S10 Página : 1 ING. JCRL Fecha : Precios y cantidades de insumos requeridos Obra CONSTRUCCION DE VIVIENDA S10 Fórmula 01 ESTRUCTURAS Fecha Código Insumo Unidad Precio Cantidad Parcial I.U. 2 ALAMBRE NEGRO RECOCIDO # 16 KG 1.61 207.32 333.79 2 ALAMBRE NEGRO RECOCIDO # 8 KG 1.61 25.72 41.41 2 CLAVOS PARA MADERA C/C 3" KG 1.61 37.27 60.00 3 ACERO DE REFUERZO FY=4200 GRADO 60 KG 1.60 3,685.92 5,897.47 4 ARENA GRUESA M3 12.50 17.43 217.88 5 PIEDRA CHANCADA DE 1/2" M3 38.00 31.36 1,191.68 5 PIEDRA MEDIANA DE 6" M3 21.80 14.33 312.39 5 PIEDRA GRANDE DE 8" M3 21.80 11.96 260.73 17 LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS. UND 0.93 1,237.95 1,151.29 21 CEMENTO PORTLAND TIPO I (42.5KG) BLS 10.59 547.79 5,801.10 30 AGUA M3 9.00 18.37 165.33 38 HORMIGON M3 12.50 64.58 807.25 43 MADERA TORNILLO CEPILLADA P2 3.30 289.99 956.97 43 MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 1.81 1,042.44 1,886.82 43 REGLA DE MADERA P2 1.81 10.37 18.77 47 OPERADOR DE EQUIPO LIVIANO HH 8.57 82.71 708.82 47 CAPATAZ HH 10.28 42.01 431.86 47 OPERARIO HH 8.27 375.62 3,106.38 47 OFICIAL HH 7.70 325.05 2,502.89 47 PEON HH 6.87 767.78 5,274.65 48 VIBRADOR DE CONCRETO 4 HP 2.40" HM 9.92 15.52 153.96 48 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 15.51 45.00 697.95 48 MEZCLADORA DE CONCRETO 20-35HP 16P3 HM 15.51 6.68 103.61 48 WINCHE DE DOS BALDES (350KG)M.E. 3.6HP HM 15.51 15.52 240.72 48 CIZALLA P/CORTE DE FIERRO HM 3.19 78.88 251.63 49 CAMION VOLQUETE 4x2 140-210 HP 6 M3. HM 88.72 11.10 984.79 SUB-TOTAL 33,560.12 INSUMOS COMODIN 37 HERRAMIENTAS MANUALES %MO ### SUB-TOTAL TOTAL 33,560.12 MONTO PARTIDAS ESTIMADAS

description

sd

Transcript of INSUMOS ESTRUCTURAS

Page 1: INSUMOS ESTRUCTURAS

S10 Página : 1

ING. JCRL Fecha :

Precios y cantidades de insumos requeridosObra CONSTRUCCION DE VIVIENDA S10

Fórmula 01 ESTRUCTURAS

Fecha

Código Insumo Unidad Precio Cantidad Parcial

I.U.2 ALAMBRE NEGRO RECOCIDO # 16 KG 1.61 207.32 333.79

2 ALAMBRE NEGRO RECOCIDO # 8 KG 1.61 25.72 41.41

2 CLAVOS PARA MADERA C/C 3" KG 1.61 37.27 60.00

3 ACERO DE REFUERZO FY=4200 GRADO 60 KG 1.60 3,685.92 5,897.47

4 ARENA GRUESA M3 12.50 17.43 217.88

5 PIEDRA CHANCADA DE 1/2" M3 38.00 31.36 1,191.68

5 PIEDRA MEDIANA DE 6" M3 21.80 14.33 312.39

5 PIEDRA GRANDE DE 8" M3 21.80 11.96 260.73

17 LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS. UND 0.93 1,237.95 1,151.29

21 CEMENTO PORTLAND TIPO I (42.5KG) BLS 10.59 547.79 5,801.10

30 AGUA M3 9.00 18.37 165.33

38 HORMIGON M3 12.50 64.58 807.25

43 MADERA TORNILLO CEPILLADA P2 3.30 289.99 956.97

43 MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 1.81 1,042.44 1,886.82

43 REGLA DE MADERA P2 1.81 10.37 18.77

47 OPERADOR DE EQUIPO LIVIANO HH 8.57 82.71 708.82

47 CAPATAZ HH 10.28 42.01 431.86

47 OPERARIO HH 8.27 375.62 3,106.38

47 OFICIAL HH 7.70 325.05 2,502.89

47 PEON HH 6.87 767.78 5,274.65

48 VIBRADOR DE CONCRETO 4 HP 2.40" HM 9.92 15.52 153.96

48 MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 15.51 45.00 697.95

48 MEZCLADORA DE CONCRETO 20-35HP 16P3 HM 15.51 6.68 103.61

48 WINCHE DE DOS BALDES (350KG)M.E. 3.6HP HM 15.51 15.52 240.72

48 CIZALLA P/CORTE DE FIERRO HM 3.19 78.88 251.63

49 CAMION VOLQUETE 4x2 140-210 HP 6 M3. HM 88.72 11.10 984.79

SUB-TOTAL 33,560.12

INSUMOS COMODIN

37 HERRAMIENTAS MANUALES %MO 340.84

SUB-TOTAL

TOTAL 33,560.12

MONTO PARTIDAS ESTIMADAS

D45
USUARIO11-01:
Page 2: INSUMOS ESTRUCTURAS

La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se

está utilizando

Page 3: INSUMOS ESTRUCTURAS

Presupuestado

333.79

41.41

60.00

5,897.47

217.88

1,191.68

312.39

260.73

1,151.29

5,801.10

165.33

807.25

956.97

1,886.82

18.77

708.82

431.86

3,106.38

2,502.89

5,274.65

153.96

697.95

103.61

240.72

251.63

984.79

33,560.12

340.84

340.84

33,900.96

0.00

33,900.96

G45
USUARIO11-01:
G47
USUARIO11-01:
Page 4: INSUMOS ESTRUCTURAS

La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se