RESUMEN METRADOITEM DESCRIPCION UND METRADO
CONCRETO EN VIGAS F'C=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO ESTRUCTURAL TRABAJADO PARA VIGAS CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5 TARRAJEO INTERIOR C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS EMPOT) TARRAJEO EXTERIOR C/MORTERO 1:5 X 1.5CM.(INC.COLUMNAS EMPOT) TARRAJEO DE DERRAMES INCLUYE COLUMNAS Y VIGAS CON CEMENTO - ARENA CIELORRASOS CON MEZCLA DE CEMENTO-ARENA PINTURA LATEX EN CIELO RASO 2 MANOS PINTURA LATEX EN MUROS INTERIORES 2 MANOS PINTURA LATEX EN MUROS EXTERIORES 2 MANOS PINTURA LATEX EN DERRAMES 2 MANOS PINTURA LATEX EN VIGAS 2 MANOS
M3 M2 KG M3 M2 KG UND M3 M2 KG M2 M2 M2 M2 M2 M M2 M2 M2 M2 M2 M2
20.09 84.39 2,176.00 18.79 328.15 1,193.00 1,880.00 1.38 12.50 57.00 24.79 489.36 159.32 847.64 90.10 243.90 285.14 290.19 847.64 90.10 36.59 14.40
PLANILLA DE METRADOS GENERALPARTIDA VIGAS CONCRETO EN VIGAS F'C=210 KG/CM2 PRIMER PISO EJE A, VS-3 EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-5 ENTRE EJE A Y B , V-7 EJE B, V-2 EJE B, VS-1 EJE B, V-5 EJE C, VS-1 EJE C, V-4 EJE C, V-5 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 EJE D, VS-3 EJE D, VS-1 EJE D, VS-2 EJE 1, V-1 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-2 ENTRE EJE 2 Y 3 , VS-1 EJE 3, V-3 EJE 3, V-4 EJE 3, VS-1 EJE 4, V-3 EJE 4, V-4 EJE 4, V-6 EJE 5, V-4 ENTRE EJE 5 Y 6 , V-5 EJE 6, V-4 ENTRE EJE 6 Y 7 , V-8 EJE 7, V-5 EJE 7, VS-1 EJE 8, V-4 EJE 9, VS-1 EJE 9, VS-3 SEGUNDO PISO EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-5 ENTRE EJE A Y B , V-7 EJE B, V-4 EJE B, VS-1 EJE B, V-5 EJE C, V-4 EJE C, V-5 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 EJE D, VS-1 EJE D, VS-2 EJE D, V5 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-4 EJE 3, VS-1 EJE 3, V-5 EJE 4, VS-1 EJE 4, V-5 EJE 5, V-4 ENTRE EJE 5 Y 6 , V-5 EJE 6, V-4 ENTRE EJE 6 Y 7 , VS-1 EJE 7, V-5 EJE 7, VS-1 EJE 8, V-4 EJE 9, VS-1 TERCER PISO EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-5 ENTRE EJE A Y B , V-7 EJE B, V-4 EJE B, VS-1 EJE B, V-5 EJE C, V-4 EJE C, V-5 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.80 1.35 2.20 2.20 8.30 2.20 2.00 4.80 1.10 2.05 1.10 0.25 0.15 0.25 0.20 0.25 0.25 0.25 0.25 0.25 0.20 0.25 0.20 0.40 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.44 0.08 0.11 0.09 0.42 0.11 0.10 0.24 0.06 0.08 0.06 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.80 1.35 2.20 1.00 8.30 2.20 2.00 4.80 1.10 2.05 1.10 10.80 2.40 1.00 5.55 7.50 6.20 1.00 6.20 1.00 2.15 3.40 4.40 2.65 0.80 2.60 3.40 3.90 0.25 0.15 0.25 0.20 0.25 0.25 0.25 0.25 0.25 0.20 0.25 0.25 0.15 0.25 0.20 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.15 0.25 0.25 0.25 0.25 0.25 0.20 0.40 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.40 0.20 0.20 0.20 0.30 0.20 0.30 0.20 0.20 0.20 0.30 0.20 0.20 0.20 0.30 0.20 0.44 0.08 0.11 0.04 0.42 0.11 0.10 0.24 0.06 0.08 0.06 0.54 0.14 0.05 0.22 0.38 0.47 0.05 0.47 0.05 0.11 0.17 0.20 0.13 0.04 0.13 0.26 0.20 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 4.20 8.80 1.35 2.20 1.00 8.30 2.20 2.00 3.90 4.75 2.10 2.05 1.10 1.60 10.80 4.60 7.35 5.20 7.50 2.15 3.00 1.00 2.70 3.00 1.00 2.70 2.15 3.40 4.40 2.65 0.80 2.60 3.40 3.90 3.60 0.20 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.15 0.25 0.25 0.15 0.35 0.25 0.25 0.25 0.25 0.15 0.20 0.40 0.20 0.30 0.20 0.20 0.30 0.20 0.30 0.20 0.20 0.30 0.20 0.20 0.20 0.30 0.20 0.20 0.15 0.25 0.15 0.25 0.20 0.25 0.25 0.25 0.25 0.25 0.25 0.20 0.25 0.15 0.25 0.15 0.20 0.20 0.40 0.20 0.20 0.40 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.40 0.15 0.13 0.44 0.08 0.11 0.04 0.83 0.11 0.10 0.20 0.24 0.11 0.08 0.06 0.05 0.54 0.28 1.10 0.21 0.75 0.11 0.23 0.05 0.14 0.23 0.05 0.12 0.11 0.17 0.20 0.19 0.04 0.13 0.26 0.20 0.11 M3 20.09 UND. N VECES LONGITUD ANCHO ALTURA ESPESOR AREA PARCIAL TOTAL
PLANILLA DE METRADOS GENERALPARTIDA EJE D, VS-1 EJE D, VS-2 EJE D, V5 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-4 EJE 3, VS-1 EJE 3, V-5 EJE 4, VS-1 EJE 4, V-5 EJE 5, V-4 ENTRE EJE 5 Y 6 , V-5 EJE 6, V-4 ENTRE EJE 6 Y 7 , VS-1 EJE 7, V-5 EJE 7, VS-1 EJE 8, V-4 EJE 9, VS-1 CUARTO PISO EJE A, VS-1 EJE A, VS-4 ENTRE EJE A Y B , V-5 EJE B, VS-1 EJE B, V-5 EJE D, VS-4 EJE 3, VS-4 EJE 4, VS-1 EJE 4, VS-4 ENTRE EJE 5 Y 6 , VS-1 EJE 6, VS-1 ENCOFRADO Y DESENCOFRADO VIGAS PRIMER PISO EJE A, VS-3 EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-7 EJE B, V-2 EJE B, V-5 EJE C, VS-1 EJE C, V-4 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 EJE D, VS-1 EJE D, VS-2 EJE 1, V-1 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-2 EJE 3, V-3 EJE 3, V-4 EJE 3, VS-1 EJE 4, V-3 EJE 4, V-4 EJE 4, V-6 EJE 8, V-4 EJE 9, VS-1 EJE 9, VS-3 SEGUNDO PISO EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-7 EJE B, V-5 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 EJE D, VS-1 EJE D, VS-2 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-4 EJE 3, VS-1 EJE 3, V-5 EJE 4, VS-1 EJE 4, V-5 EJE 8, V-4 EJE 9, VS-1 TERCER PISO EJE A, VS-1 EJE A, VS-2 ENTRE EJE A Y B , V-7 EJE B, V-5 ENTRE EJE C Y D , V-7 ENTRE EJE C Y D , V-5 M3 M3 M3 M3 M3 M3 1.00 2.00 1.00 1.00 1.00 1.00 8.80 1.35 2.20 2.00 2.05 1.10 0.20 0.40 0.20 0.20 0.20 0.20 1.76 1.08 0.44 0.40 0.41 0.22 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 8.80 1.35 1.00 2.00 2.05 1.10 10.80 2.40 5.55 1.60 6.20 1.00 6.20 1.00 3.40 3.90 0.20 0.40 0.20 0.20 0.20 0.20 0.20 0.40 0.20 0.20 0.30 0.20 0.30 0.20 0.30 0.20 1.76 1.08 0.20 0.40 0.41 0.22 2.16 1.92 1.11 0.32 1.86 0.20 1.86 0.20 1.02 0.78 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 2.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 4.20 8.80 1.35 1.00 8.30 2.00 3.90 4.75 2.05 1.10 10.80 4.60 7.35 5.20 7.50 3.00 1.00 2.70 3.00 1.00 2.70 3.40 3.90 3.60 0.20 0.20 0.40 0.20 0.65 0.20 0.20 0.20 0.20 0.20 0.20 0.40 1.15 0.20 0.65 0.45 0.20 0.20 0.45 0.20 0.30 0.30 0.20 0.20 1.68 1.76 1.08 0.20 5.42 0.40 0.78 0.95 0.41 0.22 2.16 3.68 8.45 1.04 4.88 1.35 0.20 0.54 1.35 0.20 0.81 1.02 0.78 1.44 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.75 2.50 1.00 4.20 1.20 1.35 6.60 3.40 2.70 3.70 3.70 0.25 0.15 0.25 0.25 0.25 0.15 0.15 0.25 0.15 0.25 0.25 0.20 0.30 0.20 0.20 0.20 0.30 0.30 0.20 0.30 0.20 0.20 0.14 0.11 0.05 0.21 0.06 0.06 0.30 0.17 0.12 0.19 0.19 84.39 UND. N VECES M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LONGITUD 12.40 2.40 1.00 5.55 7.50 6.20 1.00 6.20 1.00 2.15 3.40 4.40 2.65 0.80 2.60 3.40 3.90 ANCHO ALTURA 0.25 0.15 0.25 0.20 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.15 0.25 0.25 0.25 0.25 0.25 0.20 0.40 0.20 0.20 0.20 0.30 0.20 0.30 0.20 0.20 0.20 0.30 0.20 0.20 0.20 0.30 0.20 ESPESOR AREA PARCIAL 0.62 0.14 0.05 0.22 0.38 0.47 0.05 0.47 0.05 0.11 0.17 0.20 0.13 0.04 0.13 0.26 0.20 TOTAL
PLANILLA DE METRADOS GENERALPARTIDA EJE D, VS-1 EJE D, VS-2 EJE D, V5 ENTRE EJE 1 Y 2 , V-7 EJE 2, V-4 EJE 3, VS-1 EJE 3, V-5 EJE 4, VS-1 EJE 4, V-5 EJE 8, V-4 EJE 9, VS-1 CUARTO PISO EJE A, VS-1 EJE A, VS-4 ENTRE EJE A Y B , V-5 EJE B, VS-1 EJE B, V-5 EJE D, VS-4 EJE 3, VS-4 EJE 4, VS-1 EJE 4, VS-4 ENTRE EJE 5 Y 6 , VS-1 EJE 6, VS-1 ACERO DE REFUERZO LOSA ALIGERADA CONCRETO LOSA ALIGERADA f'c = 210 kg/cm2 PRIMER PISO SEGUNDO PISO TERCER PISO CUARTO PISO ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA PRIMER PISO SEGUNDO PISO TERCER PISO CUARTO PISO ACERO DE REFUERZO LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO PRIMER PISO SEGUNDO PISO TERCER PISO CUARTO PISO LOSA MACIZA CONCRETO LOSA MACIZA f'c = 210 kg/cm2 PRIMER PISO TERCER PISO ENCOFRADO Y DESENCOFRADO LOSA MACIZA PRIMER PISO TERCER PISO ACERO DE REFUERZO ALBAILERIA M2 M2 KG 1.00 1.00 1.00 7.50 1.00 5.00 7.50 5.00 57.00 57.00 24.79 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.15 2.20 1.15 2.20 1.15 2.20 1.15 2.60 2.60 2.40 2.40 2.40 2.40 2.40 489.36 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 4.20 9.50 1.00 3.65 0.60 2.60 4.70 9.70 1.30 1.80 2.00 2.05 2.05 3.15 3.10 2.65 2.60 1.10 2.60 2.00 1.10 2.40 2.60 2.60 2.60 1.10 2.60 2.60 2.65 2.60 11.13 24.70 1.10 9.49 1.20 2.86 11.28 25.22 3.38 4.68 2.20 5.33 5.33 8.35 8.06 2.99 5.72 0.00 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 2.76 5.28 0.00 2.76 5.28 M3 M3 1.00 1.00 7.50 0.20 0.05 5.00 0.38 1.00 12.50 1.38 M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 KG 1.00 1.00 1.00 1.00 1.00 1.00 FACTOR= 1.00 FACTOR= 1.00 FACTOR= 1.00 FACTOR= 8.75 8.75 8.75 8.75 69.56 66.52 66.52 12.15 108.60 101.05 101.05 17.45 108.60 101.05 101.05 17.45 1,193.00 608.67 582.03 582.03 106.31 1,193.00 1,880.00 1.00 FACTOR= 1.00 FACTOR= 1.00 FACTOR= 1.00 FACTOR= 0.09 0.09 0.09 0.09 69.56 66.52 66.52 12.15 6.09 5.82 5.82 1.06 328.15 18.79 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 KG 1.00 2.00 1.00 1.00 1.00 2.00 2.00 1.00 2.00 1.00 1.00 1.00 2.75 2.50 1.00 4.20 1.20 1.35 6.60 3.40 2.70 3.70 3.70 0.20 0.30 0.20 0.20 0.20 0.30 0.30 0.20 0.30 0.20 0.20 0.55 1.50 0.20 0.84 0.24 0.81 3.96 0.68 1.62 0.74 0.74 2,176.00 2,176.00 UND. N VECES M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 LONGITUD 12.40 2.40 1.00 5.55 1.35 6.20 1.00 6.20 1.