.04.01 CONCRETO F'c= 210 KG/cm2 PARA VIGAS m3 5.56 420.83 2,339.81 0.00 S/. 0.00 467.96 S/. 1,520.88 0.00 S/. 0.00 350.97 37 02.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 55.75 46.33 2,582.90 0.00 S/. 0.00 516.58 S/. 1,678.89 0.00 S/. 0.00 387.44 38 02.04.04.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 774.49 5.09 3,942.15 788.43 S/. 394.22 0.00 S/. 2,365.29 0.00 S/. 0.00 394.22 39 02.04.05 LOSA DE CASETA 40 02.04.05.01 CONCRETO F'c= 210 KG/cm2 PARA LOSA m3 2.39 520.46 1,243.90 0.00 S/. 0.00 746.34 S/. 373.17 0.00 S/. 0.00 124.39 41 02.04.05.02 ENCOFRADO Y DESENCOFRADO LOSA DE CASETA m2 19.78 45.54 900.78 0.00 S/. 0.00 540.47 S/. 270.23 0.00 S/. 0.00 90.08 42 02.04.05.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 369.78 5.09 1,882.18 0.00 S/. 0.00 1,505.74 S/. 188.22 0.00 S/. 0.00 188.22 43 02.04.06 CUBA 44 02.04.06.01 CONCRETO F'c= 210 KG/cm2 PARA CUBA m3 5.65 422.43 2,386.73 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 45 02.04.06.02 ENCOFRADO Y DESENCOFRADO EN CUBA m2 66.99 58.69 3,931.64 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 2,358.98 46 02.04.06.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2 kg 720.69 5.09 3,668.31 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 3,668.31 47 02.04.07 MURETE 48 02.04.07.01 MURETE DE CONCRETO DE 30x30x130 CM (C.P MASARAY) m3 0.12 245.30 29.44 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 0.00 49 02.05 MURO DE ALBAÑILERIA 50 02.05.01 MURO DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTO m2 17.16 44.51 763.79 0.00 S/. 0.00 0.00 S/. 0.00 0.00 S/. 0.00 763.79 51 02.06 REVOQUES Y ENLUCIDOS 1RA QUINCENA DEL 03/12/2015 AL 15/12/2105 2DA QUINCENA DEL 16/12/2014 AL 31/12/2015 3RA QUINCENA DEL 01/01/2015 AL 15/01/2015 4TA QUINCENA DEL 16/01/2015 AL 31/01/2015 5TA QUINCENA DEL 01/02/2015 AL 06/02/2015 PARALIZACION DE OBRA DEL 07/02/2015 AL 07/05/2015: 90 DÍAS 6TA QUINCENA DEL 08/05/2015 AL 15/05/2015

description

Cronograma de obra

Transcript of 2. Cronograma Valorizado Actualizado a Val 6

CRONOG. VALORIZADO

CRONOGRAMA VALORIZADO ACTUALIZADO DE OBRA "INSTALACION DEL SERVICIO DE AGUA POTABLE Y ALCANTARILLADO EN EL CASERIO MASARAY, DISTRITO DE CALLERIA, PROVINCIA CORONEL PORTILLO, UCAYALI"NroItemDescripcinUnd.MetradoPrecio (S/.)Presupuesto (S/.)MES 1MES 02MES 03MES 04MES 051RA QUINCENA DEL 03/12/2015 AL 15/12/21052DA QUINCENA DEL 16/12/2014 AL 31/12/20153RA QUINCENA DEL 01/01/2015 AL 15/01/20154TA QUINCENA DEL 16/01/2015 AL 31/01/20155TA QUINCENA DEL 01/02/2015 AL 06/02/2015PARALIZACION DE OBRA DEL 07/02/2015 AL 07/05/2015: 90 DAS6TA QUINCENA DEL 08/05/2015 AL 15/05/2015SALDO7MA QUINCENA DEL 16/05/2015 AL 31/05/20158VA QUINCENA DEL 01/06/2015 AL 03/06/201519101TRABAJOS PRELIMINARES201.01 CARTEL DE OBRA 2.40x3.60 und1.00784.37784.37784.3700.0000.0000.000.0000301.02 ALQUILER DE ALMACEN Y OFICINAmes3.00250.00750.00225.002620.00750.00093.7593.757915401.03 TRANSPORTE DE EQUIPOS Y HERRAMIENTASton85.88140.0012,023.204,208.1236071,202.3200.0002,404.64601.1650695501.04 SEGURIDAD Y SALUD0.000.00601.04.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD EN EL TRABAJOund1.00350.00350.000.0000.0000.000280.0070.005020701.04.02 EQUIPOS DE PROTECCION INDIVIDUALund2.00840.001,680.00336.00504336.001680.00084.00252.0020050801.04.03 EQUIPOS DE PROTECCION COLECTIVAund1.0077.1777.1715.432315.4380.0003.8611.5884901.04.04 SEALIZACION TEMPORAL DE SEGURIDADund1.00207.38207.3841.486241.48210.00010.3731.1022101001.04.05 CAPACITACION EN SEGURIDAD Y SALUDund1.00870.00870.000.0000.0000.000696.00174.00147271101.04.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUDund1.00400.00400.0080.0012080.00400.00020.0060.005191202ESTRUCTURA DE TANQUE ELEVADO DE CONCRETO ARMADO V=14 M30.001302.01 TRABAJOS PRELIMINARES0.001402.01.01 LIMPIEZA DE TERRENO MANUALm225.000.9523.7523.7500.0000.0000.000.00001502.01.02 TRAZO NIVELES Y REPLANTEOm225.003.9598.750.00990.0000.0000.000.00001602.02 MOVIMIENTO DE TIERRAS0.001702.02.01 EXCAVACION DE ZANJA MANUALm375.0038.022,851.500.0028520.0000.0000.000.00001802.02.02 BASE GRANULAR E=0.10m, COMO ELEMENTO FILTRANTEm225.0041.351,033.750.0010340.0000.0000.000.00001902.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIOm356.3717.49985.910.0000.0000.000788.73197.1819702002.02.04 ELIMINACION DE MATERIAL EXCEDENTEm324.224.56110.440.0000.0000.00088.3522.091572102.03 OBRAS DE CONCRETO SIMPLE0.002202.03.01 SOLADO PARA ZAPATAS E= 0.10m225.0040.691,017.250.0010170.0000.0000.000.00002302.04 OBRAS DE CONCRETO ARMADO0.002402.04.01 ZAPATAS0.002502.04.01.01 CONCRETO F'c= 210 KG/cm2 EN ZAPATASm38.41391.143,289.490.0032890.0000.0000.00-0.00002602.04.01.02 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg423.695.092,156.581,078.2910780.0000.0000.000.00002702.04.02 ESCALERA0.002802.04.02.01 CONCRETO FC=210 KG/CM2, EN ESCALERAm30.71520.61369.630.0000.0000.000369.630.00002902.04.02.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAm23.3237.99126.130.0000.0000.000126.13-0.00003002.04.02.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg35.175.09179.020.00017.90180.000179.02-35.80-3603102.04.03 COLUMNAS0.003202.04.03.01 CONCRETO F'c= 210 KG/cm2 PARA COLUMNAS m36.76520.613,519.320.000703.862288527.9000.000.00003302.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNASm277.2843.483,360.130.000672.032184504.0200.000.00003402.04.03.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg1,091.835.095,557.411,111.481111555.742223555.7400.000.01003502.04.04 VIGAS Y DINTELES0.003602.04.04.01 CONCRETO F'c= 210 KG/cm2 PARA VIGAS m35.56420.832,339.810.000467.9615210.000350.970.00003702.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGASm255.7546.332,582.900.000516.5816790.000387.44-0.01-003802.04.04.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg774.495.093,942.15788.433940.0023650.000394.22-0.01-003902.04.05 LOSA DE CASETA0.004002.04.05.01 CONCRETO F'c= 210 KG/cm2 PARA LOSAm32.39520.461,243.900.000746.343730.000124.39-0.00004102.04.05.02 ENCOFRADO Y DESENCOFRADO LOSA DE CASETAm219.7845.54900.780.000540.472700.00090.080.00004202.04.05.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg369.785.091,882.180.0001,505.741880.000188.220.00004302.04.06 CUBA0.004402.04.06.01 CONCRETO F'c= 210 KG/cm2 PARA CUBAm35.65422.432,386.730.0000.0000.0000.002,386.73238704502.04.06.02 ENCOFRADO Y DESENCOFRADO EN CUBAm266.9958.693,931.640.0000.0000.0002,358.981,572.66157304602.04.06.03 ACERO DE REFUERZO F'Y=4.200 KG/CM2kg720.695.093,668.310.0000.0000.0003,668.310.00004702.04.07 MURETE0.004802.04.07.01 MURETE DE CONCRETO DE 30x30x130 CM (C.P MASARAY)m30.12245.3029.440.0000.0000.0000.0029.442904902.05 MURO DE ALBAILERIA0.005002.05.01 MURO DE LADRILLO TUBULAR 12x15x24 ASENTADO DE CANTOm217.1644.51763.790.0000.0000.000763.790.00005102.06 REVOQUES Y ENLUCIDOS0.005202.06.01 TARRAJEO DE MUROS INTERIOR Y/O EXTERIORm234.3218.31628.400.0000.0000.000628.40-0.00005302.06.02 TARRAJEO DE COLUMNAS,VIGAS Y DINT.m2128.5530.473,916.920.0000.0000.0003,916.92-0.00005402.06.03 VESTIDURA DE DERRAMES m5.4010.7958.270.0000.0000.00058.27-0.00005502.06.04 TARRAJEO DE CIELORRASOm221.7037.72818.520.0000.0000.000818.520.00005602.06.05 TARRAJEO EN INTERIOR DE CUBA C/IMPERMEABILIZANTEm236.2020.69748.980.0000.0000.0000.00748.9874905702.06.06 TARRAJEO EN EXTERIOR DE CUBAm239.1433.031,292.790.0000.0000.0000.001,292.79129305802.07 ESTRUCTURA DE MADERA0.005902.07.01 BARANDA DE MADERA DE 2"X3"m48.5117.33840.680.0000.0000.0000.00840.6808416002.08 CARPINTERIA DE MADERA0.006102.08.01 VENTANA DE MADERA CON FIERROS PASANTES (INC. MALLA MOSQUITEROS)m22.20120.77265.690.0000.0000.0000.00265.6902666202.09 CARPINTERIA METALICA0.006302.09.01 PUERTA METALICA (070 x 2.10 M.) INC. ACCES. Y COLOC. DE PINTURAund1.00350.00350.000.0000.0000.0000.00350.0035006402.09.02 ESCALERA DE GATO CON TUBO DE FIERRO NEGRO DE 1.5", CON PELDAOS DE 5/8" I/PINTURAm13.77138.851,911.960.0000.0000.0000.001,911.96191206502.09.03 CANASTILLA DE PROTECCION DE ESCALERAm6.3290.09569.370.0000.0000.0000.00569.3756906602.09.04 BARANDA METALICA C/TUB. FIERRO NEGRO 1.5" INC/PINTURAm14.70164.172,413.300.0000.0000.0000.002,413.30241306702.10 CERRAJERIA0.006802.10.01 BISAGRA CAPUCHINA ALUMINIZADA DE 4"x4"und4.0014.0856.320.0000.0000.0000.0056.325606902.10.02 CERRAJERIA P/PUERTA PRINCIPAL 2 GOLPESund1.00102.82102.820.0000.0000.0000.00102.8210307002.11 PINTURA0.007102.11.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORESm2162.879.051,473.970.0000.0000.0000.001,473.97014747202.11.02 PINTURA ESMALTE EN CIELORRASOm224.808.73216.500.0000.0000.0000.00216.5002167302.11.03 PINTURA ANTICORROSIVO Y ESMALTE EN VENTANAS DE FIERROm212.1013.51163.470.0000.0000.0000.00163.4701637402.12 OTROS - VARIOS0.007502.12.01 WATER STOP DE P.V.C. DE 6". PROVISION Y COLOCADO DE JUNTAm11.6022.69263.200.0000.0000.000263.200.00007602.12.02 TAPA DE INSPECCION (0.60 X 0.60 m) und2.00285.00570.000.0000.0000.0000.00570.0057007702.12.03 KIT PARA DESINFECCION Y CLORACION DE AGUAund1.00250.13250.130.0000.0000.0000.00250.1325007802.13 INSTALACIONES HIDRALICAS0.007902.13.01 LINEA DE IMPULSIN0.008002.13.01.01 TUBERIA DE IMPULSION FG UR 2"m12.4873.07911.910.0000.0000.0000.00911.9191208102.13.01.02 ACCESORIOS PARA LINEA DE IMPULSION 2"und1.00110.07110.070.0000.0000.0000.00110.0711008202.13.02 LINEA DE ADUCCION0.008302.13.02.01 EXCAVACION DE ZANJA MANUAL P/TUB. DE 1 PROF. 0.60 Mm7.6013.42101.990.0000.0000.0000.00101.9910208402.13.02.02 REFINE NIVELACION DE ZANJAS PARA TUB. DE AGUAm7.601.047.900.0000.0000.0000.007.90808502.13.02.03 CAMA DE FONDO CON ARENA, E=0.10 M. PARA TUBERIA DE AGUAm7.602.5319.230.0000.0000.0000.0019.231908602.13.02.04 RELLENO CON ARENA H=0.15, EN TUBERIA DE AGUA m7.601.5411.700.0000.0000.0000.0011.701208702.13.02.05 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIOm7.604.4433.740.0000.0000.0000.0033.743408802.13.02.06 ELIMINACION DE MATERIAL EXCEDENTE m33.167.6024.020.0000.0000.0000.0024.022408902.13.02.07 TUBERIA DE ADUCCIN DE FG 2"m20.4673.071,495.010.0000.0000.0000.001,495.01149509002.13.02.08 ACCESORIOS PARA LINEA DE ADUCCION 2"und1.00325.28325.280.0000.0000.0000.00325.2832509102.13.03 REBOSE - PURGA0.009202.13.03.01 TUBERIA PVC SAP C-7.5 3"m14.7022.04323.990.0000.0000.0000.00323.9932409302.13.03.02 ACCESORIOS PARA REBOSE 3"und1.00337.32337.320.0000.0000.0000.00337.3233709402.13.04 ARBOL HIDARULICO0.009502.13.04.01 SUM. E INST. DE ARBOL HIDRAULICO 2"und1.001,249.141,249.140.0000.0000.0000.001,249.14124909602.13.05 INSTALACIONES ELECTRICAS0.009702.13.05.01 CENTRO DE LUZ CON PVC-SAPpto2.0054.85109.700.0000.0000.0000.00109.7001109802.13.05.02 BRAQUETE P/PAREDund1.0024.5124.510.0000.0000.0000.0024.510259902.13.05.03 INTERRUPTOR UNIPOLAR SIMPLEund1.0015.5615.560.0000.0000.0000.0015.5601610002.13.05.04 LAMPARA AHORRADORA DE ENERGIA DE 18Wund2.0018.9637.920.0000.0000.0000.0037.9203810102.13.05.05 ALIMENTADOR DEL TABLERO DE DISTRIBUCIONML10.006.5165.100.0000.0000.0000.0065.1006510202.13.05.06 CAJA ELECTRICA METALICAund1.00175.66175.660.0000.0000.0000.00175.66017610302.13.06 EQUIPO DE BOMBEO0.0010402.13.06.01 EQUIPO DE BOMBEO DE AGUA 10.00KWund1.0010,179.3710,179.370.0000.0000.0000.0010,179.3710179010502.13.06.02 ELECTROBOMBA SUMERGIBLE DE 3 HPund1.003,626.453,626.450.0000.0000.0000.003,626.453626010602.13.07 PUESTA A TIERRA0.0010702.13.07.01 PUESTA A TIERRA EN TABLEROund1.001,449.841,449.840.0000.0000.0000.001,449.840145010803PERFORACION DE POZO TUBULAR PROFUNDIDAD 105.00 M.0.0010903.01 PERFORACION DE POZO REGISTRO DE CONTROL0.0011003.01.01 LIMPIEZA DE TERRENO MANUALm225.000.9523.750.0000.0000.0000.0023.7524011103.01.02 MONTAJE Y DESMONTAJE DE CASTILLO DE PERFORACIONund1.00246.33246.330.0000.0000.0000.00246.33246011203.01.03 POZO DE LODOSm34.0038.02152.080.0000.0000.0000.00152.08152011303.02 PERFORACION DE POZO PROFUNDO0.0011403.02.01 PERFORACION DE POZO PROFUNDO CON EQUIPO DE ROTACION BROCA D=8"m105.0077.238,109.150.0000.0000.0000.008,109.158109011503.02.02 ANALISIS GRANULOMETRICOund1.00300.00300.000.0000.0000.0000.00300.00300011603.03 TUBERIAS Y FILTROS0.0011703.03.01 SUM. E INST.DE TUBERIA PVC SAP - P/ C-10 4"m84.0025.562,147.040.0000.0000.0000.002,147.04150064711803.03.02PERFORACION DE POZO TUBULAR PROFUNDIDAD 105.00 M.m22.0028.00616.000.0000.0000.0000.00616.00061611903.03.03 GRAVA PARA FILTRO DE 1/4" A 3/4"ML105.0017.431,830.150.0000.0000.0000.001,830.150183012003.03.04 SUM. E INST.DE TUBERIA PVC SAP - C-7.5 UR 2"m50.0012.36618.000.0000.0000.0000.00618.00061812103.04 DESARROLLO DEL POZO0.0012203.04.01 DESARROLLO DEL POZO POR AIRE COMPRIMIDO O PISTONEOh72.007.77559.440.0000.0000.0000.00559.44055912303.05 REGISTRO Y PRUEBA DE CONTROL0.0012403.05.01 ANALISIS FISICO QUIMICO COMPLETOund1.00400.00400.000.0000.0000.0000.00400.00040012503.06 SELLADO DEL POZO0.0012603.06.01 SELLADO SANITARIO EN ESPACIO ANULARund1.00198.83198.830.0000.0000.0000.00198.83019912703.06.02 DESINFECCION POZO TUBULARund1.0026.5426.540.0000.0000.0000.0026.5402712803.07 OTROS0.0012903.07.01 LIMPIEZA DEL MATERIAL EXTRAIDO DEL POZOm34.2338.02160.820.0000.0000.0000.00160.82016113004RED DE AGUA POTABLE 0.0013104.01 TRABAJOS PRELIMINARES0.0013204.01.01 TRAZO ,NIVELACION Y REPLANTEO DE REDES DE AGUAm2,500.901.583,951.423,556.281980.0000.0000.00197.571009813304.01.02 LIMPIEZA DE TERRENO MANUALm23,001.080.571,710.621,710.6200.0000.0000.00-0.000013404.02 MOVIMIENTO DE TIERRAS0.0013504.02.01 EXCAVACION DE ZANJA C/EQUIPO H=0.60Mm2,500.902.406,002.163,301.192101300.1100.0000.00300.10300013604.02.02 REFINE NIVELACION DE ZANJAS PARA TUB. DE AGUAm2,500.901.042,600.941,430.52910130.0500.0000.00130.04130013704.02.03 CAMA DE FONDO CON ARENA, E=0.10 M. PARA TUBERIA DE AGUAm2,500.902.536,327.283,480.00-34800.0000.0000.006,327.28006,327.2813804.02.04 RELLENO CON MATERIAL CLASIFICADO H=0.15, SOBRE TUBERIA DE AGUAm2,500.901.543,851.392,118.261348192.5700.0000.00192.57193013904.02.05 RELLENO DE ZANJA C/EQUIPO H=0.40Mm2,500.902.766,902.481,725.6210350.0000.0002,070.742,070.75150057114004.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3125.057.60950.38522.7133347.5200.0000.0047.5204814104.03 INSTALACION Y SUMINISTRO DE TUBERIA0.0014204.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 2"m594.1711.076,577.461,315.494604328.8700.0000.00328.88329014304.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 1.5"m536.269.565,126.651,025.333589256.3300.0000.00256.33256014404.03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC-SAP C-7.5 =1"m1,370.475.367,345.722,571.004040367.2900.0000.00367.28367014504.03.04 PRUEBA HIDRAULICA Y DESINFECCIONm2,500.900.761,900.680.0000.0000.0000.001,900.681901014604.04 ACCESORIOS - VALVULAS - OTROS0.0014704.04.01 TAPON PVC SAP 1"und11.0019.31212.410.0017229.7400.00010.62-0.000014804.04.02 CODO PVC-SAP 1" x 22.5und5.0021.31106.5553.28430.0000.00010.66-0.01-014904.04.03 CODO PVC-SAP 1" x 45und2.0019.3138.6219.31150.0000.0003.860.000015004.04.04 CODO PVC-SAP 1" x 90und3.0019.6158.8326.47260.0000.0005.880.010015104.04.05 CODO PVC-SAP 1.5" x 22.5und2.0019.8139.6219.81160.0000.0003.960.000015204.04.06 CODO PVC-SAP 2" x 22.5und1.0021.3121.310.00172.9800.0001.07-0.000015304.04.07 CODO PVC-SAP 2" x 90und1.0023.3123.310.00193.2600.0001.170.000015404.04.08 TEE PVC-SAP 1.5"* 1.5"und3.0020.4561.3527.61280.0000.0006.14-0.01-0015504.04.09 TEE PVC-SAP 2"* 2"und3.0022.1166.330.00549.2900.0003.32-0.01-0015604.04.10 CRUZ PVC SAP 2"x2"und1.0027.3527.350.00223.8300.0001.370.000015704.04.11 VALVULA DE COMPUERTA PESADA DE BRONCE 1"und7.0063.29443.030.0000.0000.000443.030.000015804.04.12 VALVULA DE COMPUERTA PESADA DE BRONCE 1 1/2"und3.00101.29303.870.0000.0000.000303.870.000015904.04.13 VALVULA DE COMPUERTA PESADA DE BRONCE 2"und2.00106.29212.580.0000.0000.000212.580.000016004.04.14 REDUCCION PVC SAP DE 1.5" A 1"und5.0020.31101.550.008214.2200.0005.08-0.01-0016104.04.15 REDUCCION PVC SAP DE 2" A 1"und6.0021.81130.860.0010618.3200.0006.54-0.000016204.04.16 REDUCCION PVC SAP DE 2" A 1 1/2"und2.0023.3146.620.00386.5300.0002.330.000016304.04.17 YEE PVC-SAP DE 2"und2.0019.8139.620.00325.5500.0001.980.000016404.04.18 CAJA DE CONCRETO PARA VALVULA DE CONTROLund12.00110.001,320.000.00660660.0000.0000.000.000016504.05CONEXIONES DOMICILIARIAS0.0016604.05.01 TRAZO ,NIVELACION Y REPLANTEO DE REDES DE AGUAm1,840.061.582,907.291,162.925811,104.7700.0000.0058.1458016704.05.02 EXCAVACION DE ZANJA C/EQUIPO H=0.60Mm1,840.062.404,416.140.004423,886.2000.0000.0088.3388016804.05.03 REFINE NIVELACION DE ZANJAS PARA TUB. DE AGUAm1,840.061.041,913.660.0001,875.3900.0000.0038.2738016904.05.04 CAMA DE FONDO CON ARENA, E=0.10 M. PARA TUBERIA DE AGUAm1,840.062.534,655.350.0000.0000.0000.004,655.35004655.3517004.05.05 RELLENO CON MATERIAL CLASIFICADO H=0.15, SOBRE TUBERIA DE AGUA m1,840.061.542,833.690.0002,777.0200.0000.0056.6757017104.05.06 RELLENO DE ZANJA C/EQUIPO H=0.40Mm1,840.062.765,078.570.0002,031.4300.0000.003,047.140304717204.05.07 ELIMINACION DE MATERIAL EXCEDENTE m3206.097.601,566.280.0001,534.9500.0000.0031.3303117304.05.08 CONEXION DOMICILIARIA CORTA MATRIZ PVC SAP 1/2"und56.0042.852,399.600.0002,351.6100.0000.0047.9948017404.05.09 CONEXION DOMICILIARIA LARGA MATRIZ PVC SAP 1/2"und41.0060.012,460.410.0002,411.2000.0000.0049.2149017504.05.10 PRUEBA HIDRAULICA Y DESINFECCIONm1,840.060.761,398.450.0000.0000.0000.001,398.450139817604.05.11 CAJA DE REGISTRO DE 12" X 24"pza97.0094.829,197.540.0000.00920919.7504,598.772,759.27200075917704.05.12 ACCESORIOS PARA CONEXIONES DOMICILIARIAS0.0017804.05.12.01 TEE PVC-SAP 1" P/RED DE AGUAund55.0014.86817.300.000800.9500.00016.35-0.000017904.05.12.02 TEE PVC-SAP 1 1/2" P/RED DE AGUAund29.0017.36503.440.000493.3700.00010.070.000018004.05.12.03 TEE PVC-SAP 2" P/RED DE AGUAund13.0017.86232.180.000227.5400.0004.640.000018104.05.12.04 REDUCCION PVC SAP DE 1" A 1/2"und55.0010.78592.900.000581.0400.00011.860.000018204.05.12.05 REDUCCION PVC SAP DE 1.5" A 1/2"und29.0011.28327.120.000320.5800.0006.540.000018304.05.12.06 REDUCCION PVC SAP DE 2" A 1/2"und13.0014.78192.140.000188.3000.0003.84-0.000018405SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES (BIODIGESTOR)0.0018505.01 TRABAJOS PRELIMINARES0.0018605.01.01 LIMPIEZA DE TERRENO MANUALm2937.400.95890.530.0000.0000.0000.00890.53891018705.01.02 TRAZO NIVELES Y REPLANTEOm2937.403.953,702.730.0000.0000.0000.003,702.733703018805.02 MOVIMIENTO DE TIERRAS18905.02.01 EXCAVACION DE ZANJA MANUALm3135.8838.025,166.160.0000.0000.0000.005,166.165166019005.02.02 REFINE Y NIVELACION DE PAREDES Y FONDO DE ZANJAm2245.961.14280.390.0000.0000.0000.00280.39280019105.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIOm341.2817.49721.990.0000.0000.0000.00721.9940032219205.02.04 ELIMINACION DE MATERIAL EXCEDENTE m394.604.56431.380.0000.0000.0000.00431.38043119305.03 INSTALACIONES SANITARIAS0.0019405.03.01 BIODIGESTOR DE POLIETILENO CAP, 600 LTS INC/COLOCACION Y ACCESORIOSund86.001,203.07103,464.020.0000.0000.0000.00103,464.02103464019505.03.02 CAJA DE REGISTRO PREFABRICADO (0.60 X 0.30 m.) INCL. TAPAund172.00119.3820,533.360.0000.0000.0000.0020,533.3620533019605.03.03 CAJA DE REGISTRO DE DESAGUE DE 0.50 X 0.50 m. (POZO DE LODOS) INCL. TAPAund86.00111.349,575.240.0000.0000.0000.009,575.247000257519705.03.04 TUBERIA PVC SAL PARA DESAGUE DE 4"m344.0030.1910,385.360.0000.0000.0000.0010,385.368308207719806SISTEMA DE PERCOLACION DE AGUAS RESIDUALES (ZANJA DE PERCOLACION)19906.01 TRABAJOS PRELIMINARES20006.01.01 LIMPIEZA DE TERRENO MANUALm2361.200.95343.140.0000.0000.0000.00343.14343020106.01.02 TRAZO NIVELES Y REPLANTEOm2361.203.951,426.740.0000.0000.0000.001,426.741427020206.02 MOVIMIENTO DE TIERRAS0.0020306.02.01 EXCAVACION DE ZANJA MANUALm3251.2038.029,550.620.0000.0000.0000.009,550.629551020406.02.02 REFINE Y NIVELACION DE PAREDES Y FONDO DE ZANJAm21,083.601.141,235.300.0000.0000.0000.001,235.300020506.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3326.814.561,490.250.0000.0000.0000.001,490.250020606.03 TRATAMIENTO DE AGUAS RESIDUALES (ZANJA DE PERCOLACIN) 0.0020706.03.01 ZANJAS DE PERCOLACIN L=7.00 mt - EN DOMICILIOSund86.00466.4740,116.420.0000.0000.0000.0040,116.420020807MODULO DE SS.HH DOMICILIARIO (84 UND) + MODULO DE SS.HH PUBLICO P/C.E. (02 UND)0.0020907.01 TRABAJOS PRELIMINARES0.0021007.01.01 LIMPIEZA DE TERRENO MANUALm2736.940.95700.090.0000.005250.000140.0235.0098014021107.01.02 TRAZO NIVELES Y REPLANTEOm2736.944.563,360.450.0000.0025200.000672.09168.022258567221207.02 MOVIMIENTO DE TIERRAS0.0021307.02.01 EXCAVACION DE ZANJA MANUAL PARA PILOTESm3123.2638.024,686.350.0000.0035150.0001,171.59-0.0054905117221407.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIOm3100.7017.491,761.240.0000.007040.0001,056.740.0018612105721507.02.03 ELIMINACION DE MATERIAL EXCEDENTEm359.544.56271.500.0000.002040.00067.88-0.011846821607.03 OBRAS DE CONCRETO SIMPLE0.0021707.03.01 SOLADO PARA PILOTES E= 0.10m220.6440.69839.840.00041.993360.000461.910.00387946221807.03.02 SOLADO EN ESCALERA DE MADERAm249.4540.692,012.120.0000.0000.0000.002,012.120021907.04 OBRAS DE CONCRETO ARMADO0.0022007.04.01 PILOTES DE CONCRETO0.0022107.04.01.01 PILOTE DE CONCRETO DE 0.20x0.20 m TIPO 01und120.00109.7213,166.400.006580.0013173,949.9206,583.20658.32866770658307.04.01.02 PILOTE DE CONCRETO DE 0.20x0.20 m TIPO 02und396.0099.3139,326.760.00015,730.7078651,966.34011,798.031,966.3446397831179822207.04.01.03 ZAPATA DE CONCRETO FC=140 KG/CM2, EN ESCALERAund86.0090.827,810.520.0000.0000.0000.007,810.520022307.05 ESTRUCTURA DE MADERA Y COBERTURAS 0.0022407.05.01 COLUMNA DE MADERA QUINILLA Y/O SIMILAR DE 4" x 4" p23,947.405.0820,052.790.0001,002.6407,018.48011,029.031,002.6422116281102922507.05.02 COLUMNA DE MADERA QUINILLA Y/O SIMILAR DE 3" x 3" p2767.805.203,992.560.000199.630798.5102,794.79199.63111584279522607.05.03 VIGA PRINCIPAL DE MADERA QUINILLA Y/O SIMILAR DE 2"x4" p21,416.205.287,477.540.000373.8802,617.1403,738.77747.75279568373922707.05.04 VIGA SECUNDARIA DE MADERA QUINILLA Y/O SIMILAR DE 2"x3" p23,583.805.2018,635.760.000931.7906,522.5209,317.881,863.571736458931822807.05.05 TABLAS DE MADERA QUINILLA Y/O SIMILAR e=1" EN ESCALERAp21,186.805.937,037.720.000351.8900.0000.006,685.830022907.05.06 ZANCAS DE MADERA QUINILLA Y/O SIMILAR DE 2" X 10" EN ESCALERAp21,436.207.7911,188.000.000559.4000.0000.0010,628.600023007.05.07 PISO DE MADERA QUINILLA Y/O SIMILAR DE 1" X 10"p26,490.206.5642,575.710.0002,128.79014,901.50021,287.864,257.5690634582128823107.05.08 BARANDA DE MADERA DE 2"X2"m1,979.125.7811,439.310.000571.9700.0009,151.451,715.891046863915123207.05.09 TABIQUERIA DE MADERA MACHIMBRADA m21,314.9660.9980,199.410.0004,009.9708,019.94060,149.568,019.94482395926015023307.05.10 CORREAS DE MADERA 2"x2"p22,390.605.4713,076.580.000653.8300.00011,115.091,307.6614534741111523407.05.11 CARTELAS DE MADERA QUINILLA Y/O SIMILAR DE 1"und258.006.301,625.400.00081.2700.0001,381.59162.5422456138223507.05.12 COBERTURA CON PLANCHAS DE FIBROCEMENTOm21,101.4220.6222,711.280.0001,135.5600.00017,033.464,542.2638685171703323607.05.13 CUMBRERA PREFABRICADASm275.7018.104,990.170.000249.5100.0003,742.63998.03186764374323707.05.14 SOPORTE DE MADERA MACHIEMBRADA PARA LAVATORIOm2108.1124.862,687.610.000134.3800.0001,343.811,209.4236116134423807.06 ZOCALOS Y CONTARZOCALOS0.0023907.06.01 ZOCALO INTERIOR DE CERAMICA DE 0.20x0.30 MT m2607.9355.7733,904.260.0000.0000.00015,256.9218,647.3451727451525724007.07 PISOS Y PAVIMENTOS0.0024107.07.01 FALSO PISO DE DE CONCRETO F'C=140 KG/CM2, E=3"m2229.1439.899,140.390.0000.0000.0007,312.311,828.08668374731224207.07.02 PISO DE CERAMICA ANTIDESLIZANTE DE 20x30 CM. DE 1RAm2138.6546.396,431.970.0000.0000.0003,215.993,215.98206852321624307.08 CARPINTERIA METALICA0.0024407.08.01 ESCALERA DE GATO CON TUBO DE FIERRO NEGRO DE 1.5", CON PELDAOS DE 5/8" I/PINTURAm7.5060.93456.980.0000.0000.0000.00456.980024507.09 CARPINTERIA DE MADERA0.0024607.09.01 VENTANA DE MADERA CON FIERROS PASANTES (INC. MALLA MOSQUITEROS)m278.72120.779,507.010.0000.0000.0000.009,507.010024707.09.02 PUERTA DE MADERA MACHIHEMBRADA 0.70x2.10 (INC/MARCO)m2126.42110.2613,939.070.0000.0000.0006,969.546,969.53971489697024807.10 CERRAJERIA0.0024907.10.01 BISAGRA CAPUCHINA ALUMINIZADA DE 4"x4"und258.0010.062,595.480.0000.0000.0001,297.741,297.7433683129825007.10.02 CERRADURA PTA.BAO SEG.INT.PER.MANIJ.CERRAD.GOAL 42 NP BAOpza88.0047.614,189.680.0000.0000.0002,094.842,094.8487767209525107.11 PINTURA0.0025207.11.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOSm22,086.429.3119,424.570.0000.0000.0000.0019,424.570025307.11.02 PINTURA ANTICORROSIVO Y ESMALTE EN VENTANAS DE FIERROm278.7216.361,287.860.0000.0000.0000.001,287.860025407.12 INSTALACIONES SANITARIAS0.0025507.12.01 APARATOS Y ACCESORIOS SANITARIOS0.0025607.12.01.01 INODORO TANQUE BAJO COLORpza88.00164.4814,474.240.0000.0000.0007,237.127,237.121047518723725707.12.01.02 LAVATORIOS DE PEDESTAL BLANCO.pza88.00207.8318,289.040.0000.0000.0009,144.529,144.521672445914525807.12.01.03 URINARIOS DE LOZA DE PICO COLOROpza2.00117.82235.640.0000.0000.000117.82117.8227811825907.12.01.04 DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORApza86.0040.133,451.180.0000.0000.0001,725.591,725.5959553172626007.12.01.05 LAVADERO DE ACERO INOXIDABLE RECTANGULAR 1 POZA C/ESCURRIDOR, INC. GRIFERIApza84.00269.3722,627.080.0000.0000.00014,707.607,919.4833279001470826107.12.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO0.0026207.12.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"pto262.0015.544,071.480.0000.0000.0003,867.91203.57157481386826307.12.02.02 RED DE DERIVACION C/TUBERIA PVC SAP 1/2"m384.265.882,259.450.0000.0000.0001,807.56451.8940841180826407.12.02.03 ACCESORIOS PVC SAP 1/2", P/INST. DE AGUAund86.0032.312,778.660.0000.0000.0002,222.93555.7361768222326507.12.02.04 TANQUE DE POLIPROPILENO DE 600 LTS.und2.00462.08924.160.0000.0000.0000.00924.160026607.12.03 SISTEMA DE DESAGUE0.0026707.12.03.01 SALIDA DE DESAGUE PVC SAL 4"pto88.0031.622,782.560.0000.0000.0002,226.05556.5161941222626807.12.03.02 SALIDA DE DESAGUE PVC SAL 2"pto258.0023.215,988.180.0000.0000.0004,790.541,197.64286866479126907.12.03.03 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4"m155.8230.194,704.210.0000.0000.0003,763.37940.84177037376327007.12.03.04 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2"m271.2211.933,235.650.0000.0000.0002,588.52647.1383756258927107.12.03.05 ACCESORIOS PVC SAL 4", P/INST. DE DESAGUEund86.0083.047,141.440.0000.0000.0005,713.151,428.29408001571327207.12.03.06 ACCESORIOS PVC SAL 2", P/INST. DE DESAGUEund86.0062.045,335.440.0000.0000.0004,268.351,067.09227735426827307.13 INSTALACIONES ELECTRICAS0.0027407.13.01 SALIDA DE CENTRO DE LUZ pto174.0036.796,401.460.0000.0000.0004,481.021,920.44286851448127507.13.02 FOCO AHORRADOR DE 12 W und174.0023.884,155.120.0000.0000.0002,908.581,246.54120855290927607.13.03 INTERRUPTOR UNIPOLAR SIMPLEund174.0015.562,707.440.0000.0000.0001,895.21812.2351312189527707.13.04 ALIMENTADOR DEL TABLERO DE DISTRIBUCIONML430.006.512,799.300.0000.0000.000559.862,239.441567256027807.13.05 CAJA ELECTRICA METALICAund86.0065.115,599.460.0000.0000.0002,799.732,799.73156770280027908IMPACTO AMBIENTAL0.0028008.01 EDUCACION AMBIENTAL0.0028108.01.01 CAPACITACION A LA COMUNIDAD BENEFICIARIA EN SOSTENIBILIDAD AMBIENTALund1.00297.00297.000.0000.0000.000297.000.0088229728208.02 SEALIZACION0.0028308.02.01 LETRERO INFORMATIVO, PREVENTIVO Y DE REGLAMENTACIONund2.0070.53141.060.0000.0000.000141.060.0019914128408.03 LETRINA SANITARIA0.0028508.03.01 EXCAVACION MANUAL DE TERRENOm33.3838.02128.510.000128.5100.0000.00-0.000028608.03.02 INSTALACION DE LETRINAS SANITARIAS CON MATERIAL DE LA ZONAund1.00395.46395.460.000395.4600.0000.000.000028708.03.03 CLAUSURA DE LETRINAS SANITARIASund1.00132.66132.660.0000.0000.00092.8639.801239328808.04 CONTENEDORES0.0028908.04.01 CONTENEDORES DE RESIDUOS SOLIDOSund1.00300.00300.000.0000.0000.000210.0090.0063021029008.05 MICRORELLENO SANITARIO0.0000.00029108.05.01 EXCAVACION MANUAL DE TERRENOm32.0038.0276.040.0000.0000.00053.2322.81405329208.05.02 RELLENO COMPACTADO CON MATERIAL PROPIOm32.0053.70107.400.0000.0000.00075.1832.22817529308.05.03 RELLENO COMPACTADO CON MATERIAL IMPERMEABILIZANTEm30.5086.6843.340.0000.0000.00030.3413.00133029408.06 BOTADERO0.0029508.06.01 ACONDICIONAMIENTO DE BOTADEROm35.0043.23216.150.0000.0000.0000.00216.150029608.07 CAPACITACION Y EDUCACION SANITARIA0.0029708.07.01 CAPACITACION Y EDUCACION SANITARIAund1.00633.00633.000.0000.0000.000443.10189.90280544329808.08 VARIOS0.0029908.08.01 PLACA RECORDATORIAund1.00500.00500.000.0000.0000.0000.00500.000030008.08.02 LIMPIEZA FINAL DE OBRAm22,787.661.714,766.900.0000.0000.0000.004,766.9000COSTO DIRECTO9759353275933143590443132748302031525545610689465501309843GASTOS GENERALES 10%975943276331459043133483003152645611894655030984UTILIDAD 10%975943276331459043133483003152645611894655030984SUBTOTAL117112339311397717085337592579620378306547328107358601371811FACTOR DE RELACION1.0896575701.0896575701.089657571.089657571.089657571.089657571.089657571.089657571.089657571.089657571.08965757TOTAL DE PRESUPUESTO127612342835433377720540962631590412224596400116984113405147AVANCE MENSUAL3.36%3.40%6.05%3.21%4.95%0.00%32.30%46.74%9167%934.87%AVANCE ACUMULADO3.36%6.75%12.80%16.01%20.96%20.96%53.26%100.00%9188.12%10122.99%0571.9704009.97653.83081.270-33143113600249.510134.380000000000000000000000000000000000000000000000000000000000000950100128.5190395.469000900409000900909000081900900909081819081810008181818150601000000000000000000000000000000000000000500000000000000000000000000000000000000000000000000000000000

Hoja112/3/142/6/15652/6/155/7/15905/7/156/1/152518012/3/1412/31/142812/3/14112/4/14212/5/14312/6/14412/7/14512/8/14612/9/14712/10/14812/11/14912/12/141012/13/141112/14/141212/15/141312/16/141412/17/141512/18/141612/19/141712/20/141812/21/141912/22/142012/23/142112/24/142212/25/142312/26/142412/27/142512/28/142612/29/142712/30/142812/31/14291/1/15301/2/15311/3/15321/4/15331/5/15341/6/15351/7/15361/8/15371/9/15381/10/15391/11/15401/12/15411/13/15421/14/15431/15/15441/16/15451/17/15461/18/15471/19/15481/20/15491/21/15501/22/15511/23/15521/24/15531/25/15541/26/15551/27/15561/28/15571/29/15581/30/15591/31/15602/1/15612/2/15622/3/15632/4/15642/5/15652/6/1512/7/1522/8/1532/9/1542/10/1552/11/1562/12/1572/13/1582/14/1592/15/15102/16/15112/17/15122/18/15132/19/15142/20/15152/21/15162/22/15172/23/15182/24/15192/25/15202/26/15212/27/15222/28/15233/1/15243/2/15253/3/15263/4/15273/5/15283/6/15293/7/15303/8/15313/9/15323/10/15333/11/15343/12/15353/13/15363/14/15373/15/15383/16/15393/17/15403/18/15413/19/15423/20/15433/21/15443/22/15453/23/15463/24/15473/25/15483/26/15493/27/15503/28/15513/29/15523/30/15533/31/15544/1/15554/2/15564/3/15574/4/15584/5/15594/6/15604/7/15614/8/15624/9/15634/10/15644/11/15654/12/15664/13/15674/14/15684/15/15694/16/15704/17/15714/18/15724/19/15734/20/15744/21/15754/22/15764/23/15774/24/15784/25/15794/26/15804/27/15814/28/15824/29/15834/30/15845/1/15855/2/15865/3/15875/4/15885/5/15895/6/15905/7/15665/8/15675/9/15685/10/15695/11/15705/12/15715/13/15725/14/15735/15/15745/16/15755/17/15765/18/15775/19/15785/20/15795/21/15805/22/15815/23/15825/24/15835/25/15845/26/15855/27/15865/28/15875/29/15885/30/15895/31/15901806/1/15

Hoja2AP1EVENTOINICIOTERMINON DIASLluvia5/8/155/8/151Lluvia5/9/155/9/151Efecto Lluvia5/10/155/10/151Lluvia5/11/155/11/151Lluvia5/12/155/12/151Efecto Lluvia5/13/155/13/151Total6AP2EVENTOINICIOTERMINON DIASLluvia5/15/155/15/151Lluvia5/16/155/16/151Efecto Lluvia5/17/155/17/151Efecto Lluvia5/11/155/11/151Total4