3.2 Cronograma Valorizado Pt02 a Pozo 03

download 3.2 Cronograma Valorizado Pt02 a Pozo 03

of 2

description

cronograga valorizado de elaboracion de un puente

Transcript of 3.2 Cronograma Valorizado Pt02 a Pozo 03

  • PUENTE 02 INGRESO A POZO 03, L=08m.OBRAS PROVISIONALES, TRABAJOS PRELIMINARES

    OBRAS PRELIMINARESALMACEN, OFICINA, CASETA DE GUARDIANIA Y SS. HH. S/. 3,000.00 S/. 3,000.00DESBROCE Y LIMPIEZA S/. 555.31 S/. 555.31MOVILIZACION Y DESMOVILIZACION DE EQUIPO S/. 5,000.00 S/. 5,000.00TRANQUERAS DE MADERA 1.20X1.10M P/DESVIO TRANSITO VEHICULAR S/. 464.00 S/. 464.00

    TRABAJOS PRELIMINARESLIMPIEZA DE TERRENO MANUAL S/. 295.64 S/. 295.64ELIMINACION DE MATERIAL DE DESBROCE D= 5Km. S/. 836.37 S/. 836.37CARTEL DE OBRA (3.60 x 2.40) BANNER INC. MATERIALES S/. 758.61 S/. 758.61MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL PERMANENTE S/. 6,066.67 S/. 1,933.33 S/. 8,000.00FLETE S/. 7,202.40 S/. 7,202.40

    PLAN DE SEGURIDAD Y SALUD DE OBRAIMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO S/. 2,000.00 S/. 2,000.00EQUIPOS DE PROTECCIN INDIVIDUAL S/. 3,000.00 S/. 3,000.00EQUIPOS DE PROTECCIN COLECTIVA S/. 2,000.00 S/. 2,000.00SEALIZACIN TEMPORAL DE SEGURIDAD S/. 2,500.00 S/. 2,500.00CAPACITACIN EN SEGURIDAD Y SALUD S/. 1,500.00 S/. 1,500.00RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO S/. 1,200.00 S/. 1,200.00

    SUB ESTRUCTURAESTRIBOS

    MOVIMIENTO DE TIERRAS EN ESTRIBOTRAZO NIVELACION Y REPLANTEO 3 ETAPAS (EXCAVACIN, RELLENO, AFIRMADO) S/. 2,045.49 S/. 2,045.49CORTE DE TERRENO C/EQUIPO PESADO (Zona Selva Baja) S/. 6,837.88 S/. 6,837.88DESVIO TEMPORAL DE CAUSE DE RIO O QUEBRADA S/. 2,043.59 S/. 2,043.59EXCAVACION PARA ESTRUCTURAS EN LECHO DE RIO S/. 429.66 S/. 429.66RELLENO COMPAC. C/EQUIPO PESADO DE ZANJA C/MATERIAL PROPIO @ 0.30m. S/. 4,117.89 S/. 4,117.89RELLENO COMPAC. C/EQUIPO PESADO DE ZANJA C/MATERIAL PRESTAMO COMPACTADO @ 0.30m. S/. 2,774.90 S/. 2,774.90ELIMINACION DE MATERIAL EXCEDENTE D= 5Km. S/. 9,289.25 S/. 9,289.25

    CONCRETO ARMADOSOLADO DE CONCRETO F'C=100 KG/CM2. E=0.10 M. S/. 3,796.87 S/. 3,796.87CONCRETO EN ESTRIBOS BAJO AGUA F'c= 210 Kg/Cm2 . S/. 17,876.96 S/. 17,876.96CONCRETO EN ESTRIBOS EN CONDICIONES SECAS F'c= 210 Kg/Cm2 . S/. 38,204.52 S/. 38,204.52ENCOFRADO Y DESENCOFRADO ESTRIBOS. S/. 19,360.23 S/. 19,360.23ACERO GRADO 60 Fy=4200 Kg/cm2 S/. 68,944.63 S/. 68,944.63CURADO DE CONCRETO C/ADITIVO S/. 2,280.44 S/. 2,280.44

    MOVIMIENTO DE TIERRAS EN ACCESOSCORTE DE TERRENO C/EQUIPO PESADO S/. 59.60 S/. 59.60ELIMINACION DE MATERIAL EXCEDENTE D= 5Km. S/. 24.15 S/. 24.15CONFORMACION DE TALUD Y/O RELLENO COMP. C/MATERIAL DE PRESTAMO (CBR>10%) C/ EQUIPO PESADO PARA SUB RASANTE S/. 7,367.69 S/. 7,367.69CONFORMACION DE TALUD Y/O RELLENO COMP. C/MATERIAL PROPIO (CBR>10%) C/ EQUIPO PESADO PARA SUB RASANTE S/. 199.62 S/. 199.62AFIRMADO DE 0.20 M. HORMIGON : TIERRA 80%:20% C/EQUIPO PESADO S/. 4,123.20 S/. 4,123.20

    SUPER ESTRUCTURAVIGAS PRINCIPALES Y VIGAS DIAFRAGMA

    CONCRETO ARMADO EN VIGASCONCRETO EN VIGAS F'C= 210 KG/CM2 . S/. 2,488.17 S/. 2,488.17ENCOFRADO Y DESENCOFRADO EN VIGAS ( VIGA PRINCIP. Y DIAFRAGMA) S/. 3,910.51 S/. 3,910.51ACERO GRADO 60 Fy=4200 Kg/cm2 S/. 7,264.58 S/. 7,264.58CURADO DE CONCRETO C/ADITIVO S/. 332.77 S/. 332.77

    Totalmes 1 mes 2 mes 3

    CRONOGRAMA VALORIZADO DE OBRA"EXPEDIENTE TECNICO PARA LA CONSTRUCCION DEL PUENTE 02 INGRESO AL POZO 3, DEL LOTE 31C PLANTA DE GAS - CURIMANA, PROVINCIA DE PADRE ABAD -

    REGION UCAYALI"

    Pgina 1

  • CONCRETO EN LOSA Y VEREDACONCRETO EN LOSA F'C= 210 KG/CM2 . S/. 3,340.08 S/. 3,340.08ENCOFRADO Y DESENCOFRADO EN LOSA DE PUENTE Y VEREDAS S/. 2,881.59 S/. 2,881.59ACERO GRADO 60 Fy=4200 Kg/cm2 S/. 5,770.57 S/. 5,770.57CURADO DE CONCRETO C/ADITIVO S/. 266.54 S/. 266.54

    FALSO PUENTEEXCAVACION PARA ESTRUCTURAS BAJO AGUA S/. 64.14 S/. 64.14CONCRETO CICLOPEO EN FALSO PUENTE FC=140KG/CM2 + 30 % PM. S/. 4,822.31 S/. 4,822.31 TRONCOS DE MADERA, L=1.10 DIAM= 4" S/. 3,220.56 S/. 3,220.56TRONCOS DE MADERA, L=5.64 m, DIAM. >= 20" S/. 3,182.20 S/. 3,182.20TRONCOS DE MADERA, L=2.20 m, DIAM. >= 20" S/. 2,902.20 S/. 2,902.20ENTABLADO DE MADERA 3"x10"x14' S/. 1,784.31 S/. 181.99 S/. 1,966.30

    OBRAS COMPLEMENTARIAS DE PUENTEAPOYO DE NEOPRENO S/. 4,500.28 S/. 4,500.28JUNTA DE DILATACION METALICA S/. 4,426.86 S/. 4,426.86ACABADO DE VEREDA S/. 382.92 S/. 382.92DRENAJE TUBO PVC DE D=3" S/. 215.40 S/. 215.40BARANDA METALICA S/. 5,223.60 S/. 5,223.60

    SEALIZACINSEALIZACION VERTICAL PREVENTIVA S/. 1,604.30 S/. 1,604.30SEALIZACION VERTICAL INFORMATIVA S/. 619.30 S/. 619.30

    PLAN DE MANEJO AMBIENTALPROGRAMA DE PREVENCION O MITIGACION

    PROGRAMA DE RIESGO PERMANENTE EN OBRAPLAN DE CONTINGENCIAS S/. 1,000.00 S/. 1,000.00SEALIZACION DE SEGURIDAD S/. 400.00 S/. 400.00

    PROGRAMA DE MONITOREOMITIGACION DE RUIDOS S/. 2,000.00 S/. 2,000.00CALIDAD DEL AGUA S/. 1,500.00 S/. 1,500.00CALIDAD DE AIRE (GASES, MATERIAL PARTICULADO) S/. 1,500.00 S/. 1,500.00

    PROGRAMA DE MANEJO DE RESIDUOS SOLIDOSIMPLEMENTACION DE UN PROGRAMA DE MANEJO DE RR.SS (ESCOMBROS, MATERIALES REUTIZABLES, MATERIAL RECICLABLE, ETC) S/. 2,000.00 S/. 2,000.00TACHOS DE BASURA S/. 80.00 S/. 80.00

    PROGRAMA DE ABANDONORECUPERACION DE AREAS UTILIZADAS S/. 1,200.00 S/. 1,200.00

    VARIOSLIMPIEZA DE TERRENO C/EQUIPO PESADO S/. 1,630.00 S/. 1,630.00FIN DE OBRA

    Total S/. 222,654.99 S/. 76,129.09 S/. 298,784.08

    Totalmes 1 mes 2 mes 3

    CRONOGRAMA VALORIZADO DE OBRA"EXPEDIENTE TECNICO PARA LA CONSTRUCCION DEL PUENTE 02 INGRESO AL POZO 3, DEL LOTE 31C PLANTA DE GAS - CURIMANA, PROVINCIA DE PADRE ABAD -

    REGION UCAYALI"

    Pgina 2