Desagregado de Gastos Agosto Parchado de Vias

70
DESAGREGADO DEL PRESUPUESTO ANALÍTICO COSTO DIRECTO RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 01 JORNAL BASICO DEL EMPLEADO EVENTUAL CARGO UNID. P.U. CANTIDAD SUB TOTAL OPERARIO hh 13.58 348.6277 4,738.78 PEON hh 10.64 3,671.8979 39,084.91 TOTAL 43,823.68 MATERIALES DE CONSTRUCCION 01 MATERIALES DE CONSTRUCCION DESCRIPCION UNIDAD CANT P.U. TOTAL ALAMBRE NEGRO RECOCIDO # 16 kg 539.451 5.50 2,966.98 ALAMBRE NEGRO RECOCIDO # 8 kg 55.929 5.50 307.61 CLAVOS PARA MADERA C/C 3" kg 461.1621 5.50 2,536.39 CLAVOS PARA MADERA C/C 4" kg 67.1148 5.50 369.13 ACERO DE REFUERZO FY=4200 GRADO 60 kg 7552.314 3.60 27,188.33 ARENA FINA m3 12.6 80.00 1,008.00 PIEDRA CHANCADA DE 3/4" m3 91.6344 65.00 5,956.24 ARENA GRUESA m3 70.785 65.00 4,601.03 PIEDRA MEDIANA m3 398.9074 35.00 13,961.76 PIEDRA GRANDE m3 570.9 35.00 19,981.50 ASFALTO RC-250 gln 78.75 25.00 1,968.75 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3596.39 21.50 77,322.39 YESO QQ 108.9775 6.50 708.35 CORDEL m 3269.34 0.50 1,634.67 MITIGACION DE IMPACTO AMBIENTAL m2 1 3,000.00 3,000.00 FLETE TERRESTRE GLB 1 4,441.40 4,441.40 MOVILIZACION Y DESMOVILIZACION DE EQUIPO (TRANSPORTADO) GLB 1 4,680.00 4,680.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO (AUTOPROPULSADO) GLB 1 1,600.00 1,600.00 HORMIGON m3 436.602 65.00 28,379.13 CARTEL DE OBRA INC.INSTALACION Y TRANSP GLB 1 795.10 795.10 MADERA NACIONAL P/ENCOFRADO-CARP p2 3579.456 2.50 8,948.64 ESTACA DE MADERA p2 544.8919 1.85 1,008.05 PINTURA ESMALTE gln 25.8 35.00 903.00 TUBERIA PVC UF S-25 Ø=8" (INC/ANILLO) m 682.5 31.75 21,669.38 TOTAL 235,935.82 BIENES DE CONSUMO S/. DESCRIPCION UND CANTIDAD P.U. TOTAL HERRAMIENTAS MANUALES %MO 1.0000 3,706.91 3,706.91 TOTAL 3,706.91 ALQUILER DE BIENES INMUEBLES S/. DESCRIPCION UND. CANT P.U TOTAL MIRAS Y JALONES hm 206.4000 4.50 928.80 CAMION VOLQUETE 210-280 HP 12 M3 hm 373.6119 294.82 110,148.26 COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 309.1625 15.00 4,637.44 CARGADOR S/LLANTAS 160-195 HP hm 271.0080 216.73 58,735.56 TRACTOR DE ORUGAS DE 190-240 HP hm 591.1829 216.43 127,949.72 MOTONIVELADORA DE 180-200 HP hm 642.8414 188.91 121,439.17 MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 hm 540.22 30.00 16,206.71 TEODOLITO hm 233.92 7.50 1,754.39 TOTAL 441,800.04 COSTO DIRECTO TOTAL S/.

Transcript of Desagregado de Gastos Agosto Parchado de Vias

Page 1: Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

COSTO DIRECTO

RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 43,823.68

01 JORNAL BASICO

DEL EMPLEADO EVENTUAL

CARGO UNID. P.U. CANTIDAD SUB TOTALOPERARIO hh 13.58 348.6277 4,738.78 PEON hh 10.64 3,671.8979 39,084.91 TOTAL 43,823.68

MATERIALES DE CONSTRUCCION

01 MATERIALES DE CONSTRUCCION

DESCRIPCION UNIDAD CANT P.U. TOTAL

ALAMBRE NEGRO RECOCIDO # 16 kg 539.451 5.50 2,966.98

ALAMBRE NEGRO RECOCIDO # 8 kg 55.929 5.50 307.61

CLAVOS PARA MADERA C/C 3" kg 461.1621 5.50 2,536.39

CLAVOS PARA MADERA C/C 4" kg 67.1148 5.50 369.13

ACERO DE REFUERZO FY=4200 GRADO 60 kg 7552.314 3.60 27,188.33

ARENA FINA m3 12.6 80.00 1,008.00

PIEDRA CHANCADA DE 3/4" m3 91.6344 65.00 5,956.24

ARENA GRUESA m3 70.785 65.00 4,601.03

PIEDRA MEDIANA m3 398.9074 35.00 13,961.76

PIEDRA GRANDE m3 570.9 35.00 19,981.50

ASFALTO RC-250 gln 78.75 25.00 1,968.75

CEMENTO PORTLAND TIPO I (42.5KG) BOL 3596.39 21.50 77,322.39

YESO QQ 108.9775 6.50 708.35

CORDEL m 3269.34 0.50 1,634.67

MITIGACION DE IMPACTO AMBIENTAL m2 1 3,000.00 3,000.00

FLETE TERRESTRE GLB 1 4,441.40 4,441.40

MOVILIZACION Y DESMOVILIZACION DE EQUIPO (TRANSPORTADO) GLB 1 4,680.00 4,680.00

MOVILIZACION Y DESMOVILIZACION DE EQUIPO (AUTOPROPULSADO) GLB 1 1,600.00 1,600.00

HORMIGON m3 436.602 65.00 28,379.13

CARTEL DE OBRA INC.INSTALACION Y TRANSP GLB 1 795.10 795.10

MADERA NACIONAL P/ENCOFRADO-CARP p2 3579.456 2.50 8,948.64

ESTACA DE MADERA p2 544.8919 1.85 1,008.05

PINTURA ESMALTE gln 25.8 35.00 903.00

TUBERIA PVC UF S-25 Ø=8" (INC/ANILLO) m 682.5 31.75 21,669.38

TOTAL 235,935.82

BIENES DE CONSUMO S/. 3,706.91

DESCRIPCION UND CANTIDAD P.U. TOTAL

HERRAMIENTAS MANUALES %MO 1.0000 3,706.91 3,706.91

TOTAL 3,706.91

ALQUILER DE BIENES INMUEBLES S/. 441,800.04

DESCRIPCION UND. CANT P.U TOTAL

MIRAS Y JALONES hm 206.4000 4.50 928.80

CAMION VOLQUETE 210-280 HP 12 M3 hm 373.6119 294.82 110,148.26

COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 309.1625 15.00 4,637.44

CARGADOR S/LLANTAS 160-195 HP hm 271.0080 216.73 58,735.56

TRACTOR DE ORUGAS DE 190-240 HP hm 591.1829 216.43 127,949.72

MOTONIVELADORA DE 180-200 HP hm 642.8414 188.91 121,439.17

MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 hm 540.22 30.00 16,206.71

TEODOLITO hm 233.92 7.50 1,754.39

TOTAL 441,800.04

COSTO DIRECTO TOTAL S/. 860,159.26

Page 2: Desagregado de Gastos Agosto Parchado de Vias

RELACIÓN DE INSUMOS KERAPATACOSTO DIRECTO

MATERIALES DE CONSTRUCCION

Nº DESCRIPCION UNIDAD CANT P.U. TOTAL

1 FIERRO CORRUGADO DE 1/2" Varilla 72 26.50 1,908.00 2 FIERRO CORRUGADO DE 3/8" Varilla 67 16.00 1,072.00

4 pza 3 800.00 2,400.00

5 ALAMBRE GALVANISADO # 8 gln 152 36.40 5,532.80 6 ALAMBRE NEGRO # 16 kg 75 8.00 600.00 8 ALAMBRE NEGRO RECOCIDO # 8 kg 237 6.00 1,422.00 9 CLAVOS PARA MADERA C/C 2" kg 59 6.00 354.00 10 CLAVOS PARA MADERA C/C 3" kg 157 6.00 942.00 11 CLAVOS PARA MADERA C/C 2" - 4" kg 5 6.00 30.00 12 ARENA FINA m3 80 75.00 6,000.00 13 PIEDRA CHANCADA DE 1/2" m3 30 75.00 2,250.00 14 PIEDRA CHANCADA DE 3/4" m3 36 75.00 2,700.00 15 PIEDRA GRANDE DE 8" m4 25 55.00 1,375.00

PIEDRA MEDIANA DE 4" m3 56 55.00 3,080.00 PIEDRA MEDIANA DE 6" m3 0 60.00 0.00

15 ARENA GRUESA m3 123 75.00 9,225.00 16 m3 300 1.20 360.00 17 CACHIMBA PVC ISO 4435 DN=200 MM A 110 MM X 45° INC. CODO 45° und 300 46.00 13,800.00 18 LADRILLO K.K. DE ARCILLA 9X14X24 CM und 188 1.30 244.40 19 CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,064 23.50 25,004.00 20 CAJA DE CONCRETO P/MEDIDOR 1/2" - 3/4" und 300 25.00 7,500.00 21 CINTA TEFLON pza 48 2.00 96.00 22 PEGAMENTO P/TUBO PVC gln 7 83.38 583.66 23 ADITIVO IMPERMEABILIZANTE EN POLVO kg 70 25.00 1,750.00 24 CINTA PLASTICA P/SEÑAL DE SEGURIDAD OBRA m 315 1.00 315.00 25 YESO DE 28 Kg BOL 30 6.00 180.00 26 PLACA RECORDATORIA ACRILICA und 1 800.00 800.00 27 HORMIGON m3 16 60.00 960.00 28 AGUA m3 400 5.00 2,000.00 29 HIPOCLORITO DE CALCIO AL 70% kg 0 20.00 0.00 30 CARTEL DE OBRA INC.INSTALACION Y TRANSP GLB 0 700.00 0.00 31 MADERA PARA ENCOFRADO Y CARPINTERIA p2 0 4.00 0.00 32 ESTACA DE MADERA p2 0 4.00 0.00 33 CAJA DE DESAGUE DE 12"X24" und 0 30.00 0.00 34 MARCO Y TAPA F.FDO. P/REGISTRO VALVULA und 0 35.00 0.00 35 MARCO Y TAPA P/BUZON FºFº D=0.60 M DE 125 KG. pza 0 430.00 0.00 36 MARCO Y TAPA F°F° DESAGUE 23" X 11" LIV. CONEX. DOMICILIARIA pza 0 35.00 0.00 37 PINTURA ESMALTE gln 0 35.00 0.00 38 MARCO Y TAPA FO. GO. P/MEDIDOR 1/2"-3/4" und 0 35.00 0.00 39 TUBO CSN UF CLASE 1 ESPIGA CAMPANA DN 200MM. und 0 60.00 0.00 40 ABRAZADERA P/ CONEXION DE AGUA PVC SAP 1/2" x 90MM pza 0 12.00 0.00 41 ABRAZADERA P/ CONEXION DE AGUA PVC SAP 1/2" x 63MM pza 0 10.00 0.00 42 TUBERIA PVC UF ISO 4422 90 MM INC. ANILLO und 0 69.72 0.00 43 TUBERIA PVC UF ISO 4422 63 MM INC. ANILLO und 0 36.12 0.00 44 TUBERIA PVC UF ISO 4435 DN 110MM INC. C/ANILLO und 0 78.00 0.00 45 TUBERIA PVC UF ISO 4435 DN 200MM INC. C/ANILLO und 0 191.22 0.00 46 TUBERIA PVC SAP A-10 DE 1/2" und 0 15.00 0.00 47 TAPON PVC UF ISO 4422 DN 63MM pza 0 15.00 0.00 48 TEE PVC UF ISO 4422 DN 63MM C/ANILLO pza 0 38.23 0.00 49 CRUZ PVC UF ISO 4422 DN 90MM C/ANILLO pza 0 69.48 0.00 50 TEE PVC UF ISO 4422 DN 110MM X 63MM C/ANILLO pza 0 85.00 0.00 51 TEE PVC UF ISO 4422 DN 110MM X 90MM C/ANILLO pza 0 85.00 0.00 52 TEE PVC UF ISO 4422 DN 90MM C/ANILLO pza 0 61.86 0.00 53 CODO PVC UF DE 90º ISO 4422 DN 90MM C/ANILLO pza 0 47.25 0.00 54 CODO PVC UF DE 45º ISO 4422 DN 90MM C/ANILLO pza 0 42.97 0.00 55 TAPON PVC UF ISO 4422 DN 90MM pza 0 36.66 0.00 56 REDUCCION PVC UF ISO 4422 DN 90MM x 63MM pza 0 27.97 0.00 57 TEE PVC UF ISO 4422 DN 90MM X 63MM C/ANILLO pza 0 61.86 0.00 58 CRUZ PVC UF ISO 4422 DN 90MM X 63MM C/ANILLO pza 0 69.48 0.00 59 UNION UNIVERSAL PVC SAP DE 1/2" und 0 2.50 0.00 60 CURVA PVC 1/2" P/AGUA und 0 2.00 0.00 61 NIPLE STANDAR PVC SAP 1/2"X 1 1/2" pza 0 1.00 0.00 62 LLAVE PASO RT-NIPLE-TUERCA-EMPAQ. 1/2" und 0 5.00 0.00 63 NIPLE PVC 7.5 X 3/4"-REEMP MEDIDOR 1/2" und 0 1.00 0.00 64 CODO PVC SAP (AGUA) CON ROSCA 1/2"X 45° pza 0 1.00 0.00 65 LLAVE DE TOMA CORPORATION PVC SAP DE 1/2" TUERCA Y NIPLE pza 0 5.00 0.00 66 VALVULA COMPUERTA FºFº TIPO MAZZA ISO 4422 DN 90MM C-7.5 INC/ACCESORIOS und 0 240.00 0.00

GRIFO CONTRAINCENDIO TIPO POSTE 2 BOCAS INC. ACCESORIOS (CON REVESTIMIENTO DE PINTURA EPÓXICA)

CABLE TW # 14 AWG

Page 3: Desagregado de Gastos Agosto Parchado de Vias

67 VALVULA COMPUERTA FºFº TIPO MAZZA ISO 4422 DN 63MM C-7.5 INC/ACCESORIOS und 0 180.00 0.00

TOTAL S/. 96,061.86

Page 4: Desagregado de Gastos Agosto Parchado de Vias

COMBUSTIBLES , CARBURANTES Y LUBRICANTES

Nº DESCRIPCION UND CANTIDAD P.U. TOTAL1 GASOLINA 84 OCTANOS gln 80.00 12.50 1,000.00 2 PETROLEO DIESSEL N° 02 gln 20.00 12.50 250.00

TOTAL 1,250.00

GASTOS GENERALES

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALGASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) GLN 0.00 12.50 0.00

TOTAL 0.00

GASTOS DE SUPERVISIÓN

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL

GASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) GLN 0.00 12.50 0.00

TOTAL 0.00

Page 5: Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS GENERALES

RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 18,075.00

SERVICIOS NO PERSONALES

CARGO NRO MESES MONTO SUB TOTAL

RESIDENTE DE OBRA 3.00 0.50 6,250.00 9,375.00

ASISTENTE TECNICO 3.00 1.00 1,500.00 4,500.00

ASISTENTE ADMINISTRATIVO 3.00 1.00 1,400.00 4,200.00TOTAL 18,075.00

COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 0.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALGASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) GLN 0.00 15.00 0.00

TOTAL 0.00

MATERIALES DE CONSUMO S/. 1,295.00

IMPLEMENTOS DE SEGURIDAD

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALBOTAS DE JEBE PAR 10.00 25.00 250.00LENTES UNID. 20.00 3.00 60.00CINTAS DE SEGURIDAD KG 1.00 50.00 50.00ZAPATO DE SEGURIDAD CATT PAR 1.00 230.00 230.00CHALECOS CORTA VIENTO UNID. 4.00 50.00 200.00CASCO DE PROTECCION UNID. 10.00 12.00 120.00VARIOS VESTUARIOS GLB 7.00 55.00 385.00

TOTAL 1,295.00

MEDICAMENTOS S/. 100.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALBOTIQUIN DE PRIMEROS AUXILIOS GLB 1.00 100.00 100.00

TOTAL 100.00

BIENES DE CONSUMO S/. 420.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALLECHE EN TARRO (DESINTOXICACION) CAJA 3.00 140.00 420.00

TOTAL 420.00

EQUIPAMIENTO DE BIENES INMUEBLES S/. 300.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALALQUILER ALMACEN- RESIDENCIA MES 3.00 100.00 300.00

TOTAL 300.00

OTROS SERVICIOS DE TERCEROS S/. 150.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALSERVICIO DE FOTOCOPIADO UNID 1.00 150.00 150.00

TOTAL 150.00

MATERIALES DE ESCRITORIO S/. 526.82

MATERIALES DE ESCRITORIO

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALCUADERNO DE OBRA UNID 3.00 20.00 60.00ENGRAMPADOR UNID 1.00 10.00 10.00PERFORADOR UNID 1.00 10.00 10.00LAPICEROS TINTA UNID 10.00 2.00 20.00ARCHIVADORES DE LOMO ANCHO TIPO OFICIO UNID 4.00 10.00 40.00AGENDA DE NOTAS UNID 3.00 5.00 15.00CUADERNO ESPIRAL DE 200HOJAS A4 UNID 3.00 9.00 27.00ESPIRALES VARIOS TAMAÑOS UNID 20.00 1.60 32.00MICAS DE COLOR VARIOS MILLAR 0.30 85.00 25.50PAQUETE DE POSSIT PAQUETE 2.00 18.00 36.00PARTES DIARIOS TALON 3.00 10.00 30.00PEGAMENTO EN BARRA UHU UNID 3.00 5.00 15.00RESALTADOR UNID 2.00 3.00 6.00SELLO UNID 3.00 15.00 45.00TARJETAS DE CONTROL VISIBLE MILLAR 0.40 80.00 32.00TARJETAS DE SALIDA DE MATERIALES MILLAR 0.40 140.00 56.00PAPEL BOND 80GR MILLAR 0.50 27.00 13.50VARIOS UTILES DE ESCRITORIO GLB 1.00 53.82 53.82

526.82

TOTAL GASTOS GENERALES S/. 20,866.82

COEF.

INCIDENCIA

Page 6: Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

0

MATERIALES DE CONSUMO S/. 0.00

01 COMBUSTIBLES , CARBURANTES Y LUBRICANTES

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALGASOLINA 84 OCT (CAMIONETA DE OBRA/INC.TRANS.) GLN 0.00 12.50 0.00

TOTAL 0.00

SERVICIOS NO PERSONALES S/. 0.00

SERVICIOS NO PERSONALES

CARGO COEF. INCIDENCIA MESES MONTO x MES SUB TOTAL01 INGENIERO SUPERVISOR DE OBRA 1.00 4.00 3,000.00 0.00

TOTAL 0.00

IMPLEMENTOS DE SEGURIDAD

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALCASCOS DE PROTECCIÓN 3M UND 1.00 40.00 40.00ZAPATOS PUNTA DE ACERO PAR 1.00 280.00 280.00LENTES DE PROTECCIÓN PERSONAL TÉCNICO UND 1.00 35.00 35.00CHALECOS CON CINTAS REFLECTANTES PERSONAL TÉC UND 1.00 40.00 40.00

0.00

S/. 0.00

OTROS SERVICIOS DE TERCEROS-PERSONAS NATURALES Y JURIDICAS S/. 0.00

DESCRIPCION CANT CANT MONTO SUB TOTALREVELADO DE FOTOGRAFIAS RLLO 0.00 0.00 0.00

TOTAL 0.00

MATERIALES DE ESCRITORIO S/. 0.00

01 MATERIALES DE ESCRITORIO

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTALPAPEL A-4, 80 GRAMOS Millar 2.00 26.00 52.00MICAS UND 10.00 1.00 10.00ENGRAMPADOR PROFESIONAL UND 1.00 24.00 24.00PERFORADOR PROFESIONAL UND 2.00 15.00 30.00ARCHIVADOR TAMAÑO ESTANDAR UND 5.00 9.00 45.00WINCHA DE 8 MT MARCA STANLEY. UND 2.00 15.00 30.00FOLDER MANILA COLOR AMARILLO CON FASTENR UND 30.00 0.50 15.00LAPICEROS (PILOT) UND 10.00 2.00 20.00RESALTADOR UND 2.00 2.50 5.00CD UND 15.00 0.82 12.30WINCHA DE 100 MT MARCA STANLEY. UND 1.00 49.23 49.23CUADERNO 200h ARCO IRIS, ANILLADO PEQUEÑO UND 3.00 5.00 15.00LIBRETA DE CAMPO UND 2.00 7.00 14.00

TOTAL 0.00

ALQUILER DE BIENES MUEBLES S/. 0.00

01 MATERIALES DE ESCRITORIO

DESCRIPCIÓN UND. Nº MESES P.U. SUB TOTALALQUILER DE 01 COMPUTADORA P IV UND 0.00 250.00 0.00ALQUILER DE 01 IMPRESORA INYECCION A TINTA UND 0.00 80.00 0.00

TOTAL 0.00

TOTAL GASTOS DE SUPERVISION 0.00

Page 7: Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

LIQUIDACION DE OBRA

SERVICIOS NO PERSONALES S/. 1,567.53

DEL EMPLEADO EVENTUAL (COEF. INC. = 1)

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL

LIQUIDADOR DE OBRA (ING. CIVIL COLEGIADO) 1.00 1.00 900.00 900.00

CONTADOR PUBLICO COLEGIADO 1.00 1.00 667.53 667.53

TOTAL 1,567.53

TOTAL GASTOS DE LIQUIDACION DE OBRA S/. 1,567.53

Page 8: Desagregado de Gastos Agosto Parchado de Vias

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS DE ELABORACIÓN DEL EXPEDIENTE TÉCNICO

OTROS SERVICION A TERCEROS S/. 0.00

DESCRIPCION UND CANTIDAD COSTO SUB TOTALELABORACION DE EXPEDIENTE TECNICO 1.00 1.00 0.00 0.00

TOTAL 0.00

TOTAL EXPEDIENTE TECNICO S/. 0.00

Page 9: Desagregado de Gastos Agosto Parchado de Vias

COSTO DIRECTO 125,703.73 EXPEDIENTE TECNICO - GASTOS DE LIQUIDACION 1,567.53 GASTOS GENERALES 20,866.82 GASTOS SUPERVICON -

148,138.08

PRESUPUESTO TOTAL DE RESOLUCION 148,138.08

Page 10: Desagregado de Gastos Agosto Parchado de Vias

148,138.08

Page 11: Desagregado de Gastos Agosto Parchado de Vias

Presupuesto

Presupuesto 403008 MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

Subpresupuesto 001 MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

Cliente MUNICIPALIDAD PROVINCIAL DE ABANCAY

Lugar APURIMAC - ABANCAY - ABANCAY

Item Descripción Und. Precio S/.

01 OBRAS PROVISIONALES

01.01 ALQUILER DE LOCAL PARA ALMACEN mes 120.00

01.02 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 X 2.40 und 780.00

02 OBRAS PRELIMINARES

02.01 NIVELACION DE TERRENO CON EQUIPO TOPOGRAFICO m2 1.58

02.02 LIMPIEZA DE TERRENO MANUAL m2 2.76

02.03 TRAZO Y REPLANTEO CON VALLAS AISLADAS m2 1.79

03 MOVIMIENTO DE TIERRAS

03.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA EN TERRENO SATURADO m3 4.98

03.02 EXCAVACION PARA CIMIENTOS, ZAPATAS EN SUELO SATURADO m3 60.24

03.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO m3 20.20

03.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 6.81

03.05 ELIMINACION DE MATERIAL EXCEDENTE MANUALMENTE m3 36.14

03.06 NIVELACION INTERIOR Y APISONADO m2 11.60

04 ESTRUCTURAS

04.01 CONCRETO SIMPLE

04.01.01 FALSA ZAPATA - CONCRETO 1.12 m3 117.86

04.01.02 CIMIENTO CORRIDOS - CONCRETO 1.40 + 30% P.M m2 169.05

04.01.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 29.10

04.01.04 CONCRETO SIMPLE MEZCLA 1:8+ 25% P.M. PARA SOBRECIMIENTO m3 246.39

05 CONCRETO ARMADO

Page 12: Desagregado de Gastos Agosto Parchado de Vias

05.01 MUROS DE CONTENCION

05.01.01 SOLADO PARA ZAPATA MEZCLA 1:12 C:H (e=4") m2 119.60

05.01.02 ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 - TRABAJADO kg 4.68

05.01.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS - MURO DE CONTENCION m2 55.62

05.01.04 CONCRETO f'c=175 kg/cm2 CON MEZCLADORA m3 281.48

05.01.05 SISTEMA DE DRENAJE PARA MURO DE CONTENCION m 81.85

05.02 ZAPATAS

05.02.01 ENCOFRADO Y DESENCOFRADO PARA ZAPATA CONECTADA m2 55.62

05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.68

05.02.03 CONCRETO PARA ZAPATA CONECTADA Fc=210 kg/m2 m2 432.60

05.03 VIGAS DE CIMENTACION

05.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 17.58

05.03.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.68

05.03.03 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 372.37

05.04 COLUMNAS

05.04.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 32.63

05.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 GRADO 60 kg 4.53

05.04.03 CONCRETO EN COLUMNAS f´c=210kg/cm2 m3 414.79

05.05 COLUMNETAS

05.05.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 32.63

05.05.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.68

05.05.03 CONCRETO EN COLUMNAS f´c=210kg/cm2 m3 414.79

05.06 VIGAS

05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 41.60

05.06.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg 4.43

05.06.03 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 423.15

Page 13: Desagregado de Gastos Agosto Parchado de Vias

05.07 LOSAS ALIGERADAS

05.07.01 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2 55.62

05.07.02 LADRILLO HUECO DE CONCRETO H=15 PARA TECHO ALIGERADO pza 2.31

05.07.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 4.68

05.07.04 CONCRETO f'c=210 kg/cm2 CON DOSIFICACION Y ADITIVOS m3 532.84

05.07.05 VENTANA ALTA DE ILUMINACION m2 94.06

05.08 ESCALERAS

05.08.01 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS m2 55.62

05.08.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.68

05.08.03 CONCRETO ESCALERAS f´c=210 kg/cm2 m3 417.46

06 SISTEMA DE DRENAJE

06.01 SISTEMA DE GRENAJES m 13.74

07 ALBAÑILERIA

07.01 MUROS Y TABIQUES

07.01.01 MUROS DE ALBAÑILERIA CONFINADA, AMARRE CABEZA m2 131.54

07.01.02 MURO DE SOGA LADRILLO KING KONG CON CEMENTO ARENA m2 94.10

07.02 CERCO PERIMETRICO

07.02.01 MUROS DE BLOQUE HUECO DE CONCRETO E=15CM - 1.5 C:A de 0.15x0.20x0.40 m2 62.59

07.03 CIELO RASOS

07.03.01 CIELO RASO SISTEMA DRIWALL m2 48.68

07.04 REVOQUES, ENLUCIDOS Y MOLDURAS

07.04.01 TARRAJEO DE INTERIORES MEZCLA 1:5 C:A m2 29.17

07.04.02 TARRAJEO EN EXTERIORES MEZCLA 1:5 C:A m2 41.74

07.04.03 TARRAJEO MUROS CERCO PERIMETRICO C:A 1.5 m2 18.51

07.04.04 VESTIDURA DE DERRAMES ANCHO PROMD. 15 CM m2 17.31

07.04.05 TARRAJEO DE VIGAS Y/O COLUMNAS m2 39.76

07.04.06 TARRAJEO DE CIELORASO m2 31.50

Page 14: Desagregado de Gastos Agosto Parchado de Vias

07.04.07 BRUÑAS DE 1 X 1 cm m 3.09

07.05 PISOS Y PAVIMENTOS

07.05.01 CONCRETO FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=4" m2 51.78

07.05.02 PISO CERAMICO ANTIDESLIZANTE DE 30x30 mts m2 43.11

07.05.03 VEREDA DE CONCRETO E=4° m2 68.63

07.05.04 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 24.14

07.05.05 JUNTAS ASFALTICAS m 4.94

07.06 ZOCALOS Y ENTREZOCALOS

07.06.01 ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO - ARENA m2 15.52

07.06.02 ZOCALO DE CERAMICA BLANCA 20 X 30CM DE PRIMERA m2 16.23

07.06.03 CONTRAZOCALO CERAMICO 30 X 30 H=0.10 m. PEGADO CON CEMENTO Y FRAGUA GRIS m 7.55

08 CARPINTERIA Y CERRAJERIA

08.01 CARPINTERIA DE MADERA

08.01.01 PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3" m2 227.31

08.01.02 PUERTA DE MADERA AGUANO TABLERO REBAJADO m 478.70

08.02 CERRAJERIA

08.02.01 CERRADURA DE TRES GOLPES CON LLAVE INTERIOR Y EXTERIOR und 82.05

08.02.02 CHAPA CON PERILLA SEGURIDAD INTERIOR Y LLAVE EXTERIOR und 52.05

08.02.03 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 11.83

08.03 CARPINTERIA METALICA

08.03.01 VENTANA METALICA DE SEGURIDAD (INCL. COLOCADO+ACCESORIOS) m2 133.96

08.03.02 PUERTA METALICA m2 126.80

08.03.03 PUERTA METALICA GARAJE m2 136.80

08.03.04 CEERCO METALICO m2 136.80

08.03.05 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2 - PARANTE 1X1M m 35.76

09 VIDRIOS, CRISTALES Y SIMILARES

Page 15: Desagregado de Gastos Agosto Parchado de Vias

09.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2 6.24

10 PINTURA

10.01 PINTADO DE MUROS INTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR) m2 6.04

10.02 PINTADO DE MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR) m2 6.54

10.03 PINTURA ESMALTE EN ZOCALO m2 8.02

10.04 PINTURA LATEX EN MUROS CERCO PERIMETRICO m2 6.04

10.05 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2 9.34

10.06 PINTURA EN DERRAMES m 5.40

11 INSTALACIONES SANITARIAS

11.01 APARATOS Y ACCESORIOS SANITARIOS

11.01.01 INODORO TANQUE BAJO BLANCO INC. COLOCADO pza 202.35

11.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE INC. COLOCADO pza 132.35

11.01.03 LAVADERO DE ACERO INOXIDABLE DE COCINA pza 171.37

11.01.04 PAPELERA LOSA BLANCO DE 13X15 cm INC. COLOCADO pza 26.37

11.01.05 TOALLERO DE LOSA COLOR und 12.00

11.02 SISTEMA DE DESAGUE

11.02.01 SALIDA DESAGUE EN PVC 4" pto 106.76

11.02.02 SALIDA DESAGUE EN PVC 2" pto 66.74

11.02.03 SALIDA VENTILACION EN PVC 2" pto 77.86

11.02.04 TUBERIA PVC SAL DE 4" m 11.79

11.02.05 TUBERIA PVC SAL DE 2" m 14.83

11.02.06 SUMIDERO DE 2" pza 46.15

11.02.07 REGISTRO DE BRONCE 2" und 38.39

11.02.08 REGISTRO DE BRONCE 4" pza 50.03

11.02.09 TRAMPA P DE PVC PARA DESAGUE D 2 und 49.10

11.02.10 CODO PVC SAL 2X45° pza 14.04

11.02.11 CODO PVC SAL 2X90° pza 13.87

Page 16: Desagregado de Gastos Agosto Parchado de Vias

11.02.12 CODO PVC SAL 4X90° pza 16.66

11.02.13 YEE DE PVC SAL DE 2° und 22.05

11.02.14 CAJA DE REGISTRO DE DESAGUE 12''X24'' TAPA DE F`F pza 108.56

11.03 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

11.03.01 SALIDA DE AGUA FRIA TUBERIA PVC SAP 1/2" pto 23.38

11.03.02 CODO DE P°G° UNION ROSCADA DE 1/2 m 3.92

11.03.03 TEE PVC SAP Ø 1/2° und 7.74

11.03.04 VALVULA COMPUERTA DE 1/2" und 48.38

11.03.05 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS pza 1,537.40

12 INSTALACIONES ELECTRICAS

12.01 SALIDA DE TECHO (CENTRO DE LUZ ) INC. INTERRUPTOR pto 52.21

12.02 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 46.15

12.03 TABLERO GENERAL 03 CIRCUITOS CON LLAVE TERMOMAGNETICO und 295.87

12.04 FLUORESCENTE RECTI ISPE 2 X 40W (INC. ACCESORIOS) und 251.75

12.05 ARTEFACTO TIPO ANTORCHA MOD. E35 - INCLUYE ACCESORIOS und 78.36

12.06 LUMINARIA DE EMERGENCIA und 159.38

12.07 POZO PUESTA A TIERRA und 523.98

13 OBRAS COMPLEMENTARIAS

13.01 PRUEBAS DE CALIDAD DE CONCRETO

13.01.01 DISEÑO DE MEZCLAS DE CONCRETO LAB und 350.00

13.01.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRENCION) und 30.00

13.01.03 CONTROL DE CALIDAD DE LADRILLO und 25.00

13.01.04 PRUEBA DE COMPACTACION DE SUELOS und 20.00

14 MITIGACION DE IMPACTO AMBIENTAL

14.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1,000.00

15 FLETE TERRESTRE

Page 17: Desagregado de Gastos Agosto Parchado de Vias

15.01 FLETE TERRESTRE ABANCAY glb 120.00

Costo Directo

SON : DOSCIENTOS CINCUENTIUN MIL OCHOCIENTOS DIECISEIS Y 33/100 NUEVOS SOLES

Page 18: Desagregado de Gastos Agosto Parchado de Vias

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO, ENRIQUE PELACH, PERU,VENEZUELA, PACHACUTEC Y CANADA

Parcial S/.

1,260.00

480.00

780.00

2,050.38

741.02

795.29

514.07

29,466.38

5,478.00

6,515.56

1,082.52

9,874.50

3,975.40

2,540.40

16,345.85

16,345.85

2,663.64

7,952.11

3,234.17

2,495.93

80,221.21

Page 19: Desagregado de Gastos Agosto Parchado de Vias

20,639.28

1,908.82

1,619.28

4,665.96

11,765.86

679.36

7,781.84

1,868.83

808.33

5,104.68

9,103.05

1,215.13

4,670.64

3,217.28

11,319.99

3,093.98

6,064.95

2,161.06

5,031.64

2,242.01

1,358.60

1,431.03

10,410.04

3,613.79

3,787.65

3,008.60

Page 20: Desagregado de Gastos Agosto Parchado de Vias

14,181.69

5,909.63

4,504.50

271.16

3,383.53

112.87

1,753.68

647.97

62.06

1,043.65

579.28

579.28

82,946.22

20,830.46

11,437.40

9,393.06

8,340.12

8,340.12

5,867.40

5,867.40

26,847.39

9,960.10

4,166.49

2,229.90

2,402.28

5,593.04

2,211.30

Page 21: Desagregado de Gastos Agosto Parchado de Vias

284.28

19,392.88

9,682.86

6,367.35

1,942.23

1,318.04

82.40

1,667.97

266.94

533.16

867.87

17,648.64

8,457.65

4,943.99

3,513.66

1,156.38

574.35

156.15

425.88

8,034.61

4,148.74

576.94

2,112.19

1,061.57

135.17

879.84

Page 22: Desagregado de Gastos Agosto Parchado de Vias

879.84

3,786.54

2,177.42

261.60

120.30

727.64

271.70

227.88

8,781.91

1,633.32

607.05

397.05

514.11

79.11

36.00

4,568.84

427.04

1,067.84

155.72

498.01

235.35

415.35

115.17

200.12

294.60

84.24

83.22

Page 23: Desagregado de Gastos Agosto Parchado de Vias

99.96

132.30

759.92

2,579.75

350.70

194.31

61.92

435.42

1,537.40

5,150.08

887.57

830.70

591.74

1,762.25

235.08

318.76

523.98

1,100.00

1,100.00

350.00

450.00

100.00

200.00

1,000.00

1,000.00

600.00

Page 24: Desagregado de Gastos Agosto Parchado de Vias

600.00

251,816.33

SON : DOSCIENTOS CINCUENTIUN MIL OCHOCIENTOS DIECISEIS Y 33/100 NUEVOS SOLES

251,816.33

Page 25: Desagregado de Gastos Agosto Parchado de Vias

S10 Página : 1

Precios y cantidades de recursos requeridos por tipo

Obra

Subpresupuesto

Lugar APURIMAC - ABANCAY - ABANCAY

Código Recurso Unidad Precio Parcial S/.

MANO DE OBRA

0101010003 OPERARIO hh 3,629.8281 8.12 29,474.20

0101010004 OFICIAL hh 1,288.6210 7.25 9,342.50

0101010005 PEON hh 5,209.6187 6.58 34,279.29

01010300000005 OPERARIO TOPOGRAFO hh 24.5038 8.12 198.97

73,294.96

MATERIALES

Unidad Precio Parcial S/.

0201010023 ACEITE PARA MOTOR SAE-30 gal 2.2803 20.00 45.61

0201020012 GRASA lbs 0.0566 20.00 1.13

02010300010001 GASOLINA 84 gal 134.1410 15.00 2,012.12

0201040001 PETROLEO D-2 gal 102.0617 14.00 1,428.86

02010500010001 ASFALTO RC-250 gal 2.2184 25.00 55.46

0203020003 FLETE TERRESTRE ABANCAY glb 5.0000 120.00 600.00

02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 192.5714 5.00 962.86

02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 119.1020 5.00 595.51

02040100020001 ALAMBRE NEGRO N° 16 kg 112.6932 5.00 563.47

02040100030001 ALAMBRE GALVANIZADO N° 8 kg 13.2583 5.00 66.29

0204010008 PERNOS AUTOPERFORANTES und 241.0600 1.00 241.06

0204010009 PLANCHA METALICA m2 1.4680 20.00 29.36

0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 4,340.0042 3.60 15,624.02

02041200010007 CLAVOS PARA MADERA CON CABEZA DE 4" kg 78.2782 5.50 430.53

02041200010009 CLAVOS PARA MADERA C/C 3" kg 157.9322 5.00 789.66

02041200010010 CLAVOS PARA MADERA C/C 2" kg 2.8710 5.00 14.36

02041200010011 CLAVOS PARA MADERA CON CABEZA DE 5" kg 28.2468 5.00 141.23

0204180008 PLOMO ELECTROLITICO kg 0.1890 10.00 1.89

0204270003 REGLA DE ALUMINIO DE 6.00 Metros m 336.2009 8.00 2,689.61

02050700010010 TUBERIA PVC-SAP C-10 C/R DE 1 1/2" X 5 m m 15.0000 4.50 67.50

02050700020024 TUBERIA PVC SAP ELECTRICA DE 3/4" x3 m (20 mm) m 75.9900 2.00 151.98

02050700020025 m 1.0500 2.80 2.94

02050900020007 CODO PVC-SAP S/P 3/4" X 90° pza 1.0000 1.00 1.00

02051000020007 CODO PVC SAL 4" X 45° und 28.0000 5.50 154.00

02051000020008 CODO PVC SAP C/R 1/2" X 90° pza 15.0000 1.00 15.00

02051000020009 CODO PVC SAP DE 6" und 18.5984 1.50 27.90

02051100010016 TEE PVC SAP S/P 1/2 und 8.0000 2.00 16.00

02051100020001 TEE PVC-SAP C/R 1/2" und 15.0000 2.00 30.00

02060100010003 TUBERIA PVC-SAL 2" X 3 m m 48.9135 8.00 391.31

02060100010006 TUBERIA PVC-SAL 4" X 3 m und 4.2000 8.00 33.60

0206010002 TUBERIA PVC-SAL 4" m 44.3520 8.00 354.82

02060200020001 CODO PVC-SAL 2" X 45° und 6.3000 5.00 31.50

02060200030001 CODO PVC-SAL 2" X 90° und 41.1500 5.00 205.75

02060200030003 CODO PVC-SAL 4" X 90° und 6.3000 5.00 31.50

0206030002 UNION PVC-SAP DE 3/4 pza 1.0000 1.00 1.00

02060500010014 TEE PVC-SAL DE 4" A 2" und 9.0000 5.00 45.00

02060500010029 TEE PVC-SAL 2" x 2" pza 7.0000 5.00 35.00

02060700010001 TEE SANITARIA PVC-SAL DE 2" und 7.4400 2.50 18.60

02061100010013 YEE DOBLE PVC-SAL DE 4" A 2" und 4.0000 5.50 22.00

02061200010002 TRAMPA "P" PVC SAL DE 2" und 6.0000 15.00 90.00

02061400010002 REDUCCION PVC-SAL DE 4" A 2" und 4.0000 6.00 24.00

02061600010001 SOMBRERO DE VENTILACION PVC-SAL DE 2" und 2.0000 3.50 7.00

02061700010001 YEE PVC SAL SIMPLE DE 2" und 16.0000 4.50 72.00

02061700010003 YEE PVC SAL SIMPLE DE 4" und 4.0000 5.50 22.00

02061700010010 YEE PVC SAL 2" x 2" und 6.0000 5.00 30.00

02070100010002 PIEDRA CHANCADA 1/2" m3 11.1235 75.00 834.26

02070100010003 PIEDRA CHANCADA 3/4" m3 43.1576 75.00 3,236.82

02070100050001 PIEDRA MEDIANA DE 4" m3 56.1000 60.00 3,366.00

02070100050002 PIEDRA MEDIANA DE 6" m3 5.7970 65.00 376.81

0207010006 PIEDRA GRANDE DE 8" m3 23.5200 75.00 1,764.00

02070200010001 ARENA FINA m3 34.6141 75.00 2,596.06

02070200010002 ARENA GRUESA m3 82.3577 75.00 6,176.83

02070500010003 TIERRA DE CHACRA O VEGETAL m3 1.4000 30.00 42.00

MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD KERAPATA - NIVEL I-1MICRO RED MICAELA BASTIDAS DEL DISTRITO DE TAMBURCO, PROVINCIA DE ABANCAY Y DEPARTAMENTO DE APURIMAC.

MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD KERAPATA - NIVEL I-1MICRO RED MICAELA BASTIDAS DEL DISTRITO DE TAMBURCO PROVINCIA DE ABANCAY Y DEPARTAMENTO DE APURIMAC.

TUBERIA PVC SAP C-10 S/P DE 3/4"TUBERIA PVC SAP C-10 S/P DE 3/4"

Page 26: Desagregado de Gastos Agosto Parchado de Vias

02090100010004 MARCO Y PATA FO. GO. P/MEDIDOR 1/2" - 3/4" und 1.0000 85.00 85.00

0209040001 TAPA CON MARCO FIERRO FUNDIDO PARA DESAGUE 12" X 24" pza 7.0000 50.00 350.00

02100400040004 BLOQUE DE CONCRETO HUECO 0.15X0.20X0.40 und 1,865.5000 2.00 3,731.00

0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 1,428.7873 23.00 32,862.11

0213030001 YESO bol 56.5695 10.00 565.70

0213070001 FRAGUA kg 52.3540 5.00 261.77

02150200010004 RAMALL TEE PVC SAL 2" und 16.0000 5.00 80.00

02160100090004 LADRILLO PARA LOSA ALIGERADA 30X20X15 pza 2,047.5000 1.80 3,685.50

02160200070005 LADRILLO KK MACIZO DE CONCRETO 12x0.9x24cm und 5,651.7500 1.40 7,912.45

02160200070006 LADRILLO KK MACIZO DE CONCRETO 10x12x24cm und 4,292.2600 1.60 6,867.62

02191300010016 TUB PVC SAP P/INST ELECT DE 1" m 1.0000 8.00 8.00

02191300010017 TUBERIA PVC SAP C-10 DE 6" CRIBADA m 9.2992 60.00 557.95

0222080004 PEGAMENTO PARA CPVC und 0.1690 85.00 14.37

0222080012 PEGAMENTO PARA PVC gal 1.2991 85.00 110.42

0222080013 PEGAMENTO PARA PVC DE 1/4 GLN und 0.0160 85.00 1.36

0222080017 PEGAMENTO EN POLVO (BOLSA 0.25 KG) bol 41.5397 18.00 747.71

0222100001 SILICONA und 7.0500 12.00 84.60

0222110001 COLA SINTETICA gal 5.7420 40.00 229.68

02221500010004 ADITIVO ACELERANTE FRAGUA gal 4.8133 60.00 288.80

02221500010013 ADITIVO ACELERANTE IMPERMEABILIZANTE ADIKRET RAPIDO gal 4.8133 60.00 288.80

0225020008 CERAMICA CELIMA SERIE ANTIDESLIZANTE MOSAICO PISO/PARED 0.30X0.30 m2 155.0850 27.00 4,187.30

0225020133 CERAMICA CELIMA 0.20X0.30 cm m2 3.9420 27.00 106.43

0225020134 CERAMICA CELIMA 0.10X0.30 cm m2 13.7940 27.00 372.44

0231000001 MADERA AGUANO p2 582.2100 6.00 3,493.26

0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 2,516.1671 2.80 7,045.27

0231010002 MADERA TORNILLO PARA ENCOFRADOS INCLUYE CORTE p2 763.7040 2.50 1,909.26

0231010003 MADERA TORNILLO PARA INCLUYE CORTE PARA ENCOFRADO p2 23.4890 6.00 140.93

02310500010001 TRIPLAY LUPUNA 4 x 8 x 4 mm pln 23.0550 16.00 368.88

02311000010002 LISTONES DE 2"X2"X3.0 M pza 55.5700 10.50 583.49

02370600010003 BISAGRA CAPUCHINA ALUMINIZADA 3 1/2"x3 1/2" und 36.0000 5.00 180.00

0237080001 CERRADURA PARA PUERTA INTERIOR und 3.0000 35.00 105.00

02370800010012 CERRADURA EXTERIOR DE TRES GOLPES pza 7.0000 65.00 455.00

0237160004 PISON MANUAL und 438.0000 5.00 2,190.00

0238010005 LIJA PARA MADERA und 5.8180 2.50 14.55

0238010006 LIJA PARA PARED Nro 10 hja 52.1000 2.50 130.25

0240010011 PINTURA LATEX LAVABLE gal 26.6820 25.00 667.05

0240020016 PINTURA ESMALTE SINTETICO gal 0.6750 30.00 20.25

0240080012 THINNER gal 0.3000 25.00 7.50

0240150001 IMPRIMANTE gal 56.3170 18.00 1,013.71

0240160001 BARNIZ MARINO gal 1.4545 35.00 50.91

02401600020008 TAPAPOROS DE MADERA ACABADA C/BARNIZ O LACA gal 1.6174 15.00 24.26

0241020001 CINTA AISLANTE rll 3.5000 5.00 17.50

0241030001 CINTA TEFLON und 3.0000 2.50 7.50

0243120001 VIDRIO TRANSPARENTE CRUDO MEDIO DOBLE p2 148.6260 3.80 564.78

02460200020001 SUMIDERO DE BRONCE DE 2" und 9.0000 8.00 72.00

02461100010002 PAPELERA DE LOZA BLANCA und 3.0000 15.00 45.00

02461200030001 REGISTRO DE BRONCE DE 2" und 7.0000 5.00 35.00

02461200030003 REGISTRO DE BRONCE DE 4" und 4.0000 5.00 20.00

02461500010002 TOALLERO DE LOSA COLOR CON BARRA PLASTICA und 3.0000 12.00 36.00

0247010003 LAVATORIO DE LOSA COLOR BLANCO CON ACCESORIOS pza 3.0000 120.00 360.00

02470200010019 INODORO TANQUE BAJO NORMAL COLOR BLANCO C/A und 3.0000 190.00 570.00

02470700010008 LAVATORIO INOXIDABLE 19"x37" C/ESC. P SAT. C/A und 3.0000 160.00 480.00

02480100010001 und 1.0000 1,500.00 1,500.00

02490200010002 CODO FIERRO GALVANIZADO DE 1/2" X 90° und 49.5700 3.50 173.50

02490600010001 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" und 9.0000 15.00 135.00

0253180001 VALVULA COMPUERTA DE 1/2" und 9.0000 20.00 180.00

02550800010004 SOLDADURA ELECTRICA CELLOCORD P 3/16" kg 0.1890 1.00 0.19

0255080015 SOLDADURA kg 1.8900 12.00 22.68

0258060012 DUCTO DE LUZ CON VIDRIO TEMPLADO Y ESTRUCTURA METALICA und 3.6000 30.00 108.00

02610000000007 LAMPARA DE EMERGENCIA EEC-LR-2T SAL pza 2.0000 150.00 300.00

02620400010016 INTERRUPTOR TERMOMAGNETICO DE 3x20Ax240V und 6.0000 45.00 270.00

02621300010006 TOMACORRIENTE DOBLE PLANO BAKELITA und 18.0000 6.00 108.00

02621400010025 PLACA DE CONCRETO TIPO DRYWALL und 60.2650 40.00 2,410.60

0263060002 PUERTA DE MADERA AGUANO und 7.3400 450.00 3,303.00

0263060003 PUERTA METALICA TIPO REJA (GARAJE) m2 23.2000 120.00 2,784.00

02680100010004 CAJA OCTOGONAL FIERRO GALVANIZADO 4" X 2 1/8" und 17.0000 2.00 34.00

02680900010005 CAJA RECTANGULAR FIERRO GALVANIZADO DE 100 x 50 x 40 mm (6" X 2" X 1½") und 35.0000 3.00 105.00

02682700010006 CAJA DE DESAGUE DE 12"x24" pza 7.0000 10.00 70.00

0270010288 CABLE TW # 14 AWG m 318.5500 1.20 382.26

0270010292 CABLE TW # 2 AWG - 35 NM2 m 1.5000 2.50 3.75

02701100170006 ARTEFACTO DE ILUMINACION TIPO-06 und 3.0000 70.00 210.00

0272010090 TUBO FO. GALV. ST ISO-I.2" m 0.3780 12.00 4.54

0272010091 TUBO FO. GALV. ST ISO-I.1" m 3.7800 8.00 30.24

0272010092 TUBO FO. GALV. ST ISO-I.1 1/2" m 3.9690 10.00 39.69

0272040042 VARILLA DE COBRE DE 3/4" X 2.40 m und 1.0000 255.00 255.00

0274010003 TABLERO GENERAL C/LLAVE TERMOMAGNETICO und 2.0000 130.00 260.00

0290130021 AGUA m3 129.8678 10.00 1,208.68

02902300010009 FLUORESCENTE REJILLA ECONOMICO RE 40WAT und 14.0000 120.00 1,680.00

TANQUE DE AGUA DE ETERNIT (POLIETILENO) DE 1000 LITROS INCLUYE ACCESORIOS INTERNOS

Page 27: Desagregado de Gastos Agosto Parchado de Vias

02902300500002 PRUEBAS DE CALIDAD DE CONCRETO ROTURA und 15.0000 30.00 450.00

02902300500003 PRUEBAS DE COMPACTACION DE SUELOS und 10.0000 20.00 200.00

02902300500004 PRUEBAS DE CALIDAD DE LADRILLO glb 4.0000 25.00 100.00

02902300500005 DISEÑO DE MEZCLAS DE CONCRETO und 1.0000 350.00 350.00

0290240006 ACCESORIOS INSTALACIONES DE CARRILES m 126.5565 13.00 1,645.23

148,896.93

EQUIPOS

Unidad Precio Parcial S/.

0301000002 NIVEL TOPOGRAFICO día 3.0630 8.00 24.50

03010000110001 TEODOLITO día 1.7231 10.00 17.23

0301000014 MIRAS día 2.3450 10.00 23.45

03010300060007 PLANCHA COMPÁCTADORA 4HP hm 19.0566 25.00 476.42

03011600010002 CARGADOR FRONTAL CAT-930 hm 25.8100 180.00 4,645.80

03011800020003 TRACTOR DE ORUGAS CAT D6D hm 22.0000 200.00 4,400.00

0301220004 CAMION VOLQUETE hm 25.8100 180.00 4,645.80

03012900010002 VIBRADOR DE CONCRETO 4 HP 1.25" hm 80.9023 18.70 1,512.87

0301290003 MEZCLADORA DE CONCRETO hm 116.8577 25.00 2,921.44

18,667.51

SUBCONTRATOS

04000100010017 ESTUDIO DE IMPACTO AMBIENTAL und 1.0000 1,000.00 1,000.00

0400020007 ALQUILER DE ALMACEN glb 4.0000 120.00 480.00

04000500010003 CARTEL DE OBRA und 1.0000 780.00 780.00

04050200010005 ANDAMIO METALICO m2 488.3880 5.00 2,441.94

04110100010003 SC PUERTA METALICA A TODO COSTO m2 4.5500 110.00 500.50

04110200010001 SC VENTANA METALICA m2 30.9700 110.00 3,406.70

8,609.14

HERRAMIENTAS MANUALES

04000500010003 HERRAMIENTAS MANUALES %M.O 2,347.79 2,347.79

COSTO DIRECTO 251,816.33

Page 28: Desagregado de Gastos Agosto Parchado de Vias

VALORIZACION MES DE AGOSTO

PARTIDA DESCRIPCIONPRESUPUESTO

AVANCESSALDO

ANTERIOR ACTUALUnd. Metrado Precio S/. Parcial S/.

Metrado % Metrado % Metrado % Metrado %

01 OBRAS PROVISIONALES 161.20 0.00 44.69 44.69 116.5101.01 LIMPIEZA DE TERRENO MANUAL m2 20.00 4.47 89.38 0.00 0.00 0.00% 10.00 44.69 50.00% 10.00 44.69 50.00% 10.00 44.69 50.00%01.02 TRAZO, NIVELACION Y REPLANTEO m2 20.00 3.59 71.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 71.82 100.00%

02 AVENIDA GARCILAZO 11,100.51 0.00 11100.51 11100.51 0.0002.01 MOVIMIENTO DE TIERRAS

02.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 270.00 41.11 11,100.51 0.00 0.00 0.00% 270.00 11,100.51 100.00% 270.00 11100.51 100.00% 0.00 0.00 0.00%

02.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 25,869.51 0.00 20113.93 20113.93 5755.5802.02.01 IMPRIMACION BITUMINOSA m2 270.00 14.30 3,861.81 0.00 0.00 0.00% 209.93 3,002.61 77.75% 209.93 3002.61 77.75% 60.07 859.20 22.25%02.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 270.00 81.51 22,007.70 0.00 0.00 0.00% 209.93 17,111.31 77.75% 209.93 17111.31 77.75% 60.07 4896.39 22.25%

3 AVENIDA ENRIQUE PELACH

3.01 MOVIMIENTO DE TIERRAS 6,166.95 0.00 4373.07 4373.07 1793.8803.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 150.00 41.11 6,166.95 0.00 0.00 0.00% 106.37 4,373.07 70.91% 106.37 4373.07 70.91% 43.63 1793.88 29.09%

3.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 14,371.95 0.00 10191.34 10191.34 4180.6103.02.01 IMPRIMACION BITUMINOSA m2 150.00 14.30 2,145.45 0.00 0.00 0.00% 106.37 1,521.37 70.91% 106.37 1521.37 70.91% 43.63 624.08 29.09%03.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 150.00 81.51 12,226.50 0.00 0.00 0.00% 106.37 8,669.97 70.91% 106.37 8669.97 70.91% 43.63 3556.53 29.09%

4 AVENIDA PERU 7,400.34 0.00 0.00 0.00 7400.344.01 MOVIMIENTO DE TIERRAS

04.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 180.00 41.11 7,400.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 180.00 7400.34 100.00%

4.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 17,246.34 0.00 0.00 0.00 17246.3404.02.01 IMPRIMACION BITUMINOSA m2 180.00 14.30 2,574.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 180.00 2574.54 100.00%04.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 180.00 81.51 14,671.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 180.00 14671.80 100.00%

5 AVENIDA VENEZUELA 7,811.47 0.00 1301.14 1301.14 6510.335.01 MOVIMIENTO DE TIERRAS

05.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 190.00 41.11 7,811.47 0.00 0.00 0.00% 31.65 1,301.14 16.66% 31.65 1301.14 16.66% 158.35 6510.33 83.34%

5.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 18,204.47 0.00 0.00 0.00 18204.4705.02.01 IMPRIMACION BITUMINOSA m2 190.00 14.30 2,717.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 190.00 2717.57 100.00%05.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 190.00 81.51 15,486.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 190.00 15486.90 100.00%

6 AVENIDA PACHACUTEC 909.01 0.00 0.00 0.00 909.016.01 MOVIMIENTO DE TIERRAS

06.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 22.11 41.11 909.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.11 909.01 100.00%

6.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 2,118.43 0.00 0.00 0.00 2118.4306.02.01 IMPRIMACION BITUMINOSA m2 22.11 14.30 316.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.11 316.24 100.00%06.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 22.11 81.51 1,802.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.11 1802.19 100.00%

7 AVENIDA CANADA 2,085.66 0.00 2085.66 2085.66 0.007.01 MOVIMIENTO DE TIERRAS

07.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 50.73 41.11 2,085.66 0.00 0.00 0.00% 50.73 2,085.66 100.00% 50.73 2085.66 100.00% 0.00 0.00 0.00%

7.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 4,860.59 0.00 0.00 0.00 4860.5907.02.01 IMPRIMACION BITUMINOSA m2 50.73 14.30 725.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 50.73 725.59 100.00%

ACUMULADO 

ValorizS/.

ValorizS/.

ValorizS/.

ValorizS/.

Page 29: Desagregado de Gastos Agosto Parchado de Vias

07.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 50.73 81.51 4,135.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 50.73 4135.00 100.00%

8 AVENIDA VALLECITO EL OLIVO 1,929.84 0.00 1603.82 1603.82 326.038.01 MOVIMIENTO DE TIERRAS

08.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO e=3´´ m2 46.94 41.11 1,929.84 0.00 0.00 0.00% 39.01 1,603.82 83.11% 39.01 1603.82 83.11% 7.93 326.03 16.89%

8.02 PAVIMENTO FLEXIBLE (PARCHADO DE VIAS) 4,497.46 0.00 0.00 0.00 4497.4608.02.01 IMPRIMACION BITUMINOSA m2 46.94 14.30 671.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.94 671.38 100.00%08.02.02 CARPETA ASFALTICA EN CALIENTE DE 3´´ m2 46.94 81.51 3,826.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.94 3826.08 100.00%

9 FLETE TERRESTRE-GLOBAL 970.00 0.00 0.00 0.00 970.0007.06.01 CAMIONETA 4X4- TRASLADO ASFALTICO m2 2.00 485.00 970.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 970.00 100.00%

COSTO DIRECTO 84.86% 125,703.73 0.00 0.00% 50,814.16 50,814.16 74,889.58GASTOS GENERALES 14.09% 20,866.82 - - - - GASTOS DE LIQUIDACION 1.06% 1,567.53 - - - - SUB TOTAL 15.14% 1,567.53 0.00 0.00% 0.00 0.00 0.00

PRESUPUESTO TOTAL 148,138.08 0.00 50,814.16 50,814.16 74,889.58PORCENTAJES 100.00% 0.00% 34.30% 34.30% 50.55%

125,703.736

43,215.90

909.78 125,703.74

Costo Directo 125,703.73

SON : CIENTO VEINTE Y CINCO MIL SETECIENTOS TRES CON 73/100 NUEVOS SOLES

Page 30: Desagregado de Gastos Agosto Parchado de Vias

MUNICIPALIDAD PROVINCIAL DE ABANCAY

Informe Mensual de Obra N° 001MES DE AGOSTO

Obra :

Residente de Obra. : Ing. JAVIER LUCHO QUISPE LEON

2012

MUNICIPALIDAD DISTRITAL DE ECHARATE

Informe Mensual de Obra N° 001MES DE AGOSTO

Obra :

Residente de Obra. : Ing. JAVIER LUCHO QUISPE LEON

2012

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY,

REGION APURIMAC

PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

Page 31: Desagregado de Gastos Agosto Parchado de Vias

MUNICIPALIDAD DISTRITAL DE ECHARATE

Informe Mensual de Obra N° 001MES DE AGOSTO

Obra :

Residente de Obra. : Ing. JAVIER LUCHO QUISPE LEON

2012

MUNICIPALIDAD DISTRITAL DE ECHARATE

Informe Mensual de Obra N° 001MES DE AGOSTO

Obra :

Residente de Obra. : Ing. JAVIER LUCHO QUISPE LEON

2012

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY,

REGION APURIMAC

“AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DE SAN AGUSTIN , DISTRITO DE ECHARATI - LA CONVENCION - CUSCO"

Page 32: Desagregado de Gastos Agosto Parchado de Vias

CONTENIDO

Informe Mensual de Obra N° 001

MES DE JULIO

Obra :

RESIDENTE DE OBRA : Ing. JAVIER LUCHO QUISPE LEONUbicación : ABANCAY Año

No DESCRIPCIONContenido

Informe Mensual1.00 MEMORIA DESCRIPTIVA

2.00 ANTECEDENTES

3.00 ALCANCE DE LOS TRABAJOS Y METAS

4.00 INFORMACION GENERAL

5.00 DESCRIPCION DE LAS PARTIDAS EJECUTADAS

6.00 PROCEDIMIENTOS CONSTRUCTIVOS EMPLEADOS

7.00 LAS OCURRENCIAS TRASCENDENTES PARA EL DESARROLLO DE LA EJECUCIÓN DE OBRA.

8.00 DOCUMENTOS TECNICOS

9.00 RECURSOS UTILIZADOS

10.00 PLANILLA DE METRADOS

11.1 Planilla de metrados del presupuesto original11.2 Planilla de mayores metrados11.3 Planilla de partidas nuevas

11.00 VALORIZACION

11.1 Resumen de las Valorizaciones11.2 Valorización de Avance de Obra11.3 Valorización de Mayores Metrados11.4 Valorización de Partidas Nuevas11.5 Valorización de Deductivos

12.00 MOVIMIENTO DE ALMACEN

5.1. Resumen de los Movimiento de Almacén Mensual5.2. Movimiento diario de almacen

13.00 MOVIMIENTO DE MAQUINARIA

6.1. Resumen de Movimiento de Maquinaria6.2. Control Diario de Maquinaria

14.00 AUXILIAR ESTÁNDAR

15.00 HOJAS DE TAREO DEL PERSONAL

16.00 CONTROL DE CALIDAD

17.00 MODIFICACION DEL PROYECTO

18.00 PANEL FOTOGRAFICO

19.00 CUADERNO DE OBRA

20.00 ANEXOS

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA

Page 33: Desagregado de Gastos Agosto Parchado de Vias

CONTENIDO

Informe Mensual de Obra N° 001

MES DE JULIO

: Ing. JAVIER LUCHO QUISPE LEON2012

CONTROL

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC,

Page 34: Desagregado de Gastos Agosto Parchado de Vias

GENERALIDADES MES DE JUNIO

1.00 MEMORIA DESCRIPTIVAIntroducción.

2.00 ANTECEDENTES

3.00 ALCANCE DE LOS TRABAJOS Y METAS

PARCHADO DE PISTAS 909.78M2

4.00 INFORMACION GENERAL

4.1 RESIDENTE DE OBRA : Ing. JAVIER LUCHO QUISPE LEONEspecialidad : Ingeniero CivilColegiatura : 76753

4.2 FECHA REPORTADA : DEL 01 DE AGOSTO AL 31 DEL 2012

4.3 DATOS DEL PROYECTO

Unidad Ejecutora : MUNICIPALIDAD PROVINCIAL DE ABANCAYSec. Fun. :15Función :15 SALUDObra

Fuente de FinanciamientoModalidad de Ejecución : ADMINISTRACION DIRECTA

4.4 INFORMACION FINANCIERO DEL EXPEDIENTE PRIMIGENIOMONTO DEL PROYECTO S/. 148,138.08Costo Directo S/. 125,703.73Costo Indirecto S/. 22,434.35 Gastos Generales S/. 20,866.82Gastos de Liquidación S/. 1,567.53

4.5 INFORMACION FINANCIERO DEL COMPONENTE 01SEGÚN EXPEDIENTE TECNICO PRIMIGENIO

MANTENIMIENTO DE VIAS : S/. 148,138.08 SEGÚN PERFIL TECNICO

CENTRO DE SALUD KERAPATA: S/. 148,138.08

Presupuesto Base : S/. 148,138.08 NUEVOS SOLESPresupuesto Total : S/. 148,138.08 NUEVOS SOLESPresupuesto Asignado año 2012 : S/. 148,138.08 NUEVOS SOLESPresupuesto Ejecutado mes : S/. 50,814.16 34.30%

La Municipalidad Provincial de Abancay , intenta incorporar una nueva forma de producir desarrollo urbano en el espacio publico para consolidar los barrios y alrededores, articulando la participacion de diferentes actores se aprobo el expediente Tecnico a nivel defenitivo del: "MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC" mediante asamblea Pública y cuerpo edil . Esta obra se ejecutará en el marco de gestión institucional con recursos financiados por la Municipalidad Provincial de Abancay.

.- El Expediente Técnico se aprueba con un presupuesto de S/. 148,138.038 N.S. donde esta presupuestado para 01 componentes. .- Se inicia la ejecución de obra el 01 de agosto del 2012, debiéndose culminar la obra el 01 de noviembre del 2012 (plazo de ejecución de 90 días calendario)..- El inicio de servicios de Residencia inicia el 01 de agosto del 2012

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA

Page 35: Desagregado de Gastos Agosto Parchado de Vias

Presupuesto Acumulado : S/. 50,814.16 34.30%Presupuesto Saldo : S/. 74,889.58 50.55%

4.7 VALORIZACIONES

Valorización Mensual : S/. 50,814.16 34.30%Valorización Mayores Metrados : S/. - 0.00%Valorización Partidas Nuevas : S/. - 0.00%Valorización Deductivos : S/. - 0.00%Valorización Acumulada : S/. 0.00%Valorización Saldos : S/. 148,138.08 100.00%

4.8 CRONOGRAMA DE OBRA :Inicio de Obra : 8/1/2012Paralizacion : 8/20/2012Reinicio : 8/28/2012Fin de Obra : 11/1/2012Programado : 3.00 mesesEjecutado : 3.00 mesesAmpliación tiempo de ejecución : no

4.9 UBICACIÓNDistrito ABANCAYProvincia : ABANCAYDepartamento : APURIMAC

Page 36: Desagregado de Gastos Agosto Parchado de Vias

GENERALIDADES MES DE JUNIO

: Ing. JAVIER LUCHO QUISPE LEON: Ingeniero Civil: 76753

: MUNICIPALIDAD PROVINCIAL DE ABANCAY:15:15 SALUD

: ADMINISTRACION DIRECTA

La Municipalidad Provincial de Abancay , intenta incorporar una nueva forma de producir desarrollo urbano en el espacio publico para consolidar los barrios y alrededores, articulando la participacion de diferentes actores se aprobo el expediente Tecnico a nivel

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION

mediante asamblea Pública y cuerpo edil . Esta obra se ejecutará en el marco de gestión institucional con recursos

.- El Expediente Técnico se aprueba con un presupuesto de S/. 148,138.038 N.S. donde esta presupuestado para 01

.- Se inicia la ejecución de obra el 01 de agosto del 2012, debiéndose culminar la obra el 01 de noviembre del 2012 (plazo de

.- El inicio de servicios de Residencia inicia el 01 de agosto del 2012

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA

Page 37: Desagregado de Gastos Agosto Parchado de Vias

: ABANCAY: APURIMAC

Page 38: Desagregado de Gastos Agosto Parchado de Vias

AÑ0: 2012SUB GERENCIA DE OBRAS PUBLICAS Y PRIVADAS MES DE AGOSTO

FICHA TECNICA DE PROYECTODATOS GENERALES

UBICACIÓN NOMBRE DEL PROYECTO: UNIDAD EJECUTORADPTO : APURIMAC

: MUNICIPALIDAD PROVINCIAL DE ABANCAYPROV : ABANCAY

DIST ABANCAYCOMPONENTE: CONSTRUCCION DEL CENTRO DE SALUD KERAPATA

MODALIDAD ADMINISTRACION DIRECTALOC. ABANCAY

PERFIL EXPEDIENTE TECNICOVARIACION VIABILIDAD PLAZO EJECUCION

CODIGO SNIP 200957 RES. APROB. -

MONTO 148,138.08 MONTO 148,138.08 MONTO 0.00 0.00% 04 MESES

FECHA 12/29/2011 FECHA FECHA -

CADENA FUNCIONAL

SEC. FUNC. FUNCION PROGRAMA SUB PROYECTO ACT. PROYECTO COMPONENTE META

INFORMACION DE AGENTESNº AGENTE CARGO ESPECIALIDAD COLEGIATURA RESOLUCION

1 Inspector/Supervisor Ing. Civil

2 INGº JAVIER LUCHO QUISPE LEON Residente Ing. Civil 76753

3

PLAZO EJECUCIONFECHA DE INICIO: 8/1/2012 FECHA DE REINICIO: 5/1/2012 FECHA DE CONCLUSION: 7/7/2012 03 Meses FECHA DE TERMINO REAL:

METAS ESTRUCTURA DE PRESUPUESTO EXP. TEC.

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

EXP. ETC. PRIMIGENIO S/. 148,138.08MANTENIMIENTO DE VIAS S/. 127,271.26

Costo Directo 125,703.73

Gastos Generales -

Gastos de Inspección -

Gastos de Liquidación 1,567.53

Expediente Técnico -

Capacitacion Social

TOTAL S/. 127,271.26 RESUMEN INFORME MENSUAL

A V A N C E F ISICO AVANCE FINANCIERO

MES PROGRAMADO MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS EJECUTADO AVANCE FINANCIERO EJECUTADO

VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % % % MONTO % % ACUMULADO

0.00 0.00 0.00 AGOSTO 51,848.33 35.00 0.00 0.00 0.00 0.00 0.00 0.00 50,814.16 34.30 35.00 34.30 0.00 0.00 0.00 SETIEMBRE 39,997.28 27.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF! #REF! 27.00 #REF! 29,087.57 22.85 22.85 OCTUBRE 56,292.47 38.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF! #REF! 38.00 #REF! 48,334.23 37.98 60.83 NOVIEMBRE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

DICIEMBRE 0.00 0.00 0.00 0.00 0.00

TOTAL 148,138.08 100.00 0.00 0.00 0.00 0.00 0.00 0.00 #REF! #REF! 100.00 #REF! TOTAL 77,421.80

CURVA AVANCE FISICO CURVA DE AVANCE FISICO VS AVANCE FINANCIERO

MANTENIMIENTO DE VIAS DE LAS AVENIDAS: GARCILAZO,ENRIQUE PELACH, AV. PERU, AV. VENEZUELA, AV. PACHACUTEC, VALLECITO EL OLIVO,Y AV. CANADA EN EL DISTRITO DE ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

RES. APROB./MODIFIC.

PROGRAM. ACUM.

EJECUTADO ACUMUL.

SETIEMBRE0

5

10

15

20

25

30

35

40

45

50

0 0

21.875

43.75

34.375

0

3.80885680470617

24.2354472418488

35.5536447195827

PROGRAMADOEJECUTADO

MAYO JUNIO JULIO AGOSTO0

5

10

15

20

25

30

35

40

45

50

0

3.80885680470617

24.2354472418488

35.5536447195827

0 0 0.543

43.078475

AVANCE FISICO

AVANCE FINANCIERO

Page 39: Desagregado de Gastos Agosto Parchado de Vias

SETIEMBRE0

5

10

15

20

25

30

35

40

45

50

0 0

21.875

43.75

34.375

0

3.80885680470617

24.2354472418488

35.5536447195827

PROGRAMADOEJECUTADO

MAYO JUNIO JULIO AGOSTO0

5

10

15

20

25

30

35

40

45

50

0

3.80885680470617

24.2354472418488

35.5536447195827

0 0 0.543

43.078475

AVANCE FISICO

AVANCE FINANCIERO

Page 40: Desagregado de Gastos Agosto Parchado de Vias

62

S/. 51,848.33

S/. 39,997.28S/. 56,292.47

148138.08

Page 41: Desagregado de Gastos Agosto Parchado de Vias

5.00 DESCRIPCION DE LAS PARTIDAS EJECUTADAS

01 OBRAS PREMILINARES

01.01 LIMPIEZA DE TERRENO MANUAL

se realizo la limpieza de terreno manual utilizando escobas

01.02 TRAZO, NIVELACION Y REPLANTEO

Partida no ejecutada

02 AV GARCILAZO

02.01 MOVIMIENTO DE TIERRAS

02.01.01 ROTURA DE PAVIMENTO FLEXIBLE ASFALTO

02.02 PAVIMENTO FLEXIBLE

02.02.01 IMPRIMACION BITUMINOSA

02.02.02 CARPETA ASFALTICA

03.05 ELIMINACION DE MATERIAL EXCEDENTE MANUALMENTE

3.06 NIVELACION INTERIOR Y APISONADO

04 ESTRUCTURAS

04.01 CONCRETO SIMPLE

04.01.01 FALSA ZAPATA - CONCRETO 1.12

04.01.02 CIMIENTO CORRIDOS - CONCRETO 1.40 + 30% P.M

Partida no ejecutada

04.01.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

Partida no ejecutada

04.01.04 CONCRETO SIMPLE MEZCLA 1:8+ 25% P.M. PARA SOBRECIMIENTO

Partida no ejecutada

05 CONCRETO ARMADO

05.01 MUROS DE CONTENCION

05.01.01 SOLADO PARA ZAPATA MEZCLA 1:12 C:H (e=4")

Partida no ejecutada

La rotura del pavimiento flexible se realizo en su totalidad de m2 que se especifica en el expediente, utilizando picos, palas

Se realizo la imprimacion utilizando el MC-60 para la primera capa y el PEN para la 2da capa

La eliminación del material esponjado, Fue retirado después de la excavación, esta eliminación se realizo con Maquinaria, a una distancia donde se realiza el botadero que no dificulten el proceso constructivo.

La eliminación del material esponjado, se realizo después de la excavación, esta eliminación se realizo con Manualmente, a una distancia donde se realiza el botadero, que no dificulten el proceso constructivo.

Una vez realizada la excavación hasta el nivel, se procedio a colocarse plantillas para definir el nivel indicado en los planos. Una vez que se tubo el nivel adecuado, se procedio a compactar manualmente, con apoyo de un pisón.

Se procedio a baciar el concreto simple 1.12 de un espesor de acuerdo al plano, que se ejecuto en el fondo de las excavaciones de las zapatas, proporcionando una base para el trazado de columnas y colocación de la armadura. Esta mezcla comprende la preparación y colocación de concreto cemento – hormigón 1:10 de 0.40 m de espesor, directamente sobre el suelo de relleno, como se indican en los planos.

Page 42: Desagregado de Gastos Agosto Parchado de Vias

05.01.02 ACERO CORRUGADO FY=4200 kg/cm2 GRADO 60 - TRABAJADO

Partida no ejecutada

05.01.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS - MURO DE CONTENCION

Partida no ejecutada

05.01.04 CONCRETO f'c=175 kg/cm2 CON MEZCLADORA

Partida no ejecutada

05.01.05 SISTEMA DE DRENAJE PARA MURO DE CONTENCION

Partida no ejecutada

05.02 ZAPATAS

05.02.01 ENCOFRADO Y DESENCOFRADO PARA ZAPATA CONECTADA

05.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

05.02.03 CONCRETO PARA ZAPATA CONECTADA Fc=210 kg/m2

05.03 VIGAS DE CIMENTACION

05.03.01 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION

Partida no ejecutada

05.03.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

05.03.03 CONCRETO VIGAS DE CIMENTACION f'c=210 kg/cm2

Partida no ejecutada

05.04 COLUMNAS

05.04.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

Partida no ejecutada

05.04.02 ACERO DE REFUERZO fy=4,200 kg/cm2 GRADO 60

Partida no ejecutada

05.04.03 CONCRETO EN COLUMNAS f´c=210kg/cm2

Partida no ejecutada

05.05 COLUMNETAS

05.05.01 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

Partida no ejecutada

El encofrado y desencofrado de las caras laterales , se ejecutaron deacuardo al cumpliendo con las especificaciones técnicas correspondientes y las características geométricas indicadas en los planos pertinentes

El concreto se realizo con una mezcla de agua y cemento – arena y piedra chancada - concreto Fc=210 preparado en una mezcladora dentro de la cual se disponio las armaduras de acero de acuerdo a los planos de estructuras.

El acero corrugado esta ejecutado deacuerdo a lo especificado en los planos en base a su esfuerzo de fluencia Fy = 4200 kg/cm2. toda la armadura fue cortada a la medida y fabricada estrictamente, como se indican en los detalles y dimensiones mostrados en los planos del proyecto.

Page 43: Desagregado de Gastos Agosto Parchado de Vias

05.05.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Partida no ejecutada

05.05.03 CONCRETO EN COLUMNAS f´c=210kg/cm2

Partida no ejecutada

05.06 VIGAS

05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

Partida no ejecutada

05.06.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS

Partida no ejecutada

05.06.03 CONCRETO EN VIGAS f'c=210 kg/cm2

Partida no ejecutada

05.07 LOSAS ALIGERADAS

05.07.01 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS

Partida no ejecutada

05.07.02 LADRILLO HUECO DE CONCRETO H=15 PARA TECHO ALIGERADO

Partida no ejecutada

05.07.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS

Partida no ejecutada

05.07.04 CONCRETO f'c=210 kg/cm2 CON DOSIFICACION Y ADITIVOS

Partida no ejecutada

05.07.05 VENTANA ALTA DE ILUMINACION

Partida no ejecutada

05.08 ESCALERAS

05.08.01 ENCOFRADO Y DESENCOFRADO PARA ESCALERAS

Partida no ejecutada

05.08.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60

Partida no ejecutada

05.08.03 CONCRETO ESCALERAS f´c=210 kg/cm2

Partida no ejecutada

06 SISTEMA DE DRENAJE

06.01 SISTEMA DE DRENAJES

07 ALBAÑILERIA

07.01 MUROS Y TABIQUES

07.01.01 MUROS DE ALBAÑILERIA CONFINADA, AMARRE CABEZA

Partida no ejecutada

07.01.02 MURO DE SOGA LADRILLO KING KONG CON CEMENTO ARENA

Partida no ejecutada

07.02 CERCO PERIMETRICO

07.02.01 MUROS DE BLOQUE HUECO DE CONCRETO E=15CM - 1.5 C:A de 0.15x0.20x0.40

Partida no ejecutada

07.03 CIELO RASOS

El sistema de drenajes se ejecuto deacuerdo alas especificaciones tecnicas y el plano respectivo, tambien se iso las pruebas de control al drenado ya que se cuenta con mucha filtracion en el terreno

Page 44: Desagregado de Gastos Agosto Parchado de Vias

07.03.01 CIELO RASO SISTEMA DRIWALL

Partida no ejecutada

07.04 REVOQUES, ENLUCIDOS Y MOLDURAS

07.04.01 TARRAJEO DE INTERIORES MEZCLA 1:5 C:A

Partida no ejecutada

07.04.02 TARRAJEO EN EXTERIORES MEZCLA 1:5 C:A

Partida no ejecutada

07.04.03 TARRAJEO MUROS CERCO PERIMETRICO C:A 1.5

Partida no ejecutada

07.04.04 VESTIDURA DE DERRAMES ANCHO PROMD. 15 CM

Partida no ejecutada

07.04.05 TARRAJEO DE VIGAS Y/O COLUMNAS

Partida no ejecutada

07.04.06 TARRAJEO DE CIELORASO

Partida no ejecutada

07.04.07 BRUÑAS DE 1 X 1 cm

Partida no ejecutada

07.05 PISOS Y PAVIMENTOS

07.05.01 CONCRETO FALSO PISO MEZCLA 1:8 CEMENTO-HORMIGON e=4"

Partida no ejecutada

07.05.02 PISO CERAMICO ANTIDESLIZANTE DE 30x30 mts

Partida no ejecutada

07.05.03 VEREDA DE CONCRETO E=4°

Partida no ejecutada

07.05.04 ENCOFRADO Y DESENCOFRADO EN VEREDAS

Partida no ejecutada

07.05.05 JUNTAS ASFALTICAS

Partida no ejecutada

07.06 ZOCALOS Y ENTREZOCALOS

07.06.01 ZOCALO DE CEMENTO SIMPLE MEZCLA CEMENTO - ARENA

Partida no ejecutada

07.06.02 ZOCALO DE CERAMICA BLANCA 20 X 30CM DE PRIMERA

Partida no ejecutada

07.06.03 CONTRAZOCALO CERAMICO 30 X 30 H=0.10 m. PEGADO CON CEM

Partida no ejecutada

08 CARPINTERIA Y CERRAJERIA

08.01 CARPINTERIA DE MADERA

08.01.01 PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3"

Partida no ejecutada

08.01.02 PUERTA DE MADERA AGUANO TABLERO REBAJADO

Partida no ejecutada

08.02 CERRAJERIA

08.02.01 CERRADURA DE TRES GOLPES CON LLAVE INTERIOR Y EXTERIOR

Page 45: Desagregado de Gastos Agosto Parchado de Vias

Partida no ejecutada

08.02.02 CHAPA CON PERILLA SEGURIDAD INTERIOR Y LLAVE EXTERIOR

Partida no ejecutada

08.02.03 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½"

Partida no ejecutada

08.03 CARPINTERIA METALICA

08.03.01 VENTANA METALICA DE SEGURIDAD (INCL. COLOCADO+ACCESORIOS)

Partida no ejecutada

08.03.02 PUERTA METALICA

Partida no ejecutada

08.03.03 PUERTA METALICA GARAJE

Partida no ejecutada

08.03.04 CEERCO METALICO

Partida no ejecutada

08.03.05 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 1 1/2 - PARANTE 1X1M

Partida no ejecutada

09 VIDRIOS, CRISTALES Y SIMILARES

09.01 VIDRIO SEMIDOBLE INCOLORO CRUDO

Partida no ejecutada

10 PINTURA

10.01 PINTADO DE MUROS INTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)

Partida no ejecutada

10.02 PINTADO DE MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)

Partida no ejecutada

10.03 PINTURA ESMALTE EN ZOCALO

Partida no ejecutada

10.04 PINTURA LATEX EN MUROS CERCO PERIMETRICO

Partida no ejecutada

10.05 PINTURA EN PUERTAS C/BARNIZ 2 MANOS

Partida no ejecutada

10.06 PINTURA EN DERRAMES

Partida no ejecutada

11 INSTALACIONES SANITARIAS

11.01 APARATOS Y ACCESORIOS SANITARIOS

11.01.01 INODORO TANQUE BAJO BLANCO INC. COLOCADO

Partida no ejecutada

11.01.02 LAVATORIO DE PARED BLANCO 1 LLAVE INC. COLOCADO

Partida no ejecutada

11.01.03 LAVADERO DE ACERO INOXIDABLE DE COCINA

Partida no ejecutada

11.01.04 PAPELERA LOSA BLANCO DE 13X15 cm INC. COLOCADO

Partida no ejecutada

11.01.05 TOALLERO DE LOSA COLOR

Partida no ejecutada

Page 46: Desagregado de Gastos Agosto Parchado de Vias

11.02 SISTEMA DE DESAGUE

Partida no ejecutada

11.03 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

Partida no ejecutada

12 INSTALACIONES ELECTRICAS

Partida no ejecutada

13 OBRAS COMPLEMENTARIAS

13.01 PRUEBAS DE CALIDAD DE CONCRETO

Partida no ejecutada

13.01.01 DISEÑO DE MEZCLAS DE CONCRETO LAB

No se ejecuto

13.01.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRENCION)

Partida no ejecutada

13.01.03 CONTROL DE CALIDAD DE LADRILLO

No se ejecuto

13.01.04 PRUEBA DE COMPACTACION DE SUELOS

No se ejecuto

14 MITIGACION DE IMPACTO AMBIENTAL

14.01 MITIGACION DEL IMPACTO AMBIENTAL

No se ejecuto

15 FLETE TERRESTRE

15.01 FLETE TERRESTRE ABANCAY

No se ejecuto

6.00 PROCEDIMIENTOS CONSTRUCTIVOS EMPLEADOS

7.00 LAS OCURRENCIAS TRASCENDENTES PARA EL DESARROLLO DE LA EJECUCIÓN DE OBRA.

Los procedimientos constructivos empleados están basados a las Especificaciones Técnicas descritos en el expediente técnico y las normas del Reglamento Nacional de Edificaciones.

La residencia realizo el informe respectivo del corte de obra en el cuaderno de obra indicando las valorizacion respectiva y los materiales encontrados en cancha.

No se contaba con almacen, no se contaba con informe de maquinaria pesada, no se conto con informe mensual de residencia, Se informo todas las ocurrencias al Jefe De la Sub Gerencia De Obras Publicas y Privadas.No se encontro documento alguno concerniente al manejo del movimiento de almacen, salida e ingreso de materiales lo que dificulta cuantificar en la documentacion respectiva como BINCARD Y CARDEX

Page 47: Desagregado de Gastos Agosto Parchado de Vias

8.00 DOCUMENTOS TECNICOS

DOCUMENTO NUMERO FECHA OBSERVACIONES

Resolución de Aprobacion ExpedienteActa de Apertura de Cuaderno 0 - 50 12-Apr-12Acta de Entrega de Terreno - 9-Apr-12Acta de Inicio de Obra - 9-Apr-12 SE DESCONOCEActa de Terminacion Obra - -Acta de Paralización/Corte - -Acta de Reinicio de Obra - 4-Jun-12Fecha de Paralizacion - -

Acta de Entrega de Obra - -

9.00 RECURSOS UTILIZADOS9.01 RECURSOS HUMANOS

CATEGORIA MAYO JUNIO JULIO OBSERVACIONES

Residente de Obra 1Inspector de Obra 1Asistente Técnico 1Asistente Administrativo 1Maestro de Obra 1Almacenero 1Operador de Maquinaria Liviana (Se considera el personal 0Operario 1Oficial 0

Peón 12

Total 19

9.02 RECURSOS DE MAQUINARIA Y EQUIPO

MAQUINARIA CANT. MAQ. PROPIA MAQ. ALQUILD.

Volquete 12 m3. 1 6Cargador Frontal 1 15Plancha compactadora. 1 x 0Concretera de 9p3. 1 x 12vibradora 1 x 8

Han laborado 30 días calendarios donde se ha realizado Gasto Presupuestal sin control por la Unidad Ejecutora, sin Supervisión al igual no se encontró documentación de orden legal, cuaderno de obra, informes actas de reinicio.En la actualidad la obra se encuentra paralizado, se ha encontrado con materiales al exterior al cuidado de un guardián que solo cuida de noche.No existe en los archivos de la Sub Gerencia de las Obras Públicas y Privadas la Nominación del Ingeniero Residente, Cuaderno de Obra, informe mensual y menos Supervisión tal como indica la RESOLUCIÓN DE CONTRALORÍA Nº 195-88-CG EMITIDA

De acuerdo al informe presentado por el Ex Sub Gerente De Obras Publicas y Privadas donde indica que la obra inicio con Residente y Supervisor de obra al igual presenta una planilla donde indica que es personal que ha laborado en el mes de mayo del 2012, al igual presnta una serie de documentos donde indica adeudar a proveedores que han abastecido a obra sin pasar por las dependencias encargadas de hacer la adquisicion.

TOTAL (HRS) EN EL MES

Page 48: Desagregado de Gastos Agosto Parchado de Vias

COMENTARIO

10.00 PLANILLA DE METRADOS10.01 Del presupuesto original.

Se adjunta planilla de metrados

10.02 De adicionales por mayores metrados.. Se adjunta planilla de mayores metrados

10.03 De adicionales por partidas nuevasSe adjunta planilla por partidas nuevas

11.00 VALORIZACION11.01 Resumen de las Valorizaciones Se adjunta valorización en anexo 111.02 Valorización de Avance de Obra Se adjunta valorización en anexo 211.03 Valorización de Mayores Metrados Se adjunta valorización en anexo 311.04 Valorización de Partidas Nuevas Se adjunta valorización en anexo 4

12.00 REPORTE DE EJECUCIÓN FINANCIERA.Se adjunta valorización en anexo

13.00 MOVIMIENTO DE ALMACEN VALORIZADO.Se adjunta valorización en anexo

14.00 PROTOCOLOS DE CONTROL DE CALIDADSe adjunta valorización en anexo

15.00 CONCLUSIONES Y RECOMENDACIONES

SE HA UTILIZADO LA CONCRETERA DE 9P3, ES DE LA MUNICIPALIDAD A LA CUAL SE LE HA DADO MANTENIMIENTO, CAMBIO DE ACEITE PARA EL MOTOR, CORREAS, PERNOS DE SUJECCION, AL IGUAL SE COMUNICA QUE POR FALTA DE ABASTECIMIENTOS DE MATERIALES POR EL AREA DE ABASTECIMIENTOS SE REALIZO PRESTAMOS DE 120 BOLSAS DE CEMENTO DONDE SE ASUME EL GASTO POR FLETE TERRESTRE

La residencia concluye de los antecedentes concerniente al proceso de ejecucion tecnico, financiero y administrativo lo siguiente:

NO SE CUENTA CON INFORMACION DEL PROCESO CONSTRUCTIVO DONDE NOS INDIQUE CUALES FUERON LAS METAS ALCANZADAS EN EL MES DE MAYO DEL 2012DE LA PARTE FINANCIERA NO SE HA REALIZADO EJECUCION EN EL MES DE MAYO, PERO A LA ACTUALIDAD SE NOS DA HA CONOCER GASTOS EFECTUADOS POR CONCEPTO DE MAQUINARIA Y MATERIALES, LOS MSMOS HAN CONTRAVENIDO EL PROCESO DE ADQUISICION, DADO EN LA LEY No.

DE LA PARTE ADMINISTRATIVA NO SE TIENE INFORMACION COMO INFORME MENSUAL DEL MES DE MAYO, MOVIMIENTO DE ALMACEN, CUADERNO DE OBRAA LA ACTUALIDAD LA RESIDENCIA INDICA QUE SE TUVO DESABASTECIMIENTO DE MATERIALES, EL AREA DE ABASTECIMIENTO NO HA CUMPLIDO EL ABASTECIMIENTO DE MATERIALES LOS MISMOS AFECTAN EL NORMAL DESARROLLO DE LA EJECUCION DE OBRA AFECTANDO LA RUTA CRITICA.

Page 49: Desagregado de Gastos Agosto Parchado de Vias
Page 50: Desagregado de Gastos Agosto Parchado de Vias

B.3.3 RECURSOS DE MAQUINARIA Y EQUIPO

MAQUINARIA MAQ. CONVENIO MAQ. PROPIA MAQ. ALQUILD.

Camioneta Hilux 4x4 PZ-6995 - 0Concretera de 9P3. x 20Plancha compactadora. x 3Cargador Frontal - 0

0

0

B.3.4 VALORIZACION DE MAQUINARIA Y EQUIPO

DESCRIPCION APROBADO ANTERIOR ACTUAL ACUMULADO SALDO

Costo Directo 0.00 0.00 0.00 0.00 0.00

TOTAL 0.00 0.00 0.00 0.00 0.00

COMENTARIO

TOTAL (HRS) EN EL MES

LA CONCRETERA DE 9P3, ES DE LA MUNICIPALIDAD A LA CUAL SE LE HA DADO MANTENIMIENTO, CAMBIO DE ACEITE PARA EL MOTOR, CORREAS, PERNOS DE SUJECCION Y BUJIAS.

Page 51: Desagregado de Gastos Agosto Parchado de Vias

MANIFIESTO DE GASTOS - MES DE MAYO 2012

META 65RUBRO 18

PROYECTO

RUBRO ESTADO FINANCIERO: MANO DE OBRA CALIFICADA Y NO CALIFICADA

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 C/P 2752 13-07-2012 CLEOFE ALMANPLANILLA DE RA PER 15 16000.57 16000.57

2 O/C 356 23.05.12 FETRACHO HNOPLANILLA DE RA PER 10 2950.80 2950.80

18,951.37

RUBRO ESTADO FINANCIERO: BIENES

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 O/C 356 23.05.12 FETRACHO HNOGUANTES DE J PARES 10 7.99 79.90

2 O/C 356 23.05.12 FETRACHO HNOGUANTES DE C PARES 10 7.99 79.90

3 O/C 356 23.05.12 FETRACHO HNOCASCOS DE CO UNDS 12 18.00 216.00

4 O/C 356 23.05.12 FETRACHO HNOMASCARRILLA UNDS 4 3.30 13.20

5 O/C 356 23.05.12 FETRACHO HNOBOTAS DE JEBE PARES 4 22.00 88.00

6 O/C 356 23.05.12 FETRACHO HNOLENTES DE SE UNDS 14 6.99 97.86

7 O/C 356 23.05.12 FETRACHO HNO POLOS COLOR UNDS 2 16.00 32.00

8 O/C 356 23.05.12 FETRACHO HNOCASCOS COLOR UNDS 6 38.00 228.00

1 O/C 357 24.05.12 INVERSIONES GALAMBRE Nº 8 KLS 40 4.20 168.00

2 O/C 357 24.05.12 INVERSIONES GALAMBRE Nº 16 KLS 50 4.20 210.00

3 O/C 357 24.05.12 INVERSIONES GCLAVOS PARA KLS 20 4.20 84.00

4 O/C 357 24.05.12 INVERSIONES GCLAVOS PARA KLS 40 4.20 168.00

1 O/C 370 28.05.12 FETRACHO HNOPALA UNDS 10 25.00 250.00

2 O/C 370 28.05.12 FETRACHO HNOPICO UNDS 10 25.90 259.00

3 O/C 370 28.05.12 FETRACHO HNOCARRETILLA UNDS 3 180.00 540.00

4 O/C 370 28.05.12 FETRACHO HNOCORDEL DE NY CONO 1 22.00 22.00

5 O/C 370 28.05.12 FETRACHO HNOBARRETA EXAGO UNDS 1 82.00 82.00

6 O/C 370 28.05.12 FETRACHO HNOCOMBAS DE 5 UNDS 2 26.00 52.00

7 O/C 370 28.05.12 FETRACHO HNOCOMBA DE 26 L UNDS 1 96.00 96.00

8 O/C 370 28.05.12 FETRACHO HNOYESO QUIN 2 6.00 12.00

9 O/C 370 28.05.12 FETRACHO HNOMANGUERA DE 3 MTS 50 1.50 75.00

10 O/C 370 28.05.12 FETRACHO HNOCILINDRO META UNDS 2 75.00 150.00

11 O/C 370 28.05.12 FETRACHO HNOHOJA DE SIERR UNDS 12 4.70 56.40

1 O/C 374 24.05.12 INVERSIONES G ACERO CORRU VARIL 264 26.70 7,048.80

2 O/C 374 24.05.12 INVERSIONES G ACERO CORRU VARIL 254 15.00 3,810.00

3 O/C 374 24.05.12 INVERSIONES G ACERO CORRU VARIL 11 6.00 66.00

13,984.06

32,935.43

MANIFIESTO DE GASTOS - MES DE JUNIO 2012

META 65RUBRO 18

PROYECTO

RUBRO ESTADO FINANCIERO: BIENES

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 O/C 388 05.06.12 NIÑO DE GUZM MADERA CORRIE UNDS 30 32.50 975.00

2 O/C 388 05.06.12 NIÑO DE GUZM MADERA CORRIE UNDS 42 25.00 1,050.00

3 O/C 388 05.06.12 NIÑO DE GUZM MADERA CORRIE UNDS 50 13.00 650.00

1 O/C 448 13.06.12 TAPIA ARAUJO PIEDRA CHANCAD M3 36 80.00 2,880.00

2 O/C 448 13.06.12 TAPIA ARAUJO PIEDRA GRANDE M4 25 70.00 1,750.00

3 O/C 448 13.06.12 TAPIA ARAUJO ARENA GRUESA M5 19 75.00 1,425.00

4 O/C 448 13.06.12 TAPIA ARAUJO PIERA MEDIANA M6 5 70.00 350.00

5 O/C 448 13.06.12 TAPIA ARAUJO HORMIGON M7 54 70.00 3,780.00

6 O/C 448 13.06.12 TAPIA ARAUJO ARENA FINA DE RIO 80 75.00 6,000.00

1 O/C 484 19.06.12 FERNANDEZ ALARCHIVADOR D UNDS 6 3.32 19.92

2 O/C 484 19.06.12 FERNANDEZ ALBOLIGRAFO TI UNDS 4 24.00 96.00

3 O/C 484 19.06.12 FERNANDEZ ALBOLIGRAFO TI UNDS 4 0.24 0.96

4 O/C 484 19.06.12 FERNANDEZ ALBOLIGRAFO TI UNDS 4 0.28 1.12

5 O/C 484 19.06.12 FERNANDEZ ALCORRECTOR LI UNDS 1 1.99 1.99

6 O/C 484 19.06.12 FERNANDEZ ALCUADERNO ANI UNDS 2 4.86 9.72

7 O/C 484 19.06.12 FERNANDEZ ALENGRANPADOR UNDS 1 6.13 6.13

" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE KERAPATA NIVEL I-1 MICRO-RED MICAELA BASTIDAS DEL DISTRITO DE

TAMBURCO”, PROVINCIA ABANCAY

PRECIO UNITARIO

VALOR TOTAL S/.

PRECIO UNITARIO

VALOR TOTAL S/.

TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE MAYO 2012

" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE KERAPATA NIVEL I-1 MICRO-RED MICAELA BASTIDAS DEL DISTRITO DE

TAMBURCO”, PROVINCIA ABANCAY

PRECIO UNITARIO

VALOR TOTAL S/.

Page 52: Desagregado de Gastos Agosto Parchado de Vias

8 O/C 484 19.06.12 FERNANDEZ ALFASTENER X 5 CAJA 1 4.31 4.31

9 O/C 484 19.06.12 FERNANDEZ ALFOLDER MANIL BOLS 1 4.46 4.46

10 O/C 484 19.06.12 FERNANDEZ ALCAJA GRAPAS X CAJA 1 2.18 2.18

11 O/C 484 19.06.12 FERNANDEZ ALPAPEL BOND FO PAQUET 6 11.39 68.34

12 O/C 484 19.06.12 FERNANDEZ ALPERFORADOR D/ UND 1 3.74 3.74

13 O/C 484 19.06.12 FERNANDEZ ALREGLA DE PLAS UND 1 0.40 0.40

14 O/C 484 19.06.12 FERNANDEZ ALRESALTADOR UND 1 1.16 1.16

15 O/C 484 19.06.12 FERNANDEZ ALTABLERO DE M UND 3 2.38 7.14

19,087.57

RUBRO ESTADO FINANCIERO: PERSONAL TECNICO ADMINISTATIVO / OTROS

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 C/P 2503 21/06/2012 QUISPE LEON J SERVICIO 1 1,000.00 1,000.00

2 C/P 2533 05.07.12 HUAMANÑAHUI POR SERVICIO SERVICIO 1 3,000.00 3,000.00

3 C/P 2752 05.07.12 HUAMANÑAHUI POR SERVICIO SERVICIO 1 3,000.00 3,000.00

4 C/P 2548 05.07.12 HUAMANÑAHUI POR SERVICIO SERVICIO 1 3,000.00 3,000.00

10,000.00

29,087.57

MANIFIESTO DE GASTOS - MES DE JULIO 2012

META 65RUBRO 18

PROYECTO

RUBRO ESTADO FINANCIERO: MANO DE OBRA CALIFICADA Y NO CALIFICADA

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 C/P 2752 13-07-2012 CLEOFE ALMANPLANILLA DE RA PER 15 13707.00 13707.00

13,707.00

RUBRO ESTADO FINANCIERO: BIENES

Nº O/C O C/PDOCUMENTO DETALLE

U. M. CANT.Nº FECHARAZON SOCIAL O NOMBRECONCEPTO

1 O/C 546 13.07.12 ESTACION DE SGASOLINA DE 8 GLS 80 13.13 1,050.40

2 O/C 547 13.07.12 ALVARADO PALPETROLEO B5 GLS 180 13.80 2,484.00

1 O/C 570 19.07.12 CORPORACION CEMENTO PORT UNDS 800 23.15 18,519.23

1 O/C 575 20.07.12 TAPIA ARAUJO BLOQUE HUECO UNDS 1102 1.50 1,653.00

2 O/C 575 20.07.12 TAPIA ARAUJO LADRILLO KING UNDS 12134 0.90 10,920.60

34,627.23

TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE JULIO 2012 48,334.23

PRECIO UNITARIO

VALOR TOTAL S/.

POR HABILITO DE CAJA CHICA

TOTAL DE MONTO EJECUTADO CORRESPONDIENTE AL MES DE JUNIO 2012

" MEJORAMIENTO DE LA CAPACIDAD RESOLUTIVA DEL PUESTO DE SALUD DE KERAPATA NIVEL I-1 MICRO-RED MICAELA BASTIDAS DEL DISTRITO DE

TAMBURCO”, PROVINCIA ABANCAY

PRECIO UNITARIO

VALOR TOTAL S/.

PRECIO UNITARIO

VALOR TOTAL S/.

Page 53: Desagregado de Gastos Agosto Parchado de Vias

RESUMEN DEL ESTADO FINANCIERO

META 0065 - 2012 CORRESPONDIENTE AL MES DE MAYO - JUNIO - JULIO - 2012

PROYECTO MEJORAMIENTO DE LA CAPACIDAD DE RESOLUTIVA DEL PUESTO DE SALUD DE KERAPATA NIVEL I-1 MICRO RED MICAELA BASTIDAS DISTRITO DE TAMBURCO PROVINCIA DE ABANCAY-APURIMAC

MONTO PRESUPUESTO TOTAL ES S/.297,339.00 ASIGNACIONES AÑO MES CORRELATIVO Nº MONTO S/.

S/. 0.00 1ª 2012 MAYO 0065 - 2012 S/.32,935.43MONTO TOTAL PRESUPUESTO S/.297,339.00 2º 2012 JUNIO 0065 - 2012 S/.29,087.57

3ª 2012 JULIO 0065 - 2012 S/.48,334.23

TOTAL ASIGNADO A LA FECHA S/.110,357.23

ITEM RUBROS

MONTO ASIGNADO MONTO EJECUTADO MONTO EJECUTADO MONTO EJECUTADOACUMULADO SALDO

(SEGÚN PRESUPUESTO) MAYO JUNIO JULIO

S/. % S/. % S/. % S/. % S/. % S/. %

1 COSTO DIRECT 270,339.00 90.92% 32,935.43 11.08% 19,087.57 6.42% 48,334.23 16.26% 100,357.23 27.38% 169,981.77 57.17%

1.1 26.22.33 MANO DE OBRA 100,339.00 33.75% 18,951.37 6.37% 0.00 0.00% 13,707.00 4.61% 32,658.37 4.61% 67,680.63 22.76%

1.2 26.22.34 BIENES 170,000.00 57.17% 13,984.06 4.70% 19,087.57 6.42% 34,627.23 11.65% 67,698.86 22.77% 102,301.14 34.41%

2 GASTOS GENE 27,000.00 9.08% 0.00 0.00% 10,000.00 3.36% 0.00 0.00% 10,000.00 14.30% 17,000.00 23.25%

2.1 26.22.35 PERSONAL TEC 27,000.00 9.08% 0.00 0.00% 10,000.00 3.36% 0.00 0.00% 10,000.00 3.36% 17,000.00 23.25%

TOTAL 297,339.00 100.00% 32,935.43 11.08% 29,087.57 9.78% 48,334.23 16.26% 110,357.23 41.68% 186,981.77 80.42%

S/.62,023.00

MONTO AMPLIACION PRESUPUESTAL

ESPECIFICA DE GASTO

Page 54: Desagregado de Gastos Agosto Parchado de Vias

S/.29,087.57

S/.48,334.23S/.48,334.23

Page 55: Desagregado de Gastos Agosto Parchado de Vias

VALORIZACIÓN DE AVANCE DE OBRA Nº 01

OBRA:

CORRESPONDIENTE AL MES DE AGOSTO DEL 2012

MONTO DE OBRA S/. 148,138.08

MONTO ASIGNADO 2012S/. 148,138.08

01 DEAGOSTO

PLAZO DE EJECUCIÓN 03 MESES

FECHA DE TERMINO 01 DE NOVIEMBRE

ITEM PRESUPUESTO PROGRAMADO

Und. Metrado

01 RECOLECCION DE LEÑA

01.01 HACHADO UN 3350.00

01.02 TRANSPORTE DE LEÑA ML 5.00

01.02.02

01.02.02

COSTO DIRECTO MENSUAL ( S/.)

PRESUPUESTO TOTAL PORCENTAJES

ABANCAY, PROVINCIA ABANCAY, REGION APURIMAC

FECHA DE INICIO DE OBRA

Page 56: Desagregado de Gastos Agosto Parchado de Vias

VALORIZACIÓN DE AVANCE DE OBRA Nº 01

REGION APURIMAC

DEPARTAMENTO APURIMAC

PROVINCIA ABANCAYDISTRITO ABANCAY

PRESUPUESTO PROGRAMADOAVANCES

ANTERIOR ACTUAL

Parcial (S/.) Metrado % Metrado % Metrado

0.20 670.00

55.00 275.00 0.00 0.00 0.00% 45.00 2475.00 900.00% 45.00

945.00 0.00 2,475.00

148,138.08 0.00 2,475.00 PORCENTAJES 0.00% 1.67%

ACUMULADO 

Precio (S/.)

ValorizS/.

ValorizS/.

Page 57: Desagregado de Gastos Agosto Parchado de Vias

AVANCES

%

2475.00 900.00%

2,475.00

2,475.001.67%

ACUMULADO Valoriz

S/.