REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S 410.01 FECHA : 16/05/22 OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca PARTIDA : Colocación de Cajas Portamedidor 1Ø, incluye picado de pared, resane, TABLA DE RENDIMIENTOS (En 8 horas) en y montaje de baston de FoGo 3/4" Ø x 1.8m. REN.CUADRILLA 9.0 0.0 FACTOR REND. 1.0 0.0 ESPECIFICACION CANTID. HORAS REN.EQUIPOS 9.0 0.0 Camioneta 1000 Kg. 0.10 0.8 0.00 0.0 PERSONAL BASE : Principal C. # B 0.00 0.0 CAPATAZ : 0.1 = 0.8 MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 OFICIAL : 1.0 = 8.0 0.0 HECHO POR : PEON : 1.0 = 8.0 M E T R A D O C O S T O S INDICE CREPCO COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro % MATERIALES : 0 0.00% 1000 Baston de FoGo 3/4" Ø x 1.8m. u 1.00 13.50 13.50 0 0.00% Cemento Bls 0.05 18.70 0.88 14.38 22 24.22% 2000 Agregados m3 0.02 16.15 0.24 0 0.00% Material Menudo Tubo PVC cable THW Glb 1.00 6.38 6.38 0 0.00% 0.00 0 0 0.00% 0.00 6.62 22 11.15% 3000 0.00 0 0.00% 0.00 0 0.00% 0.00 0 0.00% 0.00 0.00 0 0.00% 0.00 21.00 0.00% MANO DE OBRA : Capataz H.H. 0.09 16.44 1.46 Operario H.H. 0.00 13.70 0.00 Oficial H.H. 0.89 12.13 10.78 Peon H.H. 0.89 10.95 9.73 H.H. 0.00 0.00 H.H. 0.00 0.00 21.98 47 37.02% HERRAMIENTAS Y EQUIPOS : Herramientas varias EST. 5% 1.10 37 Equipos Seguridad EST. 5% 1.10 Camioneta 1000 kg. H.M 0.09 48.34 4.30 H.M 0.00 0.00 H.M 0 0.00 H.M 0 0.00 6.49 37 10.94% COSTO DIRECTO S/. 49.47 G.G., D.T. Y UTILIDADES S/. 9.89 39 16.67% TOTAL S/. 59.37 100.00%

Transcript of Costos-unitarios CD Costa

Page 1: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.01 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Colocación de Cajas Portamedidor 1Ø, incluye picado de pared, resane, sumini TABLA DE RENDIMIENTOS (En 8 horas) en

y montaje de baston de FoGo 3/4" Ø x 1.8m. REN.CUADRILLA 9.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 9.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Baston de FoGo 3/4" Ø x 1.8m. u 1.00 13.50 13.50 0 0.00%

Cemento Bls 0.05 18.70 0.88 14.38 22 24.22%

2000 Agregados m3 0.02 16.15 0.24 0 0.00%

Material Menudo Tubo PVC cable THW Glb 1.00 6.38 6.38 0 0.00%

0.00 0 0 0.00%

0.00 6.62 22 11.15%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 21.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.09 16.44 1.46

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.89 12.13 10.78

Peon H.H. 0.89 10.95 9.73

H.H. 0.00 0.00

H.H. 0.00 0.00 21.98 47 37.02%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.10 37

Equipos Seguridad EST. 5% 1.10

Camioneta 1000 kg. H.M 0.09 48.34 4.30

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 6.49 37 10.94%

COSTO DIRECTO S/. 49.47

G.G., D.T. Y UTILIDADES S/. 9.89 39 16.67%

TOTAL S/. 59.37 100.00%

Page 2: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.02 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Colocación de Cajas Portamedidor 3Ø, incluye picado de pared, resane, sumini TABLA DE RENDIMIENTOS (En 8 horas) en

y montaje de baston de FoGo 1" Ø x 1.8m. REN.CUADRILLA 6.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 6.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Baston de FoGo 1" Ø x 1.8m. u 1.00 17.00 17.00 0 0.00%

Cemento Bls 0.05 18.70 0.88 17.88 22 22.17%

2000 Agregados m3 0.02 16.15 0.24 0 0.00%

Material Menudo Tubo PVC cable THW Glb 1.00 6.38 6.38 0 0.00%

0.00 0 0 0.00%

0.00 6.62 22 8.21%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 24.50 0.00%

MANO DE OBRA :

Capataz H.H. 0.13 16.44 2.19

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 1.33 12.13 16.17

Peon H.H. 1.33 10.95 14.60

H.H. 0.00 0.00

H.H. 0.00 0.00 32.97 47 40.87%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.65 37

Equipos Seguridad EST. 5% 1.65

Camioneta 1000 kg. H.M 0.13 48.34 6.45

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 9.74 37 12.08%

COSTO DIRECTO S/. 67.21

G.G., D.T. Y UTILIDADES S/. 13.44 39 16.67%

TOTAL S/. 80.65 100.00%

Page 3: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.04 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de tubo de FoGo 3/4" Ø x 1.8m.en cajas existentes TABLA DE RENDIMIENTOS (En 8 horas) en

incluye suministro de baston de FoGo 3/4" Ø x 1.5m REN.CUADRILLA 8.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 8.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Baston de FoGo 1" Ø x 1.5m. u 1.00 13.50 13.50 0 0.00%

Cemento Bls 0.05 18.70 0.88 14.38 22 25.73%

2000 Agregados m3 0.01 16.15 0.16 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.16 22 0.29%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 14.54 0.00%

MANO DE OBRA :

Capataz H.H. 0.10 16.44 1.64

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 1.00 12.13 12.13

Peon H.H. 1.00 10.95 10.95

H.H. 0.00 0.00

H.H. 0.00 0.00 24.72 47 44.24%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.24 37

Equipos Seguridad EST. 5% 1.24

Camioneta 1000 kg. H.M 0.10 48.34 4.83

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 7.31 37 13.07%

COSTO DIRECTO S/. 46.57

G.G., D.T. Y UTILIDADES S/. 9.31 39 16.67%

TOTAL S/. 55.88 100.00%

Page 4: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.07 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Riel DIN en caja existente TABLA DE RENDIMIENTOS (En 8 horas) en

incluye suministro riel DIN REN.CUADRILLA 22.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 22.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : = 0.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 riel DIN u 1.00 10.00 10.00 0 0.00%

0.00 10.00 22 49.62%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 22 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 10.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.04 16.44 0.60

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 0.36 10.95 3.98

H.H. 0.00 0.00

H.H. 0.00 0.00 4.58 47 22.72%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.23 37

Equipos Seguridad EST. 5% 0.23

Camioneta 1000 kg. H.M 0.04 48.34 1.76

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 2.22 37 10.99%

COSTO DIRECTO S/. 16.80

G.G., D.T. Y UTILIDADES S/. 3.36 39 16.67%

TOTAL S/. 20.15 100.00%

Page 5: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.08 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Colocación de Cajas Portamedidor 1Ø y 3Ø, incluye picado de pared, resane, s TABLA DE RENDIMIENTOS (En 8 horas) en

y montaje de tubo PVC de 3/4" Ø x 1.m. Instalacion de caja portatermogneticoREN.CUADRILLA 10.0 0.0

dentro de vivienda (ACOMETIDA SUBTERRANEA) FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 10.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Tubo PVCde 3/4" Ø x 1.0m. u 1.00 5.00 5.00 0 0.00%

Cemento Bls 0.05 18.70 0.88 5.88 22 11.74%

2000 Agregados m3 0.02 16.15 0.24 0 0.00%

Material Menudo Tubo PVC cable THW Glb 1.00 10.00 10.00 0 0.00%

0.00 0 0 0.00%

0.00 10.24 22 20.45%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 16.12 0.00%

MANO DE OBRA :

Capataz H.H. 0.08 16.44 1.32

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.80 12.13 9.70

Peon H.H. 0.80 10.95 8.76

H.H. 0.00 0.00

H.H. 0.00 0.00 19.78 47 39.48%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.99 37

Equipos Seguridad EST. 5% 0.99

Camioneta 1000 kg. H.M 0.08 48.34 3.87

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 5.85 37 11.67%

COSTO DIRECTO S/. 41.75

G.G., D.T. Y UTILIDADES S/. 8.35 39 16.67%

TOTAL S/. 50.09 100.00%

Page 6: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.09 FECHA : 08/04/23 0.00

OBRA 0 COSTO POR : Pza LUGAR 0

PARTIDA : Instalación de tubo de FoGo 1" Ø x 1.5m.en cajas existentes TABLA DE RENDIMIENTOS (En 8 horas) en

incluye suministro de baston de FoGo 1" Ø x 1.5m REN.CUADRILLA 15.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 15.0 0.0 0.0

Camioneta 1000 Kg. 0.25 2.0

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Baston de FoGo 1" Ø x 1.5m. u 1.00 19.20 19.20 0 0.00%

Cemento Bls 0.07 18.70 1.31 20.51 22 35.45%

2000 Agregados m3 0.02 16.15 0.32 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.32 22 0.56%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 20.83 0.00%

MANO DE OBRA :

Capataz H.H. 0.05 16.44 0.88

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.53 12.13 6.47

Peon H.H. 1.07 10.95 11.68

H.H. 0.00 0.00

H.H. 0.00 0.00 19.03 47 32.89%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.95 37

Equipos Seguridad EST. 5% 0.95

Camioneta 1000 kg. H.M 0.13 48.34 6.45

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 8.35 37 14.43%

COSTO DIRECTO S/. 48.21

G.G., D.T. Y UTILIDADES S/. 9.64 39 16.67%

TOTAL S/. 57.85 100.00%

Page 7: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.10 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Cjto LUGAR Cajamarca

PARTIDA : Suministro e instalación de tubo de FoGo de 3/4" Ø - 2.5m y codos PVC-SAP TABLA DE RENDIMIENTOS (En 8 horas) en

adosado en pared y/o techo con abrazaderas REN.CUADRILLA 30.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 30.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Tubo de FoGo 3/4" Ø - 2.5m. u 1.00 22.50 22.50 0 0.00%

Codo PVC-SAP de 3/4" Ø u 4.00 4.26 17.04 39.54 22 54.84%

2000 Abrazaderas metalicas u 4.00 3.00 12.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 12.00 22 16.64%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 51.54 0.00%

MANO DE OBRA :

Capataz H.H. 0.03 16.44 0.44

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.27 12.13 3.23

Peon H.H. 0.27 10.95 2.92

H.H. 0.00 0.00

H.H. 0.00 0.00 6.59 47 9.14%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.33 37

Equipos Seguridad EST. 5% 0.33

Camioneta 1000 Kg. H.M 0.03 48.34 1.29

0 H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 1.95 37 2.70%

COSTO DIRECTO S/. 60.08

G.G., D.T. Y UTILIDADES S/. 12.02 39 16.67%

TOTAL S/. 72.10 100.00%

Page 8: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

410.11 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Suministro e instalación de mastil de madera de 1.50m TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 14.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 14.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 0.0 = 0.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Mastil de madera de 1.50m Pza 1.00 15.00 15.00 0 0.00%

alambre para amarre kg 0.05 7.35 0.37 15.37 22 38.03%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 22 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 15.37 0.00%

MANO DE OBRA :

Capataz H.H. 0.06 16.44 0.94

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.57 12.13 6.93

Peon H.H. 0.57 10.95 6.26

H.H. 0.00 0.00

H.H. 0.00 0.00 14.13 47 34.97%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.71 37

Equipos Seguridad EST. 5% 0.71

Camioneta 1000 Kg. H.M 0.06 48.34 2.76

0 H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 4.18 37 10.33%

COSTO DIRECTO S/. 33.67

G.G., D.T. Y UTILIDADES S/. 6.73 39 16.67%

TOTAL S/. 40.40 100.00%

Page 9: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.03 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple de la Red con Empalme TABLA DE RENDIMIENTOS (En 8 horas) en

de derivación en Gel y conector bimetalico (02) a la Caja Portamedidor incluye REN.CUADRILLA 20.0 0.0

correa plastica nylon. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 20.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.23 4.23 0 0.00%

0.00 4.23 54 12.39%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.23 0.00%

MANO DE OBRA :

Capataz H.H. 0.04 16.44 0.66

Operario H.H. 0.40 13.70 5.48

Oficial H.H. 0.40 12.13 4.85

Peon H.H. 0.80 10.95 8.76

H.H. 0.00 0.00

H.H. 0.00 0.00 19.75 47 57.86%HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.99 37

Equipos Seguridad EST. 5% 0.99

Camioneta 1000 Kg. H.M 0.04 48.34 1.93

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.40 1.39 0.56

H.M 0 0.00

H.M 0 0.00 4.46 37 13.08%

COSTO DIRECTO S/. 28.44

G.G., D.T. Y UTILIDADES S/. 5.69 39 16.67%

TOTAL S/. 34.13 100.00%

Page 10: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.04 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple de la Red con Empalme TABLA DE RENDIMIENTOS (En 8 horas) en

de derivación en Gel y conector bimetalico 02) con cruce de calle, incluye suministro REN.CUADRILLA 14.0 0.0

liston de madera, correa plastica nylon, cemento y material agregado. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 14.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo, alambr Glb 1.00 6.48 6.48 0 0.00%

Liston de madera tornillo de 2.5"x2.5"x 4.0 m u 1.00 13.10 13.10 19.58 54 29.77%

2000 Cemento Bls 0.03 18.70 0.47 0 0.00%

Agregados m3 0.01 16.15 0.16 0.00%

0.00 0 0.00%

0.00 0.63 54 0.96%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 20.21 0.00%

MANO DE OBRA :

Capataz H.H. 0.06 16.44 0.94

Operario H.H. 0.57 13.70 7.83

Oficial H.H. 0.57 12.13 6.93

Peon H.H. 1.14 10.95 12.51

H.H. 0.00 0.00

H.H. 0.00 0.00 28.21 47 42.90%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.41 37

Equipos Seguridad EST. 5% 1.41

Camioneta 1000 Kg. H.M 0.06 48.34 2.76

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.57 1.39 0.79

H.M 0 0.00

H.M 0 0.00 6.38 37 9.70%

COSTO DIRECTO S/. 54.80

G.G., D.T. Y UTILIDADES S/. 10.96 39 16.67%

TOTAL S/. 65.76 100.00%

Page 11: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.05 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : INST. ACOMETIDA DOMICILIARIA CONEXIÓN CAJA DE DERIVACION, CAJA PORTAMEDIDOR TABLA DE RENDIMIENTOS (En 8 horas) en

Y ACCESORIOS.DE FIJACION E INTERRUPTOR TERMOMAGNETICO, INCL. SUMIN.DE REN.CUADRILLA 16.0 0.0

CINTA AUTOFUNDENTE EPR, CINTA AISLANTE Y CORREA PLASTICA NYLON. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 16.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.23 4.23 0 0.00%

0.00 4.23 54 12.38%

2000 0.00 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.00 54 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.23 0.00%

MANO DE OBRA :

Capataz H.H. 0.05 16.44 0.82

Operario H.H. 0.50 13.70 6.85

Oficial H.H. 0.50 12.13 6.07

Peon H.H. 0.50 10.95 5.48

H.H. 0.00 0.00

H.H. 0.00 0.00 19.21 47 56.22%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.96 37

Equipos Seguridad EST. 5% 0.96

Camioneta 1000 Kg. H.M 0.05 48.34 2.42

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.50 1.39 0.70

H.M 0 0.00

H.M 0 0.00 5.03 37 14.73%

COSTO DIRECTO S/. 28.48

G.G., D.T. Y UTILIDADES S/. 5.70 39 16.67%

TOTAL S/. 34.17 100.00%

Page 12: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.06 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Inst.acometida domiciliaria simple fachada de la caja de derivacion, a caja portamedido TABLA DE RENDIMIENTOS (En 8 horas) en

con cruce de calle y accesorios de fijacion e interruptor termomagnetico, incl.suministro de cinta REN.CUADRILLA 15.0 0.0

epr, cinta aislante, vinilica y cintillo correa plastica, liston de madera, cemento y mater FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 15.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo, alambr Glb 1.00 6.48 6.48 0 0.00%

Liston de madera tornillo de 2.5"x2.5"x 4.0 m u 1.00 13.10 13.10 19.58 54 31.07%

2000 Cemento Bls 0.03 18.70 0.47 0 0.00%

Agregados m3 0.01 16.15 0.16 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 20.21 0.00%

MANO DE OBRA :

Capataz H.H. 0.05 16.44 0.88

Operario H.H. 0.53 13.70 7.31

Oficial H.H. 0.53 12.13 6.47

Peon H.H. 1.07 10.95 11.68

H.H. 0.00 0.00

H.H. 0.00 0.00 26.33 47 41.78%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.32 37

Equipos Seguridad EST. 5% 1.32

Camioneta 1000 Kg. H.M 0.05 48.34 2.60

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.53 1.39 0.74

H.M 0 0.00

H.M 0 0.00 5.98 37 9.49%

COSTO DIRECTO S/. 52.52

G.G., D.T. Y UTILIDADES S/. 10.50 39 16.67%

TOTAL S/. 63.02 99.00%

Page 13: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.07 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple a la Caja Portamedidor TABLA DE RENDIMIENTOS (En 8 horas) en

conectores bimetalicos,incluye suministro correa plastica nylon. REN.CUADRILLA 18.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 18.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.23 4.23 0 0.00%

0.00 4.23 54 11.55%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.23 0.00%

MANO DE OBRA :

Capataz H.H. 0.04 16.44 0.73

Operario H.H. 0.44 13.70 6.09

Oficial H.H. 0.44 12.13 5.39

Peon H.H. 0.89 10.95 9.73

H.H. 0.00 0.00

H.H. 0.00 0.00 21.94 47 59.92%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.10 37

Equipos Seguridad EST. 5% 1.10

Camioneta 1000 kg. H.M 0.04 48.34 2.15

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 4.34 37 11.86%

COSTO DIRECTO S/. 30.52

G.G., D.T. Y UTILIDADES S/. 6.10 39 16.67%

TOTAL S/. 36.62 100.00%

Page 14: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.08 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple de la Red con cruce de calle TABLA DE RENDIMIENTOS (En 8 horas) en

a la caja portamedidor y conector bimetalico, incluye suministro de liston de madera, REN.CUADRILLA 15.0 0.0

correa plastica nylon, cemento y material agregado. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 15.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo, alambr Glb 1.00 6.48 6.48 0 0.00%

Liston de madera tornillo de 2.5"x2.5"x 4.0 m u 1.00 13.10 13.10 19.58 54 31.53%

2000 Cemento Bls 0.03 18.70 0.47 0 0.00%

Agregados m3 0.01 16.15 0.16 0.00%

0.00 0 0.00%

0.00 0.63 54 1.01%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 20.21 0.00%

MANO DE OBRA :

Capataz H.H. 0.05 16.44 0.88

Operario H.H. 0.53 13.70 7.31

Oficial H.H. 0.53 12.13 6.47

Peon H.H. 1.07 10.95 11.68

H.H. 0.00 0.00

H.H. 0.00 0.00 26.33 47 42.40%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.32 37

Equipos Seguridad EST. 5% 1.32

Camioneta 1000 kg. H.M 0.05 48.34 2.58

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 5.21 37 8.39%

COSTO DIRECTO S/. 51.75

G.G., D.T. Y UTILIDADES S/. 10.35 39 16.67%

TOTAL S/. 62.10 100.00%

Page 15: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.10 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Trifásica , incluye conexión al medidor, cinta vinilica TABLA DE RENDIMIENTOS (En 8 horas) en

cinta autofundente y Cintyllos REN.CUADRILLA 10.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 10.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 0.70 5.6 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.09 4.09 0 0.00%

0.00 0.00 0 0.00%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.09 0.00%

MANO DE OBRA :

Capataz H.H. 0.08 16.44 1.32

Operario H.H. 0.80 13.70 10.96

Oficial H.H. 0.80 12.13 9.70

Peon H.H. 0.80 10.95 8.76

H.H. 0.00 0.00

H.H. 0.00 0.00 30.74 47 60.20%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.54 37

Equipos Seguridad EST. 5% 1.54

Camioneta 1000 Kg. H.M 0.08 48.34 3.87

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.56 1.39 0.78

H.M 0 0.00

H.M 0 0.00 7.72 37 15.12%

COSTO DIRECTO S/. 42.55

G.G., D.T. Y UTILIDADES S/. 8.51 39 16.67%

TOTAL S/. 51.06 91.99%

Page 16: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.11 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Inst. de Acom. Domic. Simple subterránea conexión caja portamedidor TABLA DE RENDIMIENTOS (En 8 horas) en

e interruptor termomagnetico incl. Suministro empalme 1f, manta termocontraible REN.CUADRILLA 8.3 0.0

conectores, excavación zanja, resane y limpieza terreno FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 8.3 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Empalme monofásico 70/6-70mm² kit 1.00 25.13 25.13 0 0.00%

Manta termocontraible UNID. 2.00 5.50 11.00 36.13 54 30.67%

2000 Material Menudo (soldadura,Pintura) Glob 1.00 5.00 5.00 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 41.13 0.00%

MANO DE OBRA :

Capataz H.H. 0.10 16.44 1.58

Operario H.H. 0.96 13.70 13.20

Oficial H.H. 0.96 12.13 11.69

Peon H.H. 1.93 10.95 21.11

H.H. 0.00 0.00

H.H. 0.00 0.00 47.59 47 40.39%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 2.38 37

Equipos Seguridad EST. 5% 2.38

Camioneta 1000 kg. H.M 0.10 48.34 4.71

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 9.46 37 8.03%

COSTO DIRECTO S/. 98.18

G.G., D.T. Y UTILIDADES S/. 19.64 39 16.67%

TOTAL S/. 117.82 95.76%

Page 17: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.12 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Inst. de Acom. Domic. Trifasica subterránea conexión caja portamedidor TABLA DE RENDIMIENTOS (En 8 horas) en

e interruptor termomagnetico incl. Suministro empalme 3f+N, manta termocontraible REN.CUADRILLA 5.5 0.0

conectores, excavación zanja, resane y limpieza terreno FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 5.5 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Empalme trifasico 120/6-70mm² kit 1.00 33.50 33.50 0 0.00%

Empalme unipolar 70/6-70mm² UNID. 1.00 13.40 13.40 46.9 54 26.23%

2000 Manta termocontraible UNID. 2.00 5.50 11.00 0 0.00%

Material Menudo (soldadura,Pintura) Glob 1.00 5.00 5.00 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 62.90 0.00%

MANO DE OBRA :

Capataz H.H. 0.15 16.44 2.39

Operario H.H. 1.45 13.70 19.93

Oficial H.H. 1.45 12.13 17.64

Peon H.H. 2.91 10.95 31.85

H.H. 0.00 0.00

H.H. 0.00 0.00 71.82 47 40.17%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 3.59 37

Equipos Seguridad EST. 5% 3.59

Camioneta 1000 kg. H.M 0.15 48.34 7.10

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 14.28 37 7.99%

COSTO DIRECTO S/. 149.00

G.G., D.T. Y UTILIDADES S/. 29.80 39 16.67%

TOTAL S/. 178.80 91.05%

Page 18: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

430.01 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Medidores Monofásicos y/o trifásicos en Caja Portamedidor TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 18.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 18.0 0.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 0.0 = 0.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo ( cinta EPR y Vinilica) u 1.00 0.32 0.32 0 0.00%

0.00 0.32 22 1.74%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 0.32 0.00%

MANO DE OBRA :

Capataz H.H. 0.04 16.44 0.73

Operario H.H. 0.44 13.70 6.09

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 0.44 10.95 4.87

H.H. 0.00 0.00

H.H. 0.00 0.00 11.69 47 63.55%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.58 37

Equipos Seguridad EST. 5% 0.58

Camioneta 1000 kg. H.M 0.04 48.34 2.15

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 3.32 37 18.04%

COSTO DIRECTO S/. 15.32

G.G., D.T. Y UTILIDADES S/. 3.06 39 16.67%

TOTAL S/. 18.39 100.00%

Page 19: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

430.02 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Medidores Monofásicos y/o trifásicos existentes en Caja Portam TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 19.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 19.0 0.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 0.0 = 0.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo ( cinta EPR y Vinilica) u 1.00 0.32 0.32 0 0.00%

0.00 0.32 22 1.83%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 0.32 0.00%

MANO DE OBRA :

Capataz H.H. 0.04 16.44 0.69

Operario H.H. 0.42 13.70 5.77

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 0.42 10.95 4.61

H.H. 0.00 0.00

H.H. 0.00 0.00 11.07 47 63.48%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.55 37

Equipos Seguridad EST. 5% 0.55

Camioneta 1000 kg. H.M 0.04 48.34 2.04

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 3.14 37 18.02%

COSTO DIRECTO S/. 14.53

G.G., D.T. Y UTILIDADES S/. 2.91 39 16.67%

TOTAL S/. 17.44 100.00%

Page 20: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

332.05 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA Contruccion de Murete de 1.75x0.75x0.4m (incluye insumos) TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 1.9 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 1.9 0.0 0.0 0.0

0.00 0.0

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : = 0.0 0.0 0.0

OFICIAL : = 0.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Arcilla seleccionada m3 0.03 30.00 0.90 0 0.00%

Adobe (24x50x12)cm UNID. 45.00 0.30 13.50 14.4 22 16.32%

2000 Agua m3 0.15 5.21 0.78 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.78 22 0.89%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 15.18 0.00%

MANO DE OBRA :

Capataz H.H. 0.42 16.44 6.92

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 4.21 10.95 46.11

H.H. 0.00 0.00

H.H. 0.00 0.00 53.03 47 60.11%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 2.65 0

Equipos Seguridad EST. 5% 2.65

H.M 0.00 0.00

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 5.30 37 6.01%

COSTO DIRECTO S/. 73.51

G.G., D.T. Y UTILIDADES S/. 14.70 38 16.67%

TOTAL S/. 88.21 100.00%

Page 21: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

332.06 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA Contruccion de Murete de 2x1,2x0.3m incluye colocación de cajas TABLA DE RENDIMIENTOS (En 8 horas) en

portamedidor, suministro e instalación de tubos de F°G° de 3/4" Ø x 4 m REN.CUADRILLA 1.9 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 1.9 0.0 0.0 0.0

Camioneta 1000 Kg. 0.25 2.0

0.00 0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Cemento Bls 2.00 18.70 37.40 0 0.00%

Ladrillo King-Kong unidad 75.00 0.30 22.50 59.9 22 12.74%

2000 Agua m3 0.07 5.21 0.36 0 0.00%

Agregados m3 0.10 16.15 1.62 0.00%

Fierro de 3/8" unidad 2.00 29.00 58.00 0 0.00%

Baston de F.G. de 3/4" x 4 mts. Un. 1.00 38.00 38.00 98.0 22 20.84%

3000 material menudo Cjto 1.00 5.10 5.10 0 0.00%

0.00 0 0.00%

0.00 5.1 22 1.08%

0.00 0.00 0 0.00%

0.00 162.98 0.00%

MANO DE OBRA :

Capataz H.H. 0.42 16.44 6.92

Operario H.H. 4.21 13.70 57.68

Oficial H.H. 4.21 12.13 51.07

Peon H.H. 4.21 10.95 46.11

H.H. 0.00 0.00

H.H. 0.00 0.00 161.79 47 34.41%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 8.09 0

Equipos Seguridad EST. 5% 8.09

Camioneta 1000 Kg. H.M 1.05 48.34 50.88

H.M 0.00 0.00

H.M 0 0.00

H.M 0 0.00 67.06 37 14.26%

COSTO DIRECTO S/. 391.83

G.G., D.T. Y UTILIDADES S/. 78.37 39 16.67%

TOTAL S/. 470.19 100.00%

Page 22: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

440.03 FECHA : 08/04/23 3.00

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Construcción de Murete de 1.75 x 0.75 x0.40m, Enlucido con Cemento, incluye TABLA DE RENDIMIENTOS (En 8 horas) en

colocación de Caja Portamedidor, suministro e instalación de tubos REN.CUADRILLA 2.0 0.0

de F°G° de 3/4" Ø x 4 m FACTOR REND. 2.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 2.0 0.0 0.0

Camioneta 1000 Kg. 0.12 1.0

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.2 = 1.6 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 1.0 = 8.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Cemento Bolsa 0.40 18.70 7.48 0 0.00%

yeso Bolsa 2.00 2.50 5.00

adobe unidad 30.00 0.10 3.00

tierra de cultivo m3 0.30 45.00 13.50 28.98 22 10.82%

2000 Tubos PVC SAP 2"x6 m unidad 2.00 15.00 30.00 0 0 0.00%

Curvas PVC SAP 2" unidad 2.00 8.00 16.00 46.00 22 17.18%

Cinta Band IT m 5.00 4.50 22.50 0 0.00%

Hebillas unidad 5.00 1.80 9.00 0 0.00%

3000 material menudo Cjto 1.00 5.10 5.10 0.00%

0.00 36.60 22 13.67%

0.00 111.58 0.00%

MANO DE OBRA :

Capataz H.H. 0.40 16.44 6.58

Operario H.H. 2.00 13.7 27.40

Oficial H.H. 2.00 12.13 24.26

Peon H.H. 2.00 10.95 21.90

H.H. 0.00 0.00

H.H. 0.00 0.00 80.14 47 29.93%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias y Equipos Seguridad EST. 5% 4.01

Equipos Seguridad EST. 5% 4.01

Camioneta 1000 kg. H.M 0.484 48.34 23.40

H.M 0.000 0.00

H.M 0 0.00

H.M 0 0.00 31.41 37 11.73%

COSTO DIRECTO S/. 223.13

G.G., D.T. Y UTILIDADES S/. 44.63 39 16.67%

TOTAL S/. 267.75 100.00%

Page 23: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

610.01 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Desmontaje de cajas Portamedidores Monof. Y Trif. Incluye Medidor TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 17.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 17.0 0.0 0.0

Camioneta 1000 Kg. 0.25 2.0

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : = 0.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 UNID. 0.00 0 0.00%

UNID. 0.00 0.00 0 0.00%

2000 Glob 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 0.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.05 16.44 0.77

Operario H.H. 0.47 13.70 6.45

Oficial H.H. 0.47 12.13 5.71

Peon H.H. 0.00 10.95 0.00

H.H. 0.00 0.00

H.H. 0.00 0.00 12.93 47 54.12%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.65 37

Equipos Seguridad EST. 5% 0.65

Camioneta 1000 kg. H.M 0.12 48.34 5.69

H.M 0.00

H.M 0 0.00

H.M 0 0.00 6.98 37 29.22%

COSTO DIRECTO S/. 19.91

G.G., D.T. Y UTILIDADES S/. 3.98 39 16.67%

TOTAL S/. 23.89 100.00%

Page 24: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

610.02 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Desmontaje de acometidas simple o doble, incluye separador PVC, desconexi TABLA DE RENDIMIENTOS (En 8 horas) en

de cajas y otros. REN.CUADRILLA 29.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 29.0 18.0 0.0 0.0

Camioneta 1000 Kg. 0.15 1.2

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : = 0.0 0.0 0.0

OFICIAL : = 0.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 UNID. 0.00 0 0.00%

UNID. 0.00 0.00 0 0.00%

2000 Glob 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 0.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.03 16.44 0.45

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 0.55 10.95 6.04

H.H. 0.00 0.00

H.H. 0.00 0.00 6.49 47 56.80%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.32 37

Equipos Seguridad EST. 5% 0.32

Camioneta 1000 Kg. H.M 0.04 48.34 2.00

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.28 1.39 0.38

H.M 0 0.00

H.M 0 0.00 3.03 37 26.53%

COSTO DIRECTO S/. 9.53

G.G., D.T. Y UTILIDADES S/. 1.91 39 16.67%

TOTAL S/. 11.43 100.00%

Page 25: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

610.03 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Desmontaje de medidor monofasico y/o trifasico TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILLA 44.0 0.0

FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 44.0 18.0 0.0 0.0

Camioneta 1000 Kg. 0.25 2.0

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : = 0.0 0.0 0.0

OFICIAL : = 0.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 UNID. 0.00 0 0.00%

UNID. 0.00 0.00 0 0.00%

2000 Glob 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 0.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.02 16.44 0.30

Operario H.H. 0.00 13.70 0.00

Oficial H.H. 0.00 12.13 0.00

Peon H.H. 0.36 10.95 3.98

H.H. 0.00 0.00

H.H. 0.00 0.00 4.28 47 51.65%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.21 37

Equipos Seguridad EST. 5% 0.21

Camioneta 1000 kg. H.M 0.05 48.34 2.20

H.M 0.00

H.M 0 0.00

H.M 0 0.00 2.63 37 31.68%

COSTO DIRECTO S/. 6.91

G.G., D.T. Y UTILIDADES S/. 1.38 39 16.67%

TOTAL S/. 8.29 100.00%

Page 26: Costos-unitarios CD Costa

REF F O R M U L A R I O Nº 10 - A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

620.02 FECHA : 15/10/08 2.96

OBRA Remodelacion de Redes de Distribucion Stgo de Chuco Cachicadan COSTO POR : Gbl LUGAR La Libertad

PARTIDA : Transporte de Materiales Desmantelados Stgo Chuco CD-Almacen Hidrand TABLA DE RENDIMIENTOS (En 8 horas) en

REN.CUADRILL 1.0

FACTOR REND. 1.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 1.0

Camioneta 1000 Kg. 2.00 16.0

0.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

OPERARIO : 0.5 = 4.0 0.0 0.0

0.0 OFICIAL : 1.0 = 8.0 0.0 0.0

0.0 PEON : 4.0 = 32.0

HECHO POR :

M E T R A D O INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

0.00 0.00 0.00%

MANO DE OBRA :

Capataz H.H. 0.80 16.44 13.15

Operario H.H. 4.00 13.70 54.80

Oficial H.H. 8.00 12.13 97.04

Peon H.H. 32.00 10.95 350.40

515.39 0.00%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 25.77

Equipos Seguridad EST. 5% 25.77

Camioneta 1000 Kg. H.M 16.00 48.34 773.44 0

0.00

0.00

0 0.0000 0.00

0 0.0000 0.00

824.98 0.00%

COSTO DIRECTO S/. 1,340.37 $446.79

G.G., D.T. Y UTILIDADES S/. 0.00%

TOTAL S/. 0.00%

Page 27: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.13 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple de la Red con Empalme TABLA DE RENDIMIENTOS (En 8 horas) en

tipo perforación (02) a la Caja Portamedidor, incluye REN.CUADRILLA 24.0 0.0

correa plastica nylon. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 24.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.23 4.23 0 0.00%

0.00 4.23 54 14.44%

2000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.23 0.00%

MANO DE OBRA :

Capataz H.H. 0.03 16.44 0.55

Operario H.H. 0.33 13.70 4.57

Oficial H.H. 0.33 12.13 4.04

Peon H.H. 0.67 10.95 7.30

H.H. 0.00 0.00

H.H. 0.00 0.00 16.46 47 56.19%HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.82 37

Equipos Seguridad EST. 5% 0.82

Camioneta 1000 Kg. H.M 0.03 48.34 1.61

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.33 1.39 0.46

H.M 0 0.00

H.M 0 0.00 3.72 37 12.70%

COSTO DIRECTO S/. 24.41

G.G., D.T. Y UTILIDADES S/. 4.88 39 16.67%

TOTAL S/. 29.29 100.00%

Page 28: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.14 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Aerea Simple de la Red con Empalme TABLA DE RENDIMIENTOS (En 8 horas) en

de tipo perforación (02) con cruce de calle, incluye REN.CUADRILLA 25.0 0.0

liston de madera, correa plastica nylon FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 25.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo, alambre) Glb 1.00 6.48 6.48 0 0.00%

Liston de madera tornillo de 2.5"x2.5"x 4.0 m u 1.00 13.10 13.10 19.58 54 41.89%

2000 0.00 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.00 54 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 19.58 0.00%

MANO DE OBRA :

Capataz H.H. 0.03 16.44 0.53

Operario H.H. 0.32 13.70 4.38

Oficial H.H. 0.32 12.13 3.88

Peon H.H. 0.64 10.95 7.01

H.H. 0.00 0.00

H.H. 0.00 0.00 15.80 47 33.80%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 0.79 37

Equipos Seguridad EST. 5% 0.79

Camioneta 1000 Kg. H.M 0.03 48.34 1.55

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.32 1.39 0.44

H.M 0 0.00

H.M 0 0.00 3.57 37 7.64%

COSTO DIRECTO S/. 38.95

G.G., D.T. Y UTILIDADES S/. 7.79 39 16.67%

TOTAL S/. 46.74 100.00%

Page 29: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.15 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias conexión Modulo de Derivación, caja port TABLA DE RENDIMIENTOS (En 8 horas) en

y accesorios de fijación e interruptor termomagnetico dentro de vivienda incl. sumi REN.CUADRILLA 14.3 0.0

correa plastica nylón. FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 14.3 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo) Glb 1.00 4.23 4.23 0 0.00%

0.00 4.23 54 9.25%

2000 0.00 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.00 54 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 4.23 0.00%

MANO DE OBRA :

Capataz H.H. 0.06 16.44 0.92

Operario H.H. 0.56 13.70 7.66

Oficial H.H. 0.56 12.13 6.79

Peon H.H. 1.12 10.95 12.25

H.H. 0.00 0.00

H.H. 0.00 0.00 27.62 47 60.42%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.38 37

Equipos Seguridad EST. 5% 1.38

Camioneta 1000 Kg. H.M 0.06 48.34 2.70

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.56 1.39 0.78

H.M 0 0.00

H.M 0 0.00 6.24 37 13.66%

COSTO DIRECTO S/. 38.10

G.G., D.T. Y UTILIDADES S/. 7.62 39 16.67%

TOTAL S/. 45.72 100.00%

Page 30: Costos-unitarios CD Costa

REF F O R M U L A R I O No. 10 : A N A L I S I S D E C O S T O S U N I T A R I O S

Dólar/Sol

420.16 FECHA : 08/04/23 3.30

OBRA Ampliacion de Redes de 10 AAHH Chimbote COSTO POR : Pza LUGAR Cajamarca

PARTIDA : Instalación de Acometidas Domiciliarias Simple fachada del modulo de Derivación a TABLA DE RENDIMIENTOS (En 8 horas) en

portamedidor c/cruce calle y accesorios de fijación e interruptor termomagnético, iREN.CUADRILLA 13.0 0.0

suministro de liston de madera tornillo, cintas EPR, vinilica y cintillo FACTOR REND. 1.0 0.0

ESPECIFICACION CANTID. HORAS REN.EQUIPOS 13.0 0.0 0.0

Camioneta 1000 Kg. 0.10 0.8

Escalera dielectrica embonable 7.5m (3 Cuerpos) 1.00 8.0 PERSONAL BASE : Principal C. # B

0.00 0.0 CAPATAZ : 0.1 = 0.8 0.0

MEZCLA 0.00 0.0 OPERARIO : 1.0 = 8.0 0.0 0.0

OFICIAL : 1.0 = 8.0 0.0 0.0

HECHO POR : PEON : 2.0 = 16.0

M E T R A D O C O S T O S INDICE CREPCO

COD D E S C R I P C I O N UNID. CANTID. UNITARIO PARCIAL SUB-TOTAL Nro %

MATERIALES : 0 0.00%

1000 Material Menudo(cinta EPR, vinilica y cintillo, alambre) Glb 1.00 6.48 6.48 0 0.00%

Liston de madera tornillo de 2.5"x2.5"x 4.0 m u 1.00 13.10 13.10 19.58 54 28.70%

2000 0.00 0 0.00%

0.00 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

3000 0.00 0 0.00%

0.00 0 0.00%

0.00 0 0.00%

0.00 0.00 0 0.00%

0.00 19.58 0.00%

MANO DE OBRA :

Capataz H.H. 0.06 16.44 1.01

Operario H.H. 0.62 13.70 8.43

Oficial H.H. 0.62 12.13 7.46

Peon H.H. 1.23 10.95 13.48

H.H. 0.00 0.00

H.H. 0.00 0.00 30.38 47 44.53%

HERRAMIENTAS Y EQUIPOS :

Herramientas varias EST. 5% 1.52 37

Equipos Seguridad EST. 5% 1.52

Camioneta 1000 Kg. H.M 0.06 48.34 3.00

Escalera dielectrica embonable 7.5m (3 Cuerpos) H.M 0.62 1.39 0.86

H.M 0 0.00

H.M 0 0.00 6.90 37 10.11%

COSTO DIRECTO S/. 56.86

G.G., D.T. Y UTILIDADES S/. 11.37 39 16.67%

TOTAL S/. 68.23 100.00%

Page 31: Costos-unitarios CD Costa

datos generales1 Obra: Ampliacion de Redes de 10 AAHH Chimbote2 Lugar: Cajamarca3 T.C. 3.3

Costo/unitarioCapataz 16.44Operario 13.7Oficial 12.13Peon 10.95

HERRAMIENTAS Y EQUIPOSCamión Grúa 5 Tn. 122.57Camioneta 1000 kg. 48.34Escalera dielectrica embonable 10.0m (3 cuerpos) 1.39Camión volquete 4x2 m3 176.43Compactadora 20.93Cortadora de concreto 31.25Mezcladora 15Vibradora 7.5Planta de asfalto en frio 110.00Amasadora de asfalto 150.00Pavimentadoras 150.00Equipo de medicion y pruebas 50

MATERIALESCemento 18.7Agua 5.21Hormigon 22.7Arena 22.7Tubo de PVC 1Ladrillo 0.3