ACUEDUCTOS COMPUTOS
-
Author
ibaldo-puente -
Category
Documents
-
view
229 -
download
1
Embed Size (px)
Transcript of ACUEDUCTOS COMPUTOS
-
7/30/2019 ACUEDUCTOS COMPUTOS
1/82
AO: 2012
NPART NCODIGO Y DESCRIPCIN
EXCAVACION A MANO EN TERRENO PEDREGOSO O CANTO
OBRA: "CONSTRUCCION DE URBANISMO PARA EL SECTOR L
UBICACIN: SECTOR LA MORUSCA, MUNICIPIO GARCIA DE
GRUPO
3
CAVAJAL ZULIMAR C.I.V-19.506.723PUENTE IBALDO C.I.V-18.207.983
PATIO ALBA C.I.V-15.639.475
ZAMBRANO AZAELIZ C.I.V- 19.036.111
CONTRERAS MARYURY C.I.V- 19.035.108
1
H-016.400.00NIVELACION Y REPLANTEO
H-012.340.100LIMPIEZA DE TERRENO, APERTURA DE PICAS Y DESMONTES
2
H-021.130.SNO
RODADO
-
7/30/2019 ACUEDUCTOS COMPUTOS
2/82
H-022.230.201
CON MATERIAL SELECIONADO DE LA EXCAVACION
3
RELLENO EN ZANJA COMPACTADO CON EQUIPO ADECUADO A MAQUINA
-
7/30/2019 ACUEDUCTOS COMPUTOS
3/82
CON MATERIAL DE PRESTAMORELLENO EN ZANJA COMPACTADO CON EQUIPO ADECUADO A MAQUINA
H-022.230.202.1
5
4
-
7/30/2019 ACUEDUCTOS COMPUTOS
4/82
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6
H-022.260.108SUMINISTRO Y COLOCACION DE ARENA EN APOYOTIPO B,NO INCLUYE TRANSPORTE
H-023.000.200ACOPIO,CARGA,ACARREO Y BOTE A MAQUINA DE MATERIALSOBRANTE DE RELLENO
7
-
7/30/2019 ACUEDUCTOS COMPUTOS
5/82
de 6 a 12 TF.POR MAQUINA, SE PAGARA SOLO UN VIAJE DE IDA YUNO DE REGRESO POR MAQUINA Y NO SE RECONOCERACUANDO UNA MAQUINA SE SUSTITUYE POR OTRA.
H-111.340.SN02
H-181.310.405SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE ABJUNTA AUTOMATICA DE 50mm (2) INCLUYE ANILLLOS DEGOMA Y TRANSPORTE A LA OBRA.
TRANSPORTE EN DISTANCIA COMPRENDIDA ENTRE 10 Y 40KM ,PARA MAQUINARIA PESADA, MOVIMIENTO DE TIERRABASES,ASFALTO, PREP.DEL SITIO, DRENAJES, CON PESO
8
-
7/30/2019 ACUEDUCTOS COMPUTOS
6/82
1.00
1.00
9
-
7/30/2019 ACUEDUCTOS COMPUTOS
7/82
1.00
56.00
1.00
1.00
1.00
1.00
1.00
H- 181.310. 406SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE ABJUNTA AUTOMATIACA DE 75 mm (3) INCLUYE ANILLLOS DEGOMA .
-
7/30/2019 ACUEDUCTOS COMPUTOS
8/82
1.00
1.00
1.00
10
-
7/30/2019 ACUEDUCTOS COMPUTOS
9/82
1.00
1.00
1.00
1.00
1.00
1.00
672.00
H-181.320.304SUMINISTRO,TRANSPORTE Y COLOCACION DE TUBERIA SCHEDULLE80 DIM= 3/4"
H-181.310.411SUMINISTRO Y COLOCACION DE TUBERIA PVC CLASE AB, JUNTA
AUTOMATICA 160 mm (6). INCLUYE ANILLOS DE GOMA.
13
11
12
H-181.320.304.1SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA SCHEDULLE80 DIM= 1"
-
7/30/2019 ACUEDUCTOS COMPUTOS
10/82
1.00
1.00
1.00
1.00
H-181.320.301SUMINISTRO TRANSPORTE Y COLOCACION DE TUBERIA
SCHEDULLE DE 80 DIM = A 1/2"
-
7/30/2019 ACUEDUCTOS COMPUTOS
11/82
1.00
1.00
1.00
1.00
1.00
14
-
7/30/2019 ACUEDUCTOS COMPUTOS
12/82
1.00
1.00
1.00
1.00
18
19
21
H-181.610.405SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 DE = 50 mmJP*JP
H-181.610.505
20
15
H-181.330.110SUMINISTRO, TRANSPORTE Y COLOCACION DE TUBERIA DE HG ASTMDE DIM=6"
17
H-181.610.406SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 D: 75 mmJP*JP .
H-181.610.411.SUMINISTRO Y COLOCACION DE CODOS PVC DE 90 D: 160 mmJP*JP .
H.181.740.402SUMINSTRO,TRANSPORTE Y COLOCACION DE BASE COMPLETA PARAMEDIDOR Y CAJA TRONCO-CONICA, INCLUYE MORTERO DE FIJACION YCONEXIONES DE ACUERDO A NORMAS INOS.
SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,NO REDUCIDA JP* DE 50* 50 mm
-
7/30/2019 ACUEDUCTOS COMPUTOS
13/82
H- 181.611. 300.6SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERAPVC DE 75 mm DERIVACION A 1/2 "3/4" , 1"H-181.611.300.8SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERAPVC DE 110 mm DERIVACION A 1/2 "3/4" , 1"H-181.611.506SUMINISTRO Y COLOCACION DE TAPONES HEMBRAS DE PVC JPDE 75 mmH- 181.611.508SUMINISTRO Y COLOCACION DE TAPONES HEMBRAS DE PVC JPDE 110 mm
H-181.611.806
SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JPDE 75*50 mm
H- 181 .611.810.1SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JPDE 75*63 mm
H-181.611.908.1SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JPDE 110*75 mm
H- 181.612.011.1SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JPDE 160*110 mm
H-181.612.112.1SUMINISTRO Y COLOCACION DE REDUCCIONES DE PVC ABE*JPDE 200*160 mm
H-181.613.805SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADADIM = 2"
H-181.613.807SUNINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADADIM = 3"
H-181.613.807SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADADIM = 4"
H- 181. 613.810SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADADIM = 6"
H- 181.613.812SUMINISTRO Y TRANSPORTE Y COLOCACION BRIDA ROSCADADIM = 8"
H- 181.620.401SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90
SCHEDULLE 80 DIM = 1/2"
H-181.620.404
SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,NO REDUCIDA JP* DE 160*160mmH-181.611.300.5SUMINISTRO TRANSPORTE Y COLOCACION DE ABRAZADERAPVC DE 50 mm DERIVACION A 1/2 "3/4" , 1"
SUMINISTRO Y COLOCACION DE TEE DE PVC PARA AB,NO REDUCIDA JP* DE 75*7 5 mmH- 181.610. 511
-
7/30/2019 ACUEDUCTOS COMPUTOS
14/82
SCHEDULLE 80 DIM = 3/4"
H-181.620.404.1SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90SCHEDULLE 80 DIM = 1"
H- 181.620.504SUMINISTRO Y TRANSPORTE Y COLOCACION CODO DE 90
SCHEDULLE 80 DIM = 3/4
H-181.620.504.1SUMINISTRO Y TRANSPORTE Y COLOCACION DE TEE NOREDUCIDA SCHEDULLE 80 DIM = 3/4
H- 181.621.304.1SUMINISTRO Y TRANSPORTE Y COLOCACION DE TEE NOREDUCIDA SCHEDULLE 80 DIM = 1"
-
7/30/2019 ACUEDUCTOS COMPUTOS
15/82
LARGO ANCHO ALT/ESP MTS M M Kg/ml
768.39
445.06
692.00
241.14
2146.59
2146.59
768.39
445.06
692.00
1905.45 0.60 0.89 1017.51
29.8629.8429.7829.9324.7721.7721.68
187.63
187.63 0.60 0.70 78.80
MORUSCA, MUNICIPIO GARCIA DE HEVIA, ESTADO TACHIRA".
EVIA, ESTADO TAHIRA.
-
7/30/2019 ACUEDUCTOS COMPUTOS
16/82
2.98 0.20 0.40 0.24
5.65 0.20 0.40 0.45
2.98 0.20 0.40 0.24
6.07 0.60 0.70 2.55
6.08 0.60 0.70 2.55
8.09 0.20 0.40 0.65
2.93 0.20 0.40 0.23
8.09 0.20 0.40 0.65
2.98 0.20 0.40 0.24
6.07 0.60 0.70 2.55246.64
1109.64
1109.64
33.67
0.97
-
7/30/2019 ACUEDUCTOS COMPUTOS
17/82
0.05
0.01
0.003
0.0003
210.95
863.99
194.98
14.14
1.44
0.21
-
7/30/2019 ACUEDUCTOS COMPUTOS
18/82
0.15
0.03
210.95
1905.45 0.60 0.10 114.33
187.63 0.60 0.10 11.26
7.09 0.60 0.10 0.43
2.98 0.20 0.10 0.06
5.65 0.20 0.10 0.11
2.98 0.20 0.10 0.06
6.07 0.60 0.10 0.36
6.08 0.60 0.10 0.36
8.09 0.20 0.10 0.16
2.93 0.20 0.10 0.06
8.09 0.20 0.10 0.16
2.98 0.20 0.10 0.06
6.07 0.60 0.10 0.36
127.77
-
7/30/2019 ACUEDUCTOS COMPUTOS
19/82
4.564.609.962.420.831.61
0.741.250.311.91
15.341.170.551.170.551.700.831.42
11.250.61
0.140.480.74
10.800.820.680.820.860.680.820.491.980.202.77
17.202.316.710.713.590.851.210.831.080.830.871.001.38
2.414.882.48
25 49
-
7/30/2019 ACUEDUCTOS COMPUTOS
20/82
0.780.940.871.430.790.560.98
0.871.160.780.571.003.191.944.793.293.498.09
35.52 35.52
5.01
3.741.272.415.562.973.131.570.812.99
13.807.240.540.520.380.490.480.500.380.360.380.160.591.000.780.714.451.03
7.2470.49 70.49
26.7117.422.690.334.92
29.4122.620.583.000.82
0.910.205.34
-
7/30/2019 ACUEDUCTOS COMPUTOS
21/82
6.4230.809.990.430.430.430.730.88
0.881.150.790.840.850.870.871.150.780.851.004.383.49
19.10
231.73 231.73
58.55 3278.803775.43
85.6785.5085.1885.51
341.86 341.86
85.1885.5185.4885.50
341.67 341.67
85.1885.5185.4885.50
341.67 341.67
85.1885.5185.4885.50
341.67 341.67
85.2285.5185.5285.50
341.75 341.75
85.2285.5185.52
-
7/30/2019 ACUEDUCTOS COMPUTOS
22/82
341.75 341.75
85.2285.5185.5285.50
341.75 341.75
29.8629.8429.7829.9324.7721.7721.68
187.63 187.63
1.030.470.19
0.850.951.17
17.322.242.42
32.7647.9223.081.091.100.700.390.253.010.970.970.522.360.860.290.320.411.011.190.643.08
48.320.640.980.790.840.870.830.630.910.830.880.860.821.00
0.794.269.18
-
7/30/2019 ACUEDUCTOS COMPUTOS
23/82
11.673.719.738.04
23.100.560.291.86
1.330.131.052.120.771.107.66
337.44 337.44
2917.19
768.39
445.06
692.001905.45
21.42 21.42
17.43 17.4338.85
21.58 21.58
21.96 21.96
23.01 23.01
0.520.520.610.250.710.630.110.340.370.630.450.910.71
6.76 4542.724609.27
-
7/30/2019 ACUEDUCTOS COMPUTOS
24/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
25/82
0.170.130.150.170.170.170.170.35
0.320.320.120.110.117.70 7.70
0.350.440.79 0.79
0.780.680.75
0.662.87 2.87
0.590.400.400.140.140.130.080.090.270.110.130.350.280.160.280.330.280.160.350.170.140.070.100.32
0.390.390.390.320.327.28 7.28
0.170.100.27 0.27
0.310.280.35
0.310.330.36
-
7/30/2019 ACUEDUCTOS COMPUTOS
26/82
0.290.170.160.130.150.130.150.14
0.140.120.120.120.260.254.55 4.55
0.120.100.100.100.100.12
0.64 0.64
0.950.950.950.950.351.850.351.858.20 8.20
40.40
0.10 0.10
-
7/30/2019 ACUEDUCTOS COMPUTOS
27/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
28/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
29/82
kg/m Kg kg km Ton Ton*km m*km"COMPUTOS METRICOS"
-
7/30/2019 ACUEDUCTOS COMPUTOS
30/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
31/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
32/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
33/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
34/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
35/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
36/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
37/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
38/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
39/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
40/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
41/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
42/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
43/82
PZA UND JGO
Tuberia secundaria= edificio+centroescuela-pre escolar+liceo+mercal+cTuberia secundaria= (182,13+7,09+
APERTURAS DE PICAS Y DESMO
NIVELACION Y REPLANTEO= DAT
excav tub de manz=long total *anchexcav tub de manzana= 187,63m*0,
EXC
long tub principal C= calle princ+ callong tub principal C= ( 87,83+216,47long total de tub principal= (768,38+excavacion= 1905,45m*0.60m*0.89
excavacion= largo*ancho*profexcavacion total = excv tub princ + e
long. De tub.= manzanas(1, 2, 3, 4,long.de tub. Manzana 1= ( 7,71m+ 4long. De tub. Manzana 2=( 7,71m+
long tub del centro comercial= 7,09excav de tub C.C= long*ancho*prof
long total de la tub prin= tub princ Along tub principal A= calle princ + calong tub principal A= (122,42+ 93,01long tub principal B= calle princ+ calong tub principal B= (203,15+ 18,3
long. De tub. Manzana 3=( 7,72m+long. De tub. Manzana 4=(7,74m+ 4,long. De tub. Manzana 5=(7,66m+ 4,long. De tub. Manzana 6=(4,69m+ 4,long. De tub. Manzana 7=(4,70m+ 4,long total de tub manzana= 187,63
APERTURA DE PICAS Y DESMON
Tuberia principal A= Calle princ+carTuberia principal A= (122,42+ 93,01
Tuberia principal B= calle princ+ caTuberiaprincipal B= (203,15+ 18,31Tuberia principal C= calle princ+ callTuberia principal C= ( 87,83+216,4
TU
-
7/30/2019 ACUEDUCTOS COMPUTOS
44/82
long tub del simoncito= 5,65mexcav de tub = long*ancho*profexcav tub del simoncito= 5,65m*0,2
excav de tub= long*ancho*prof
excav de tub= long*ancho*profexcav tub del area deportv= 2,93m,*
excav tub del casa comunal= 8,09m
long tub de la capilla= 2,98mexcav de tub= long*ancho*prof
long tub de la casa cultural= 2,98mexcav de tub = long*ancho*profexcav tub de casa cultural= 2,98m*0
COMPACTACION= Volumen de la
DESALOJO TUBERIA 6"= /4*
6"------------->X
Diametro= 6"*25,54mm /1" = 153,2long tuberia= dato de la partida 3= 1
excav tub del liceo= 6,08m*0,60m*0
RELLETOTAL DE EXCAVACION= EXCAV
excav tub de mercal= 8,09m*0,20m
long tub area deportiva= 2,93m
long tub del modulo policial= 2,98m
excav tub del modulo policial= 2,98
long tub de escuela-preescolar = 6,excav de tub = long*ancho*profexcav tub de escuela-preescolar= 6,
long tub del liceo = 6,08Mexcav de tub = long*ancho*prof
excav de tub= long*ancho*prof
long tub de mercal = 8,09M
excav de tub = long*ancho*prof
excav tub de la capilla= 2,98m*0,20
long tub del centro medico asistenciexcav de tub= long*ancho*profexcav tub del centro medico= 6,07mlong total de la tuberia secundaria=
long tub del casa comunal= 8,09m
Diametro ( m)= 1"----------->25
2"------------->XDiametro= 2"*25,54mm /1" = 51,08long tuberia= dato de la partida 3= 7
Diametro ( m)= 1"----------->25
EXCAVACION TOTAL= 1109,64m3
DESALOJO TUBERIA (6)"= /4*(0
DESALOJO TUBERIA 3"= /4*Diametro ( m)= 1"----------->25
3"------------->XDiametro= 3"*25,54mm /1" = 76,62long tuberia= dato de la partida 3= 6DESALOJO TUBERIA 3"= /4*(0,0
CENTRO COMERCIA
DESALOJO TUBERIA 2"= /4*
-
7/30/2019 ACUEDUCTOS COMPUTOS
45/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
46/82
altura del tub= 0,02+0,05m=0,08mvolumen tuberia= dato de la partidaVOLUMEN DE RELLENO DE PRES
ALTURA DE RELLENO= (altura de taltura del tub= diametro+0,05m
CENTRO COMERCIALESlong tuberia=( dato proveniente de lcolchon de arena= 7,09m*0,60m*0,1
ESCUELA- PREESCOLARlong tuberia=( dato proveniente de lcolchon de arena= 6,07m*0,60m*0,1LICEOlong tuberia=( dato proveniente de l
long tuberia=( dato proveniente de l
long tuberia=( dato proveniente de l
TOTAL DE COLCHON DE ARENA=
COLCHO DE ARENA= long tuberia*Tuberia Principal
long tuberia=( dato proveniente de l
MODULO POLICIAL
colchon de arena= 1905,45m*0,60m
Tuberia secundaria
long tuberia=( dato proveniente de lcolchon de arena= 187,63m*0,60m*
diametro= dato de la partida 4= 0,01
altura del tub= 0,013+0,05m=0,06mvolumen tuberia= dato de la partidaVOLUMEN DE RELLENO DE PRES
colchon de arena= 5,65m*0,20m*0,1
EDIFICIO
colchon de arena= 2,98m*0,20m*0,1
colchon de arena= 8,09m*0,20m*0,1AREA DEPORTIVA
colchon de arena= 2,93m*0,20m*0,1CASA COMUNAL
colchon de arena= 8,09m*0,20m*0,1CAPILLA
colchon de arena= 2,98m*0,20m*0,1CENTRO MEDICO ASISTENCIAL
colchon de arena= 6,07m*0,60m*0,1
long tuberia=( dato proveniente de l
long tuberia=( dato proveniente de l
long tuberia=( dato proveniente de l
TOTAL DE RELLENO DE PRESTA
colchon de arena= 6,08m*0,60m*0,1MERCALlong tuberia=( dato proveniente de l
CASA CULTURALlong tuberia=( dato proveniente de lcolchon de arena= 2,98m*0,20m*0,1SIMONCITOlong tuberia=( dato proveniente de l
-
7/30/2019 ACUEDUCTOS COMPUTOS
47/82
TRAMO 11= 15,34mTRAMO 12=1,17mTRAMO 13= 0,55mTRAMO 14= 1,17mTRAMO 15= 0,55mTRAMO 16= 1,70mTRAMO 17= 0,83m
TRAMO 35=17,20mTRAMO 36=2,31mTRAMO 37=6,71m
TRAMO 38=0,71mTRAMO 39=3,59mTRAMO 40=0,85mTRAMO 41=1,21mTRAMO 42=0,83mTRAMO 43= 1,08mTRAMO 44=0,83mTRAMO 45= 0,87mTRAMO 46=1,00mTRAMO 47=138m
TRAMO 48=2,41m
TRAMO 18= 1,42mTRAMO 19= 11,25mTRAMO 20= 0,61m
TRAMO 21= 0,14mTRAMO 22= 0,48mTRAMO 23= 0,74mTRAMO 24=10,80mTRAMO 25=0,82mTRAMO 26= 0,68m
TRAMO 1= 4,56m=
TRAMO 2= 4,60m=TRAMO 3= 9,96mTRAMO 4= 2,42mTRAMO 5= 0,83mTRAMO 6= 1,61m
TRAMO 7= 0,74mTRAMO 8= 1,25mTRAMO 9= 0,31mTRAMO 10= 1,91m
Tuberia Pvc 2"= long tuberiaCENTRO MEDICO ASISTENCIAL=
TRAMO 34=2,77m
TRAMO 49=4,88mTRAMO 50= 2,48mTRAMO 51= 25 49m
TRAMO 27= 0,82mTRAMO 28=0,86mTRAMO 29= 0,68mTRAMO 30=0,82mTRAMO 31=0,49mTRAMO 32=1,98mTRAMO 33=0,20m
-
7/30/2019 ACUEDUCTOS COMPUTOS
48/82
TRAMO 3= 2,69mTRAMO 4= 0,33mTRAMO 5= 4,92mTRAMO 6= 29,41mTRAMO 7= 22,62mTRAMO 8= 0,58mTRAMO 9= 3,00mTRAMO 10=0,82m
TRAMO 11= 0,91mTRAMO 12=0,20mTRAMO 13= 5,34m
TRAMO 1= 26,71mTRAMO 2= 17,42m
TRAMO 6= 2,97m=TRAMO 7= 3,13m=TRAMO 8= 1,57mTRAMO 9= 0,81mTRAMO 10= 2,99mTRAMO 11= 13,80mTRAMO 12=7,24m=TRAMO 13= 0,54m=TRAMO 14=0,52m=TRAMO 15= 0,38m=TRAMO 16= 0,49m=TRAMO 17= 0,48m=TRAMO 18= 0,50m=TRAMO 19= 0,38m=TRAMO 20= 0,36m=TRAMO 21= 0,38m=TRAMO 22= 0,16m=
TRAMO 8= 0,87TRAMO 9= 1,16mTRAMO 10= 0,78mTRAMO 11= 0,57mTRAMO 12=1,00mTRAMO 13= 3,19mTRAMO 14= 1,94mTRAMO 15= 4,79m
TRAMO 23= 0,59m=TRAMO 24=1,00mTRAMO 25=0,78m=TRAMO 26=0,71m=TRAMO 27=4,45mTRAMO 28=1,03m
TRAMO 29=7,24m
TRAMO 1=5,01m=
TRAMO 2= 3,74m=TRAMO 3= 1,27m=TRAMO 4= 2,41m=TRAMO 5= 5,56m=
SIMONCITO= suma de los tramos
Tuberia Pvc 2"= 35,52mCENTRO COMERCIAL= suma de lo
Tuberia Pvc 2"= 70,49m
TRAMO 1= 0,78m=TRAMO 2= 0,94mTRAMO 3= 0,87mTRAMO 4= 1,43mTRAMO 5= 0,79mTRAMO 6= 0,56mTRAMO 7= 0,98m
ESCUELA PREESCOLARTuberia Pvc 2"= suma de los tram
TRAMO 16= 3,29mTRAMO 17= 3,49mTRAMO 18= 8,09m
-
7/30/2019 ACUEDUCTOS COMPUTOS
49/82
long de bajantes= (10,8m+4,7m+7,
TRAMO 36=19,10m
Tuberia Pvc 2"= 231,73m
TRAMO 15= 6,42mTRAMO 16= 30,8mTRAMO 17= 9,99mTRAMO 18= 0,43mTRAMO 19= 0,43mTRAMO 20= 0,43mTRAMO 21= 0,73mTRAMO 22= 0,88m
TRAMO 23= 0,88mTRAMO 24=1,15m
TRAMO 31=0,78mTRAMO 32=0,85mTRAMO 33=1,00mTRAMO 34=4,38m
TRAMO 28=0,87mTRAMO 29= 0,87mTRAMO 30=1,15m
TRAMO 35=3,49m
TRAMO 25=0,79mTRAMO 26= 0,84mTRAMO 27= 0,85m
Tuberia Pvc 2"= N Bloques*long
TUBERIA DE DISTRIBUCION DELTuberia PVC 3"= N Manzana* longMANZANA 4
long tub. Edificio 08 (4,94m+10,80mlong tub. Edificio 07 (4,94m+10,80mlong tub. Edificio 06 (4,94m+10,80mlong tub. Edificio 05 (4,94m+10,80m
MANZANA 1
long tub. Edificio 14 (4,94m+10,80m
long tub. Edificio 09 (4,94m+10,80m
MANZANA 2
long tub. Edificio 10 (4,94m+10,80m
BAJANTES POR BLOQUE = 3 BAJ
TUBERIA PVC 2"= 158,89m+35,52
MANZANA 7
long tub. Edificio 25 (4,94m+10,80mTuberia PVC 3"= 1* 341,75m= 341,
MANZANA 6
long tub. Edificio 13 (4,94m+10,80mlong tub. Edificio 16 (4,94m+10,80mlong tub. Edificio 15 (4,94m+10,80m
MANZANA 3long tub. Edificio 12 (4,94m+10,80mlong tub. Edificio 11 (4,94m+10,80m
Tuberia PVC 3"= 1* 341,86m= 341,
Tuberia PVC 3"= 1* 341,67m= 341,
Tuberia PVC 3"= 1* 341,67m= 341,
long tub. Edificio 24 (4,94m+10,80mlong tub. Edificio 23 (4,94m+10,80mlong tub. Edificio 22 (4,94m+10,80m
long tub. Edificio 28 (4,94m+10,80mlong tub. Edificio 27 (4,94m+10,80mlong tub. Edificio 26 (4,94m+10,80m
long tub. Edificio 01 (4,94m+10,80m
long tub. Edificio 04 (4,94m+10,80mlong tub. Edificio 03 (4,94m+10,80mlong tub. Edificio 02 (4,94m+10,80m
Tuberia PVC 3"= 1* 341,67m= 341,
-
7/30/2019 ACUEDUCTOS COMPUTOS
50/82
TRAMO 45= 0,79m
TRAMO 43= 0,82mTRAMO 44=1,00m
TRAMO 46=4,26mTRAMO 47=9,18m
long tub. Edificio 19 (4,94m+10,80m
LICEO
long tub. Edificio 16 (4,94m+10,80mTuberia PVC 3"= 1* 341,75m= 341,
Tuberia PVC 3"= 1* 341,75m= 341,
MANZANA 5long tub. Edificio 20 (4,94m+10,80m
TRAMO 34=0,79mTRAMO 35=0,84mTRAMO 36=0,87mTRAMO 37=0,83mTRAMO 38=0,63mTRAMO 39=0,91mTRAMO 40=0,83m
TRAMO 25=0,32mTRAMO 26= 0,41mTRAMO 27= 1,01m
TRAMO 10= 32,76m
TRAMO 5= 0,95mTRAMO 6= 1,17m
long tub. Edificio 18 (4,94m+10,80m
TUBERIA PRINCIPAL DEL TANQU
long. De tub.= manzanas(1, 2, 3, 4,long.de tub. Manzana 1= ( 7,71m+ 4long. De tub. Manzana 2=( 7,71m+long. De tub. Manzana 3=( 7,72m+long. De tub. Manzana 4=(7,74m+ 4,long. De tub. Manzana 5=(7,66m+ 4,long. De tub. Manzana 6=(4,69m+ 4,long. De tub. Manzana 7=(4,70m+ 4,long total de tub manzana= 187,63
Long tuberia PVC= SUMA DE CADTRAMO 1=1,03mTRAMO 2= (0,27+0,20)= 0,47mTRAMO 3= 0,19m
TRAMO 4= 0,85m
TRAMO 11= 47,92
TRAMO 22= 2,36mTRAMO 23=0,86mTRAMO 24=0,29m
TRAMO 7= 17,32mTRAMO 8= 2,24mTRAMO 9= 2,42m
TRAMO 12=23,08TRAMO 13= 1,09mTRAMO 14= 1,10mTRAMO 15= 0,70 m
TRAMO 28=1,19mTRAMO 29= 0,64mTRAMO 30=3,08m
TRAMO 31=48,32m
TRAMO 42=0,86m
TRAMO 32=0,64mTRAMO 33=0,98m
TRAMO 16= 0,39 mTRAMO 17= 0,25 mTRAMO 18= 3,01 mTRAMO 19= 0,97mTRAMO 20= 0,97mTRAMO 21= 0,52m
TRAMO 41=0,88m
-
7/30/2019 ACUEDUCTOS COMPUTOS
51/82
TOTAL DE TUBERIA DE 3"= 291
APARTAMENTO= 672 APARTAMETUBERIA SCHEDULLE 1" (SE
Tramo3= 0,61mTramo4= 0,25mTramo5= 0,71mTramo6= 0,63mTramo7= 0,11mTramo8= 0,34mTramo9= 037,mTramo10= 0,63m
CASA CULTURAL=tramo1+tramo2CASA CULTURAL=0,90m+0,69m+0
APARTAMENTO= NUMERO DE ATramo1= 0,52mTramo2= 0,52m
TRAMO 53=23,1mTRAMO 54=0,56mTRAMO 55=0,29m
TRAMO 57=1,33mTRAMO 58=0,13m
TRAMO 49=11,67mTRAMO 50= 3,71mTRAMO 51= 9,73m
TRAMO 56=1,86m
TRAMO 59=1,05mTRAMO 60=2,12m
TUBERIA 3/4"= SUMATORIA DE
MERCAL= 0,90m+9,77m+10,75m=CAPILLA= Tramo1+Tramo 2+TramCAPILLA=0,88m+1,05m+0,89m+2,5
TRAMO 52=8,04m
TUBERIA PRINCIPAL A
Long tuberia (A)= dato provenienteTUBERIA PRINCIPAL BLong tuberia (B)= dato provenienteTUBERIA PRINCIPAL CLong tuberia (C)= dato provenienteTUBERIA PVC 6"=1905,45m
Tramo11= 0,45mTramo12= 0,91m
TUBERIA 3/4"= 38,85m
MERCAL= Tramo1+Tramo2+Tramo
Tramo13= 0,71m
TUBERIA 1"= SUMATORIA DE
TRAMO 61=0,77mTRAMO 62=1,10mTRAMO 63=7,66m
CASA COMUNAL= Tramo1+TramoCASA COMUNAL= 0,88m+1,05m+0MODULO POLICIAL= Tramo1+Tra
MODULO POLICIAL=(0,72m+0,68Tramo10+Tramo11+Tramo12
4,55m=21,46m
-
7/30/2019 ACUEDUCTOS COMPUTOS
52/82
TRAMO 1=0,13m
TRAMO11=0,15mTRAMO14=0,72m
TRAMO10=0,15m
TRAMO 3= 0,13mTRAMO 8=0,31mTRAMO 10= 0,13mTRAMO 18= 0,12mTRAMO 19= 0,12mTRAMO 20= 0,12mTRAMO 21= 0,12mTRAMO 22=0,17 mTRAMO 23= 0,17mTRAMO 25= 0,15mTRAMO 27=0,11mTRAMO 28=0,11mTRAMO 29= 0,11mTRAMO 31= 0,15 mTRAMO 32= 0,15mTUBERIA SCHEDULLE DE 1/2"=
TRAMO9=0,18m
TRAMO 1= 0,12mTRAMO2=0,12mTRAMO3=0,17mTRAMO4=0,17mTRAMO5=0,15mTRAMO6=0,15mTRAMO7=0,12mTRAMO8=0,17m
ESCUELA PREESCOLAR
TUBERI
TRAMO 32=0,15mTRAMO 33=0,15mTRAMO 34=0,12m
TRAMO 35=0,11mTRAMO 36=0,17m
SIMONCITO=
CASA CULTURAL
TRAMO1 =0,08mTRAMO 2=0,17mTRAMO 3=0,17m
TRAMO 6= 0,12mTRAMO 8=0,83mTRAMO 9=0,83m
TRAMO 13=0,11mTRAMO 14=0,11mTRAMO 15=0,11mTRAMO 19=0,45mTRAMO 20=0,45mTRAMO 21=0,45m
TRAMO 28=0,11mTRAMO 29=0,10m
TRAMO37=0,17m
TUBERIA SCHEDULLE DE 1/2"=
TRAMO 4=0,08mTUBERIA SCHEDULLE DE 1/2"=AREA DEPORTIVATRAMO1 =2,93m
LICEOTRAMO 1=0,11mTRAMO 2=0,11m
TRAMO 23=0,10mTRAMO 23=0,10mTRAMO 27=0,11m
-
7/30/2019 ACUEDUCTOS COMPUTOS
53/82
TRAMO 25=0,28mTRAMO 26=0,16mTRAMO 27=0,28m
TRAMO 38=0,13mTRAMO 39=0,15mTRAMO 40=0,17mTRAMO 41=0,17mTRAMO 42=0,17mTRAMO 43=0,17mTRAMO 50=0,35m
TRAMO 52=0,32m
MERCALTRAMO 1=0,35mTRAMO 2=0,44mTUBERIA SCHEDULLE DE 1/2"=CASA COMUNAL
TRAMO 18=0,35m
TRAMO 45=0,17m
TRAMO 15=0,11mTRAMO 17=0,13m
TRAMO 53=032mTRAMO 54=0,12mTRAMO 57=0,11mTRAMO 58=0,11mTUBERIA SCHEDULLE DE 1/2"=
TRAMO 28=0,33mTRAMO 29=0,28mTRAMO 30=0,16m
TUBERIA SCHEDULLE DE 1/2"=
TRAMO 31=0,35mTRAMO 20=0,17mTRAMO 21=0,14mTRAMO 22=0,07mTRAMO 38=0,10mTRAMO 41=0,32m
TRAMO 42=0,39m
TRAMO 1=0,78mTRAMO 2=0,68mTRAMO 3=0,75m
TRAMO 4=0,66mTUBERIA SCHEDULLE DE 1/2"=CENTRO MEDICO ASISTENCIALTRAMO 1=0,59mTRAMO 2=0,40mTRAMO 3=0,40mTRAMO 5=0,14mTRAMO 6=0,14mTRAMO 7=0,13mTRAMO 12=0,08mTRAMO 13=0,09mTRAMO 14=0,27m
CAPILLATRAMO 1=0,17mTRAMO 2=0,10mTUBERIA SCHEDULLE DE 1/2"=CENTRO COMERCIALTRAMO 1=0,31mTRAMO 2=0,28m
TRAMO 43=039mTRAMO 45=0,39mTRAMO 46=0,32mTRAMO 47=0,32m
TRAMO 3=0,35m
TRAMO 4=0,31mTRAMO 5=0,33mTRAMO 6=0,36m
-
7/30/2019 ACUEDUCTOS COMPUTOS
54/82
TOTAL DE TUBERIA SCHEDULLE
APARTAMENTOSTRAMO 1=(0,05m+0,90)=TRAMO 2= (0,05m+0,90m)=TRAMO 3 =(0,05m+0,90m)=TRAMO 5=(0,05m+0,90m)TRAMO 6=(0,05m+0,30m)=TRAMO 7=(0,05m+1,80m)=TRAMO 10=(0,05m+0,30m)=TRAMO 11=(1,80m+0,05m)=TUBERIA SCHEDULLE DE 1/2"=
TUBERIA DEL TANQUE AUSTRALI
TUBERIA SCHEDULLE DE 1/2"=
TUBERIA DE HG ASTM 6"= 10m
TRAMO 25=0,26mTRAMO 26=0,25mTUBERIA SCHEDULLE DE 1/2"=MODULO POLICIALTRAMO 1=0,12mTRAMO 2=0,10mTRAMO 3=0,10mTRAMO 7=0,10mTRAMO 8=0,10mTRAMO 9=0,12m
TRAMO 12=0,29mTRAMO 13=0,17mTRAMO 14=0,16mTRAMO 15=0,13mTRAMO 16=0,15mTRAMO 17=0,13mTRAMO 18=0,15mTRAMO 19=0,14m
TRAMO 20=0,14mTRAMO 21=0,12mTRAMO 22=0,12mTRAMO 23=0,12m
CAJA TRONCO-CONICA= CASA CMERCAL+MODULO POLICIAL+
-
7/30/2019 ACUEDUCTOS COMPUTOS
55/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
56/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
57/82
comerciales+casa cultural+simoncito+modulo policial+asa comunal+area deportivo+capilla+centro medico asistencial2,98+5,65+2,98+6,07+6,08+8,09+8,09+2,93+2,98+6,07)m= 241,14m
NTE= (1905,45+241,14)m= 2146,59mNIVELACION Y REPLANTEO
O PROVENIENTE DE LA PARTIDA N 1=2146,59m
*prof60m*0,70m=78,80 m3.
CENTRO COMERCIAL 2"
OBSERVACIONES
VACION A MANO EN TERRENO DE CANTO RODADO
le2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m445,06+694)m= 1905,45m= 1017,50m3
EXCAVACION TUBERIA SECUNDARIA
xcv tub secundariaEXCAVACION TUBERIA PRINCIPALde 6"
EDIFICIO 3"
, 6, 7),66m+ 7,72m+ 9,77m)= 29,86m3,67m+ 7,70m+ 9,76m)= 29,84m3
+ tub princ B + tub princ Crre 6+ carre 5+ calle 1+ carre 3+ carre4+ tramo 21+ tramo 22+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39 mrre4+ carre3+ carre2 + tramo 37+ tramo 38+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 m
,69m+ 7,71m+ 9,76m)= 29,78m3,70m+ 7,74m+ 9,75m)= 29,93m3,73m+ 4,73m+ 7,65m)= 24,77m3,70m+ 7,68m+ 4,70m)= 21,77m3,57m+ 7,70+ 4,71m)= 21,68m3
APERTURA DE PICAS Y DESMONTESES= long tuberia (A+B+C) + long tuberia secundaria (acometidas)
re 6+carre 5+calle 1+carre 3+carre 4+tramo21+tramo 22+ 256,91+ 146,35+ 6,94+ 6,85 +29,12+ 106,79)m= 768,39m
rre4+ carre3+ carre2 + tramo 37+ tramo 38+ 18,60+ 131,99 + 28,82+ 44,19)m= 445,06 mle2 + carre 4 + carre 3 +carre 2+ carre 1 + calle 1+ tramo 62+ 17,17+ 12,42+ 11,74+ 263,95+ 63,17+ 19,25)m = 692m
TUBERIA SECUNDARIA
TUBERIA PRINCIPAL
ERIA DEL TANQUE SUBTERRANEO A LA PRINCIPAL
-
7/30/2019 ACUEDUCTOS COMPUTOS
58/82
SIMONCITO 2"
m*0,40m = 0,45m3
MERCAL 3/4"
0,20m*0,40m= 0,23 m3
*0,20m*0,40m= 0,65m3CAPILLA 3/4"
CASA CULTURAL 1"
,20m*0,40m = 0,24m3
xcavacion- desalojos
*long tuberia 6"
4mm/1000m=0,15m905,45m
,70= 2,55m3
NO COMPACTADO CON MATERIAL DE LA EXCAVACIONTUBERIA PRINCIPAL+ EXCAV TUBERIA SECUNDARIA
0,40= 0,65m3AREA DEPORTIVA 1/2"
*0,20m*0,40m = 0,24m3ESCUELA - PREESCOLAR 2"
7m
07m*0,60m*0,70= 2,55m3LICEO 3"
*0,40m= 0,24m3
CENTRO MEDICO ASISTENCIAL 2"al= 6,07m
*0,60m*0,70m= 2,55m341,14m
MODULO POLICIAL 1"
CASA COMUNAL 1"
LICEO y MANZANAS
,54mm
mm/1000m=0,05m,09m+5,65+6,07+6,07m=24,88m
,54mm
TUBERIA PRINCIPAL
,15m)*1905,45m=33,67m3
*long tuberia 3"
,54mm
mm/1000m=0,08m,08m+187,63m=193,71m8m)*193,71m=0,97m3
,SIMONCITO,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCIAL
*long tuberia "
-
7/30/2019 ACUEDUCTOS COMPUTOS
59/82
0,01m3TAMO= (14,05m*0,20m*0,08m)-0,01m3=0,21m3
ub+0,05m)
33,67m3TAMO= (1905,45m*0,60m*0,20m)- 33,67m3=194,98m3
TUBERIA SECUNDARIA
m
0,97mTAMO= (193,71m*0,60m*0,13m)-0,97 m3=14,14m3
,ESCUELA-PREESCOLAR,CENTRO MEDICO ASISTENCIAL (2")ub+0,05m)
m
MERCAL Y CAPILLA
ub+0,05m)
m
LENO COMPACTADO CON MATERIAL DE PRESTAMO
TAMO= Long tub.*ancho*(altura tub+0,05)-volumen de la tuberia
0,05m3TAMO= (24,88m*0,60m*0,10m)-0,05m3=1,44m3
CULTURAL,MODULO POLICIAL, CASA COMUNAL (1")ub+0,05m)
m
TUBERIA PRINCIPAL 6"
ub+0,05m)
m
09m+2,98m=11,07m,012m)*11,07m=0,003m3
AREA DEPORTIVA
*long tuberia 1/2"
,54mm
7mm/1000m=0,013m93m
,013m)*2,93m=0,0003m3
LA PARTIDA 6= 127,77m3DE LA PARTIDA 5= 210,95m3,67m3+0,97m3+0,05m3+0,01m3+0,003m3+0,0003m3+210,95m3)= 863,99m3
5m)*24,88m=0,05m3
SA CULTURAL,MODULO POLICIAL, CASA COMUNAL
*long tuberia 1"
,54mm
mm/1000m=0,03m,98m+2,98m+8,09m= 14,05m3m)*14,05m=0,01m3
MERCAL Y CAPILLA
*long tuberia 3/4"
,54mm
6mm/1000m=0,02m
-
7/30/2019 ACUEDUCTOS COMPUTOS
60/82
0,01m3TAMO= (11,07m*0,20m*0,07m)-0,003m3=0,15m3
AREA DEPORTIVA
ub+0,05m)
BOTE DEL MATERIAL DE LA EXCAVACION
partida 3)0m= 0,43 m3
partida 3)0m= 0,36m3
partida 3)
partida 3)
partida 3)
VOL (Tuberia Principal+ Tuberia Secundaria)
ancho* profundidad
partida 3)
COLCHON DE ARENA
*0,10m= 114,33m3
partida 3)0,10m= 11,26m3
3m
0,01m3TAMO= (11,07m*0,20m*0,07m)-0,0003m3=0,03m3
0m= 0,11 m3
0m= 0,06 m3
0m= 0,16m3
0m= 0,06m3
0m= 0,16m3
0m= 0,06m3
0m= 0,36m3
partida 3)
partida 3)
partida 3)
O= 210,95m3
0m= 0,36m3
partida 3)
partida 3)0m= 0,06 m3
partida 3)
-
7/30/2019 ACUEDUCTOS COMPUTOS
61/82
TRANSPORTE DE MAQUINARIA
TUBERIA PVC 2" (TUBERIA SECUNDARIA)
SUMATORIA DE LOS TRAMOS
-
7/30/2019 ACUEDUCTOS COMPUTOS
62/82
s tramos
os
-
7/30/2019 ACUEDUCTOS COMPUTOS
63/82
1m)+(10,8m+3,45m)+(10,8m+6,09m+4,7m)=58,55mdel bajantes= 56 bloques* 58,55m= 3278,80m
TUBERIA PVC 3" (TUBERIA SECUNDARIA)
ANQUE SUBTERRANEO A LOS TANQUE ELEVADOStuberia
+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
+14,21m+ 23,44m+16,54m+ 10,80m+ 4,94m)= 85,67m
+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
ANTES
m+70,49m+271,73m+3278,80m=3775,43m
+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m5m
+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
6
7m
7m
+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m
+16,15m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,18m+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m+16,44m+ 23,44m+14,12m+ 10,80m+ 4,94m)= 85,48m
7m
-
7/30/2019 ACUEDUCTOS COMPUTOS
64/82
+16,48m+ 23,44m+14,11m+ 10,80m+ 4,94m)= 85,51m
+16,44m+ 23,46m+14,12m+ 10,80m+ 4,94m)= 85,50m5m
5m
+16,15m+ 23,48m+14,11m+ 10,80m+ 4,94m)= 85,22m
+16,44m+ 23,48m+14,12m+ 10,80m+ 4,94m)= 85,52m
SUBTERRANEO A LA TUBERIA PRINCIPAL
, 6, 7),66m+ 7,72m+ 9,77m)= 29,86m3,67m+ 7,70m+ 9,76m)= 29,84m3,69m+ 7,71m+ 9,76m)= 29,78m3,70m+ 7,74m+ 9,75m)= 29,93m3,73m+ 4,73m+ 7,65m)= 24,77m3,70m+ 7,68m+ 4,70m)= 21,77m3,57m+ 7,70+ 4,71m)= 21,68m3
TRAMO HASTA EL TANQUE SUBTERRANEO
-
7/30/2019 ACUEDUCTOS COMPUTOS
65/82
,19m
NTO*6,76m=4542,72mUNDARIA)=4609,27m
tramo3+tramo4+tramo5+tramo6,57m+(0,29m+0,69m)+1,63m+18,24m=23,01m
ARTAMENTO*(SUMA DE LOS TRAMOS)
LOS TRAMOS
22,22m3+Tramo 4+ Tramo 5
9m+12,02m= 17,43m
e la partida 1= 768,39m
e la partida 1= 445,06m
e la partida 1= 692m
TUBERIA PVC 6" (TUBERIA PRINCIPAL)
3
OS TRAMOSTUBERIA SCHEDULLE 1" (SECUNDARIA)
+Tramo3+Tramo4+Tramo5,89m+2,59m+16,17m)= 21,58mo 2+Tramo 3+Tramo 4+ Tramo 5+Tramo 6+Tramo7+Tramo8+Tramo9+
+0,26m+0,20m+6,24m+0,66m+1m+0,43m+0,68m+0,40m+6,14+
TUBERIA SCHEDULLE 3/4" (SECUNDARIA)
-
7/30/2019 ACUEDUCTOS COMPUTOS
66/82
2,30m
Tuberia de 1/2"=Sumatoria de los TramosA SCHEDULLE DE 1/2" PARA CONEXIONES DE PIEZA
2,37m
0,50m
-
7/30/2019 ACUEDUCTOS COMPUTOS
67/82
0,79m
7,70m
7,28m
2,87m
0,27m
-
7/30/2019 ACUEDUCTOS COMPUTOS
68/82
DE 1/2"=40,40M
0,64m
ANO AL POZO DE PERFORACIONTUBERIA DE HIERRO GALVANIZADO DE 6"
0,64m
4,55m
CAJA TRONCO-CONICAOMUNAL+CENTRO COMERCIAL+CENTRO MEDICO ASISTENCIAL+CAPILLA+
-
7/30/2019 ACUEDUCTOS COMPUTOS
69/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
70/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
71/82
N PART UND CANTIDAD
LIMPIEZA DE TERRENO, APERTURA DE PICAS Y DESMONTES
UBICACIN: EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, ESTAD
AO : 2.011
"PRESUPUESTO"CODIGO Y DESCRIPCIN
1,109.64m3
1 mts 2,146.59
2
3
4
mts 2,146.59
H-012.340.100
H-016.400.00
NIVELACION Y REPLANTEO
H-021.130.SNO
EXCAVACION A MANO EN TERRENO PEDREGOSO O CANTO
RODADO
OBRA: "TERMINACION DE LA RED DE CLOACA DE LA ASOCIACIONPENSAMIENTO,EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, EST
-
7/30/2019 ACUEDUCTOS COMPUTOS
72/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
73/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
74/82
PU PTOTAL
O TAHIRA.
2.10 4,507.84
317.87 352,721.27
4.21 9,037.14
CIVIL LIBERTAD YDO TACHIRA".
-
7/30/2019 ACUEDUCTOS COMPUTOS
75/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
76/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
77/82
SEMANA 1 SEMANA 2
AO : 2.011
N PART CODIGO Y DESCRIPCINME
OBRA: "TERMINACION DE LA RED DE CLOACA DE LA ASOCIACIONMUNICIPIO GARCIA DE HEVIA, ESTADO TACHIRA".
UBICACIN: EL SOCORRO, MUNICIPIO GARCIA DE HEVIA, ESTAD
CRONOGRAMA DE
-
7/30/2019 ACUEDUCTOS COMPUTOS
78/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
79/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
80/82
SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8
S 1 MES 2
CIVIL LIBERTAD Y PENSAMIENTO,EL SOCORRO,
TAHIRA.
TRABAJO
-
7/30/2019 ACUEDUCTOS COMPUTOS
81/82
-
7/30/2019 ACUEDUCTOS COMPUTOS
82/82