Item Descripción Und. Metrado Rendimiento f 01 OBRAS PROVISIONALES 01.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS glb 1.00 1.00 1.00 1.00 1.00 10.00 0.10 01.02 CAMPAMENTO PROVISIONAL DE OBRA m2 60.00 100.00 0.60 1.00 0.60 2.00 0.30 01.03 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40m und 2.00 1.00 2.00 1.00 2.00 2.00 1.00 01.04 FLETE TERRESTRE glb 1.00 1.00 1.00 1.00 1.00 20.00 0.05 02 OBRAS PRELIMINARES 02.01 TRAZO, NIVELACION Y REPLANTEO km 14.73 1.00 14.73 1.00 14.73 15.00 0.98 02.02 TRAZO DURANTE LA EJECUCION DE LA OBRA mes 6.00 1.00 6.00 1.00 6.00 6.00 1.00 02.03 DESVIO Y MANTENIMIENTO DE TRANSITO glb 1.00 1.00 1.00 1.00 1.00 6.00 0.17 02.04 DESBROCE Y LIMPIEZA EN ZONAS BOSCOSAS m2 4,787.89 40.00 119.70 1.00 119.70 10.00 11.97 03 MOVIMIENTO DE TIERRAS 03.01 CORTE EN TIERRA SUELTA m3 18,861.96 400.00 47.15 1.00 47.15 30.00 1.57 03.02 CORTE EN ROCA CONGLOMERADA m3 63,198.03 300.00 210.66 1.00 210.66 60.00 3.51 03.03 CORTE ROCA FIJA 03.03. PERFORACION Y DISPARO m3 17,919.02 60.00 298.65 1.00 298.65 20.00 14.93 03.03. EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES m3 17,919.02 350.00 51.20 1.00 51.20 10.00 5.12 03.04 CONFORMACION DE TERRAPLENES C/MATERIAL SELECCIONADO m3 26,053.74 500.00 52.11 1.00 52.11 10.00 5.21 03.05 PERFILADO Y COMPACTADO DE SUB RASANTE m2 82,792.12 2,200.00 37.63 1.00 37.63 15.00 2.51 03.06 ELIMINACION DE MATERIAL EXCEDENTE D> 1km. m3 ### 450.00 237.24 2.00 118.62 25.00 9.49 04 PLATAFORMA DE RODADURA 04.01 MEJORAMIENTO DE TERRENO DE FUNDACION C/ OVER SELECCIONADO 04.01. CORTE EN TERRENO PARA MEJORAMIENTO C/ OVER H=0.80M m3 1,144.00 500.00 2.29 1.00 2.29 3.00 0.76 04.01. EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO (PEDRA 10") m3 1,430.00 500.00 2.86 1.00 2.86 3.00 0.95 04.01. ZARANDEO MECANICO (PIEDRA 10") m3 1,430.00 450.00 3.18 1.00 3.18 3.00 1.06 04.01. CARGUIO DE MATERIAL m3 1,430.00 710.00 2.01 1.00 2.01 3.00 0.67 04.01. TRANSPORTE DE MATERIAL m3 1,430.00 390.00 3.67 1.00 3.67 3.00 1.22 04.01. EXTENDIDO Y COMPACTADO m2 1,430.00 2,500.00 0.57 1.00 0.57 2.00 0.29 04.02 MEJORAMIENTO DE TERRENO A NIVEL DE SUB RASANTE 04.02. CONFORMACION DE SUB BASE GRANULA e=0.15 m m2 15,355.78 2,200.00 6.98 1.00 6.98 15.00 0.47 04.03 AFIRMADO 04.03. m3 29,465.81 400.00 73.66 1.00 73.66 30.00 2.46 04.03. ZARANDEO MECANICO PARA BASE - AFIRMADO, e=0.25 m3 29,465.81 350.00 84.19 1.00 84.19 30.00 2.81 04.03. CARGUIO DE MATERIAL DE CANTERA m3 29,465.81 710.00 41.50 1.00 41.50 30.00 1.38 04.03. TRANSPORTE DE MATERIAL PARA BASE - AFIRMADO m3 29,465.81 390.00 75.55 1.00 75.55 30.00 2.52 Tiempo Unitario Duración (d = tu/f) Duración Estimada f (correg.) EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA PARA BASE - AFIRMADO, e=0.25m

Transcript of cronograma

ProgramacinItemDescripcinUnd.MetradoRendimientoTiempo UnitariofDuracin (d = tu/f)Duracin Estimadaf (correg.)Duracin Programada (d = tu/f(corre.))01OBRAS PROVISIONALES01.01MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOSglb1.001.001.001.001.0010.000.1010.0001.02CAMPAMENTO PROVISIONAL DE OBRAm260.00100.000.601.000.602.000.302.0001.03CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40mund2.001.002.001.002.002.001.002.0001.04FLETE TERRESTREglb1.001.001.001.001.0020.000.0520.0002OBRAS PRELIMINARES02.01TRAZO, NIVELACION Y REPLANTEOkm14.731.0014.731.0014.7315.000.9815.0002.02TRAZO DURANTE LA EJECUCION DE LA OBRAmes6.001.006.001.006.006.001.006.0002.03DESVIO Y MANTENIMIENTO DE TRANSITOglb1.001.001.001.001.006.000.176.0002.04DESBROCE Y LIMPIEZA EN ZONAS BOSCOSASm24,787.8940.00119.701.00119.7010.0011.9710.0003MOVIMIENTO DE TIERRAS03.01CORTE EN TIERRA SUELTAm318,861.96400.0047.151.0047.1530.001.5730.0003.02CORTE EN ROCA CONGLOMERADAm363,198.03300.00210.661.00210.6660.003.5160.0003.03CORTE ROCA FIJA03.03.01PERFORACION Y DISPAROm317,919.0260.00298.651.00298.6520.0014.9320.0003.03.02EXCAVACION, DESQUINCHE Y PEINADO DE TALUDESm317,919.02350.0051.201.0051.2010.005.1210.0003.04CONFORMACION DE TERRAPLENES C/MATERIAL SELECCIONADOm326,053.74500.0052.111.0052.1110.005.2110.0003.05PERFILADO Y COMPACTADO DE SUB RASANTEm282,792.122,200.0037.631.0037.6315.002.5115.0003.06ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3106,760.02450.00237.242.00118.6225.009.4925.0004PLATAFORMA DE RODADURA04.01MEJORAMIENTO DE TERRENO DE FUNDACION C/ OVER SELECCIONADO04.01.01CORTE EN TERRENO PARA MEJORAMIENTO C/ OVER H=0.80Mm31,144.00500.002.291.002.293.000.763.0004.01.02EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO (PEDRA 10")m31,430.00500.002.861.002.863.000.953.0004.01.03ZARANDEO MECANICO (PIEDRA 10")m31,430.00450.003.181.003.183.001.063.0004.01.04CARGUIO DE MATERIALm31,430.00710.002.011.002.013.000.673.0004.01.05TRANSPORTE DE MATERIALm31,430.00390.003.671.003.673.001.223.0004.01.06EXTENDIDO Y COMPACTADOm21,430.002,500.000.571.000.572.000.292.0004.02MEJORAMIENTO DE TERRENO A NIVEL DE SUB RASANTE04.02.01CONFORMACION DE SUB BASE GRANULA e=0.15 mm215,355.782,200.006.981.006.9815.000.4715.0004.03AFIRMADO04.03.01EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA PARA BASE - AFIRMADO, e=0.25mm329,465.81400.0073.661.0073.6630.002.4630.0004.03.02ZARANDEO MECANICO PARA BASE - AFIRMADO, e=0.25m329,465.81350.0084.191.0084.1930.002.8130.0004.03.03CARGUIO DE MATERIAL DE CANTERAm329,465.81710.0041.501.0041.5030.001.3830.0004.03.04TRANSPORTE DE MATERIAL PARA BASE - AFIRMADOm329,465.81390.0075.551.0075.5530.002.5230.0004.03.05EXTENDIDO, BATIDO Y COMPACTADO EN BASE DE AFIRMADOm282,792.122,000.0041.401.0041.4030.001.3830.0005OBRAS DE ARTE05.01ALCANTARILLAS DE CONCRETO ARMADO05.01.01TRAZO Y REPLANTEO EN ESTRUCTURASm21,523.54200.007.621.007.622.003.812.0005.01.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm31,790.8180.0022.391.0022.392.0011.192.0005.01.03ENCAUZAMIENTO DE ALCANTARILLASm2714.108.3385.691.0085.692.0042.852.0005.01.04ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m32,328.06390.005.971.005.972.002.982.0005.01.05MEJORAMIENTO DE TERRENO CON SISTEMA OVER SIDEm286.05100.000.861.000.8610.000.0910.0005.01.06CONCRETO fc=100 KG/CM2 SOLADO PARA CIMENTACIONESm25.3140.000.631.000.6310.000.0610.0005.01.07ENCOFRADO Y DESENCOFRADO EN ESTRUCTURASm32,630.7610.00263.081.00263.0810.0026.3110.0005.01.08CONCRETO SIMPLE f'c=175 kg/cm2m373.805.6765.932.0032.9610.006.5910.0005.01.09CONCRETO f'c=210 kg/cm2m368.585.6765.011.0065.0110.006.5010.0005.01.10ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60m225,849.40100.00258.491.00258.497.0036.937.005.02CUNETAS05.02.01CONFORMACION DE CUNETA TRIANGULARm14,991.92250.0059.971.0059.9720.003.0020.005.03BADEN05.03.01TRAZO Y REPLANTEO EN ESTRUCTURASm2250.00200.001.251.001.251.001.251.0005.03.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3116.9280.001.461.001.462.000.732.0005.03.03NIVELACION Y APISONADOm2250.00120.002.081.002.082.001.042.0005.03.04SUB BASE DE MATERIAL GRANULAR, h=0.20 mm2250.00100.002.501.002.502.001.252.0005.03.05ENCOFRADO Y DESENCOFRADOm275.0012.506.001.006.002.003.002.0005.03.06CONCRETO f'c=210 kg/cm2 EN BADENm366.9222.003.042.001.525.000.615.0005.03.07EMBOQUILLADO DE PIEDRA DE 8" CON MORTEROm336.7510.003.683.001.235.000.745.0005.03.08JUNTA ASFALTICA DE DILATACION, e = 1"m125.0050.002.504.000.631.002.501.0005.03.09ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3152.00390.000.391.000.391.000.391.005.04PASE DE AGUA05.04.01TRAZO Y REPLANTEO EN ESTRUCTURASm210.00200.000.051.000.052.000.032.0005.04.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm310.0080.000.131.000.131.000.131.0005.04.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m313.00390.000.031.000.031.000.031.0005.04.04ENCOFRADO Y DESENCOFRADOm230.0012.502.401.002.402.001.202.0005.04.05CONCRETO f'c=210 kg/cm2m36.7022.000.301.000.303.000.103.0005.04.06ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg503.46240.002.101.002.104.000.524.005.05PONTON LOSA VIGA05.05.01TRAZO Y REPLANTEO EN ESTRUCTURASm2231.08200.001.161.001.162.000.582.0005.05.02DESMONTAJE DE VIGAS (MADERA DE PONTON EXISTENTE)m275.0050.001.501.001.503.000.503.0005.05.03EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN PONTONm3440.18350.001.261.001.266.000.216.0005.05.04RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO CLASIFICADOm3160.7010.0016.071.0016.074.004.024.0005.05.05ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3572.23390.001.471.001.472.000.732.0005.05.06ENCOFRADO Y DESENCOFRADOm2591.0912.5047.291.0047.2910.004.7310.0005.05.07CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.G.m3214.3424.008.931.008.9312.000.7412.0005.05.08CONCRETO f'c=280 kg/cm2 - PARA PONTONm325.3615.001.691.001.693.000.563.0005.05.09ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg2,617.30240.0010.911.0010.915.002.185.0005.05.10TUBERIA PVC SAL 3" DRENAJE LOSAm9.00200.000.051.000.051.000.051.0005.05.11APOYO NEOPRENO GRADO 3, 60 DURO DE 0.50 x 0.20 x 0.05 mund9.001.009.001.009.001.009.001.0005.05.12JUNTA DE DILATACION CON TECNOPORT, e=1"m32.40200.000.161.000.161.000.161.0005.05.13BARANDA DE FG D=2.5"m30.006.005.001.005.004.001.254.005.06MUROS DE CONTENCION05.06.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3194.3580.002.431.002.435.000.495.0005.06.02ENCOFRADO Y DESENCOFRADOm2461.0012.5036.881.0036.8810.003.6910.0005.06.03CONCRETO f'c=175 kg/cm2m3175.4017.0010.321.0010.3210.001.0310.0005.06.04ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg7,638.38240.0031.831.0031.836.005.306.0005.06.05DEMOLICION DE MURO DE C EXISTENTEm363.0015.004.201.004.202.002.102.0005.06.06ELIMINACION DE MATERIAL EXCEDENTE D> 5km.m3347.15390.000.891.000.891.000.891.005.07MURO DE MAMPOSTERIA DE PIEDRA05.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm313.8080.000.171.000.172.000.092.0005.08.02ASENTADO DE MAMPOSTERIA DE PIEDRA CON MEZCLA 1:4, e=0.30m246.0010.004.601.004.602.002.302.0005.08.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m317.94390.000.051.000.051.000.051.005.08SUB DREN05.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3175.7080.002.201.002.205.000.445.0005.08.02CAMA DE ARENA e=0.10mm39.6080.000.121.000.123.000.043.0005.08.03TUBERIA PERFORADA HDPE 100 mm PERFORADAm171.00100.001.711.001.712.000.862.0005.08.04GEOTEXTIL PARA ESTRUCTURASm2624.00250.002.501.002.502.001.252.0005.08.05RELLENO DE FILTRO CON MATERIAL GRANULAR.m3105.608.0013.201.0013.202.006.602.0005.08.06RELLENO CON MATERIAL PROPIO CLASIFICADOm331.1710.003.121.003.122.001.562.0005.08.07TUBERIA DE VENTILACION DE F G 1 1/2" PARA SUB DRENund3.0040.000.081.000.081.000.081.0006SEALIZACION Y SEGURIDAD VIAL06.01HITOS KILOMETRICOSund15.005.003.001.003.005.000.605.0006.02SEAL INFORMATIVA DE 1.50x0.60 m.und7.0015.000.471.000.472.000.232.0006.03SEAL PREVENTIVA DE 0.60x0.60 m.und44.0015.002.931.002.934.000.734.0006.04SEAL REGLAMENTARIA DE 0.75x0.75 m.und9.0015.000.601.000.602.000.302.0007IMPACTO AMBIENTAL07.01RESTAURACION DE PATIO DE MAQUINAS Y CAMPAMENTOm2460.002,500.000.181.000.182.000.092.0007.02ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTEm31,500.001,200.001.251.001.252.000.632.0007.03PROGRAMA DE REVEGETACIONha1.050.502.101.002.102.001.052.00

TiemposItemDescripcinDuracin ProgramadaMetradoPrecio (S/.)Parcial (S/.)01OBRAS PROVISIONALES78,874.4401.01MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOS10.001.0028,774.0928,774.0901.02CAMPAMENTO PROVISIONAL DE OBRA2.0060.0033.081,819.8001.03CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40m2.002.00841.982,155.4801.04FLETE TERRESTRE20.001.0046,125.0746,125.0702OBRAS PRELIMINARES71,239.5202.01TRAZO, NIVELACION Y REPLANTEO15.0014.73719.0715,594.0602.02TRAZO DURANTE LA EJECUCION DE LA OBRA6.006.007,017.1040,542.0002.03DESVIO Y MANTENIMIENTO DE TRANSITO6.001.002,990.102,990.1002.04DESBROCE Y LIMPIEZA EN ZONAS BOSCOSAS10.004,787.892.4812,113.3603MOVIMIENTO DE TIERRAS2,371,641.7603.01CORTE EN TIERRA SUELTA30.0018,861.963.96120,016.6403.02CORTE EN ROCA CONGLOMERADA60.0063,198.037.68545,162.1103.03CORTE ROCA FIJA486,882.4703.03.01PERFORACION Y DISPARO20.0017,919.0217.60352,220.4203.03.02EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES10.0017,919.026.86134,662.0503.04CONFORMACION DE TERRAPLENES C/MATERIAL SELECCIONADO10.0026,053.744.22261,414.0103.05PERFILADO Y COMPACTADO DE SUB RASANTE15.0082,792.121.28149,853.7403.06ELIMINACION DE MATERIAL EXCEDENTE D> 1km.25.00106,760.026.58664,384.5204PLATAFORMA DE RODADURA1,542,792.1304.01MEJORAMIENTO DE TERRENO DE FUNDACION C/ OVER SELECCIONADO43,580.6804.01.01CORTE EN TERRENO PARA MEJORAMIENTO C/ OVER H=0.80M3.001,144.002.605,628.4804.01.02EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO (PEDRA 10")3.001,430.007.9319,347.9004.01.03ZARANDEO MECANICO (PIEDRA 10")3.001,430.005.805,534.1004.01.04CARGUIO DE MATERIAL3.001,430.005.232,917.2004.01.05TRANSPORTE DE MATERIAL3.001,430.0010.818,251.1004.01.06EXTENDIDO Y COMPACTADO2.001,430.001.691,901.9004.02MEJORAMIENTO DE TERRENO A NIVEL DE SUB RASANTE466,662.1504.02.01CONFORMACION DE SUB BASE GRANULA e=0.15 m15.0015,355.7824.48466,662.1504.03AFIRMADO1,032,549.3004.03.01EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA PARA BASE - AFIRMADO, e=0.25m30.0029,465.818.26505,990.5304.03.02ZARANDEO MECANICO PARA BASE - AFIRMADO, e=0.2530.0029,465.814.97132,331.9104.03.03CARGUIO DE MATERIAL DE CANTERA30.0029,465.815.2254,099.6204.03.04TRANSPORTE DE MATERIAL PARA BASE - AFIRMADO30.0029,465.8110.58153,017.0504.03.05EXTENDIDO, BATIDO Y COMPACTADO EN BASE DE AFIRMADO30.0082,792.121.55187,110.1905OBRAS DE ARTE986,301.1005.01ALCANTARILLAS DE CONCRETO ARMADO199,643.5605.01.01TRAZO Y REPLANTEO EN ESTRUCTURAS2.001,523.542.873,011.9105.01.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS2.001,790.8117.7015,289.5205.01.03ENCAUZAMIENTO DE ALCANTARILLAS2.00714.1011.908,497.7905.01.04ELIMINACION DE MATERIAL EXCEDENTE D> 1km.2.002,328.066.5811,386.9805.01.05MEJORAMIENTO DE TERRENO CON SISTEMA OVER SIDE10.0086.05128.9414,022.2805.01.06CONCRETO fc=100 KG/CM2 SOLADO PARA CIMENTACIONES10.0025.31275.905,675.8005.01.07ENCOFRADO Y DESENCOFRADO EN ESTRUCTURAS10.002,630.7636.2621,115.6805.01.08CONCRETO SIMPLE f'c=175 kg/cm210.00373.80375.6797,188.0505.01.09CONCRETO f'c=210 kg/cm210.00368.58436.8722,674.1305.01.10ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 607.0025,849.403.739,009.875.02CUNETAS200,223.3405.02.01CONFORMACION DE CUNETA TRIANGULAR20.0014,991.922.1149,023.585.03BADEN50,365.8405.03.01TRAZO Y REPLANTEO EN ESTRUCTURAS1.00250.002.87652.5005.03.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS2.00116.9217.701,952.5605.03.03NIVELACION Y APISONADO2.00250.002.76690.0005.03.04SUB BASE DE MATERIAL GRANULAR, h=0.20 m2.00250.0038.043,657.5005.03.05ENCOFRADO Y DESENCOFRADO2.0075.0036.262,712.0005.03.06CONCRETO f'c=210 kg/cm2 EN BADEN5.0066.92440.9627,626.5805.03.07EMBOQUILLADO DE PIEDRA DE 8" CON MORTERO5.0036.75248.1810,130.5105.03.08JUNTA ASFALTICA DE DILATACION, e = 1"1.00125.0012.211,490.0005.03.09ELIMINACION DE MATERIAL EXCEDENTE D> 1km.1.00152.006.581,454.195.04PASE DE AGUA6,489.1905.04.01TRAZO Y REPLANTEO EN ESTRUCTURAS2.0010.002.8726.1005.04.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS1.0010.0017.70167.0005.04.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.1.0013.006.58124.3805.04.04ENCOFRADO Y DESENCOFRADO2.0030.0036.261,084.8005.04.05CONCRETO f'c=210 kg/cm23.006.70440.962,765.9605.04.06ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 604.00503.463.732,320.955.05PONTON LOSA VIGA153,228.4505.05.01TRAZO Y REPLANTEO EN ESTRUCTURAS2.00231.082.87603.1205.05.02DESMONTAJE DE VIGAS (MADERA DE PONTON EXISTENTE)3.0075.005.94445.5005.05.03EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN PONTON6.00440.1817.703,490.6305.05.04RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO CLASIFICADO4.00160.7055.0310,321.7605.05.05ELIMINACION DE MATERIAL EXCEDENTE D> 1km.2.00572.236.585,474.6905.05.06ENCOFRADO Y DESENCOFRADO10.00591.0936.2621,373.8105.05.07CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.G.12.00214.34342.3980,859.7705.05.08CONCRETO f'c=280 kg/cm2 - PARA PONTON3.0025.36501.0313,563.5405.05.09ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 605.002,617.304.0212,065.7505.05.10TUBERIA PVC SAL 3" DRENAJE LOSA1.009.007.2965.6105.05.11APOYO NEOPRENO GRADO 3, 60 DURO DE 0.50 x 0.20 x 0.05 m1.009.00290.002,610.0005.05.12JUNTA DE DILATACION CON TECNOPORT, e=1"1.0032.402.5783.2705.05.13BARANDA DE FG D=2.5"4.0030.0089.142,271.005.06MUROS DE CONTENCION139,651.3205.06.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS5.00194.3517.703,245.6505.06.02ENCOFRADO Y DESENCOFRADO10.00461.0036.2616,669.7605.06.03CONCRETO f'c=175 kg/cm210.00175.40379.2279,482.5105.06.04ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 606.007,638.383.7335,212.9305.06.05DEMOLICION DE MURO DE C EXISTENTE2.0063.0027.711,745.7305.06.06ELIMINACION DE MATERIAL EXCEDENTE D> 5km.1.00347.156.583,294.745.07MURO DE MAMPOSTERIA DE PIEDRA21,108.4505.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS2.0013.8018.96247.8505.08.02ASENTADO DE MAMPOSTERIA DE PIEDRA CON MEZCLA 1:4, e=0.302.0046.00433.5220,688.9605.08.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.1.0017.946.58171.645.08SUB DREN25,323.2205.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS5.00175.7017.702,934.1905.08.02CAMA DE ARENA e=0.10m3.009.60147.201,549.4405.08.03TUBERIA PERFORADA HDPE 100 mm PERFORADA2.00171.0031.104,411.8005.08.04GEOTEXTIL PARA ESTRUCTURAS2.00624.004.157,662.7205.08.05RELLENO DE FILTRO CON MATERIAL GRANULAR.2.00105.60122.226,910.4605.08.06RELLENO CON MATERIAL PROPIO CLASIFICADO2.0031.1722.651,658.5605.08.07TUBERIA DE VENTILACION DE F G 1 1/2" PARA SUB DREN1.003.0065.35196.0506SEALIZACION Y SEGURIDAD VIAL15,520.4606.01HITOS KILOMETRICOS5.0015.00181.972,752.3506.02SEAL INFORMATIVA DE 1.50x0.60 m.2.007.00717.152,201.5706.03SEAL PREVENTIVA DE 0.60x0.60 m.4.0044.00515.138,581.3206.04SEAL REGLAMENTARIA DE 0.75x0.75 m.2.009.00426.931,985.2207IMPACTO AMBIENTAL17,759.1307.01RESTAURACION DE PATIO DE MAQUINAS Y CAMPAMENTO2.00460.002.841,573.2007.02ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTE2.001,500.003.366,510.0007.03PROGRAMA DE REVEGETACION2.001.059,217.339,675.93DIAS671.00MESES22.3666666667

Cronograma ValorizadoCRONOGRAMA VALORIZADO DE AVANCE DE OBRAPROYECTO:"MEJORAMIENTO DEL CAMINO VECINAL ECO UNO - SAN PEDRO - LA VICTORIA DE 14+731.96 KM. DE LONGITUD"ENTIDAD:MUNICIPALIDAD DISTRITAL DE QUIRUVILCAUBICACIN:QUIRUVILCA - SANTIAGO DE CHUCO - LA LIBERTADPLAZO DE EJECUCION:180 DIAS CALENDARIOSVALOR REFERENCIAL:6108275.1396FECHA:JUNIO 2014ItemDescripcinUnd.MetradoPrecio(S/.)Total(S/.)MES 01MES 02MES 03MES 04MES 05MES 06Monto(S/.)(%)Monto(S/.)(%)Monto(S/.)(%)Monto(S/.)(%)Monto(S/.)(%)Monto(S/.)(%)01OBRAS PROVISIONALES01.01MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPOSglb1.0028,774.0928,774.0917,264.4560.00%0.000.00%0.000.00%0.000.00%5,754.8220.00%5,754.8220.00%28,774.090.00100.00%01.02CAMPAMENTO PROVISIONAL DE OBRAm260.0033.081,984.801,984.80100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,984.800.00100.00%01.03CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40mund2.00841.981,683.961,683.96100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,683.960.00100.00%01.04FLETE TERRESTREglb1.0075,285.4675,285.4645,171.2860.00%15,057.0920.00%15,057.0920.00%0.000.00%0.000.00%0.000.00%75,285.460.00100.00%02OBRAS PRELIMINARES0.000.000.00%02.01TRAZO, NIVELACION Y REPLANTEOkm14.73719.0710,591.9010,591.90100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%10,591.900.00100.00%02.02TRAZO DURANTE LA EJECUCION DE LA OBRAmes6.007,017.1042,102.607,017.0716.67%7,017.0716.67%7,017.0716.67%7,017.0716.67%7,017.0716.67%7,017.2416.67%42,102.600.00100.00%02.03DESVIO Y MANTENIMIENTO DE TRANSITOglb1.002,990.102,990.10598.0220.00%598.0220.00%598.0220.00%598.0220.00%598.0220.00%0.000.00%2,990.100.00100.00%02.04DESBROCE Y LIMPIEZA EN ZONAS BOSCOSASm24,787.892.4811,873.9711,873.97100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%11,873.970.00100.00%03MOVIMIENTO DE TIERRAS0.000.000.00%03.01CORTE EN TIERRA SUELTAm318,861.963.9674,693.360.000.00%37,346.6850.00%37,346.6850.00%0.000.00%0.000.00%0.000.00%74,693.360.00100.00%03.02CORTE EN ROCA CONGLOMERADAm363,198.037.28460,081.6692,016.3320.00%138,024.5030.00%138,024.5030.00%92,016.3320.00%0.000.00%0.000.00%460,081.660.00100.00%03.03CORTE ROCA FIJA0.000.000.00%03.03.01PERFORACION Y DISPAROm317,919.0217.60315,374.750.000.00%0.000.00%189,224.8560.00%126,149.9040.00%0.000.00%0.000.00%315,374.750.00100.00%03.03.02EXCAVACION, DESQUINCHE Y PEINADO DE TALUDESm317,919.026.86122,924.480.000.00%0.000.00%61,462.2450.00%61,462.2450.00%0.000.00%0.000.00%122,924.480.00100.00%03.04CONFORMACION DE TERRAPLENES C/MATERIAL SELECCIONADOm326,053.744.22109,946.780.000.00%0.000.00%10,994.6810.00%98,952.1090.00%0.000.00%0.000.00%109,946.780.00100.00%03.05PERFILADO Y COMPACTADO DE SUB RASANTEm282,792.121.28105,973.910.000.00%21,194.7820.00%42,389.5740.00%42,389.5740.00%0.000.00%0.000.00%105,973.910.00100.00%03.06ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3106,760.026.58702,480.930.000.00%0.000.00%140,496.1920.00%140,496.1920.00%210,744.2830.00%210,744.2830.00%702,480.930.00100.00%04PLATAFORMA DE RODADURA0.000.000.00%04.01MEJORAMIENTO DE TERRENO DE FUNDACION C/ OVER SELECCIONADO0.000.000.00%04.01.01CORTE EN TERRENO PARA MEJORAMIENTO C/ OVER H=0.80Mm31,144.002.602,974.402,974.40100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%2,974.400.00100.00%04.01.02EXTRACCION Y APILAMIENTO DE MATERIAL SELECCIONADO (PEDRA 10")m31,430.007.9311,339.9011,339.90100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%11,339.900.00100.00%04.01.03ZARANDEO MECANICO (PIEDRA 10")m31,430.005.808,294.008,294.00100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%8,294.000.00100.00%04.01.04CARGUIO DE MATERIALm31,430.005.237,478.907,478.90100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%7,478.900.00100.00%04.01.05TRANSPORTE DE MATERIALm31,430.0010.8115,458.3015,458.30100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%15,458.300.00100.00%04.01.06EXTENDIDO Y COMPACTADOm21,430.001.692,416.702,416.70100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%2,416.700.00100.00%04.02MEJORAMIENTO DE TERRENO A NIVEL DE SUB RASANTE0.000.000.00%04.02.01CONFORMACION DE SUB BASE GRANULA e=0.15 mm215,355.7824.48375,909.490.000.00%0.000.00%187,954.7550.00%187,954.7550.00%0.000.00%0.000.00%375,909.490.00100.00%04.03AFIRMADO0.000.000.00%04.03.01EXTRACCION Y APILAMIENTO DE MATERIAL DE CANTERA PARA BASE - AFIRMADO, e=0.25mm329,465.818.26243,387.590.000.00%0.000.00%121,693.8050.00%121,693.8050.00%0.000.00%0.000.00%243,387.590.00100.00%04.03.02ZARANDEO MECANICO PARA BASE - AFIRMADO, e=0.25m329,465.814.97146,445.080.000.00%0.000.00%73,222.5450.00%73,222.5450.00%0.000.00%0.000.00%146,445.080.00100.00%04.03.03CARGUIO DE MATERIAL DE CANTERAm329,465.815.22153,811.530.000.00%0.000.00%0.000.00%76,905.7650.00%76,905.7650.00%0.000.00%153,811.530.00100.00%04.03.04TRANSPORTE DE MATERIAL PARA BASE - AFIRMADOm329,465.8110.58311,748.270.000.00%0.000.00%0.000.00%155,874.1350.00%155,874.1350.00%0.000.00%311,748.270.00100.00%04.03.05EXTENDIDO, BATIDO Y COMPACTADO EN BASE DE AFIRMADOm282,792.121.55128,327.790.000.00%0.000.00%0.000.00%64,163.8950.00%64,163.8950.00%0.000.00%128,327.790.00100.00%05OBRAS DE ARTE0.000.000.00%05.01ALCANTARILLAS DE CONCRETO ARMADO0.000.000.00%05.01.01TRAZO Y REPLANTEO EN ESTRUCTURASm21,523.542.874,372.564,372.56100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%4,372.560.00100.00%05.01.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm31,790.8117.7031,697.3431,697.34100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%31,697.340.00100.00%05.01.03ENCAUZAMIENTO DE ALCANTARILLASm2714.1011.908,497.790.000.00%0.000.00%0.000.00%0.000.00%0.000.00%8,497.79100.00%8,497.790.00100.00%05.01.04ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m32,328.066.5815,318.630.000.00%15,318.63100.00%0.000.00%0.000.00%0.000.00%0.000.00%15,318.630.00100.00%05.01.05MEJORAMIENTO DE TERRENO CON SISTEMA OVER SIDEm286.05128.9411,095.294,438.1140.00%6,657.1760.00%0.000.00%0.000.00%0.000.00%0.000.00%11,095.290.00100.00%05.01.06CONCRETO fc=100 KG/CM2 SOLADO PARA CIMENTACIONESm25.31275.906,983.032,793.2140.00%4,189.8260.00%0.000.00%0.000.00%0.000.00%0.000.00%6,983.030.00100.00%05.01.07ENCOFRADO Y DESENCOFRADO EN ESTRUCTURASm32,630.7636.2695,391.360.000.00%95,391.36100.00%0.000.00%0.000.00%0.000.00%0.000.00%95,391.360.00100.00%05.01.08CONCRETO SIMPLE f'c=175 kg/cm2m373.80375.67140,425.4584,255.2760.00%56,170.1840.00%0.000.00%0.000.00%0.000.00%0.000.00%140,425.450.00100.00%05.01.09CONCRETO f'c=210 kg/cm2m368.58436.87161,021.5496,612.9360.00%64,408.6240.00%0.000.00%0.000.00%0.000.00%0.000.00%161,021.540.00100.00%05.01.10ACERO CORRUGADO Fy=4200 kg/cm2 GRADO 60m225,849.403.7396,418.2696,418.26100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%96,418.260.00100.00%5.02CUNETAS0.000.000.00%05.02.01CONFORMACION DE CUNETA TRIANGULARm14,991.922.1131,632.950.000.00%0.000.00%0.000.00%0.000.00%18,979.7760.00%12,653.1840.00%31,632.950.00100.00%5.03BADEN0.000.000.00%05.03.01TRAZO Y REPLANTEO EN ESTRUCTURASm2250.002.87717.500.000.00%717.50100.00%0.000.00%0.000.00%0.000.00%0.000.00%717.500.00100.00%05.03.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3116.9217.702,069.480.000.00%2,069.48100.00%0.000.00%0.000.00%0.000.00%0.000.00%2,069.480.00100.00%05.03.03NIVELACION Y APISONADOm2250.002.76690.000.000.00%690.00100.00%0.000.00%0.000.00%0.000.00%0.000.00%690.000.00100.00%05.03.04SUB BASE DE MATERIAL GRANULAR, h=0.20 mm2250.0038.049,510.000.000.00%9,510.00100.00%0.000.00%0.000.00%0.000.00%0.000.00%9,510.000.00100.00%05.03.05ENCOFRADO Y DESENCOFRADOm275.0036.262,719.500.000.00%2,719.50100.00%0.000.00%0.000.00%0.000.00%0.000.00%2,719.500.00100.00%05.03.06CONCRETO f'c=210 kg/cm2 EN BADENm366.92440.9629,509.040.000.00%29,509.04100.00%0.000.00%0.000.00%0.000.00%0.000.00%29,509.040.00100.00%05.03.07EMBOQUILLADO DE PIEDRA DE 8" CON MORTEROm336.75248.189,120.620.000.00%9,120.62100.00%0.000.00%0.000.00%0.000.00%0.000.00%9,120.620.00100.00%05.03.08JUNTA ASFALTICA DE DILATACION, e = 1"m125.0012.211,526.250.000.00%1,526.25100.00%0.000.00%0.000.00%0.000.00%0.000.00%1,526.250.00100.00%05.03.09ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3152.006.581,000.160.000.00%1,000.16100.00%0.000.00%0.000.00%0.000.00%0.000.00%1,000.160.00100.00%5.04PASE DE AGUA0.000.000.00%05.04.01TRAZO Y REPLANTEO EN ESTRUCTURASm210.002.8728.700.000.00%0.000.00%0.000.00%0.000.00%0.000.00%28.70100.00%28.700.00100.00%05.04.02EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm310.0017.70177.000.000.00%0.000.00%0.000.00%0.000.00%0.000.00%177.00100.00%177.000.00100.00%05.04.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m313.006.5885.540.000.00%0.000.00%0.000.00%0.000.00%0.000.00%85.54100.00%85.540.00100.00%05.04.04ENCOFRADO Y DESENCOFRADOm230.0036.261,087.800.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,087.80100.00%1,087.800.00100.00%05.04.05CONCRETO f'c=210 kg/cm2m36.70440.962,954.430.000.00%0.000.00%0.000.00%0.000.00%0.000.00%2,954.43100.00%2,954.430.00100.00%05.04.06ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg503.463.731,877.910.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,877.91100.00%1,877.910.00100.00%5.05PONTON LOSA VIGA0.000.000.00%05.05.01TRAZO Y REPLANTEO EN ESTRUCTURASm2231.082.87663.20663.20100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%663.200.00100.00%05.05.02DESMONTAJE DE VIGAS (MADERA DE PONTON EXISTENTE)m275.005.94445.50445.50100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%445.500.00100.00%05.05.03EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN PONTONm3440.1817.707,791.193,895.5950.00%3,895.5950.00%0.000.00%0.000.00%0.000.00%0.000.00%7,791.190.00100.00%05.05.04RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO CLASIFICADOm3160.7055.038,843.320.000.00%8,843.32100.00%0.000.00%0.000.00%0.000.00%0.000.00%8,843.320.00100.00%05.05.05ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m3572.236.583,765.270.000.00%3,765.27100.00%0.000.00%0.000.00%0.000.00%0.000.00%3,765.270.00100.00%05.05.06ENCOFRADO Y DESENCOFRADOm2591.0936.2621,432.928,573.1740.00%12,859.7560.00%0.000.00%0.000.00%0.000.00%0.000.00%21,432.920.00100.00%05.05.07CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.G.m3214.34342.3973,387.8729,355.1540.00%44,032.7260.00%0.000.00%0.000.00%0.000.00%0.000.00%73,387.870.00100.00%05.05.08CONCRETO f'c=280 kg/cm2 - PARA PONTONm325.36501.0312,706.120.000.00%12,706.12100.00%0.000.00%0.000.00%0.000.00%0.000.00%12,706.120.00100.00%05.05.09ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg2,617.304.0210,521.550.000.00%10,521.55100.00%0.000.00%0.000.00%0.000.00%0.000.00%10,521.550.00100.00%05.05.10TUBERIA PVC SAL 3" DRENAJE LOSAm9.007.2965.610.000.00%65.61100.00%0.000.00%0.000.00%0.000.00%0.000.00%65.610.00100.00%05.05.11APOYO NEOPRENO GRADO 3, 60 DURO DE 0.50 x 0.20 x 0.05 mund9.00290.002,610.000.000.00%2,610.00100.00%0.000.00%0.000.00%0.000.00%0.000.00%2,610.000.00100.00%05.05.12JUNTA DE DILATACION CON TECNOPORT, e=1"m32.402.5783.270.000.00%83.27100.00%0.000.00%0.000.00%0.000.00%0.000.00%83.270.00100.00%05.05.13BARANDA DE FG D=2.5"m30.0089.142,674.200.000.00%2,674.20100.00%0.000.00%0.000.00%0.000.00%0.000.00%2,674.200.00100.00%5.06MUROS DE CONTENCION0.000.000.00%05.06.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3194.3517.703,440.000.000.00%0.000.00%3,440.00100.00%0.000.00%0.000.00%0.000.00%3,440.000.00100.00%05.06.02ENCOFRADO Y DESENCOFRADOm2461.0036.2616,715.860.000.00%0.000.00%16,715.86100.00%0.000.00%0.000.00%0.000.00%16,715.860.00100.00%05.06.03CONCRETO f'c=175 kg/cm2m3175.40379.2266,515.190.000.00%0.000.00%66,515.19100.00%0.000.00%0.000.00%0.000.00%66,515.190.00100.00%05.06.04ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60kg7,638.383.7328,491.160.000.00%0.000.00%28,491.16100.00%0.000.00%0.000.00%0.000.00%28,491.160.00100.00%05.06.05DEMOLICION DE MURO DE C EXISTENTEm363.0027.711,745.730.000.00%0.000.00%1,745.73100.00%0.000.00%0.000.00%0.000.00%1,745.730.00100.00%05.06.06ELIMINACION DE MATERIAL EXCEDENTE D> 5km.m3347.156.582,284.250.000.00%0.000.00%2,284.25100.00%0.000.00%0.000.00%0.000.00%2,284.250.00100.00%5.07MURO DE MAMPOSTERIA DE PIEDRA0.000.000.00%05.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm313.8018.96261.650.000.00%0.000.00%0.000.00%0.000.00%0.000.00%261.65100.00%261.650.00100.00%05.08.02ASENTADO DE MAMPOSTERIA DE PIEDRA CON MEZCLA 1:4, e=0.30m246.00433.5219,941.920.000.00%0.000.00%0.000.00%0.000.00%0.000.00%19,941.92100.00%19,941.920.00100.00%05.08.03ELIMINACION DE MATERIAL EXCEDENTE D> 1km.m317.946.58118.050.000.00%0.000.00%0.000.00%0.000.00%0.000.00%118.05100.00%118.050.00100.00%5.08SUB DREN0.000.000.00%05.08.01EXCAVACION NO CLASIFICADA PARA ESTRUCTURASm3175.7017.703,109.893,109.89100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%3,109.890.00100.00%05.08.02CAMA DE ARENA e=0.10mm39.60147.201,413.121,413.12100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,413.120.00100.00%05.08.03TUBERIA PERFORADA HDPE 100 mm PERFORADAm171.0031.105,318.105,318.10100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%5,318.100.00100.00%05.08.04GEOTEXTIL PARA ESTRUCTURASm2624.004.152,589.602,589.60100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%2,589.600.00100.00%05.08.05RELLENO DE FILTRO CON MATERIAL GRANULAR.m3105.60122.2212,906.4312,906.43100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%12,906.430.00100.00%05.08.06RELLENO CON MATERIAL PROPIO CLASIFICADOm331.1722.65706.00706.00100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%706.000.00100.00%05.08.07TUBERIA DE VENTILACION DE F G 1 1/2" PARA SUB DRENund3.0065.35196.05196.05100.00%0.000.00%0.000.00%0.000.00%0.000.00%0.000.00%196.050.00100.00%06SEALIZACION Y SEGURIDAD VIAL0.000.000.00%06.01HITOS KILOMETRICOSund15.00181.972,729.550.000.00%0.000.00%0.000.00%0.000.00%0.000.00%2,729.55100.00%2,729.550.00100.00%06.02SEAL INFORMATIVA DE 1.50x0.60 m.und7.00717.155,020.050.000.00%0.000.00%0.000.00%0.000.00%0.000.00%5,020.05100.00%5,020.050.00100.00%06.03SEAL PREVENTIVA DE 0.60x0.60 m.und44.00515.1322,665.720.000.00%0.000.00%0.000.00%0.000.00%0.000.00%22,665.72100.00%22,665.720.00100.00%06.04SEAL REGLAMENTARIA DE 0.75x0.75 m.und9.00426.933,842.370.000.00%0.000.00%0.000.00%0.000.00%0.000.00%3,842.37100.00%3,842.370.00100.00%07IMPACTO AMBIENTAL0.000.000.00%07.01RESTAURACION DE PATIO DE MAQUINAS Y CAMPAMENTOm2460.002.841,306.400.000.00%0.000.00%0.000.00%0.000.00%0.000.00%1,306.40100.00%1,306.400.00100.00%07.02ACONDICIONAMIENTO DE DEPOSITO DE MATERIAL EXCEDENTEm31,500.003.365,040.000.000.00%0.000.00%0.000.00%0.000.00%0.000.00%5,040.00100.00%5,040.000.00100.00%07.03PROGRAMA DE REVEGETACIONha1.059,217.339,678.200.000.00%0.000.00%0.000.00%0.000.00%0.000.00%9,678.20100.00%9,678.200.00100.00%Costo Directo4,501,308.14625,923.46620,293.891,144,674.141,248,896.29540,037.75321,482.594,501,308.14Gastos Generales10%450,130.8162,592.3562,029.39114,467.41124,889.6354,003.7832,148.26450,130.82Utilidades5%225,065.4131,296.1731,014.6957,233.7162,444.8127,001.8916,074.13225,065.41Sub Total5,176,504.36719,811.98713,337.971,316,375.261,436,230.74621,043.43369,704.985,176,504.36I.G.V.18%931,770.78129,566.16128,400.83236,947.55258,521.53111,787.8266,546.90931,770.78Total6,108,275.14849,378.14841,738.801,553,322.811,694,752.27732,831.24436,251.886,108,275.15Avance Fsico Mensual13.91%13.78%25.43%27.75%12.00%7.14%Avance Fsico Acumulado13.91%27.69%53.12%80.86%92.86%100.00%