BTS HOTEL PLAN forUGM-Yogyakarta – Central JavaBTS HOTEL PLAN forUGM-Yogyakarta – Central Java
1/11BTS Hotel Presentation to UGM, 271212
Agenda• The BTS Hotel for UGM Campus Yogyakarta,
…….Background• The Result of Drive Test,…. The Telkomsel’s signal in
UGM Campus Yogyakarta• The Proposed Quality Improvement Solutions,…….
The BTS Hotel System Solution• The Outdoor & Indoor Solution Candidates and Target
Coverage Solution• The Project Organization & Time line
• The BTS Hotel for UGM Campus Yogyakarta,…….Background
• The Result of Drive Test,…. The Telkomsel’s signal inUGM Campus Yogyakarta
• The Proposed Quality Improvement Solutions,…….The BTS Hotel System Solution
• The Outdoor & Indoor Solution Candidates and TargetCoverage Solution
• The Project Organization & Time line
2/11BTS Hotel Presentation to UGM, 271212
Background• Looking at the result of drive test, we definitely need
both Indoor and Outdoor Coverage solution for both 2Gand 3G.
• With New Technology of ‘Feeder-less BTS’ and‘Camouflage Antenna’ then we can make good coverageboth Indoor and Outdoor as well as maintain goodesthetic.
• Telkomsel/Mitratel comes up with solution:– Outdoor coverage using Single operator scheme– Indoor coverage using Multi-Operator scheme
with use of carrier combiner technology from Thirdparty
• Looking at the result of drive test, we definitely needboth Indoor and Outdoor Coverage solution for both 2Gand 3G.
• With New Technology of ‘Feeder-less BTS’ and‘Camouflage Antenna’ then we can make good coverageboth Indoor and Outdoor as well as maintain goodesthetic.
• Telkomsel/Mitratel comes up with solution:– Outdoor coverage using Single operator scheme– Indoor coverage using Multi-Operator scheme
with use of carrier combiner technology from Thirdparty
3/11BTS Hotel Presentation to UGM, 271212
The Proposed Architecture
• Target Battery is for 2 hours back up• 1 BTS power consumption is 825 watt• Antenna is 16 dBi (K80010681) with 80
cm tall• F/O Backhaul is using Telkom Indoor
Antenna
OutdoorAntenna
Resources: HUAWEI TECHNOLOGIES Co, Ltd
RNC/BSC BBU
Fiber optic BackhaulFiber optic Backbone/Access
UGM-PPTIK orSTO Kota BaruTelkomsel Office
Electricity / PLNFeeder cables
PLN
KWH Meter +Rectifier-Battery
OutdoorAntenna
RadioUnit
PLN
KWH Meter +Rectifier-Battery
RadioUnit
4/11BTS Hotel Presentation to UGM, 271212
Fiber Optic Path &Solution Candidates
Man/Hand holeFiber Access
Fiber Backbone
Note:
Outdoor solution
Indoor solution
Man/Hand hole
Running an UndergroundBackbone Fiber Optic Cables Ring
96 core 2.63 km length
5/11BTS Hotel Presentation to UGM, 271212
Outdoor SolutionCandidates
Outdoor solution10 sites
Note:
6/11BTS Hotel Presentation to UGM, 271212
Indoor SolutionCandidates
Indoor solution16 IBS
Note:Indoor solution16 IBS
7/11BTS Hotel Presentation to UGM, 271212
Solution Topology
KedokteranGigi
UPT Komputer
Bahasa
WM-7 Graha Saba Farmasi WM-6
WM-10
WM-5
SIC WM-9 Rektorat
KedokteranGigi
WM-8
UC
Ekonomi
MasjidUGM
Psikologi Filsafat FisipolWM-4 WM-2 TeknikPertanian
Hukum
WM-3
WM-1
WM-10
Outdoor solution
Indoor solution
Man/Hand hole
Fiber Access
Fiber Backbone
8/11BTS Hotel Presentation to UGM, 271212
Target CoverageOutdoor Solution
9/11BTS Hotel Presentation to UGM, 271212
The ProjectOrganization
Agreement
Agreement
UserProject OwnerPelaksanaProyek
The Main Scope of Work:• Preparation• Implementation• Integration and Interconnection• Function Test, ATP and Documentation
10/11BTS Hotel Presentation to UGM, 271212