    DT & Optimization Project Review

    NORTH WEST REGION

    FEBRUARY 2014

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    2/15

    Summary

    DT activities commenced on the project from the month of June 2013.

    Although I joined the project but I quickly acclimatized myself wit the work scope,

    which comprises of:

    1. Pre DT of Clusters assigned to the engineers

    2. Raised work order

    3. Implementation of work order approved

    4. Post DT of cluster been implemented

    5. Attending to customer complain from SPOC, DTH, Sales personnel and STH.

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    3/15

    DT Team Information

    DT Team Information

    S/N Team No Team Name Team phone No Area Cover

    1 Team 26 Nura Musa 08033132530 Kano and Yobe

    2 Team 27 Zailani Muazu 08108455655 Katsina and Jigawa

    3 Team 28 Ojapa Dominion 08065716738 Kaduna and Zamfara

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    4/15

    Scope of work

    Scope of work

    S/N Team No Team Name No. ofClusters No of Highway DT

    1 Team 26 Nura Musa 22 Clusters 4

    2 Team 27 Zailani Muazu 20 Clusters 2

    3 Team 28 Ojapa Dominion 27 Clusters 2

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    5/15

    DT tool configuration (3 MS)

    DT tool configuration (3 MS)S/N Team No Team Name

    1 MS1 Short Call 2G

    2 MS2 Short Call 3G

    3 MS3 IRAT Idle

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    6/15

    Work done till date

    Month

    TotalNumberOf

    ClustersforDT

    Totalnumberofsitesin

    DT

    NoofClustersP

    reDT

    Completed

    NoofClustersPostDT

    Completed

    CustomerComplaint

    Attended

    SiteAuditDo

    ne

    WOraised

    AntennaCorrections

    Done

    AntennaSwapResolved

    NeighbourOptim

    ization

    Done

    2G

    3G

    Over All 68 617 162 65 30 57 330 61 90 17 20

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    7/15

    Work done till date

    Work done till date

    S/N Team No Team NameNo of Pre

    Done

    No of

    Implementati

    on

    No of WO

    raised

    No of Post

    done

    No of High

    way DT Pre

    done

    1 Team 26 Nura Musa 18 16 18 12 1

    2 Team 27 Zailani Muazu 20 16 20 14 0

    3 Team 28Ojapa

    Dominion27 9 23 10 0

    0

    5

    10

    15

    20

    25

    30

    Nura Musa Ojapa Dominion Zailani Muazu

    Sum of No of Clusters

    Sum of No of Pre Done

    Sum of No of Post done

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    8/15

    DT report of some major

    towns.

    Te link below is for DT report of Kaduna and Zaria City

    Zaria Kaduna

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    9/15

    KPIs for reports shown.

    Kaduna

    KPI KPI (2G/3G) Pre Value (%) Post Value (%)

    Accessibility Call Setup Success Rate (CSSR) 23.13% 96.08%

    3G 56.00% 95.54%

    Retainability Call Drop Rate (CDR) 5.97% 1.41%3G 42.67% 10.71%

    Mobility

    Soft Handover Success Rate

    (SHOSR) 100.00% 100.00%

    GSM Handover Success Rate 97.20% 95.39%

    Coverage RSCP (dbm) >= -95dbm 71.20% 76.07%

    Rxlev_Sub (dBm) >= -95 dBm 92.34% 95.88%Quality EcNo (dB) > -13dB 93.03% 95.38%

    RxQual_Sub < 5 89.89% 95.12%

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    10/15

    KPIs for reports shown.

    Zaria

    KPI KPI (2G/3G)

    Pre Value

    (%)

    Post

    Value (%)

    Accessibility Call Setup Success Rate (CSSR) 98.95% 99.50%

    3G 96.21% 96.92%

    Retainability Call Drop Rate (CDR) 1.04% 1.00%3G 8.92% 6.92%

    Mobility Soft Handover Success Rate (SHOSR) 100.00% 100.00%

    GSM Handover Success Rate 99.65% 99.48%

    Coverage RSCP (dbm) >= -95dbm 72.95% 76.25%

    Rxlev_Sub (dBm) >= -95 dBm 94.83% 97.53%

    Quality EcNo (dB) > -13dB 97.31.% 97.51%

    RxQual_Sub < 5 85.14% 90.45%

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    11/15

    Sample WO and

    site audit information.

    Below is the link sample of WO and site audit information

    Work Order Site Audit

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    12/15

    Special initiatives

    1. I have organize team viewer training for the DT engineers in the region

    2. I have supply DT analysis material to the DT engineers in the region

    3. I have given DT engineers in the region extensive training on 3G DT event

    analysis.

    4. Periodical Check of traffic affecting alarms BSC based

    5. I shared alarm affecting traffic wit my colleagues on huawei

    6. I learnt and shared how to collect alarm logs on WMS

    7. Fetching overshooting cells in Abuja city by matching there KPI wit Max TA

    and make recommendation wit lots of improvement

    By Dada Opeyemi

  • 8/12/2019 Mahalle's Presentation PPT

    13/15

    Case study for anytwo network

    improvement actions.

    1. 2G/3G KPI network for Abuja metropolis

    2. 2G/3G KPI analysis for N. West region categories into rural and urbancells.

    3. Traffic and KPI affecting alarm detection on Huawei equipment

    4. Part of team for PHC AFP

    5. Fetching PD counter on NPO which is equivalent to TA in 2G KPIs and

    shared with my colleagues