Transcript of Hi Bay Presentation

Page 1: Hi Bay Presentation

SMP Team Projects

‘Project Great’ - Across ISS

1

Page 2: Hi Bay Presentation

2

Hi Bay Refresh

Portakabin - York

Page 3: Hi Bay Presentation

3

IntroductionProject Brief

Existing LayoutTime Lapse Photos

LED LightingAir Conditioning System

New Hi Bay

Contents

Page 4: Hi Bay Presentation

Introduction

4

Portakabin reached out to the ISS projects team in June 2015 for a potential refresh of the Hi Bay Theatre which is located at their head office in York. ISS F&H currently run the day to day operations of the canteen at this site.

The Hi Bay is a multi purpose building located at the rear of a 250,000m2 site. It is used as a conference room for both Portakabin and hired out to external companies to host events as well as a rehearsal venue for the Shepard Brass Band

The current layout of the building includes a foyer area which then leads into the conference area. There is another corridor that leads off to the gents and ladies toilet and a finishing kitchen.

With poor lighting levels, no air conditioning throughout, stained walls and highly worn carpets it was not in the best condition to use for events and hire out.

ISS were asked to come in and do a total refresh of the conference and foyer areas to make it a more aesthetically pleasing and comfortable for employees and visitors to the Hi Bay.

Page 5: Hi Bay Presentation

Project Brief

5

Within this project we planned to create an efficient and effective conference room facility for the Portakabin estate. When speaking to the Client we found we could achieve this vision by;

- Installing a new AC system to create a comfortable working environment

- Installing new lighting designed for a conference facility Inc. Controllable LED panels and 3 spotlights

- New ceiling grid providing better acoustics and sound quality.

- Redecoration works to all walls within the Hi-Bay

- New carpet tiles throughout the Conference area and the Foyer

- New matt well and blinds in the Foyer to create a welcoming entrance

- Creating a store room for Laptops and IT equipment

Page 6: Hi Bay Presentation

17th September 2015

6

These pictures show the layout and condition of the Hi Bay before works commenced on site

Page 7: Hi Bay Presentation

17th September 2015

7

These pictures show the layout and condition of the Hi Bay before works commenced on site

Page 8: Hi Bay Presentation

17th September 2015

8

These pictures show the layout and condition of the Hi Bay before works commenced on site

Page 9: Hi Bay Presentation

30th September 2015

9

Three days into the project and the original ceiling grid has been removed ready for the AC to be installed and all carpet tiles have been removed

Page 10: Hi Bay Presentation

30th September 2015

10

The Foyer has been stripped, ceiling tiles removed, carpet tiles uplifted and made ready for decoration works, AC install and carpet tiles.

Page 11: Hi Bay Presentation

14th October 2015

11

The new ceiling grid has been installed and the AC system is starting to be fitted. The walls have been prepped ready to receive decoration works

Page 12: Hi Bay Presentation

21st October 2015

12

The carpet has been fitted, walls redecorated and LED panels installed. The AC system is installed and ready to be tested.

Page 13: Hi Bay Presentation

21st October 2015

13

The project is nearly completed, only a few finishing touches left and a thorough clean

Page 14: Hi Bay Presentation

21st October 2015

14

The Foyer area is complete with new ceiling tiles, carpet tiles, mat well, blinds and redecoration.

Page 15: Hi Bay Presentation

Lighting System

15

• 45 LED panels arranged in 9 rows of 5

• This will be broken down into 3 individual sections

• Each section will be able to be controlled separately or all together.

• All 45 panels will be dimmable

• 3 Spotlights will positioned over the stage and be controlled individually

• Lighting can be controlled manually and from the lectern on the stage

Page 16: Hi Bay Presentation

Lighting System Design

16

Page 17: Hi Bay Presentation

Air Conditioning System

17

• Daikin individual twin split systems

• Designed to split the units into three individual areas or to work as one large area if required.

• System comprise of an externally mounted heat pump condensing unit, ceiling cassette/wall mounted internal fan coils, interconnecting refrigerant pipework, control wiring, condensate

disposal pipework and controls

• To provide fresh air we have installed heat recovery units.

• This is the most environmentally friendly option keeping electrical loadings to a minimum

• Heat exchange ventilators recuperate 70% of the heat from exhaust air to pre-treat incoming fresh air and interface directly with the comfort cooling systems.

Page 18: Hi Bay Presentation

Air Conditioning System Design

18

Page 19: Hi Bay Presentation

Completed Project

19

This is the finished project. All works have been completed and handed over to the client.

Page 20: Hi Bay Presentation

Completed Project

20

This is the finished project. All works have been completed and handed over to the client.

Page 21: Hi Bay Presentation

Completed Project

21

Page 22: Hi Bay Presentation

Completed Project

22

Page 23: Hi Bay Presentation

Conference Area Before & After

23

Page 24: Hi Bay Presentation

Foyer Before & After