NO. NAME STUDENT ID1 CALVIN WONG PING KET 03224812 CHAN TIAN JI 03208313 VIVIAN TAY HUEY SHUEN 03238694 WONG JIA JING 03272215 YEAP PHAY SHIAN 03222436 SOO PING ZHENG 03313657 SOO YON LI 03228218 TAM ZHAO WEI 03225879 LOO SIAH MONG 0321995

10 MICHELLE TUNG MAN KAYE 032417511 LEE FONG YEN 032197612 LEE JIA KIAM 032002913 LEE LIN HUI 032279714 ELISSA CHANG YUH TING 032690915 FARAH AIDA 0322962

GROUP F MEMBERS

Page 3: Eca presentation slides

ECA FORM 1

Page 4: Eca presentation slides

ECA FORM 1

Page 5: Eca presentation slides

ECA FORM 1

Page 6: Eca presentation slides

PROJECT DETAIL

Page 7: Eca presentation slides

BRISTOL TECHNOLOGY

Client : Bristol Trading Sdn Bhd

Proposed Project : Proposed Corporate Headquarters For Bristol Trading Sdn Bhd on lot 5178, 5179 and 8609

Location : Mukim Kajang, Daerah Hulu Langat, Selangor Darul Ehsan.

PROJECT DETAIL

Page 8: Eca presentation slides

Contract Sum : Lump sum of RM4,898,990.00 Date of Possession of Site : 21st May 2003 Date of Completion : 21st January 2004 Completion Period : 8 months (inclusive of public holidays)

Quantities provided in the Bills of Quantity act only as a guidance where contractor shall compute their own quantities.

CONTRACT DETAIL

Page 9: Eca presentation slides

Liquidated and Ascertain Damages for non-completion : RM 2,000.00 per day

Defects Liability Period : 12 months from the date of Certificate of Practical Completion

Completion Period of final measurement and valuation : 6 months from the date of Certificate of Practical Completion

CONTRACT DETAIL

Page 10: Eca presentation slides

LOCATION PLAN

Page 11: Eca presentation slides

SITE PLAN

Page 12: Eca presentation slides

Proposed Corporate Headquarters for Bristol Trading Sdn Bhd on lot 5178, 5179, and 8609

BUILDING ANALYSIS

Page 13: Eca presentation slides

INTERNAL BUILDING

Page 14: Eca presentation slides

ECA FORM 1

Page 15: Eca presentation slides

ECA FORM 1

Page 16: Eca presentation slides

ECA FORM 1

Page 17: Eca presentation slides

GROSS FLOOR AREA TO BE MEASURED

LOWER GROUND FLOOR PLAN OFFICE

GROUND FLOOR PLAN GALLERY & FOYER

MEZZANINE FLOOR PLAN GALLERY, MEETING & TRAINING ROOM

FIRST FLOOR PLAN OFFICE

ROOF PLAN CEO OFFICE

Page 18: Eca presentation slides

NET FLOOR AREA

Usable Area Circulation Area

Ancillary Area Internal Division

Page 19: Eca presentation slides

NET FLOOR AREA

Total area of all enclosed spaces fulfilling the main functional requirements of the building.

USABLE AREA

CIRCULATION AREATotal area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like.

Page 20: Eca presentation slides

NET FLOOR AREA

ANCILLARY AREA

INTERNAL DIVISIONTotal area of all enclosed spaces forming entrance halls, corridors, staircases, lift wells, connecting links and the like.

Total area of all enclosed spaces for lavatories, cloakrooms, kitchens, cleaner’s room, lift, plant and tank rooms and the like, supplementary to main function of the building.

Page 21: Eca presentation slides

ECA FORM 1

Page 22: Eca presentation slides

LOWER GROUND FLOOR

Page 23: Eca presentation slides

LOWER GROUND FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

GFA :1585 m2

Page 24: Eca presentation slides

GROUND FLOOR

Page 25: Eca presentation slides

GROUND FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

GFA : 1357 m2

Page 26: Eca presentation slides

UPPER FLOORSMezzanine Floor | First Floor | Roof Floor

GFA : 1755m2

Page 27: Eca presentation slides

MEZZANINE FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

Page 28: Eca presentation slides

FIRST FLOOR PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

Page 29: Eca presentation slides

ROOF PLANUsable Area

Circulation Area

Ancillary Area

Internal Division

Page 30: Eca presentation slides

UNENCLOSED AREA

Page 31: Eca presentation slides

UNENCLOSED AREANot Enclosed Area

26.96m2

Page 32: Eca presentation slides

ROOF AREA

Page 33: Eca presentation slides

UPPER ROOF PLANUpper Roof Area

1956m2

Page 34: Eca presentation slides

ECA FORM 1

Page 35: Eca presentation slides

ECA FORM 1

Page 36: Eca presentation slides

ECA FORM 1

Page 37: Eca presentation slides

ECA FORM 1

Page 38: Eca presentation slides

FUNCTIONAL UNIT COST

Page 39: Eca presentation slides

ECA FORM 2

Page 40: Eca presentation slides

ECA FORM 2

Page 41: Eca presentation slides

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

Page 42: Eca presentation slides

Total Cost of Element : RM 140,636.10 Cost per m2 GFA : 30.19

Element Unit Quantity : 1585 m2 Element Unit Rate : 88.73

Element Ratio per m2 GFA : 0.340 Reinforced Concrete : 12,399 m3

Reinforcement (kg) : 27,537 kg Formwork (m2) : 778 m2

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

Page 43: Eca presentation slides

1. SUBSTRUCTURE

1.1 Work Below Lowest Floor Finish

Page 44: Eca presentation slides

2. SUPERSTRUCTURE

Page 45: Eca presentation slides

Total Cost of Element : RM 307,836.20 Cost per m2 GFA : 66.09

Element Unit Quantity : 4658 m2 Element Unit Rate : 65.54

Element Ratio per m2 GFA : 1.008 Reinforced Concrete : 345 m3 Reinforcement (kg) : 70,257 kg

Formwork (m2) : 4462 m2

2. SUPERSTRUCTURE

2.1 Frame

Page 46: Eca presentation slides

2. SUPERSTRUCTURE

2.1 Frame

Page 47: Eca presentation slides

Total Cost of Element : RM 233,346.70 Cost per m2 GFA : 50.10

Element Unit Quantity : 3278 m2 Element Unit Rate : 71.19

Element Ratio per m2 GFA : 0.704 m2 Reinforced Concrete : 421.00 m3 Reinforcement (kg) : 41,342.00 kg

Formwork (m2) : 2,812.00 m2

2. SUPERSTRUCTURE

2.2 Upper Floors

Page 48: Eca presentation slides

2. SUPERSTRUCTURE

2.2 Upper Floors

Page 49: Eca presentation slides

Total Cost of Element : RM 407,168.30 Cost per m2 GFA : 87.41

Element Unit Quantity : 1,671 m2 Element Unit Rate : 243.67

Element Ratio per m2 GFA : 0.359 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.3 Roof

Page 50: Eca presentation slides

2. SUPERSTRUCTURE

2.3 Roof

Page 51: Eca presentation slides

2. SUPERSTRUCTURE

2.3 Roof

Page 52: Eca presentation slides

2. SUPERSTRUCTURE

2.3 Roof

Page 53: Eca presentation slides

Total Cost of Element : RM 98,529.00 Cost per m2 GFA : 21.15 Element Unit Quantity : -

Element Unit Rate : - Element Ratio per m2 GFA : - Reinforced Concrete : 64 m2 Reinforcement (kg) : 1791 kg

Formwork (m2) : 352 m2

2. SUPERSTRUCTURE

2.4 Stairs

Page 54: Eca presentation slides

2. SUPERSTRUCTURE

2.4 Stairs

Page 55: Eca presentation slides

Total Cost of Element : RM 135,746.00 Cost per m2 GFA : 29.14

Element Unit Quantity : 2,114 m2 Element Unit Rate : 64.21

Element Ratio per m2 GFA : 0.450 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.5 External Walls

Page 56: Eca presentation slides

2. SUPERSTRUCTURE

2.5 External Walls

Page 57: Eca presentation slides

Total Cost of Element : RM 402,028.90 Cost per m2 GFA : 86.31

Element Unit Quantity : 763 m2 Element Unit Rate : 526.91

Element Ratio per m2 GFA : 0.164 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.6 Windows & External Doors

Page 58: Eca presentation slides

2. SUPERSTRUCTURE

2.6 Windows & External Doors

Page 59: Eca presentation slides

Total Cost of Element : RM 63,218.90 Cost per m2 GFA : 13.57

Element Unit Quantity : 2142 m2 Element Unit Rate : 29.51

Element Ratio per m2 GFA : 0.460 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.7 Internal Walls & Partitions

Page 60: Eca presentation slides

2. SUPERSTRUCTURE

2.7 Internal Walls & Partitions

Page 61: Eca presentation slides

Total Cost of Element : RM 24,346.90 Cost per m2 GFA : 53.01

Element Unit Quantity : 614 m2 Element Unit Rate : 39.65

Element Ratio per m2 GFA : 0.132 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

2. SUPERSTRUCTURE

2.8 Internal Doors

Page 62: Eca presentation slides

2. SUPERSTRUCTURE

2.8 Internal Doors

Page 63: Eca presentation slides

3. FINISHES

Page 64: Eca presentation slides

Total Cost of Element : RM33,140 Cost per m2 GFA : 7.11

Element Unit Quantity : 1657 Element Unit Rate : 20.00

Element Ratio per m2 GFA : 0.356 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

3. FINISHES

3.1 Wall Finishes

Page 65: Eca presentation slides

3. FINISHES

3.1 Wall Finishes

Page 66: Eca presentation slides

Total Cost of Element : RM103,748 Cost per m2 GFA : 22.27

Element Unit Quantity : 5608 Element Unit Rate : 18.50

Element Ratio per m2 GFA : 1.204 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

3. FINISHES

3.2 Internal Wall Finishes

Page 67: Eca presentation slides

3. FINISHES

3.2 Internal Wall Finishes

Page 68: Eca presentation slides

4. FITTINGS & FURNISHINGS

Page 69: Eca presentation slides

4. FITTINGS & FURNISHINGS

Page 70: Eca presentation slides

5. SERVICES

Page 71: Eca presentation slides

5. SERVICES

Page 72: Eca presentation slides

Total Cost of Element : RM35,395 Cost per m2 GFA : 7.60

Element Unit Quantity : 211 No. Element Unit Rate : 167.75

Element Ratio per m2 GFA : 0.045 Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

5.1 Sanitary Appliances

5. SERVICES

Page 73: Eca presentation slides

5.1 Sanitary Appliances

5. SERVICES

Page 74: Eca presentation slides

5.1 Sanitary Appliances

5. SERVICES

Page 75: Eca presentation slides

6. EXTERNAL WORKS

Page 76: Eca presentation slides

Total Cost of Element : RM 120,000.00 Cost per m2 GFA : RM25.76

Element Unit Quantity : - Element Unit Rate : -

Element Ratio per m2 GFA : - Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

6. EXTERNAL WORKS

6.1 Site Work

Page 77: Eca presentation slides

6. EXTERNAL WORKS

6.1 Site Work

Page 78: Eca presentation slides

Total Cost of Element : RM 14,860.00 Cost per m2 GFA : RM3.19 Element Unit Quantity : -

Element Unit Rate : - Element Ratio per m2 GFA : -

Reinforced Concrete : - Reinforcement (kg) : -

Formwork (m2) : -

6. EXTERNAL WORKS

6.2 Drainage

Page 79: Eca presentation slides

6. EXTERNAL WORKS

6.2 Drainage

Page 80: Eca presentation slides

ECA FORM 2

Page 81: Eca presentation slides

ECA FORM 3

Page 82: Eca presentation slides

ECA FORM 3

Page 83: Eca presentation slides

ECA FORM 3

Page 84: Eca presentation slides

ECA FORM 3

Page 85: Eca presentation slides

ECA FORM 3

Page 86: Eca presentation slides

ECA FORM 3

Page 87: Eca presentation slides

ECA FORM 3

Page 88: Eca presentation slides