Overview

• Personal Background

• Project Overview

• My Experience and Future Plans

Page 3: Megan Macciomei Final Presentation

3

Personal Background

Michigan State University– Major: Chemical Engineering– 3rd year– Expected Graduation: May 2018

First Co-op term with Marathon PetroleumActivities

– AIChE– Society of Women Engineers– Usher at Breslin for MSU Basketball– Cross Country– Marathon training

Page 4: Megan Macciomei Final Presentation

4

Projects

Alky Coalescing Media

Alky Caustic Wash Steam Exchanger

Nitrogen Pressure Study

Minor Projects

Page 5: Megan Macciomei Final Presentation

5

Alky Coalescing Media

Purpose:– Install coalescing media in the acid settlers in the alkylation unit

Background:– Current acid settlers do not effectively separate the sulfuric acid and

hydrocarbon

– Coalescing media is designed to distribute the emulsion

– Inability to effectively separate within the settlers results in acid carryover

– Downstream corrosion

Page 6: Megan Macciomei Final Presentation

6

Alky Coalescing Media

Actions:– Provide justification

– Data from other refineries

– Projected improvements• Estimated 87% reduction in acid

carryover

– Economic evaluation• Acid Savings ($18,500/year)

• Caustic Savings ($25,300/year)

– Evaluate alternatives

– Collaboration with Stratco

– Completed ER

– Approved project charter

Page 7: Megan Macciomei Final Presentation

7

Alky Coalescing Media

Moving forward:– Project DSP in development with

Engineering for 2018 implementation upon approval

Takeaways:– Economic evaluation

– Reliability justification

• Acid carryover within the unit

– Seek knowledgeMedia assembled outside the unit

Page 8: Megan Macciomei Final Presentation

8

Alky Caustic Wash Steam Exchanger

Purpose:– Maintain a minimum of 120°F before the DIB Caustic Wash on the Alkylation

unit to effectively neutralize sulfuric acid and caustic

Background:– Caustic heated with alkylate in 9E37A/B

– Unable to currently reach the 120°F in the winter months (higher RVP)

– Insufficient heating leads to acid carryover

– Contributes to downstream corrosion, DIB feed line failure

Page 9: Megan Macciomei Final Presentation

9

Alky Caustic Wash Steam Exchanger

Actions:– Compile justification– Economic evaluation

• 2014 DIB Feed Line Failure• Lost Opportunity: $508,657

– Evaluation of alternatives– Exchanger sizing and design

• Process design technologist

– Review tie-in points– Collaboration with Stratco– Completed ER– Approved project charter

Page 10: Megan Macciomei Final Presentation

10

Alky Caustic Wash Steam Exchanger

Moving forward:– Project DSP in development with Engineering for 2018 implementation if approved

Takeaways:– Established relationship with Stratco

– Communication with Tech Service, Engineering, Operations, etc.

– Develop critical thinking and technical knowledge

– Understanding the unit

Both Projects:– Upon approval, there is an estimated improvement in reliability and acid/caustic savings.

Page 11: Megan Macciomei Final Presentation

11

Nitrogen Pressure Supply Study

Purpose:– Evaluate the current nitrogen supply in Melvindale and Complex 2

Background:– Study meets requirements of Hazop recommendation R20141768-002

– Critical Nitrogen Pressure Needs:

• Complex 2 oxygen skids on each SRU Thermal Reactor

• Melvindale ethanol unloading pump

• Melvindale pentane loading arms

– Pressure reducing regulator in Complex 5 before Melvindale Tank Farm

Page 12: Megan Macciomei Final Presentation

12

Nitrogen Pressure Supply Study

Page 13: Megan Macciomei Final Presentation

13

Nitrogen Pressure Supply Study

Page 14: Megan Macciomei Final Presentation

14

Nitrogen Pressure Supply Study

Page 15: Megan Macciomei Final Presentation

15

Nitrogen Pressure Supply Study

Results:– Issued memo that satisfies Conceptual DSP for project (EJN 14-107)

Future Actions/Recommendations– Replace reducing regulator with back-pressure regulator– Study on upstream portion of East Plant nitrogen– Flow/Pressure indication to DCS – improved troubleshooting

Takeaways– Experience with Operations– Best ways to present data and information– Understanding pressure regulators and their purpose

Page 16: Megan Macciomei Final Presentation

16

October 2015 Turnaround Opportunities

Complex 6 Sour Water StripperAlky Contactor Bundle PullGOHT Reactor Catalyst LoadingHeaters

– Complex 1 Vac Heater– Coker Furnace

Complex 6 SRU Thermal ReactorMBR Tours

Page 17: Megan Macciomei Final Presentation

17

Minor Projects

9V41 Alky Condensate Pot overflow

East Plant Nitrogen User List

7V112 Pressure Controller

Cx2 SWS Fan Motor Adjustment

Flow Surveys: 5E18, 9E55A/B

Page 18: Megan Macciomei Final Presentation

18

My Experience

Technical knowledge developmentCritical thinking developmentManaging prioritiesInvolvement with Area TeamInteraction with Tech Service

Future:MSU for Spring 2016 semester2016 Summer Co-op

– Detroit Refinery: PSM

Page 19: Megan Macciomei Final Presentation

19

Thank You

Special Thanks:– Mentor: Nathan Hoffman– Supervisors: Joe Murowany and Jocelyn Hicks– Manager: Jeremy Theiss– Tech Service

Page 20: Megan Macciomei Final Presentation

20

Questions?