Page 1: KCOI Presentation - Feb 2017 - En

1

Kazakhstan Caspian Offshore Industries LLP

Page 2: KCOI Presentation - Feb 2017 - En

Rationale behind establishing of KCOI facilities «inside the bottle»

Caspian Sea is a completely closed water basin with only one access to it

through the Volga-Don Channel system and could be compared to a bottle

with a bottleneck. Based on the country of origin where modular units and

equipment are manufactured and destined to offshore / onshore field

development, the concepts of field development in the Caspian region can be

defined as:

• «Outside the bottle» – means fabrication of the modular units and

equipment outside the Caspian region and their delivery to the

Caspian Sea throughVolga-Don Channel.

• «Inside the bottle» – means fabrication of the equipment and

processing facilities inside the Caspian region.

Supply and transportation of oil-field equipment and heavy modules through

the Volga-Don Channel involves significant project contingencies and schedule

risks associated with the DIMENSIONAL and SEASONAL restrictions of

the Volga-Don channel, thus effecting timely supply of these goods under

strict delivery deadlines.

KCOI is one of the pioneers, who realized the necessity and advantage of

developing permanently installed fabrication facility "Inside the bottle” –

means fabrication of the equipment and processing facilities within the

Caspian region.

2

Page 3: KCOI Presentation - Feb 2017 - En

• KAZAKHSTAN CASPIAN OFFSHORE

INDUSTRIES LLP (KCOI) is an EPC contractor

established in Mangystau region. Since its foundation in 2008,

KCOI has been providing world class services for various

Customers in the region and is recognized for its

contribution to the growth of Kazakhstan’s economy and

industry.

• KCOI is a production complex oriented to service Oil & Gas

industry in Kazakhstan both Offshore and Onshore;

• KCOI is committed to create employment opportunities,

train local workforce and contribute to sustainable regional

growth;

• Through KCOI there is a transfer of sound industrial

know-how and expertise from italian Rosetti Group

S.p.A. to local personnel.

3

Page 4: KCOI Presentation - Feb 2017 - En

Kazakhstan Caspian Offshore Industries Limited Liability

Partnership (“KCOI”) is a private company established in July 2008 in

the Republic of Kazakhstan.

Company Name

Corporate Information

Mission Provide its Clients and stakeholders with the best value by running safe

and environmentally responsible operations in strict compliance with law

and ethics;

Ownership Registered in Aktau, Mangystau region, KCOI is owned and fully

supported by the following companies:

40% Rosetti Kazakhstan LLP, Aktau – Rosetti Kazakhstan is fully owned by

Rosetti Marino S.p.A. in Italy

10% Rosetti Marino S.p.A. in Italy

50% MART Machinery Plant LLP, Aktobe

Facilitate economic and industrial development of the country.

Act as an EPC contractor and successfully serve the oil & gas industry;

4

Page 5: KCOI Presentation - Feb 2017 - En

Rosetti Marino is a private Italian EPC Contractor

with more than 35 years experience in offshore

Oil & Gas Industry

Rosetti Marino provides:

5

Page 6: KCOI Presentation - Feb 2017 - En

MMP provides:

We consider a strategic key to success to merge

international company know-how with a local

partner understanding of Kazakh stakeholders

expectations

6

Page 7: KCOI Presentation - Feb 2017 - En

Overview: Rosetti Group structure

Branches and Representative Offices

Rosetti Marino Tunisia branch Rosetti General Contracting Costrucoes

& Servicos LDA (Portugal)

Fores do Brasil Sistemas e Equipamentos

Industriais Ltda (Brasil)

Rosetti Mozambique Limitada

(Mozambique)

7

Page 8: KCOI Presentation - Feb 2017 - En

KCOI’s Corporate structure and Management system

8

Page 9: KCOI Presentation - Feb 2017 - En

In April 2011 KCOI established the

Branch in Atyrau to serve offshore

projects either on Kashagan field or in

Karabatan/ Eskene fields.

The branch is currently engaged in the

following works:

• PSN KAZSTROY JSC - Frame

Agreement for Fabrication &

Installation Works of Brownfield

Modifications Offshore & Onshore

• NCOC N.V. - Modification of 2x28”

Pig traps Offshore & Onshore

Branch in «Atyrau»

9

Page 10: KCOI Presentation - Feb 2017 - En

KCOI Executive Director

A. Heltai

BRANCH MANAGER

Rustem Aldiyarov (M)

PROJECT MANAGEMENT TEAM

HR, Organization & ICT Administration & Control

HSE System & Control Procurement & Subcontracting

Functionally

reports to

HR Dept AKTAU

Functionally

reports to

HSE Dept AKTAU

Functionally reports to

Procurement & Subcontracting

Dept AKTAU

Functionally reports to

Administration, Finance & Control

Dept AKTAU

Atyrau Branch – Organization chart

10

Page 11: KCOI Presentation - Feb 2017 - En

Certificate of Compliance to

International Standards

KCOI operates according to QHSE principles, for the

best success of the company and for its full compliance

with International HSE rules and standards of onshore

and offshore oil & gas industry and RoK laws

requirements.

Certification for compliance with:

ISO 9001:2008

ISO 14001:2004

OHSAS 18001:2007

obtained by Lloyd’s Register in April 2014.

Commitment for Excellence in SAFETY

HSE MANAGEMENT PRINCIPLES

Top Management Commitment

Accountability

Communication

Risk Assessment & Control

Training & Competence

HSE OBJECTIVES

Zero Injury And Accident Free

Over 9 million man-hours

LTI FREE

Safety First!!!

11

Page 12: KCOI Presentation - Feb 2017 - En

Recognition of HSE performance by our Clients

Project PIG TRAPS MODIFICATION

Client NCOC

Location D ISLAND + ESKENE WEST –

KARABATAN

Man-hours

LTI free

630 103

Duration JUN 2015 – SEP 2016

Project RAW GAS INJECTION

Client PSNK

Location D ISLAND + ESKENE WEST –

KARABATAN

Man-hours

LTI free

541 559

Duration SEP 2015 – DEC 2016

Project EPC 3 HOOK UP

Client NCOC

Location EPC 3 ISLAND - KASHAGAN

Man-hours

LTI free

426 514

Duration JUL 2016 – JAN 2017

12

Page 13: KCOI Presentation - Feb 2017 - En

Human Resources

KCOI manpower is planned to be developed according to the

following guidelines:

• Priority assigned to recruitment and training of Kazakh

nationals from Mangystau region and also from other areas

of Kazakhstan;

• KCOI staff consists of a mix of local people, expats (mainly

from Europe) and Third Country Nationals (mainly from

East Asia);

• The presence of expats and TCN will be progressively

decreased during KCOI lifetime following the company

build-up of capabilities by local resources for both

managerial and direct operations functions;

• Preference is given to local subcontractors providing

services for KCOI in different disciplines;

• A training centre for direct workers is available in KCOI

yard in order to develop the necessary expertise and

qualification.

Our largest project involved over 1000 direct personnel

(including subcontractors and manpower agencies)

Manpower, February 2017

Local 440

Expats + TCN 53

30

70

421

193

122

217188

737

493

0

100

200

300

400

500

600

700

800

Dec 09 Dec 10 Dec 11 Dec 12 Dec 13 Dec 14 Dec 15 Dec 16 Current

Manpower

13

Page 14: KCOI Presentation - Feb 2017 - En

KCOI Annual Turnover

0

20

40

60

80

100

120

140

160

2009 2010 2011 2012 2013 2014 2015 2016

Millio

n e

uro

s

Years

Revenues (€)

Revenue (€)

Company was established targetingoffshore projects in Caspian sea,mainly Kashagan ExperimentalDevelopment program.

Currently, KCOI is exploring otheropportunities Onshore, aiming atgiant projects of TCO & KPO.

14

Page 15: KCOI Presentation - Feb 2017 - En

KCOI: A Long Term Solid EPC Contractor

OFFSHORE

PLATFORMS

JACKETS

LIVING QUARTERS

PROCESS MODULES

COMPRESSION MODULES

SUBSEA MANIFOLDS/TEMPLATES

TEMPORARY UTILITY BARGES (TUB)

Fields of Activity

15

Page 16: KCOI Presentation - Feb 2017 - En

ONSHORE

HYDROGEN AND SYNGAS PLANTS

DEHYDRATION UNITS

GAS SWEETENING

SOUR WATER STRIPPER

SULPHUR RECOVERY UNITS

WELLHEAD PACKAGES AND ENHANCED OIL RECOVERY UNITS

WATER TREATMENT FACILITIES

POWER GENERATION PACKAGES

AIR AND GAS COMPRESSION PACKAGES

HEAVY WALL PRESSURE VESSELS

MAIN FRACTIONATOR COLUMNS

GAS LIQUID SEPARATION UNITS

SLUG CATCHERS

SKID MOUNTED PROCESS PACKAGES AND PROCESS AUTOMATION &

CONTROL

Fields of Activity

KCOI: A Long Term Solid EPC Contractor

16

Page 17: KCOI Presentation - Feb 2017 - En

SHIPBUILDING

HARBOUR TUGS

OCEAN GOING TUGS

SUPPLY VESSELS

ANCHOR HANDLING

FERRIES

Fields of Activity

KCOI: A Long Term Solid EPC Contractor

17

Page 18: KCOI Presentation - Feb 2017 - En

Development of logistics base to

support oil companies, freight

forwarders, service companies that

may need facilities, warehouses and

storage areas with easy access from

sea, road and even air.

Kashagan field will require approx

100 vessels to provide services

to oil extraction and treatment

facilities

KCOI

Onshoreactivities

Offshore activities“Temir

At” yard

Shipbuilding

LogisticBase

Products & Services

18

Page 19: KCOI Presentation - Feb 2017 - En

Total investment in fabrication facilities and equipment are

in excess of

EUR 50 million

as of Dec 2016 and currently ongoing.

Land plots are the property of the company and are located near the

village of Akshukur, less than 27 km far from Aktau city and at

about 8 km from Aktau international airport, along the coast of

Mangystau region.

19

“Temir At” Fabrication Yard

Page 20: KCOI Presentation - Feb 2017 - En

20

Current layout of yard

Page 21: KCOI Presentation - Feb 2017 - En

Main Workshop

Main Structural and Piping Workshops:

Total dimension: 102 m x 73 m x 21 m

Possibility to customize Workshop layouts and

productivities based on the project requirement

(Steel and Piping).

Nr. 1 bay for Piping fabrication:

• Area: 2450 m2

• Dimension: 102 m x 24 m x 21 m

• Nr. 2 overhead cranes 20 tons each

Nr. 2 bays for Structural steel fabrication and assembly:

• Area: 4900 m2

• Dimension: 102 m x 48 m x 21 m

• Nr. 2 overhead cranes 30 tons each (Pre-Assembly)

• Nr. 2 overhead cranes 20 tons each

Yard capability:

• Tonnage – 8,000 tons/year

• Piping – 10,000 inches/month

21

Page 22: KCOI Presentation - Feb 2017 - En

No. Main covered areas, m2: TodayPhase 2

ongoingTotal

1 Structural steel fabrication and assembly workshop 4,900 4,900

2 Piping fabrication workshop 2,450 2,450

3 Sandblasting and painting workshop/shelters 502 4,600 4,600

4 Covered warehouses 770 1,750 2,520

5 Maintenance workshop 502 502

6 Offices 1,612 1,496 3,108

7 Canteen + kitchen 1,972 1,972

8 Changing Rooms 966 996 1,992

9 First aid/infirmary/gate security 356 356

TOTAL covered areas: 13,528 9,344 22,400

Main covered areas

22

Page 23: KCOI Presentation - Feb 2017 - En

KCOI’s Quay and Breakwater facilities

Description of main Facilities

Total length of yard sea front~ 1,000 m

Total length of the quay ~ 120 m

Sheet-piled length 220 m

Quay level above average sea level ~ 2 m

Quay strength (load per linear meter on quay

edge)

15 metric tons/linear

m

Allowable pressure in quay area 20 kg/cm2

Water depth in front of the quay Dredged to ~ 4.5 m

Width of access channel (dredged on sea bed) ~ 200 m

Length of access channel (dredged on sea bed) ~ 300 m

The quay strengthening is provided by sheet piles;

The quay length set above may be increased to more than 300 m if KCOI undertakes also shipbuilding activities;

The water depth is dredged to ~ 4.5 m and the width of access channel in front of the quay is ~ 200 m;

These dimensions allow access, manoeuvring and mooring of barges with total length of about 95-100 m (like transport barges TB95);

The yard is able to build and load-out modules in the range about 5,000 - 8,000 metric tons each.

23

Page 24: KCOI Presentation - Feb 2017 - En

July 2011

July 2011

May 2011

July 2011

The local content of capital expenditure at date

is 95%

All physical works completed at date have been performed by local

subcontractors selected through prequalification process and

competitive bidding.

Development Facts

24

Page 25: KCOI Presentation - Feb 2017 - En

Welding of Inconel 625 during installation of

Wellhead pipe spools on-site

Prefabrication of F22 pipe spools in Workshop

25

WELDING EXPERTISE

Page 26: KCOI Presentation - Feb 2017 - En

Summary of Welding Performance in last 2 (two) years - PIPING

Total 5932 inches of F22 pipes are welded as of today

KCOI has currently available 85 welders in total

50 welders are qualified for welding of F22 piping

Overall summary of defect rate - 3%

Pipe material

NCOC

(EPC 2&3 + PIG Trap Projects)

2015-2016 (inches)

MAERSK

2015-2016

(inches)

PSNK

2016

(inches)

Total

(inches)

Welder's

Certificate

LP as per ISO Specification 13847-2013

Clad Inconel 6625 2,596.0 2,596.0 37

B444 N06625 3,288.0 3,288.0 13

A333 GR6 / lf2 414.0 414.0 7

HP according to Asme IX

A182/A336 F22 2,456.0 3,476.0 5,932.0 50

B444 N06625 20,299.0 928.0 21,227.0 20

X60 1,298.0 1,298.0 5

Superduplex 851.0 851.0 14

6 Mo 43.0 43.0 2

LP according to Asme IX

DUPLEX 1,497.0 1,497.0 14

A312 TP316/316L 2,693.5 2,693.5 40

A333 GR6 / lf2 6,804.0 5,966.0 5,000.0 17,770.0 40

B423 N08825 2,512.5 2,713.0 5,225.5 20

B444 N06625 1,712.0 678.3 2,390.3 20

Cu Ni 17.0 17.0 20

Grand Total 43,787.5 5,966.0 15,488.8 65,242.3 302

26

Page 27: KCOI Presentation - Feb 2017 - En

Welding machines for welding of various PIPING

Manufacturer & model Type / Description Q-ty

MILLER Maxstar-200 SMAW + GTAW 56

MILLER Maxstar-210 SMAW + GTAW 32

ESAB - ORIGO MIG 502C

Combined with TIG AID 315Generator SMAW + FCAW + GTAW Combined 60

TOTAL: 148

27

Page 28: KCOI Presentation - Feb 2017 - En

Welding machines for welding of various STRUCTURES

28

Generators

No. Equipment Manufacturer Type Q-ty

1 Weld.mach/ MILLER CST-280 Miller Generator SMAW 6

2WELDING MACHINE-ORIGO MIG 410 (combinate with Esab

Feed 304 M13 or Origo Feed 484 M13)ESAB Generator FCAW Combinated 3

3 Weld.mach/ NELSON-INTRA 2100 NelsonGenerator NELSON Combinated with GUN

WELD2

4LAF 1250 Generator (Combined with Tractor A6

Mastertrac) – Brand NEW!ESAB Generator SAW Combinated 2

5 Welding machine/ MILLER BOB CAT (DISEL GENERATOR) Miller Generator SMAW (Diesel) 2

6 WELDING MACHINE ESAB LHF800 (Arcgouging) ESABGenerator SMAW+ARC-GOUGING

2

7 WELDING MACHINE-ORIGO ARC 810C (Arcgouging) ESAB 2

8Welding Machine Warrior ™ 500i (Combined with

Warrior™ Feed304) – Brand NEW!ESAB

Generator SMAW+FCAW Combinated

50

9Welding machine/ MILLER XMT 425 (combined with Miller

Suite Case 12 CR Feed )Miller 8

10Welding machine/ MILLER XMT 400 (combined with Miller

Suite Case 12 CR Feed )Miller 6

11 WELDING MACHINE KEMPPI MASTER MLS 3500 KEMPPI Generator SMAW+GTAW 5

TOTAL: 88

Invertors

No. Equipment Manufacturer Type Q-ty

1TRANSFORMER TIG-AID 315 (combine with Esab LFH 400

or 410c or Esab Mig 502C)ESAB GTAW TIG Transformer 50

2FEED 304 Warrior™(Combined with Warrior™ 500i)

– Brand NEW!ESAB Feeder FCAW Combinated 50

3FEED ESAB ORIGO 484-M13 (combine with Esab Mig 502C

or Esab Mig 410)ESAB Feeder FCAW Combinated 30

4FEED ESAB 304 M13 (combine with Esab Mig 502C or Esab

Mig 410)ESAB Feeder FCAW Combinated 7

5Weld.mach/ MILLER SUITE CASE 12 RC (combine with Miller

XMT 425 or XMT 400)Miller Feeder FCAW Combinated 2

6 A6 Mastertrac Tractor – Brand NEW! ESAB Feeder Tractor SAW 2

TOTAL: 141

NEWWelding Machine Warrior ™ 500i

(Combinated with Warrior™ Feed304)

NEWLAF 1250 Generator

(Combinated with Tractor A6 Mastertrac)

Page 29: KCOI Presentation - Feb 2017 - En

Preheating and Postweld Heat Treatment

No. Equipment Manufacturer Q-ty

1 PWHT machine ГК Ремонтные технологии 8

2 PWHT machine Weldotherm 7

3 PWHT machine Hotfoil-EHS 1

TOTAL: 16

PWHT Recorder

Inspection certificate

PWHT machine

Compliance certificate

PWHT Machine and the Operator

“ГК Ремонтные технологии”

* We have 20 qualified PWHT Specialists *“Weldotherm” PWHT Machine

29

Page 30: KCOI Presentation - Feb 2017 - En

PWHT – Reference works

• Welding of 12”, 83 mm thick

F22 pipe spools during the

EPC 3 Hook-up project, NCOC

• Welding of 6”, 36.6 mm thick F22 pipe spools at “Temir At”

Workshop for “Raw Gas Injection” project, PSNK

30

Page 31: KCOI Presentation - Feb 2017 - En

PROJECT REFERENCES

PROJECTS IN THE CASPIAN REGION:

• Ongoing Projects

• Completed Projects

• Projects executed in the Caspian Region by Rosetti Group

• Projects Reference of Rosetti Group for the Caspian Region

executed in Ravenna, Italy

31

Page 32: KCOI Presentation - Feb 2017 - En

Date of Contract Award: 2016

Type of Contract: Lump Sum and unit rates

Duration: 2017

Scope of Work description:

• Marine Civil Works (Early Works and Site Preparation) are done by

ENKA;

• Electrical and Instrumentation Works are done by JSC Montazhspetsstroy;

• Load-In and Onsite Installation of Topside Modules on EPC-3 Island (Load-

In Engineering, Method of Statement, On-Site Supervision);

• Mechanical Hook-Up and Completion of Topside Facilities;

• Pre-Commissioning and Commissioning Activities.

Early Works, Site Preparation, Load-In, Installation, Hook-Up, Mechanical Completion,

Pre-Commissioning of Topsides for EP Clusters 3 and 4 (Offshore)

Client: JV Consortium ENKA – Montazhspetstroy / Final Client NCOC N.V.

Location: North Caspian Sea, Kazakhstan Sector (Offshore)

Contracting Entity: KCOI

32

Page 33: KCOI Presentation - Feb 2017 - En

Modification of 2x28 inch Pig traps (Offshore & Onshore)

Client: NCOC N.V.

Location: North Caspian Sea, Kazakhstan Sector, Island D, Karabatan

Contracting Entity: JV Consortium KCOI LLP – JSC Montazhspetsstroy

Date of Contract Award: Jun 2015

Type of Contract: Lump Sum and unit

rates

Duration: Sep 2016

Scope of Work description:

• Construction engineering production and issuing of the constructive

schemes (i.e. structural shop drawings), and red-line marked up shop

drawing (as-builts) for structures.

• Supply, procurement, fabrication of steel structure.

• Inspection (visual checks / dimensional checks, non-destructive tests)

• Painting

• Installation

• Final documentations

• Electrical and Instrumentation Works – onshore are done by JSC

Montazhspetsstroy.

33

Page 34: KCOI Presentation - Feb 2017 - En

Date of Contract Award: July 2015

Type of Contract: Lump sums & Daily rates

Duration: 1 years

Scope of Work description:

• Plant modifications (Piping, Steel structures,

etc.);

• Material grades: CS, Low alloy steels including

F22 material, SS, Cu-Ni & Incoloy;

• Workshop Prefabrication;

• Hydrotest, Leak test, Mechanical Completion.

FRAME AGREEMNT FOR FABRICATION & INSTALLATION WORKS OF BROWNFIELD MODIFICATIONS

OFFSHORE & ONSHORE

Client: PSN Kazstroy / Final Client NCOC N.V.

Location: Offshore / Onshore Karabatan / KCOI’s “Temir At” yard

Contracting Entity: KCOI

34

Page 35: KCOI Presentation - Feb 2017 - En

PROVISION OF CONSTRUCTION ENGINEERING AND CONSTRUCTION SERVICES FOR BUILDINGS

10 kV Substation (LER)

Client: TCO

Main Contractor: SKEMA LER

Location: KCOI’s “Temir At” yard

Contracting Entity: KCOI

Date of Contract Award: November 2014

Type of Contract: Lump Sum

Duration: Hold, restart Sep 2016 – Nov 2016

Scope of Work description:

Engineering, Procurement and Construction

• Engineering

• Procurement

• Fabrication

•E&I and HVAC

35

Page 36: KCOI Presentation - Feb 2017 - En

PROVISION OF FABRICATION AND WELDING SERVICES FOR EPC 2&3

Client: ER SAI Caspian Contractor LLC

Location: The industrial base (ERSAI Caspian Yard)

Contracting Entity: KCOI

Date of Contract Award: November 2014

Type of Contract: Unit Rates

Duration: April 2015 – May 2016

Scope of Work description:

• Prefabrication and erection of Pipes, piping supports;

• Pre-heating;

• Pressure Pipe Welding;

• Material grades: CS, Low alloy steels including F22

material, SS, Cu-Ni & Incoloy.

36

Page 37: KCOI Presentation - Feb 2017 - En

Date of Contract Award: November 2015

Type of Contract: Lump Sum & Daily rates

Duration: 1 year

Scope of Work description:

• Vessels mooring

• Vessels repairing services

Vessels mooring and repairing services in “Temir At”

Oil and Gas Offshore Facilities Fabrication Yard.

Client: “Caspian Marine & Dredging contractors” (Van Oord) LLP

Location: KCOI Yard

Contracting Entity: KCOI

37

Page 38: KCOI Presentation - Feb 2017 - En

Date of Contract Award: December 2014

Type of Contract: Lump Sum

Duration: 10 months

Scope of Work description:

Engineering, Procurement and Construction

• Engineering

• Procurement

• Fabrication

• Hydro-Testing and Commissioning

Supply of open drain tanks

Client: Maersk Oil Kazakhstan

Location: Dunga Field Development

Contracting Entity: KCOI

38

Page 39: KCOI Presentation - Feb 2017 - En

Date of Contract Award: March 2015

Type of Contract: Lump Sum

Duration: 2 months

Fabrication of A-frame & dredging Plough for Afon Wen tug boat

Client: Caspiisky Buksir LLP

Location: KCOI’s «Temir At» yard

Contracting Entity: KCOI

Scope of Work description:

• Construction engineering production and issuing of the constructive

schemes (i.e. structural shop drawings), and red-line marked up shop

drawing (as-builts) for structures.

• Supply, procurement, fabrication of steel structure.

• Inspection (visual checks / dimensional checks, non-destructive tests)

• Painting

• Installation

• Final documentations

39

Page 40: KCOI Presentation - Feb 2017 - En

Well Clean-up Double Basket Strainer Unit

Client: Maersk Oil Kazakhstan

Location: Dunga Field Development

Contracting Entity: KCOI

Date of Contract Award: January 2014

Type of Contract: Turn Key

Completion date: 2015

Scope of Work description:

Engineering, Procurement and Construction

• Engineering

• Procurement

• Fabrication

• Hydro-Testing and Commissioning

40

Page 41: KCOI Presentation - Feb 2017 - En

OFFSHORE & ONSHORE COMMISSIONING

KARABATAN AND ISLAND D SITES - KASHAGAN EXPERIMENTAL PROJECT

Client: AGIP KCO

Location: North Caspian Sea, Kazakhstan Sector, Atyrau

Main Contractor: IMTECH-BOLASHAK

Contracting Entity: KCOI

Date of Contract Award:

January 2011

Type of Contract:

Preliminaries LS

daily Rates, unit Rate,

reimbursable services

Duration: 3 years

Scope of Work description:

Offshore & Onshore Commissioning Assistance

• provision of commissioning personnel

• procurement services

• testing & repair services

• finishing/modifications works

41

Page 42: KCOI Presentation - Feb 2017 - En

Well Hook Up installation works on K-Line & L-Lines

Client: Maersk Oil Kazakhstan

Location: Dunga Field Development

Contracting Entity: KCOI

Date of Contract Award: October 2013

Type of Contract: Turn Key

Completion date: 2015

Scope of Work description:

Procurement and Construction

• Procurement

• Fabrication

• Installation on site

• Hydro-Testing and Commissioning

42

Page 43: KCOI Presentation - Feb 2017 - En

REPAIR ACTIVITIES ON THE 28" RAW GAS TRUNK LINE

Client: AGIP KCO NV

Main Contractor: KCOI

Project: Kashagan Experimental Program

Location: North-East area of the Kazakhstan Sector of the Caspian Sea, Atyrau

Contract Award : January 2014

Delivery Date: May 2014 - base Scope

Type of Contract: Preliminaries LS and unit rates

epC Contract: Construction engineering,

Procurement, Construction,

Welding, Mechanical Completion

Descrition:

CONTRACTOR scope consists in all the activities necessary

to repair the Raw Gas Trunk line replacing the failed sections

with new pipe sections and perform welding.

43

Page 44: KCOI Presentation - Feb 2017 - En

OFFSHORE MECHANICAL HOOK UP

Client: AGIP KCO NV

Main Contractor: Saipem S.p.A

Project: Kashagan Experimental Program

Location: North Caspian Sea, Kazakhstan Sector, Island D (Hub 1)

Contracting Entity: KCOI

Preliminary data:

700.000 direct mhrs (≈ 350 workers and 60 indirects)

Description:

Structures, equipment, piping, painting, PFP, insulation hook up works on Island

D. Full responsibility, management and execution of construction for

Non-Process Buildings, Logistics Support and Train 1 Bridges Areas.

Carry over, modifications and completion works in other Island D Areas.

Contract Award : May 2011

Delivery Date: July 2012 - Base Scope

Type of Contract: Preliminaries LS and unit rates

epC Contract: Construction engineering,

Procurement of installation materials

Construction, Mechanical Completion

Assistance to Pre-Comm & Commissioning

44

Page 45: KCOI Presentation - Feb 2017 - En

OFFSHORE ELECTRICAL, INSTRUMENTAL & TELECOM HOOK-UP

Client: AGIP KCO NV

Main Contractor: Tozzi Kazakhstan / KCOI – partnership de facto

Project: Kashagan Experimental Program

Location: North Caspian Sea, Kazakhstan Sector, Island D (Hub 1)

Contracting Entity: KCOI

Preliminary data:

1,000,000 direct mhrs (≈ 450 workers and 110 indirects)

Description:

Electrical, Instrumentation and Telecom hook up works on Island D

including major cables pulling and terminations.

Carry over, modifications and completion works.

Contract Award: May 2011

Delivery Date: August 2012 for Base Scope

Type of Contract: Preliminaries LS and unit rates

epC Contract: Construction engineering,

Procurement of installation materials

Construciton, Mechanical Completion

Assistance to Pre-Comm &

Commissioning

45

Page 46: KCOI Presentation - Feb 2017 - En

Fixed Skid Mounted Pig Launchers / Receivers

Client: Maersk Oil Kazakhstan

Location: Dunga Field Development

Contracting Entity: KCOI

Date of Contract Award: May 2012

Type of Contract: Turn Key

Duration: 1 year

Scope of Work description:

Engineering, Design and Construction

• Engineering carried out in Ravenna HQ

• Procurement in Both Ravenna & Aktau

• Fabrication & Erection

• Hydro-Testing and Commissioning

• Delivery to FIELD

46

Page 47: KCOI Presentation - Feb 2017 - En

MODIFICATION OF LIVING QUARTER BARGE TO TEMPORARY REFUGE

Client: AGIP KCO

Main Contractor: CASPIAN OCEAN LLP

Location: North Caspian Sea, Kazakhstan Sector, Atyrau

Contracting Entity: KCOI

Date of Contract Award: July 2012

Type of Contract: Conversion

Duration : 9 months

Scope of Work description:

Offshore & Onshore Commissioning Assistance

• provision of commissioning personnel

• procurement services

• testing & repair services

• finishing/modifications works

47

Page 48: KCOI Presentation - Feb 2017 - En

PIPELINE OIL & GAS TRAPS SKIDS FOR EPC 2,3,4 AND FFD

ENGINEERING, PROCUREMENT AND FABRICATION ACTIVITIES

Client: AGIP KCO NV

Main Contractor: KCOI

Project: Kashagan Experimental Program

Location: North Caspian Sea, Kazakhstan Sector, “Temir At” Yard

Preliminary data

Weight: approx. 800 tons

Description:

- Nr. 8 offshore traps skids (and associated piping,

instrumentation and electrical equipment and wiring)

Date of Contract Award: May 2010

Type of Contract: Preliminaries LS, P&C at Unit Rate

EPC CONTRACT: Procurement, Fabrication,

Testing, Load-out,

Sea-fastening and Certification.

48

Page 49: KCOI Presentation - Feb 2017 - En

Mooring and Quay rental

Client: Cashman Caspian LLP

Location: KCOI Yard

Contracting Entity: KCOI

Date of Contract Award: November 2012

Type of Contract: Mooring and Rental of Quay

Duration: 5 months

Scope of Work description:

• Mooring services • Logistics Support

•Warehousing • Canteen for Crew

• Minor Fabrication works

49

Page 50: KCOI Presentation - Feb 2017 - En

Marine Logistics

Client: Caspian Offshore Construction LLP

Location: KCOI Yard

Contracting Entity: KCOI

Period of Contract: April – December 2012

Type of Contract: Marine operations

Duration: 9 month

Scope of Work description:

• Mooring services;

•Vessel loading/unloading;

•Waste Discharge.

50

Page 51: KCOI Presentation - Feb 2017 - En

References executed in “Caspian Area”

Piperacks - 3.500 tons, Kuryk (RoK)

Piperacks - 5.000 tons, Astrakan (Russia)

Infill Decks 1.900 tons - Kuryk

Modules, Packages & Barges

Barge TB95, Astrakhan (Russia)

51

Page 52: KCOI Presentation - Feb 2017 - En

Production Manifolds - 6.100 tons

References for “Kashagan”

Modules, Packages & Barges

Temporary Utility Barge 1800 tons Karligash

52

Page 53: KCOI Presentation - Feb 2017 - En

The End

Thank you for your

attention!

Our contacts:

Legal Address: "Grand Nur Plaza" Business Centre,

Office 33,

29a micro district,

Aktau, Mangystau region,

Republic of Kazakhstan.

Tel: +7 (7292) 425 400

Email: [email protected], [email protected]

Website: www.kcoi.kz

53