Analisis Unitarios Paquete

96
UNIDAD: M2 I. EQUIPO ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT. HERRAMIE 10%M,O 195.00 195.00 195 II. MATERIALES EN OBRA ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT. ESTACAS M ML PUNTILLA LB HILO ROLLO DESPERDIC % III.TRANSPORTE CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT IV. MANO DE OBRA RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT OFICIAL 30,000.00 1.95 58,500.00 50.00 1,170.00  Ayudante (1) 20,000.00 1.95 39,000.00 50.00 780.00 1,950 OS INDIRECTOS ESCRIPCI O ORCENT AJ SUB- TOTAL  ADMINISTRA CION IMPRTEVISTOS UTILIDAD SUB-TOTAL   ANALISIS DE PRECIO UNIT ARIO DESCRIPCI LOCALIZACION Y REPLANTEO SUBTOTAL SUBTOTAL SUBTOTAL SUBTOTAL TOTAL COSTO DIRECTO ECIO UNITARIO TOTAL PROYECTO: CASA HABITACIONAL UN PISO

Transcript of Analisis Unitarios Paquete

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 1/96

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 195.00 195.00

195

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

ESTACAS M ML

PUNTILLA LB

HILO ROLLO

DESPERDIC %

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNITOFICIAL 30,000.00 1.95 58,500.00 50.00 1,170.00

 Ayudante (1) 20,000.00 1.95 39,000.00 50.00 780.00

1,950

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTRACION

IMPRTEVISTOSUTILIDAD

SUB-TOTAL

 

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI LOCALIZACION Y REPLANTEO

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

PROYECTO: CASA HABITACIONAL UN PISO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 2/96

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

 AYUDANTE (1) 1.95 20.00

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.05

UTILIDAD 0.10

SUB-TOTAL

SUBTOTAL

PROYECTO: CASA HABITACIONAL UN PISO

PROYECTO: CASA HABITACIONAL UN PISO

 

DESCRIPCI DESCAPOTE Y LIMPIEZA MANUAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

PROPONENTE: A

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 3/96

UNIDAD: M3I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 1,560.00

1,560

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

ayudante (1) 1.95 2.50

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.05

UTILIDAD 0.10

SUB-TOTAL

DESCRIPCI EXCAVACION MANUAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

PROYECTO: CASA HABITACIONAL UN PISO

PROPONENTE:

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 4/96

UNIDAD: M3

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O

 VIBRO (RANA) 2.00

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

 ARCILLA M3

 AGUA LTS 66.00

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

 AYUDANTE (1) 1.95 16.00

OFICIAL 1.95 16.00

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.10UTILIDAD 0.05

SUB-TOTAL

ANALISIS DE PRECIOS UNITARIOS

PROYECTO: CASA HABITACIONAL UN PISO

PROYECTO: CASA HABITACIONAL UN PISO

PROPONENTE:

DESCRIPCI RELLENO CON MATERIAL SELECCIONADO COMPACTADO

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 5/96

 

UNIDAD: KG

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 97.50

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG

 ALAMBRE KG

DESPERDIC %

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 1.95 100.00

 AYUDANTE 1.95 100.00

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.05UTILIDAD 0.10

SUB-TOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

PROPONENTE:

DESCRIPCI  ACERO DE REFUERZO 60000 PSI

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 6/96

UNIDAD: M3

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CEMENTO KG

 ARENA LAV M3

 AGUA LTS

DESPERDIC %

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 1.95 3.00

ayudante (2) 1.95 3.00

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.10

UTILIDAD 0.05

SUB-TOTAL

 

SUBTOTAL TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

PROPONENTE

DESCRIPCI MORTERO 1- 4

SUBTOTAL

SUBTOTAL

SUBTOTAL

 

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 7/96

UNIDAD: KG

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

  10%M,O

SUBTOTAL

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG

 ALAMBRE KG

DESPERDIC %

SUBTOTAL 1,793

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

SUBTOTAL

IV. MANO DE OBRA

RABAJADO JORNAL RESTACION RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 1.95 100.00

 AYUDANTE 1 1.95 100.00

SUBTOTAL

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.10

UTILIDAD 0.05

SUB-TOTAL

 

TOTAL COSTO DIRECTO

 TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI CONCRETO DE 3000 psi

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 8/96

UNIDAD: M3

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O

MEZCLADO M3 0.31

SUBTOTAL 11,320

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CEMENTO KL

TRITURADO M3

 ARENA M3

 AGUA LTDESCRIPCI %

SUBTOTAL

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

SUBTOTAL

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 1.95 5.00

 AYUDANTE 5 1.95 5.00

SUBTOTAL

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.10

UTILIDAD 0.05

SUB-TOTAL

PROPONENTE:

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI ZAPATA DE ,80 *,80 ,30

PROPONENTE:

TOTAL COSTO DIRECTO

 TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 9/96

UNIDAD: UN

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3

REFUERZO KG

 ALAMBRE KIL

DERSDPER %

127,179

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

 AYUDANTE (2) 1.95 2.50

OFICIAL (1) 1.95 2.50

OS INDIRECTOSESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15

IMPRTEVIS 0.10UTILIDAD 0.05

SUB-TOTAL

 

UNIDAD: ML

PROPONENTE:

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI  VIGA DE AMARRE INFERIOR 0,25*0,30 CONCRETO 3000 PSI

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 10/96

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 1,365.00

vibro DIA HORA 50,000.00 6,250.00

7,615

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG 2,416.66 4.00 9,666.64

 ALAMBRE KG 3,500.00 O,O5 175.00 ,

REFUERZO KG 1,533.00 3.70 5,672.10

CONCRETO M3 428,983.00 0.08 32,173.73

FORMALET M2 2,560.00 1.00 2,560.00DESPERDIC % 50,247.47 0.05 2,512.37

SUBTOTAL 52,760

III.TRANSP VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

CONCEPTO

SUBTOTAL

IV. MANO D JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

RABAJADOR

oficial (1) 30,000.00 1.95 58,500.00 10.00 5,850.00

 AYUDANTE 40,000.00 1.95 78,000.00 10.00 7,800.00

SUBTOTAL 13,650

74,025

OS INDIRE ORCENTAJ SUB-TOTAL

ESCRIPCIO 0.15 11,103.73

 ADMINISTR 0.10 7,402.48IMPRTEVIS 0.05 3,701.24

UTILIDAD SUB-TOTAL 22,207

96,232

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

TOTAL COSTO DIRECTO

 TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI  VIGA DE AMARRE AEREA 0,20* 0,25 CONCRETO 3000 PSI

PROPONENTE:

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 11/96

HERRAMIE 10%M,O 975.00

 VIBRO DIA HORA 50,000.00 6,250.00

SUBTOTAL 7,225

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG 2,416.66 4.00 9,666.64

 ALAMBRE KG 3,500.00 0.05 175.00

REFUERZO KG 1,533.00 3.40 5,212.20

CONCRETO M2 428,983.00 0.05 21,449.15FORMALET M2 16,353.00 1.00 16,353.00

DESPERDIC % 52,855.99 0.05 2,642.80

SUBTOTAL 55,499

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 14.00 4,178.57 AYUDANTE 40,000.00 1.95 78,000.00 14.00 5,571.43

9,750

72,474

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 10,871.07

IMPRTEVIS 0.10 7,247.38

UTILIDAD 0.05 3,623.69

21,742

94,216

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 758.30 758.30

PROYECTO: CASA HABITACIONAL UN PISO

PROPONENTE:

SUB-TOTAL

SUBTOTAL

 TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCICOLUMNA 0,20* 0,20 CONCRETO 3000 PSI INC REFUERZO60000 Y 37000 PSI

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 12/96

 ANDAMIOS SECCION 18.00 3,500.00 194.44

 VIBRO DIA HORA 50,000.00 6,250.00

7,203

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG 2,416.66 4.00 9,666.64

 ALAMBRE N KG 3,500.00 0.05 175.00

REFUERZO KG 1,533.00 3.40 5,212.20

CONCRETO M3 428,983.00 0.04 17,159.32

FORMALET M2 19,686.00 1.00 19,686.00DESPERDIC % 51,899.16 0.05 2,594.96

54,494

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIToficial (1) 30,000.00 1.95 58,500.00 18.00 3,250.00

 AYUDANTE 40,000.00 1.95 78,000.00 18.00 4,333.33

7,583

69,280

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 10,392.03

IMPRTEVIS 0.10 6,928.02UTILIDAD 0.05 3,464.01

SUB-TOTAL 20,78490,064

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 1,338.24

 PROYECTO: CASA HABITACIONAL UN PISO

PROPONENTE:

TOTAL COSTO DIRECTO

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

SUBTOTAL

DESCRIPCIPLACA DE PISO CONCRETO DE 3000 PSI E= 0,12 INC MALLAELECTROSOLDADA

SUBTOTAL

ECIO UNITARIO TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 13/96

1,338

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 428,983.00 0.12 51,477.96

MALLA ELE M2 4,000.00 1.00 4,000.00

DESPERDIC % 55,477.96 0.05 2,773.90

58,252

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 10.20 5,735.29 Ayudante (2) 40,000.00 1.95 78,000.00 10.20 7,647.06

13,382

72,972

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 10,945.87

IMPRTEVIS 0.10 7,297.24

UTILIDAD 0.05 3,648.62

SUB-TOTAL 21,892

94,864

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 1,365.00

DESCRIPCIPLACA DE ENTRE PISO EN METALD E-0,10 maciza INCREFUERZO

PROYECTO: CASA HABITACIONAL UN PISO

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

SUBTOTAL

SUBTOTAL

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 14/96

1,365

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 428,983.00 0.10 42,898.30

MALLA ELE M2 4,000.00 1.00 4,000.00

LAMINA ME M2 23,076.00 1.00 23,076.00

PUNTALES ML 1,000.00 1.00 1,000.00DESPERDIC % 70,974.30 0.05 3,548.72

74,523

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA PRECIO UNIT

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT.

oficial (1) 30,000.00 1.95 58,500.00 10.00 5,850.00

 Ayudante (2) 40,000.00 1.95 78,000.00 10.00 7,800.00

13,650

89,538

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 13,430.70

IMPRTEVIS 0.10 8,953.80UTILIDAD 0.05 4,476.90

SUB-TOTAL 26,861

116,399

UNIDAD: M3

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 6,825.00

6,825

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI CONCRETO DE 3000 PSI PARA ESCALERA INC REFUERZO DE60000 Y 37000 PSI

SUBTOTAL

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 15/96

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 428,983.00 2.34 1,003,820.22

REFUERZO KG 2,416.66 40.50 97,874.73

REFUERZO KG 1,533.00 15.12 23,178.96DESPERDIC % 1,124,873.91 0.05 56,243.70

1,124,874

III.TRANSPORTE PRECIO UNIT

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT.

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 2.00 29,250.00

 Ayudante (2) 40,000.00 1.95 78,000.00 2.00 39,000.00

68,250

1,199,949

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 179,992.34

IMPRTEVIS 0.10 119,994.89UTILIDAD 0.05 59,997.45

SUB-TOTAL 359,985

1,559,934

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 910.00 910.00

 ANDAMIOS SECCION 15.00 7,000.00 466.67

MEZCLADORA 15.00 50,000.00 6,250.00

7,627

TOTAL COSTO DIRECTO

PROYECTO: CASA HABITACIONAL UN PISO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI VIGA DE CORONAMIENTO 0,10* 0,20 CONCRETO DE 3000 PSIINCLUYE REFUERZO DE 60000 Y 37000 PSI

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 16/96

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

REFUERZO KG 2,416.66 4.00 9,666.64

 ALAMBRE N KG 3,500.00 0.05 175.00

REFUERZO KG 1,533.00 1.28 1,962.24

CONCRETO M3 428,983.00 0.02 8,579.66

FORMALET M2 12,000.00 0.40 4,800.00DESPERDIC % 25,183.54 0.05 1,259.18

26,443

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 15.00 3,900.00

 AYUDANTE 40,000.00 1.95 78,000.00 15.00 5,200.00

9,100

43,169

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 6,475.41

IMPRTEVIS 0.10 4,316.94

UTILIDAD 0.05 2,158.47

SUB-TOTAL 12,951

56,120

UNIDAD: MLI. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 975.00 975.00

 ANDAMIOS SECCION 15.00 7,000.00 466.67

MEZCLADORA 50,000.00 6,250.00

7,692

II. MATERIALES EN OBRA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

TOTAL COSTO DIRECTO

  SUBTOTAL

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI ALFAGIA DE CONCRETO A LA VISTA CONCRETO DE 3000 PSIINCLUYE REFUERZO DE 37000 PSI

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 17/96

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

 ALAMBRE N KG 3,500.00 0.05 175.00

REFUERZO KG 1,533.00 1.68 2,575.44

CONCRETO M3 428,983.00 0.01 4,289.83

FORMALET M2 40,000.00 0.30 12,000.00

DESPERDIC % 19,040.27 0.05 952.01

19,992

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 10.00 5,850.00

 AYUDANTE 20,000.00 1.95 39,000.00 10.00 3,900.00

9,750

37,434

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 5,615.09

IMPRTEVIS 0.10 3,743.40

UTILIDAD 0.05 1,871.70

SUB-TOTAL 11,230

48,664

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 758.33

andamio (1 s juego 0.18 3,500.00 630.00

1,388

II. MATERIALES EN OBRA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

MURO EN BLOQUE No 5

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 18/96

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

bloque en arc UNIDAD 950.00 14.28 13,566.00

mortero 1:4 M3 340,457.00 0.02 6,809.14desperdicio % 20,375.14 0.25 5,093.79

25,469

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 18.00 3,250.00

ayudante (2) 40,000.00 1.95 78,000.00 18.00 4,333.33

7,583

34,441

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL ADMINISTR 0.15 5,166.09

IMPRTEVIS 0.10 3,444.06UTILIDAD 0.05 1,722.03

SUB-TOTAL 10,332

44,773

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 487.50

488

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

MORTERO 1 M3 340,457.00 0.02 6,809.14

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

PROPONENTE: JUAN HARVEY ALFONSO PARADA

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCIPAÑETE IMPERMEABILIZADO MUROS EXTERIORES 1-4 E-0,02

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 19/96

SIKA I GL 25,000.00 0.06 1,500.00

DESPERDIC % 8,309.14 0.25 2,077.29

10,386

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 20.00 2,925.00

ayudante (1) 20,000.00 1.95 39,000.00 20.00 1,950.00

4,875

15,749

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 2,362.34IMPRTEVIS 0.10 1,574.89UTILIDAD 0.05 787.45

SUB-TOTAL 4,725

20,474

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 487.50

488

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

MORTERO 1 M3 340,457.00 0.02 6,809.14

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI PAÑETE LISO PARA MUROS INTERIORES 1-4 E- 0,02

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 20/96

DESPERDIC % 6,809.14 0.05 340.46

7,150

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 20.00 2,925.00

ayudante (1) 20,000.00 1.95 39,000.00 20.00 1,950.00

4,875

12,512

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,876.81IMPRTEVIS 0.10 1,251.21UTILIDAD 0.05 625.60

SUB-TOTAL 3,754

16,266

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 1,421.90

1,422

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

MORTERO 1 M3 340,456.00 0.05 17,022.80

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

SUBTOTAL

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI MORTERO DE NIVELACION PARA PISOS E- 0,05

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 21/96

DESPERDIC % 17,022.80 0.05 851.14

17,874

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 9.60 6,093.75

ayudante (2) 40,000.00 1.95 78,000.00 9.60 8,125.00

14,219

33,515

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 5,027.19IMPRTEVIS 0.10 3,351.46UTILIDAD 0.05 1,675.73

SUB-TOTAL 10,054

43,569

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 390.00

390

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CERAMICA , M2 22,000.00 1.00 22,000.00

PEGO KG 1,350.00 3.50 4,725.00

CEMENTO KG 1,500.00 0.50 750.00

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI CERAMICA PARA MUROS 0,25 * 0,35

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 22/96

DESPERDIC % 27,475.00 0.05 1,373.75

28,849

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 25.00 2,340.00

ayudante (2) 20,000.00 1.95 39,000.00 25.00 1,560.00

3,900

33,139

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 4,970.81

IMPRTEVIS 0.10 3,313.88UTILIDAD 0.05 1,656.94

SUB-TOTAL 9,942

43,080

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 390.00

390

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CERAMICA , M2 22,000.00 1.00 22,000.00

PEGO KG 1,350.00 4.50 6,075.00

CEMENTO KG 1,500.00 0.30 450.00

DESPERDIC % 28,525.00 0.05 1,426.25

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI PISO EN CERAMICA DE 0,40 * 0,40

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 23/96

29,951

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 25.00 2,340.00

ayudante (1) 20,000.00 1.95 39,000.00 25.00 1,560.00

3,900

34,241

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 5,136.19

IMPRTEVIS 0.10 3,424.13

UTILIDAD 0.05 1,712.06SUB-TOTAL 10,272

44,514

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 390.00

390

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

GRANITO G KG 1,250.00 5.00 6,250.00

CEMENTO KG 458.00 4.00 1,832.00

DILATACIO ML 1,000.00 1.00 1,000.00

LISTON DE ML 1,000.00 1.00 1,000.00

DESPERDIC % 10,082.00 0.05 504.10

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCIDILATACION Y GUARDAESCOBA EN GRANITO A LA VISTA0,10M

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 24/96

10,586

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIToficial (1) 30,000.00 1.95 58,500.00 25.00 2,340.00

ayudante (1) 20,000.00 1.95 39,000.00 25.00 1,560.00

3,900

14,876

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 2,231.42

IMPRTEVIS 0.10 1,487.61

UTILIDAD 0.05 743.81

SUB-TOTAL 4,46319,339

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 487.50

488

II. MATERIALES EN OBRAESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

MORTERO 1 M3 340,457.00 0.00 1,361.83

DESPERDIC % 1,391.33 0.05 69.57

1,431

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

SUBTOTAL

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

DESCRIPCI REMATE DE MANPOSTERIA MUROS DE CUBIERTA

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 25/96

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 20.00 2,925.00

ayudante (1) 20,000.00 1.95 39,000.00 20.00 1,950.00

4,875

6,794

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,019.08

IMPRTEVIS 0.10 679.39UTILIDAD 0.05 339.69

SUB-TOTAL 2,038

8,832

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 243.80

244

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

ESTUCO PL KG 4,500.00 0.90 4,050.00

PASTA PAR KG 4,500.00 1.00 4,500.00

DESPERDIC % 8,550.00 0.05 427.50

8,978

III.TRANSPORTE

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI ESTUCO PLASTICO

SUBTOTAL

SUBTOTAL

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 26/96

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 40.00 1,462.50ayudante (1) 20,000.00 1.95 39,000.00 40.00 975.00

2,438

11,659

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,748.82

IMPRTEVIS 0.10 1,165.88UTILIDAD 0.05 582.94

SUB-TOTAL 3,498

15,156

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 263.50

264

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT. VINILO TIP GL 32,000.00 0.04 1,280.00

PAPEL LIJA PLIEGO 1,200.00 0.25 300.00DESPERDIC % 1,580.00 0.05 79.00

1,659

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

SUBTOTAL

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI PINTURA EN VINILLO TRES MANOS

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 27/96

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 37.00 1,581.08

ayudante (1) 20,000.00 1.95 39,000.00 37.00 1,054.05

2,635

4,558

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 683.65

IMPRTEVIS 0.10 455.76UTILIDAD 0.05 227.88

SUB-TOTAL 1,367

5,925

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 325.00

COMPRESO DIA 30.00 25,000.00 833.33

1,158

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

PITURA AC GL 41,000.00 0.05 2,050.00

PAPEL LIJA PLIEGO 1,200.00 0.50 600.00

DISOLVENT GL 16,000.00 0.03 480.00

ESTOPA KG 7,000.00 0.02 140.00DESPERDIC % 3,270.00 0.05 163.50

3,434

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PROYECTO: CASA HABITACIONAL UN PISO

 ANALISIS DE PRECIO UNITARIO

DESCRIPCI PINTURA EN ESMALTE

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 28/96

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 30.00 1,950.00ayudante (1) 20,000.00 1.95 39,000.00 30.00 1,300.00

3,250

7,842

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,176.28

IMPRTEVIS 0.10 784.18UTILIDAD 0.05 392.09

SUB-TOTAL 2,353

10,194

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 184.00

184

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

mortero 1-4 M3 340,457.00 0.00 1,361.83

desperdicio % 1,361.83 0.05 68.09

1,430

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI FILOS Y DILATACIONES

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 29/96

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 53.00 1,103.77

ayudante (1) 20,000.00 1.95 39,000.00 53.00 735.85

1,840

3,454

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 518.03

IMPRTEVIS 0.10 345.35UTILIDAD 0.05 172.68

SUB-TOTAL 1,036

4,490

UNIDAD: M2

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% M,O 3,900.00

 ANDAMIO 2 JUEGO 1.00 7,000.00 7,000.00

10,900

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 428,983.00 0.10 42,898.30

REFUERZO KG 2,416.00 20.00 48,320.00

FORMALET M2 19,686.00 1.00 19,686.00

 ALAMBRE N KG 3,500.00 2.40 8,400.00

DESPERDIC % 119,304.30 0.05 5,965.22

125,270

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

PROPONENTE: JUAN HARVEY ALFONSO PARADA

DESCRIPCIPLACA EN CONCRETO REFORZADO 3000PSI 1 * 1 * 0,10 PARATANQUE ELEVADO

SUBTOTAL

SUBTOTAL

SUBTOTAL

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 30/96

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 2.50 23,400.00

 AYUDANTE 20,000.00 1.95 39,000.00 2.50 15,600.00

39,000

175,170

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 26,275.43

IMPRTEVIS 0.10 17,516.95

UTILIDAD 0.05 8,758.48

SUB-TOTAL 52,551

227,720

UNIDAD: ML

I. EQUIPO

DESCRIPCION UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. PRECIO UNIT.

HERRAMIENT 10% m,o 587.35

587

II. MATERIALES EN OBRA

DESCRIPCION UNIDAD VAL UNIT CANT. VAL/PARC. PRECIO UNIT.

TUBO PVC PE ML 9,500.00 1.05 9,975.00

soldadura pvc GL 62,000.00 0.10 6,200.00

codo sanitario UNIDAD 5,500.00 0.25 1,375.00

limpiador pvc GL 56,000.00 0.03 1,680.00

estopa kg 7,000.00 0.03 210.00

desperdicio % 19,440.00 0.05 972.00

20,412

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. PRECIO UNIT.

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

DESCRIPCIONTUBO PVC AGUAS NEGRAS DE 4"

SUBTOTAL

SUBTOTAL

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 31/96

IV. MANO DE OBRA

TRABAJADOR JORNAL PRESTACION JORN/TOT RENDIM. VAL.UNIT. PRECIO UNIT.

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

5,873

26,873

TOS INDIRECTOS

DESCRIPCION PORCENTAJE SUB-TOTAL

 ADMINISTRA 0.15 4,030.93

IMPRTEVISTO 0.10 2,687.28

UTILIDAD 0.05 1,343.64

SUB-TOTAL 8,062

34,935

UNIDAD: ML

I. EQUIPO

DESCRIPCION UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. PRECIO UNIT.

HERRAMIENT 10% m,o 587.35

587

II. MATERIALES EN OBRA

DESCRIPCION UNIDAD VAL UNIT CANT. VAL/PARC. PRECIO UNIT.

tubo pvc de 3 ml 9,200.00 1.00 9,200.00

soldadura pv gl 62,000.00 0.02 1,240.00

union sanitari UNIDAD 6,500.00 1.00 6,500.00

estopa kg 7,000.00 0.03 210.00

limpiador pvc gl 56,000.00 0.03 1,680.00

desperdicio % 18,830.00 0.05 941.50

19,772

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. PRECIO UNIT.

IV. MANO DE OBRA

PROPONENTE: JUAN HARVEY ALFONSO PARADA

PRECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCIONTUBO PVC AGUAS NEGRAS DE 3 PUL

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 32/96

TRABAJADOR JORNAL PRESTACION JORN/TOT RENDIM. VAL.UNIT. PRECIO UNIT.

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

5,873

26,232

TOS INDIRECTOS

DESCRIPCION PORCENTAJE SUB-TOTAL

 ADMINISTRA 0.15 3,934.85

IMPRTEVISTO 0.10 2,623.23

UTILIDAD 0.05 1,311.62

7,870

34,102

UNIDAD: ML

I. EQUIPO

DESCRIPCION UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. PRECIO UNIT.

HERRAMIENT 10% m,o 587.35

587

II. MATERIALES EN OBRA

DESCRIPCION UNIDAD VAL UNIT CANT. VAL/PARC. PRECIO UNIT.

tubo sanitario ml 4,000.00 1.00 4,000.00

soldadura pv gl 62,000.00 0.02 1,240.00

limpiador pvc GL 56,000.00 0.03 1,680.00

uniom sanitari UNIDAD 1,500.00 0.25 375.00

estopa kg 7,000.00 0.03 210.00

desperdicio % 7,505.00 0.05 375.25

7,880

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. PRECIO UNIT.

IV. MANO DE OBRA

TRABAJADOR JORNAL PRESTACION JORN/TOT RENDIM. VAL.UNIT. PRECIO UNIT.

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

PRECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

SUBTOTAL

DESCRIPCIONTUBO PVC AGUAS NEGRAS DE 2¨ PUL

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 33/96

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

5,873

14,341

TOS INDIRECTOS

DESCRIPCION PORCENTAJE SUB-TOTAL

 ADMINISTRA 0.15 2,151.16

IMPRTEVISTO 0.10 1,434.11

UTILIDAD 0.05 717.05

4,302

18,643

UNIDAD: UN

I. EQUIPO

DESCRIPCION UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. PRECIO UNIT.

HERRAMIENT 10% m,o 587.35

587

II. MATERIALES EN OBRA

DESCRIPCION UNIDAD VAL UNIT CANT. VAL/PARC. PRECIO UNIT.

TUBO PVC PE ML 9,500.00 1.05 9,975.00

soldadura pvc GL 62,000.00 0.10 6,200.00

codo sanitario UNIDAD 5,500.00 0.25 1,375.00

limpiador pvc GL 56,000.00 0.03 1,680.00

estopa kg 7,000.00 0.03 210.00

desperdicio % 19,440.00 0.05 972.00

20,412

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. PRECIO UNIT.

IV. MANO DE OBRA

TRABAJADOR JORNAL PRESTACION JORN/TOT RENDIM. VAL.UNIT. PRECIO UNIT.

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

SUBTOTAL

TOTAL COSTO DIRECTO

PRECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCIONPUNTO SANITARIO AGUAS NEGRAS DE 4"

SUBTOTAL

SUBTOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 34/96

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

5,873

26,873

TOS INDIRECTOS

DESCRIPCION PORCENTAJE SUB-TOTAL

 ADMINISTRA 0.15 4,030.93

IMPRTEVISTO 0.10 2,687.28

UTILIDAD 0.05 1,343.64

SUB-TOTAL 8,062

34,935

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 587.35

587

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

tubo pvc de 3 ml 8,333.00 1.00 8,333.00

soldadura pv gl 62,000.00 0.02 1,240.00

sifon de 3 pvc UNIDAD 6,500.00 1.00 6,500.00

semicodo de UNIDAD 3,000.00 1.00 3,000.00

limpiador pvc gl 56,000.00 0.03 1,680.00

desperdicio % 20,753.00 0.05 1,037.65

21,791

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

PROPONENTE: JUAN HARVEY ALFONSO PARADA

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI PUNTO SANITARIO AGUAS NEGRAS DE 3 PUL

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

PRECIO UNITARIO TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 35/96

5,873

28,251

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 4,237.72

IMPRTEVIS 0.10 2,825.15

UTILIDAD 0.05 1,412.57

SUB-TOTAL 8,475

36,727

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 587.35

587

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

tubo pvc de 2 ml 7,083.00 1.00 7,083.00

soldadura pv gl 62,000.00 0.02 1,240.00

sifon de 2 pvc UNIDAD 2,800.00 1.00 2,800.00

semicodo de UNIDAD 3,000.00 1.00 3,000.00

limpiador pvc gl 56,000.00 0.03 1,680.00desperdicio % 15,803.00 0.05 790.15

16,593

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI PUNTO SANITARIO AGUAS NEGRAS DE 2¨ PUL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 36/96

5,873

23,054

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 3,458.10

IMPRTEVIS 0.10 2,305.40

UTILIDAD 0.05 1,152.70

SUB-TOTAL 6,916

29,970

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 587.35

587

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

tubo pvc de 3 ml 4,133.00 1.00 4,133.00

soldadura pv gl 62,000.00 0.02 1,240.00

sifon de 3 pvc UNIDAD 6,500.00 1.00 6,500.00

union de 3 p UNIDAD 3,000.00 0.16 480.00

limpiador pvc gl 56,000.00 0.03 1,680.00desperdicio % 14,033.00 0.05 701.65

14,735

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 16.60 3,524.10

ayudante (1) 20,000.00 1.95 39,000.00 16.60 2,349.40

5,873

PROPONENTE: JUAN HARVEY ALFONSO PARADA

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI TUBO AGUAS LLUVIAS DE 3¨

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 37/96

21,195

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 3,179.32

IMPRTEVIS 0.10 2,119.55

UTILIDAD 0.05 1,059.77

SUB-TOTAL 6,359

27,554

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%m,o 487.50

488

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

TUBO PVC 1 ML 1,166.00 1.00 1,166.00

soldadura pv galon 62,000.00 0.02 1,240.00

limpiador pvc 1/4 galon 14,000.00 0.02 280.00

union pvc UNIDAD 500.00 0.20 100.00

estopa kg 8,000.00 0.03 240.00

desperdicio % 3,026.00 5.00 151.30

3,177

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 20.00 2,925.00ayudante (1) 20,000.00 1.95 39,000.00 20.00 1,950.00

4,875

8,540

OS INDIRECTOS

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI TUBERIA DE AGUA POTABLE PVC DE 1/2

TOTAL COSTO DIRECTO

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 38/96

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,280.97

IMPRTEVIS 0.10 853.98UTILIDAD 0.05 426.99

SUB-TOTAL 2,562

11,102

UNIDAD: ML

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 487.50

488

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

TUBO PVC ML 2,333.00 1.00 2,333.00

soldadura pv GL 62,000.00 0.01 620.00limpiador pvc 1/4 GL 14,000.00 0.02 280.00

estopa kg 8,000.00 0.02 160.00

union pvc de UNIDAD 800.00 0.25 200.00desperdicio % 3,593.00 5.00 179.65

3,773

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 20.00 2,925.00

ayudante 1 20,000.00 1.95 39,000.00 20.00 1,950.00

4,875

9,135

OS INDIRECTOS

PROPONENTE: JUAN HARVEY ALFONSO PARADA

ECIO UNITARIO TOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI TUBERIA AGUA POTABLE DE 1¨

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 39/96

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 1,370.27

IMPRTEVIS 0.10 913.52UTILIDAD 0.05 456.76

SUB-TOTAL 2,741

11,876

UNIDAD: UNI. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 975.00

975

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

TUBO PVC 1 ML 1,166.00 1.00 1,166.00

adaptador he UNIDAD 600.00 1.00 600.00

codo pvc 1/2 UNIDAD 500.00 2.00 1,000.00

soldadura pv gl 62,000.00 0.01 372.00

limpiador pvc 1/4 GL 14,000.00 0.01 140.00

desperdicio % 3,278.00 12.20 163.90

3,442

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 10.00 5,850.00

ayudante 20,000.00 1.95 39,000.00 10.00 3,900.00

9,750

14,167

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI PUNTO HIDRAULICO DE 1/2 PVC

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 40/96

 ADMINISTR 0.15 2,125.04

IMPRTEVIS 0.10 1,416.69UTILIDAD 0.05 708.35

SUB-TOTAL 4,250

18,417

UNIDAD: UN

I. EQUIPOESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 975.00

975

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

TUBO PVC 1 ML 2,333.00 1.00 2,333.00

adaptador he UNIDAD 1,000.00 1.00 1,000.00

codo pvc 1¨ UNIDAD 1,000.00 2.00 2,000.00soldadura pv gl 62,000.00 0.02 1,240.00

limpiador pvc 1/4 GL 14,000.00 0.02 280.00

desperdicio % 6,853.00 12.20 342.65

7,196

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 10.00 5,850.00

ayudante 20,000.00 1.95 39,000.00 10.00 3,900.00

9,750

17,921

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 2,688.10

PROPONENTE: JUAN HARVEY ALFONSO PARADA

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI PUNTO HIDRAULICO DE 1¨ PVC

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 41/96

IMPRTEVIS 0.10 1,792.07

UTILIDAD 0.05 896.03

SUB-TOTAL 5,376

23,297

UNIDAD: UN

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.HERRAMIE 10%M,O 19,500.00

19,500

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 496,241.00 0.09 44,661.69

LADRILLO UNIDAD 700.00 56.00 39,200.00

MORTERO 1 M3 463,776.00 0.05 23,188.80

REF 37000 P KG 1,533.00 4.48 6,867.84

DESPERDIC % 113,918.33 5.00 4,711.62118,630

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 0.50 117,000.00

 AYUDANTE 20,000.00 1.95 39,000.00 0.50 78,000.00

195,000

333,130

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 49,969.49

IMPRTEVIS 0.10 33,313.00UTILIDAD 0.05 16,656.50

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL DE DOS PISOS

DESCRIPCI CAJA DE INSPECCION EN LADRILLO 0,80 * 0,80

ECIO UNITARIO TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 42/96

SUB-TOTAL 99,939

433,069

UNIDAD: UN

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 19,500.00

19,500

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

CONCRETO M3 496,241.00 0.09 44,661.69

LADRILLO UNIDAD 700.00 104.00 72,800.00

MORTERO 1 M3 463,776.00 0.05 23,188.80

REF 37000 P KG 1,533.00 12.46 19,101.18

DESPERDIC % 159,751.67 5.00 4,711.62164,463

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 0.50 117,000.00

 AYUDANTE 20,000.00 1.95 39,000.00 0.50 78,000.00

195,000

378,963

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 56,844.49

IMPRTEVIS 0.10 37,896.33UTILIDAD 0.05 18,948.16

SUB-TOTAL 113,689

PROPONENTE: JUAN HARVEY ALFONSO PARADA

SUBTOTAL

ECIO UNITARIO TOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI CAJA DE INSPECCION EN LADRILLO 1,00 * 1,00

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 43/96

492,652

UNIDAD: UN

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10% m,o 835.71

836

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

llave paso de UNIDAD 14,000.00 1.00 14,000.00

adaptador m UNIDAD 500.00 2.00 1,000.00

cinta teflon rollo 700.00 0.25 175.00

soldadura pv gl 62,000.00 0.01 620.00desperdicio % 15,795.00 5.00 789.75

16,585III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 7.00 8,357.14

8,357

25,778

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 3,866.64

IMPRTEVIS 0.10 2,577.76UTILIDAD 0.05 1,288.88

SUB-TOTAL 7,733

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI REGISTRO DE PASO DE 1/2

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 44/96

33,511

UNIDAD: U N

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE 10%M,O 19,500.00

19,500

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

SANITARIO UNIDAD 370,000.00 1.00 370,000.00

GRIFERIA UNIDAD 25,000.00 1.00 25,000.00

MANGUER UNIDAD 3,450.00 3.00 10,350.00

CEMENTO KG 1,600.00 1.00 1,600.00

DESPERDIC % 406,950.00 5.00 20,347.50

427,298

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

oficial (1) 30,000.00 1.95 58,500.00 0.50 117,000.00

 AYUDANTE 20,000.00 1.95 39,000.00 0.50 78,000.00

195,000

641,798

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 96,269.63

IMPRTEVIS 0.10 64,179.75UTILIDAD 0.05 32,089.88

SUB-TOTAL 192,539

834,337

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI SANITARIO EN PORCELANA BLANCO INC GRIFERIA

SUBTOTAL

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

ECIO UNITARIO TOTAL

PROPONENTE: JUAN HARVEY ALFONSO PARADA

ECIO UNITARIO TOTAL

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 45/96

UNIDAD: UN

I. EQUIPO

ESCRIPCIO UNIDAD ENDIMIENT VAL.UNIT VAL/PARC. RECIO UNIT.

HERRAMIE GL 39,000.00

39,000

II. MATERIALES EN OBRA

ESCRIPCIO UNIDAD VAL UNIT CANT. VAL/PARC. RECIO UNIT.

TANQUE PL UNIDAD 185,000.00 1.00 185,000.00

FLOTADOR UNIDAD 17,000.00 1.00 17,000.00

 ACOPLES P UNIDAD 5,000.00 1.00 5,000.00

UNIVERSAL UNIDAD 5,000.00 1.00 5,000.00

REGISTRO UNIDAD 18,000.00 1.00 18,000.00

TEE 1" UNIDAD 1,200.00 2.00 2,400.00

SOLDADUR GL 62,000.00 0.10 6,200.00

SILICONA TUBO 8,000.00 0.05 400.00

LIMPIADOR 1/4 gl 14,000.00 0.10 1,400.00

CODOS 1" UNIDAD 1,200.00 1.00 1,200.00

DESPERDIC % 241,600.00 5.00 12,080.00

253,680

III.TRANSPORTE

CONCEPTO VOL O PESO DIST. Km CANT. TARIFA VAL.UNIT. RECIO UNIT

IV. MANO DE OBRA

RABAJADO JORNAL RESTACIO JORN/TOT RENDIM. VAL.UNIT. RECIO UNIT

OFICIAL 30,000.00 1.95 58,500.00 0.25 234,000.00

 AYUDANTE 20,000.00 1.95 39,000.00 0.25 156,000.00

390,000

682,680

OS INDIRECTOS

ESCRIPCIO ORCENTAJ SUB-TOTAL

 ADMINISTR 0.15 102,402.00

IMPRTEVIS 0.10 68,268.00UTILIDAD 0.05 34,134.00

SUB-TOTAL 204,804

PRECIO UNITARIO TOTAL 887,484

SUBTOTAL

SUBTOTAL

SUBTOTAL

TOTAL COSTO DIRECTO

SUBTOTAL

 ANALISIS DE PRECIO UNITARIO

PROYECTO: CASA HABITACIONAL UN PISO

DESCRIPCI TANQUE PLASTICO AJOVER DE 500 LTS INC ACCESORIOS

PROPONENTE: JUAN HARVEY ALFONSO PARADA

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 46/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 47/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 48/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 49/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 50/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 51/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 52/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 53/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 54/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 55/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 56/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 57/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 58/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 59/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 60/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 61/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 62/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 63/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 64/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 65/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 66/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 67/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 68/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 69/96

  .

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 70/96

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 71/96

  .

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 72/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 73/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 74/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 75/96

  .

 

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 76/96

 

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 77/96

 

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 78/96

 

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 79/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 80/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 81/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 82/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 83/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 84/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 85/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 86/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 87/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 88/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 89/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 90/96

  .

  .

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 91/96

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 92/96

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 93/96

7/18/2019 Analisis Unitarios Paquete

http://slidepdf.com/reader/full/analisis-unitarios-paquete 94/96

7/18/2019 Analisis Unitarios Paquete