Asta vs Primavera

download Asta vs Primavera

of 8

Transcript of Asta vs Primavera

  • 8/10/2019 Asta vs Primavera

    1/8

    24 REASONS TO USE ASTA POWERPROJECT

    RATHER THAN PRIMAVERA FOR MANAGING

    CONSTRUCTION PROJECTS

    www.astadev.com

    powerproject

  • 8/10/2019 Asta vs Primavera

    2/8

    2 Asta Powerproject gives youunparalleled control over the

    presentation of your plan. The

    outstanding visual presentation

    of project plans improves

    communication and impresses

    clients.

    Choose exactly which features

    are displayed such as float, non-

    driving links, etc..

    Add annotations such as text,

    graphics and hyperlinks to

    enhance the plan and highlight

    important information.

    Control the type, colour and

    thickness of horizontal and

    vertical grid lines, including the

    individual grid lines of any given

    row or specific date.

    Control the colour of horizontal

    and vertical bands in order to

    highlight Work Breakdown

    Structure levels, Activity Codes

    and date periods.

    UNPARALLELED CONTROL OVER THE PRESENTATION OF YOUR PLANS

    Surround the output with a

    customisable 4-sided border that

    can include unlimited logos, text

    references, notes, issue numbers,

    revision numbers, etc..

    Control the format of the

    output including number of

    lines per page, page breaks,

    legend appearance, order, font

    and page size.

    Communicate plans clearly

    1FAMILIAR, ACCESSIBLE INTERFACE

    24 REASONS TO USE ASTA POWERPROJECT RATHER THAN

    PRIMAVERA FOR MANAGING CONSTRUCTION PROJECTS

    powerproject

    2

    Familiar, easy-to-use interface

    Asta Powerprojects familiar,

    accessible interface makes it

    intuitive to use, enabling you to

    get up and running quickly and

    minimising training costs.

    Asta Powerproject has a classic

    Microsoft Office look and feel,

    with the same high level menu

    structure and short cuts (Ctrl+C

    = copy, Ctrl+A = select all,

    etc.).

    You can customise and control

    the Asta Powerproject toolbars

    to suit your needs.

    The workable screen area in

    Asta Powerproject is as large as

    possible, giving excellent

    presentation on a single

    medium-resolution screen.

  • 8/10/2019 Asta vs Primavera

    3/8

    Asta Powerproject is very powerful

    but also very easy-to-use.

    Phil Solomon,Planning Operations Director, Mace

    3 SCHEDULE CORRECTLY WITH MIXED CALENDARSAsta Powerproject always uses the correct

    calendar when two activities with different

    calendars are linked together, giving you

    accurate results that you can rely on.

    Asta Powerproject uses the

    predecessors calendar for Start-to-

    Start links and the successors

    calendar for Finish-to-Finish links,

    ensuring you always get the correct

    result.

    In this example the Start-to-Start link

    is based on the Task A (predecessor)

    calendar as Task B (successor) can

    only start 2 weeks after Task A has

    started.

    The Finish-to-Finish link is based on

    the Task B (successor) calendar,

    allowing the last 2 weeks of Task B to

    take place after Task A has finished.

    This Start-to-Start link allowsTask B to start 2 weeks after

    Task A has started. This link is

    critical and driving.

    This Finish-to-Finish link allowsthe last 2 weeks of Task B to

    happen after Task A has finished.

    This link is not critical or driving.

    Call us on 01844 261700

    to find out more

    Find out more at

    www.astadev.com/primavera 3

    4In Asta Powerproject you can assign a

    Link Category to links which enables logic

    differences to be remembered and

    demonstrated during a reschedule,

    without having to keep copies of the

    project and maintain more than one

    project file.

    You can have an unlimited number of Link

    Categories which you can name and

    configure to meet your requirements.

    Select the appearance of each link

    category (line style, colour, arrow-head

    type).

    Decide whether to display each link

    category on the plan.

    Choose whether to exclude selected

    link categories from the Critical Path

    calculation.

    DIFFERENTIATE BETWEEN DIFFERENT TYPES OF LINKS

    The Link Category affects

    the appearance of the link

    and excludes it from the

    Critical Path calculation.

    The Link Category affects

    the appearance of the linkand includes it in the

    Critical Path calculation.

    5Asta Powerproject is a powerful tool that is

    also very user-friendly. You can get up and

    running very quickly while our comprehensive

    range of training courses enables you to get

    the most from the software.

    POWERFUL AND USER-FRIENDLY

  • 8/10/2019 Asta vs Primavera

    4/8

    6 SERIOUSLY ACCURATE PROGRESS REPORTINGAsta Powerproject offers unrivalled progress

    reporting features, allowing you to keep

    records with a very fine level of detail.

    Record exactly what happened in every

    progress reporting period throughout the

    life of an activity, including actual cost,

    actual effort, actual %, actual work, etc..

    Record progress against user defined

    Progress Periods the %, cost, effort

    (man-hours/days), work etc. during the

    period are recorded. This enables you to

    produce very accurate graphs and

    histograms showing, for example, that 5%

    was completed in Week 1, 60% in Week

    2 and 35% in Week 3.

    Record multiple gaps and resume dates

    to show the true record of intermittent

    activities.

    Progress in each Progress Period is displayed in a separate colour

    24 REASONS TO USE ASTA POWERPROJECT RATHER THAN PRIMAVERA FOR MANAGING CONSTRUCTION PROJECTS

    4

    8Asta Powerproject allows you to

    control the visual appearance, content

    and placement of annotations,

    improving project communication and

    making the project plan as effective

    as possible.

    Control the font effect for each

    character within a text annotation,

    not just the whole annotation.

    Place unattached text annotations

    anywhere on the plan.

    Attach annotations to an activity

    so that the annotation moves with

    the activity.

    References to underlying

    data constantly updated

    Embed data values in attached

    annotations so that if changes occur

    to the project and the underlying data

    changes, the annotation will update

    automatically to show the new

    information. For example, if you

    include the end date of a specific

    task in an attached annotation

    and the activity is then delayed by

    2 weeks, the annotation will update

    automatically to show the new end

    date for the activity.

    Include pictures and other Microsoft

    objects such as spreadsheets and

    movies in annotations.

    Mixed font effects possible

    7 JAGGED PROGRESS VIEWIn Asta Powerproject you create a

    Jagged Line Progress view in seconds!

    This allows you to monitor the project

    and keep an accurate As-Built record of

    the work undertaken.

    Using a single pre-configured menu

    option you can transpose the

    percentage complete from each

    Progress Period for each activity onto

    the baseline task to turn an As-Built

    plan into a Jagged Line Progress view.

    EFFECTIVE, ACCURATE ANNOTATIONS

    Forecast

    Actual progress in Week 4

    Baseline

  • 8/10/2019 Asta vs Primavera

    5/8

    10

    11

    With Asta Powerproject you can share your

    project plans quickly and easily, improving

    communication and collaboration.

    You dont have to pay anything to look

    at Asta Powerproject plans. The freely-

    available Asta Project Viewer enables

    users to open, navigate (in defined

    limits) and print Asta Powerproject files.

    Asta Powerproject has excellent data

    interchange with Primavera and

    Microsoft Project.

    Project and activity data, including all

    calendars, resource libraries, activity

    codes, Work Breakdown Structures etc.

    can be exported from Asta Powerproject

    in Microsoft and Primavera formats.

    Microsoft and Primavera project files can

    also be imported into Asta Powerproject.

    This enables you to work on your

    projects in Asta Powerproject and then

    export them in Primavera or Microsoft

    formats so they can be accessed by

    users of other software solutions.

    SHARE PROJECT PLANS MORE EASILY AND AT NO ADDITIONAL COST

    9 CONTROL THE APPEARANCE OF ACTIVITIES, RESOURCES & COSTSWith full control over the on-screen

    appearance in Asta Powerproject you can

    ensure the project plan is as clear and

    easy to understand as possible.

    Choose the appearance of activity

    codes as well as resource and cost

    assignments. The appearance of the

    activities (or resource/cost tasks) can

    be set to reflect your appearance

    preferences and a colour-coded

    legend is included in presentation

    outputs.

    The same colour coding and legend

    can be applied to the resources in a

    graph so you can clearly see the

    quantities generated from eachsource.

    Easy to save in Primavera format

    DETAILED DATE ZONE

    With Asta Powerproject you can

    include up to 10 rows in the Date

    Zone, ensuring the plan is both

    detailed and easy to understand.

    Call us on 01844 261700

    to find out more

    5

    Find out more at

    www.astadev.com/primavera

    Multiple time zones in the date line

    Choose how project information is displayed

  • 8/10/2019 Asta vs Primavera

    6/8

    12 MULTIPLE TASKS PER LINEAsta Powerprojects ability to display multiple tasks per line

    enables you to save time when planning repeated tasks

    and improve the presentation of your plans.

    Save time and avoid the need to laboriouslycreate tasks on dozens of different rows.

    USES INCLUDE:

    Procurement planning for the various stages of bidding and awarding contracts for different work packages of a project:

    Repetitive processes such as the finishes stages of a commercial construction project, apartment fit-out, or the

    construction of a house:

    Intermittent activities or locations of a process:

    Distinguish clearly between different tasks on the same

    row of the plan through colour-coding and shading the

    level of detail is not compromised!

    Improve the presentation of your plans multiple tasks perline allows information to be presented in a very compact

    form on a single sheet rather than on multiple pages.

    Asta Powerproject gives you unrivalled control over your task

    types, enabling you to plan more accurately and identify ways

    to deliver the project more efficiently. Task types include:

    Buffer tasks. These can shrink or grow and act as

    contingency or risk monitors, supporting the

    critical-chain concept.

    Forced critical tasks. Forcing a task to become critical

    supports multiple critical paths within a single project.

    Interruptible tasks. The start of the task is determined by

    the incoming links and the task can grow or shrink. This

    allows successor tasks to often start earlier than originally

    scheduled, thereby shortening the critical path. This does,

    of course, have resourcing implications.

    Tasks with deadline flags. A deadline flag is an imposed

    end date that does not stop a task finishing later than the

    imposed date but changes colour and gives a warning

    when the imposed date is passed.

    14 UNRIVALLED CONTROL OVER YOUR TASK TYPES

    13 IDENTIFY AND HIDE NON-DRIVING LINKSNon-driving link

    displayed

    24 REASONS TO USE ASTA POWERPROJECT RATHER THAN PRIMAVERA FOR MANAGING CONSTRUCTION PROJECTS

    6

    Links which do not position an activity but do affect

    the float calculation are termed non-driving links i.e.

    they do not drive the position of tasks.

    With Asta Powerproject you can distinguish

    graphically between non-driving links and drivinglinks. You can also choose whether to hide or display

    non-driving links on screen and in printouts.

    Non-driving

    link hidden

    Non-driving link

    distinguished

  • 8/10/2019 Asta vs Primavera

    7/8

    15 CALCULATE AND DISPLAY FREE FLOAT EASILYIn Asta Powerproject it is simple to display Free

    Float no Global Change routines required!

    The Free Float period and dates are always

    calculated by a Critical Path calculation andcan be displayed on the bar chart with one

    easy command.

    Free Float periods and dates can be displayed

    in the spreadsheet columns.

    With Asta Powerproject you can decide on the length ofthe working day for each calendar. This ensures that

    durations are displayed accurately when different activities

    have different working hours per day.

    For example, you can set Calendar A to have a 24-hour

    day and Calendar B to have an 8-hour day. A task that

    16 DISPLAY DURATIONS ACCURATELYtakes 24 hours will take 1 day when scheduled usingCalendar A and 3 days when scheduled using Calendar B.

    You can also print your calendars for quick and easy review

    of holidays and working patterns.

    In Asta Powerproject you can enter and display

    both working time and elapsed time, helping

    you plan and schedule more precisely.

    For example, if you have a task that takes 10

    working days and there is a 1 week holiday

    period in the middle of the task, the duration

    can be displayed both as 2 working weeks and

    3 elapsed weeks.

    Elapsed time durations can also be displayed

    in elapsed months for work over longer

    timeframes.

    Call us on 01844 261700

    to find out more

    In Asta Powerproject you can schedule to the hour, minute

    or second! This enables you to detail correctly the precise

    duration of each activity and specify the exact start and end

    times of shut-down periods, holidays and shifts.

    17 CALCULATE ELAPSED TIME AS WELL AS WORKING TIME

    18 SCHEDULE SHORT ACTIVITIES PRECISELYThe feature is particularly useful on short projects, such as

    24 hour railway possessions or oil refinery maintenance

    shutdowns, where activities can have durations of minutes

    and scheduling requirements are complex.

    7

    Find out more at

    www.astadev.com/primavera

    The working duration for both tasks is 1 week, 4 days but

    due to differing holidays and weekend working they take

    different lengths of time to complete (elapsed duration)

    Holiday Weekend

    Asta Powerprojects unlimited Undo and Redo

    function allows you to undo as much as you like,

    including through a Save, a Critical Path calculation

    and a Resource Levelling exercise.

    19 UNDO AS MANY TIMES AS YOU LIKE!This makes it easy to try out a number of different

    scenarios quickly and easily without permanently

    affecting the plan.

  • 8/10/2019 Asta vs Primavera

    8/8

    To find out more and to arrange

    a personal demonstration,

    call us on 01844 261700.

    Asta Development plc

    Kingston House

    Goodsons Mews

    Wellington Street

    Thame

    OxfordshireOX9 3BX

    United Kingdom

    Tel: +44 (0)1844 261700

    Fax: +44 (0)1844 261314

    www.astadev.com

    [email protected]

    2008 Asta Development plc.

    Asta Powerproject is a registered trademark of Asta Development plc.

    All trademarks recognised. E & OE.

    20 SCHEDULE GROUPED ACTIVITIES AND OVERHEAD COSTS CORRECTLY

    In Asta Powerproject resource cost rates are independent of the resource and

    you can have as many resource cost rates as you require.

    In Asta Powerproject you can allocate resources and costs to both Summary Tasks

    (which group related activities in the Work Breakdown Structure) and Hammock Tasks

    (which group potentially unrelated activities). You can also create logic links to/from thestart and end of Summary Tasks and to/from the end of Hammock Tasks.

    You can assign individual calendars to Summary Tasks, Hammock Tasks and charts,

    ensuring that they always display correctly.

    These features enable you to correctly schedule overhead costs and resources, such as

    cranes, hoists and management charges, and integrate them into the plan. They also

    enable you to allow one major portion of the project to dictate when another major

    portion should start.

    Asta Powerproject includes Microsoft Visual Basic for Applications, the same

    programming language that is used in Microsoft Word and Microsoft Excel. This

    allows Asta to create specific extensions, integrations and automated routines

    to meet the specific needs of individual users.

    Asta Powerproject enables you to enter and display costs in different currenciesand switch between currencies at will. For example, you can calculate costs in

    Sterling but display them in Euros (or any other currency of your choice).

    The flexible currency display is particularly useful when working with partners

    from different countries or on international projects.

    21 FLEXIBLE CURRENCY DISPLAY

    22 MULTIPLE RESOURCE COST RATES

    23 CUSTOM MACROS TO MEET SPECIFIC REQUIREMENTS

    8

    Microsoft Project is a registered

    trademark of Microsoft Corp.Primavera is a registered

    trademark of Primavera

    Systems Inc

    Choose the type of Asta Powerproject licence that meets your needs -

    standalone, network or Enterprise. With standalone and network licences

    there is no need to purchase a new database as project data is storedon your computer system.

    24 FLEXIBLE, COST-EFFECTIVE LICENCING