CRONOGRAMA FISICO AGUA (IMP EN A0).pdf
Transcript of CRONOGRAMA FISICO AGUA (IMP EN A0).pdf
-
7/25/2019 CRONOGRAMA FISICO AGUA (IMP EN A0).pdf
1/1
N
CAMAMEN IINAL DE LABA
CAELDE IDENIFICACIN DE LA BADE 4.803.60M
DIE DE MECLA
LIMIEA DEFEACIN MANAL
A ELANE ELIMINA
ENCAAMIEN DE I
FLEE EEE DE HANC AJE
FLEE EN NAAL CAACIN
ECAACIN MANALEN MAEIALEL
ELLEN CN MA.I CMAC. C/EI IBAI
ELIMINACINDE MAEIAL EEDENE ( 30 )
EFINE NIELACIN CMACAD
LAD MECLA C:H, 1:10, E = 4 "
MAMEIADE IEDA E=0.40 A. C.F'=175 /2, .
CNCE F'C= 210 KG/CM2 EN M
ENCFAD DEENCFADCAAIA
ACE F = 4200 KG/CM2
CNCE F'C= 210 KG/CM2 EN ENE MANIBA
ENCFAD DEENCF E. MANIBA
ACE F = 4200 KG/CM2 EN E. MANIBA
M. CLC. DE CMEA IAMC C/MAC MEALIC EN BAAJEMIL DE 1.800.90 M
EJILLA DE ECCIN ENENANADE CAACIN
BAANDA DE ECCIN DE FG 2 "0.8 .
JNA AFALICAE=1 "
ENA EIENCIA CMEIN DE CNCE BEA
LIMIEADELEEN
A ELANE ELIMINA
ECAACIN MANALDE MAEIAL EL
ELLEN CN MAEIALIHAA NIELEDE EENCN EI
ELIMINACINMAEIAL ECEDENE
CNCE F'C= 175 KG/CM2 EN CANAL DE ALIDA
ENCFAD DEENCF CANAL DE ALIDA
LIMIEADELEEN
A ELANE ELIMINA
ECAACIN MANALDE MAEIAL EL
ELLEN CN MAEIALIHAA NIELEDE EENCN EI
ELIMINACINMAEIAL ECEDENE
CNCE F'C= 175 KG/CM2 EN CANAL DEMAIA
ENCFAD DEENCF CANAL DE DEMAIA
LIMIEADELEEN
A ELANE ELIMINA
ECAACIN MANALDE MAEIAL EL
ELLEN CN MAEIALIHAA NIELEDE EENCN EI
ELIMINACINMAEIAL ECEDENE
CNCE F'C= 175 KG/CM2 EN DEAENAD
ENCFAD DEENCF DEAENAD
JNADE DILAACIN AE E=4 "
CANAILLADE BNCE 4 "
LIMIEADELEEN
A ELANE ELIMINA
ECAACIN MANALDE MAEIAL EL
ELLEN CN MAEIALIHAA NIELEDE EENCN EI
ELIMINACINMAEIAL ECEDENE
CNCE F'C= 175 KG/CM2 EN CLMNEA
ENCFAD DEENCF CLMNEA
ACE F = 4200 KG/CM2 EN CLMNEA
CLCACINDE ALAMBE DE A
EADE MADEACN CALAMINA GALANIADA
,
LIMIEADE EEN MANAL
A, NIELACIN ELANE
ECA. MANAL E. CMACC/IEDAANJA0.601.10M
EFINE NIELACIN ANJA A=0.60M 0.70M
CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10
ECCINDE BEIA C/AENA,/CLAE H=0.25
ELLEN C/MA. I CMAC. C/EI IBAI
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
MINIE IN.DE BEIA DE CFI4422 110 MM C7.50
DBLE EBAHIDALICA, BEIA DE .110 MM
MINIE INALACIN CDCF 110MM 22.5C7.5
MINIE INALACIN CDCF 110MM 45C7.5
MINI CLC.ALLA DE GAINC/AN 75 MM
MINI CLC.ALLA DE AIE 75MM
EGI /ALLA DE CNL, GA, AIE
LIMIEA DEFEACIN MANAL
A NIELACIN ELANE
ECAACINMANAL ENMAEIAL EL
ELLEN CNMAEIAL I HAA NIELE DE EENCN EI
ELIMINACIN DE MAEIAL ECEDENE
EFINE NIELACIN CMACAD
LAD MECLA C:H, 1:10, E =4 "
CNCE F'C= 210 KG/CM2 EN AAA
ACE F = 4200 KG/CM2 EN AAA
CNCE ENCLMNAF'C=210 KG/CM2
ENCFAD DEENCFAD EN CLMNA
ACE F = 4200 KG/CM2 EN CLMNA
IGA MEALICA L=16 ML
MINI CLCACIN DE AANDELA
BEIA DE F G 4 "
MINIE INALACIN DE ACCEI
EBA DE CALIDADDELCNCE (EBAALACMEIN)
DEBCE DE MALEA
LIMIEADELEEN
A ELANE ELIMINA
FLEE EEE DE HANC A EDIMENAD
CE NIELACINDE EEN
EFINE NIELACIN EN EENNMAL
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
LAD MECLA C:H, 1:10, E =4 "
CNCE F'C=140 KG/CM2 EN CAJADE ALIDA
ENCFAD DEENCFAD
CNCE F'C= 210 KG/CM2
ENCFAD DEENCF M EFAD
CAD DE CNCE
ACE F = 4200 KG/CM2
AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE
AAJE EEI MECLA C:A,1:4 =2.00 .
MINIE INALACIN DE ACCEIEN EDIMENAD
MINIE IN.DE CMEADE EACACINDE LD
LIMIEADELEEN
A ELANE ELIMINA
FLEE EEE DE HANC A FIL LEN
ECAACINMAIA MANALEN IEAELACN EENCIADE AICE
EFINE NIELACIN EN EENNMAL
EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25
LAD MECLA C:H, 1:10, E =4 "
CNCE FC=210 KG/CM2
ENCFAD DEENCFAD DE M
CAD DE CNCE
ACE F = 4200 KG/CM2
AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE
AAJE EEI MECLA C:A,1:4 =2.00 .
AENAD DE LADILL KK 18 HC91424 CNCEMENAENA,1.:5 AAFIL LEN
FIL DE AENA
FIL DE GAA1
FIL DE GAA2
FIL DE GAA3
MINI CLCACIN DE CMEAEN CAMAA DE INECNEIN
MINIE INALACIN DE ACCEIEN FIL
A ELANE ELIMINA,INC. CAEA DE ALLA
FLEE EEE DE HANC A EEI
ECAACINMAIA MANALEN CA ELA CN EENCIA DE AICE
EFINE, NIELACIN CMACACIN CAELA
EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25
LAD MECLA C:H, 1:10, E =4 "
CNCE F'=175 KG/CM2 EN AAA LADE FND
ACE F=4200 KG/CM2, GAD60 EN AAA LA
CNCE F'=280 KG/CM2 EN M
ENCFAD DEENCFAD DE MCILINDIC
ACE F=4200 KG/CM2, GAD60 EN M CILINDIC
CNCE FC=280 KG/CM2 EN IGAANILLENCFAD DEENCFAD DE IGAANILL
ACE F=4200 KG/CM2, GAD60 IGAANILL
CNCE F'=280 KG/CM2 EN CLA
ENCFAD DEENCFAD DE CLA
ACE F=4200 KG/CM2, GAD60 CLA
AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE
AAJE EEI MECLA C:A,1:4 =2.00 .
M. CLC.DE MAC AA, LANCHA 1/4 " DE D" =0.60 M2,C/MECANIMDE
ABEAEG./DIE
M. CLC.DE ECALEADE ACCE CN B DE FG DE 2 " 3 " , EGN DIE
INADDE M EEI AL LAE
M. E IN. DE ACCEI DE ENILACINCN B.+CD DE FF 90 DE 6 "
M. E IN. DE EGLA GADADA DE MADEAMEDID DEALA
M. E IN. DE HICLAD
CEC EIMEICALAMBE A+E MADEA
DEINFECCIN DEL EEI
ECAACIN MAIAMANAL EN CA ELA CN EENCIA DE AICE
EFINE, NIELACIN CMACACIN CA ELA
EI+ACMD DE DEMNE EN NAALEDAA, F.E.=1.25
LAD MECLA C:H, 1:10, E = 4 "
CNCE EN CIMIEN BECIMIENF'=175 KG/CM2 + 20 .M.
ENCFAD DEENCFADDE BECIMIEN
CNCE F'C=140 KG/CM2 +20 %.M.
ENCFAD DEENCFADEN DADDE A
CNCE EN CLMNAF'=175 KG/CM2, ENCAEA DE ALLA
ENCFAD DEENCFADDE CLMNA, ENCAEADE ALLA
ACE F=4200 KG/CM2, GAD 60 EN CLMNA, EN CAEA DE ALLA
CNCE EN IGA F'=175 KG/CM2, EN CAEADE ALLA
ENCFAD DEENCFADDE IGA, EN CAEADE ALLA
ACE F=4200 KG/CM2, GAD 60 EN IGA, ENCAEADE ALLA
CNCE EN LAALIGEADAF'=175 KG/CM2,DE CAEA DE ALLA
ENCFAD DEENCFADEN LA ALIGEADA, EN CAEADE ALLA
ACE F=4200 KG/CM2, GAD 60 EN LA ALIGEADA, EN CAEADE ALLA
IIN CLCACINDE LADILL HEC DE ACILLA CCIDA DE 303015 CM3
CNCE FC=175 KG/CM2 EN CAJADE EBE
ENCFAD DEENCFADEN CAJA DE EBE
ACE F=4200 KG/CM2, GAD 60 EN CAJA DE EBE
M DE GALADILL KINGKNG CN CEMENAENA, 1: 4,E=1.5 CM
AAJE INEI FACHAD C/ME 1:51.5 (INC.CLMNAEM)
AAJE EEI FACHAD C/ME 1:51.5 (INC.CLMNAEM)
EIDADE DEAME EN EA,ENANA AN
CIEL A INCL. IGAEMADA LADI C/ME 1:51.5
I DE 5 CM, C/ME 1:5, FACHAD
CBIEALAD.AELE AEN.DE BA 3CM.+FAGA C/M. 1:5
EEDADE CNCE F'=140 KG/CM2 =10 ACABAD FACHADBAD, INCENCF.
ENANA DE FIE MAC LAINA DE 2 "1/16 "
EAMEAL LAC 1/16 " C/MAC 2 " 2 " 1/4 " EFE
M.E IN.DE MAC AA, LANCHA 1/4 " DE 0.60 0.60 M2,C/MECANIMDE ABEAEG. /DIE
M.E IN.DE MAC AADE EJILLA MEALICA DE LAINADE 1 " 1/16 "
M. CLC.DE ECALEADE ACCECN B DE FG DE 2 " 3 " , EGN DIE
CEADAAAEEI C/LLAEINE. EEI DE 2 GLE
CANDADAAAA MEALICA
INAD DE CIEL A AL LAE
INAD DE M INEI AL LAE
INAD DE M EEI AL LAEINAD DE ENANAMEALICA(2 MAN ANIC. +2 EMALE)
INAD DE EAMEALICA LAC (2 MANANIC. + 2 EMALE)
JNADE CNCCIN CNEKN
IDI EMIDIBLE INCL DE 3 MM
M. E IN. DE MEDID DE CADAL DE 6 "
M. E IN. DE CD DE FF 45 DE 6 "
M. E IN. DE EE DE FF 45DE 6 "
M. E IN. DE NIN FLEIBLE IDEE DE 6 "
M. E IN. DE CD DE FF 90 DE 6 "
M. E IN. DE LLA DE CMEADE 6 "
M. E IN. DE BIDAME AGA
MINI E IN.DE BEIADE FF, D=6 "
,
LIMIEADE EEN MANAL
A, NIELACIN ELANE
ECA. ANJA,EEN IEA ELA,A= 0.60 /B , H=1.00 M.
EFINE NIELACIN ANJA A=0.60M 0.70M
CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10
ECCINDE BEIA C/AENA,/CLAE H=0.25
ELLEN C/MA. I CMAC. C/EI IBAI
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
MINIE IN.DE BEIA DE CFI4422 110 MM C7.50
DBLE EBAHIDALICA, BEIA DE .110 MM
MINIE INALACIN CDCF 110MM 22.5C7.5
MINIE INALACIN CDCF 110MM 45C7.5
MINI CLC.ALLA DE GAINC/AN 75 MM
MINI CLC.ALLA DE AIE 75MM
EGI /ALLA DE CNL, GA, AIE
( )
LIMIEADELEEN
A ELANE ELIMINA
ECAACINMANAL DE MAEIAL EL
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
ENCFAD DEENCFAD CAJADE ALLA
CNCE F'C=175 KG/CM2 EN CAJADE ALLA
DAD DE CNCE0.200.200.20 M C:AN 2 " EFAD.
ENCFAD DEENCFAD M LADE FND C7
ENCFAD DEENCFAD LAEI C 7
CNCE F'C=210 KG/CM2 FND, M ECHC07
ACE F = 4200 KG/CM2 FND,M ECH C07
AAJE INEI MECLA C: A, 1:2. =2.00 . CN ADII IMEMEABILIANE
AAJE EEI MECLA C:A,1:4 =2.00 .
AAMEALICADE 60 60 CM
MINI CLC.ALLA ACCEI DE INGEDD =3/4 "
ACCEIDE ALIDA DEAGE D =1 "
ACCEIDE ALIDA DEAGE D=3/4 "
IEMADE ENILACIN C/AN EFAD C2 "
FIL DE GAADE CAJADE ALLA
,
DEMLICIN DE AIMEN DE CNCEDE 8 "
LIMIEADE EEN MANAL
A, NIELACIN ELANE
FLEE EEE DE HANC A ED DE DIIBCIN
ECAACINMAIA A MAINAENEEN NMAL/E .53
EFINE NIELACIN ANJA A=0.60M 0.70M
CAMADEA FND/ B.C, A = 0.60.0.70 H=0.10
ECCINDE BEIA C/AENA,/CLAE H=0.25
ELLEN C/MA. I CMAC. C/EI IBAI
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
CNCE F'C= 210 KG/CM2 EN EICINDE AIMEN
MINIE IN.DE BEIA DE CFI 4422 75 MM C7.5
MINIE IN.DE BEIA DE CFI 4422 63 MM C7.5
DBLE EBAHIDALICABEIAC AGA 75 MM, 63 MM
MINIE INALACIN CDCF 75MM 22.5C7.5
MINIE INALACIN CDCF 75MM 45C7.5
MINIE INALACIN CDCF 75MM 90C7.5
MINIE INALACIN CDCF 63MM 90C75
MINI CLC.ALLA DE GAINC/AN 75 MM
MINI CLC.ALLA DE AIE 75MM
EGI /ALLA DE CNL, GA, AIE
A ELANE ELIMINA
ECA. MANAL E. EL C/IEDA4 "10 " 30%ANJA0.501.10M
EFINE NIELACIN ANJA A=0.50M
CAMADEA FND/ B.C, A = 0.50.H=0.10
ELLEN C/MA. EAM50%. C/EI IBAI
ECCINDE BEIA C/AENA,/CLAE H=0.25
ELIMINACIN DE MA. ECED., E=25%, D. 2 KM
MINIE IN.DE BEIADE CFI 4422 25 MM C7.5
CNEIN DMICILIAIA AGA1/2 "INC.ACCEIB 63MM A 75MM
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36M1 M2 M3 M4 M5 M6 M7 M8
D
H
, ,