    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 1 of 23 

    PHOTO NO. 1

    Ps. along side at Victor LenacShiprepair Yard, Rijeka, Croatia

    PHOTO NO. 2

    Ps.along side,Topside coating generally intact,mechanical damage on bow areafrom anchor chains.

    PHOTO NO. 3

    Ps. shell looking forward. Areas with bare steel and corrosion. Antifouling is in general intact, and ingood condition considering 4 years

    service.

  • 8/16/2019 Fotos Trompeteros

    2/24

  • 8/16/2019 Fotos Trompeteros

    3/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 3 of 23 

    PHOTO NO. 7

    Forecastle deck with Ps. windlass.

    PHOTO NO. 8

    Windlass with hydraulic pipingequipped with coated canvas forcorrosion protection. Clean driptray.

    PHOTO NO. 9

    Forecastle deck, entrante to bosunstore, and with emergency towingarrangement at Ps.

  • 8/16/2019 Fotos Trompeteros

    4/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 4 of 30 

    PHOTO NO. 10

    Mooring winch on cargo deck,Froward Sb.

    PHOTO NO. 11

    One of the three mooring winchesarranged on aft deck.

    PHOTO NO. 12

    Spare propeller arranged on

    foundation, cargo deck Froward Ps.

  • 8/16/2019 Fotos Trompeteros

    5/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 5 of 30 

    PHOTO NO. 13

    Carwalk open grating of galvanizadsteel, fitted on supporting structurewith rubber strip for corrosionprotection.

    PHOTO NO. 14

    High pressure pipes: Carbon steel.Return pipes: Stainless steel.Pilot pipes: Duplex steel.Hydraulic piping is fitted on supportswith special purpose rubber-linedclamps.

    PHOTO NO. 15

    Sample of cargo piping and support.Sliding material between pipe andsupport. The sliding material appearto be of dubious quality, somedeterioration in development.U-bolts and nuts of mild steel.

  • 8/16/2019 Fotos Trompeteros

    6/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 6 of 30 

    PHOTO NO. 16

    Steam piping for slop tanks heatingcoils, and cargo tanks deckheaters. Pipes have pre-installedinsulation fitted with non-metallicsheeting.

    PHOTO NO. 17

    Electric cables’ piping with expansionbend in bolted steel box.

    PHOTO NO. 18

    Cargo lines’ expansion joints.Existing sliding type expansion jointsin cargo-, inert gas-, and tankwashing lines were now removed,and replaced by stainless steelbellow-type expansion joints.

  • 8/16/2019 Fotos Trompeteros

    7/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 7 of 30 

    PHOTO NO. 19

    Cargo deck with 250 mm Fishplate.

    Fixed mooring equipment andfittings were marked with SWL forweld bead parking.

    PHOTO NO. 20

    Cargo deck with longitudinalstiffeners and transverse girders.

    PHOTO NO. 21

    Cargo deck with longitudinalstiffeners’ junction to transversegirders. Note soft-toe vertical

    brackets.

  • 8/16/2019 Fotos Trompeteros

    8/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 8 of 30 

    PHOTO NO. 22

    Cargo deck.Cargo tank entry hatch with swing-out cover.

    PHOTO NO. 23

    Cargo deck.Framo type cargo pump’s hydraulicconnection. Note small bore hole intop flange for the new vacuumstripping pipe.

    PHOTO NO. 24

    Cargo deck.

    Cargo deck heater.

  • 8/16/2019 Fotos Trompeteros

    9/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 9 of 30 

    PHOTO NO. 25

    Cargo deck. Auxitrol radar type level gauge.

    PHOTO NO. 26

    Cargo deck.Sensor for independent High-Highlevel alarm, 98 %.

    PHOTO NO. 27

    Cargo deck.Bolted hatch for portable tankwashing machine. Blind flagedconnection is indicated by blue

    arrow.

  • 8/16/2019 Fotos Trompeteros

    10/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 10 of 30 

    PHOTO NO. 28

    Cargo deck.Tilden pneumatic pump (yellow),connected to cargo drain system,with discharge to drain tank Sb.

    PHOTO NO. 29

    Cargo manifold with presentationflanges and reducers.Drip tray with galvanized steelgrating.

    PHOTO NO. 30

    Cargo manifold’s cargo hose

    support rail at slip side.

  • 8/16/2019 Fotos Trompeteros

    11/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 11 of 30 

    PHOTO NO. 31

    Cargo manifold reducers positionedon top of Ps. & Sb. deck houses.

    PHOTO NO. 32

    Inert gas plant’s deck seal.

    PHOTO NO. 33

    Inert gas plant’s PV-breaker.

  • 8/16/2019 Fotos Trompeteros

    12/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 12 of 30 

    PHOTO NO. 34

    Hydraulic piston type hose handlingcrane.SWL 10 t, outreach 4.0 – 20.0 m.Separate electric – hydraulic powerpack is installed in crane columnbase.

    PHOTO NO. 35

    Cargo tanks.No. 4 Sb.Longitudinal bulkhead – inner bottom,looking forward.Drop line with supports mounted onthe bulkhead..

    PHOTO NO. 36

    Cargo tanks.No. 4 Sb.Drop line’s forward end.

    Coating found fully intact withoutdefects. No pitting formationswere found on inner bottom. Thecoating, originally light grey,

    found dis-coloured brown.

  • 8/16/2019 Fotos Trompeteros

    13/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 19 of 30 

    PHOTO NO. 55

    Main engineFoundation with hold-down bolts andresin casting.

    PHOTO NO. 56

     Auxiliary engine no. 1

    MAN B&W 7L 23/30H, 910 kW at 720rpm

    In course of main overhaul.

    PHOTO NO. 57

     Auxiliary engine no. 1 in course of

    main overhaul, view into crankcase.

  • 8/16/2019 Fotos Trompeteros

    14/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 20 of 30 

    PHOTO NO. 58

    Emergency diesel generador.Sisu Diesel, 6-cylinder, 142 kW at1,800 rpm,

    driving Stamfort generator.

    PHOTO NO. 59

    Engine control room.

    PHOTO NO. 60

     Air condition plant foraccommodation.2 x compressors, 175 m3/hr

    Maker: York Refrigeration.

  • 8/16/2019 Fotos Trompeteros

    15/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 21 of 30 

    PHOTO NO. 61

    Steam – Electric water heater.

    PHOTO NO. 62

    Incinerator1 x 40,000 Kcal/hr.Maker: Nanjing Luzhou MachineryWorksNow opened for repair of brick work

    PHOTO NO. 63

    Central coolers.

     Alfa Laval, plate type.

  • 8/16/2019 Fotos Trompeteros

    16/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 22 of 30 

    PHOTO NO. 64

    Lube oil cooler. Alfa Laval, plate type.

    PHOTO NO. 65

    Lube oil filter, Alfa Laval.

    PHOTO NO. 66

    Cooling water pumps with electric

    motors dismantled for overhaul.

  • 8/16/2019 Fotos Trompeteros

    17/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 23 of 30 

    PHOTO NO. 67

    Oily water separatorB+V Industrietechnik, 5 m3/hr

    PHOTO NO. 68

    View in aft part engine room lowerfloor.Lifting beam for shafting isarranged above. A high pressure washing machineis installed, right side in photo.

    PHOTO NO. 69

    View under floor plates in way of

    shafting, at aft part of engine room.

  • 8/16/2019 Fotos Trompeteros

    18/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 24 of 30 

    PHOTO NO. 70

    Framo power packs, arranged inseparate compartment in engineroom. High pressure pumps andelectric motors are not separated byenclosure.The hydraulic power packs servescargo pumps, ballast pumps plus allhydraulic winches.

    PHOTO NO. 71

    Steering gear Porsgrunn.Type: Rotary vane electric –hydraulic. 2 pump units.

    PHOTO NO. 72

    Spare propeller shaft, preserved and

    stored in steering gear room.

  • 8/16/2019 Fotos Trompeteros

    19/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 25 of 30 

    PHOTO NO. 73

    Ballast pump room, Framo typehydraulic driven ballast pumas, 2 x1,000 m3/hr.

    PHOTO NO. 74

    Ballast pump room, Framo typehydraulic driven ballast pumas, 2 x1,000 m3/hr.

    PHOTO NO. 75

     Accommkodation.Constructed of good materials, fair

    workmanship. Clean and wellmaintained 

  • 8/16/2019 Fotos Trompeteros

    20/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 26 of 30 

    PHOTO NO. 76

     AccommodationView of Cargo Control Room, seenfrom Ship Office part. 

    PHOTO NO. 77

     AccommodationView of Cargo Control Room.Computers for cargo plantoperations and monitoring.

    PHOTO NO. 78

    Navigation Bridge

  • 8/16/2019 Fotos Trompeteros

    21/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 27 of 30 

    PHOTO NO. 79

    Navigation Bridge withCommunication room at aft part, Ps.

    PHOTO NO. 80

     Accommodation.View of Officer’s mess room.

    PHOTO NO. 81

     Accommodation.

    View of Crew’s mess room.

  • 8/16/2019 Fotos Trompeteros

    22/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 28 of 30 

    PHOTO NO. 82 

     AccommodationView of Galley. Walls and cieling ofstainless steel panels.

    PHOTO NO. 83

     AccommodationView of provision reefer spaces.Walls and cieling of stainless steelpanels.

    PHOTO NO. 84

     AccommodationView of Master’s office. 

  • 8/16/2019 Fotos Trompeteros

    23/24

     

    PBH

    Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 29 of 30 

    PHOTO NO. 85

     AccommodationView of Conference room.

    PHOTO NO. 86

     Accommodation.View of Gym room.

    PHOTO NO. 87

     Accommodation.

    View of ship’s laundry. Well equippedwith Electrolux type machines.

  • 8/16/2019 Fotos Trompeteros

    24/24

      Humboldt

    Shipmanagement 

    M/T “ MERIOM WAVE”Condit ion Survey Report No. 2008.17,Date 02.08.2008  Page 30 of 30 

    PHOTO NO. 88

     AccommodationFire zone doors are equipped withmagnetic release in event of FIREalarm.

    PHOTO NO. 89

     Accommodation.View of Hospital.

    PHOTO NO. 90

     Accommodation.View of typical officer’s cabin.