Calendario Valorizado de Avance de Obra (1)

10
Página 1 de 10 Calendario Valorizado de Avance de Ob Obra : CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATO Ubicacion : CHARACATO - AREQUIPA - AREQUIPA Costo A : Ago - 2014 Cliente : MUNICIPALIDAD DISTRITAL DE CHARACAT PLAZO DE E Item Descripcion Unid Metrado Parcial 30 Dias MIRADOR 01 SEGURIDAD Y SALUD EN OBRA 01.01 MES 2.00 250.00 500.00 500.00 01.02 GLB 1.00 1,395.70 1,395.70 1,395.70 01.03 UND 20.00 199.59 3,991.80 3,991.80 02 OBRAS PROVISIONALES 02.01 M2 15.00 112.85 1,692.75 1,692.75 02.02 PZA 1.00 897.47 897.47 897.47 02.03 DIA 15.00 116.88 1,753.20 1,753.20 03 OBRAS PRELIMINARES 03.01 M2 572.52 1.63 933.21 933.21 03.02 M2 572.52 0.83 475.19 475.19 03.03 M3 108.40 14.47 1,568.55 1,568.55 04 MOVIMIENTO DE TIERRAS 04.01 EXPLANACIONES 04.01.0 M2 194.62 3.71 722.04 722.04 04.01.0 M2 194.62 1.43 278.31 278.31 04.02 RELLENO CON MATERIAL DE PRESTAMO 04.02.0 M2 101.52 19.28 1,957.31 652.44 04.02.0 M2 110.75 2.49 275.77 - 04.03 EXCAVACIONES MASIVAS 04.03.0 M3 48.42 31.80 1,539.76 1,539.76 04.03.0 M3 45.90 16.20 743.58 371.79 05 OBRAS DE CONCRETO SIMPLE 05.01 M3 56.31 324.95 18,297.93 18,297.93 05.02 M2 207.97 54.13 11,257.42 11,257.42 05.03 M2 148.40 47.17 7,000.03 7,000.03 05.04 M 5.65 33.02 186.56 186.56 05.05 M3 24.14 184.75 4,459.87 4,459.87 05.06 M3 5.61 245.81 1,378.99 1,378.99 Precio Unitario SEGURIDAD Y SUPERVISION DE EQUIPOS DE PROTECCION COLECTIVA EQUIPOS DE PROTECCION INDIVIDUAL ALMACEN, GUARDIANIA Y CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACIÓN DESMOVILIZACION DE EQUIPOS Y REPLANTEO LIMPIEZA DE TERRENO MANUAL ELIMINACION DE MATERIAL EXCEDENTE ESCARIFICADO h=30 cm COMPACTADO C/PLANCHA BASE COMPACTADA DE h= 20 cm PARA CALZADAS COLOCACION DE CAMA DE ARENA H=0.05 m EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECO RELLENO COMPACTADO C/EQUIPO MAT/PROPIO MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4" MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO. CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 m CIMIENTOS CORRIDOS 1:10+30% P.G. SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)

description

calendario valoreizado

Transcript of Calendario Valorizado de Avance de Obra (1)

Calendario Valorizado

Calendario Valorizado de Avance de ObraObra: CONSTRUCCION PARQUE SAN FRANCISCO, DISTRITO DE CHARACATO13 de febreroUbicacion: CHARACATO - AREQUIPA - AREQUIPACosto A: Ago - 2014Cliente: MUNICIPALIDAD DISTRITAL DE CHARACATOPLAZO DE EJECUCIONItemDescripcionUnidMetradoPrecioUnitarioParcial30 Dias 30 Dias TOTAL60 Dias

MIRADOR 01SEGURIDAD Y SALUD EN OBRA 01.01S.C. PLAN DE SEGURIDAD Y SUPERVISION DE OBRAMES2.00250.00500.00500.000.0500.00 01.02EQUIPOS DE PROTECCION COLECTIVAGLB1.001,395.701,395.701,395.700.01,395.70 01.03EQUIPOS DE PROTECCION INDIVIDUALUND20.00199.593,991.803,991.800.03,991.80 02OBRAS PROVISIONALES 02.01CASETA DE ALMACEN, GUARDIANIA Y OFICINASM215.00112.851,692.751,692.750.01,692.75 02.02CARTEL DE OBRA DE 2.40m x 3.60m INCL. COLOCACINPZA1.00897.47897.47897.470.0897.47 02.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MATERIALESDIA15.00116.881,753.201,753.200.01,753.20 03OBRAS PRELIMINARES 03.01TRAZO Y REPLANTEO PRELIMINARM2572.521.63933.21933.210.0933.21 03.02LIMPIEZA DE TERRENO MANUALM2572.520.83475.19475.190.0475.19 03.03ELIMINACION DE MATERIAL EXCEDENTEM3108.4014.471,568.551,568.550.01,568.55 04MOVIMIENTO DE TIERRAS 04.01EXPLANACIONES 04.01.01ESCARIFICADO h=30 cmM2194.623.71722.04722.040.0722.04 04.01.02COMPACTADO C/PLANCHAM2194.621.43278.31278.310.0278.31 04.02RELLENO CON MATERIAL DE PRESTAMO 04.02.01BASE COMPACTADA DE h= 20 cm PARA CALZADASM2101.5219.281,957.31652.441,304.871,957.31 04.02.02COLOCACION DE CAMA DE ARENA H=0.05 mM2110.752.49275.770.0275.77275.77 04.03EXCAVACIONES MASIVAS 04.03.01EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.00 MT TERRENO NORMAL SECOM348.4231.801,539.761,539.760.01,539.76 04.03.02RELLENO COMPACTADO C/EQUIPO MAT/PROPIOM345.9016.20743.58371.79371.79743.58 05OBRAS DE CONCRETO SIMPLE 05.01MUROS DE CONTENC, CONCRETO 175 kg/cm2 + 30% P.M. 4"M356.31324.9518,297.9318,297.930.018,297.93 05.02MUROS DE CONTENCION, ENCOF. Y DESENCOFRADO.M2207.9754.1311,257.4211,257.420.011,257.42 05.03VEREDA CONCRETO 175 kg/cm2 e=4" ACABADO PULIDO 1:2M2148.4047.177,000.037,000.030.07,000.03 05.04VEREDA, ENCOFRADO Y DESENCOFRADO H=0.3 mM5.6533.02186.56186.560.0186.56 05.05CIMIENTOS CORRIDOS 1:10+30% P.G.M324.14184.754,459.874,459.870.04,459.87 05.06SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. (1P)M35.61245.811,378.991,378.990.01,378.99 05.07SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADOM286.3227.092,338.412,338.410.02,338.41 06OBRAS DE CONCRETO ARMADO 06.01COLUMNAS, ENCOFRADO Y DESENCOFRADOM237.2053.671,996.520.01,996.521,996.52 06.02COLUMNAS, CONCRETO 175 KG/CM2M32.79405.161,130.400.01,130.401,130.40 06.03COLUMNAS, ACERO fy=4200 kg/cm2KG280.675.421,521.23760.62760.611,521.23 07REVOQUES ENLUCIDOS Y MOLDURAS 07.01TARRAJEO EN MURO: EXTERIORESM2192.4820.703,984.340.03,984.343,984.34 07.02REVESTIMIENTO EN SILLARM242.4365.232,767.710.02,767.712,767.71 07.03MOLDURA EN SILLAR PARA BASEM43.60110.414,813.880.04,813.884,813.88 07.04MOLDURA EN SILLAR PARA CABECERAM35.20114.654,035.680.04,035.684,035.68 08PISOS Y PAVIMENTOS 08.01PISO ADOQUIN DE CONCRETO 08.01.01CALZADA DE ADOQUIN DE CONCRETOM292.9751.444,782.380.04,782.384,782.38 08.01.02SELLADO DE JUNTASM292.974.06377.460.0377.46377.46 08.02PISO-LAJA CORTE REGULAR 08.02.01PISO PIEDRA TALAMOLLE REGULAR ARENADO FORMATO 0.30 X 0.30 mM252.24107.675,624.680.05,624.685,624.68 08.02.02PISO PIEDRA TALAMOLLE NATURAL FORMATO 0.10 X 0.25M295.98187.0917,956.900.017,956.9017,956.90 08.03BERMA 08.03.01BERMA DE BLOCK GRASSM245.3428.651,298.990.01,298.991,298.99 09PINTURA 09.01PINTURA LATEX EN MUROS INTERIOR Y EXTERIORM277.2010.55814.460.0814.46814.46 10CARPINTERIA DE MADERA 10.01PERGOLA DE MADERAUND1.003,060.323,060.320.03,060.323,060.32 11CARPINTERIA METALICA 11.01BANCA METALICA ORNAMENTALUND4.00730.002,920.000.02,920.002,920.00 11.02POSTE METALICO ORNAMENTAL H=3.25UND6.00550.003,300.000.03,300.003,300.00 11.03BASURERO METALICOUND2.00180.00360.000.0360.00360.00 11.04BARANDAS METALICAS EN TUBO NEGRO DE 2" Y TUBO METALICO DE 5/8" X 1.5mm (TIPO ORNAMENTAL)M41.1979.223,263.070.03,263.073,263.07 12TRATAMIENTO DE AREAS VERDES 12.01RELLENO CON TIERRA DE CHACRAM310.84144.271,563.890.01,563.891,563.89 12.02NIVELACION INTERIOR Y APISONADO C/EQUIPOM2108.363.55384.680.0384.68384.68 12.03SEMBRADO DE GRASS (AMERCICANO) EN BLOQUES DE 0.50 * 0.50 cmM2108.365.53599.230.0599.23599.23 12.04SEMBRADO DE PLANTONES DE ARBOLES h=1.50UND11.00100.281,103.080.01,103.081,103.08 12.05SEMBRADO DE FLORESUND750.005.153,862.500.03,862.503,862.50 13INSTALACIONES ELECTRICAS 13.01CABLEADO SUBTERRANEO 13.01.01EXCAVACION MANUALM36.2725.43159.45159.450.0159.45 13.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M31.3311.90372.83372.830.0372.83 13.01.03POZO DE TIERRAUND1.001,835.681,835.681,835.680.01,835.68 13.01.04CONDUCTOR NYY 6mm2 ALUMBRADOM49.3311.51567.79567.790.0567.79 13.02ACCESORIOS Y ARTEFACTOS 13.02.01SUMINISTRO E INSTALACION DE LUMINARIA de 1x70 A.F. JOSFELUND12.00326.903,922.803,922.800.03,922.80 13.02.02TABLERO GENERAL TG 2-3x150A, 1-2x20 AUND1.00388.89388.89388.890.0388.89 14SISTEMA DE RIEGO 14.01CANALIZACIONES Y/O TUBERIAS 14.01.01EXCAVACION MANUALM36.7425.43171.40171.400.0171.40 14.01.02RELLENO Y COMPACTACION DE ZANJAS A=0.50m H=0.65M33.7011.90401.03401.030.0401.03 14.01.03TUBERIA PVC CLASE 10 - 1/2"M33.7012.46419.90419.900.0419.90 14.02ARTEFACTOS Y ACCESORIOS 14.02.01LLAVE DE RIEGO C/GRIFO DE 1/2" EN CAJUELA CONCRETO f'c 140 S/DPZA4.00133.72534.88534.880.0534.88 14.02.02MEDIDOR DE AGUA DE 3/4"PZA1.00739.63739.63739.630.0739.63 15VARIOS 15.01SERVICIO DE MEDIDOR DE AGUAUND1.00320.00320.00320.000.0320.00 15.02SERVICIO DE MEDIDOR DE LUZUND1.00487.79487.79487.790.0487.79 15.03PRUEBA HIDRAULICA RED DE AGUAM36.728.59315.42315.420.0315.42 15.04PRUEBA DE DENSIDAD DE CAMPOUND5.0055.00275.000.0275.00275.00 15.05PRUEBA DE CALIDAD DEL CONCRETOUND20.0024.94498.80498.800.0498.80 15.06LIMPIEZA FINAL EN OBRAM2542.071.32715.530.0715.53715.53 15.07JUNTA CON SELLO ASFALTICOM47.046.10286.940.0286.94286.94 15.08TRASLADO DE POSTES DE ALUMBRADOUND4.001,145.974,583.884,583.880.04,583.88

COSTO DIRECTO152,162.8978,172.2173,990.68152,162.89GASTOS GENERALES8 %12,173.036,253.785,919.2512,173.03UTILIDAD10 %15,216.297,817.227,399.0715,216.29SUB TOTAL179,552.2192,243.2187,309.00179,552.21IGV.18 %32,319.4016,603.7815,715.6232,319.40PRESUPUESTO TOTAL211,871.61108,846.99103,024.62211,871.61TOTAL ACUMULADO108,846.99211,871.61PORCENTAJE DE AVANCE51.37% 48.63% PORCENTAJE ACUMULADO51.37% 100.00%

&"Times New Roman,Negrita Cursiva"&8Pgina &P de &N

Hoja1

Hoja2