    23/10/2007 500 kV Cable Shibo Shanghai 1

    Shibo 500 kV cable Project Shanghai China

    D. Dubois

    Fall 2007 PES-ICC Meeting

    Scottsdale, AZ, November 4-7, 2007

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    2/9

    23/10/2007 500 kV Cable Shibo Shanghai 2

    500 kV Shibo Project in Shanghai

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    3/9

    23/10/2007 500 kV Cable Shibo Shanghai 3

    Brief description of the Project

    Project Owner : Shanghai Municipality Electric Power Co.

    Installation of a new 500 kV circuit in a tunnel

    Tender date : 2006, August 31st

    Contract coming into force: 2006, November 28th

    Contract period:

    Supply: 24 months

    Installation: 18 months

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    4/9

    23/10/2007 500 kV Cable Shibo Shanghai 4

    Scope of the Project

    2500 mm copper XLPE 500 kV cablewith smooth aluminium sheath and fireretardant jacket.

    One circuit (17km long) in a tunnel

    Total cable length : 51 km (81 drums)

    78 joints

    6 GIS terminations

    Cable system design, type test Supply of cable and accessories

    Design of cable clamp and cablemetallic support

    Supervision of cable laying Training of customers fitters.

    Technical support, supervision andinstruction for mounting ofaccessories.

    500 kV circuits

    500 kV joints

    220 kV circuits

    3.5 m138 inches

    220 kV joints

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    5/9

    23/10/2007 500 kV Cable Shibo Shanghai 5

    Schematic diagram

    635 m (2083 ft)

    Major section: 1905 m (6250 ft)

    9 Major Sections: 17.2 km (10.7 miles)

    Earthing cabinetwith SVL's

    GISsealing

    ends

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    6/9

    23/10/2007 500 kV Cable Shibo Shanghai 6

    Cable design

    Current carrying capacity: 1800 A

    Max ambient temp. 40C

    Short-circuit current:63 kA for 2 sec.

    BIL: 1550 kVbut test level is 1675 kV

    2500 mm (5000 kcmil) CopperMilliken, 6 segments

    30.4 mm (1197 mils) XLPEinsulation

    Smooth Aluminum Sheaththickness 2.2 mm (87 mils)

    HFFR (Halogen Free FireRetardant) outer jacket.Thickness 5.5 mm (217 mils)

    Outer diameter: 152 mm (5 in.)

    Weight: 39.6 kg/m (26.6 lb/ft)

    ConductorMilliken, 6 segments

    InsulationDry curing XLPE

    Smooth Aluminiumlaminated Sheath

    HFFR sheath

    Extruded SC skin

    Insulation screen

    Conductor screen

    Semi-conductingWater-swelling Tapewith EmbeddedCopper Wires

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    7/9

    23/10/2007 500 kV Cable Shibo Shanghai 7

    Cable reels

    Steel drum with a metalliclagging

    Outer diameter is limitedto 4.3 m (14.1 ft)

    New handling equipmentfor wide reels.

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    8/9

    23/10/2007 500 kV Cable Shibo Shanghai 8

    Accessories

    Cross-bonding Joint

    Heavy Outer Protection design

    With integrated PD sensor

    PD Sensor

    HDPE protection Copper shieldFilling jelly

    PD connectioncabinet

    EPDMpremoulded body

    Metallic screeninterruption

    Coaxial bonding lead

    GIS Sealing End

    Oil filled with a pressuremonitoring system

    Bondinglead

    High voltageconnection

    EPDM stressrelief cone

    Expansion tank

    Oil filledGIS sealing end

  • 8/7/2019 6.trans.Presentation_500kV_Shibo_3

    9/9

    23/10/2007 500 kV Cable Shibo Shanghai 9

    Type Tests Program

    Electrical type tests are based on IEC 62067

    Lightning impulse test: 1675 kV, Switching impulse: 1300 kV

    The Cable Jacket must comply with IEC 60332-3 category A.

    A special compound has been developed by Nexans to complywith the fire requirements and the physic & chemical requirements.