CUBICACION BOCATOMA
Hormigon (m3) Enrocado (m3) Emplantillado (m3) Adoquinado (m2) Escarpe (m3)446.84 262.60 14.48 52.24 155.05
CUBICACION ABOVEDADOS
km Hormigon (m3) Emplantillado (m3) Excavacion (m3) Rellenos (m3)2,171.96 72.23 4.99 1,239.06 253.023,355.78 54.69 3.99 948.43 190.104,954.04 77.97 4.81 1,334.23 273.625,630.81 83.79 5.18 1,430.68 294.506,073.01 63.42 3.83 1,093.10 221.42TOTAL 352.11 22.80 6,045.49 1,232.65
relleno estructural
exc. Abovedados1239.061
948.4251334.2251430.675
1093.1
![Page 2: Cubicacion_bocatoma_abovedados 23532](https://reader036.fdocuments.es/reader036/viewer/2022082708/563db98a550346aa9a9e4cae/html5/thumbnails/2.jpg)
Excavacion* (m3) Relleno estructural (m3) Acero (kg)421.67 31,278.79
*Se asume excavacion 50% en suelo comun y 50% en roca para el presupuestoAcero 70kg/m3
relleno estructural relleno abovedados89.239924 253.02 33.04 23.06
2.7049 190.10 241.69884 273.62 36
109.446792 294.50 3972.77 221.42 28.5
145.81421.670456
exc. Abovedados38.54 33.04
29.5 2441.5 3644.5 39
34 28.5