    E-Dhara, E-governance

    By

    Rahil Darji Maulee Desai Aravind Shah

    Adit Shah Muneek Shah

  • 7/28/2019 E Dhara, E Governance presentation

    2/27

    Gujarat e-Governance Framework

  • 7/28/2019 E Dhara, E Governance presentation

    3/27

    Gujarat e-Governance Framework

  • 7/28/2019 E Dhara, E Governance presentation

    4/27

    e- Dhara

    Vision: To enable access and maintenance of Village Land

    Records in an Easy, Transparent and Secure manner.

    Objectives To convert physical Village Land Records into Electronic

    records.

    To automate maintenance and updation of Village Land

    Records in a secure manner. To set up e-Dhara Kendras (e-DKs) for accessing and updating

    of Land Records in a scalable manner

    To charge user fee for self sustainable structure.

  • 7/28/2019 E Dhara, E Governance presentation

    5/27

    Background

    Land records are maintained for various purposes.

    Instant availability is significant

    Records of Rights maintained and updated

    Traditionally- manual register maintained by talati

    Digitization of 1.5 crore land records

  • 7/28/2019 E Dhara, E Governance presentation

    6/27

    Background

    Complete system:

    1) Issuance of computerized ROR from dedicated counters in

    the taluka office

    (2) receiving mutation application and processing it in onlinemode

    Wave of change in record maintenance and piloted in

    Junagadh, Vanthali Taluka.

  • 7/28/2019 E Dhara, E Governance presentation

    7/27

    Statistics

    As on today, all 227 talukas are on central server solution

    Monthly 80,000 mutations take place at e- Dhara Kendras and

    from it 20,000 mutations take place automatically due tointegration with registration

    Approx. 40 lacs of copies of ROR getting printed every month

  • 7/28/2019 E Dhara, E Governance presentation

    8/27

    Transformation Process

    Based on transformation of manual process for maintainingand updating the land records across the state.

  • 7/28/2019 E Dhara, E Governance presentation

    9/27

    Mutation Types

  • 7/28/2019 E Dhara, E Governance presentation

    10/27

    Manual v/s Computerized System

  • 7/28/2019 E Dhara, E Governance presentation

    11/27

    Hardware Requirements

    No. Item Quantity Configuration1. Server 1

    P4 2.4 Ghz with 512 GB

    RAM (pref 1 GB), 80 GB

    HDD, DAT Drive, 17. colour

    monitor, internal CD-writer2. Client Based on workload

    (Minimum 3)P4 2 GHz with 128 MB(256 pref), 40 GB HDD, CD

    Rom, 17 colour monitor3. Printer DMP 1 180 col. printer4. Printer Laser Based on work

    loadHP 1150 or higher (at least

    14 PPM)5. Biometric device 26. CD writer 1

  • 7/28/2019 E Dhara, E Governance presentation

    12/27

    Hardware Requirements

    7. UPS 12 KVA online with 30/60

    mins. backup, SMF batteries

    and cabinet8. Generator 1 5 KVA9. Scanner 1 Legal size

    10. Switch 1 24 Port 10/100 I/O11. Rack 1 19 wall mounted rack12. Air conditioner 1 1.52 tons

    13. LCD projector 1 at District HQ With ceiling mount kit,cables and projection screen

  • 7/28/2019 E Dhara, E Governance presentation

    13/27

    Software Requirements

    Software for e-Dhara is known as BhulekhSoft ,developed by

    the NIC Gujarat unit.

    Client : Windows platform (98SE, 2000, ME and XP).

    Servers : Windows OS (98SE, 2000, 2003 or Win NT) with SQL

    Server (7.0 or 2000).

    Front end in Visual Basic 6.0 | Back end

    data base : SQL 7.0 and 2000.

  • 7/28/2019 E Dhara, E Governance presentation

    14/27

    Software Requirement

    Reports : Crystal Reports, Version 7 | Gujarati

    language interface, GIST SDK from C-DAC

    Minimum RAM : server is 128 MB,

    client 64 MB RAM

  • 7/28/2019 E Dhara, E Governance presentation

    15/27

    Software Requirement

    Front Office Module : mutation application receipt,

    application verifi- cation, mutation entry number generation

    and acknowledgement receipt printing.

    VF6 mutation entry, printing, verification and locking for

    generating of notices.

    Mutation Module : Structure entry, S-form generation

    depicting changes to be effected, final form and effecting

    update to RoR.

  • 7/28/2019 E Dhara, E Governance presentation

    16/27

    Software Requirement

    RoR and Query Module : No data entry can be made.

    Meant only for viewing and verifying of records. The module can

    be run over a dial-up line.

    Crop Module : Checklist generation, crop data entry, carrying

    or- ward previous season crop data and data entry for changes.

  • 7/28/2019 E Dhara, E Governance presentation

    17/27

    Software Requirement

    Admin Module :Configuring user ID, password and

    biometric finger- prints for all categories of users.

    Correction Module :Correcting 7/12 and 8A based

    upon talati or public verification. Strict timelines have

    been built into this module.

  • 7/28/2019 E Dhara, E Governance presentation

    18/27

    Software Requirements

    Other Forms :Currently Village Form 13 relating to summary

    of crop, trees and irrigation sources and Village Form 16

    depicting information on irrigation sources and equipment

    used have been included.

  • 7/28/2019 E Dhara, E Governance presentation

    19/27

    Peopleo Computer Operator

    data entry operations printing reports

    generate s-form and get it signed from certifying authority

    o E- Dhara Deputy Mamalatdar

    o Village Talati

    Certifying Authority

    o Mamlatdar

    o Prant officer

    o District nodal officer

    monitor activities of E-Dhara

    Maximise uptime

    o District collector

    Custodian of E-Dhara software

    review progress and monitoring during RO meeting

    Guiding for streamlining of E-Dhara operations

  • 7/28/2019 E Dhara, E Governance presentation

    20/27

    TrainingFunctional Training

    a) Talatis

    b) Deputy Mamlatdar

    c) e-Dhara Deputy Mamlatdar

    e) Mamlatdarf) Prant officer

    Technical Training

    Technical training is essential and unavoidable to data entryoperators. A functional overview during functional training

    session is also helpful

  • 7/28/2019 E Dhara, E Governance presentation

    21/27

    Initiatives contributing to the sustainable

    success of e-Dhara

    1) Accessibility and Usability

    2006: villagers came to taluka centers for ROR copies

    2008: VSAT based e-Gram centers were established and RORs

    can be delivered from anywhere

    Gujarati language is supported

    2) Trustworthiness/ Transparency/Credibility

    Capture of photographs and fingerprints for securedtransactions

    Data fed into central server from 227 e-Dhara servers.

  • 7/28/2019 E Dhara, E Governance presentation

    22/27

    3) Project Monitoring and Management

    Changes to Bombay land code of Revenue Act to integrated

    e-dhara with Garvi system

    Powerful Monitoring and MIS support available from state

    level to taluka level

    4) Leadership and administration

    High commitments from highly placed leaders andbureaucrats in Gujarat

    Initiatives contributing to the sustainable

    success of e-Dhara

  • 7/28/2019 E Dhara, E Governance presentation

    23/27

    5) Financial Sustainability

    e-Dhara is generating Rs. 2 crores per month from fees

    charged for ROR copies

    6) Integration with other systems of GOG

    Integrated with garvi system

    Generation of mutation entries and notices on the same day

    as the transaction Auto-mutation has increased the degree of integration

    between e- Dhara and relevant banking transactions

    Initiatives contributing to the sustainable

    success of e-Dhara

  • 7/28/2019 E Dhara, E Governance presentation

    24/27

    Registration Process- Screen Shot

  • 7/28/2019 E Dhara, E Governance presentation

    25/27

    Sample Notice

  • 7/28/2019 E Dhara, E Governance presentation

    26/27

    7/12 Record

  • 7/28/2019 E Dhara, E Governance presentation

    27/27

    THANK YOU