CRONOGRAMA VALORIZADO DE OBRA Página: 1 de 7 CRONOGRAMA VALORIZADO DE OBRA ITEM TAREA PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL 01 SISTEMA DE AGUA POTABLE 424,483.90 01.01 TRABAJOS PRELIMINARES 9,430.28 01.01.01 CARTEL DE OBRA DE 3.60X2.40M INCLUYE COLOCACION 1,000.00 1,000.00 1,000.00 01.01.02 CAMPAMENTO PROVISIONAL DE OBRA 8,430.28 8,430.28 8,430.28 01.02 CAPTACION TIPO CAISSON (01 UND) 15,393.05 01.02.01 TRABAJOS PRELIMINARES 3.28 01.02.01.01 LIMPIEZA DE TERRENO MANUAL 1.25 1.25 1.25 01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR 2.03 2.03 2.03 01.02.02 MOVIMIENTO DE TIERRAS 1,736.22 01.02.02.01 EXCAVACION MASIVA MANUAL 12.45 12.45 12.45 01.02.02.02 EXCAVACION MANUAL BAJO AGUA 1,555.52 1,555.52 1,555.52 01.02.02.03 ACARREO DE MATERIAL EXCEDENTE 168.25 168.25 168.25 01.02.03 OBRAS DE CONCRETO SIMPLE 11.23 01.02.03.01 CONCRETO F'C=175 KG/CM2 PARA ANCLAJES Y/O DADOS 11.23 11.23 11.23 01.02.04 OBRAS DE CONCRETO ARMADO 10,191.25 01.02.04.01 CONCRETO F'C=210 KG/CM2 ADITIVADO EN CAISSON 5,039.52 5,039.52 5,039.52 01.02.04.02 ENCOFRADO Y DESENCOFRADO METALICO CIRCULAR PARA ANILLOS 443.82 443.82 443.82 01.02.04.03 MONTAJE DE ANILLOS DE CONCRETO CIRCULAR EN CAISSON 103.40 103.40 103.40 01.02.04.04 ENCOFRADO Y DESENCOFRADO TAPA EN CAISSON 72.64 72.64 72.64 01.02.04.05 ACERO DE REFUERZO FY=4200 KG/CM2 4,531.87 4,531.87 4,531.87 01.02.05 CARPINTERIA METALICA 1,703.26 01.02.05.01 FABRICACION DE ENCOFRADO METALICO CIRCULAR PARA ANILLOS 1,703.26 1,703.26 1,703.26 01.02.06 FILTROS 20.71 01.02.06.01 FILTRO DE MATERIAL SELECCIONADO D= 1" - 2" 9.21 9.21 9.21 01.02.06.02 FILTRO DE MATERIAL SELECCIONADO D= 3/4" 5.75 5.75 5.75 01.02.06.03 FILTRO DE MATERIAL SELECCIONADO D= 1/4" 5.75 5.75 5.75 01.02.07 VARIOS 1,727.10 01.02.07.01 SUMINISTRO Y COLOCACION DE ACCESORIOS CAPTACION TIPO CAISSON 1,542.29 1,542.29 1,542.29 01.02.07.02 TAPA METALICA DE INSPECCION DE 0.60 x 0.60 M 184.81 184.81 184.81 01.03 CASETA DE BOMBEO (01 UND) 86,357.17 01.03.01 TRABAJOS PRELIMINARES 17.75 01.03.01.01 LIMPIEZA DE TERRENO MANUAL 6.75 6.75 6.75 01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR 11.00 11.00 11.00 01.03.02 MOVIMIENTO DE TIERRAS 29.13 01.03.02.01 EXCAVACION MASIVA MANUAL 17.13 17.13 17.13 01.03.02.02 ACARREO DE MATERIAL EXCEDENTE 12.00 12.00 12.00 01.03.03 OBRAS DE CONCRETO SIMPLE 596.97 01.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% PG 167.52 167.52 167.52 01.03.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H + 25% PM 105.29 105.29 105.29 01.03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO 324.16 324.16 324.16 01.03.04 OBRAS DE CONCRETO ARMADO 2,439.83 01.03.04.01 CONCRETO F'C=175 KG/CM2 EN ZAPATAS 104.62 104.62 104.62 01.03.04.02 CONCRETO F'C=175 KG/CM2 EN COLUMNAS 144.73 144.73 144.73 01.03.04.03 CONCRETO F'C=175 KG/CM2 EN VIGAS Y LOSAS 668.61 668.61 668.61 01.03.04.04 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 26.21 26.21 26.21 01.03.04.05 ENCOFRADO Y DESENCOFRADO EN LOSAS Y VIGAS 582.18 582.18 582.18 01.03.04.06 ACERO DE REFUERZO FY=4200 KG/CM2 913.48 913.48 913.48

description

CRONOGRAMA VALORIZADO PARA UNA OBRA DE SANEAMIENTO

Transcript of CRONOGRAMA VALORIZADO

INFORME

CRONOGRAMA VALORIZADO DE OBRA

ITEMTAREAPARCIALMES 1MES 2MES 3MES 4MES 5MES 6MES 7TOTAL01SISTEMA DE AGUA POTABLE424,483.9001.01 TRABAJOS PRELIMINARES9,430.2801.01.01 CARTEL DE OBRA DE 3.60X2.40M INCLUYE COLOCACION1,000.001,000.001,000.00OK01.01.02 CAMPAMENTO PROVISIONAL DE OBRA8,430.288,430.288,430.28OK01.02 CAPTACION TIPO CAISSON (01 UND)15,393.0501.02.01 TRABAJOS PRELIMINARES3.2801.02.01.01 LIMPIEZA DE TERRENO MANUAL1.251.251.25OK01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR2.032.032.03OK01.02.02 MOVIMIENTO DE TIERRAS1,736.2201.02.02.01 EXCAVACION MASIVA MANUAL12.4512.4512.45OK01.02.02.02 EXCAVACION MANUAL BAJO AGUA1,555.521,555.521,555.52OK01.02.02.03 ACARREO DE MATERIAL EXCEDENTE168.25168.25168.25OK01.02.03 OBRAS DE CONCRETO SIMPLE11.2301.02.03.01 CONCRETO F'C=175 KG/CM2 PARA ANCLAJES Y/O DADOS11.2311.2311.23OK01.02.04 OBRAS DE CONCRETO ARMADO10,191.2501.02.04.01 CONCRETO F'C=210 KG/CM2 ADITIVADO EN CAISSON5,039.525,039.525,039.52OK01.02.04.02 ENCOFRADO Y DESENCOFRADO METALICO CIRCULAR PARA ANILLOS443.82443.82443.82OK01.02.04.03 MONTAJE DE ANILLOS DE CONCRETO CIRCULAR EN CAISSON103.40103.40103.40OK01.02.04.04 ENCOFRADO Y DESENCOFRADO TAPA EN CAISSON72.6472.6472.64OK01.02.04.05 ACERO DE REFUERZO FY=4200 KG/CM24,531.874,531.874,531.87OK01.02.05 CARPINTERIA METALICA1,703.2601.02.05.01 FABRICACION DE ENCOFRADO METALICO CIRCULAR PARA ANILLOS1,703.261,703.261,703.26OK01.02.06 FILTROS20.7101.02.06.01 FILTRO DE MATERIAL SELECCIONADO D= 1" - 2"9.219.219.21OK01.02.06.02 FILTRO DE MATERIAL SELECCIONADO D= 3/4"5.755.755.75OK01.02.06.03 FILTRO DE MATERIAL SELECCIONADO D= 1/4"5.755.755.75OK01.02.07 VARIOS1,727.1001.02.07.01 SUMINISTRO Y COLOCACION DE ACCESORIOS CAPTACION TIPO CAISSON1,542.291,542.291,542.29OK01.02.07.02 TAPA METALICA DE INSPECCION DE 0.60 x 0.60 M184.81184.81184.81OK01.03 CASETA DE BOMBEO (01 UND)86,357.1701.03.01 TRABAJOS PRELIMINARES17.7501.03.01.01 LIMPIEZA DE TERRENO MANUAL6.756.756.75OK01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR11.0011.0011.00OK01.03.02 MOVIMIENTO DE TIERRAS29.1301.03.02.01 EXCAVACION MASIVA MANUAL17.1317.1317.13OK01.03.02.02 ACARREO DE MATERIAL EXCEDENTE12.0012.0012.00OK01.03.03 OBRAS DE CONCRETO SIMPLE596.9701.03.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% PG167.52167.52167.52OK01.03.03.02 CONCRETO SOBRECIMIENTO DE 1:8 C:H + 25% PM105.29105.29105.29OK01.03.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO324.16324.16324.16OK01.03.04 OBRAS DE CONCRETO ARMADO2,439.8301.03.04.01 CONCRETO F'C=175 KG/CM2 EN ZAPATAS104.62104.62104.62OK01.03.04.02 CONCRETO F'C=175 KG/CM2 EN COLUMNAS144.73144.73144.73OK01.03.04.03 CONCRETO F'C=175 KG/CM2 EN VIGAS Y LOSAS668.61668.61668.61OK01.03.04.04 ENCOFRADO Y DESENCOFRADO EN COLUMNAS26.2126.2126.21OK01.03.04.05 ENCOFRADO Y DESENCOFRADO EN LOSAS Y VIGAS582.18582.18582.18OK01.03.04.06 ACERO DE REFUERZO FY=4200 KG/CM2913.48913.48913.48OK01.03.05 ALBAILERIA533.2701.03.05.01 MUROS DE BLOQUES DE CONCRETO BRUADO EXTERIOR (CARAVISTA)256.07256.07256.07OK01.03.05.02 ELABORACION DE BLOQUE DE CONCRETO277.20277.20277.20OK01.03.06 TARRAJEOS Y ACABADOS162.1001.03.06.01 TARRAJEO EN EXTERIORES, MORTERO C:A 1:5, E=1.5 CM.162.10162.10162.10OK01.03.07 PISOS Y PAVIMENTOS460.6501.03.07.01 PISO DE CEMENTO PULIDO E=10 CM460.65460.65460.65OK01.03.08 PINTURA136.3101.03.08.01 PINTURA EN EXTERIORES AL LATEX136.31136.31136.31OK01.03.09 INSTALACIONES ELECTRICAS844.5501.03.09.01 TABLERO GENERAL38.0838.0838.08OK01.03.09.02 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15A83.0872.6910.3983.08OK01.03.09.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 40A51.5451.5451.54OK01.03.09.04 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A77.0877.0877.08OK01.03.09.05 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3/4)62.0462.0462.04OK01.03.09.06 SALIDA TOMACORRIENTE C/AWG TW 4.0MM(12)+D PVC SEL 19MM(3/4)166.78166.78166.78OK01.03.09.07 POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR208.45208.45208.45OK01.03.09.08 CABLE ELECTRICO TW AWG NO. 12157.50157.50157.50OK01.03.10 EQUIPOS ELECTROMECANICOS5,131.8701.03.10.01 SUMINISTRO E INSTALACION DE ELECTROBOMBA DE 2 HP4,054.584,054.584,054.58OK01.03.10.02 SUMINISTRO E INSTALACION DE ACCESORIOS ELECTRO MECANICOS1,077.291,077.291,077.29OK01.03.11 INSTALACION ELECTRICA DE DISTRIBUCION PRIMARIA Y SUBESTACION75,633.8001.03.11.01 SUMINISTRO DE MATERIALES64,001.3064,001.3064,001.30OK01.03.11.02 MONTAJE ELECTROMECANICO8,432.438,432.438,432.43OK01.03.11.03 TRANSPORTE Y/O ACARREO3,200.073,200.073,200.07OK01.03.12 VARIOS370.9401.03.12.01 SUMINISTRO Y COLOCADO DE PUERTA METALICA199.16199.16199.16OK01.03.12.02 SUMINISTRO Y COLOCADO DE VENTANA METALICA DE 3/4" INC. VIDRIO36.9736.9736.97OK01.03.12.03 TAPA METALICA DE INSPECCION DE 0.40 x 0.40 M134.81134.81134.81OK01.04 LINEA DE IMPULSION (255.68 M.)3,730.1301.04.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS242.90242.90242.90OK01.04.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA519.99519.99519.99OK01.04.03 EXCAVACION MANUAL DE ZANJAS EN SUELO CONGLOMERADO416.02416.02416.02OK01.04.04 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6"79.2679.2679.26OK01.04.05 CAMA DE APOYO PARA TUBERIAS MENORES DE 6"86.9386.9386.93OK01.04.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/EQUIPO381.60381.60381.60OK01.04.07 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS241.67241.67241.67OK01.04.08 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-7.5 DE 1 1/2"1,334.651,334.651,334.65OK01.04.09 SUMINISTRO Y COLOCACION DE ACCESORIOS PVC LINEA DE IMPULSION2.102.102.10OK01.04.10 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA109.94109.94109.94OK01.04.11 CRUCE DE CARRETERA EN LINEA DE IMPULSION (01 UND)315.0701.04.11.01 TRABAJOS PRELIMINARES13.4001.04.11.01.01 LIMPIEZA DE TERRENO PRELIMINAR3.903.903.90OK01.04.11.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS9.509.509.50OK01.04.11.02 MOVIMIENTO DE TIERRAS73.0301.04.11.02.01 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA30.9030.9030.90OK01.04.11.02.02 CAMA DE APOYO PARA TUBERIAS MENORES DE 6"3.403.403.40OK01.04.11.02.03 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6"3.102.710.393.10OK01.04.11.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO35.6335.6335.63OK01.04.11.03 OBRAS DE CONCRETO SIMPLE55.2401.04.11.03.01 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS55.2455.2455.24OK01.04.11.04 SUMINISTRO E INSTALACION DE TUBERIAS82.8001.04.11.04.01 SUMINISTRO Y TENDIDO DE TUBERIA PVC HDPE DE 1 1/2"82.8082.8082.80OK01.04.11.05 SUMINISTRO Y COLOCACION DE ACCESORIOS90.6001.04.11.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS PARA TUBERIA HDPE90.6090.6090.60OK01.05 TANQUE ELEVADO H = 5.00m Y VOLUMEN 13M329,310.3701.05.01 TRABAJOS PRELIMINARES36.0101.05.01.01 LIMPIEZA DE TERRENO MANUAL13.7013.7013.70OK01.05.01.02 TRAZO Y REPLANTEO PRELIMINAR22.3119.522.7922.31OK01.05.02 MOVIMIENTO DE TIERRAS235.2901.05.02.01 EXCAVACION MANUAL PARA ZAPATAS113.38113.38113.38OK01.05.02.02 REFINE Y NIVELACION DE ZAPATAS2.372.372.37OK01.05.02.03 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/EQUIPO40.1840.1840.18OK01.05.02.04 ACARREO DE MATERIAL EXCEDENTE79.3679.3679.36OK01.05.03 OBRAS DE CONCRETO SIMPLE972.7801.05.03.01 CONCRETO PARA FALSA ZAPATA F'C=175 KG/CM2972.78972.78972.78OK01.05.04 OBRAS DE CONCRETO ARMADO17,773.8701.05.04.01 ZAPATAS1,545.5901.05.04.01.01 CONCRETO PARA ZAPATAS F'C=210 KG/CM21,056.511,056.511,056.51OK01.05.04.01.02 ACERO DE REFUERZO FY=4200 KG/CM2 EN ZAPATAS489.08489.08489.08OK01.05.04.02 COLUMNAS5,766.1401.05.04.02.01 CONCRETO PARA COLUMNAS F'C=210 KG/CM21,703.131,703.131,703.13OK01.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS1,440.971,440.971,440.97OK01.05.04.02.03 ACERO DE REFUERZO FY=4200 KG/CM2 EN COLUMNAS2,622.042,622.042,622.04OK01.05.04.03 VIGAS3,454.6201.05.04.03.01 CONCRETO PARA VIGAS F'C=210 KG/CM2832.67832.67832.67OK01.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS998.52998.52998.52OK01.05.04.03.03 ACERO DE REFUERZO FY=4200 KG/CM2 EN VIGAS1,623.431,623.431,623.43OK01.05.04.04 TANQUE ELEVADO7,007.5201.05.04.04.01 CONCRETO PARA TANQUE ELEVADO F'C=210 KG/CM22,690.072,690.072,690.07OK01.05.04.04.02 ENCOFRADO Y DESENCOFRADO TAPA TANQUE ELEVADO599.71599.71599.71OK01.05.04.04.03 ENCOFRADO Y DESENCOFRADO MUROS TANQUE ELEVADO1,493.361,493.361,493.36OK01.05.04.04.04 ACERO DE REFUERZO FY=4200 KG/CM22,224.382,224.382,224.38OK01.05.05 REVOQUES Y ENLUCIDOS1,210.2201.05.05.01 TARRAJEO EN INTERIORES C/IMPERMEABILIZANTE C:A 1:5, E=1.5 CM.331.47331.47331.47OK01.05.05.02 TARRAJEO EN EXTERIORES, MORTERO C:A 1:5, E=1.5 CM.878.75645.33233.42878.75OK01.05.06 PINTURA661.4401.05.06.01 PINTURA EN EXTERIORES AL LATEX661.44661.44661.44OK01.05.07 CARPINTERIA METALICA1,439.6101.05.07.01 SUMINISTRO Y COLOCADO DE ESCALERA DE FIERRO GALVANIZADO EN TANQUE ELEVADO1,256.651,256.651,256.65OK01.05.07.02 TAPA SANITARIA METALICA 0.60 x 0.60 M.182.96182.96182.96OK01.05.08 VARIOS6,981.1501.05.08.01 SUMINISTRO Y COLOCACION DE ACCESORIOS EN TANQUE ELEVADO4,352.334,352.334,352.33OK01.05.08.02 SUMINISTRO Y COLOCACION DE HIPOCLORADOR POR GOTEO2,511.332,511.332,511.33OK01.05.08.03 SUMINISTRO Y COLOCACION TUB. VENT. FG DE 2"62.7962.7962.79OK01.05.08.04 PRUEBA HIDRAULICA Y DESINFECCION, RESERVORIO54.7054.7054.70OK01.06 RED DE DISTRIBUCION (12 697.55 M.)136,669.7501.06.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS12,062.6712,062.6712,062.67OK01.06.02 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL34,156.4117,001.9617,154.4534,156.41OK01.06.03 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6"3,936.24863.96960.81929.82960.81220.833,936.24OK01.06.04 CAMA DE APOYO PARA TUBERIAS MENORES DE 6"4,317.17947.571,053.801,019.801,053.80242.204,317.17OK01.06.05 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/EQUIPO18,951.118,167.368,485.572,298.1818,951.11OK01.06.06 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-10 DE 3/4"15,592.6415,592.6415,592.64OK01.06.07 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-10 DE 1"15,871.726,062.129,809.6015,871.72OK01.06.08 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-7.5 DE 1 1/2"7,757.027,757.027,757.02OK01.06.09 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-7.5 DE 2"11,052.6711,052.6711,052.67OK01.06.10 SUMINISTRO Y COLOCACION DE ACCESORIOS PVC RED DE DISTRIBUCION1,385.821,385.821,385.82OK01.06.11 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA5,459.952,004.833,455.125,459.95OK01.06.12 CRUCE DE CARRETERA (10 UND)2,811.7801.06.12.01 TRABAJOS PRELIMINARES134.0001.06.12.01.01 LIMPIEZA DE TERRENO PRELIMINAR39.0039.0039.00OK01.06.12.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS95.0095.0095.00OK01.06.12.02 MOVIMIENTO DE TIERRAS730.3001.06.12.02.01 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA309.00309.00309.00OK01.06.12.02.02 CAMA DE APOYO PARA TUBERIAS MENORES DE 6"34.0034.0034.00OK01.06.12.02.03 REFINE, NIVELACION Y FONDOS TUBERIA HASTA 6"31.0031.0031.00OK01.06.12.02.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO356.30356.30356.30OK01.06.12.03 OBRAS DE CONCRETO SIMPLE552.3801.06.12.03.01 CONCRETO F'C=140 KG/CM2 PARA ANCLAJES Y/O DADOS552.38552.38552.38OK01.06.12.04 SUMINISTRO E INSTALACION DE TUBERIAS489.1001.06.12.04.01 SUMINISTRO Y TENDIDO DE TUBERIA PVC HDPE DE 2"116.20116.20116.20OK01.06.12.04.02 SUMINISTRO Y TENDIDO DE TUBERIA PVC HDPE DE 1"53.7053.7053.70OK01.06.12.04.03 SUMINISTRO Y TENDIDO DE TUBERIA PVC HDPE DE 3/4"319.20319.20319.20OK01.06.12.05 SUMINISTRO Y COLOCACION DE ACCESORIOS906.0001.06.12.05.01 SUMINISTRO Y COLOCACION DE ACCESORIOS PARA TUBERIA HDPE906.00622.87283.13906.00OK01.06.13 VALVULAS DE CONTROL (03 UND)1,792.2901.06.13.01 LIMPIEZA DE TERRENO MANUAL0.470.470.47OK01.06.13.02 TRAZO Y REPLANTEO PRELIMINAR0.760.760.76OK01.06.13.03 EXCAVACION MASIVA MANUAL3.363.363.36OK01.06.13.04 REFINE Y NIVELACION EN TERRENO NORMAL0.260.260.26OK01.06.13.05 ACARREO DE MATERIAL EXCEDENTE2.322.322.32OK01.06.13.06 CONCRETO F'C=175 KG/CM2 C/ACELERANTE S/EQUIPO134.75134.75134.75OK01.06.13.07 ENCOFRADO Y DESENCOFRADO MUROS190.35190.35190.35OK01.06.13.08 TARRAJEO EN INTERIORES C/IMPERMEABILIZANTE C:A 1:5, E=1.5 CM.17.9617.9617.96OK01.06.13.09 TARRAJEO EN EXTERIORES, MORTERO C:A 1:5, E=1.5 CM.30.1530.1530.15OK01.06.13.10 SUMINISTRO Y COLOCACION DE ACCES. VALVULA CONTROL D= 2"572.68572.68572.68OK01.06.13.11 SUMINISTRO Y COLOCACION DE ACCES. VALVULA CONTROL D= 1 1/2"268.88268.88268.88OK01.06.13.12 SUMINISTRO Y COLOCACION DE ACCES. VALVULA CONTROL D= 1"143.68143.68143.68OK01.06.13.13 PINTURA EN EXTERIORES AL LATEX21.4521.4521.45OK01.06.13.14 TAPA METALICA DE INSPECCION DE 0.40 x 0.40 M404.43404.43404.43OK01.06.13.15 FILTRO DE GRAVA0.790.790.79OK01.06.14 VALVULAS DE PURGA - LIMPIA (04 UND)1,522.2601.06.14.01 LIMPIEZA DE TERRENO MANUAL0.840.840.84OK01.06.14.02 TRAZO Y REPLANTEO PRELIMINAR1.371.371.37OK01.06.14.03 EXCAVACION MASIVA MANUAL4.864.864.86OK01.06.14.04 REFINE Y NIVELACION EN TERRENO NORMAL0.480.480.48OK01.06.14.05 ACARREO DE MATERIAL EXCEDENTE3.403.403.40OK01.06.14.06 CONCRETO F'C=175 KG/CM2 C/ACELERANTE S/EQUIPO220.84220.84220.84OK01.06.14.07 ENCOFRADO Y DESENCOFRADO MUROS241.94241.94241.94OK01.06.14.08 TARRAJEO EN INTERIORES C/IMPERMEABILIZANTE C:A 1:5, E=1.5 CM.23.9423.9423.94OK01.06.14.09 TARRAJEO EN EXTERIORES, MORTERO C:A 1:5, E=1.5 CM.40.2040.2040.20OK01.06.14.10 SUMINISTRO Y COLOCACION DE ACCESORIOS VALV. PURGA D= 1", TIPO I130.54130.54130.54OK01.06.14.11 SUMINISTRO Y COLOCACION DE ACCESORIOS VALV. PURGA D= 3/4", TIPO I280.02280.02280.02OK01.06.14.12 PINTURA EN EXTERIORES AL LATEX33.8033.8033.80OK01.06.14.13 TAPA METALICA DE INSPECCION DE 0.40 x 0.40 M539.24539.24539.24OK01.06.14.14 FILTRO DE GRAVA0.790.790.79OK01.07 CONEXIONES DOMICILIARIAS DE AGUA39,219.6901.07.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS2,465.252,465.252,465.25OK01.07.02 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA8,018.551,094.843,824.233,099.488,018.55OK01.07.03 CAMA DE APOYO PARA TUBERIAS MENORES DE 6"882.3029.69852.61882.30OK01.07.04 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/EQUIPO3,098.4361.622,112.56924.253,098.43OK01.07.05 SUMINISTRO Y TENDIDO DE TUBERIA PVC SAP C-10 DE 1/2"6,020.40478.905,541.506,020.40OK01.07.06 SUMINISTRO Y COLOCACION DE ACCESORIOS DE EMPALME CONEX. DOMICIL.2,327.322,327.322,327.32OK01.07.07 SUMINISTRO Y COLOCACION DE ACCESORIOS DE VALVULA DE CONTROL DE 1/2"16,407.449,591.116,816.3316,407.44OK01.08 PILETAS DOMICILIARIAS74,502.4601.08.01 PILETA DOMICILIARIA74,502.4629,934.0244,568.4474,502.46OK01.09 FLETES29,871.0001.09.01 FLETE TERRESTRE19,503.0019,503.0019,503.00OK01.09.02 FLETE TERRESTRE LOCAL (RURAL)10,368.0010,368.0010,368.00OK02ELIMINACION DE EXCRETAS645,079.7102.01 UNIDADES BASICAS DE SANEAMIENTO - VIVIENDAS (166 UBS) CON SECOS ECOLOGICOS645,079.7102.01.01 TRABAJOS PRELIMINARES5,135.4802.01.01.01 LIMPIEZA DE TERRENO MANUAL944.81944.81944.81OK02.01.01.02 TRAZO Y REPLANTEO SIN EQUIPO4,190.674,190.674,190.67OK02.01.02 MOVIMIENTO DE TIERRAS11,289.0002.01.02.01 EXCAVACION MANUAL PARA CIMIENTO3,090.941,689.411,401.533,090.94OK02.01.02.02 EXCAVACION DE ZANJAS PARA TUBERIA PVC SAL 2" (HASTA POZO PERCOLADOR)2,194.29861.49958.07374.732,194.29OK02.01.02.03 ELIMINACION MATERIAL EXCEDENTE MANUAL6,003.772,020.502,863.341,119.936,003.77OK02.01.03 OBRAS DE CONCRETO SIMPLE84,820.8002.01.03.01 SOLADO DE CONCRETO E=4" MEZCLA 1:10 C.H.13,120.0613,120.0613,120.06OK02.01.03.02 CONCRETO F'C=100 kg/cm256,713.5522,929.1126,584.487,199.9656,713.55OK02.01.03.03 ENCOFRADO Y DESENCOFRADO MUROS (2 CARAS)14,987.199,018.455,968.7414,987.19OK02.01.04 OBRAS DE CONCRETO ARMADO172,407.5802.01.04.01 CONCRETO F'C=175 KG/CM2121,321.8654,124.1962,752.694,444.98121,321.86OK02.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS (2 CARAS)25,141.1225,141.1225,141.12OK02.01.04.03 ACERO DE REFUERZO FY=4200 KG/CM225,944.6025,819.87124.7325,944.60OK02.01.05 MUROS DE BLOQUES DE CONCRETO DE .15x.20x.40 CM43,008.5302.01.05.01 MUROS DE BLOQUES DE CONCRETO BRUADO EXTERIOR (CARAVISTA)20,698.135,885.326,823.567,051.01938.2420,698.13OK02.01.05.02 ELABORACION DE BLOQUE DE CONCRETO22,310.409,282.1310,322.722,705.5522,310.40OK02.01.06 REVOQUES ENLUCIDOS Y MOLDURAS75,447.6802.01.06.01 TARRAJEO EN INTERIORES C/IMPERMEABILIZANTE C:A 1:5, E=1.5 CM.48,785.7610,976.8012,726.7213,150.9411,931.3048,785.76OK02.01.06.02 TARRAJEO EN EXTERIORES, MORTERO C:A 1:5, E=1.5 CM.25,612.275,970.436,922.247,152.985,566.6325,612.27OK02.01.06.03 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS1,049.651,049.651,049.65OK02.01.07 PISOS Y PAVIMENTOS6,167.0202.01.07.01 PISO DE CEMENTO COLOREADO Y PULIDO E=8.25 CM6,167.025,662.98504.046,167.02OK02.01.08 PINTURA21,536.8402.01.08.01 PINTURA EN EXTERIORES AL LATEX21,536.84336.5111,922.189,278.1521,536.84OK02.01.09 CARPINTERIA DE MADERA36,274.3202.01.09.01 VIGA DE MADERA DE 2" x 3" x 2.05M19,501.6816,522.262,979.4219,501.68OK02.01.09.02 CORREAS DE MADERA 2"x2"x3.15M.16,772.6412,702.814,069.8316,772.64OK02.01.10 COBERTURA36,525.2802.01.10.01 COBERTURA CON PLANCHA ONDULINE CLASIC36,525.2830,247.506,277.7836,525.28OK02.01.11 INSTALACIONES SANITARIAS74,391.2402.01.11.01 SUMINISTRO E INSTALACION DE ACCESORIOS EN BAO ECOLOGICO74,391.2463,177.8511,213.3974,391.24OK02.01.12 INSTALACIONES ELECTRICAS5,678.8602.01.12.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 16MM(5/8)5,678.865,678.865,678.86OK02.01.13 VARIOS39,197.5802.01.13.01 SUMINISTRO Y COLOCADO DE PUERTA METALICA33,060.5610,921.7922,138.7733,060.56OK02.01.13.02 SUMINISTRO Y COLOCADO DE VENTANA METALICA DE 3/4" INC. VIDRIO6,137.026,137.026,137.02OK02.01.14 ZANJAS DE PERCOLACION33,199.5002.01.14.01 LIMPIEZA DE TERRENO MANUAL308.76308.76308.76OK02.01.14.02 TRAZO Y REPLANTEO SIN EQUIPO1,369.501,369.501,369.50OK02.01.14.03 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA1,282.35454.17828.181,282.35OK02.01.14.04 RELLENO CON FILTRO DE GRAVA2,958.122,958.122,958.12OK02.01.14.05 RELLENO CON MATERIAL PROPIO SELECCIONADO S/EQUIPO290.83290.83290.83OK02.01.14.06 SUMINISTRO Y COLOCACION DE ACCESORIOS26,989.9412,601.9214,388.0226,989.94OK03CAPACITACION SOCIAL28,330.4003.01 ACCIONES PARA CAPACITACION SOCIAL28,330.405,372.185,974.445,781.715,974.445,227.6328,330.40OK

TOTAL121,844.78287,524.07301,085.43255,600.45131,839.280.00.01,097,894.01

MESME+S 0ME+S 1ME+S 2ME+S 3ME+S 4ME+S 5ME+S 6ME+S 7TOTALMONTO121,844.78287,524.07301,085.43255,600.45131,839.280.00.01,097,894.01% DE AVACE0.00%11.10%26.19%27.42%23.28%12.01%0.00%0.00%100.00%CURVA "S"121,844.78409,368.85710,454.28966,054.731,097,894.011,097,894.0101,097,894.010% DE AVACE ACUMULADO0.00%11.10%37.29%64.71%87.99%100.00%100.00%100.00%

&"Comic Sans MS,Normal"&U&K04-049CRONOGRAMA VALORIZADO DE OBRA&"Comic Sans MS,Normal"&U&K04-049Pgina: &P de &N