Desagregado de Gastos Agosto Parchado de Vias

of 70 /70
DESAGREGADO DEL PRESUPUESTO ANALÍTICO COSTO DIRECTO RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 01 JORNAL BASICO DEL EMPLEADO EVENTUAL CARGO UNID. P.U. CANTIDAD SUB TOTAL OPERARIO hh 13.58 348.6277 4,738.78 PEON hh 10.64 3,671.8979 39,084.91 TOTAL 43,823.68 MATERIALES DE CONSTRUCCION 01 MATERIALES DE CONSTRUCCION DESCRIPCION UNIDAD CANT P.U. TOTAL ALAMBRE NEGRO RECOCIDO # 16 kg 539.451 5.50 2,966.98 ALAMBRE NEGRO RECOCIDO # 8 kg 55.929 5.50 307.61 CLAVOS PARA MADERA C/C 3" kg 461.1621 5.50 2,536.39 CLAVOS PARA MADERA C/C 4" kg 67.1148 5.50 369.13 ACERO DE REFUERZO FY=4200 GRADO 60 kg 7552.314 3.60 27,188.33 ARENA FINA m3 12.6 80.00 1,008.00 PIEDRA CHANCADA DE 3/4" m3 91.6344 65.00 5,956.24 ARENA GRUESA m3 70.785 65.00 4,601.03 PIEDRA MEDIANA m3 398.9074 35.00 13,961.76 PIEDRA GRANDE m3 570.9 35.00 19,981.50 ASFALTO RC-250 gln 78.75 25.00 1,968.75 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3596.39 21.50 77,322.39 YESO QQ 108.9775 6.50 708.35 CORDEL m 3269.34 0.50 1,634.67 MITIGACION DE IMPACTO AMBIENTAL m2 1 3,000.00 3,000.00 FLETE TERRESTRE GLB 1 4,441.40 4,441.40 MOVILIZACION Y DESMOVILIZACION DE EQUIPO (TRANSPORTADO) GLB 1 4,680.00 4,680.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO (AUTOPROPULSADO) GLB 1 1,600.00 1,600.00 HORMIGON m3 436.602 65.00 28,379.13 CARTEL DE OBRA INC.INSTALACION Y TRANSP GLB 1 795.10 795.10 MADERA NACIONAL P/ENCOFRADO-CARP p2 3579.456 2.50 8,948.64 ESTACA DE MADERA p2 544.8919 1.85 1,008.05 PINTURA ESMALTE gln 25.8 35.00 903.00 TUBERIA PVC UF S-25 Ø=8" (INC/ANILLO) m 682.5 31.75 21,669.38 TOTAL 235,935.82 BIENES DE CONSUMO S/. DESCRIPCION UND CANTIDAD P.U. TOTAL HERRAMIENTAS MANUALES %MO 1.0000 3,706.91 3,706.91 TOTAL 3,706.91 ALQUILER DE BIENES INMUEBLES S/. DESCRIPCION UND. CANT P.U TOTAL MIRAS Y JALONES hm 206.4000 4.50 928.80 CAMION VOLQUETE 210-280 HP 12 M3 hm 373.6119 294.82 110,148.26 COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 309.1625 15.00 4,637.44 CARGADOR S/LLANTAS 160-195 HP hm 271.0080 216.73 58,735.56 TRACTOR DE ORUGAS DE 190-240 HP hm 591.1829 216.43 127,949.72 MOTONIVELADORA DE 180-200 HP hm 642.8414 188.91 121,439.17 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 hm 540.22 30.00 16,206.71 TEODOLITO hm 233.92 7.50 1,754.39 TOTAL 441,800.04 COSTO DIRECTO TOTAL S/.

Embed Size (px)

Transcript of Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALTICO COSTO DIRECTORETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO01 JORNAL BASICO DEL EMPLEADO EVENTUAL CARGO OPERARIO PEON TOTAL UNID. hh hh P.U.13.58 10.64

S/.

43,823.68

CANTIDAD348.6277 3,671.8979

SUB TOTAL 4,738.78 39,084.91 43,823.68

MATERIALES DE CONSTRUCCION01 MATERIALES DE CONSTRUCCION DESCRIPCION ALAMBRE NEGRO RECOCIDO # 16 ALAMBRE NEGRO RECOCIDO # 8 CLAVOS PARA MADERA C/C 3" CLAVOS PARA MADERA C/C 4" ACERO DE REFUERZO FY=4200 GRADO 60 ARENA FINA PIEDRA CHANCADA DE 3/4" ARENA GRUESA PIEDRA MEDIANA PIEDRA GRANDE ASFALTO RC-250 CEMENTO PORTLAND TIPO I (42.5KG) YESO CORDEL MITIGACION DE IMPACTO AMBIENTAL FLETE TERRESTRE MOVILIZACION Y DESMOVILIZACION DE EQUIPO (TRANSPORTADO) MOVILIZACION Y DESMOVILIZACION DE EQUIPO (AUTOPROPULSADO) HORMIGON CARTEL DE OBRA INC.INSTALACION Y TRANSP MADERA NACIONAL P/ENCOFRADO-CARP ESTACA DE MADERA PINTURA ESMALTE TUBERIA PVC UF S-25 =8" (INC/ANILLO) TOTAL UNIDAD kg kg kg kg kg m3 m3 m3 m3 m3 gln BOL QQ m m2 GLB GLB GLB m3 GLB p2 p2 gln m CANT 539.451 55.929 461.1621 67.1148 7552.314 12.6 91.6344 70.785 398.9074 570.9 78.75 3596.39 108.9775 3269.34 1 1 1 1 436.602 1 3579.456 544.8919 25.8 682.5 P.U. 5.50 5.50 5.50 5.50 3.60 80.00 65.00 65.00 35.00 35.00 25.00 21.50 6.50 0.50 3,000.00 4,441.40 4,680.00 1,600.00 65.00 795.10 2.50 1.85 35.00 31.75 TOTAL 2,966.98 307.61 2,536.39 369.13 27,188.33 1,008.00 5,956.24 4,601.03 13,961.76 19,981.50 1,968.75 77,322.39 708.35 1,634.67 3,000.00 4,441.40 4,680.00 1,600.00 28,379.13 795.10 8,948.64 1,008.05 903.00 21,669.38 235,935.82

BIENES DE CONSUMODESCRIPCION HERRAMIENTAS MANUALES TOTAL UND %MO CANTIDAD 1.0000 P.U. 3,706.91 TOTAL

S/.

3,706.91

3,706.91 3,706.91

ALQUILER DE BIENES INMUEBLESDESCRIPCION MIRAS Y JALONES CAMION VOLQUETE 210-280 HP 12 M3 COMPACTADOR VIBR. TIPO PLANCHA 4 HP CARGADOR S/LLANTAS 160-195 HP TRACTOR DE ORUGAS DE 190-240 HP MOTONIVELADORA DE 180-200 HP MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 TEODOLITO TOTAL UND. hm hm hm hm hm hm hm hm CANT 206.4000 373.6119 309.1625 271.0080 591.1829 642.8414 540.22 233.92 P.U 4.50 294.82 15.00 216.73 216.43 188.91 30.00 7.50 TOTAL

S/. 441,800.04

928.80 110,148.26 4,637.44 58,735.56 127,949.72 121,439.17 16,206.71 1,754.39 441,800.04

COSTO DIRECTO TOTAL

S/.

860,159.26

RELACIN DE INSUMOS KERAPATA COSTO DIRECTOMATERIALES DE CONSTRUCCIONN 1 2 4 5 6 8 9 10 11 12 13 14 15 DESCRIPCION FIERRO CORRUGADO DE 1/2" FIERRO CORRUGADO DE 3/8" GRIFO CONTRAINCENDIO TIPO POSTE 2 BOCAS INC. ACCESORIOS (CON REVESTIMIENTO DE PINTURA EPXICA) ALAMBRE GALVANISADO # 8 ALAMBRE NEGRO # 16 ALAMBRE NEGRO RECOCIDO # 8 CLAVOS PARA MADERA C/C 2" CLAVOS PARA MADERA C/C 3" CLAVOS PARA MADERA C/C 2" - 4" ARENA FINA PIEDRA CHANCADA DE 1/2" PIEDRA CHANCADA DE 3/4" PIEDRA GRANDE DE 8" PIEDRA MEDIANA DE 4" PIEDRA MEDIANA DE 6" ARENA GRUESA CABLE TW # 14 AWG CACHIMBA PVC ISO 4435 DN=200 MM A 110 MM X 45 INC. CODO 45 LADRILLO K.K. DE ARCILLA 9X14X24 CM CEMENTO PORTLAND TIPO I (42.5KG) CAJA DE CONCRETO P/MEDIDOR 1/2" - 3/4" CINTA TEFLON PEGAMENTO P/TUBO PVC ADITIVO IMPERMEABILIZANTE EN POLVO CINTA PLASTICA P/SEAL DE SEGURIDAD OBRA YESO DE 28 Kg PLACA RECORDATORIA ACRILICA HORMIGON AGUA HIPOCLORITO DE CALCIO AL 70% CARTEL DE OBRA INC.INSTALACION Y TRANSP MADERA PARA ENCOFRADO Y CARPINTERIA ESTACA DE MADERA CAJA DE DESAGUE DE 12"X24" MARCO Y TAPA F.FDO. P/REGISTRO VALVULA MARCO Y TAPA P/BUZON FF D=0.60 M DE 125 KG. MARCO Y TAPA FF DESAGUE 23" X 11" LIV. CONEX. DOMICILIARIA PINTURA ESMALTE MARCO Y TAPA FO. GO. P/MEDIDOR 1/2"-3/4" TUBO CSN UF CLASE 1 ESPIGA CAMPANA DN 200MM. ABRAZADERA P/ CONEXION DE AGUA PVC SAP 1/2" x 90MM ABRAZADERA P/ CONEXION DE AGUA PVC SAP 1/2" x 63MM TUBERIA PVC UF ISO 4422 90 MM INC. ANILLO TUBERIA PVC UF ISO 4422 63 MM INC. ANILLO TUBERIA PVC UF ISO 4435 DN 110MM INC. C/ANILLO TUBERIA PVC UF ISO 4435 DN 200MM INC. C/ANILLO TUBERIA PVC SAP A-10 DE 1/2" TAPON PVC UF ISO 4422 DN 63MM TEE PVC UF ISO 4422 DN 63MM C/ANILLO CRUZ PVC UF ISO 4422 DN 90MM C/ANILLO TEE PVC UF ISO 4422 DN 110MM X 63MM C/ANILLO TEE PVC UF ISO 4422 DN 110MM X 90MM C/ANILLO TEE PVC UF ISO 4422 DN 90MM C/ANILLO CODO PVC UF DE 90 ISO 4422 DN 90MM C/ANILLO CODO PVC UF DE 45 ISO 4422 DN 90MM C/ANILLO TAPON PVC UF ISO 4422 DN 90MM REDUCCION PVC UF ISO 4422 DN 90MM x 63MM TEE PVC UF ISO 4422 DN 90MM X 63MM C/ANILLO CRUZ PVC UF ISO 4422 DN 90MM X 63MM C/ANILLO UNION UNIVERSAL PVC SAP DE 1/2" CURVA PVC 1/2" P/AGUA NIPLE STANDAR PVC SAP 1/2"X 1 1/2" LLAVE PASO RT-NIPLE-TUERCA-EMPAQ. 1/2" NIPLE PVC 7.5 X 3/4"-REEMP MEDIDOR 1/2" CODO PVC SAP (AGUA) CON ROSCA 1/2"X 45 LLAVE DE TOMA CORPORATION PVC SAP DE 1/2" TUERCA Y NIPLE VALVULA COMPUERTA FF TIPO MAZZA ISO 4422 DN 90MM C-7.5 INC/ACCESORIOS VALVULA COMPUERTA FF TIPO MAZZA ISO 4422 DN 63MM C-7.5 INC/ACCESORIOS UNIDAD Varilla Varilla pza gln kg kg kg kg kg m3 m3 m3 m4 m3 m3 m3 m3 und und BOL und pza gln kg m BOL und m3 m3 kg GLB p2 p2 und und pza pza gln und und pza pza und und und und und pza pza pza pza pza pza pza pza pza pza pza pza und und pza und und pza pza und und CANT 72 67 3 152 75 237 59 157 5 80 30 36 25 56 0 123 300 300 188 1,064 300 48 7 70 315 30 1 16 400 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 P.U. 26.50 16.00 800.00 36.40 8.00 6.00 6.00 6.00 6.00 75.00 75.00 75.00 55.00 55.00 60.00 75.00 1.20 46.00 1.30 23.50 25.00 2.00 83.38 25.00 1.00 6.00 800.00 60.00 5.00 20.00 700.00 4.00 4.00 30.00 35.00 430.00 35.00 35.00 35.00 60.00 12.00 10.00 69.72 36.12 78.00 191.22 15.00 15.00 38.23 69.48 85.00 85.00 61.86 47.25 42.97 36.66 27.97 61.86 69.48 2.50 2.00 1.00 5.00 1.00 1.00 5.00 240.00 180.00 TOTAL 1,908.00 1,072.00 2,400.00 5,532.80 600.00 1,422.00 354.00 942.00 30.00 6,000.00 2,250.00 2,700.00 1,375.00 3,080.00 0.00 9,225.00 360.00 13,800.00 244.40 25,004.00 7,500.00 96.00 583.66 1,750.00 315.00 180.00 800.00 960.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

TOTAL

S/.

96,061.86

COMBUSTIBLES , CARBURANTES Y LUBRICANTESN 1 2 DESCRIPCION GASOLINA 84 OCTANOS PETROLEO DIESSEL N 02 TOTAL GASTOS GENERALES DESCRIPCIN GASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) TOTAL GASTOS DE SUPERVISIN DESCRIPCIN GASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) TOTAL UND. GLN CANTIDAD 0.00 P.U. 12.50 SUB TOTAL 0.00 0.00 UND. GLN CANTIDAD 0.00 P.U. 12.50 SUB TOTAL 0.00 0.00 UND gln gln CANTIDAD 80.00 20.00 P.U. 12.50 12.50 TOTAL 1,000.00 250.00

1,250.00

DESAGREGADO DEL PRESUPUESTO ANALTICO GASTOS GENERALESRETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO SERVICIOS NO PERSONALESCOEF. CARGO RESIDENTE DE OBRA ASISTENTE TECNICO ASISTENTE ADMINISTRATIVO TOTAL NRO MESES 3.00 3.00 3.00 INCIDENCIA 0.50 1.00 1.00 MONTO 6,250.00 1,500.00 1,400.00 SUB TOTAL 9,375.00 4,500.00 4,200.00 18,075.00

S/.

18,075.00

COMBUSTIBLES , CARBURANTES Y LUBRICANTESDESCRIPCIN GASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) TOTAL UND. GLN CANTIDAD 0.00 P.U. 15.00

S/.SUB TOTAL 0.00 0.00

0.00

MATERIALES DE CONSUMOIMPLEMENTOS DE SEGURIDAD DESCRIPCIN BOTAS DE JEBE LENTES CINTAS DE SEGURIDAD ZAPATO DE SEGURIDAD CATT CHALECOS CORTA VIENTO CASCO DE PROTECCION VARIOS VESTUARIOS TOTAL UND. PAR UNID. KG PAR UNID. UNID. GLB CANTIDAD 10.00 20.00 1.00 1.00 4.00 10.00 7.00 P.U. 25.00 3.00 50.00 230.00 50.00 12.00 55.00

S/.

1,295.00

SUB TOTAL 250.00 60.00 50.00 230.00 200.00 120.00 385.00 1,295.00

MEDICAMENTOSDESCRIPCIN BOTIQUIN DE PRIMEROS AUXILIOS TOTAL UND. GLB CANTIDAD 1.00 P.U. 100.00

S/.SUB TOTAL 100.00 100.00

100.00

BIENES DE CONSUMODESCRIPCIN LECHE EN TARRO (DESINTOXICACION) TOTAL UND. CAJA CANTIDAD 3.00 P.U. 140.00

S/.SUB TOTAL 420.00 420.00

420.00

EQUIPAMIENTO DE BIENES INMUEBLESDESCRIPCIN ALQUILER ALMACEN- RESIDENCIA TOTAL UND. MES CANTIDAD 3.00 P.U. 100.00

S/.SUB TOTAL 300.00 300.00

300.00

OTROS SERVICIOS DE TERCEROSDESCRIPCIN SERVICIO DE FOTOCOPIADO TOTAL UND. UNID CANTIDAD 1.00 P.U. 150.00

S/.SUB TOTAL 150.00 150.00

150.00

MATERIALES DE ESCRITORIOMATERIALES DE ESCRITORIO DESCRIPCIN CUADERNO DE OBRA ENGRAMPADOR PERFORADOR LAPICEROS TINTA ARCHIVADORES DE LOMO ANCHO TIPO OFICIO AGENDA DE NOTAS CUADERNO ESPIRAL DE 200HOJAS A4 ESPIRALES VARIOS TAMAOS MICAS DE COLOR VARIOS PAQUETE DE POSSIT PARTES DIARIOS PEGAMENTO EN BARRA UHU RESALTADOR SELLO TARJETAS DE CONTROL VISIBLE TARJETAS DE SALIDA DE MATERIALES PAPEL BOND 80GR VARIOS UTILES DE ESCRITORIO UND. UNID UNID UNID UNID UNID UNID UNID UNID MILLAR PAQUETE TALON UNID UNID UNID MILLAR MILLAR MILLAR GLB CANTIDAD 3.00 1.00 1.00 10.00 4.00 3.00 3.00 20.00 0.30 2.00 3.00 3.00 2.00 3.00 0.40 0.40 0.50 1.00 P.U. 20.00 10.00 10.00 2.00 10.00 5.00 9.00 1.60 85.00 18.00 10.00 5.00 3.00 15.00 80.00 140.00 27.00 53.82

S/.

526.82

SUB TOTAL 60.00 10.00 10.00 20.00 40.00 15.00 27.00 32.00 25.50 36.00 30.00 15.00 6.00 45.00 32.00 56.00 13.50 53.82 526.82

TOTAL GASTOS GENERALES

S/.

20,866.82

DESAGREGADO DEL PRESUPUESTO ANALTICO 0MATERIALES DE CONSUMO01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES DESCRIPCIN GASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) TOTAL UND. GLN CANTIDAD 0.00 P.U. 12.50 SUB TOTAL 0.00 0.00

S/.

0.00

SERVICIOS NO PERSONALESSERVICIOS NO PERSONALES CARGO 01 INGENIERO SUPERVISOR DE OBRA COEF. INCIDENCIA 1.00 TOTAL MESES 4.00 MONTO x MES 3,000.00

S/.

0.00

SUB TOTAL 0.00 0.00

IMPLEMENTOS DE SEGURIDAD DESCRIPCIN CASCOS DE PROTECCIN 3M ZAPATOS PUNTA DE ACERO LENTES DE PROTECCIN PERSONAL TCNICO CHALECOS CON CINTAS REFLECTANTES PERSONAL TCNICO UND. UND PAR UND UND CANTIDAD 1.00 1.00 1.00 1.00 P.U. 40.00 280.00 35.00 40.00 SUB TOTAL 40.00 280.00 35.00 40.00 0.00

S/. OTROS SERVICIOS DE TERCEROS-PERSONAS NATURALES Y JURIDICASDESCRIPCION REVELADO DE FOTOGRAFIAS TOTAL CANT RLLO CANT 0.00 MONTO 0.00

0.00 0.00

S/.SUB TOTAL 0.00 0.00

MATERIALES DE ESCRITORIO01 MATERIALES DE ESCRITORIO DESCRIPCIN PAPEL A-4, 80 GRAMOS MICAS ENGRAMPADOR PROFESIONAL PERFORADOR PROFESIONAL ARCHIVADOR TAMAO ESTANDAR WINCHA DE 8 MT MARCA STANLEY. FOLDER MANILA COLOR AMARILLO CON FASTENR LAPICEROS (PILOT) RESALTADOR CD WINCHA DE 100 MT MARCA STANLEY. CUADERNO 200h ARCO IRIS, ANILLADO PEQUEO LIBRETA DE CAMPO TOTAL UND. Millar UND UND UND UND UND UND UND UND UND UND UND UND CANTIDAD 2.00 10.00 1.00 2.00 5.00 2.00 30.00 10.00 2.00 15.00 1.00 3.00 2.00 P.U. 26.00 1.00 24.00 15.00 9.00 15.00 0.50 2.00 2.50 0.82 49.23 5.00 7.00

S/.

0.00

SUB TOTAL 52.00 10.00 24.00 30.00 45.00 30.00 15.00 20.00 5.00 12.30 49.23 15.00 14.00 0.00

ALQUILER DE BIENES MUEBLES01 MATERIALES DE ESCRITORIO DESCRIPCIN ALQUILER DE 01 COMPUTADORA P IV ALQUILER DE 01 IMPRESORA INYECCION A TINTA TOTAL UND. UND UND N MESES 0.00 0.00 P.U. 250.00 80.00

S/.

0.00

SUB TOTAL 0.00 0.00 0.00

TOTAL GASTOS DE SUPERVISION

0.00

DESAGREGADO DEL PRESUPUESTO ANALTICO LIQUIDACION DE OBRASERVICIOS NO PERSONALESDEL EMPLEADO EVENTUAL (COEF. INC. = 1) CARGO LIQUIDADOR DE OBRA (ING. CIVIL COLEGIADO) CONTADOR PUBLICO COLEGIADO TOTAL N DE PERSONAS 1.00 1.00 MESES 1.00 1.00 COSTO 900.00 667.53 SUB TOTAL 900.00 667.53 1,567.53

S/.

1,567.53

TOTAL GASTOS DE LIQUIDACION DE OBRA

S/.

1,567.53

DESAGREGADO DEL PRESUPUESTO ANALTICO GASTOS DE ELABORACIN DEL EXPEDIENTE TCNICOOTROS SERVICION A TERCEROSDESCRIPCION ELABORACION DE EXPEDIENTE TECNICO TOTAL UND 1.00 CANTIDAD 1.00 COSTO 0.00 SUB TOTAL 0.00 0.00

S/.

0.00

TOTAL EXPEDIENTE TECNICO

S/.

0.00

COSTO DIRECTO EXPEDIENTE TECNICO GASTOS DE LIQUIDACION GASTOS GENERALES GASTOS SUPERVICON

125,703.73 1,567.53 20,866.82 148,138.08

PRESUPUESTO TOTAL DE RESOLUCION

148,138.08

148,138.08

PresupuestoPresupuesto Subpresupuesto

403008 001

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACU

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACU

Cliente Lugar

MUNICIPALIDAD PROVINCIAL DE ABANCAY APURIMAC - ABANCAY - ABANCAY DescripcinOBRAS PROVISIONALES ALQUILER DE LOCAL PARA ALMACEN CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 OBRAS PRELIMINARES NIVELACION DE TERRENO CON EQUIPO TOPOGRAFICO LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO CON VALLAS AISLADAS MOVIMIENTO DE TIERRAS CORTE DE MATERIAL SUELTO CON MAQUINARIA EN TERRENO SATURADO EXCAVACION PARA CIMIENTOS, ZAPATAS EN SUELO SATURADO RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA ELIMINACION DE MATERIAL EXCEDENTE MANUALMENTE NIVELACION INTERIOR Y APISONADO ESTRUCTURAS CONCRETO SIMPLE FALSA ZAPATA - CONCRETO 1.12 CIMIENTO CORRIDOS - CONCRETO 1.40 + 30% P.M ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS CONCRETO SIMPLE MEZCLA 1:8+ 25% P.M. PARA SOBRECIMIENTO CONCRETO ARMADO MUROS DE CONTENCION m3 m2 m2 m3 117.86 169.05 29.10 246.39 m3 m3 m3 m3 m3 m2 4.98 60.24 20.20 6.81 36.14 11.60 m2 m2 m2 1.58 2.76 1.79 mes und 120.00 780.00

Item01 01.01 01.02 02 02.01 02.02 02.03 03 03.01 03.02 03.03 03.04 03.05 03.06 04 04.01 04.01.01 04.01.02 04.01.03 04.01.04 05 05.01

Und.

Precio S/.

05.01.01 05.01.02 05.01.03 05.01.04 05.01.05 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 05.04 05.04.01 05.04.02 05.04.03 05.05 05.05.01 05.05.02 05.05.03 05.06 05.06.01 05.06.02 05.06.03 05.07 05.07.01

SOLADO PARA ZAPATA MEZCLA 1:12 C:H (e=4") ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 - TRABAJADO ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS - MURO DE CONTENCION CONCRETO f'c=175 kg/cm2 CON MEZCLADORA SISTEMA DE DRENAJE PARA MURO DE CONTENCION ZAPATAS ENCOFRADO Y DESENCOFRADO PARA ZAPATA CONECTADA ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 CONCRETO PARA ZAPATA CONECTADA Fc=210 kg/m2 VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 COLUMNAS ENCOFRADO Y DESENCOFRADO PARA COLUMNAS ACERO DE REFUERZO fy=4,200 kg/cm2 GRADO 60 CONCRETO EN COLUMNAS fc=210kg/cm2 COLUMNETAS ENCOFRADO Y DESENCOFRADO PARA COLUMNAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 CONCRETO EN COLUMNAS fc=210kg/cm2 VIGAS ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS CONCRETO EN VIGAS f'c=210 kg/cm2 LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS

m2 kg m2 m3 m

119.60 4.68 55.62 281.48 81.85

m2 kg m2

55.62 4.68 432.60

m2 kg m3

17.58 4.68 372.37

m2 kg m3

32.63 4.53 414.79

m2 kg m3

32.63 4.68 414.79

m2 kg m3

41.60 4.43 423.15

m2

55.62

05.07.02 05.07.03 05.07.04 05.07.05 05.08 05.08.01 05.08.02 05.08.03 06 06.01 07 07.01 07.01.01 07.01.02 07.02 07.02.01 07.03 07.03.01 07.04 07.04.01 07.04.02 07.04.03 07.04.04 07.04.05 07.04.06 07.04.07 07.05 07.05.01

LADRILLO HUECO DE CONCRETO H=15 PARA TECHO ALIGERADO ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS CONCRETO f'c=210 kg/cm2 CON DOSIFICACION Y ADITIVOS VENTANA ALTA DE ILUMINACION ESCALERAS ENCOFRADO Y DESENCOFRADO PARA ESCALERAS ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 CONCRETO ESCALERAS fc=210 kg/cm2 SISTEMA DE DRENAJE SISTEMA DE GRENAJES ALBAILERIA MUROS Y TABIQUES MUROS DE ALBAILERIA CONFINADA, AMARRE CABEZA MURO DE SOGA LADRILLO KING KONG CON CEMENTO ARENA CERCO PERIMETRICO MUROS DE BLOQUE HUECO DE CONCRETO E=15CM - 1.5 C:A de 0.15x0.20x0.40 CIELO RASOS CIELO RASO SISTEMA DRIWALL REVOQUES, ENLUCIDOS Y MOLDURAS TARRAJEO DE INTERIORES MEZCLA 1:5 C:A TARRAJEO EN EXTERIORES MEZCLA 1:5 C:A TARRAJEO MUROS CERCO PERIMETRICO C:A 1.5 VESTIDURA DE DERRAMES ANCHO PROMD. 15 CM TARRAJEO DE VIGAS Y/O COLUMNAS TARRAJEO DE CIELORASO BRUAS DE 1 X 1 cm PISOS Y PAVIMENTOS CONCRETO FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=4"

pza kg m3 m2

2.31 4.68 532.84 94.06

m2 kg m3

55.62 4.68 417.46

m

13.74

m2 m2

131.54 94.10

m2

62.59

m2

48.68

m2 m2 m2 m2 m2 m2 m

29.17 41.74 18.51 17.31 39.76 31.50 3.09

m2

51.78

07.05.02 07.05.03 07.05.04 07.05.05 07.06 07.06.01 07.06.02 07.06.03 08 08.01 08.01.01

PISO CERAMICO ANTIDESLIZANTE DE 30x30 mts VEREDA DE CONCRETO E=4 ENCOFRADO Y DESENCOFRADO EN VEREDAS JUNTAS ASFALTICAS ZOCALOS Y ENTREZOCALOS ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO - ARENA ZOCALO DE CERAMICA BLANCA 20 X 30CM DE PRIMERA CONTRAZOCALO CERAMICO 30 X 30 H=0.10 m. PEGADO CON CEMENTO Y FRAGUA GRIS CARPINTERIA Y CERRAJERIA CARPINTERIA DE MADERA PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"

m2 m2 m2 m

43.11 68.63 24.14 4.94

m2 m2 m

15.52 16.23 7.55

m2

227.31

08.01.02 08.02 08.02.01 08.02.02 08.02.03 08.03 08.03.01 08.03.02 08.03.03 08.03.04 08.03.05 09 09.01 10 10.01 10.02

PUERTA DE MADERA AGUANO TABLERO REBAJADO CERRAJERIA CERRADURA DE TRES GOLPES CON LLAVE INTERIOR Y EXTERIOR CHAPA CON PERILLA SEGURIDAD INTERIOR Y LLAVE EXTERIOR BISAGRA CAPUCHINAS ALUMINIZADA DE 3" X 3" CARPINTERIA METALICA VENTANA METALICA DE SEGURIDAD (INCL. COLOCADO+ACCESORIOS) PUERTA METALICA PUERTA METALICA GARAJE CEERCO METALICO BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2 - PARANTE 1X1M VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE INCOLORO CRUDO PINTURA PINTADO DE MUROS INTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR) PINTADO DE MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)

m

478.70

und und und

82.05 52.05 11.83

m2 m2 m2 m2 m

133.96 126.80 136.80 136.80 35.76

p2

6.24

m2 m2

6.04 6.54

10.03 10.04 10.05 10.06 11 11.01 11.01.01 11.01.02 11.01.03 11.01.04 11.01.05 11.02 11.02.01 11.02.02 11.02.03 11.02.04 11.02.05 11.02.06 11.02.07 11.02.08 11.02.09 11.02.10 11.02.11 11.02.12 11.02.13 11.02.14 11.03 11.03.01

PINTURA ESMALTE EN ZOCALO PINTURA LATEX EN MUROS CERCO PERIMETRICO PINTURA EN PUERTAS C/BARNIZ 2 MANOS PINTURA EN DERRAMES INSTALACIONES SANITARIAS APARATOS Y ACCESORIOS SANITARIOS INODORO TANQUE BAJO BLANCO INC. COLOCADO LAVATORIO DE PARED BLANCO 1 LLAVE INC. COLOCADO LAVADERO DE ACERO INOXIDABLE DE COCINA PAPELERA LOSA BLANCO DE 13X15 cm INC. COLOCADO TOALLERO DE LOSA COLOR SISTEMA DE DESAGUE SALIDA DESAGUE EN PVC 4" SALIDA DESAGUE EN PVC 2" SALIDA VENTILACION EN PVC 2" TUBERIA PVC SAL DE 4" TUBERIA PVC SAL DE 2" SUMIDERO DE 2" REGISTRO DE BRONCE 2" REGISTRO DE BRONCE 4" TRAMPA P DE PVC PARA DESAGUE D 2 CODO PVC SAL 2X45 CODO PVC SAL 2X90 CODO PVC SAL 4X90 YEE DE PVC SAL DE 2 CAJA DE REGISTRO DE DESAGUE 12''X24'' TAPA DE F`F SISTEMA DE AGUA FRIA Y CONTRA INCENDIO SALIDA DE AGUA FRIA TUBERIA PVC SAP 1/2"

m2 m2 m2 m

8.02 6.04 9.34 5.40

pza pza pza pza und

202.35 132.35 171.37 26.37 12.00

pto pto pto m m pza und pza und pza pza pza und pza

106.76 66.74 77.86 11.79 14.83 46.15 38.39 50.03 49.10 14.04 13.87 16.66 22.05 108.56

pto

23.38

11.03.02 11.03.03 11.03.04 11.03.05 12 12.01 12.02 12.03 12.04 12.05 12.06 12.07 13 13.01 13.01.01 13.01.02 13.01.03 13.01.04 14 14.01 15 15.01

CODO DE PG UNION ROSCADA DE 1/2 TEE PVC SAP 1/2 VALVULA COMPUERTA DE 1/2" TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS INSTALACIONES ELECTRICAS SALIDA DE TECHO (CENTRO DE LUZ ) INC. INTERRUPTOR SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC TABLERO GENERAL 03 CIRCUITOS CON LLAVE TERMOMAGNETICO FLUORESCENTE RECTI ISPE 2 X 40W (INC. ACCESORIOS) ARTEFACTO TIPO ANTORCHA MOD. E35 - INCLUYE ACCESORIOS LUMINARIA DE EMERGENCIA POZO PUESTA A TIERRA OBRAS COMPLEMENTARIAS PRUEBAS DE CALIDAD DE CONCRETO DISEO DE MEZCLAS DE CONCRETO LAB PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRENCION) CONTROL DE CALIDAD DE LADRILLO PRUEBA DE COMPACTACION DE SUELOS MITIGACION DE IMPACTO AMBIENTAL MITIGACION DEL IMPACTO AMBIENTAL FLETE TERRESTRE FLETE TERRESTRE ABANCAY

m und und pza

3.92 7.74 48.38 1,537.40

pto pto und und und und und

52.21 46.15 295.87 251.75 78.36 159.38 523.98

und und und und

350.00 30.00 25.00 20.00

glb

1,000.00

glb Costo Directo

120.00

SON :

DOSCIENTOS CINCUENTIUN MIL OCHOCIENTOS DIECISEIS Y 33/100 NUEVOS SOLES

ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

Parcial S/.1,260.00 480.00 780.00 2,050.38 741.02 795.29 514.07 29,466.38 5,478.00 6,515.56 1,082.52 9,874.50 3,975.40 2,540.40 16,345.85 16,345.85 2,663.64 7,952.11 3,234.17 2,495.93 80,221.21 20,639.28

1,908.82 1,619.28 4,665.96 11,765.86 679.36 7,781.84 1,868.83 808.33 5,104.68 9,103.05 1,215.13 4,670.64 3,217.28 11,319.99 3,093.98 6,064.95 2,161.06 5,031.64 2,242.01 1,358.60 1,431.03 10,410.04 3,613.79 3,787.65 3,008.60 14,181.69 5,909.63

4,504.50 271.16 3,383.53 112.87 1,753.68 647.97 62.06 1,043.65 579.28 579.28 82,946.22 20,830.46 11,437.40 9,393.06 8,340.12 8,340.12 5,867.40 5,867.40 26,847.39 9,960.10 4,166.49 2,229.90 2,402.28 5,593.04 2,211.30 284.28 19,392.88 9,682.86

6,367.35 1,942.23 1,318.04 82.40 1,667.97 266.94 533.16 867.87 17,648.64 8,457.65 4,943.99

3,513.66 1,156.38 574.35 156.15 425.88 8,034.61 4,148.74 576.94 2,112.19 1,061.57 135.17 879.84 879.84 3,786.54 2,177.42 261.60

120.30 727.64 271.70 227.88 8,781.91 1,633.32 607.05 397.05 514.11 79.11 36.00 4,568.84 427.04 1,067.84 155.72 498.01 235.35 415.35 115.17 200.12 294.60 84.24 83.22 99.96 132.30 759.92 2,579.75 350.70

194.31 61.92 435.42 1,537.40 5,150.08 887.57 830.70 591.74 1,762.25 235.08 318.76 523.98 1,100.00 1,100.00 350.00 450.00 100.00 200.00 1,000.00 1,000.00 600.00 600.00 251,816.33

LES

251,816.33

S10

Pgina :

1

Precios y cantidades de recursos requeridos por tipoObra MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD KERAPATA - NIVEL I-1MICRO RED MICAELA BASTIDAS DEL DISTRITO DE TAMBURCO, PROVINCIA DE ABANCAY Y DEPARTAMENTO DE APURIMAC. MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD KERAPATA - NIVEL I-1MICRO RED MICAELA BASTIDAS DEL DISTRITO DE TAMBURCO PROVINCIA DE ABANCAY Y DEPARTAMENTO DE APURIMAC. APURIMAC - ABANCAY - ABANCAYRecurso Unidad Precio Parcial S/.

Subpresupuesto

LugarCdigo

MANO DE OBRA 0101010003 0101010004 0101010005 01010300000005 OPERARIO OFICIAL PEON OPERARIO TOPOGRAFO hh hh hh hh 3,629.8281 1,288.6210 5,209.6187 24.5038 8.12 7.25 6.58 8.12 29,474.20 9,342.50 34,279.29 198.97

73,294.96 MATERIALESUnidad Precio Parcial S/.

0201010023 0201020012 02010300010001 0201040001 02010500010001 0203020003 02040100010001 02040100010002 02040100020001 02040100030001 0204010008 0204010009 0204030001 02041200010007 02041200010009 02041200010010 02041200010011 0204180008 0204270003 02050700010010 02050700020024 02050700020025 02050900020007 02051000020007 02051000020008 02051000020009 02051100010016 02051100020001 02060100010003 02060100010006 0206010002 02060200020001 02060200030001 02060200030003 0206030002 02060500010014 02060500010029 02060700010001 02061100010013 02061200010002 02061400010002 02061600010001 02061700010001 02061700010003 02061700010010 02070100010002 02070100010003 02070100050001 02070100050002 0207010006 02070200010001 02070200010002 02070500010003 02090100010004 0209040001 02100400040004

ACEITE PARA MOTOR SAE-30 GRASA GASOLINA 84 PETROLEO D-2 ASFALTO RC-250 FLETE TERRESTRE ABANCAY ALAMBRE NEGRO RECOCIDO N 8 ALAMBRE NEGRO RECOCIDO N 16 ALAMBRE NEGRO N 16 ALAMBRE GALVANIZADO N 8 PERNOS AUTOPERFORANTES PLANCHA METALICA ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 CLAVOS PARA MADERA CON CABEZA DE 4" CLAVOS PARA MADERA C/C 3" CLAVOS PARA MADERA C/C 2" CLAVOS PARA MADERA CON CABEZA DE 5" PLOMO ELECTROLITICO REGLA DE ALUMINIO DE 6.00 Metros TUBERIA PVC-SAP C-10 C/R DE 1 1/2" X 5 m TUBERIA PVC SAP ELECTRICA DE 3/4" x3 m (20 mm) TUBERIA PVC SAP C-10 S/P DE 3/4" TUBERIA PVC SAP C-10 S/P DE 3/4" CODO PVC-SAP S/P 3/4" X 90 CODO PVC SAL 4" X 45 CODO PVC SAP C/R 1/2" X 90 CODO PVC SAP DE 6" TEE PVC SAP S/P 1/2 TEE PVC-SAP C/R 1/2" TUBERIA PVC-SAL 2" X 3 m TUBERIA PVC-SAL 4" X 3 m TUBERIA PVC-SAL 4" CODO PVC-SAL 2" X 45 CODO PVC-SAL 2" X 90 CODO PVC-SAL 4" X 90 UNION PVC-SAP DE 3/4 TEE PVC-SAL DE 4" A 2" TEE PVC-SAL 2" x 2" TEE SANITARIA PVC-SAL DE 2" YEE DOBLE PVC-SAL DE 4" A 2" TRAMPA "P" PVC SAL DE 2" REDUCCION PVC-SAL DE 4" A 2" SOMBRERO DE VENTILACION PVC-SAL DE 2" YEE PVC SAL SIMPLE DE 2" YEE PVC SAL SIMPLE DE 4" YEE PVC SAL 2" x 2" PIEDRA CHANCADA 1/2" PIEDRA CHANCADA 3/4" PIEDRA MEDIANA DE 4" PIEDRA MEDIANA DE 6" PIEDRA GRANDE DE 8" ARENA FINA ARENA GRUESA TIERRA DE CHACRA O VEGETAL MARCO Y PATA FO. GO. P/MEDIDOR 1/2" - 3/4" TAPA CON MARCO FIERRO FUNDIDO PARA DESAGUE 12" X 24" BLOQUE DE CONCRETO HUECO 0.15X0.20X0.40

gal lbs gal gal gal glb kg kg kg kg und m2 kg kg kg kg kg kg m m m m pza und pza und und und m und m und und und pza und pza und und und und und und und und m3 m3 m3 m3 m3 m3 m3 m3 und pza und

2.2803 0.0566 134.1410 102.0617 2.2184 5.0000 192.5714 119.1020 112.6932 13.2583 241.0600 1.4680 4,340.0042 78.2782 157.9322 2.8710 28.2468 0.1890 336.2009 15.0000 75.9900 1.0500 1.0000 28.0000 15.0000 18.5984 8.0000 15.0000 48.9135 4.2000 44.3520 6.3000 41.1500 6.3000 1.0000 9.0000 7.0000 7.4400 4.0000 6.0000 4.0000 2.0000 16.0000 4.0000 6.0000 11.1235 43.1576 56.1000 5.7970 23.5200 34.6141 82.3577 1.4000 1.0000 7.0000 1,865.5000

20.00 20.00 15.00 14.00 25.00 120.00 5.00 5.00 5.00 5.00 1.00 20.00 3.60 5.50 5.00 5.00 5.00 10.00 8.00 4.50 2.00 2.80 1.00 5.50 1.00 1.50 2.00 2.00 8.00 8.00 8.00 5.00 5.00 5.00 1.00 5.00 5.00 2.50 5.50 15.00 6.00 3.50 4.50 5.50 5.00 75.00 75.00 60.00 65.00 75.00 75.00 75.00 30.00 85.00 50.00 2.00

45.61 1.13 2,012.12 1,428.86 55.46 600.00 962.86 595.51 563.47 66.29 241.06 29.36 15,624.02 430.53 789.66 14.36 141.23 1.89 2,689.61 67.50 151.98 2.94 1.00 154.00 15.00 27.90 16.00 30.00 391.31 33.60 354.82 31.50 205.75 31.50 1.00 45.00 35.00 18.60 22.00 90.00 24.00 7.00 72.00 22.00 30.00 834.26 3,236.82 3,366.00 376.81 1,764.00 2,596.06 6,176.83 42.00 85.00 350.00 3,731.00

0213010001 0213030001 0213070001 02150200010004 02160100090004 02160200070005 02160200070006 02191300010016 02191300010017 0222080004 0222080012 0222080013 0222080017 0222100001 0222110001 02221500010004 02221500010013 0225020008 0225020133 0225020134 0231000001 0231000002 0231010002 0231010003 02310500010001 02311000010002 02370600010003 0237080001 02370800010012 0237160004 0238010005 0238010006 0240010011 0240020016 0240080012 0240150001 0240160001 02401600020008 0241020001 0241030001 0243120001 02460200020001 02461100010002 02461200030001 02461200030003 02461500010002 0247010003 02470200010019 02470700010008 02480100010001 02490200010002 02490600010001 0253180001 02550800010004 0255080015 0258060012 02610000000007 02620400010016 02621300010006 02621400010025 0263060002 0263060003 02680100010004 02680900010005 02682700010006 0270010288 0270010292 02701100170006 0272010090 0272010091 0272010092 0272040042 0274010003 0290130021 02902300010009 02902300500002 02902300500003 02902300500004 02902300500005 0290240006

CEMENTO PORTLAND TIPO I (42.5 kg) YESO FRAGUA RAMALL TEE PVC SAL 2" LADRILLO PARA LOSA ALIGERADA 30X20X15 LADRILLO KK MACIZO DE CONCRETO 12x0.9x24cm LADRILLO KK MACIZO DE CONCRETO 10x12x24cm TUB PVC SAP P/INST ELECT DE 1" TUBERIA PVC SAP C-10 DE 6" CRIBADA PEGAMENTO PARA CPVC PEGAMENTO PARA PVC PEGAMENTO PARA PVC DE 1/4 GLN PEGAMENTO EN POLVO (BOLSA 0.25 KG) SILICONA COLA SINTETICA ADITIVO ACELERANTE FRAGUA ADITIVO ACELERANTE IMPERMEABILIZANTE ADIKRET RAPIDO CERAMICA CELIMA SERIE ANTIDESLIZANTE MOSAICO PISO/PARED 0.30X0.30 CERAMICA CELIMA 0.20X0.30 cm CERAMICA CELIMA 0.10X0.30 cm MADERA AGUANO MADERA NACIONAL P/ENCOFRADO-CARP MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE MADERA TORNILLO PARA INCLUYE CORTE PARA ENCOFRADO TRIPLAY LUPUNA 4 x 8 x 4 mm LISTONES DE 2"X2"X3.0 M BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" CERRADURA PARA PUERTA INTERIOR CERRADURA EXTERIOR DE TRES GOLPES PISON MANUAL LIJA PARA MADERA LIJA PARA PARED Nro 10 PINTURA LATEX LAVABLE PINTURA ESMALTE SINTETICO THINNER IMPRIMANTE BARNIZ MARINO TAPAPOROS DE MADERA ACABADA C/BARNIZ O LACA CINTA AISLANTE CINTA TEFLON VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE SUMIDERO DE BRONCE DE 2" PAPELERA DE LOZA BLANCA REGISTRO DE BRONCE DE 2" REGISTRO DE BRONCE DE 4" TOALLERO DE LOSA COLOR CON BARRA PLASTICA LAVATORIO DE LOSA COLOR BLANCO CON ACCESORIOS INODORO TANQUE BAJO NORMAL COLOR BLANCO C/A LAVATORIO INOXIDABLE 19"x37" C/ESC. P SAT. C/A TANQUE DE AGUA DE ETERNIT (POLIETILENO) DE 1000 LITROS INCLUYE ACCESORIOS INTERNOS CODO FIERRO GALVANIZADO DE 1/2" X 90 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" VALVULA COMPUERTA DE 1/2" SOLDADURA ELECTRICA CELLOCORD P 3/16" SOLDADURA DUCTO DE LUZ CON VIDRIO TEMPLADO Y ESTRUCTURA METALICA LAMPARA DE EMERGENCIA EEC-LR-2T SAL INTERRUPTOR TERMOMAGNETICO DE 3x20Ax240V TOMACORRIENTE DOBLE PLANO BAKELITA PLACA DE CONCRETO TIPO DRYWALL PUERTA DE MADERA AGUANO PUERTA METALICA TIPO REJA (GARAJE) CAJA OCTOGONAL FIERRO GALVANIZADO 4" X 2 1/8" CAJA RECTANGULAR FIERRO GALVANIZADO DE 100 x 50 x 40 mm (6" X 2" X 1") CAJA DE DESAGUE DE 12"x24" CABLE TW # 14 AWG CABLE TW # 2 AWG - 35 NM2 ARTEFACTO DE ILUMINACION TIPO-06 TUBO FO. GALV. ST ISO-I.2" TUBO FO. GALV. ST ISO-I.1" TUBO FO. GALV. ST ISO-I.1 1/2" VARILLA DE COBRE DE 3/4" X 2.40 m TABLERO GENERAL C/LLAVE TERMOMAGNETICO AGUA FLUORESCENTE REJILLA ECONOMICO RE 40WAT PRUEBAS DE CALIDAD DE CONCRETO ROTURA PRUEBAS DE COMPACTACION DE SUELOS PRUEBAS DE CALIDAD DE LADRILLO DISEO DE MEZCLAS DE CONCRETO ACCESORIOS INSTALACIONES DE CARRILES

bol bol kg und pza und und m m und gal und bol und gal gal gal m2 m2 m2 p2 p2 p2 p2 pln pza und und pza und und hja gal gal gal gal gal gal rll und p2 und und und und und pza und und und und und und kg kg und pza und und und und m2 und und pza m m und m m m und und m3 und und und glb und m

1,428.7873 56.5695 52.3540 16.0000 2,047.5000 5,651.7500 4,292.2600 1.0000 9.2992 0.1690 1.2991 0.0160 41.5397 7.0500 5.7420 4.8133 4.8133 155.0850 3.9420 13.7940 582.2100 2,516.1671 763.7040 23.4890 23.0550 55.5700 36.0000 3.0000 7.0000 438.0000 5.8180 52.1000 26.6820 0.6750 0.3000 56.3170 1.4545 1.6174 3.5000 3.0000 148.6260 9.0000 3.0000 7.0000 4.0000 3.0000 3.0000 3.0000 3.0000 1.0000 49.5700 9.0000 9.0000 0.1890 1.8900 3.6000 2.0000 6.0000 18.0000 60.2650 7.3400 23.2000 17.0000 35.0000 7.0000 318.5500 1.5000 3.0000 0.3780 3.7800 3.9690 1.0000 2.0000 129.8678 14.0000 15.0000 10.0000 4.0000 1.0000 126.5565

23.00 10.00 5.00 5.00 1.80 1.40 1.60 8.00 60.00 85.00 85.00 85.00 18.00 12.00 40.00 60.00 60.00 27.00 27.00 27.00 6.00 2.80 2.50 6.00 16.00 10.50 5.00 35.00 65.00 5.00 2.50 2.50 25.00 30.00 25.00 18.00 35.00 15.00 5.00 2.50 3.80 8.00 15.00 5.00 5.00 12.00 120.00 190.00 160.00 1,500.00 3.50 15.00 20.00 1.00 12.00 30.00 150.00 45.00 6.00 40.00 450.00 120.00 2.00 3.00 10.00 1.20 2.50 70.00 12.00 8.00 10.00 255.00 130.00 10.00 120.00 30.00 20.00 25.00 350.00 13.00

32,862.11 565.70 261.77 80.00 3,685.50 7,912.45 6,867.62 8.00 557.95 14.37 110.42 1.36 747.71 84.60 229.68 288.80 288.80 4,187.30 106.43 372.44 3,493.26 7,045.27 1,909.26 140.93 368.88 583.49 180.00 105.00 455.00 2,190.00 14.55 130.25 667.05 20.25 7.50 1,013.71 50.91 24.26 17.50 7.50 564.78 72.00 45.00 35.00 20.00 36.00 360.00 570.00 480.00 1,500.00 173.50 135.00 180.00 0.19 22.68 108.00 300.00 270.00 108.00 2,410.60 3,303.00 2,784.00 34.00 105.00 70.00 382.26 3.75 210.00 4.54 30.24 39.69 255.00 260.00 1,208.68 1,680.00 450.00 200.00 100.00 350.00 1,645.23

148,896.93 EQUIPOSUnidad Precio Parcial S/.

0301000002 03010000110001 0301000014 03010300060007 03011600010002 03011800020003 0301220004 03012900010002 0301290003

NIVEL TOPOGRAFICO TEODOLITO MIRAS PLANCHA COMPCTADORA 4HP CARGADOR FRONTAL CAT-930 TRACTOR DE ORUGAS CAT D6D CAMION VOLQUETE VIBRADOR DE CONCRETO 4 HP 1.25" MEZCLADORA DE CONCRETO

da da da hm hm hm hm hm hm

3.0630 1.7231 2.3450 19.0566 25.8100 22.0000 25.8100 80.9023 116.8577

8.00 10.00 10.00 25.00 180.00 200.00 180.00 18.70 25.00

24.50 17.23 23.45 476.42 4,645.80 4,400.00 4,645.80 1,512.87 2,921.44

18,667.51 SUBCONTRATOS

04000100010017 0400020007 04000500010003 04050200010005 04110100010003 04110200010001

ESTUDIO DE IMPACTO AMBIENTAL ALQUILER DE ALMACEN CARTEL DE OBRA ANDAMIO METALICO SC PUERTA METALICA A TODO COSTO SC VENTANA METALICA

und glb und m2 m2 m2

1.0000 4.0000 1.0000 488.3880 4.5500 30.9700

1,000.00 120.00 780.00 5.00 110.00 110.00

1,000.00 480.00 780.00 2,441.94 500.50 3,406.70 8,609.14

HERRAMIENTAS MANUALES

04000500010003

HERRAMIENTAS MANUALES

%M.O

2,347.79

2,347.79

COSTO DIRECTO

251,816.33

VALORIZACION MES DE AGOSTOPRESUPUESTO PARTIDA DESCRIPCION Und. Metrado Precio S/. Parcial S/.

AVANCES ANTERIOR Metrado Valoriz S/. % Metrado ACTUAL Valoriz S/. % Metrado ACUMULADO Valoriz S/. % Metrado

SALDO Valoriz S/. %

01 01.01 01.02 02 02.01 02.01.01 02.02 02.02.01 02.02.02 3 3.01 03.01.01 3.02 03.02.01 03.02.02 4 4.01 04.01.01 4.02 04.02.01 04.02.02 5 5.01 05.01.01 5.02 05.02.01 05.02.02 6 6.01 06.01.01 6.02 06.02.01 06.02.02 7 7.01 07.01.01 7.02 07.02.01 07.02.02

OBRAS PROVISIONALES LIMPIEZA DE TERRENO MANUAL TRAZO, NIVELACION Y REPLANTEO AVENIDA GARCILAZO MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 AVENIDA ENRIQUE PELACH MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 AVENIDA PERU MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 AVENIDA VENEZUELA MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 AVENIDA PACHACUTEC MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 AVENIDA CANADA MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 m2 m2 50.73 50.73 14.30 81.51 m2 50.73 41.11 m2 m2 22.11 22.11 14.30 81.51 m2 22.11 41.11 m2 m2 190.00 190.00 14.30 81.51 m2 190.00 41.11 m2 m2 180.00 180.00 14.30 81.51 m2 180.00 41.11 m2 m2 150.00 150.00 14.30 81.51 m2 150.00 41.11 m2 m2 270.00 270.00 14.30 81.51 m2 270.00 41.11 m2 m2 20.00 20.00 4.47 3.59

161.2089.38 71.82 0.00 0.00

0.000.00 0.00 0.000.00

44.690.00% 0.00%10.00 0.00

44.6950.00% 0.00% 10.00 0.00 44.69 0.00 11100.51 100.00% 270.00 11100.51 20113.93 3002.61 17111.31 100.00% 0.00 50.00% 0.00% 10.00 20.00

116.5144.69 71.82 0.00 0.00 5755.58 859.20 4896.39 0.00% 50.00% 100.00%

44.69 0.00 11100.51

11,100.5111,100.51

0.00 0.00

0.00%

270.00

11,100.51 20113.93 3,002.61 17,111.31

25,869.513,861.81 22,007.70 0.00 0.00

0.00 0.00

0.00% 0.00%

209.93 209.93

77.75% 77.75%

209.93 209.93

77.75% 77.75%

60.07 60.07

22.25% 22.25%

6,166.956,166.95 0.00

0.00 0.00 0.000.00 0.00

0.00%

106.37

4373.07 4,373.07 10191.34 1,521.37 8,669.97 0.00

70.91%

106.37

4373.07 4373.07 10191.34 1521.37 8669.97 0.00

70.91%

43.63

1793.88 1793.88 4180.61 624.08 3556.53 7400.34

29.09%

14,371.952,145.45 12,226.50

0.00 0.00 0.00

0.00% 0.00%

106.37 106.37

70.91% 70.91%

106.37 106.37

70.91% 70.91%

43.63 43.63

29.09% 29.09%

7,400.347,400.34 0.00

0.00 0.00

0.00%

0.00

0.00 0.00

0.00%

0.00 0.00

0.00

0.00%

180.00

7400.34 17246.34 2574.54 14671.80 6510.33

100.00%

17,246.342,574.54 14,671.80 0.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00 1301.14

0.00% 0.00%

0.00 0.00

0.00 0.00 1301.14

0.00% 0.00%

180.00 180.00

100.00% 100.00%

7,811.477,811.47 0.00

0.00 0.00

0.00%

31.65

1,301.14 0.00

16.66%

31.65

1301.14 0.00

16.66%

158.35

6510.33 18204.47 2717.57 15486.90 909.01

83.34%

18,204.472,717.57 15,486.90 0.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00 0.00

0.00 0.00

0.00% 0.00%

190.00 190.00

100.00% 100.00%

909.01909.01 0.00

0.00 0.00

0.00%

0.00

0.00 0.00

0.00%

0.00 0.00

0.00

0.00%

22.11

909.01 2118.43 316.24 1802.19 0.00

100.00%

2,118.43316.24 1,802.19 0.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00 2085.66

0.00% 0.00%

0.00 0.00

0.00 0.00 2085.66

0.00% 0.00%

22.11 22.11

100.00% 100.00%

2,085.662,085.66 0.00

0.00 0.00

0.00%

50.73

2,085.66 0.00

100.00%

50.73

2085.66 0.00

100.00%

0.00

0.00 4860.59 725.59 4135.00

0.00%

4,860.59725.59 4,135.00 0.00 0.00

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00

0.00% 0.00%

50.73 50.73

100.00% 100.00%

8 8.01 08.01.01 8.02 08.02.01 08.02.02 9 07.06.01

AVENIDA VALLECITO EL OLIVO MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) IMPRIMACION BITUMINOSA CARPETA ASFALTICA EN CALIENTE DE 3 FLETE TERRESTRE-GLOBAL CAMIONETA 4X4- TRASLADO ASFALTICO COSTO DIRECTO GASTOS GENERALES GASTOS DE LIQUIDACION SUB TOTAL m2 2.00 485.00 m2 m2 46.94 46.94 14.30 81.51 m2 46.94 41.11

1,929.841,929.84 0.00

0.00 0.00 0.000.00 0.00

1603.82 0.00%39.01

1603.82 83.11% 39.01 1603.82 0.00 83.11% 7.93

326.03 326.03 4497.46 671.38 3826.08 970.00 970.00 74,889.58 0.00 16.89%

1,603.82 0.00

4,497.46671.38 3,826.08

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00 0.00 0.00

0.00 0.00

0.00% 0.00%

46.94 46.94

100.00% 100.00%

970.00970.00 0.00

0.00 0.00 0.00

0.00% 0.00%

0.00

0.00 50,814.16 0.00

0.00%

0.00

0.00 50,814.16 0.00

0.00%

2.00

100.00%

84.86% 14.09% 1.06% 15.14%

PRESUPUESTO TOTALPORCENTAJES

125,703.73 20,866.82 1,567.53 1,567.53 148,138.08 100.00%125,703.736

0.00%

0.00 0.00%

50,814.16 34.30%

50,814.16 34.30%

74,889.58 50.55%

43,215.90 909.78 Costo Directo SON : CIENTO VEINTE Y CINCO MIL SETECIENTOS TRES CON 73/100 NUEVOS SOLES 125,703.73 125,703.74

MUNICIPALIDAD PROVINCIAL DE ABANCAY

Obra :

Informe Mensual de Obra N 001 MES DE AGOSTO MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV.PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

Residente de Obra.

: Ing. JAVIER LUCHO QUISPE LEON

2012

MUNICIPALIDAD DISTRITAL DE ECHARATE

Informe Mensual de Obra N 001 MES DE AGOSTO MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV.Obra :PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, Residente de Obra. : Ing. JAVIER LUCHO QUISPE LEON

2012

MUNICIPALIDAD DISTRITAL DE ECHARATE

Obra :

Informe Mensual de Obra N 001 MES DE AGOSTO MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV.PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

Residente de Obra.

: Ing. JAVIER LUCHO QUISPE LEON

2012

MUNICIPALIDAD DISTRITAL DE ECHARATE

Informe Mensual de Obra N 001 MES DE AGOSTO AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DE SAN AGUSTIN , DISTRITO DEObra :Residente de Obra. ECHARATI - LA CONVENCION - CUSCO" : Ing. JAVIER LUCHO QUISPE LEON

2012

CONTENIDOInforme Mensual de Obra N 001 MES DE JULIO

Obra :

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA

RESIDENTE DE OBRA Ubicacin : No

: Ing. JAVIER LUCHO QUISPE LEONABANCAY

Ao DESCRIPCION Contenido Informe Mensual

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

MEMORIA DESCRIPTIVA ANTECEDENTES ALCANCE DE LOS TRABAJOS Y METAS INFORMACION GENERAL DESCRIPCION DE LAS PARTIDAS EJECUTADAS PROCEDIMIENTOS CONSTRUCTIVOS EMPLEADOS LAS OCURRENCIAS TRASCENDENTES PARA EL DESARROLLO DE LA EJECUCIN DE OBRA. DOCUMENTOS TECNICOS RECURSOS UTILIZADOS PLANILLA DE METRADOS 11.1 11.2 11.3

Planilla de metrados del presupuesto original Planilla de mayores metrados Planilla de partidas nuevas Resumen de las Valorizaciones Valorizacin de Avance de Obra Valorizacin de Mayores Metrados Valorizacin de Partidas Nuevas Valorizacin de Deductivos Resumen de los Movimiento de Almacn Mensual Movimiento diario de almacen Resumen de Movimiento de Maquinaria Control Diario de Maquinaria

11.00

VALORIZACION 11.1 11.2 11.3 11.4 11.5

12.00

MOVIMIENTO DE ALMACEN 5.1. 5.2.

13.00

MOVIMIENTO DE MAQUINARIA 6.1. 6.2.

14.00 15.00 16.00 17.00 18.00 19.00 20.00

AUXILIAR ESTNDAR HOJAS DE TAREO DEL PERSONAL CONTROL DE CALIDAD MODIFICACION DEL PROYECTO PANEL FOTOGRAFICO CUADERNO DE OBRA ANEXOS

ENEZUELA, AV. PACHACUTEC,

2012CONTROL

GENERALIDADES MES DE JUNIO1.00 MEMORIA DESCRIPTIVA Introduccin. La Municipalidad Provincial de Abancay , intenta incorporar una nueva forma de producir desarrollo urbano en el espacio publico para consolidar los barrios y alrededores, articulando la participacion de diferentes actores se aprobo el expediente Tecnico a nivel defenitivo del: "MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC" mediante asamblea Pblica y cuerpo edil . Esta obra se ejecutar en el marco de gestin institucional con recursos financiados por la Municipalidad Provincial de Abancay. ANTECEDENTES .- El Expediente Tcnico se aprueba con un presupuesto de S/. 148,138.038 N.S. donde esta presupuestado para 01 componentes. .- Se inicia la ejecucin de obra el 01 de agosto del 2012, debindose culminar la obra el 01 de noviembre del 2012 (plazo de ejecucin de 90 das calendario). .- El inicio de servicios de Residencia inicia el 01 de agosto del 2012 ALCANCE DE LOS TRABAJOS Y METAS PARCHADO DE PISTAS 909.78M2

2.00

3.00

4.00

INFORMACION GENERAL 4.1 RESIDENTE DE OBRA Especialidad Colegiatura 4.2 FECHA REPORTADA 4.3 DATOS DEL PROYECTO Unidad Ejecutora Sec. Fun. Funcin Obra : MUNICIPALIDAD PROVINCIAL DE ABANCAY :15 :15 SALUD MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA : ADMINISTRACION DIRECTA : Ing. JAVIER LUCHO QUISPE LEON : Ingeniero Civil : 76753 : DEL 01 DE AGOSTO AL 31 DEL 2012

Fuente de Financiamiento Modalidad de Ejecucin

4.4 INFORMACION FINANCIERO DEL EXPEDIENTE PRIMIGENIO MONTO DEL PROYECTO S/. 148,138.08 Costo Directo S/. 125,703.73 Costo Indirecto S/. 22,434.35 Gastos Generales S/. 20,866.82 Gastos de Liquidacin S/. 1,567.53 4.5 INFORMACION FINANCIERO DEL COMPONENTE 01 SEGN EXPEDIENTE TECNICO PRIMIGENIO MANTENIMIENTO DE VIAS : S/. 148,138.08 SEGN PERFIL TECNICO CENTRO DE SALUD KERAPATA: S/. 148,138.08

Presupuesto Base Presupuesto Total Presupuesto Asignado ao 2012 Presupuesto Ejecutado mes Presupuesto Acumulado Presupuesto Saldo

: S/. : S/. : S/. : S/. : S/. : S/.

148,138.08 148,138.08 148,138.08 50,814.16 50,814.16 74,889.58

NUEVOS SOLES NUEVOS SOLES NUEVOS SOLES 34.30% 34.30% 50.55%

4.7 VALORIZACIONES Valorizacin Mensual Valorizacin Mayores Metrados Valorizacin Partidas Nuevas Valorizacin Deductivos Valorizacin Acumulada Valorizacin Saldos 4.8 CRONOGRAMA DE OBRA Inicio de Obra Paralizacion Reinicio Fin de Obra Programado Ejecutado Ampliacin tiempo de ejecucin

: S/. : S/. : S/. : S/. : S/. : S/. : : : : : : : :

50,814.16 148,138.08

34.30% 0.00% 0.00% 0.00% 0.00% 100.00%

8/1/2012 8/20/2012 8/28/2012 11/1/2012 3.00 3.00 no

meses meses

4.9 UBICACIN Distrito Provincia Departamento

ABANCAY : ABANCAY : APURIMAC

ano en el espacio publico para ediente Tecnico a nivel defenitivo AV. VENEZUELA, AV. IA ABANCAY, REGION n institucional con recursos

estado para 01 componentes. bre del 2012 (plazo de ejecucin

RIQUE PELACH, AV. PERU, AV. VO,Y AV. CANADA

SUB GERENCIA DE OBRAS PUBLICAS Y PRIVADAS

A0: 2012 MES DE AGOSTO

FICHA TECNICA DE PROYECTODATOS GENERALESUBICACINDPTO PROV DIST LOC. CODIGO SNIP MONTO FECHA : APURIMAC : ABANCAY ABANCAY ABANCAY

NOMBRE DEL PROYECTO:MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC COMPONENTE: CONSTRUCCION DEL CENTRO DE SALUD KERAPATA

UNIDAD EJECUTORA: MUNICIPALIDAD PROVINCIAL DE ABANCAY MODALIDAD VARIACION VIABILIDAD 0.00% PLAZO EJECUCION04 MESES

ADMINISTRACION DIRECTA

PERFIL200957 148,138.08 12/29/2011

EXPEDIENTE TECNICO RES. APROB. MONTO FECHAPROGRAMA SUB PROYECTO ACT. PROYECTO148,138.08

RES. APROB./MODIFIC. MONTO FECHACADENA FUNCIONAL COMPONENTE INFORMACION DE AGENTES

0.00 -

SEC. FUNC.

FUNCION

META

N

AGENTE

CARGO

ESPECIALIDAD

COLEGIATURA

RESOLUCION

1 2 3FECHA DE INICIO:

ING JAVIER LUCHO QUISPE LEON

Inspector/Supervisor Residente

Ing. Civil Ing. Civil

76753

PLAZO EJECUCION8/1/2012 FECHA DE REINICIO:

5/1/2012

FECHA DE CONCLUSION:

7/7/2012

03 Meses

FECHA DE TERMINO REAL: ESTRUCTURA DE PRESUPUESTO EXP. TEC.

METAS

EXP. ETC. PRIMIGENIO MANTENIMIENTO DE VIASCosto Directo Gastos Generales

S/. 148,138.08 S/. 127,271.26125,703.73 1,567.53 -

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

Gastos de Inspeccin Gastos de Liquidacin Expediente Tcnico Capacitacion Social

TOTAL S/.

127,271.26

RESUMEN INFORME MENSUALAVANCE F ISICO AVANCE FINANCIERO

MES

PROGRAMADO VALORIZADO %35.00 27.00 38.00 0.00 0.00 100.00

MAYORES METRADOS VALORIZADO0.00 0.00 0.00 0.00 0.00

PARTIDAS NUEVAS %0.00 0.00 0.00 0.00 0.00 0.00

DEDUCTIVOS % VALORIZADO0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

EJECUTADO %0.00 0.00 0.00 0.00 0.00 0.00

VALORIZADO0.00 0.00 0.00 0.00 0.00

VALORIZADO50,814.16 #REF! #REF!

%34.30 #REF! #REF!

PROGRAM. ACUM. %0.00 35.00 27.00 38.00 0.00 0.00

EJECUTAD O ACUMUL. % 0.00 34.30 #REF! #REF!

AVANCE FINANCIERO EJECUTADO MONTO % % ACUMULADO

AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE TOTAL

51,848.33 39,997.28 56,292.47 0.00 148,138.08

0.00 29,087.57 48,334.23

0.00 22.85 37.98

0.00 0.00 22.85 60.83

#REF!

#REF! ##############

#REF!

TOTAL

77,421.80CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

CURVA AVANCE FISICO

50 45 40 35 30 25 20 15 10 24.23544724 21.875 43.75

50

43.07847540

35.55364472

34.375

30

24.23544724

35.55364472

PROGRAMADO EJECUTADO

20

AVANCE FISICO

AVANCE FINANCIERO

10 3.808856805

5 0 -50 SETIEMBRE

3.8088568050

00 0 MAYO JUNIO 0.543 JULIO AGOSTO

0-10

62 S/. 51,848.33 S/. 39,997.28 S/. 56,292.47 148138.08

5.00

DESCRIPCION DE LAS PARTIDAS EJECUTADAS01 01.01OBRAS PREMILINARES LIMPIEZA DE TERRENO MANUAL

se realizo la limpieza de terreno manual utilizando escobas01.02TRAZO, NIVELACION Y REPLANTEO

Partida no ejecutada02 02.01 02.01.01AV GARCILAZO MOVIMIENTO DE TIERRAS ROTURA DE PAVIMENTO FLEXIBLE ASFALTO

La rotura del pavimiento flexible se realizo en su totalidad de m2 que se especifica en el expediente, utilizando picos, palas02.02 02.02.01PAVIMENTO FLEXIBLE IMPRIMACION BITUMINOSA

Se realizo la imprimacion utilizando el MC-60 para la primera capa y el PEN para la 2da capa02.02.02CARPETA ASFALTICA

La eliminacin del material esponjado, Fue retirado despus de la excavacin, esta eliminacin se realizo con Maquinaria, a una distancia donde se realiza el botadero que no dificulten el proceso constructivo.

03.05

ELIMINACION DE MATERIAL EXCEDENTE MANUALMENTE

La eliminacin del material esponjado, se realizo despus de la excavacin, esta eliminacin se realizo con Manualmente, a una distancia donde se realiza el botadero, que no dificulten el proceso constructivo.3.06NIVELACION INTERIOR Y APISONADO

Una vez realizada la excavacin hasta el nivel, se procedio a colocarse plantillas para definir el nivel indicado en los planos. Una vez que se tubo el nivel adecuado, se procedio a compactar manualmente, con apoyo de un pisn.

04 04.01 04.01.01

ESTRUCTURAS CONCRETO SIMPLE FALSA ZAPATA - CONCRETO 1.12

Se procedio a baciar el concreto simple 1.12 de un espesor de acuerdo al plano, que se ejecuto en el fondo de las excavaciones de las zapatas, proporcionando una base para el trazado de columnas y colocacin de la armadura. Esta mezcla comprende la preparacin y colocacin de concreto cemento hormign 1:10 de 0.40 m de espesor, directamente sobre el suelo de relleno, como se indican en los planos.04.01.02CIMIENTO CORRIDOS - CONCRETO 1.40 + 30% P.M Partida no ejecutada

04.01.03

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS Partida no ejecutada

04.01.04

CONCRETO SIMPLE MEZCLA 1:8+ 25% P.M. PARA SOBRECIMIENTO Partida no ejecutada

05 05.01 05.01.01

CONCRETO ARMADO

MUROS DE CONTENCION SOLADO PARA ZAPATA MEZCLA 1:12 C:H (e=4") Partida no ejecutada

05.01.02

ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 - TRABAJADO

Partida no ejecutada

05.01.03

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS - MURO DE CONTENCION Partida no ejecutada

05.01.04

CONCRETO f'c=175 kg/cm2 CON MEZCLADORA Partida no ejecutada

05.01.05

SISTEMA DE DRENAJE PARA MURO DE CONTENCION Partida no ejecutada

05.02 05.02.01

ZAPATAS ENCOFRADO Y DESENCOFRADO PARA ZAPATA CONECTADA

El encofrado y desencofrado de las caras laterales , se ejecutaron deacuardo al cumpliendo con las especificaciones tcnicas correspondientes y las caractersticas geomtricas indicadas en los planos pertinentes05.02.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

05.02.03

CONCRETO PARA ZAPATA CONECTADA Fc=210 kg/m2

El concreto se realizo con una mezcla de agua y cemento arena y piedra chancada - concreto Fc=210 preparado en una mezcladora dentro de la cual se disponio las armaduras de acero de acuerdo a los planos de estructuras.

05.03 05.03.01

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION Partida no ejecutada

05.03.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

El acero corrugado esta ejecutado deacuerdo a lo especificado en los planos en base a su esfuerzo de fluencia Fy = 4200 kg/cm2. toda la armadura fue cortada a la medida y fabricada estrictamente, como se indican en los detalles y dimensiones mostrados en los planos del proyecto.05.03.03CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 Partida no ejecutada

05.04 05.04.01

COLUMNAS ENCOFRADO Y DESENCOFRADO PARA COLUMNAS Partida no ejecutada

05.04.02

ACERO DE REFUERZO fy=4,200 kg/cm2 GRADO 60 Partida no ejecutada

05.04.03

CONCRETO EN COLUMNAS fc=210kg/cm2 Partida no ejecutada

05.05 05.05.01

COLUMNETAS ENCOFRADO Y DESENCOFRADO PARA COLUMNAS Partida no ejecutada

05.05.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 Partida no ejecutada

05.05.03

CONCRETO EN COLUMNAS fc=210kg/cm2

Partida no ejecutada

05.06 05.06.01

VIGAS ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS Partida no ejecutada

05.06.02

ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS Partida no ejecutada

05.06.03

CONCRETO EN VIGAS f'c=210 kg/cm2 Partida no ejecutada

05.07 05.07.01

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS Partida no ejecutada

05.07.02

LADRILLO HUECO DE CONCRETO H=15 PARA TECHO ALIGERADO Partida no ejecutada

05.07.03

ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS Partida no ejecutada

05.07.04

CONCRETO f'c=210 kg/cm2 CON DOSIFICACION Y ADITIVOS Partida no ejecutada

05.07.05

VENTANA ALTA DE ILUMINACION Partida no ejecutada

05.08 05.08.01

ESCALERAS ENCOFRADO Y DESENCOFRADO PARA ESCALERAS Partida no ejecutada

05.08.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 Partida no ejecutada

05.08.03

CONCRETO ESCALERAS fc=210 kg/cm2 Partida no ejecutada

06 06.01

SISTEMA DE DRENAJE SISTEMA DE DRENAJES El sistema de drenajes se ejecuto deacuerdo alas especificaciones tecnicas y el plano respectivo, tambien se iso las pruebas de control al drenado ya que se cuenta con mucha filtracion en el terreno

07 07.01 07.01.01

ALBAILERIA MUROS Y TABIQUES MUROS DE ALBAILERIA CONFINADA, AMARRE CABEZA Partida no ejecutada

07.01.02

MURO DE SOGA LADRILLO KING KONG CON CEMENTO ARENA Partida no ejecutada

07.02 07.02.01

CERCO PERIMETRICO MUROS DE BLOQUE HUECO DE CONCRETO E=15CM - 1.5 C:A de 0.15x0.20x0.40 Partida no ejecutada

07.03 07.03.01

CIELO RASOS CIELO RASO SISTEMA DRIWALL Partida no ejecutada

07.04 07.04.01

REVOQUES, ENLUCIDOS Y MOLDURAS TARRAJEO DE INTERIORES MEZCLA 1:5 C:A Partida no ejecutada

07.04.02

TARRAJEO EN EXTERIORES MEZCLA 1:5 C:A Partida no ejecutada

07.04.03

TARRAJEO MUROS CERCO PERIMETRICO C:A 1.5 Partida no ejecutada

07.04.04

VESTIDURA DE DERRAMES ANCHO PROMD. 15 CM Partida no ejecutada

07.04.05

TARRAJEO DE VIGAS Y/O COLUMNAS Partida no ejecutada

07.04.06

TARRAJEO DE CIELORASO Partida no ejecutada

07.04.07

BRUAS DE 1 X 1 cm Partida no ejecutada

07.05 07.05.01

PISOS Y PAVIMENTOS CONCRETO FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=4" Partida no ejecutada

07.05.02

PISO CERAMICO ANTIDESLIZANTE DE 30x30 mts Partida no ejecutada

07.05.03

VEREDA DE CONCRETO E=4 Partida no ejecutada

07.05.04

ENCOFRADO Y DESENCOFRADO EN VEREDAS Partida no ejecutada

07.05.05

JUNTAS ASFALTICAS Partida no ejecutada

07.06 07.06.01

ZOCALOS Y ENTREZOCALOS ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO - ARENA Partida no ejecutada

07.06.02

ZOCALO DE CERAMICA BLANCA 20 X 30CM DE PRIMERA Partida no ejecutada

07.06.03

CONTRAZOCALO CERAMICO 30 X 30 H=0.10 m. PEGADO CON CEMENTO Y FRAGUA GRIS Partida no ejecutada

08 08.01 08.01.01

CARPINTERIA Y CERRAJERIA CARPINTERIA DE MADERA PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3" Partida no ejecutada

08.01.02

PUERTA DE MADERA AGUANO TABLERO REBAJADO Partida no ejecutada

08.02 08.02.01

CERRAJERIA CERRADURA DE TRES GOLPES CON LLAVE INTERIOR Y EXTERIOR Partida no ejecutada

08.02.02

CHAPA CON PERILLA SEGURIDAD INTERIOR Y LLAVE EXTERIOR Partida no ejecutada

08.02.03

BISAGRA CAPUCHINAS ALUMINIZADA DE 3" X 3" Partida no ejecutada

08.03 08.03.01

CARPINTERIA METALICA VENTANA METALICA DE SEGURIDAD (INCL. COLOCADO+ACCESORIOS) Partida no ejecutada

08.03.02

PUERTA METALICA Partida no ejecutada

08.03.03

PUERTA METALICA GARAJE Partida no ejecutada

08.03.04

CEERCO METALICO Partida no ejecutada

08.03.05

BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2 - PARANTE 1X1M Partida no ejecutada

09 09.01

VIDRIOS, CRISTALES Y SIMILARES VIDRIO SEMIDOBLE INCOLORO CRUDO Partida no ejecutada

10 10.01

PINTURA PINTADO DE MUROS INTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR) Partida no ejecutada

10.02

PINTADO DE MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR) Partida no ejecutada

10.03

PINTURA ESMALTE EN ZOCALO Partida no ejecutada

10.04

PINTURA LATEX EN MUROS CERCO PERIMETRICO Partida no ejecutada

10.05

PINTURA EN PUERTAS C/BARNIZ 2 MANOS Partida no ejecutada

10.06

PINTURA EN DERRAMES Partida no ejecutada

11 11.01 11.01.01

INSTALACIONES SANITARIAS APARATOS Y ACCESORIOS SANITARIOS INODORO TANQUE BAJO BLANCO INC. COLOCADO Partida no ejecutada

11.01.02

LAVATORIO DE PARED BLANCO 1 LLAVE INC. COLOCADO Partida no ejecutada

11.01.03

LAVADERO DE ACERO INOXIDABLE DE COCINA Partida no ejecutada

11.01.04

PAPELERA LOSA BLANCO DE 13X15 cm INC. COLOCADO Partida no ejecutada

11.01.05

TOALLERO DE LOSA COLOR Partida no ejecutada

11.02

SISTEMA DE DESAGUE Partida no ejecutada

11.03

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO Partida no ejecutada

12

INSTALACIONES ELECTRICAS Partida no ejecutada

13 13.01

OBRAS COMPLEMENTARIAS PRUEBAS DE CALIDAD DE CONCRETO Partida no ejecutada

13.01.01

DISEO DE MEZCLAS DE CONCRETO LAB No se ejecuto

13.01.02

PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRENCION) Partida no ejecutada

13.01.03

CONTROL DE CALIDAD DE LADRILLO No se ejecuto

13.01.04

PRUEBA DE COMPACTACION DE SUELOS No se ejecuto

14 14.01

MITIGACION DE IMPACTO AMBIENTAL MITIGACION DEL IMPACTO AMBIENTAL No se ejecuto

15 15.01

FLETE TERRESTRE FLETE TERRESTRE ABANCAY No se ejecuto

6.00

PROCEDIMIENTOS CONSTRUCTIVOS EMPLEADOS Los procedimientos constructivos empleados estn basados a las Especificaciones Tcnicas descritos en el expediente tcnico y las normas del Reglamento Nacional de Edificaciones. LAS OCURRENCIAS TRASCENDENTES PARA EL DESARROLLO DE LA EJECUCIN DE OBRA. La residencia realizo el informe respectivo del corte de obra en el cuaderno de obra indicando las valorizacion respectiva y los materiales encontrados en cancha. No se contaba con almacen, no se contaba con informe de maquinaria pesada, no se conto con informe mensual de residencia, Se informo todas las ocurrencias al Jefe De la Sub Gerencia De Obras Publicas y Privadas. No se encontro documento alguno concerniente al manejo del movimiento de almacen, salida e ingreso de materiales lo que dificulta cuantificar en la documentacion respectiva como BINCARD Y Han laborado 30 das calendarios donde se ha realizado Gasto Presupuestal sin control por la Unidad Ejecutora, sin Supervisin al igual no se encontr documentacin de orden legal, cuaderno de obra, En la actualidad la obra se encuentra paralizado, se ha encontrado con materiales al exterior al cuidado de un guardin que solo cuida de noche. No existe en los archivos de la Sub Gerencia de las Obras Pblicas y Privadas la Nominacin del Ingeniero Residente, Cuaderno de Obra, informe mensual y menos Supervisin tal como indica la De acuerdo al informe presentado por el Ex Sub Gerente De Obras Publicas y Privadas donde indica que la obra inicio con Residente y Supervisor de obra al igual presenta una planilla donde indica que es personal que ha laborado en el mes de mayo del 2012, al igual presnta una serie de documentos donde indica adeudar a proveedores que han abastecido a obra sin pasar por las dependencias encargadas de hacer la adquisicion.

7.00

De acuerdo al informe presentado por el Ex Sub Gerente De Obras Publicas y Privadas donde indica que la obra inicio con Residente y Supervisor de obra al igual presenta una planilla donde indica que es personal que ha laborado en el mes de mayo del 2012, al igual presnta una serie de documentos donde indica adeudar a proveedores que han abastecido a obra sin pasar por las dependencias encargadas de hacer la adquisicion.

8.00

DOCUMENTOS TECNICOSDOCUMENTO Resolucin de Aprobacion Expediente Acta de Apertura de Cuaderno Obra Acta de Entrega de Terreno Acta de Inicio de Obra Acta de Terminacion Obra Acta de Paralizacin/Corte Acta de Reinicio de Obra Fecha de Paralizacion Acta de Entrega de Obra NUMERO 0 - 50 FECHA 12-Apr-12 9-Apr-12 9-Apr-12 4-Jun-12 OBSERVACIONES

SE DESCONOCE

9.00

RECURSOS UTILIZADOS 9.01 RECURSOS HUMANOSCATEGORIA MAYO JUNIO JULIO OBSERVACIONES

Residente de Obra 1 Inspector de Obra 1 Asistente Tcnico 1 Asistente Administrativo 1 Maestro de Obra 1 Almacenero 1 Operador de Maquinaria Liviana (Se considera el personal que laboro) 0 Operario 1 Oficial 0 Pen 12 Total 19

9.02MAQUINARIA

RECURSOS DE MAQUINARIA Y EQUIPOCANT. 1 1 1 1 1 MAQ. PROPIA MAQ. ALQUILD. TOTAL (HRS) EN EL MES 6 15 0 12 8

Volquete 12 m3. Cargador Frontal Plancha compactadora. Concretera de 9p3. vibradora

x x x

COMENTARIO SE HA UTILIZADO LA CONCRETERA DE 9P3, ES DE LA MUNICIPALIDAD A LA CUAL SE LE HA DADO MANTENIMIENTO, CAMBIO DE ACEITE PARA EL MOTOR, CORREAS, PERNOS DE SUJECCION, AL IGUAL SE COMUNICA QUE POR FALTA DE ABASTECIMIENTOS DE MATERIALES POR EL AREA DE ABASTECIMIENTOS SE REALIZO PRESTAMOS DE 120 BOLSAS DE CEMENTO DONDE SE ASUME EL GASTO POR FLETE TERRESTRE

10.00

PLANILLA DE METRADOS Del presupuesto original. 10.01 Se adjunta planilla de metrados 10.02 De adicionales por mayores metrados.

.

Se adjunta planilla de mayores metrados De adicionales por partidas nuevas Se adjunta planilla por partidas nuevas

10.03

11.00

VALORIZACION 11.01 Resumen de las Valorizaciones 11.02 Valorizacin de Avance de Obra 11.03 Valorizacin de Mayores Metrados 11.04 Valorizacin de Partidas Nuevas REPORTE DE EJECUCIN FINANCIERA. Se adjunta valorizacin en anexo MOVIMIENTO DE ALMACEN VALORIZADO. Se adjunta valorizacin en anexo PROTOCOLOS DE CONTROL DE CALIDAD Se adjunta valorizacin en anexo CONCLUSIONES Y RECOMENDACIONES

Se adjunta valorizacin en anexo No. 1 Se adjunta valorizacin en anexo No. 2 Se adjunta valorizacin en anexo No. 3 Se adjunta valorizacin en anexo No. 4

12.00

13.00

14.00

15.00

La residencia concluye de los antecedentes concerniente al proceso de ejecucion tecnico, financiero y administrativo lo siguiente:NO SE CUENTA CON INFORMACION DEL PROCESO CONSTRUCTIVO DONDE NOS INDIQUE CUALES FUERON LAS METAS ALCANZADAS EN EL MES DE MAYO DEL 2012 MES DE MAYO, PERO A LA DE LA PARTE FINANCIERA NO SE HA REALIZADO EJECUCION EN EL ACTUALIDAD SE NOS DA HA CONOCER GASTOS EFECTUADOS POR CONCEPTO DE MAQUINARIA Y MATERIALES, LOS MSMOS HAN CONTRAVENIDO EL PROCESO DE ADQUISICION, DADO EN LA LEY No. DE LA PARTE ADMINISTRATIVA NO SE TIENE INFORMACION COMO INFORME MENSUAL DEL MES DE MAYO, MOVIMIENTO DE ALMACEN,INDICA QUE SE TUVO DESABASTECIMIENTO DE MATERIALES, EL AREA A LA ACTUALIDAD LA RESIDENCIA CUADERNO DE OBRA DE ABASTECIMIENTO NO HA CUMPLIDO EL ABASTECIMIENTO DE MATERIALES LOS MISMOS AFECTAN EL NORMAL DESARROLLO DE LA EJECUCION DE OBRA AFECTANDO LA RUTA CRITICA.

B.3.3

RECURSOS DE MAQUINARIA Y EQUIPO

MAQUINARIA Camioneta Hilux 4x4 PZ-6995 Concretera de 9P3. Plancha compactadora. Cargador Frontal

MAQ. CONVENIO MAQ. PROPIA

MAQ. ALQUILD. -

TOTAL (HRS) EN EL MES 0 20 3 0 0 0

x x -

B.3.4

VALORIZACION DE MAQUINARIA Y EQUIPODESCRIPCION Costo Directo TOTAL APROBADO 0.00 0.00 ANTERIOR 0.00 0.00 ACTUAL 0.00 0.00 ACUMULADO 0.00 0.00

COMENTARIO LA CONCRETERA DE 9P3, ES DE LA MUNICIPALIDAD A LA CUAL SE LE HA DADO MANTENIMIENTO, CAMBIO DE ACEITE PARA EL MOTOR, CORREAS, PERNOS DE SUJECCION Y BUJIAS.

SALDO 0.00 0.00

MANTENIMIENTO, CAMBIO DE ACEITE

MANIFIESTO DE GASTOS - MES DE MAYO 2012META RUBRO PROYECTO 65 18" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE

RUBRO ESTADO FINANCIERO: MANO DE OBRA CALIFICADA Y NO CALIFICADAN 1 2 O/C O C/P C/P O/C 2752 356 DOCUMENTO N 13-07-2012 23.05.12 DETALLE RAZON SOCIAL O NOMBRE FECHA CONCEPTO U. M. CANT. PRECIO UNITARIO VALOR TOTAL S/. 16000.57 2950.80

CLEOFE ALMANZA GUTIERREZ PLANILLA DE RACION PER - 004 (MES DE MAYO 2012) 12K 15 16000.57 FETRACHO HNOS ESPINOZA LOPEZ PER - 004 (MES DE JUNIO 2012) PLANILLA DE RACION 12W 10 2950.80

18,951.37

RUBRO ESTADO FINANCIERO: BIENESN 1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 1 2 3 O/C O C/P O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C DOCUMENTO N 356 356 356 356 356 356 356 356 357 357 357 357 370 370 370 370 370 370 370 370 370 370 370 374 374 374 23.05.12 23.05.12 23.05.12 23.05.12 23.05.12 23.05.12 23.05.12 23.05.12 24.05.12 24.05.12 24.05.12 24.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 28.05.12 24.05.12 24.05.12 24.05.12 DETALLE RAZON SOCIAL O NOMBRE FECHA CONCEPTO U. M. CANT. 10 10 4 4 14 PRECIO UNITARIO 7.99 7.99 18.00 3.30 22.00 6.99 16.00 38.00 4.20 4.20 4.20 4.20 25.00 25.90 180.00 22.00 82.00 26.00 96.00 6.00 1.50 75.00 4.70 26.70 15.00 6.00 VALOR TOTAL S/. 79.90 79.90 216.00 13.20 88.00 97.86 32.00 228.00 168.00 210.00 84.00 168.00 250.00 259.00 540.00 22.00 82.00 52.00 96.00 12.00 75.00 150.00 56.40 7,048.80 3,810.00 66.00

FETRACHO HNOS ESPINOZA LOPEZ PARES GUANTES DE JEBE FETRACHO HNOS ESPINOZA LOPEZ PARES GUANTES DE CUERO FETRACHO HNOS ESPINOZA LOPEZ UNDS MASCARRILLA FETRACHO HNOS ESPINOZA LOPEZ40 BOTAS DE JEBE N PARES FETRACHO HNOS ESPINOZA LOPEZ UNDS LENTES DE SEGURIDAD

FETRACHO HNOS ESPINOZA COLOR ROJO+LOGOTIPO 12 CASCOS DE LOPEZ UNDS

FETRACHO HNOS ESPINOZA LOPEZ UNDS ESTAMPADO2 POLOS COLOR GRIS CON FETRACHO HNOS ESPINOZA LOPEZ UNDS CASCOS COLOR BLANCO CON LOGOTIPO 6 INVERSIONES G.CH.R SACN 8 S. CHOQUE HUICHO ALAMBRE ANA KLS INVERSIONES G.CH.R SACN 16 S. CHOQUE HUICHO ALAMBRE ANA KLS INVERSIONES G.CH.R SAC ANAMADERA DE HUICHO CLAVOS PARA S. CHOQUE 4" KLS INVERSIONES G.CH.R SAC ANAMADERA DE HUICHO CLAVOS PARA S. CHOQUE 3" KLS FETRACHO HNOS ESPINOZA LOPEZ UNDS PALA FETRACHO HNOS ESPINOZA LOPEZ UNDS PICO FETRACHO HNOS ESPINOZA LOPEZ UNDS CARRETILLA FETRACHO HNOS ESPINOZANYLON CONO CORDEL DE LOPEZ FETRACHO HNOS ESPINOZA LOPEZ UNDS BARRETA EXAGONAL DE 5/8" FETRACHO HNOS ESPINOZA 5 LBS UNDS COMBAS DE LOPEZ FETRACHO HNOS ESPINOZA LOPEZ UNDS COMBA DE 26 LBS FETRACHO HNOS ESPINOZA LOPEZ QUIN YESO FETRACHO HNOS ESPINOZADE 3/4 DEMTS MANGUERA LOPEZ DIAMETRO FETRACHO HNOS ESPINOZA LOPEZ UNDS CILINDRO METALICO VACIO FETRACHO HNOS ESPINOZA LOPEZ UNDS HOJA DE SIERRA SAMFLEX INVERSIONES G.CH.R SAC ANA S. CHOQUE HUICHO ACERO CORRUGADO DE 1/2" VARIL INVERSIONES G.CH.R SAC ANA S. CHOQUE HUICHO ACERO CORRUGADO DE 3/8" VARIL INVERSIONES G.CH.R SAC ANA S. CHOQUE HUICHO ACERO CORRUGADO DE 1/4" VARIL 40 50 20 40 10 10 3 1 1 2 1 2 50 2 12 264 254 11

13,984.06TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE MAYO 2012

32,935.43

MANIFIESTO DE GASTOS - MES DE JUNIO 2012META RUBRO PROYECTO 65 18" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE

RUBRO ESTADO FINANCIERO: BIENESN 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 O/C O C/P O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C O/C DOCUMENTO N 388 388 388 448 448 448 448 448 448 484 484 484 484 484 484 484 484 484 05.06.12 05.06.12 05.06.12 13.06.12 13.06.12 13.06.12 13.06.12 13.06.12 13.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 DETALLE RAZON SOCIAL O NOMBRE FECHA CONCEPTO U. M. CANT. PRECIO UNITARIO 25.00 13.00 80.00 70.00 75.00 70.00 70.00 75.00 3.32 24.00 0.24 0.28 1.99 4.86 6.13 4.31 4.46 VALOR TOTAL S/. 975.00 1,050.00 650.00 2,880.00 1,750.00 1,425.00 350.00 3,780.00 6,000.00 19.92 96.00 0.96 1.12 1.99 9.72 6.13 4.31 4.46

NIO DE GUZMAN CAVERO ESTHER UNDS MADERA CORRIENTE DE MONTAA 1 1/2" X 10" X 10" 32.50 30 NIO DE GUZMAN CAVERO ESTHER UNDS MADERA CORRIENTE DE MONTAA 1 1/2" X 8" X 10" 42 NIO DE GUZMAN CAVERO ESTHER UNDS MADERA CORRIENTE DE MONTAA 2" X 3 " X 10" 50 TAPIA ARAUJO JORGE ELIAS PIEDRA CHANCADA DE 3/4"-TM 1 1/2" M3 TAPIA ARAUJO JORGE ELIAS PIEDRA GRANDE DE 8" M4 TAPIA ARAUJO JORGE ELIAS ARENA GRUESA DE RIO 5 M TAPIA ARAUJO JORGE MEDIANA 4" PIERA ELIAS TAPIA ARAUJO JORGE ELIAS HORMIGON TAPIA ARAUJO JORGE ELIAS DE RIO ARENA FINA M6 M7 36 25 19 5 54 80

FERNANDEZ ALVAREZ EULOGIO ALFREDO PLASTIFICADO ARCHIVADOR DE CARTON 6 UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO BOLIGRAFO TINTA SECA COLOR AZUL 4 UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO BOLIGRAFO TINTA SECA COLOR NEGRO 4 UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO BOLIGRAFO TINTA SECA COLOR ROJO 4 UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO CORRECTOR LIQUIDO UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO CUADERNO ANILLO SIMPLE UNDS FERNANDEZ ALVAREZ EULOGIO C/YUNQUE ENGRANPADOR ALFREDO UNDS FERNANDEZ ALVAREZ EULOGIO ALFREDO FOLDER MANILA SIN REFUERZO BOLS 1 2 1 1

FERNANDEZ ALVAREZ EULOGIO UNDS METALICO ARTESC FASTENER X 50 ALFREDO 1 CAJA

10 11 12 13 14 15

O/C O/C O/C O/C O/C O/C

484 484 484 484 484 484

19.06.12 19.06.12 19.06.12 19.06.12 19.06.12 19.06.12

FERNANDEZ ALVAREZ EULOGIO ALFREDO CAJA GRAPAS X 500 UNDS CAJA FERNANDEZ ALVAREZ EULOGIO ALFREDOD/75 GR. PAPEL BOND FOTOCOPIA PAQUET FERNANDEZ ALVAREZ EULOGIO ALFREDO REGLA DE PLASTICO UND FERNANDEZ ALVAREZ EULOGIO ALFREDO RESALTADOR UND

1 6 1 1

2.18 11.39 3.74 0.40 1.16 2.38

2.18 68.34 3.74 0.40 1.16 7.14

FERNANDEZ ALVAREZ EULOGIO ALFREDO PERFORADOR D/032 ESPIGAS DE 7 HOJAS 1 UND

FERNANDEZ ALVAREZ EULOGIO ALFREDO TABLERO DE MADERA MANIJA DE PRESION 3 UND

19,087.57

RUBRO ESTADO FINANCIERO: PERSONAL TECNICO ADMINISTATIVO / OTROSN O/C O C/P DOCUMENTO N 2503 2533 2752 2548 DETALLE POR HABILITO QUISPE LEON JAVIER LUCHO DE CAJA CHICA RAZON SOCIAL O NOMBRE FECHA CONCEPTO 21/06/2012 05.07.12 05.07.12 05.07.12 U. M. CANT. PRECIO UNITARIO 1,000.00 3,000.00 3,000.00 3,000.00 VALOR TOTAL S/. 1,000.00 3,000.00 3,000.00 3,000.00

1 2 3 4

C/P C/P C/P C/P

SERVICIO

1

HUAMANAHUI CRUZSERVICIOS COMO ASISTENTE EN LA SGSLO POR EDISON 1 SERVICIO HUAMANAHUI CRUZSERVICIOS COMO ASISTENTE EN LA SGSLO POR EDISON 1 SERVICIO HUAMANAHUI CRUZSERVICIOS COMO ASISTENTE EN LA SGSLO POR EDISON 1 SERVICIO

10,000.00TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE JUNIO 2012

29,087.57

MANIFIESTO DE GASTOS - MES DE JULIO 2012META RUBRO PROYECTO 65 18" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE

RUBRO ESTADO FINANCIERO: MANO DE OBRA CALIFICADA Y NO CALIFICADAN 1 O/C O C/P C/P 2752 DOCUMENTO N 13-07-2012 DETALLE RAZON SOCIAL O NOMBRE FECHA CONCEPTO U. M. CANT. PRECIO UNITARIO VALOR TOTAL S/. 13707.00

CLEOFE ALMANZA GUTIERREZ PLANILLA DE RACION PER - 2012 (MES 15 JULIO 2012) 0213 DE 13707.00

13,707.00

RUBRO ESTADO FINANCIERO: BIENESN 1 2 1 1 2 O/C O C/P O/C O/C O/C O/C O/C DOCUMENTO N 546 547 570 575 575 13.07.12 13.07.12 19.07.12 20.07.12 20.07.12 DETALLE RAZON SOCIAL O NOMBRE FECHA CONCEPTO ALVARADO PALOMINO ANDRES PETROLEO B5 U. M. CANT. 80 180 800 PRECIO UNITARIO 13.13 13.80 23.15 VALOR TOTAL S/. 1,050.40 2,484.00 18,519.23 1,653.00 10,920.60 ESTACION DE SERVICIOS EL PILOTO SRL. GASOLINA DE 84 OCTANOS GLS GLS CORPORACION CHUMBAO PORTLAND TIPO I CEMENTO S.R.L. UNDS

TAPIA ARAUJO JORGE ELIAS BLOQUE HUECO DE CONCRETO 0.40 X 2.20 X 0.15CM, E=1" 1102 1.50 UNDS TAPIA ARAUJO JORGE ELIAS LADRILLO KING-KONG DE CONCRETO A.14X 0.24 X 0.09 M 12134 0.90 UNDS

34,627.23TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE JULIO 2012

48,334.23

RESUMEN DEL ESTADO FINANCIEROMETA PROYECTO

0065 - 2012

CORRESPONDIENTE AL MES DE

MAYO - JUNIO - JULIO - 2012

MEJORAMIENTO DE LA CAPACIDAD DE RESOLUTIVA DEL PUESTO DE SALUD DE KERAPATA NIVEL I-1 MICRO RED MICAELA BASTIDAS DISTRITO DE TAMBURCO PROVINCIA DE ABANCAY-APURIMAC

MONTO PRESUPUESTO TOTAL ES MONTO AMPLIACION PRESUPUESTAL MONTO TOTAL PRESUPUESTO

S/.297,339.00 S/. 0.00 S/.297,339.00

ASIGNACIONES 1 2 3

AO 2012 2012 2012

MES MAYO JUNIO JULIO TOTAL ASIGNADO A LA FECHA

CORRELATIVO N 0065 - 2012 0065 - 2012 0065 - 2012

MONTO S/.

S/.32,935.43 S/.29,087.57 S/.48,334.23S/.110,357.23

MONTO ASIGNADOITEMESPECIFICA DE GASTO

MONTO EJECUTADO

MONTO EJECUTADO

MONTO EJECUTADO

RUBROS

(SEGN PRESUPUESTO)

MAYO S/.32,935.43 18,951.37 13,984.06 0.00 0.00

JUNIO %11.08% 6.37% 4.70% 0.00% 0.00%

JULIO %6.42% 0.00% 6.42% 3.36% 3.36%

ACUMULADO S/.100,357.23 32,658.37 67,698.86 10,000.00 10,000.00

SALDO S/.169,981.77 67,680.63 102,301.14 17,000.00 17,000.00 4.61% 22.77%

S/.1 1.1 1.2 2 2.1 26.22.35 26.22.33 26.22.34 COSTO DIRECTO 270,339.00 MANO DE OBRA CALIFICADA 100,339.00 BIENES 170,000.00 GASTOS GENERALES 27,000.00

%90.92% 33.75% 57.17% 9.08%

S/.19,087.57 0.00 19,087.57 10,000.00 10,000.00

S/.48,334.23 13,707.00 34,627.23 0.00 0.00

%16.26% 4.61% 11.65% 0.00% 0.00%

%27.38%

%57.17% 22.76% 34.41% 23.25% 23.25%

14.30% 3.36%

PERSONAL TECNICO Y ADMINIST./OTROS 27,000.00 9.08%

TOTAL

297,339.00

100.00%

32,935.43

11.08%

29,087.57

9.78%

48,334.23

16.26%

110,357.23

41.68%

186,981.77

80.42%

S/.62,023.00

S/.29,087.57 S/.48,334.23 S/.48,334.23

VALORIZACIN DE AVANCE DE OBRAOBRA: CORRESPONDIENTE AL MES DE AGOSTO DEL 2012MONTO DE OBRA MONTO ASIGNADO 2012 FECHA OBRA DE INICIO DE

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV.

S/. 148,138.08 S/. 148,138.08 01 DEAGOSTO 03 MESES 01 DE NOVIEMBRE

PLAZO DE EJECUCIN FECHA DE TERMINO

PRESUPUESTO PROGRAMADO

ITEM Und.

Metrado

01 01.01 01.02 01.02.02 01.02.02

RECOLECCION DE LEA HACHADO TRANSPORTE DE LEA UN ML 3350.00 5.00

COSTO DIRECTO MENSUAL ( S/.)

PRESUPUESTO TOTALPORCENTAJES

VANCE DE OBRA N 01

QUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE

REGION DEPARTAMENTO PROVINCIA DISTRITO

APURIMAC APURIMAC ABANCAY ABANCAY

PRESUPUESTO PROGRAMADO

Precio (S/.)

Parcial (S/.)

Metrado

ANTERIOR Valoriz S/.

%

Metrado

AVANCES ACTUAL Valoriz S/.

ACUMULADO % Metrado

0.20 55.00

670.00 275.00

0.00

0.00

0.00%

45.00

2475.00

900.00%

45.00

945.00 148,138.08

0.00 0.00 0.00%

2,475.00 2,475.00 1.67%

NADA EN EL DISTRITO DE

ACUMULADO Valoriz S/.

%

2475.00

900.00%

2,475.00 2,475.00 1.67%