DESCRIPCIÓN PRESUPUESTO TOTAL Und. Metrado Presupuesto ESTRUCTURAS ### OBRAS PRELIMINARES Y PROVISIONALES 15,132.96 TRAZO Y REPLANTEO m2 2,500.00 2.31 5,775.00 CASETA DE OFICINAS Y ALMACENES GLB 1.00 2,700.00 2,700.00 BAÑOS PROVISIONALES PARA OBRA - AMBIENTE PREFABRGLB 1.00 2,717.62 2,717.62 INSTALACIONES SANITARIAS PROVISIONALES GLB 1.00 1,970.17 1,970.17 INSTALACIONES ELECTRCAS PROVISIONALES GLB 1.00 1,970.17 1,970.17 MOVIMIENTO DE TIERRAS 76,935.58 EXCAVACION PARA CIMIENTOS HASTA 1.40 MT TERRENO m3 111.88 23.80 2,662.74 EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE m3 728.77 26.78 19,516.46 EXCAVACION DE SARDINELES m3 7.81 21.42 167.29 EXCAVACION PARA CISTERNA HASTA 2.40 MT TERRENO Nm3 79.11 30.60 2,420.77 RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO m3 302.24 15.92 4,811.66 CORTE SUPERFICIAL MANUAL HASTA 0.20 MT m3 228.30 13.39 3,056.94 NIVELACION INTERIOR APISONADO C/EQUIPOS LIVIANO m2 1,278.40 4.42 5,650.53 ACARREO DE DESMONTE PRODUCTO DE LA EXCAVACION m3 1,099.55 17.85 19,626.97 ELIMINACION DE DESMONTE m3 1,099.55 17.30 19,022.22 CONCRETO SIMPLE 48,272.91 FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON E=4" m2 1,278.40 20.71 26,475.66 SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 506.65 15.29 7,746.68 CIMIENTOS CORRIDOS MEZCLA 100KG/CM2 CEMENTO-HORMm3 86.11 163.17 14,050.57 ESTRUCTURAS METALICAS 36,336.19 ESTRUCTURA METALICA TUBULAR - PARA COLUMNAS,VIGAkg 3,450.73 10.53 36,336.19 CONCRETO ARMADO Y ESTRUCTURAS METALICAS 1,400,404.28 ZAPATAS 157,128.33 CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 405.46 248.26 100,659.50 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS m2 432.70 24.79 10,726.63 ACERO PARA ZAPATAS GRADO 60 kg 13,069.20 3.50 45,742.20 SOBRECIMIENTOS ARMADOS 14,686.53 CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 210 m3 20.35 265.74 5,407.81 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS REm2 186.20 27.47 5,114.91 ACERO EN SOBRECIMIENTO REFORZADO GRADO 60 kg 1,189.66 3.50 4,163.81 MUROS DE CONCRETO 10,691.18 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 m3 11.25 343.01 3,858.86 ENCOFRADO Y DESENCOF MUROS REFORZADOS m2 130.30 35.21 4,587.86 ACERO EN MUROS REFORZADOS GRADO 60 kg 623.46 3.60 2,244.46 COLUMNAS 168,757.43 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 133.54 348.15 46,491.95 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 784.50 39.44 30,940.68 ACERO CORRUGADO EN COLUMNAS kg 26,092.80 3.50 91,324.80 PLACAS Y MUROS DE CONCRETO 75,041.22 CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 210 m3 80.67 339.01 27,347.94 Precio Unitario S/.

description

j

Transcript of Chekealho Cumpa

Page 1: Chekealho Cumpa

DESCRIPCIÓN

PRESUPUESTO TOTAL

Und. Metrado Presupuesto

ESTRUCTURAS ###OBRAS PRELIMINARES Y PROVISIONALES 15,132.96 diferencia TRAZO Y REPLANTEO m2 2,500.00 2.31 5,775.00 2,500.00 0.00

CASETA DE OFICINAS Y ALMACENES GLB 1.00 2,700.00 2,700.00 1.00 0.00

BAÑOS PROVISIONALES PARA OBRA - AMBIENTE GLB 1.00 2,717.62 2,717.62 1.00 0.00

INSTALACIONES SANITARIAS PROVISIONALES GLB 1.00 1,970.17 1,970.17 1.00 0.00

INSTALACIONES ELECTRCAS PROVISIONALES GLB 1.00 1,970.17 1,970.17 1.00 0.00

MOVIMIENTO DE TIERRAS 76,935.58

EXCAVACION PARA CIMIENTOS HASTA 1.40 MT m3 111.88 23.80 2,662.74 144.84 32.96

EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 m3 728.77 26.78 19,516.46 733.62 4.85

EXCAVACION DE SARDINELES m3 7.81 21.42 167.29 7.81 0.00

EXCAVACION PARA CISTERNA HASTA 2.40 MT T m3 79.11 30.60 2,420.77 79.11 0.00

RELLENO DE ZANJAS APISONADO CON MATERIAL m3 302.24 15.92 4,811.66 341.81 39.57

CORTE SUPERFICIAL MANUAL HASTA 0.20 MT m3 228.30 13.39 3,056.94 271.51 43.21

NIVELACION INTERIOR APISONADO C/EQUIPOS LI m2 1,278.40 4.42 5,650.53 1,357.56 79.16

ACARREO DE DESMONTE PRODUCTO DE LA EXCAm3 1,099.55 17.85 19,626.97 1,097.28 -2.27

ELIMINACION DE DESMONTE m3 1,099.55 17.30 19,022.22 1,097.28 -2.27

CONCRETO SIMPLE 48,272.91

FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON m2 1,278.40 20.71 26,475.66 1,357.56 79.16

SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGOm2 506.65 15.29 7,746.68 506.65 0.00

CIMIENTOS CORRIDOS MEZCLA 100KG/CM2 CEM m3 86.11 163.17 14,050.57 113.37 27.26

ESTRUCTURAS METALICAS 36,336.19

ESTRUCTURA METALICA TUBULAR - PARA COLUMNkg 3,450.73 10.53 36,336.19 -3,450.73

CONCRETO ARMADO Y ESTRUCTURAS METALICAS ###

ZAPATAS 157,128.33

CONCRETO PARA ZAPATAS F'C=210 KG/CM2 m3 405.46 248.26 100,659.50 416.99 11.53

ENCOFRADO Y DESENCOFRADO PARA ZAPATASm2 432.70 24.79 10,726.63 461.60 28.90

ACERO PARA ZAPATAS GRADO 60 kg 13,069.20 3.50 45,742.20 13,145.70 76.50

SOBRECIMIENTOS ARMADOS 14,686.53

CONCRETO EN SOBRECIMIENTO REFORZADO F'm3 20.35 265.74 5,407.81 22.75 2.40

ENCOFRADO Y DESENCOFRADO DE SOBRECIM m2 186.20 27.47 5,114.91 205.40 19.20

ACERO EN SOBRECIMIENTO REFORZADO GRAD kg 1,189.66 3.50 4,163.81 4,927.42 3,737.76

MUROS DE CONCRETO 10,691.18

CONCRETO EN MUROS REFORZADOS F'C= 210 m3 11.25 343.01 3,858.86 11.25 0.00

ENCOFRADO Y DESENCOF MUROS REFORZADOm2 130.30 35.21 4,587.86 130.30 0.00

ACERO EN MUROS REFORZADOS GRADO 60 kg 623.46 3.60 2,244.46 623.46 0.00

COLUMNAS 168,757.43

CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 133.54 348.15 46,491.95 133.29 -0.25

ENCOFRADO Y DESENCOFRADO NORMAL EN C m2 784.50 39.44 30,940.68 785.20 0.70

ACERO CORRUGADO EN COLUMNAS kg 26,092.80 3.50 91,324.80 25,989.79 -103.01

PLACAS Y MUROS DE CONCRETO 75,041.22

CONCRETO EN MUROS TABIQUES Y PLACAS F'C m3 80.67 339.01 27,347.94 94.76 14.09

Precio Unitario

S/.

Page 2: Chekealho Cumpa

ENCOFRADO Y DESENCOFRADO MUROS TABIQUm2 505.60 37.08 18,747.65 607.00 101.40

ACERO GRADO 60 EN MUROS TABIQUES Y PLACkg 8,270.18 3.50 28,945.63 8,367.75 97.57

VIGAS 316,145.29

CONCRETO EN VIGAS F'C=210 KG/CM2 m3 348.48 319.25 111,252.24 347.48 -1.00

ENCOFRADO Y DESENCOFRADO NORMAL EN VI m2 1,437.10 42.15 60,573.77 1,437.10 0.00

ACERO CORRUGADO EN VIGAS kg 41,234.08 3.50 144,319.28 41,907.78 673.70

LOSAS MACIZAS 614,333.85

CONCRETO EN LOSAS MACIZAS F'C=210 KG/CMm3 468.21 288.54 135,097.31 470.09 1.88

ENCOFRADO Y DESENCOFRADO NORMAL DE LOm2 1,872.80 39.71 74,368.89 1,872.80 0.00

ACERO GRADO 60 EN LOSAS MACIZAS kg 115,676.47 3.50 404,867.65 115,676.47 0.00

LOSAS ALIGERADAS 6,974.88 1° PISO

CONCRETO EN LOSAS ALIGERADAS F'C=210 K m3 5.74 305.82 1,755.41 5.74 0.00

ENCOFRADO Y DESENCOFRADO NORMAL EN L m2 65.60 31.65 2,076.24 65.60 0.00

ACERO CORRUGADO EN LOSAS ALIGERADAS kg 356.16 3.50 1,246.56 356.16 0.00

LADRILLO HUECO DE ARCILLA 15X30X30 CM und 787.00 2.41 1,896.67 551.51 -235.49

ESCALERAS 22,460.55

CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 28.27 318.11 8,992.97 28.27 0.00

ENCOFRADO Y DESENCOFRADO NORMAL EN E m2 91.40 47.60 4,350.64 91.40 0.00

ACERO CORRUGADO EN ESCALERAS kg 2,604.84 3.50 9,116.94 2,604.84 0.00

GRADAS 2,256.96

CONCRETO EN GRADAS F'C=210KG/CM2 m3 7.19 268.27 1,928.86 8.38 1.19

ENCOFRADO DE GRADAS REFORZADAS m2 4.20 23.87 100.25 3.90 -0.30

ACERO CORRUGADO EN GRADAS GRADO 60 kg 65.10 3.50 227.85 129.69 64.59

CISTERNA 11,928.06

CONCRETO EN CISTERNA SUBTERRANEA F'C=2m3 19.89 263.61 5,243.20 21.38 1.49

ENCOFRADO Y DESENCOFRADO NORMAL EN C m2 84.50 33.45 2,826.53 123.46 38.96

ACERO GRADO 60 EN CISTERNA SUBTERRANEAkg 1102.38 3.50 3,858.33 2,189.56 1,087.18

ARQUITECTURA ###MUROS Y TABIQUES 136,322.75

MURO DE SOGA LADRILLO KING-KONG CON CEM m2 413.03 45.69 18,871.34 420.95 7.92

MURO DE CABEZA LADRILLO KING-KONG CON C m2 1,227.95 74.29 91,224.41 1,231.44 3.48

TABIQUE DRYWALL PL. REGULAR 1/2" DE 12CM. m2 425.65 58.20 24,772.83 -425.65

TABIQUE DRYWALL PL. REGULAR 1/2" DE 12CM. m2 24.50 44.60 1,092.70 -24.50

TABIQUE DRYWALL PL. SANITARIA 1/2" DE 12CM. m2 5.28 68.46 361.47 -5.28

REVOQUES Y ENLUCIDOS 159,514.01

TARRAJEO RAYADO DE MUROS INTERIORES m2 317.94 14.47 4,600.59 318.79 0.85

TARRAJEO DE MUROS INTERIORES m2 2,235.15 15.87 35,471.83 2,812.83 577.68

TARRAJEO DE MUROS EXTERIORES m3 729.80 17.73 12,939.35 727.07 -2.73

TARRAJEO DE SUPERFICIE DE COLUMNAS CON C m2 784.50 20.61 16,168.55 584.67 -199.83

TARRAJEO DE SUPERFICIE DE PLACAS Y MUROS m2 505.60 20.58 10,405.25 938.98 433.38

TARRAJEO EN SUPERFICIE DE VIGAS CON CEMEN m2 1,437.10 20.61 29,618.63 1,282.50 -154.60

TARRAJEO CIELORRASOS CON MEZCLA DE CEME m2 56.82 20.42 1,160.26 -56.82

TARRAJEO DE LOSA MACIZA CON MEZCLA CEME m2 1,872.80 20.61 38,598.41 1,898.80 26.00

VESTIDURA DE DERRAMES m 568.50 8.92 5,071.02 411.80 -156.70

EJECUCION DE BRUÑAS DE 1X1 m 1,515.63 1.86 2,819.07 133.80 -1,381.83

TARRAJEO CON IMPERMEABILIZANTES m2 48.40 25.29 1,224.04 72.08 23.68

TARRAJEO FONDO DE ESCALERAS CON MEZCLA m2 66.10 21.74 1,437.01 44.38 -21.72

Page 3: Chekealho Cumpa

PISOS Y PAVIMENTOS 181,823.65

CONTRAPISO DE 40 MM. m2 2,328.03 19.25 44,814.58 1,427.03 -901.00

PISO CERAMICO PIEDRA GRIS 40X40 m2 382.76 52.38 20,048.97 1,242.24 859.48

PISO CERAMICO GRANILLA BLANCO NACIONAL 30m2 90.18 50.45 4,549.58 101.59 11.41

PISO CERAMICO GRANILLA GRIS NACIONAL 30X30m2 319.33 50.45 16,110.20 488.16 168.83

PISO CERAMICO GRANITO AZUL NACIONAL 40X40m2 1,334.98 52.74 70,406.85 -1,334.98

PISO DE 48 MM. ACABADO CEMENTO PULIDO CONm2 103.90 23.43 2,434.38 465.63 361.73

PISO DE 48 MM. DE CEMENTO ACABADO CEMEN m2 96.88 23.43 2,269.90 72.77 -24.11

PISO DE 48 MM. ACABADO CEMENTO SEMI PULI m2 6.00 25.80 154.80 48.52 42.52

AFIRMADO DE 4" PARA VEREDAS m2 103.90 12.61 1,310.18 223.88 119.98

FORJADO Y REVESTIM. DE GRADAS Y ESCALERAS m 156.45 18.26 2,856.78 164.20 7.75

FORJADO Y REVESTIM. DE GRADAS EN CEMENTOm 39.60 23.37 925.45 28.80 -10.80

FORJADO DE DESCANSOS DE ESCALERAS Y GRADm2 30.24 23.43 708.52 32.67 2.43

REVESTIMIENTO DE PASOS DE GRADAS Y ESCAL m 156.45 38.95 6,093.73 164.20 7.75

REVESTIMIENTO DE DESCANSOS DE GRADAS Y E m2 30.24 74.24 2,245.02 32.67 2.43

CANTONERA DE BORDE DE PASO EN CEMENTO P m 101.25 9.19 930.49 100.66 -0.59

CANTONERA DE BORDE DE PASO EN ALUMINIO m 55.20 21.69 1,197.29

VEREDA DE CONCRETO DE 4" F'C=175KG/CM2 m2 103.90 45.88 4,766.93 231.97 128.07

ZOCALOS Y CONTRAZOCALOS 35,585.89

ZOCALOS 23,760.28

ZOCALO CERAMICO NACIONAL GRANILLA BLAN m2 317.94 47.79 15,194.35 269.94 -48.00

ZOCALO DE CEMENTO PULIDO C/IMPERMEABI m2 124.15 30.24 3,754.30 290.48 166.33

ZOCALO DE MICROCEMENTO m2 64.43 74.68 4,811.63 145.24 80.81

CONTRAZOCALOS 11,825.61

CONTRAZOCALO CERAMICO NACIONAL GRANILLm 237.75 8.73 2,075.56 229.50 -8.25

CONTRAZOCALOS CERAMICA NACIONAL GRANI m 571.28 10.99 6,278.37 425.12 -146.16

CONTRAZOCALOS CERAMICA NACIONAL PIEDRAm 207.35 10.76 2,231.09 332.29 124.94

CONTRAZOCALO CEMENTO S/COLOREAR H = 1 m 134.70 9.21 1,240.59 69.84 -64.86

CARPINTERIA METALICA 73,786.85

BARANDA METALICA CENTRAL EN ESCALERAS IN m 12.75 99.18 1,264.55 11.60 -1.15

BARANDA METALICA EN BALCONES INC. ACABAD m 13.40 99.89 1,338.53 13.45 0.05

PUERTA METALICA CONTRAPLACADA INC. ACAB und 1.00 877.37 877.37 7.00 6.00

DIVISIONES DE URINARIOS EN ACERO INOX. , A und 4.00 326.37 1,305.48 7.00 3.00

PASAMANOS METALICOS EN ESCALERAS INC. A m 51.75 41.91 2,168.84 18.00 -33.75

PARASOL METALICO EN FACHADAS m 206.50 76.79 15,857.14 44.02 -162.48

CELOSIA QUIEBRAVISTA EN VENTANAS EXTERIORm2 231.50 169.84 39,317.96 60.65 -170.85

TUBO DE FE. DE 2"X1"X2MM INC. ACABADO EN m 121.20 34.71 4,206.85 102.00 -19.20

REJAS METALICAS EN VENTANAS DE TUBOS DE 2"m2 41.44 82.51 3,419.21 42.85 1.41

REJAS METALICAS EN VENTANAS DE TUBOS DE 2"m2 40.06 82.58 3,308.15 -40.06

ESCALERAS DE GATO INC. ACABADO und 1.00 311.59 311.59 2.00 1.00

TAPAS DE 60X60 C/MARCO PARA CISTERNA und 2.00 205.59 411.18 -2.00

CARPINTERIA DE MADERA 21,523.19

PUERTA CONTRAPLACADA DE 45 MM TRIPLAY m2 122.20 133.95 16,368.69 118.54 -3.66

DIVISIONES DE MELAMINA Y ALUMINIO PARA SSH m 16.90 305.00 5,154.50 12.75 -4.15

CUBIERTAS Y CIELOSRASOS 56,628.02

COBERTURA DE LADRILLO PASTELERO 25X25 m2 1,301.75 27.77 36,149.60 1,450.32 148.57

FALSO CIELORASO DE DRYWALL REGULAR DE 1m2 243.19 60.24 14,649.77 -243.19

FALSO CIELORASO DE DRYWALL SANITARIO DE m2 69.26 63.20 4,377.23 69.10 -0.16

Page 4: Chekealho Cumpa

DINTEL DE DRYWALL REGULAR DE 1/2" SOBRE m 16.35 56.57 924.92 12.80 -3.55

FRISO DE DRYWALL REGULAR DE 1/2" P/CIERR m 9.00 58.50 526.50 -9.00

CERRAJERIA 12,733.32

CERRADURA CILINDRICA PARA PUERTA DE BAÑOund 17.00 54.27 922.59 26.00 9.00

CERRADURA CILINDRICA PUERTA INTERIOR MANI und 37.00 58.05 2,147.85 34.00 -3.00

CERRADURA PARA PUERTA EXTERIOR LLAVE/ LL und 6.00 66.05 396.30 6.00 0.00

CERRADURA TIPO PARCHE DE 3 GOLPES und 1.00 66.87 66.87 3.00 2.00

BISAGRAS CAPUCHINAS DE DE 3" X 3" und 244.00 9.12 2,225.28 304.00 60.00

TOPE DE PUERTA DE ACERO INOX. FIJO AL PISO und 68.00 26.70 1,815.60 -68.00

TIRADOR DE ACERO INOXIDABLE TIPO C DOBLADund 4.00 240.45 961.80 -4.00

PICAPORTES DE DE EMBUTIR METALICO und 14.00 26.36 369.04 -14.00

PICAPORTE DE FIERRO REDONDO DE 1/2" CON und 1.00 16.30 16.30 -1.00

FRENO HIDRAULICO AL PISO und 4.00 302.09 1,208.36 -4.00

CIERRA PUERTAS und 8.00 157.37 1,258.96 -8.00

BARRAS ANTIPANICO und 1.00 1,344.37 1,344.37 -1.00

CRISTALES Y ESPEJOS 164,989.18

VENTANAS DE CRISTAL TEMPLADO DE 6MM CORRm2 232.99 248.23 57,835.11 196.82 -36.17

VENTANAS ALTAS DE CRISTAL TEMPLADO DE 6M m2 19.82 276.03 5,470.91 23.80 3.98

VENTANAS ALTAS DE CRISTAL TEMPLADO DE 6M m2 59.00 269.03 15,872.77 20.48 -38.52

MURO CORTINA CRISTAL TEMPLADO 8MM. REFLE m2 139.29 360.00 50,144.40 134.04 -5.25

MAMPARA DE CRISTAL TEMPLADOINCOLORO DE m2 13.52 334.03 4,516.09 17.03 3.51

CRISTAL TEMPLADO INCOLORO DE 10 MM PARA Mm2 21.84 302.71 6,611.19 37.43 15.59

MAMPARA DE CRISTAL TEMPLADOINCOLORO DE m2 70.50 328.63 23,168.42 -70.50

ESPEJO NACIONAL BISELADO DE 6MM m2 18.54 73.91 1,370.29 19.72 1.18

PINTURA 65,007.98

PINTURA LATEX LAVABLE EN MUROS INTERIORESm2 2,234.38 8.23 18,388.95 2,812.83 578.45

PINTURA LATEX LAVABLE EN MUROS EXTERIORESm2 729.80 8.53 6,225.19 727.08 -2.72

PINTURA LATEX LAVABLE EN CIELORRASOS m2 1,729.45 7.98 13,801.01 -1,729.45

PINTURA LATEX LAVABLE EN ESTRUCTURAS (VI m2 2,727.17 8.53 23,262.76 2,366.24 -360.93

PINTURA AL DUCO EN PUERTAS m2 177.32 18.78 3,330.07 276.32 99.00

APARATOS Y ACCESORIOS SANITARIOS 33,982.12

INODORO BLANCO TANQUE BAJO C/ACCESORIO und 3.00 268.25 804.75 2.00 -1.00

INODORO PARA FLUXOMETROS CON ACC. Y TAP und 19.00 607.61 11,544.59 20.00 1.00

LAVATORIO BLANCO CON LLAVE SIMPLE Y ACC. und 10.00 287.78 2,877.80 9.00 -1.00

LAVATORIO OVALIN SOBREPONER CON LLAVE SIund 16.00 315.28 5,044.48 15.00 -1.00

URINARIO BLANCO C/VALV. TEMPORIZADA DE 1/und 8.00 296.59 2,372.72 7.00 -1.00

LLAVE SIMPLE DE DUCHA DE 1/4 DE VUELTA und 1.00 155.45 155.45 -1.00

LAVADERO AMAZONAS C/ACCESORIOS und 1.00 262.71 262.71 -1.00

DISPENSADOR DE PAPEL HIGIENICO DE ADOSAR und 22.00 49.00 1,078.00 22.00 0.00

GANCHO DOBLE LOZA DE COLOR pza 58.00 8.90 516.20 -58.00

DISPENSADOR DE JABON LIQUIDO und 21.00 49.00 1,029.00 15.00 -6.00

DISPENSADOR DE PAPEL TOALLA pza 19.00 39.90 758.10 15.00 -4.00

BARRA DEACERO INOX DE 24" PARA DISCAPACIT und 4.00 168.00 672.00 4.00 0.00

SECADOR DE MANO ELECTRICO DE SENSOR und 4.00 448.00 1,792.00 4.00 0.00

COLOCACION DE APARATOS SANITARIOS und 58.00 54.64 3,169.12 52.00 -6.00

COLOCACION DE ACCESORIOS SANITARIOS und 88.00 21.65 1,905.20 41.00 -47.00

VARIOS 16,514.48

JARDINERIA Y LIMPIEZA 2,000.00

Page 5: Chekealho Cumpa

LIMPIEZA FINAL DE OBRA GLB 1.00 2,000.00 2,000.00 1.00 0.00

VARIOS 14,514.48

TABLERO DE CONCRETO ACABADO EN TERRAZm 45.00 98.00 4,410.00 -45.00

POYO DE CONCRETO PARA CLOSETS m 16.00 31.53 504.48 -16.00

MESA DE TRABAJO DE 3.00x1.20 und 8.00 1,200.00 9,600.00 32.00 24.00

INSTALACIONES ELECTRICAS ###ILUMINACION 39,015.80

SALIDAS DE CENTROS DE LUZ PVC-P pto 409.00 70.86 28,981.74 409.00 0.00

SALIDA DE BRAQUETES PVC-P pto 6.00 79.83 478.98 6.00 0.00

SALIDA DE INTERRUPTORES SIMPLES pto 53.00 70.76 3,750.28 53.00 0.00

SALIDA DE INTERRUPTORES DOBLES pto 38.00 82.80 3,146.40 38.00 0.00

SALIDA DE INTERRUPTORES SIMPLE 3 VIAS pto 18.00 80.24 1,444.32 18.00 0.00

SALIDAS DE CENTROS DE LUZ PVC-P - PARA LUZ pto 16.00 75.88 1,214.08 16.00 0.00

TOMACORRIENTES Y FUERZA 29,747.29

SALIDA PARA TOMACORRIENTES DOBLES CON TTpto 102.00 92.54 9,439.08 102.00 0.00

SALIDA PARA TOMACORRIENTES DOBLES PARA L pto 16.00 92.54 1,480.64 16.00 0.00

SALIDA PARA TOMACORRIENTES DOBLES ESTABI pto 82.00 92.54 7,588.28 82.00 0.00

SALIDA PARA TOMACORRIENTES DOBLES ESTABILpto 100.00 92.54 9,254.00 100.00 0.00

SALIDA PARA TOMACORRIENTES DOBLES CON TTpto 9.00 92.54 832.86 9.00 0.00

SALIDA DE FUERZA PARA EXTRACTOR pto 4.00 107.88 431.52 4.00 0.00

SALIDA DE PULSADOR PARA EXTRACTOR pto 4.00 94.31 377.24 4.00 0.00

SALIDA DE FUERZA PARA CONTROL DE NIVEL DE pto 1.00 72.13 72.13 1.00 0.00

SALIDA DE FUERZA PARA EQUIPOS 2.5 HP PVC-P pto 2.00 135.77 271.54 2.00 0.00

TABLEROS ELECTRICOS 40,119.69

TABLERO ELECTRICO GENERAL TGN und 1.00 8,773.02 8,773.02 1.00 0.00

TABLERO ELECTRICO ST1 und 1.00 2,104.31 2,104.31 1.00 0.00

TABLERO ELECTRICO ST1.1 und 1.00 1,589.51 1,589.51 1.00 0.00

TABLERO ELECTRICO ST1.2 und 1.00 1,596.11 1,596.11 1.00 0.00

TABLERO ELECTRICO ST1.3 und 1.00 1,657.11 1,657.11 1.00 0.00

TABLERO ELECTRICO TB-AGUA und 1.00 578.21 578.21 1.00 0.00

TABLERO ELECTRICO TB und 1.00 1,064.26 1,064.26 1.00 0.00

TABLERO ELECTRICO NUCLEO ASCENSOR und 1.00 1,098.16 1,098.16 1.00 0.00

TABLERO ELECTRICO ST2 und 1.00 1,808.11 1,808.11 1.00 0.00

TABLERO ELECTRICO ST2.1 und 1.00 1,498.01 1,498.01 1.00 0.00

TABLERO ELECTRICO ST2.2 und 1.00 2,311.69 2,311.69 1.00 0.00

TABLERO ELECTRICO ST2.3 und 1.00 1,313.01 1,313.01 1.00 0.00

TABLERO ELECTRICO TG-ES und 1.00 5,028.61 5,028.61 1.00 0.00

TABLERO ELECTRICO TES1.1 und 1.00 1,556.21 1,556.21 1.00 0.00

TABLERO ELECTRICO TES1.2 und 1.00 1,208.91 1,208.91 1.00 0.00

TABLERO ELECTRICO TES1.3 und 1.00 1,556.21 1,556.21 1.00 0.00

TABLERO ELECTRICO TES2 und 1.00 1,539.61 1,539.61 1.00 0.00

TABLERO ELECTRICO TES2.1 und 1.00 1,232.11 1,232.11 1.00 0.00

TABLERO ELECTRICO TES2.2 und 1.00 1,374.41 1,374.41 1.00 0.00

TABLERO ELECTRICO TES2.3 und 1.00 1,232.11 1,232.11 1.00 0.00

TUBERIAS Y ALIMENTADORES 73,298.03

ACOMETIDAS SECUNDARIAS 49,495.94

CONDUCTOR N2XY 1KV 3 - 1X300mm2 m 118.98 248.38 29,552.25 118.98 0.00

Page 6: Chekealho Cumpa

CONDUCTOR LSOH -50mm2 m 178.80 19.56 3,497.33 178.80 0.00

CONDUCTOR LSOH -35mm2 m 679.40 14.05 9,545.57 679.40 0.00

CONDUCTOR LSOH -25mm2 m 260.10 10.37 2,697.24 260.10 0.00

CONDUCTOR LSOH - 16mm2 m 82.00 7.06 578.92 82.00 0.00

CONDUCTOR LSOH -10mm2 m 568.80 5.11 2,906.57 568.80 0.00

CONDUCTOR LSOH -4mm2 m 322.00 2.23 718.06 322.00 0.00

TUBERIAS PVC-P Y/O F.G. 6,079.22

TUBERIAS PVC SAP (ELECTRICAS) D=3/4" - 20 m 125.00 5.32 665.00 125.00 0.00

TUBERIAS PVC SAP (ELECTRICAS) D=11/2" - 4 m 351.35 8.09 2,842.42 351.35 0.00

TUBERIAS PVC SAP (ELECTRICAS) D=2" - 50mmm 80.10 10.39 832.24 80.10 0.00

TUBERIAS PVC SAP (ELECTRICAS) D=3" - 80mmm 107.98 16.11 1,739.56 107.98 0.00

VARIOS 17,722.87

POZO DE CONEXION A TIERRA und 5.00 842.47 4,212.35 5.00 0.00

EXCAVACION DE ZANJAS HASTA 1.00 MT TERR m 205.63 10.83 2,226.97 205.63 0.00

CAMA DE ARENA m 205.63 5.54 1,139.19 205.63 0.00

RELLENO DE ZANJAS m 338.03 10.67 3,606.78 338.03 0.00

BUZON - CAJA DE CONCRETO DE 80X80 C/TAPAund 6.00 374.13 2,244.78 6.00 0.00

BUZON ELECTRICO DE CONCRETO DE 1.20x1.2 und 5.00 858.56 4,292.80 5.00 0.00

CAJAS ESPECIALES 899.49

CAJA DE PASE DE F.G. DE 100X100X50MM und 18.00 17.86 321.48 18.00 0.00

CAJA DE PASE DE F.G. DE 150X150X100MM und 3.00 28.07 84.21 3.00 0.00

CAJA DE PASE DE F.G. DE 200X200X100MM und 1.00 33.87 33.87 1.00 0.00

CAJA DE PASE DE F.G. DE 250X250X100MM und 1.00 36.37 36.37 1.00 0.00

CAJA DE PASE DE F.G. DE 300X300X150MM und 7.00 50.32 352.24 7.00 0.00

CAJA DE PASE DE F.G. DE 450X450X150MM und 1.00 71.32 71.32 1.00 0.00

LUMINARIAS 65,779.28

ARTEFACTO 2X36W DE ADOSAR C/REJILLA ESPE und 336.00 151.90 51,038.40 336.00 0.00

ARTEFACTO DE ADOSAR C/LAMPARA FLUORESCENund 7.00 141.62 991.34 7.00 0.00

ARTEFACTO BRAQUETE C/LAMPARA AHORRADORAund 1.00 23.02 23.02 1.00 0.00

SPOTS ADOSABLE C/ESPEJO ALUMINIO FACETAD und 66.00 190.30 12,559.80 66.00 0.00

ARTEFACTO LUZ DE EMERGENCIA CON BATERIA und 16.00 72.92 1,166.72 16.00 0.00

INSTALACIONES MECANICAS - ELECTRICAS Y ESPECIALES 489,307.88

INSTALACIONES ELECTRICAS 32,156.88

SUMINISTRO E INSTALACION TRANSFORMA und 1.00 6,652.44 6,652.44 1.00 0.00

SUMINISTRO E INSTALACION UPS DE 30KVA und 1.00 25,504.44 25,504.44 1.00 0.00

INSTALACIONES DE VOZ Y DATA Y ESPECIALES 457,151.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 44,666.00 44,666.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y O GLB 1.00 43,506.00 43,506.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 36,698.00 36,698.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 60,738.00 60,738.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 21,340.00 21,340.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y O GLB 1.00 42,272.00 42,272.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 34,542.00 34,542.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 29,836.00 29,836.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 29,936.00 29,936.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 29,296.00 29,296.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 29,636.00 29,636.00 1.00 0.00

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 29,636.00 29,636.00 1.00 0.00

Page 7: Chekealho Cumpa

SUMINISTROS Y MATERIALES VOZ Y DATA Y GLB 1.00 25,049.00 25,049.00 1.00 0.00

INSTALACIONES SANITARIAS 54,488.98SISTEMA DE AGUA FRIA 31468.45

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP - pto 63.00 50.44 3,177.72 63.00 0.00

CODO DE F.G. DE 1/2" und 34.00 5.79 196.86 34.00 0.00

CODO DE F.G. DE 1" und 8.00 10.98 87.84 8.00 0.00

CODO DE F.G. DE 1 1/4" und 21.00 13.38 280.98 21.00 0.00

CODO DE F.G. DE 2" und 10.00 14.46 144.60 10.00 0.00

CODO DE F.G. DE 2 1/2" und 2.00 17.72 35.44 2.00 0.00

REDUCCION DE F.G. DE 1.1/2" A 1" und 1.00 4.22 4.22 1.00 0.00

NIPLE DE 2" CON PLANCHA ROMPE AGUA DE F.G. und 3.00 32.28 96.84 3.00 0.00

NIPLE DE 2 1/2" CON PLANCHA ROMPE AGUA DE Fund 2.00 57.28 114.56 2.00 0.00

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAPm 108.60 9.83 1,067.54 108.60 0.00

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAPm 96.00 10.87 1,043.52 96.00 0.00

RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP m 6.00 11.95 71.70 6.00 0.00

RED DE DISTRIBUCION TUBERIA DE 1 1/4" PVC-SAPm 52.90 15.40 814.66 52.90 0.00

RED DE DISTRIBUCION TUBERIA DE 1 1/2" PVC-S m 153.80 17.48 2,688.42 153.80 0.00

RED DE DISTRIBUCION TUBERIA DE 2" PVC-SAP m 54.00 23.01 1,242.54 54.00 0.00

RED DE DISTRIBUCION TUBERIA F.G. DE 2" m 5.00 20.96 104.80 5.00 0.00

RED DE DISTRIBUCION TUBERIA F.G. DE 2 1/2" m 2.00 23.63 47.26 2.00 0.00

CODO PVC-SAP SP AGUA DE 1/2" und 96.00 1.26 120.96 96.00 0.00

CODO PVC-SAP SP AGUA DE 3/4" und 3.00 1.79 5.37 3.00 0.00

CODO PVC-SAP SP AGUA DE 1" und 6.00 3.15 18.90 6.00 0.00

CODO PVC-SAP SP AGUA DE 1 1/4" und 57.00 10.12 576.84 57.00 0.00

CODO PVC-SAP SP AGUA DE 1 1/2" und 52.00 10.91 567.32 52.00 0.00

CODO PVC-SAP SP AGUA DE 2" und 4.00 14.76 59.04 4.00 0.00

TEE PVC SAP SP PARA AGUA DE 1/2" und 2.00 1.96 3.92 2.00 0.00

TEE PVC SAP SP PARA AGUA DE 3/4" und 7.00 2.67 18.69 7.00 0.00

TEE PVC SAP SP PARA AGUA DE 1" und 4.00 4.18 16.72 4.00 0.00

TEE PVC SAP SP PARA AGUA DE 1 1/4" und 21.00 7.39 155.19 21.00 0.00

TEE PVC SAP SP PARA AGUA DE 1 1/2" und 30.00 7.70 231.00 30.00 0.00

TEE PVC SAP SP PARA AGUA DE 2" und 9.00 12.11 108.99 9.00 0.00

TEE PVC SAP SP PARA AGUA DE 2.1/2" und 1.00 14.83 14.83 1.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 1/2" und 6.00 1.16 6.96 6.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 3/4" und 14.00 1.32 18.48 14.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 1" und 6.00 1.63 9.78 6.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 1 1/4" und 10.00 6.15 61.50 10.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 1 1/2" und 5.00 6.57 32.85 5.00 0.00

UNION SIMPLE PVC-P SP P/AGUA DE 2" und 15.00 4.57 68.55 15.00 0.00

UNION UNIVERSAL DE F.G. DE 1" und 2.00 7.20 14.40 2.00 0.00

UNION UNIVERSAL DE F.G. DE 2" und 2.00 12.80 25.60 2.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 1/2" und 9.00 59.07 531.63 9.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 3/4" und 5.00 77.57 387.85 5.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 1" und 1.00 106.51 106.51 1.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 1 1/4"und 5.00 173.44 867.20 5.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 1 1/2" und 19.00 190.15 3,612.85 19.00 0.00

VALVULA ESFERICA DE BRONCE C/ACC. DE 2" und 5.00 217.80 1,089.00 5.00 0.00

Page 8: Chekealho Cumpa

VALVULA CHECK DE 2" und 6.00 231.58 1,389.48 6.00 0.00

VALVULA FLOTADOR DE 2" und 1.00 139.18 139.18 1.00 0.00

VALVULA PIE CON CANASTILLA DE 2 1/2" und 2.00 210.89 421.78 2.00 0.00

UNION EXTENSIBLE DE 2" und 2.00 96.10 192.20 2.00 0.00

REDUCCION PVC SP P/AGUA DE 3/4"-1/2" und 8.00 1.53 12.24 8.00 0.00

REDUCCION PVC SP P/AGUA DE 1"-3/4" und 4.00 2.37 9.48 4.00 0.00

REDUCCION PVC SP P/AGUA DE 1"-1/2" und 3.00 2.37 7.11 3.00 0.00

REDUCCION PVC SP P/AGUA DE 1 1/2"-1/2" und 9.00 6.27 56.43 9.00 0.00

REDUCCION PVC SP P/AGUA DE 2" -1 1/2" und 4.00 9.56 38.24 4.00 0.00

REDUCCION PVC SP P/AGUA DE 1 1/2"-1" und 1.00 4.27 4.27 1.00 0.00

REDUCCION PVC SP P/AGUA DE 1 1/2"-3/4" und 5.00 4.27 21.35 5.00 0.00

REDUCCION PVC SP P/AGUA DE 1 1/2"-11/4" und 15.00 4.47 67.05 15.00 0.00

REDUCCION PVC SP P/AGUA DE 2" -1" und 3.00 9.56 28.68 3.00 0.00

LLAVE DE RIEGO CON GRIFO DE 1/2" pza 4.00 29.11 116.44 4.00 0.00

NICHO PARA VALULAS und 25.00 90.59 2,264.75 25.00 0.00

EXCAVACION DE ZANJAS HASTA 1.00 MT TERRENm 1.00 10.83 10.83 1.00 0.00

TANQUE HIDRONEUMATICO DE 140 GAL, C/ACC. und 1.00 2,791.76 2,791.76 1.00 0.00

BOMBA CENTRIFUGA DE 1.8HP, HDT 28M. Y 2.4Litund 2.00 1,962.92 3,925.84 2.00 0.00

NIVELACION Y APISONADO DE ZANJAS m 1.00 2.80 2.80 1.00 0.00

RELLENO DE ZANJAS m 1.00 10.67 10.67 1.00 0.00

ELIMINACION DE DESMONTE m 1.00 7.44 7.44 1.00 0.00

SISTEMA DE DESAGUE 23,020.53

SALIDAS DE DESAGUE PVC SAL - MANO DE OBRApto 55.00 50.72 2,789.60 55.00 0.00

TUBERIA DE PVC SAL 2" m 238.00 10.36 2,465.68 238.00 0.00

TUBERIA DE PVC SAL 3" m 16.75 12.21 204.52 16.75 0.00

TUBERIA DE PVC SAL 4" m 182.85 14.81 2,708.01 182.85 0.00

CODO PVC SAL 2"X90° pza 97.00 4.91 476.27 97.00 0.00

CODO PVC SAL 3"X90° pza 2.00 8.98 17.96 2.00 0.00

CODO PVC SAL 4"X90° pza 5.00 9.32 46.60 5.00 0.00

CODO PVC-SAL C/VENT. 4"X2" und 11.00 14.67 161.37 11.00 0.00

CODO PVC SAL 2"X45° pza 34.00 4.91 166.94 34.00 0.00

CODO PVC SAL 4"X45° pza 10.00 9.32 93.20 10.00 0.00

TEE SANITARIA PVC-SAL 2" und 57.00 5.96 339.72 57.00 0.00

TEE SANITARIA PVC-SAL 4" und 20.00 15.36 307.20 20.00 0.00

TEE SANITARIA PVC-SAL 2"X4" und 1.00 17.45 17.45 1.00 0.00

YEE SIMPLE PVC-SAL 2" und 51.00 5.80 295.80 51.00 0.00

YEE SIMPLE PVC-SAL 3" und 5.00 9.40 47.00 5.00 0.00

YEE SIMPLE PVC-SAL 4" und 13.00 15.36 199.68 13.00 0.00

YEE SIMPLE PVC-SAL 2"X4" und 12.00 16.46 197.52 12.00 0.00

YEE SIMPLE PVC-SAL 3"X2" und 7.00 9.40 65.80 7.00 0.00

YEE DOBLE PVC-SAL 2" und 1.00 6.21 6.21 1.00 0.00

YEE DOBLE PVC-SAL 2"X4" und 1.00 25.41 25.41 1.00 0.00

TRAMPA P PVC-SAL DE 2" und 20.00 7.11 142.20 20.00 0.00

und 2.00 7.72 15.44 2.00 0.00

REDUCCION PVC-SAL DE 4" A 2" und 12.00 7.95 95.40 12.00 0.00

SOMBRERO VENTILACION PVC DE 2" pza 16.00 10.77 172.32 16.00 0.00

SOMBRERO VENTILACION PVC DE 4" pza 3.00 18.75 56.25 3.00 0.00

REGISTROS DE BRONCE CROMADO 2" pza 21.00 26.81 563.01 21.00 0.00

REDUCCION PVC-SAL DE 3" A 2"

Page 9: Chekealho Cumpa

REGISTROS DE BRONCE CROMADO 3" pza 2.00 29.25 58.50 2.00 0.00

REGISTROS DE BRONCE CROMADO 4" pza 2.00 35.83 71.66 2.00 0.00

SUMIDEROS DE 2" pza 20.00 33.53 670.60 20.00 0.00

SUMIDEROS DE 3" pza 3.00 36.23 108.69 3.00 0.00

VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 4und 2.00 306.61 613.22 2.00 0.00

REBOSE C/TUBERIA DE ACERO S/DISEÑO DE 4" und 1.00 271.55 271.55 1.00 0.00

CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 12.00 245.97 2,951.64 12.00 0.00

CAJA DE REGISTRO DE DESAGUE 24" X 24" pza 3.00 306.17 918.51 3.00 0.00

EXCAVACION DE ZANJAS HASTA 1.00 MT TERRE m 152.35 10.83 1,649.95 152.35 0.00

NIVELACION Y APISONADO DE ZANJAS m 152.35 2.80 426.58 152.35 0.00

CAMA DE ARENA m 152.35 5.54 844.02 152.35 0.00

RELLENO DE ZANJAS m 152.35 10.67 1,625.57 152.35 0.00

ELIMINACION DE DESMONTE m 152.35 7.44 1,133.48 152.35 0.00

SISTEMA DE AGUA FRIA

SISTEMNA DE DESAGUE

TOTALES COSTO DIRECTO ###

GASTOS GENERALES 10% 332,814.98

SUBTOTAL (NO INCLUYE IGV) 3,660,964.78

IGV 695,583.31

TOTAL ###

Page 10: Chekealho Cumpa

PRESUPUESTO 1er PISO PRESUPUESTO 2do PISO### ### ###

diferencia0.00 2,500.00 5,775.00 0.00

0.00 1.00 2,700.00 0.00

0.00 1.00 2,717.62 0.00

0.00 1.00 1,970.17 0.00

0.00 1.00 1,970.17 0.00

784.45 144.84 3,447.19 0.00

129.88 733.62 19,646.34 0.00

0.00 7.81 167.29 0.00

0.00 79.11 2,420.77 0.00

629.95 341.81 5,441.62 0.00

578.61 271.51 3,635.55 0.00

349.89 1,357.56 6,000.42 0.00

-40.52 1,097.28 19,586.45 0.00

-39.27 1,097.28 18,982.94 0.00

1,639.40 1,357.56 28,115.07 0.00

0.00 506.65 7,746.68 0.00

4,448.01 113.37 18,498.58 0.00

-36,336.19 0.00 0.00

2,862.44 416.99 103,521.94 0.00

716.43 461.60 11,443.06 0.00

267.75 13,145.70 46,009.95 0.00

637.78 22.75 6,045.59 0.00

527.42 205.40 5,642.34 0.00

13,082.16 4,927.42 17,245.97 0.00

0.00 11.25 3,858.86 0.00

0.00 130.30 4,587.86 0.00

0.00 623.46 2,244.46 0.00

-87.04 133.29 46,404.91

27.61 785.20 30,968.29

-360.53 25,989.79 90,964.27

4,776.65 94.76 32,124.59

Page 11: Chekealho Cumpa

3,759.91 607.00 22,507.56

341.49 8,367.75 29,287.13

-319.25 347.48 110,932.99

0.00 1,437.10 60,573.76

2,357.95 41,907.78 146,677.23

542.46 470.09 135,639.77

0.00 1,872.80 74,368.89

0.00 115,676.47 404,867.65

1° PISO

0.00 5.74 1,755.41

0.00 65.60 2,076.24

0.00 356.16 1,246.56

-567.53 551.51 1,329.14

0.00 28.27 8,992.97

0.00 91.40 4,350.64

0.00 2,604.84 9,116.94

319.24 8.38 2,248.10

-7.16 3.90 93.09

226.07 129.69 453.91

392.78 21.38 5,635.98

1,303.21 123.46 4,129.74

3,805.13 2,189.56 7,663.46

361.86 184.37 8,423.87 236.58 10,809.34

258.90 742.45 55,156.61 488.99 36,326.70

-24,772.83 224.32 13,055.42

-1,092.70

-361.47 6.44 440.88

12.35 233.31 3,376.00 85.49 1,236.97

9,167.79 1,110.43 17,622.52 1,702.40 27,017.16

-48.33 340.98 6,045.58 386.10 6,845.54

-4,118.56 335.10 6,906.41 249.57 5,143.64

8,918.94 249.06 5,125.65 689.92 14,198.45

-3,186.31 592.59 12,213.28 689.92 14,219.15

-1,160.26

535.86 1,108.53 22,846.80

-1,397.76 411.80 3,673.26

-2,570.21 133.80 248.87

598.87 72.08 1,822.90

-472.17 44.38 964.82

Page 12: Chekealho Cumpa

-17,344.25 1,427.03 27,470.33

45,019.43 464.29 24,319.51 777.95 40,748.76

575.46 56.29 2,839.83 45.30 2,285.21

8,517.22 244.08 12,313.84 244.08 12,313.71

-70,406.85

8,475.38 232.82 5,454.97 232.82 5,454.88

-564.84 30.93 724.69 41.85 980.43

1,096.89 24.26 625.91 24.26 625.84

1,512.91 223.88 2,823.13

141.52 164.20 2,998.29 164.20 2,998.29

-252.40 28.80 673.06 28.80 673.06

56.93 32.67 765.46 32.67 765.46

301.86 164.20 6,395.59 164.20 6,395.59

180.40 32.67 2,425.42 32.67 2,425.42

-5.42 100.66 925.07 100.66 925.07

5,875.62 231.97 10,642.78

-2,293.92 154.20 7,369.22 115.74 5,531.21

5,029.82 145.24 4,392.06 145.24 4,392.06

6,034.89 145.24 10,846.52

-72.02 114.75 1,001.77 114.75 1,001.77

-1,606.30 191.92 2,109.20 233.20 2,562.87

1,344.35 191.92 2,065.06 140.37 1,510.38

-597.36

-114.06 11.60 1,150.49

4.99 0.00 13.45 1,343.52

5,264.22 3.00 2,632.11 3.70 3,246.27

979.11 2.00 652.74 5.00 1,631.85

-1,414.46 16.00 670.56

-12,476.84 44.02 3,380.30

-29,017.16 60.65 10,300.80

-666.43 51.00 1,770.21 51.00 1,770.21

116.34 15.80 1,303.66

-3,308.15

311.59 2.00 623.18

-411.18

-490.26 72.34 9,689.94 46.20 6,188.49

-1,265.75 7.35 2,241.75 5.40 1,647.00

4,125.80 808.54 22,453.16 641.78 17,822.23

-14,649.77

-10.11 31.25 1,975.00 37.85 2,392.12

Page 13: Chekealho Cumpa

-200.82 9.10 514.79 3.70 209.31

-526.50 0.00

488.43 0.00 13.00 705.51

-174.15 0.00 13.00 754.65

0.00 0.00

133.74 0.00 2.00 133.74

547.20 87.00 793.44 112.00 1,021.44

-1,815.60 0.00

-961.80 0.00

-369.04 0.00

-16.30 0.00

-1,208.36 0.00

-1,258.96 0.00

-1,344.37 0.00

-8,978.98 0.00 105.54 26,199.13

1,098.60 0.00 9.45 2,608.48

-10,363.04 0.00 8.70 2,340.56

-1,890.00 0.00 51.18 18,424.80

1,172.45 0.00 10.31 3,444.68

4,719.25 0.00 23.97 7,255.96

-23,168.42 0.00

87.21 0.00 10.54 779.01

4,760.64 0.00 1,702.40 14,010.79

-23.20 0.00 386.10 3,293.42

-13,801.01 0.00

-3,078.73 0.00 1,189.49 10,146.39

1,859.22 0.00 94.08 1,766.82

-268.25 0.00 1.00 268.25

607.61 0.00 9.00 5,468.49

-287.78 0.00 4.00 1,151.12

-315.28 0.00

-296.59 0.00 4.00 1,186.36

-155.45 0.00

-262.71 0.00

0.00 0.00 10.00 490.00

-516.20 0.00

-294.00 0.00 7.00 343.00

-159.60 0.00 7.00 279.30

0.00 0.00 2.00 336.00

0.00 0.00 2.00 896.00

-327.84 0.00 23.00 1,256.72

-1,017.55 0.00 41.00 887.65

Page 14: Chekealho Cumpa

0.00 0.00

-4,410.00 0.00

-504.48 0.00

28,800.00 0.00

738,167.46

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 15: Chekealho Cumpa

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 16: Chekealho Cumpa

0.00

54,488.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 17: Chekealho Cumpa

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 18: Chekealho Cumpa

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00