DESCRIPCION UNIDADREPLANTEO Y NIVELACION (CONDUCCIONES EJES DE PROYECTO) ( R ) km

EXCAVACION ZANJA A MAQUINA H=0.00-2.75m (CONGLOMERADO) m3

m

TEE PVC U/E ɸ 63mm 1.60MPa (MAT/TRANS/INST) ( R ) u

VALVULA ɸ 2 " (50-63 mm) HF-LL (MAT/TRANS/INST) ( R ) u

UNION GIBAULT 02" ASIMETRICA (MAT/TRANS/INST) u

TEE ACERO 02X06X06"(MAT/REC/TRANS/INST) u

UNION GIBAULT 06" ASIMETRICA (MAT/TRANS/INST) u

REDUCTOR PVC U/E ɸ 160@ 63 mm ( R ) u

REDUCTOR PVC U/E ɸ 110@ 63 mm ( R ) u

LEVANTAMIENTO DE ADOQUIN DE HORMIGON ( R ) m2

READOQUINADO (MATERIAL EXISTENTE) ( R ) m2

ADOQUINADO (F"C=300 kg/cm2) INCLUYE CAMA DE ARENA Y EMPORADO m2

RECONEXION POR CAMBIO DE RED-PVC COLLAR A.G. 2X 1/2" (MAT/INST/EXC/RELL) u

CONEXIÓN DOMICILIARIA SERVICIO HG 1/2" (MAT/TRANS/INST) u

RELLENO COMPACTADO (MAT. EXCAVACION) ( R ) m3

SUMINISTRO TENDIDO Y COMPACT. CON PLANCHA SUB BASE III (A MANO) ( R ) m3

SUMINISTRO TENDIDO Y COMPACT. CON PLANCHA BASE II (A MANO) ( R ) m3

HORMIGON SIMPLE f'c= 180kg/cm2 m3

TEE PVC U/E ɸ 110 mm 1.60 Mpa (MAT/TRANS/INST) ( R ) u

UNION GIBAULT 04" ASIMETRICA (MAT/TRANS/INST) u

CAJA VALVULA HF ɸ6" (MAT/TRANS/INST) ( R ) u

TUBERIA PVC U/E ɸ 63mm 1.25MPa (MAT/TRANS/INST) ( R )

Page 4: CRONOGRAMA-VALORADO

CAJA VALVULA HF ɸ6" (MAT/TRANS/INST) ( R )

ROTURA DE BORDILLOS VIAL h=50 cm ( R ) m

DESEMPEDRADO m2

REEMPEDRADO (MAT. EXISTENTE) ( R ) m2

EMPEDRADO (INCLUYE MATERIAL) ( R ) m2

ROTULO DE IDENTIFICACION DEL PROYECTO 2.40X1.20m (ESTRUC. DE MADERA Y LONA) u

CONO DE SEÑALIZACION VIAL FLUORESCENTE u

CINTA REFLECTIVA (SEGURIDAD) rollo

CONTROL DE POLVO (agua) ( R ) m3

SEÑALIZACION (LETREROS) ( R ) u

TOTAL:

Page 5: CRONOGRAMA-VALORADO

CANTIDAD P. UNITARIO TOTAL0.77 600.72 462.55

741.31 4.53 3358.13

772.20 8.37 6463.31

3.00 25.23 75.69

6.00 116.20 697.20

17.00 29.25 497.25

2.00 188.74 377.48

4.00 64.35 257.40

2.00 60.27 120.54

3.00 50.91 152.73

50.00 0.96 48.00

40.00 4.15 166.00

10.00 13.40 134.00

20.00 102.95 2059.00

20.00 211.71 4234.20

518.92 4.06 2106.82

111.20 23.13 2572.06

111.20 26.64 2962.37

1.00 134.40 134.40

2.00 65.04 130.08

6.00 44.93 269.58

6.00 63.40 380.40

Page 6: CRONOGRAMA-VALORADO

2.00 3.21 6.42

202.40 0.94 190.26

182.16 4.18 761.43

20.24 7.14 144.51

2.00 139.21 278.42

10.00 35.10 351.00

5.00 14.04 70.20

16.00 19.39 310.24

4.00 107.18 428.72

30200.39

Page 7: CRONOGRAMA-VALORADO

ITEM DESCRIPCION UNIDAD CANTIDAD

1REPLANTEO Y NIVELACION (CONDUCCIONES EJES DE PROYECTO) ( R )

km 0.77

2ROTULO DE IDENTIFICACION DEL PROYECTO 2.40X1.20m (ESTRUC. DE MADERA Y LONA)

u 2.00

3CONO DE SEÑALIZACION VIAL FLUORESCENTE

u 10.00

4CINTA REFLECTIVA (SEGURIDAD)

rollo 5.00

5SEÑALIZACION (LETREROS) ( R )

u 4.00

6CONTROL DE POLVO (agua) ( R )

m3 16.00

7LEVANTAMIENTO DE ADOQUIN DE HORMIGON ( R )

m2 50.00

8DESEMPEDRADO

m2 202.40

9EXCAVACION ZANJA A MAQUINA H=0.00-2.75m (CONGLOMERADO)

m3 741.31

10SUMINISTRO TENDIDO Y COMPACT. CON PLANCHA SUB BASE III (A MANO) ( R )

m3 111.20

11SUMINISTRO TENDIDO Y COMPACT. CON PLANCHA BASE II (A MANO) ( R )

m3 111.20

12 m 772.20

13TEE PVC U/E ɸ 63mm 1.60MPa (MAT/TRANS/INST) ( R )

u 3.00

14VALVULA ɸ 2 " (50-63 mm) HF-LL (MAT/TRANS/INST) ( R )

u 6.00

15UNION GIBAULT 02" ASIMETRICA (MAT/TRANS/INST)

u 17.00

TUBERIA PVC U/E ɸ 63mm 1.25MPa (MAT/TRANS/INST) ( R )

Page 8: CRONOGRAMA-VALORADO

16TEE ACERO 02X06X06"(MAT/REC/TRANS/INST)

u 2.00

17UNION GIBAULT 06" ASIMETRICA (MAT/TRANS/INST)

u 4.00

18REDUCTOR PVC U/E ɸ 160@ 63 mm ( R )

u 2.00

19REDUCTOR PVC U/E ɸ 110@ 63 mm ( R )

u 3.00

20TEE PVC U/E ɸ 110 mm 1.60 Mpa (MAT/TRANS/INST) ( R )

u 2.00

21UNION GIBAULT 04" ASIMETRICA (MAT/TRANS/INST)

u 6.00

22CAJA VALVULA HF ɸ6" (MAT/TRANS/INST) ( R )

u 6.00

23RECONEXION POR CAMBIO DE RED-PVC COLLAR A.G. 2X 1/2" (MAT/INST/EXC/RELL)

u 20.00

27RELLENO COMPACTADO (MAT. EXCAVACION) ( R )

m3 518.92

24ROTURA DE BORDILLOS VIAL h=50 cm ( R )

m 2.00

25CONEXIÓN DOMICILIARIA SERVICIO HG 1/2" (MAT/TRANS/INST)

u 20.00

26HORMIGON SIMPLE f'c= 180kg/cm2

m3 1.00

28READOQUINADO (MATERIAL EXISTENTE) ( R )

m2 40.00

29ADOQUINADO (F"C=300 kg/cm2) INCLUYE CAMA DE ARENA Y EMPORADO

m2 10.00

30REEMPEDRADO (MAT. EXISTENTE) ( R )

m2 182.16

31EMPEDRADO (INCLUYE MATERIAL) ( R )

m2 20.24

Page 9: CRONOGRAMA-VALORADO

TIEMPO: 3 Meses (12 Semanas)SALDO POR MES 1 MES 2

P. UNITARIO TOTAL EJECUTAR S 1 S2 S3 S4 S 5 S 6 S 7600.72 462.55 0.77 462.55

462.55 0.77139.21 278.42 2.00 278.42

278.42 2.0035.10 351.00 10.00 351.00

351.00 10.0014.04 70.20 5.00 70.20

70.20 5.00107.18 428.72 4.00 428.72

428.72 4.0019.39 310.24 16.00 31.02 31.02 31.02 31.02 31.02 31.02 31.02

310.24 1.60 1.60 1.60 1.60 1.60 1.60 1.600.96 48.00 50.00 16.68 31.32

48.00 10.00 40.000.94 190.26 202.40 65.80 124.46

190.26 70.00 132.404.53 3358.13 741.31 479.73 479.73 479.73 479.73 479.73 479.73

3358.13 105.90 105.90 105.90 105.90 105.90 105.9023.13 2572.06 111.20 367.44 367.44 367.44 367.44 367.44 367.44

2572.06 15.88 15.88 15.88 15.88 15.88 15.8826.64 2962.37 111.20 423.20 423.20 423.20 423.20 423.20 423.20

2962.37 15.88 15.88 15.88 15.88 15.88 15.888.37 6463.31 772.20 837.00 1883.00 1883.00

6463.31 100.00 225.00 225.0025.23 75.69 3.00 25.23 25.23

75.69 1.00 1.00116.20 697.20 6.00 232.40 232.40

697.20 2.00 2.0029.25 497.25 17.00 146.25 146.25

497.25 5.00 5.00

Page 10: CRONOGRAMA-VALORADO

188.74 377.48 2.00 188.74 188.74377.48 1.00 1.00

64.35 257.40 4.00 128.70 128.70257.40 2.00 2.00

60.27 120.54 2.00 60.27 60.27120.54 1.00 1.00

50.91 152.73 3.00 50.91 50.91152.73 1.00 1.00

65.04 130.08 2.00 65.04130.08 1.00

44.93 269.58 6.00 89.86 89.86269.58 2.00 2.00

63.40 380.40 6.00 126.80 126.80 63.40380.40 2.00 2.00 1.00

102.95 2059.00 20.00 1029.502059.00 10.00

4.06 2106.82 518.922106.82

3.21 6.42 2.006.42

211.71 4234.20 20.004234.20

134.40 134.40 1.00134.40

4.15 166.00 40.00166.00

13.40 134.00 10.00134.00

4.18 761.43 182.16761.43

7.14 144.51 20.24144.51

TOTAL: 30200.39

Page 11: CRONOGRAMA-VALORADO

S1 S2 S3 S4 S5 S6 S7INVERSIÓN PROGRAMADA SEMANAL (USD) 1638.59 1398.51 1425.85 1301.39 2265.19 4233.55 5264.69

AVANCE PARCIAL EN % 5.43 4.63 4.72 4.31 7.50 14.02 17.43INVERSION ACUMULADA (USD) 1638.59 3037.10 4462.95 5764.34 8029.53 12263.08 17527.77INVERSIÓN ACUMULADO EN % 5.43 10.06 14.78 19.09 26.59 40.61 58.04

Page 12: CRONOGRAMA-VALORADO

TIEMPO: 3 Meses (12 Semanas)MES 2 MES 3

S 8 S 9 S 10 S 11 S 12462.55

0.77 Cantidad (km)278.42

2.00 Cantidad (u)351.0010.00 Cantidad (u)70.205.00 Cantidad (rollo)

428.724.00 Cantidad (u)

31.02 31.02 31.06 310.241.60 1.60 1.60 16.00 Cantidad (m3)

48.0050.00 Cantidad (m2)

190.26202.40 Cantidad (m2)

479.75 3358.13105.91 741.31 Cantidad (m3)367.42 2572.0615.92 111.20 Cantidad (m3)

423.17 2962.3715.92 111.20 Cantidad (m3)

1860.31 6463.31222.20 772.20 Cantidad (m)25.23 75.691.00 3.00 Cantidad (u)

232.40 697.202.00 6.00 Cantidad (u)

204.75 497.257.00 17.00 Cantidad (u)

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Page 13: CRONOGRAMA-VALORADO

377.482.00 Cantidad (u)

257.404.00 Cantidad (u)

120.542.00 Cantidad (u)

50.91 152.731.00 3.00 Cantidad (u)

65.04 130.081.00 2.00 Cantidad (u)

89.86 269.582.00 6.00 Cantidad (u)

63.40 380.401.00 6.00 Cantidad (u)

1029.50 2059.0010.00 20.00 Cantidad (u)

698.32 698.32 710.18 2106.82172.00 172.00 174.92 518.92 Cantidad (m3)

6.42 6.422.00 2.00 Cantidad (m)

2117.10 2117.10 4234.2010.00 10.00 20.00 Cantidad (u)67.20 67.20 134.400.50 0.50 1.00 Cantidad (m3)

83.00 83.00 166.0020.00 20.00 40.00 Cantidad (m2)

134.00 134.0010.00 10.00 Cantidad (m2)

418.00 343.43 761.43100.00 82.16 182.16 Cantidad (m2)

144.51 144.5120.24 20.24 Cantidad (m2)

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Total $:

Page 14: CRONOGRAMA-VALORADO

S8 S9 S10 S11 S125621.08 729.34 2931.96 2685.30 704.94

18.61 2.42 9.71 8.89 2.3323148.85 23878.19 26810.15 29495.45 30200.40

76.65 79.07 88.77 97.67 100.00