Metrado de Cargas Edi 10 Pisos

download Metrado de Cargas Edi 10 Pisos

of 28

description

metrado de cargas

Transcript of Metrado de Cargas Edi 10 Pisos

  • 2. METRADO DE CARGAS

    TECHO 10CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)PARA TECHOS Y AZOTEAS 790

    COL CIRC 60cm

  • TECHO 9CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)DPTOS 790

    TECHO 8

    COL CIRC 60cm

  • CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)DPTOS 790

    TECHO 7CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)

    COL CIRC 60cm

  • V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)DPTOS 790

    TECHO 6CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35

    COL CIRC 60cm

  • C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)OFICINAS 790

    TECHO 5CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2

    COL CIRC 60cm

  • COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)OFICINAS 790

    TECHO 4CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    COL CIRC 60cm

  • 0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)AULAS DE CLASE 790

    TECHO 3CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    COL CIRC 60cm

    COL CIRC 60cm

  • DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)AULAS DE CLASE 790

    TECHO 2CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    COL CIRC 60cm

  • DESCRIPCION LARGO (m) ESPESOR(m)PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)TIENDAS 790

    TECHO 1CARGAS MUERTAS DESCRIPCION PERALTE (m) BASE(m)V101(65X35) 0.65 0.35V102(55X30) 0.55 0.3C1(50X35) 0.5 0.35C2(75X75) 0.75 0.75

    DESCRIPCION AREA(m2COL TIPO T 0 0.42COL TIPO L 0 0.3675

    0.3848COL CRUZ 0.6125

    DESCRIPCION AREA(m2LOZA MACIZA(25cm) 790

    DESCRIPCION LARGO (m) ESPESOR(m)

    COL CIRC 60cm

  • PLACA P-1 6 0.25PLACA P-2 4 0.25

    DESCRIPCION AREA(m2PLACA P-3 0.7045PLACA P-4 0.675

    DESCRIPCION AREA(m2)ACABADOS 790TABIQUERIA 790

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA DESCRIPCION AREA(m2)TIENDAS 790

    RESUMENTECHO PESO(tn)CTT10 1012.139CTT9 1150.389CTT8 1150.389CTT7 1150.389CTT6 1160.264CTT5 1160.264CTT4 1209.639CTT3 1209.639CTT2 1308.389CTT1 1396.148

    P= 11907.645

  • LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 0 0

    PMT10= 992.389

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.1 0.25 1 19.75

    CVT10= 19.75

    CTT10 1012.139

  • LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT9= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.2 0.25 1 39.5

    CVT9= 39.5

    CTT9 1150.389

  • LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT8= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.2 0.25 1 39.5

    CVT8= 39.5

    CTT8 1150.389

    LONG (m) P.E (tn/m3) cantidad P.P(TN)

  • 32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT7= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.2 0.25 1 39.5

    CVT7= 39.5

    CTT7 1150.389

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.12

  • 3 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT6= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.25 0.25 1 49.375

    CVT6= 49.375

    CTT6 1160.264

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)

  • 3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT5= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.25 0.25 1 49.375

    CVT5= 49.375

    CTT5 1160.264

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.292

  • 3 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT4= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.25 0.5 1 98.75

    CVT4= 98.75

    CTT4 1209.639

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

  • ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT3= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.25 0.5 1 98.75

    CVT3= 98.75

    CTT3 1209.639

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.283 2.4 12 15.123 2.4 14 56.7

    LONG (m) P.E (tn/m3) cantidad P.P(TN)3 2.4 2 6.0483 2.4 2 5.2923 2.4 4 11.082243 2.4 2 8.82

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

  • ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 8 86.43 2.4 4 28.8

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)3 2.4 6 30.43443 2.4 3 14.58

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT2= 1110.889

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.5 0.5 1 197.5

    CVT2= 197.5

    CTT2 1308.389

    LONG (m) P.E (tn/m3) cantidad P.P(TN)32 2.4 6 104.83230 2.4 6 71.284 2.4 12 20.164 2.4 14 75.6

    LONG (m) P.E (tn/m3) cantidad P.P(TN)4 2.4 2 8.0644 2.4 2 7.0564 2.4 4 14.776324 2.4 2 11.76

    ESPESOR (m) P.E (tn/m3) cantidad P.P(TN)0.25 2.4 1 474

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)

  • 4 2.4 8 115.24 2.4 4 38.4

    ALTURA(m) P.E (tn/m3) cantidad P.P(TN)4 2.4 6 40.57924 2.4 3 19.44

    E-020(tn/m2) cantidad P.P(TN)0.1 1 79

    0.15 1 118.5

    PMT1= 1198.648

    CARGAS VIVAS , CARGAS DE USO O SOBRECARGA E-020(tn/m2) E-030 cantidad P.P(TN)

    0.5 0.5 1 197.5

    CVT1= 197.5

    CTT1 1396.148

  • MODELAMIENTO EN SAP20001.-Cambio de unidades 2.- Dibujar la malla3.- Definir materiales

    concreto PESO VOLUMETRICO 2.4tn/m3MODULO DE Ec= 150000*SQR(280) tn/m2MODULO DE POISSON 0.15Fc= 2800 tn/m2

    aceroPESO VOLUMETRICO 7.85tn/m3MODULO DE Es= 20e6 tn/m2Fy= 42000 tn/m2

    4.-Definir secciones 1 V101(65X35)2 V102(55X30)3 C1(50X35)4 C2(75X75)5 COL TIPO T6 COL TIPO L78 COL CRUZ9 PLACA

    10 LOZA MACIZA(25cm)

    5.-asignar secciones6.- asignar brazos7.- discretizacion de muros esctructurales8.- asignacion de apoyos9.- calculo de la excentricidad accidental

    ex= 1.6ex= 1.5

    10.- Ubicar la masa accidental11.- definir diafragmas12.- asignar diafragmas13.-asignar restricciones a la masa accidental14.- DEFINIR cargas sismicas15.- Eliminar cargas excedentes16.- Definir los desplazamientos17.- Agregar fuerzas sismicas por cada piso

    17.1 calculo del periodo fundamental (T)

    COL CIRC 60cm

  • T= hn/CT

    HN= ALTURA DEL EDIFICIO 31Ct= NORMA E030 PAG 20 45

    T= 0.68889 DEBE SER MENOR A 0.7SI ES MAYO SE CALCULA UNA FUERZA ADICIONAL

    17.2 Calculo del coeficiente de amplificacion sismica Norma E030 pag 10

    C=2,5*(Tp/T)debe ser menor a 2.5 si es mayor tomar 2.5

    Suelo Tp rigido 0.4

    Intermedio 0.6Felxible 0.9

    Suelo qa(kg/cm2) St(mm) factor de suelo (S)rigido

  • V=(ZUCS/R)*P 2666.87 TN

    17.4 Calculo de las fuerzas sismicas por altura

    PISO PESOtn ALTURA(m)PISO 10 1012.13864 31PISO 9 1150.38864 28PISO 8 1150.38864 25PISO 7 1150.38864 22PISO 6 1160.26364 19PISO 5 1160.26364 16PISO 4 1209.63864 13PISO 3 1209.63864 10PISO 2 1308.38864 7PISO 1 1396.14752 4

    Pi*Hi

    18 CORRE ANALISIS

    19 VERIFICAR DESPLAZAMIENTO 0.007 maxDesplazamiento en x

    PISO 10 H (mm) acmuladoPISO 10 3000 280.21PISO 9 3000 251.89PISO 8 3000 221.69PISO 7 3000 190.19PISO 6 3000 157.83

  • PISO 5 3000 125.31PISO 4 3000 93.6PISO 3 3000 63.89PISO 2 3000 37.6PISO 1 3000 16.38

    distor= despl10/h0.00944

    0.00292

    Desplazamiento en YPISO 10 H (mm) acmuladoPISO 10 3000 286.22PISO 9 3000 254.23PISO 8 3000 221.09PISO 7 3000 187.25PISO 6 3000 153.19PISO 5 3000 119.97PISO 4 3000 87.67PISO 3 3000 58.35PISO 2 3000 33.12PISO 1 3000 13.58

  • 5.25

  • SI ES MAYO SE CALCULA UNA FUERZA ADICIONAL

    para nuestro caso cap port 1.6

    UBICACIN EN CHICLAYO

  • Pi*Hi Fi31376.30 416.6532210.88 427.7428759.72 381.9125308.55 336.0822045.01 292.7418564.22 246.5215725.30 208.8212096.39 160.639158.72 121.625584.59 74.16

    200829.6725 2666.87

    Desplazamiento en xparcial deriva

    28.32 0.009430.2 0.010131.5 0.0105

    32.36 0.010832.52 0.0108

  • 31.71 0.010629.71 0.009926.29 0.008821.22 0.007116.38 0.0055

    Desplazamiento en Yparcial deriva

    31.99 0.010733.14 0.011033.84 0.011334.06 0.011433.22 0.0111

    32.3 0.010829.32 0.009825.23 0.008419.54 0.006513.58 0.0045