UND METRADO PRECIO UNITARIO PARCIAL 1.00.00 CONSTRUCCION DE GALERIAS DE FILTRACION 1.01.00 TRABAJOS PROVISIONALES 1.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS vje 2.00 4,343.24 8,686.48 1.02.00 CONSTRUCCION CAMPAMENTO, OFICINAS Y ALMACEN PARA OBRA und 1.00 5,224.00 5,224.00 1.02.01 CARTEL DE OBRADE 3.60X4.80m (GIGANTOGRAFIAS und 1.00 1,227.99 1,227.99 TRABAJOS PRELIMINARES 1.02.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m 604.10 0.69 416.83 1.02.03 TRAZO, NIVELACION Y REPLANTEO DE OBRA ML 986.25 0.52 512.85 1.03.00 MOVIMIENTO DE TIERRAS 1.03.01 EXCAVACION C/EQUIPO T. CONGLOMERADO SATURADO H=7.50M. m3 21,112.46 4.55 96,061.69 1.03.02 REFINE Y NIVELACION DE FONDO PARA TUBERIA m 623.00 1.19 741.37 1.03.03 CAMA DE ARENA E=0.15M. PARA TUBERIA m 623.00 5.78 3,600.94 1.03.04 RELLENO DE ZANJA COMCTADO C/EQ. CON GRAVA 3-5MM. m3 623.00 57.93 36,090.39 m3 99.68 16.29 1,623.79 RELLENO DE ZANJA SIN CONPACTAR CON MATERIAL PROPIO m 20,389.78 3.01 61,373.24 1.03.05 ENTIBADO CORRIDO DE ZANJAS 3.51-4.00m DE PROF. m 623.00 26.73 16,652.79 1.04.00 SUMINISTRO E INSTALACION DE TUBERIAS 1.04.01 m 382.15 59.06 22,569.78 1.04.01.01 TUBERIA PVC CLASE A-7.5 UF 200 MM, RANURADA m 604.10 38.05 22,986.01 1.04.03 m 382.15 5.01 1,914.57 1.04.03.01 m 604.10 4.81 2,905.72 1.04.04 SUMINISTRO E INSTALACION DE ACCESORIOS 1.04.04.01 BRIDA DE ACERO DE 200 MM und 12.00 220.79 2,649.48 1.04.04.02 BRIDA CIEGA DE ACERO DE 200 MM und 7.00 265.06 1,855.42 1.04.04.03 TRANSICION EKS DE 8" (2000MM.) und 12.00 473.59 5,683.08 TRANSICION FKS DE 8" (200MM.) und 8.00 473.59 3,788.72 1.04.04.04 TUBO ACEROS SCH-40 1 1/2" m 123.50 30.26 3,737.11 1.04.04.05 INSTALACION DE TRANSICION DE Fo FDO. CAMPANA -BRIDA 200MM und 20.00 50.05 1,001.00 1.04.04.06 SUMINISTRO E INSTALACION DE VALVULAS 1.04.04.07 VALVULA MARIPOSA HIERRO DUCTIL BRIDADA DE 200 MM und 12.00 3,190.78 38,289.36 1.04.04.08 VALVULA TIPO GUILLOTINA HIERRO DUCTIL BRIDADA DE 200MM und 7.00 2,052.64 14,368.48 1.04.04.09 INSTALACION VALVULA MARIPOSA H.D. BRIDADA 200MM. und 12.00 50.05 600.60 INSTALACION VALVULA TIPO GUILLOTINA H.D. BRIDADA DE 200MM und 7.00 50.05 350.35 1.04.05 BUZONES 1.04.05.01 BUZON DE CONEXIÓN TIPO 1 DE 2.10X1.60m H=8.70M und 7.00 14,146.22 99,023.54 1.04.05.02 BUZON DE CONEXIÓN TIPO 1 DE 1.40X1.60m H=8.70M und 1.00 11,739.64 11,739.64 1.05.00 BUZON DE CONEXIÓN TIPO 1 DE 1.60X1.60m H=8.70M und 4.00 11,950.12 47,800.48 1.05.01 BUZON DE DE ARANQUE D=1.24m. H=2.30M und 1.00 1,745.67 1,745.67 1.05.01.01 RED DE CONDUCCION DE AGUA POTABLE TRABAJOS PROVISIONALES m 13,463.06 0.94 12,655.28 TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m 6,731.53 0.34 2,288.72 TRAZO, NIVELACION Y REPLANTEO DE OBRA ML 6,731.53 0.52 3,500.40 MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJA EN RIBERA DE RIO CON PROF. PROM H=2.20m m 6,015.35 23.29 140,097.50 EXCAVACION DE ZANJA EN T. NORMAL CON PROF. PROM H=1.50m m 716.18 4.93 3,530.77 REFINE Y NIVELACION DE FONDO PARA TUBERIA m 6,731.53 1.19 8,010.52 1.05.01.02 CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM m 6,731.53 5.08 34,196.17 1.06.00 PROTECION SOBRE TUBERIA E=0.20M ML 6,731.53 5.64 37,965.83 1.06.01 RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO Hprom=0.80m m 6,731.53 6.42 43,216.42 1.07.00 SUMINISTRO E INSTALACION DE TUBERIAS UF 1.07.01 m 4,151.20 41.45 172,067.24 1.07.01.01 m 2,580.33 53.90 139,079.79 1.07.01.02 PRUEBA HIDRAULICA Y DESINFECCION DE REDES 1.07.01.04 m 6,731.53 3.88 26,118.34 1.07.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS 1.07.01.06 CODO PVC,UF,C-10, Ø160mm x 90° und 3.00 307.87 923.61 CODO PVC,UF,C-7.5, Ø160mm x 45° und 7.00 177.71 1,243.97 CODO PVC,UF,C-10, Ø160mm x 45° und 2.00 192.71 385.42 CODO PVC,UF,C-7.5, Ø160mm x 22°30' und 19.00 118.15 2,244.85 CODO PVC,UF,C-10, Ø160mm x 22°30' und 10.00 133.15 1,331.50 CODO PVC,UF,C-7.5, Ø160mm x 11.15° und 14.00 190.66 2,669.24 CODO PVC,UF,C-10, Ø160mm x 11°15' und 9.00 205.66 1,850.94 CAMARA DE VALVULA DE AIRE Y PURGA und 3.00 6,336.38 19,009.14 RELLENO DE ZANJA COMCTADO C/EQ. CON MATERIAL PROPIO SELECCIONADO TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200 MM. UNION HERMETICA INSTALACION TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200 MM. INSTALACION TUBERIA PVC CLASE A-7.5 UF 200 MM. INC.PRUEBA HIDRAULICA CINTA PLASTICA SEÑALIZADORA DE PELIGRO LIMITE DE OBRA INCLUYE POSTES TUBERIA PVC C-7.5 Ø160mm / AGUA POTABLE TUBERIA PVC C-10 Ø160mm / AGUA POTABLE DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C- 7.5/C-10,160mm CONSTRUCCION DE CAMARA DE AIRE DE CONCRETO ARMADO DE 1.60X1.60m. Hprom=4.20M.

Transcript of CRONOGRAMA VALORIZADA.xls

Page 1: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

1.00.00 CONSTRUCCION DE GALERIAS DE FILTRACION 1.01.00 TRABAJOS PROVISIONALES

1.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS vje 2.00 4,343.24 8,686.48 1.02.00 CONSTRUCCION CAMPAMENTO, OFICINAS Y ALMACEN PARA OBRA und 1.00 5,224.00 5,224.00 1.02.01 CARTEL DE OBRADE 3.60X4.80m (GIGANTOGRAFIAS und 1.00 1,227.99 1,227.99

TRABAJOS PRELIMINARES

1.02.02 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m 604.10 0.69 416.83

1.02.03 TRAZO, NIVELACION Y REPLANTEO DE OBRA ML 986.25 0.52 512.85 1.03.00 MOVIMIENTO DE TIERRAS 1.03.01 EXCAVACION C/EQUIPO T. CONGLOMERADO SATURADO H=7.50M. m3 21,112.46 4.55 96,061.69 1.03.02 REFINE Y NIVELACION DE FONDO PARA TUBERIA m 623.00 1.19 741.37 1.03.03 CAMA DE ARENA E=0.15M. PARA TUBERIA m 623.00 5.78 3,600.94 1.03.04 RELLENO DE ZANJA COMCTADO C/EQ. CON GRAVA 3-5MM. m3 623.00 57.93 36,090.39

m3 99.68 16.29 1,623.79 RELLENO DE ZANJA SIN CONPACTAR CON MATERIAL PROPIO m 20,389.78 3.01 61,373.24

1.03.05 ENTIBADO CORRIDO DE ZANJAS 3.51-4.00m DE PROF. m 623.00 26.73 16,652.79 1.04.00 SUMINISTRO E INSTALACION DE TUBERIAS

1.04.01 m 382.15 59.06 22,569.78

1.04.01.01 TUBERIA PVC CLASE A-7.5 UF 200 MM, RANURADA m 604.10 38.05 22,986.00

1.04.03 m 382.15 5.01 1,914.57

1.04.03.01 m 604.10 4.81 2,905.72

1.04.04 SUMINISTRO E INSTALACION DE ACCESORIOS 1.04.04.01 BRIDA DE ACERO DE 200 MM und 12.00 220.79 2,649.48 1.04.04.02 BRIDA CIEGA DE ACERO DE 200 MM und 7.00 265.06 1,855.42 1.04.04.03 TRANSICION EKS DE 8" (2000MM.) und 12.00 473.59 5,683.08

TRANSICION FKS DE 8" (200MM.) und 8.00 473.59 3,788.72 1.04.04.04 TUBO ACEROS SCH-40 1 1/2" m 123.50 30.26 3,737.11

1.04.04.05 INSTALACION DE TRANSICION DE Fo FDO. CAMPANA -BRIDA 200MM und 20.00 50.05 1,001.00 1.04.04.06 SUMINISTRO E INSTALACION DE VALVULAS

1.04.04.07 VALVULA MARIPOSA HIERRO DUCTIL BRIDADA DE 200 MM und 12.00 3,190.78 38,289.36 1.04.04.08 VALVULA TIPO GUILLOTINA HIERRO DUCTIL BRIDADA DE 200MM und 7.00 2,052.64 14,368.48 1.04.04.09 INSTALACION VALVULA MARIPOSA H.D. BRIDADA 200MM. und 12.00 50.05 600.60

INSTALACION VALVULA TIPO GUILLOTINA H.D. BRIDADA DE 200MM und 7.00 50.05 350.35 1.04.05 BUZONES

1.04.05.01 BUZON DE CONEXIÓN TIPO 1 DE 2.10X1.60m H=8.70M und 7.00 14,146.22 99,023.54 1.04.05.02 BUZON DE CONEXIÓN TIPO 1 DE 1.40X1.60m H=8.70M und 1.00 11,739.64 11,739.64

1.05.00 BUZON DE CONEXIÓN TIPO 1 DE 1.60X1.60m H=8.70M und 4.00 11,950.12 47,800.48 1.05.01 BUZON DE DE ARANQUE D=1.24m. H=2.30M und 1.00 1,745.67 1,745.67

1.05.01.01 RED DE CONDUCCION DE AGUA POTABLE TRABAJOS PROVISIONALES

m 13,463.06 0.94 12,655.28 TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL m 6,731.53 0.34 2,288.72 TRAZO, NIVELACION Y REPLANTEO DE OBRA ML 6,731.53 0.52 3,500.40 MOVIMIENTO DE TIERRAS

m 6,015.35 23.29 140,097.50

EXCAVACION DE ZANJA EN T. NORMAL CON PROF. PROM H=1.50m m 716.18 4.93 3,530.77 REFINE Y NIVELACION DE FONDO PARA TUBERIA m 6,731.53 1.19 8,010.52

1.05.01.02 CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM m 6,731.53 5.08 34,196.17 1.06.00 PROTECION SOBRE TUBERIA E=0.20M ML 6,731.53 5.64 37,965.83 1.06.01 RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO Hprom=0.80m m 6,731.53 6.42 43,216.42 1.07.00 SUMINISTRO E INSTALACION DE TUBERIAS UF 1.07.01 m 4,151.20 41.45 172,067.24

1.07.01.01 m 2,580.33 53.90 139,079.79

1.07.01.02 PRUEBA HIDRAULICA Y DESINFECCION DE REDES

1.07.01.04 m 6,731.53 3.88 26,118.34

1.07.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS

1.07.01.06 CODO PVC,UF,C-10, Ø160mm x 90° und 3.00 307.87 923.61

CODO PVC,UF,C-7.5, Ø160mm x 45° und 7.00 177.71 1,243.97

CODO PVC,UF,C-10, Ø160mm x 45° und 2.00 192.71 385.42

CODO PVC,UF,C-7.5, Ø160mm x 22°30' und 19.00 118.15 2,244.85

CODO PVC,UF,C-10, Ø160mm x 22°30' und 10.00 133.15 1,331.50

CODO PVC,UF,C-7.5, Ø160mm x 11.15° und 14.00 190.66 2,669.24

CODO PVC,UF,C-10, Ø160mm x 11°15' und 9.00 205.66 1,850.94

CAMARA DE VALVULA DE AIRE Y PURGA

und 3.00 6,336.38 19,009.14

RELLENO DE ZANJA COMCTADO C/EQ. CON MATERIAL PROPIO SELECCIONADO

TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200 MM. UNION HERMETICA

INSTALACION TUBERIA DE POLIETILENO DE ALTA DENSIDAD DE 200 MM.

INSTALACION TUBERIA PVC CLASE A-7.5 UF 200 MM. INC.PRUEBA HIDRAULICA

CINTA PLASTICA SEÑALIZADORA DE PELIGRO LIMITE DE OBRA INCLUYE POSTES

EXCAVACION DE ZANJA EN RIBERA DE RIO CON PROF. PROM H=2.20m

TUBERIA PVC C-7.5 Ø160mm / AGUA POTABLE TUBERIA PVC C-10 Ø160mm / AGUA POTABLE

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C-7.5/C-10,160mm

CONSTRUCCION DE CAMARA DE AIRE DE CONCRETO ARMADO DE 1.60X1.60m. Hprom=4.20M.

Page 2: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

und 2.00 5,616.63 11,233.26

CONSTRUCCION DE MACRO MEDIDOR DE CONCRETO und 1.00 52,671.77 52,671.77

VALVULA DE AIRE 110mm FFD und 3.00 2,401.82 7,205.46

VALVULA DE PURGA 110mm FFD und 2.00 2,571.87 5,143.74

DADOS DE CONCRETO 0.20x0.20x0.40

DADOS DE CONCRETO PARA ANCLAJE DE ACCESORIOS und 65.00 64.39 4,185.35

DADO DE CONCRETO PARA CURVANO R=80.00m und 45.00 89.03 4,006.35

RED DISTRIBUCION DE AGUA POTABLE

TRABAJOS PROVISIONALES

m 26,929.10 0.94 25,313.35

TRABAJOS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL m 13,464.55 0.34 4,577.95

TRAZO, NIVELACION Y REPLANTEO DE OBRA ML 13,464.55 0.52 7,001.57

MOVIMIENTO DE TIERRAS

EXCAVACION DE ZANJA EN TERRENO NORMAL Hprom =1.10m m 13,464.55 4.23 56,955.05

REFINE Y NIVELACION DE FONDO PARA TUBERIA m 13,464.55 1.19 16,022.81

CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM m 13,464.55 5.08 68,399.91

PROTECCION SOBRE TUBERIA E=0.20M. ML 13,464.55 5.64 75,940.06

RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO Hprom=0.80m m 13,464.55 6.42 86,442.41

SUMINISTRO E INSTALACION DE TUBERIAS UF

m 4,495.68 5.99 26,929.12

m 6,008.13 10.19 61,222.84

m 2,960.74 19.67 58,237.76

PRUEBA HIDRAULICA Y DESINFECCION DE REDES

m 4,495.68 2.94 13,217.30

m 6,008.13 2.93 17,603.82

m 2,960.74 2.97 8,793.40

SUMINISTRO E INSTALACION DE ACCESORIOS

und 13.00 43.89 570.57

und 11.00 20.08 220.88

und 1.00 183.05 183.05

und 2.00 101.45 202.90

TEE PVC-UF, C-7.5,110x110mm und 4.00 180.02 720.08

TEE PVC-UF, C-7.5, 75x75mm und 32.00 64.01 2,048.32

TEE PVC-UF, C-7.5, 63x63mm und 10.00 38.41 384.10

und 29.00 74.67 2,165.43

und 17.00 74.67 1,269.39

und 14.00 71.51 1,001.14

und 4.00 82.74 330.96

und 40.00 44.11 1,764.40

CONSTRUCCION DE CAMARA DE PURGA DE CONCRETO ARMADO DE D=1.60m. Hprom=4.60M

CINTA PLASTICA SEÑALIZADORA DE PELIGRO LIMITE DE OBRA INCLUYE POSTES

TUBERIA PVC UF C-7.5 Ø63mm AGUA POTABLE

TUBERIA PVC UF C-7.5 Ø75mm AGUA POTABLE

TUBERIA PVC UF C-7.5 Ø110mm AGUA POTABLE

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C-7.5, 63mm

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C-7.5, 75mm

DOBLE PRUEBA HIDRAULICA Y DESINFECCION TUBERIA PVC, UF, C-7.5, 110mm

TAPON PVC,UF, C-7.5, Ø75mm

TAPON PVC,UF, C-7.5, Ø63mm

CRUZ PVC,UF, C-7.5, Ø75mm

CRUZ PVC,UF, C-7.5, Ø63mm

CODO PVC, UF, C-7.5,Ø110mm x 11°15'

CODO PVC, UF, C-7.5,Ø110mm x 22°30'

CODO PVC, UF, C-7.5,Ø110mm x 45°

CODO PVC, UF, C-7.5,Ø110mm x 90°

CODO PVC, UF, C-7.5,Ø75mm x 11°15'

Page 3: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

und 18.00 50.68 912.24

und 14.00 55.64 778.96

und 13.00 53.87 700.31

und 58.00 28.62 1,659.96

und 15.00 33.90 508.50

und 10.00 34.38 343.80

und 6.00 33.50 201.00

REDUCCION PVC-UF, C-7.5, 110x75mm und 8.00 57.45 459.60

REDUCCION PVC-UF, C-7.5, 75x63mm und 7.00 35.75 250.25

VALVULAS

VALVULA COMPUERTA 63mm ISO 7259 FFD und 14.00 473.63 6,630.82

VALVULA COMPUERTA 75mm ISO 7259 FFD und 20.00 741.19 14,823.80

VALVULA DE AIRE 75mm FFD und 6.00 2,066.87 12,401.22

VALVULA DE PURGA 63mm FFD und 6.00 1,572.44 9,434.64

CONEXIÓN DOMICILIARIA DE AGUA 1/2"

CONEXIÓN DE AGUA1/2", PVC, UF, C-7.5 und 813.00 240.58 195,591.54

DADOS DE CONCRETO 0.20x0.20x0.40

DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS und 326.00 64.39 20,991.14

RESERVORIO ELEVADO TIPO FUSTE V=250m3

OBRAS PROVISIONALES

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS vje 2.00 4,343.24 8,686.48

CERCO PROVISIONAL DE OBRA m 100.00 83.84 8,384.00

m 100.00 0.94 94.00

OBRAS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL m2 153.94 1.02 157.02

TRAZO, NIVELACION Y REPLANTEO. m2 153.94 1.05 161.64

MOVIMIENTO DE TIERRAS

EXCAVACION MASIVA PARA CIMENTACION C/MAQ. m3 692.73 4.22 2,923.32

EXCAVACION MANUAL P/CAJA REBOSE m3 2.31 25.65 59.25

REFINE, NIVELACION Y COMPACTACION DE FONDO EXCAVADO m2 153.94 1.99 306.34

RELLENO COMPACTADO C/MATERIAL DE PRESTAMO m3 154.26 35.53 5,480.86

RELLENO COMPACTADO C/MATERIAL DE PROPIO m3 158.51 15.51 2,458.49

ELIMINACION DE MATERIAL EXCEDENTE m3 739.10 15.74 11,633.43

OBRAS DE CONCRETO CICLOPEO

m3 61.58 146.20 9,003.00

OBRAS DE CONCRETO ARMADO

ZAPATA CIRCULAR

ZAPATA CIRCULAR, CONCRETO F'C=280 KG/CM2 m3 168.54 307.91 51,895.15

ZAPATA CIRCULAR, ACERO F'y=4200 KG/CM2 kg 16,803.92 3.54 59,485.88

LOSA DE PISO

CODO PVC, UF, C-7.5,Ø75mm x 22°30'

CODO PVC, UF, C-7.5,Ø75mm x 45°

CODO PVC, UF, C-7.5,Ø75mm x 90°

CODO PVC, UF, C-7.5,Ø63mm x 11°15'

CODO PVC, UF, C-7.5,Ø63mm x 22°30'

CODO PVC, UF, C-7.5,Ø63mm x 45°

CODO PVC, UF, C-7.5,Ø63mm x 90°

CINTA PLASTICA SEÑALIZADORA DE PELIGRO LIMITE DE OBRA INCLUYE POSTES

CONCRETO CICLOPEO FC=100KG/CM2 + 30 % PM. PARA SUB CIMIENTO

Page 4: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

LOSA DE PISO, CONCRETO F'C=210 KG/CM2 m3 3.41 267.23 911.25

LOSA DE PISO,ACERO F'y=4200 KG/CM2 kg 134.58 3.54 476.41

FUSTE CIRCULAR

FUSTE CIRCULAR, CONCRETO F'C=280 KG/CM2 m3 82.07 293.91 24,121.19

FUSTE CIRCULAR, ENCOFRADO Y DESENCOFRADO CARAVISTA m2 713.45 44.49 31,741.39

FUSTE CIRCULAR, ACERO F'y=4200 KG/CM2 kg 10,961.74 3.54 38,804.56

VIGA PUENTE

VIGA PUENTE, CONCRETO F'C=280 KG/CM2 m3 2.37 340.80 807.70

VIGA PUENTE, ENCOFRADO Y DESENCOFRADO CARAVISTA m2 17.77 47.38 841.94

VIGA PUENTE, ACERO F'y=4200 KG/CM2 kg 299.39 3.54 1,059.84

VIGA ANILLO DE FONDO

VIGA ANILLO DE FONDO, CONCRETO F'C=280 KG/CM2 m3 4.82 350.54 1,689.60

VIGA ANILLO DE FONDO, ENCOFRADO Y DESENCOFRADO CARAVISTA m2 15.68 48.89 766.60

VIGA ANILLO DE FONDO, ACERO F'y=4200 KG/CM2 kg 583.85 3.54 2,066.83

VIGA ANILLO INFERIOR

VIGA ANILLO INFERIOR, CONCRETO F'C=280 KG/CM2 m3 4.67 350.54 1,637.02

m2 25.90 48.89 1,266.25

VIGA ANILLO INFERIOR, ACERO F'y=4200 KG/CM2 kg 525.98 3.54 1,861.97

VIGA ANILLO SUPERIOR

VIGA ANILLO SUPERIOR,CONCRETO F'C=280 KG/CM2 m3 2.33 293.91 684.81

m2 22.25 52.70 1,172.58

VIGA ANILLO SUPERIOR,ACERO F'y=4200 KG/CM2 kg 277.72 3.54 983.13

VIGA ANILLO CHIMENEA

VIGA ANILLO CHIMENEA,CONCRETO F'C=280 KG/CM2 m3 0.69 350.54 241.87

m2 4.10 48.89 200.45

VIGA ANILLO CHIMENEA, ACERO F'y=4200 KG/CM2 kg 76.72 3.54 271.59

TRONICO CONICO-CUBA

TRONICO CONICO-CUBA,CONCRETO F'C=350 KG/CM2 m3 17.29 358.88 6,205.04

m2 101.71 53.25 5,416.06

TRONICO CONICO-CUBA,ACERO F'y=4200 KG/CM2 kg 3,765.82 3.54 13,331.00

FONDO ESFERICO-CUBA

FONDO ESFERICO-CUBA,CONCRETO F'C=350 KG/CM2 m3 13.46 358.88 4,830.52

m2 79.18 53.25 4,216.34

FONDO ESFERICO-CUBA,ACERO F'y=4200 KG/CM2 kg 2,755.08 3.54 9,752.98

MUROS - CUBA

MUROS - CUBA,CONCRETO F'C=280 KG/CM2 m3 21.13 362.72 7,664.27

MUROS - CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA m2 211.22 59.70 12,609.83

MUROS - CUBA,ACERO F'y=4200 KG/CM2 kg 4,004.54 3.54 14,176.07

MUROS - CHIMENEA

MUROS - CHIMENEA,CONCRETO F'C=280 KG/CM2 m3 3.95 362.72 1,432.74

VIGA ANILLO INFERIOR, ENCOFRADO Y DESENCOFRADO CARAVISTA

VIGA ANILLO SUPERIOR,ENCOFRADO Y DESENCOFRADO CARAVISTA

VIGA ANILLO CHIMENEA,ENCOFRADO Y DESENCOFRADO CARAVISTA

TRONICO CONICO-CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA

FONDO ESFERICO-CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA

Page 5: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

MUROS - CHIMENEA,ENCOFRADO Y DESENCOFRADO CARAVISTA m2 39.52 57.70 2,280.30

MUROS - CHIMENEA,ACERO F'y=4200 KG/CM2 kg 442.63 3.54 1,566.91

CUBIERTA

CUBIERTA - CUBA,CONCRETO F'C=280 KG/CM2 m3 6.74 356.28 2,401.33

CUBIERTA - CUBA,ENCOFRADO Y DESENCOFRADO CARAVISTA m2 84.30 57.39 4,837.98

CUBIERTA - CUBA,ACERO F'y=4200 KG/CM2 kg 1,253.63 3.54 4,437.85

CAJAS DE REBOSE

CAJAS DE REBOSE,CONCRETO F'C=280 KG/CM2 m3 1.19 301.92 359.28

CAJAS DE REBOSE,ENCOFRADO Y DESENCOFRADO CARAVISTA m2 12.58 44.57 560.69

CAJAS DE REBOSE,ACERO F'y=4200 KG/CM2 kg 65.27 3.54 231.06

ARTESA DE REBOSE

ARTESA DE REBOSE,CONCRETO F'C=280 KG/CM2 m3 0.40 362.72 145.09

ARTESA DE REBOSE,ENCOFRADO Y DESENCOFRADO CARAVISTA m2 4.63 53.58 248.08

ARTESA DE REBOSE,ACERO F'y=4200 KG/CM2 kg 25.84 3.54 91.47

CURADO Y PROTECCION DE LA ESTRUCTURA

CURADO ESPECIAL DE LA ESTRUCTURA m2 670.83 6.65 4,461.02

REVOQUES Y ENLUCIDOS

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm LOSA FONDO m2 90.45 19.91 1,800.86

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm EN MUROS m2 123.93 31.36 3,886.44

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm EN VIGAS m2 16.31 26.22 427.65

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm CUPULA m2 84.30 31.22 2,631.85

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm ARTES RED m2 4.63 26.22 121.40

TARRAJEO INTERIOR C/IMPERM.CA 1:5 e=1.5cm CAJAS DE REBOSE m2 6.63 19.91 132.00

REVOQUE FINO PARA EXTERIOR DE LA ESTRUCTURA m2 344.59 11.05 3,807.72

PISOS Y PAVIMENTOS

VEREDA DE CONCRETO F'C=175K/CM2 m2 31.14 37.76 1,175.85

VEREDA, ENCOFRADO Y DESENCOFRADO NORMAL m2 8.88 38.56 342.41

CARPINTERIA METALICA Y HERRERIA

und 24.00 71.74 1,721.76

und 1.00 650.36 650.36

m 13.20 124.06 1,637.59

CANASTILLA METALICA DE SEGURIDAD C/PL 2"x1/4 +L1"x1/8" m 16.95 95.49 1,618.56

m 21.65 54.14 1,172.13

und 4.00 598.44 2,393.76

SOPORTE METALICO VERTICAL P/TUB. DIAMETRO 160mm und 12.00 186.73 2,240.76

TAPA METALICA EN CAJA DE REBOSE und 1.00 578.84 578.84

PINTURA

PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERIA METALICA m2 57.61 13.03 750.66

PINTURA EN TUBERIAS m 78.32 14.71 1,152.09

CERRAJERIA

VENTANA METALICA 0.35x0.35 C/PERFIL 1"X 1/8" + PLANCHA PERF.CUAD. E=0.9mm

PUERTA METALICA 1.20x2.40 C/PLANCHA LAC 1/8" C/MARCO 1 1/2"x1 1/2"x3/16" Y REFUERZOS

BARANDA DE SEGURIDAD DE Fo. GALV. Ø2" Y Ø1"x1.00m ALT.

ESCALERA TIPO MARINERO TUB Fo.GALV. PAR Ø2" PAS. Ø3/4"

VENTILACION C/TUBERIA DE Fo.GALV. Ø160mm.

Page 6: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

und 1.00 85.90 85.90

BISAGRA DE FIERRO 4" PARA PUERTA und 3.00 17.14 51.42

und 1.00 7.82 7.82

VARIOS

JUNTA DE CONSTRUCCION C/WATER STOP 9" ML 371.90 33.45 12,440.06

REGLA GRADUADA-INDICADOR DE NIVELES PARA RESERVORIO und 1.00 1,045.16 1,045.16

DESINFECCION C/EMPLEO DE CISTERNA+EQ.BOMBEO P/LLENADO m3 250.00 23.07 5,767.50

CLORADOR CLORO-GAS DE INYECCION DIRECTA und 3.00 7,928.84 23,786.52

JUNTAS ASFALTICAS m 31.65 4.75 150.34

ENSAYOS Y PRUEBAS

m3 250.00 20.72 5,180.00

INSTALACIONES HIDRAULICAS

TUBERIAS Y ACCESORIOS

TUBERIA DE HIERRO DUCTIL BB K-9 DN 150MM (6") m 53.49 116.09 6,209.65

TUBERIA DE HIERRO DUCTIL BB K-9 DN 110MM (4") m 57.60 98.34 5,664.38

TUBERIA DE HIERRO DUCTIL BB K-9 DN 75MM (3") und 22.42 82.59 1,851.67

CODO DE H.D. BB DN 150MM X 90° und 9.00 192.60 1,733.40

CODO DE H.D. BB DN 110MM X 90° und 4.00 108.57 434.28

CODO DE H.D. BB DN 75MM X 90° und 3.00 94.63 283.89

CODO DE H.D. BB DN 150MM X 45° und 4.00 192.60 770.40

CODO DE H.D. BB DN 110MM X 45° und 4.00 94.01 376.04

CODO DE H.D. BB DN 75MM X 45° und 2.00 90.29 180.58

UNION FLEXIBLE TIPO DRESSER DE 6" (150MM) und 3.00 216.42 649.26

UNION FLEXIBLE TIPO DRESSER DE 4" (110MM) und 8.00 141.03 1,128.24

UNION FLEXIBLE TIPO DRESSER DE 3" (75MM) und 4.00 133.46 533.84

VALVULA COMPUERTA H.D. BB DN 150MM und 2.00 983.42 1,966.84

VALVULA COMPUERTA H.D. BB DN 110MM und 6.00 629.18 3,775.08

VALVULA COMPUERTA H.D. BB DN 75MM und 3.00 617.90 1,853.70

TEEDE HD BB DN150MM X 150MM und 2.00 261.18 522.36

TEEDE HD BB DN150MM X 110MM und 4.00 176.82 707.28

TEEDE HD BB DN150MM X 75MM und 1.00 143.23 143.23

BRIDA ROMPE AGUA DN 150 MM und 2.00 80.31 160.62

BRIDA ROMPE AGUA DN 110 MM und 2.00 60.40 120.80

BRIDA ROMPE AGUA DN 75 MM und 1.00 41.81 41.81

REDUCCION DE H.D. BB DN 150MM x 110MM und 1.00 241.30 241.30

REDUCCION DE H.D. BB DN 110MM x 75MM und 1.00 163.86 163.86

TRANSICCION DE BRIDA - CAMPANA HD DN 150MM und 1.00 138.64 138.64

TRANSICCION DE BRIDA - CAMPANA HD DN 110MM und 2.00 106.58 213.16

TRANSICCION DE BRIDA - CAMPANA HD DN 75MM und 1.00 78.74 78.74

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN150MM und 1.00 3,508.75 3,508.75

SUMINIST.E INSTALACION DE CERRADURA DE 3 GOLPES(INC. PROTECTOR EXTERNO Y TIRADOR)

MANIJA DE FIERRO DE Ø 1/2"

PRUEBA HIDRAULICA C/EMPLEO DE CISTERNA+EQ.BOMBEO P/LLENADO

Page 7: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN110MM und 1.00 2,808.75 2,808.75

MEDIDOR DE CAUDAL ELECTROMAGNETICO BB DN75MM und 1.00 2,248.75 2,248.75

CANASTILLA DE SUCCION ACERO INOX. DN110MM und 2.00 355.46 710.92

CANASTILLA DE SUCCION ACERO INOX. DN75MM und 1.00 305.51 305.51

BRIDA DE ACERO DN150MM P/SOLDAR und 40.00 125.88 5,035.20

BRIDA DE ACERO DN110MM P/SOLDAR und 40.00 94.38 3,775.20

BRIDA DE ACERO DN75MM P/SOLDAR und 26.00 63.58 1,653.08

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 150MM und 320.00 2.20 704.00

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 110MM und 320.00 2.20 704.00

PERNO DE ACERO INC. TUERCA P/UNIR BRIDAS DN 75MM und 208.00 2.20 457.60

EMPAQUETADURA DE JEBE ENLONADO DE 6" (150MM) und 38.00 7.57 287.66

EMPAQUETADURA DE JEBE ENLONADO DE 4" (110MM) und 42.00 6.06 254.52

EMPAQUETADURA DE JEBE ENLONADO DE 3" (75MM) und 21.00 5.63 118.23

INSTALACION DE ACCESORIOS HIERRO DUCTIL und 70.00 89.75 6,282.50

DADO DE CONCRETO PARA ANCLAJE DE ACCESORIOS und 27.00 230.36 6,219.72

RED DE DESCARGA DE PURGA Y LIMPIEZA

EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL m 26.00 20.82 541.32

REFINE Y NIVELACION DE FONDO PARA TUBERIA m 26.00 1.19 30.94

CAMA DE APOYO PARA TUBERIAS, INCLUIDO ARENA 10CM m 26.00 5.08 132.08

RELLENO Y COMPACTADO DE ZANJAS C/MAT. PROPIO m 26.00 3.07 79.82

m 26.00 7.04 183.04

DOBLE PRUEBA HIDRAULICA A RED DESCARGA m 26.00 2.96 76.96

CAJA DE CONCRETO DE 0.60x0.60M und 1.00 165.27 165.27

und 1.00 348.23 348.23

MONITOREO ARQUEOLOGICO, AMBIENTAL,SEGURIDAD Y SALUD

PROGRAMA DE EDUCACION AMBIENTAL

EDUCACION AMBIENTAL POBLADORES und 1.00 115.89 115.89

EDUCACION AMBIENTAL TRABAJADORES und 2.00 115.89 231.78

PROGRAMA DE PREVENCION Y/O MITIGACION

CARTELES MENORES und 17.00 209.99 3,569.83

SS.HH. PORTATIL (INC . MNMTO) mes 6.00 2,574.14 15,444.84

PROGRAMA DE CONTINGENCIA AMBIENTAL

EQUIPO DE CONTINGENCIA AMBIENTAL glb 6.00 564.60 3,387.60

PROGRAMA DE ABANDONO DE OBRA

REFORESTACION HA 0.08 12,032.44 962.60

HA 0.08 4,235.48 338.84

PERFILADO Y NIVELACION DE MATERIAL EXCEDENTE m2 1,382.24 0.76 1,050.50

PLANDE SEGURIDAD Y SALUD

ELABORACION DE PLAN DE SEGURIDAD Y SALUD glb 1.00 422.59 422.59

CAPACITACION EN SEGURIDAD Y SALUD glb 2.00 177.09 354.18

SUMINISTRO E INSTALACION TUBERIA PVC UF Ø160mm S-25 ISO4435

CONEXIÓN DOMICILIARIA PVC Ø150mm (6") P/DESAGUE

REACONDICIONAMIENTO DEL AREA DE CAMPAMENTO DE OBRAS PROVISIONALES

Page 8: CRONOGRAMA VALORIZADA.xls

UND METRADO PRECIO UNITARIO PARCIAL

IMPLEMENTACION DE PLAN DE SEGURIDAD Y SALUD

EQUIPO DE PROTECCION PERSONAL (EPPS) mes 6.00 7,272.59 43,635.54

EQUIPO DE CONTINGENCIGENCIAS EN SEGURIDAD Y SALUD glb 6.00 839.79 5,038.74

CARTELES PREVENTIVOS DE SEGURIDAD und 10.00 159.13 1,591.30

ARQUEOLOGIA

ELABORACION DEL PLAN DE MONITOREO glb 1.00 5,000.00 5,000.00

MONITOREO ARQUEOLOGICO mes 6.00 2,627.20 15,763.20

OBRAS DE PROTECCION DE ESTRUCTURAS DE CAPTACION

TRABAJOS PROVISIONALES

TRAZO, NIVELACION Y REPLANTEO. m2 32,915.82 1.05 34,561.61

MOVIMIENTO DE TIERRAS

CORTE SOBRE RIBERA P/ESTRUCTURAS DE PROTECCION m3 514.75 5.89 3,031.88

CORTE Y ACUMULACION DE MAT. P/ENCAUZAMIENTO DE RIO m3 8,228.98 3.32 27,320.21

ACARREO DE PIEDRA DE 5"-10" APIE DE OBRA m3 1,200.00 19.80 23,760.00

GAVIONES

und 90.00 324.97 29,247.30

und 90.00 148.76 13,388.40

und 160.00 474.47 75,915.20

und 160.00 148.76 23,801.60

m2 1,932.20 8.54 16,500.99

COSTO DIRECTO 2,916,618.18 PORCENTAJE DE AVANCE GASTOS GENERALES 8 % CD 0.08 233,329.45

UTILIDAD 7% CD 0.07 204,163.27

FACTOR DE RELACION 0.95 3,354,110.91

SUBTOTAL S/. 3,354,110.90 IGV 0.18 603,739.96

PRESUPUESTO TOTAL S/. 3,957,850.86

COSTO TOTAL 3,957,850.86

SUMINISTRO E INSTALACION DE GAVION CAJA FUERTE 5.0x1.0x1.0m, (10x12 Q 2.7mm y 3.4mm. Galfan)

LLENADO Y CERRADO DE GAVION CAJA FUERTE 5.0x1.0x1.0m,(10x12 Q 2.7mm y 3.4 mm. Galfan)

SUMINISTRO E INSTALACION DE GAVION TIPO COLCHOFUERTE 5.0x2.0x0.3m, (10x12 Q 2.7mm y 3.4mm. Galfan)

LLENADO Y CERRADO DE GAVION TIPO COLCHOFUERTE 5.0x2.0x0.3m,(10x12 Q 2.7mm y 3.4 mm. Galfan)

SUMINISTRO DE INSTALACION DE GEOTEXTIL NO TEJIDO PP GT 190P

Page 9: CRONOGRAMA VALORIZADA.xls

INCIDENCIA PRESUPUESTAL

OBRA

UBICACIÓNCONVOCATORIACONTRATISTASUPERVISOR FACTOR DE RELACI 1.000000000

PROPIETARIOPRESUPUESTO REFERENCIAL incluido el I.G.V.PRESUPUESTO CONTRATADO incluido el I.G.V.FECHA PTO. REFERENCIAL :

ITEM DESCRIPCION PRESUPUESTO1 PRESTACION ADICIONAL DE OBRA Nº1 3,957,850.86 2 DEDUCTIVO DE OBRA N°1 1,675,937.68 3 TOTAL VARIACION 2,281,913.18 4 PRESUPUESTO CONTRACTUAL 9,855,052.98 5 PORCENTAJE DE INCIDENCIA 23.15%