For Polin Sistema Agua Potable P Enríquez INICIAL
-
Upload
andreafernanda -
Category
Documents
-
view
214 -
download
0
description
Transcript of For Polin Sistema Agua Potable P Enríquez INICIAL
-
PROYECTO: CONSTRUCCION DEL SISTEMA DE AGUA POTABLE DE PONCE ENRIQUEZFINANCIAMIENTO: FONDOS PROPIOS
FORMULA POLINOMICA DE REAJUSTE DE PRECIOS
REPORTE DEFINITIVO DE COSTOS
MONTO DEL PRESUPUESTO: S/. 61,591.83 COSTO DIRECTO TOTAL: S/. 51,330.23
DESGLOSE DEL EQUIPO MOTORIZADOCONCEPTO COSTO DIRECTO
DENOMI-(Incluye transporte) COEFICIENTE NACION
TOTAL 21,758.09 Mano de obra 22,971.54 0.448 BCemento Portland en sacos (Nacional) 583.20 0.011 A
CONCEPTO % VALOR Materiales Ptreos (Azuay) 2,069.90 0.040 CEquipo y maquinaria de la construccin (Nacional) 11,314.21 0.220 D
EQUIPO 0.52 11,314.21 Repuestos para maquinaria (Nacional) 5,657.10 0.110 EREPUESTOS 0.26 5,657.10 Combustibles (Nacional) 1,740.65 0.034 FMECANICOS 0.11 2,393.39 Tubos de H.S. y Accesorios 1,820.00 0.035 GCOMBUSTIBLES 0.08 1,740.65 Betn petrleo (asfalto) 1,500.00 0.029 HSALDOS (Varios) 0.03 652.74 Varios (Sistemas de agua potable zona rural) 3,673.63 0.073 XTOTAL 1.00 21,758.09 51,330.23 1.000
FORMULA: Pr = Po (0,448 B1/Bo + 0,011 A1/Ao + 0,040 C1/Co + 0,220 D1/Do + 0,110 E1/Eo + 0,034 F1/Fo + 0,035 G1/Go + 0,029 H1/Ho + 0,073 X1/Xo )
INDICES (o): Noviembre del 2003INDICES (1): a la fecha de pago del ANTICIPO o PLANILLAS
COMPOSICION DE LA CUADRILLA TIPO
COSTO SALARIO NUMERO COMPOSICIONDIRECTO S.R.H. HORAS HOMBRE
CATEGORIA I 10,838.87 1.23 8,812.09 0.477 CATEGORIA II 7,241.94 1.24 5,840.27 0.316 CATEGORIA III 1,474.84 1.26 1,170.51 0.063 CATEGORIA IV 682.17 1.28 532.95 0.029 OPERADOR G1 340.33 1.38 246.62 0.013 MECANICOS 2,393.39 1.28 1,869.84 0.102
22,971.54 18,472.27 1.000
-
ANTICIPO G8CONTRAT G7DIRECTO Y43\M IV8192
-
PROYECTO: CONSTRUCCION DEL SISTEMA DE AGUA POTABLE DE PONCE ENRIQUEZ
FINANCIAMIENTO: FONDOS PROPIOSFORMULA POLINOMICA DE REAJUSTE DE PRECIOS
MONTO DE LA OBRA: 61,591.83 dlares americanos EQUIPO + TRANSPORTE MANO DE OBRA MATERIALES
VARIOSDESCRIPCION/RUBRO CANTIDAD UNIDAD COSTOS Equipo Transporte TOTAL Categ. I Categ. II Categ. III Categ. IV Operador G1 TOTAL Cemento PortlaMateriales PtreTubos de H.S. y A Betn petrleo TOTAL RENDIMIENTOEXCAVACION A MAQUINA 0-2m 6,252.12 m3 COSTO/UNI. 1.92 0.00 1.92 0.09 0.00 0.00 0.00 0.05 0.15 0.00 0.00 0.00 0.00 0.00 0.04 2.11 1.00 2.53 15,817.86
SUBTOTAL 12004.07 0.00 12004.07 587.70 0.00 0.00 0.00 337.61 925.31 0.00 0.00 0.00 0.00 0.00 250.08 13,179.46 15,815.35 EXCAVACION Y RELLENO A MANO 900.00 m3 COSTO/UNI. 1.25 0.00 1.25 1.23 0.62 0.00 0.10 0.00 1.95 0.00 0.00 0.00 0.00 0.00 0.08 3.28 1.00 3.94 3,546.00
SUBTOTAL 1125.00 0.00 1125.00 1107.00 558.00 0.00 90.00 0.00 1755.00 0.00 0.00 0.00 0.00 0.00 72.00 2,952.00 3,542.40 PREPARACION FONDO DE ZANJA 4,880.00 m2 COSTO/UNI. 0.00 0.04 0.04 0.10 0.00 0.00 0.00 0.00 0.10 0.00 0.11 0.00 0.00 0.11 0.07 0.32 1.00 0.38 1,854.40
SUBTOTAL 0.00 195.20 195.20 492.88 0.00 0.00 0.00 0.00 492.88 0.00 536.80 0.00 0.00 536.80 361.12 1,586.00 1,903.20
RELLENO COMPACTADO A MAQUINA 7,152.12 m3 COSTO/UNI. 1.00 0.00 1.00 0.98 0.50 0.00 0.08 0.00 1.56 0.00 0.00 0.00 0.00 0.00 0.20 2.76 1.00 3.31 23,673.52 SUBTOTAL 7152.12 0.00 7152.12 7009.08 3576.06 0.00 572.17 0.00 11157.31 0.00 0.00 0.00 0.00 0.00 1,416.12 19,725.55 23,670.66
RELLENO COMPACTADO A MANO 10.00 m3 COSTO/UNI. 0.00 0.00 0.00 2.76 0.00 0.08 0.00 0.00 2.84 0.00 0.00 0.00 0.00 0.00 0.13 2.97 1.00 3.56 35.60 SUBTOTAL 0.00 0.00 0.00 27.60 0.00 0.80 0.00 0.00 28.40 0.00 0.00 0.00 0.00 0.00 1.30 29.70 35.64
RELLENO CON MEJORAMIENTO 10.00 m3 COSTO/UNI. 0.50 2.30 2.80 0.49 0.25 0.00 0.00 0.00 0.74 0.00 4.31 0.00 0.00 4.31 0.10 7.95 1.00 9.54 95.40 SUBTOTAL 5.00 23.00 28.00 4.90 2.50 0.00 0.00 0.00 7.40 0.00 43.10 0.00 0.00 43.10 1.00 79.50 95.40
RELLENO CON MATERIAL DE BASE 80.00 m3 COSTO/UNI. 0.50 2.22 2.72 0.49 0.25 0.00 0.05 0.00 0.79 0.00 9.99 0.00 0.00 9.99 0.10 13.60 1.00 16.32 1,305.60
SUBTOTAL 40.00 177.92 217.92 39.20 20.00 0.00 4.00 0.00 63.20 0.00 799.20 0.00 0.00 799.20 8.32 1,088.64 1,306.37 ROTURA DE PAVIMENTO DE 4" 200.00 m2 COSTO/UNI. 1.00 0.00 1.00 0.82 0.00 0.10 0.00 0.00 0.92 0.00 0.00 0.00 0.00 0.00 0.17 2.09 1.00 2.51 502.00
SUBTOTAL 200.00 0.00 200.00 164.00 0.00 20.00 0.00 0.00 184.00 0.00 0.00 0.00 0.00 0.00 34.00 418.00 501.60 ROTURA DE HORMIGON 15.00 m3 COSTO/UNI. 10.00 0.00 10.00 8.19 0.00 1.07 0.00 0.00 9.25 0.00 0.00 0.00 0.00 0.00 1.67 20.92 1.00 25.10 376.50
SUBTOTAL 150.00 0.00 150.00 122.78 0.00 15.98 0.00 0.00 138.76 0.00 0.00 0.00 0.00 0.00 25.05 313.81 376.57 REPOSICION DE PAVIMENTO 4" 200.00 m2 COSTO/UNI. 1.61 0.29 1.90 1.23 0.00 0.63 0.08 0.00 1.94 0.00 1.74 0.00 7.50 9.24 0.13 13.21 1.00 15.85 3,170.00
SUBTOTAL 322.00 58.00 380.00 246.00 0.00 126.00 16.00 0.00 388.00 0.00 348.00 0.00 1500.00 1848.00 25.00 2,641.00 3,169.20 REPOSICION DE H.S. f c=210Kg/cm2 15.00 m3 COSTO/UNI. 5.00 3.54 8.54 9.82 2.48 2.51 0.00 0.00 14.81 38.88 18.00 0.00 0.00 56.88 0.84 81.07 1.00 97.28 1,459.20
SUBTOTAL 75.00 53.10 128.10 147.30 37.20 37.65 0.00 0.00 222.15 583.20 270.00 0.00 0.00 853.20 12.57 1,216.02 1,459.22
CAJA DE VALVULAS d = 600 mm 52.00 U COSTO/UNI. 0.00 0.76 0.76 12.28 6.28 0.64 0.00 0.00 19.20 0.00 1.40 35.00 0.00 36.40 2.50 58.86 1.00 70.63 3,672.76 SUBTOTAL 0.00 39.52 39.52 638.56 326.56 33.28 0.00 0.00 998.40 0.00 72.80 1820.00 0.00 1892.80 130.00 3,060.72 3,672.86
INSTALACION DE VALVULA 52.00 U COSTO/UNI. 0.00 0.08 0.08 2.46 0.00 0.87 0.00 0.00 3.32 0.00 0.00 0.00 0.00 0.00 1.60 5.00 1.00 6.00 312.00 SUBTOTAL 0.00 4.16 4.16 127.66 0.00 44.98 0.00 0.00 172.64 0.00 0.00 0.00 0.00 0.00 83.20 260.00 312.00
INSTALACION DE TUBERIA DE 200 mm 420.00 m COSTO/UNI. 0.00 0.00 0.00 0.00 0.21 0.07 0.00 0.00 0.28 0.00 0.00 0.00 0.00 0.00 0.03 0.31 1.00 0.37 155.40 SUBTOTAL 0.00 0.00 0.00 0.00 88.20 29.40 0.00 0.00 117.60 0.00 0.00 0.00 0.00 0.00 12.60 130.20 156.24
INSTALACION DE TUBERIA DE 90 mm 2,481.00 m COSTO/UNI. 0.00 0.00 0.00 0.00 0.12 0.04 0.00 0.00 0.16 0.00 0.00 0.00 0.00 0.00 0.02 0.18 1.00 0.22 545.82 SUBTOTAL 0.00 0.00 0.00 0.00 297.72 99.24 0.00 0.00 396.96 0.00 0.00 0.00 0.00 0.00 49.62 446.58 535.90
INSTALACION DE TUBERIA DE 63 mm 8,604.00 m COSTO/UNI. 0.00 0.00 0.00 0.00 0.10 0.03 0.00 0.00 0.13 0.00 0.00 0.00 0.00 0.00 0.01 0.14 1.00 0.17 1,462.68
SUBTOTAL 0.00 0.00 0.00 0.00 860.40 258.12 0.00 0.00 1118.52 0.00 0.00 0.00 0.00 0.00 86.04 1,204.56 1,445.47 INSTALACION DE TUBERIA DE 50 mm 690.00 m COSTO/UNI. 0.00 0.00 0.00 0.00 0.07 0.03 0.00 0.00 0.10 0.00 0.00 0.00 0.00 0.00 0.01 0.11 1.00 0.13 89.70
SUBTOTAL 0.00 0.00 0.00 0.00 48.30 20.70 0.00 0.00 69.00 0.00 0.00 0.00 0.00 0.00 6.90 75.90 91.08 ACOMETIDA DOMICILIARIA 500.00 U COSTO/UNI. 0.00 0.00 0.00 0.00 2.85 1.44 0.00 0.00 4.30 0.00 0.00 0.00 0.00 0.00 0.57 4.87 1.00 5.84 2,920.00
SUBTOTAL 0.00 0.00 0.00 0.00 1427.00 722.00 0.00 0.00 2149.00 0.00 0.00 0.00 0.00 0.00 287.00 2,436.00 2,923.20 INSTALACION DE HIDRANTES 2.00 U COSTO/UNI. 0.00 0.00 0.00 32.74 0.00 3.59 0.00 0.00 36.34 0.00 0.00 0.00 0.00 0.00 5.33 41.67 1.00 50.00 100.00
SUBTOTAL 0.00 0.00 0.00 65.49 0.00 7.19 0.00 0.00 72.68 0.00 0.00 0.00 0.00 0.00 10.67 83.35 100.02
UNION DE COBRE d = 1/2" 50.00 U COSTO/UNI. 0.00 0.00 0.00 1.12 0.00 1.19 0.00 0.00 2.31 0.00 0.00 0.00 0.00 0.00 2.95 5.26 1.00 6.31 315.50 SUBTOTAL 0.00 0.00 0.00 56.00 0.00 59.50 0.00 0.00 115.50 0.00 0.00 0.00 0.00 0.00 147.50 263.00 315.60
DESALOJO 80.00 m3 COSTO/UNI. 0.63 1.05 1.68 0.03 0.00 0.00 0.00 0.03 0.07 0.00 0.00 0.00 0.00 0.00 0.01 1.76 1.00 2.11 168.80 SUBTOTAL 50.00 84.00 134.00 2.72 0.00 0.00 0.00 2.72 5.44 0.00 0.00 0.00 0.00 0.00 0.80 140.24 168.29
21,123.19 634.90 21,758.09 10,838.87 7,241.94 1,474.84 682.17 340.33 20,578.15 583.20 2,069.90 1,820.00 1,500.00 5,973.10 3,020.89 51,330.23 61,578.74
51,330.2300 4,473.10 1.2000
61,596.2760
4
COSTOS DIRECTOS
-
ANTICIPO G8CONTRAT G7DIRECTO Y43
\M IV8192
FORMULACALCULO