ITEM DESCRIPCION 01.00 ESTRUCTURAS 01.01 TRABAJOS PRELIMINARES 01.01.01 LIMPIEZA DE TERRENO MANUAL 1.00 01.01.02 TRAZO NIVELES Y REPLANTEO 1.00 01.02 MOVIMIENTO DE TIERRAS 01.02.01 EXCAVACION DE ZANJAS PARA CIMENTACION EJE A-A ENTRE EJES 1-1, 2-2 (CORTE 2-2) 1.00 ENTRE EJES 2-2, 3-3 (CORTE 2-2) 1.00 ENTRE EJES 3-3, 4-4 (CORTE 2-2) 1.00 EJE B-B ENTRE EJES 1-1, 2-2 (CORTE 3-3) 1.00 EJE C-C ENTRE EJES 3-3, 4-4 (CORTE 3-3) 1.00 ENTRE EJES 4-4, 5-5 (CORTE 3-3) 1.00 EJE D-D ENTRE EJES 2-2, 3-3 (CORTE 2-2) 1.00 ENTRE EJES 3-3, 4-4 (CORTE 2-2) 1.00 ENTRE EJES 4-4, 5-5 (CORTE 2-2) 1.00 ENTRE EJES C-C, D-D. ENTRE EJES 1-1, 2-2 (CORTE 1-1) 1.00 ENTRE EJES 2-2, 3-3 (CORTE 5-5) 1.00 EJE 1-1 ENTRE EJES A-A, B-B (CORTE 1-1 Y 3-3) 1.00 EJE 2-2 ENTRE EJES B-B, D-D (CORTE 1-1 Y 3-3) 1.00 EJE 3-3 ENTRE EJES B-B, D-D (CORTE 1-1) 1.00 EJE 4-4 ENTRE EJES A-A, C-C (CORTE 3-3) 1.00 EJE 5-5 ENTRE EJES C-C, D-D (CORTE 1-1) 1.00 ENTRE EJES 2-2, 3-3. ENTRE EJES C-C, D-D (CORTE 4-4) 1.00 ESCALERA 1 1.00 ZAPATA 1 3.00 ZAPATA 2 6.00 CISTERNA 1.00 Nº DE VECES

description

metrado de la vivienda unifamiliar los sauces ubicado en el distrito de sutanjalla provincia de ica y region de ica

Transcript of Metrado Los Sauces

METRADOITEMDESCRIPCIONN DE VECESDIMENSIONESPARCIALTOTALUNDLAH

01.00ESTRUCTURAS01.01TRABAJOS PRELIMINARES01.01.01 LIMPIEZA DE TERRENO MANUAL1.0020.0010.00200.00200.00M201.01.02 TRAZO NIVELES Y REPLANTEO1.0020.0010.00200.00200.00M2

01.02MOVIMIENTO DE TIERRAS01.02.01 EXCAVACION DE ZANJAS PARA CIMENTACION42.77M3EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.500.601.001.50ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.601.001.17ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.601.000.84EJE B-BENTRE EJES 1-1, 2-2 (CORTE 3-3)1.002.500.601.001.50EJE C-CENTRE EJES 3-3, 4-4 (CORTE 3-3)1.001.700.601.001.02ENTRE EJES 4-4, 5-5 (CORTE 3-3)1.002.400.601.001.44EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.601.001.17ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.601.000.84ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.001.980.601.001.19ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.780.601.000.47ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.001.170.501.000.59EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1 Y 3-3)1.003.710.601.002.23EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1 Y 3-3)1.003.980.601.002.39EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.004.000.601.002.40EJE 4-4ENTRE EJES A-A, C-C (CORTE 3-3)1.004.530.601.002.72EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.180.601.001.91ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.001.820.501.000.91ESCALERA 11.000.870.400.900.31ZAPATA 13.001.200.801.002.88ZAPATA 26.001.201.201.008.64CISTERNA1.001.801.302.856.67

01.02.02 RELLENO CON MATERIAL PROPIO2.92M3EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.500.350.100.09ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.350.100.07ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.350.100.05EJE B-BENTRE EJES 1-1, 2-2 (CORTE 3-3)1.002.500.450.100.11EJE C-CENTRE EJES 3-3, 4-4 (CORTE 3-3)1.001.700.600.100.10ENTRE EJES 4-4, 5-5 (CORTE 3-3)1.002.400.450.100.11EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.350.100.07ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.350.100.05ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.001.980.250.100.05ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.780.450.100.04ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.001.170.350.100.04EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1 Y 3-3)1.003.710.450.100.17EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1 Y 3-3)1.003.980.600.100.24EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.004.000.450.100.18EJE 4-4ENTRE EJES A-A, C-C (CORTE 3-3)1.004.530.600.100.27EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.180.450.100.14ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.001.820.350.100.06ESCALERA 11.000.870.400.100.03ZAPATA 13.001.200.650.100.23ZAPATA 26.001.201.140.100.82

01.02.03 NIVELACION INTERIOR Y APISONADO72.91M2SALA1.00AREA CAD12.1212.12COMEDOR1.00AREA CAD27.7627.76HALL 1.00AREA CAD10.6010.60BAO1.00AREA CAD2.462.46COCINA1.00AREA CAD19.9719.97

01.02.04 ELIMINACION DE MATERIAL EXCEDENTE1.0047.8247.8247.82M3

01.03OBRAS DE CONCRETO SIMPLE01.03.01 SOLADO DE CONCRETO PARA CIMIENTO CORRIDO e=0.10 mts 36.14M2EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.500.601.50ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.601.17ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.600.84EJE B-BENTRE EJES 1-1, 2-2 (CORTE 3-3)1.002.500.601.50EJE C-CENTRE EJES 3-3, 4-4 (CORTE 3-3)1.001.700.601.02ENTRE EJES 4-4, 5-5 (CORTE 3-3)1.002.400.601.44EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.601.17ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.600.84ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.001.980.601.19ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.780.600.47ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.001.170.500.59EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1 Y 3-3)1.003.710.602.23EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1 Y 3-3)1.003.980.602.39EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.004.000.602.40EJE 4-4ENTRE EJES A-A, C-C (CORTE 3-3)1.004.530.602.72EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.180.601.91ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.001.820.500.91ESCALERA 11.000.870.400.35ZAPATA 13.001.200.802.88ZAPATA 26.001.201.208.64

01.03.02 FALSO PISO DE e=10cm DE CONCRETO 1:1072.91M2SALA1.00AREA CAD12.1212.12COMEDOR1.00AREA CAD27.7627.76HALL 1.00AREA CAD10.6010.60BAO1.00AREA CAD2.462.46COCINA1.00AREA CAD19.9719.97

01.03.03CONCRETO CICLOPEO PARA CIMENTACIONES MEZCLA 1:10 + 30% P.G.18.22M3EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.500.600.801.20ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.600.800.94ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.600.800.67EJE B-BENTRE EJES 1-1, 2-2 (CORTE 3-3)1.002.500.600.801.20EJE C-CENTRE EJES 3-3, 4-4 (CORTE 3-3)1.001.700.600.800.82ENTRE EJES 4-4, 5-5 (CORTE 3-3)1.002.400.600.801.15EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.001.950.600.800.94ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.001.400.600.800.67ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.001.980.600.800.95ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.780.600.800.37ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.001.170.500.800.47EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1 Y 3-3)1.003.710.600.801.78EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1 Y 3-3)1.003.980.600.801.91EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.004.000.600.801.92EJE 4-4ENTRE EJES A-A, C-C (CORTE 3-3)1.004.530.600.802.17EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.180.600.801.53ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.001.820.500.800.73

01.04OBRAS DE CONCRETO ARMADO01.04.01 ZAPATAS01.04.01.01 CONCRETO FC=175 KG/CM2 PARA ZAPATAS5.04M3Z-13.001.201.200.502.16Z-26.001.200.800.502.8801.04.01.02 ACERO DE REFUERZO Fy=4200 Kg/cm2Ver hoja de metrado de acero1.0095.7695.76KG

01.04.02 SOBRECIMIENTOS ARMADOS01.04.02.01 CONCRETO EN SOBRECIMIENTO F'C= 175 KG/CM23.95M3EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.550.250.400.26ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.002.900.250.400.29ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.002.200.250.400.22EJE B-BENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.650.150.400.04EJE C-CENTRE EJES 4-4, 5-5 (CORTE 1-1)1.000.850.150.400.05EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.003.300.250.400.33ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.002.350.250.400.24ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.002.450.150.400.15ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.480.150.400.03ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.000.400.150.400.02EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1)1.002.650.154.001.59EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1)1.002.050.150.400.12EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.003.730.150.400.22EJE 4-4ENTRE EJES A-A, C-C (CORTE 1-1)1.000.580.150.400.03EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.700.150.400.22ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.002.350.150.400.14

01.04.02.02 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO HASTA O.40M22.82M2EJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)1.002.550.401.02ENTRE EJES 2-2, 3-3 (CORTE 2-2)1.002.900.401.16ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.002.200.400.88EJE B-BENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.650.400.26EJE C-CENTRE EJES 4-4, 5-5 (CORTE 1-1)1.000.850.400.34EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)1.003.300.401.32ENTRE EJES 3-3, 4-4 (CORTE 2-2)1.002.350.400.94ENTRE EJES 4-4, 5-5 (CORTE 2-2)1.002.450.400.98ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)1.000.480.400.19ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.000.400.400.16EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1)1.002.654.0010.60EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1)1.002.050.400.82EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)1.003.730.401.49EJE 4-4ENTRE EJES A-A, C-C (CORTE 1-1)1.000.580.400.23EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)1.003.700.401.48ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)1.002.350.400.94

01.04.02.03 ACERO DE REFUERZO Fy=4200 Kg/cm2Ver hoja de metrado de acero1.00129.37129.37KG

01.04.03 COLUMNAS01.04.03.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNAS7.16M3C-126.000.250.252.504.06C-215.000.250.252.502.34C-38.000.250.152.500.7501.04.03.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS55.49M2C-1caras laterales21.002.500.2513.13caras laterales23.002.500.2514.38caras laterales23.001.200.359.66C-2caras laterales7.002.500.254.38caras laterales9.002.500.255.63caras laterales9.001.200.252.70C-3caras laterales2.002.500.251.25caras laterales3.002.500.251.88caras laterales4.002.500.252.50caras laterales2.001.200.250.60caras laterales1.002.500.250.63caras laterales3.001.200.150.54

01.04.03.03 ACERO CORRUGADO Fy=4200Kg/cm2Ver hoja de metrado de acero1.001435.501435.50KG01.04.04 VIGAS01.04.04.01 CONCRETO F'C= 175 KG/CM2 PARA VIGAS9.53M3EJE A-AENTRE EJES 1-1, 2-2 (VCH-1)2.002.920.250.200.29ENTRE EJES 2-2, 3-3 (VCH-1)2.003.150.250.200.32ENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.250.200.27ENTRE EJES 1-1, 2-2 (VA-1)1.002.920.150.200.09ENTRE EJES 2-2, 3-3 (VA-1)1.003.150.150.200.09ENTRE EJES 3-3, 4-4 (VA-1)1.002.730.150.200.08EJE B-BENTRE EJES 1-1, 2-2 (VCH-1)2.003.420.250.200.34ENTRE EJES 2-2, 3-3 (VCH-1)2.003.150.250.200.32ENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.250.200.27ENTRE EJES 1-1, 2-2 (VA-1)1.003.550.150.200.11EJE C-CENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.250.200.27ENTRE EJES 4-4, 5-5 (VCH-1)3.002.700.250.200.41EJE D-DENTRE EJES 2-2, 3-3 (VCH-1)3.003.280.250.200.49ENTRE EJES 3-3, 4-4 (VCH-1)3.002.730.250.200.41ENTRE EJES 4-4, 5-5 (VCH-1)3.002.700.250.200.41ENTRE EJES B-B, D-D.ENTRE EJES 1-1, 3-3 (VCH-1)3.003.800.250.200.57EJE 1-1ENTRE EJES A-A, B-B (VS-1)2.004.250.250.200.43ENTRE EJES A-A, B-B (VA-1)1.001.900.150.200.06EJE 2-2ENTRE EJES A-A, B-B (VS-1)2.004.250.250.200.43ENTRE EJES B-B, D-D (VS-1)2.005.000.250.200.50EJE 3-3ENTRE EJES A-A, B-B (VS-1)2.004.250.250.200.43ENTRE EJES B-B, D-D (VS-1)2.005.000.250.200.50EJE 4-4ENTRE EJES A-A, B-B (VS-1)2.004.250.250.200.43ENTRE EJES B-B, C-C (VS-1)2.001.060.250.200.11ENTRE EJES C-C, D-D (VS-1)3.003.690.250.200.55ENTRE EJES A-A, B-B (VA-1)1.004.250.150.200.13ENTRE EJES B-B, C-C (VA-1)1.001.060.150.200.03EJE 5-5ENTRE EJES C-C, D-D (VS-1)3.003.690.250.200.55VOLADIZOSANTES DE EJE 1-1ENTRE EJES A-A, B-B (VA-1)3.002.350.150.200.21ENTRE EJES A-A, B-B (VCH-1)2.000.500.250.200.05ENTRE EJES A-A, B-B (VA-1)1.000.500.250.200.03ENTRE EJES 1-1, 2-2.ENTRE EJES B-B, D-D (VA-1)2.002.300.150.200.14ENTRE EJES 2-2, 3-3.ENTRE EJES A-A, B-B (VA-1)2.002.850.150.200.17ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (VA-1)1.002.400.150.200.07

01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS52.94M2EJE A-AENTRE EJES 1-1, 2-2 (VCH-1)2.002.920.201.17ENTRE EJES 2-2, 3-3 (VCH-1)2.003.150.201.26ENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.201.09ENTRE EJES 1-1, 2-2 (VA-1)2.002.920.201.17ENTRE EJES 2-2, 3-3 (VA-1)2.003.150.201.26ENTRE EJES 3-3, 4-4 (VA-1)2.002.730.201.09EJE B-BENTRE EJES 1-1, 2-2 (VCH-1)2.003.420.201.37ENTRE EJES 2-2, 3-3 (VCH-1)2.003.150.201.26ENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.201.09ENTRE EJES 1-1, 2-2 (VA-1)2.003.550.201.42EJE C-CENTRE EJES 3-3, 4-4 (VCH-1)2.002.730.201.09ENTRE EJES 4-4, 5-5 (VCH-1)4.002.700.202.16EJE D-DENTRE EJES 2-2, 3-3 (VCH-1)3.003.280.201.97ENTRE EJES 3-3, 4-4 (VCH-1)3.002.730.201.64ENTRE EJES 4-4, 5-5 (VCH-1)3.002.700.201.62ENTRE EJES B-B, D-D.ENTRE EJES 1-1, 3-3 (VCH-1)4.003.800.203.04EJE 1-1ENTRE EJES A-A, B-B (VS-1)2.001.620.200.65ENTRE EJES A-A, B-B (VA-1)2.001.620.200.65EJE 2-2ENTRE EJES A-A, B-B (VS-1)2.004.250.201.70ENTRE EJES B-B, D-D (VS-1)2.005.000.202.00EJE 3-3ENTRE EJES A-A, B-B (VS-1)2.004.250.201.70ENTRE EJES B-B, D-D (VS-1)2.005.000.202.00EJE 4-4ENTRE EJES A-A, B-B (VS-1)2.004.250.201.70ENTRE EJES B-B, C-C (VS-1)2.001.060.200.42ENTRE EJES C-C, D-D (VS-1)3.003.690.202.21ENTRE EJES A-A, B-B (VA-1)2.004.250.201.70ENTRE EJES B-B, C-C (VA-1)2.001.060.200.42EJE 5-5ENTRE EJES C-C, D-D (VS-1)3.003.690.202.21VOLADIZOSANTES DE EJE 1-1ENTRE EJES A-A, B-B (VA-1)3.002.350.201.41ENTRE EJES A-A, B-B (CH-1)4.000.500.200.40ENTRE EJES A-A, B-B (VA-1)4.000.500.200.40ENTRE EJES 1-1, 2-2.ENTRE EJES B-B, D-D (VA-1)6.002.300.202.76ENTRE EJES 2-2, 3-3.ENTRE EJES A-A, B-B (VA-1)2.002.850.201.14ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (VA-1)3.002.400.201.44ESCALERA2.0010.80.204.320.000.0001.04.04.03 ACERO CORRUGADO Fy=4200Kg/cm20.00Ver hoja de metrado de acero1.001334.441334.44KG0.0001.04.05 LOSAS ALIGERADAS0.0001.04.05.01 CONCRETO EN LOSAS ALIGERADAS F'C=175 KG/CM214.02M3SALA2.00AREA CAD12.120.092.18COMEDOR2.00AREA CAD27.760.095.00HALL 2.00AREA CAD10.600.091.91BAO2.00AREA CAD2.460.090.44COCINA3.00AREA CAD19.970.095.39VOLADIZOS5.00AREA CAD1.400.090.63ESCALERA1.00AREA CAD7.250.090.65

01.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS180.04M2SALA2.00AREA CAD12.1224.24COMEDOR2.00AREA CAD27.7655.52HALL 2.00AREA CAD10.6021.20BAO2.00AREA CAD2.464.92COCINA3.00AREA CAD19.9759.91VOLADIZOS5.00AREA CAD1.407.00ESCALERA1.00AREA CAD7.257.25

01.04.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO1.00180.048.3315001500UND01.04.05.04 ACERO CORRUGADO Fy=4200Kg/cm2Ver hoja de metrado de acero1.00721.78721.78KG01.04.06 ESCALERAS01.04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM24.05M3ESCALERA #1Base1.001.000.401.000.40rampa4.001.000.542.17contrapasos32.001.000.020.68descanso4.001.001.000.200.80

01.04.06.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS18.49M2ESCALERA #1rampa4.001.001.506.00contrapasos32.001.000.175.44descanso4.001.004.00base1.003.05AREA CAD3.05

01.04.06.03 ACERO DE REFUERZO Fy=4200 Kg/cm2Ver hoja de metrado de acero1.00644.56644.56KG

01.04.07 CISTERNA 01.04.07.01 CONCRETO F'C= 140 KG/CM2 EN CISTERNA3.40M3base1.001.800.151.200.32caras laterales2.002.000.152.851.71caras laterales1.001.300.152.850.56caras laterales1.001.200.152.850.50techo1.001.801.200.150.27tapa1.000.600.600.100.0401.04.07.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA39.60M2caras laterales2.002.852.0011.40caras laterales2.001.802.007.20caras laterales2.001.802.007.20caras laterales2.002.852.0011.40techo1.001.801.201.80tapa1.000.600.600.36tapa laterales4.000.600.100.2401.04.07.03 ACERO DE REFUERZO Fy=4200 Kg/cm2Ver hoja de metrado de acero1.00198.26198.26KG

01.00ARQUITECTURA01.01MUROS Y TABIQUES DE ALBAILERIA01.01.01 MURO DE LADRILLO KK CABEZA82.40M2EJE A-AENTRE EJES 1-1, 2-2 2.002.552.5012.75ENTRE EJES 2-2, 3-3 2.002.432.5012.15ENTRE EJES 3-3, 4-4 2.002.352.5011.75EJE D-DENTRE EJES 2-2, 3-33.002.902.5021.75ENTRE EJES 3-3, 4-42.002.352.5011.75ENTRE EJES 4-4, 5-52.002.452.5012.25

01.01.02 MURO DE SOGA LADRILLO KING KONG 95.84M2EJE B-BENTRE EJES 1-1, 2-2 (1er PISO)1.000.652.501.63ENTRE EJES 1-1, 2-2 (2do PISO)1.00AREA CAD3.153.15ENTRE EJES 2-2, 3-3 (2do PISO)1.001.652.504.13ENTRE EJES 3-3, 4-4 (2do PISO)1.002.352.505.88ENTRE EJES 1-1, 2-2 (AZOTEA)1.002.051.202.46EJE C-CENTRE EJES 4-4, 5-5 (1er PISO)1.000.852.502.13ENTRE EJES 3-3, 4-4 (2do PISO)1.001.702.504.25ENTRE EJES 4-4, 5-5 (2do PISO Y AZOTEA)2.00AREA CAD3.667.32EJE D-DENTRE EJES 3-3, 4-4 (AZOTEA)1.002.352.505.88ENTRE EJES 4-4, 5-5 (AZOTEA)1.002.452.506.13ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (1er PISO Y 2do PISO)2.000.652.503.25ENTRE EJES 1-1, 2-2 (AZOTEA)1.000.651.200.78ENTRE EJES 2-2, 3-3 (CORTE 5-5)1.000.402.501.00EJE 1-1ENTRE EJES A-A, B-B (1er PISO)1.003.252.508.13ENTRE EJES A-A, B-B (2do PISO)1.001.552.503.88ENTRE EJES A-A, B-B (AZOTEA)1.001.552.503.88EJE 2-2ENTRE EJES B-B, D-D (1er PISO, 2do PISO Y AZOTEA)3.002.602.5019.50EJE 3-3ENTRE EJES B-B, D-D (1er PISO)1.005.002.5012.50ENTRE EJES B-B, C-C (2do PISO)1.001.052.502.63ENTRE EJES C-C, D-D (2do PISO)1.002.802.507.00ENTRE EJES C-C, D-D (AZOTEA)1.003.102.507.75EJE 4-4ENTRE EJES B-B, C-C (1er PISO Y 2do PISO)2.001.052.505.25ENTRE EJES A-A, B-B (2do PISO)1.00AREA CAD5.005.00ENTRE EJES A-A, B-B (AZOTEA)1.004.251.205.10ENTRE EJES B-B, C-C (AZOTEA)1.001.051.201.26EJE 5-5ENTRE EJES B-B, D-D (1er PISO Y 2do PISO)2.00AREA CAD6.7913.57ENTRE EJES C-C, D-D (AZOTEA)1.00AREA CAD8.838.83ENTRE EJES 2-2, 3-3 ENTRE EJES A-A, B-B (2do PISO)1.007.402.5018.50ENTRE EJES C-C, D-D (AZOTEA)1.001.372.503.43ENTRE EJES A-A, B-B (AZOTEA)1.002.851.203.42ENTRE EJES 3-3, 4-4 ENTRE EJES A-A, B-B (2do PISO)1.000.602.501.50VOLADIZOSENTRE EJES A-A, B-B (2do PISO)1.003.452.508.63ENTRE EJES A-A, B-B (AZOTEA)1.003.851.204.62

01.02REVOQUES ENLUCIDOS Y MOLDURAS01.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA466.62M21er PISOSALA1.007.152.5017.88COMEDOR1.006.002.5015.00COCINA1.0017.302.5043.25HALL1.003.452.508.63BAO VISITAS1.005.402.5013.50ESCALERA1.008.202.5020.502do PISOHALL1.004.752.5011.88DORMITORIO 21.0017.052.5042.63DORMITORIO 31.0015.902.5039.75DORMITORIO PRINCIPAL1.0017.802.5044.50BAO VISITAS 21.006.952.5017.38BAO DORITORIO PRINCIPAL1.007.252.5018.13ESCALERA1.008.202.5020.50AZOTEACUARTO DE SERVICIO1.009.002.5022.50BAO DE SERVICIO1.007.002.5017.50LAVANDERIA 1.0010.052.5025.13ESCALERA 1.008.202.5020.50AZOTEA1.0026.951.2032.34ESCALERA #1rampa1.001.001.191.19contrapasos17.001.000.172.89pasos17.001.000.254.25descanso2.001.002.00base1.004.40areacad4.40CISTERNAcaras laterales2.001.802.8510.26caras laterales2.001.302.857.41techo1.001.801.202.16tapa1.000.600.600.36tapa laterales4.000.600.100.24

01.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA126.68M2FACHADA 1er PISO1.007.502.5018.75FACHADA 2do PISO1.0011.152.5027.88FACHADA AZOTEA1.0013.801.2016.56PARED POSTERIOR 1er PISO1.006.602.5016.50PARED POSTERIOR 2do PISO1.0012.702.5031.75PARED POSTERIOR AZOTEA1.0012.701.2015.24

01.02.03 TARRAJEO EN CIELO RASO CON MEZCLA CEMENTO ARENA179.35M21er PISOSALA1.00AREA CAD12.6012.60COMEDOR1.00AREA CAD23.423.40COCINA1.00AREA CAD23.5423.54HALL1.00AREA CAD9.129.12BAO VISITAS1.00AREA CAD2.452.45ESCALERA1.00AREA CAD7.807.802do PISOHALL1.00AREA CAD10.5010.50DORMITORIO 21.00AREA CAD17.8017.80DORMITORIO 31.00AREA CAD13.4013.40DORMITORIO PRINCIPAL1.00AREA CAD19.9519.95BAO VISITAS 21.00AREA CAD3.003.00BAO DORITORIO PRINCIPAL1.00AREA CAD3.283.28ESCALERA1.00AREA CAD7.807.80AZOTEACUARTO DE SERVICIO1.00AREA CAD6.856.85BAO DE SERVICIO1.00AREA CAD3.003.00LAVANDERIA 1.00AREA CAD6.366.36ESCALERA 1.00AREA CAD8.508.50

01.03PISOS01.03.01 PISO DE PORCELANATO98.72M21er PISOSALA1.00AREA CAD12.6012.60COMEDOR1.00AREA CAD23.423.40HALL1.00AREA CAD9.129.12BAO VISITAS1.00AREA CAD2.452.452do PISODORMITORIO 21.00AREA CAD17.8017.80DORMITORIO 31.00AREA CAD13.4013.40DORMITORIO PRINCIPAL1.00AREA CAD19.9519.95

01.03.02 PISO DE CEMENTO PULIDO1.00AREA CAD10.3210.32M2

01.03.03 PISO CERAMICO 30 X 30 SERIE ECONOMICA56.53M21er PISOCOCINA1.00AREA CAD23.5423.542do PISOHALL1.00AREA CAD10.5010.50BAO VISITAS 21.00AREA CAD3.003.00BAO DORITORIO PRINCIPAL1.00AREA CAD3.283.28AZOTEACUARTO DE SERVICIO1.00AREA CAD6.856.85BAO DE SERVICIO1.00AREA CAD3.003.00LAVANDERIA 1.00AREA CAD6.366.36

01.04ZOCALOS Y CONTRAZOCALOS19.57M201.04.01 ZOCALO DE CERAMICA1er PISOSALA1.007.150.100.72COMEDOR1.006.000.100.60COCINA1.0017.300.101.73HALL1.003.450.100.35BAO VISITAS1.005.400.100.54ESCALERA1.008.200.100.822do PISOHALL1.004.750.100.48DORMITORIO 21.0017.050.101.71DORMITORIO 31.0015.900.101.59DORMITORIO PRINCIPAL1.0017.800.101.78BAO VISITAS 21.006.950.100.70BAO DORITORIO PRINCIPAL1.007.250.100.73ESCALERA1.008.200.100.82AZOTEACUARTO DE SERVICIO1.009.000.100.90BAO DE SERVICIO1.007.000.100.70LAVANDERIA 1.0010.050.101.01ESCALERA 1.008.200.100.82AZOTEA1.0026.950.102.70ESCALERA #1contrapasos17.000.170.100.29pasos17.000.250.100.43descanso2.001.000.100.20

01.05PINTURA01.05.01 PINTADO EN INTERIORES466.62M21er PISOSALA1.007.152.5017.88COMEDOR1.006.002.5015.00COCINA1.0017.302.5043.25HALL1.003.452.508.63BAO VISITAS1.005.402.5013.50ESCALERA1.008.202.5020.502do PISOHALL1.004.752.5011.88DORMITORIO 21.0017.052.5042.63DORMITORIO 31.0015.902.5039.75DORMITORIO PRINCIPAL1.0017.802.5044.50BAO VISITAS 21.006.952.5017.38BAO DORITORIO PRINCIPAL1.007.252.5018.13ESCALERA1.008.202.5020.50AZOTEACUARTO DE SERVICIO1.009.002.5022.50BAO DE SERVICIO1.007.002.5017.50LAVANDERIA 1.0010.052.5025.13ESCALERA 1.008.202.5020.50AZOTEA1.0026.951.2032.34ESCALERA #1rampa1.001.001.191.19contrapasos17.001.000.172.89pasos17.001.000.254.25descanso2.001.002.00base1.004.40areacad4.40CISTERNAcaras laterales2.001.802.8510.26caras laterales2.001.302.857.41techo1.001.801.202.16tapa1.000.600.600.36tapa laterales4.000.600.100.24

01.05.02 PINTADO EXTERIOR 1.00126.68126.68M201.05.03 PINTADO DE CIELO RASO179.35M21er PISOSALA1.00AREA CAD12.6012.60COMEDOR1.00AREA CAD23.423.40COCINA1.00AREA CAD23.5423.54HALL1.00AREA CAD9.129.12BAO VISITAS1.00AREA CAD2.452.45ESCALERA1.00AREA CAD7.807.802do PISOHALL1.00AREA CAD10.5010.50DORMITORIO 21.00AREA CAD17.8017.80DORMITORIO 31.00AREA CAD13.4013.40DORMITORIO PRINCIPAL1.00AREA CAD19.9519.95BAO VISITAS 21.00AREA CAD3.003.00BAO DORITORIO PRINCIPAL1.00AREA CAD3.283.28ESCALERA1.00AREA CAD7.807.80AZOTEACUARTO DE SERVICIO1.00AREA CAD6.856.85BAO DE SERVICIO1.00AREA CAD3.003.00LAVANDERIA 1.00AREA CAD6.366.36ESCALERA 1.00AREA CAD8.508.50

01.06CARPINTERIA DE MADERA01.06.01 PUERTA CONTRAPLACADA 35 mm CON TRIPLAY 4 mm INCLUYE MARCO CEDRO 2"X3" 21.63M2P-11.001.002.102.10P-27.000.902.1013.23P-34.000.752.106.30

01.06.02 TABIQUE DE MADERA7.50M2TABIQUE DE MADERA (1er PISO)1.001.502.503.75TABIQUE DE MADERA (2do PISO)1.001.502.503.75

01.07CARPINTERIA METALICA01.07.01 VENTANA METALICA CON ACCESORIOS15.45M2V-14.001.451.709.86V-21.002.251.703.83V-31.000.402.100.84V-41.001.250.400.50V-51.001.050.400.42

01.07.02 MAMPARAS15.38M2M-21.001.902.504.75M-31.004.252.5010.63

01.08CERRAJERIA01.08.01 BISAGRA CAPUCHINA 12.0012.0012.00PZ01.08.02 CERRADURA PARA PUERTA 12.00PZCerraduras para puertas interiores de llave interior12.0012.0001.08.03 ACCESORIOS DE CIERRE8.00PzCerrojos8.008.00

01INSTALACIONES SANITARIAS01.01 APARATOS Y ACCESORIOS SANITARIOS01.01.01 INODORO 4.004.004.00Pz01.01.02 LAVATORIO4.004.004.00Pz01.01.03 LAVADERO DE COCINA DE ACERO INOXIDABLE1.001.001.00Pz01.01.04 DUCHAS3.003.003.00Pz01.02 DESAGUE Y VENTILACION01.02.01 SALIDA DE VENTILACION DE PVC SAL DE 2"5.005.005.00PZ01.02.02 TUBERIA PVC 2" DE VENTILACION5.006.2031.0031.00ML01.02.03 SALIDA DE DESAGUE TUBERIA PVC 4"4.004.004.00Pto.01.02.04 TUBERIA DE DESAGUE PVC SAL 2"1.0021.0821.0821.08ML01.02.05 TUBERIA DE DESAGUE PVC.SAL 4"1.0030.7430.7430.74ML01.02.06 CODO DE PVC 1.006.006.006.00UND01.02.07 YEES DE PVC 1.0011.0011.0011.00pza01.02.08 SUMIDERO DE 4"1.002.002.002.00ML01.02.09 REGISTRO DE BRONCE 4"1.004.004.004.00und01.02.10 CAJA DE REGISTRO DE DESAGUE 12" X 24"1.002.002.002.00pza01.03 SISTEMA DE AGUA FRIA 01.03.01 SALIDA DE AGUA FRIA TUBERIA PVC-SAP 3/4"1.0015.0015.0015.00Pto.01.03.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP1.0058.9058.9058.90ML01.03.03 ACCESORIOS DE REDES1.0068.0068.0068.00pza01.03.04 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA 1"1.001.001.001.00und01.03.05 VALVULA CHECK DE 3/4"1.001.001.001.00pza01.03.06 VALVULA FLOTADORA DE 1"1.001.001.001.00pza01.03.07 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS INCLUYE ACC. INTERNOS1.001.001.001.00pza01.04 SISTEMA DE AGUA CALIENTE01.04.01 SALIDA DE AGUA CALIENTE CON TUBERIA DE PVC-SAP 3/4"1.006.006.006.00Pto.01.04.02 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP1.0022.6822.6822.68ML01.04.03 ACCESORIOS DE REDES1.0026.0026.0026.00pza01.04.04 THERMA1.001.001.001.00pza

01INSTALACIONES ELECTRICAS01.01 SALIDA PARA INSTALACIONES ELECTRICAS01.01.01 SALIDA PARA CENTROS DE LUZ20.001.0020.0020.00pto01.01.02 SALIDA PARA ELECTRICIDAD BRAQUETT16.001.0016.0016.00pto01.01.03 SALIDA INTERRUPTOR DOBLE28.001.0028.0028.00pto01.01.04 SALIDA PARA TOMACORRIENTE DOBLE20.001.0020.0020.00pto01.01.05 SALIDA PARA ELECTROBOMBA1.001.001.001.00pto01.01.06 SALIDA INTERRUPTOR PARA TIMBRE1.001.001.001.00pto01.02 CANALIZACION Y/O TUBERIAS01.02.01 TUBERIA PVC SEL 20 mm1.0035.0035.0035.00ML01.02.02 TUBERIA PVC SEL 15 mm1.00240.76240.76240.76ML01.03 CONDUCTORES EN TUBERIA01.03.01 CABLE ELECTRICO TW AWG NO. 101.009.439.439.43ML01.03.02 CABLE ELECTRICO ACOMETICA TW AWG N0. 2.51.00310.15310.15310.15ML01.04 TABLERO DE DISTRIBUCION01.04.01 TABLERO GENERAL 2X15A,2X2A, 2X30A1.001.001.001.00Pza01.04.02 LLAVES DE INTERRUPCION6.001.006.006.00UND01.05 POZO DE TIERRA01.05.01 POZO CON CONEXION A TIERRA1.001.001.001.00UND

METRADO DE FIERRO

ITEMDESCRIPCIONN DE VECESN DE ELEMENTOSLONGDIMENSIONESTOTALUND 1/4 3/8 1/2 5/8 3/41"0.250.5611.62.25401.04.01.02 ACERO DE REFUERZO Fy=4200 Kg/cm295.76KGZ-11/23.0014.001.1447.88Z-21/26.007.001.1447.881/26.005.000.7422.20

01.04.02.03 ACERO DE REFUERZO Fy=4200 Kg/cm2129.37KGEJE A-AENTRE EJES 1-1, 2-2 (CORTE 2-2)3/81.004.002.555.71ESTRIBOS1/21.0016.001.164.64ENTRE EJES 2-2, 3-3 (CORTE 2-2)3/81.004.002.906.50ESTRIBOS1/21.0018.001.165.22ENTRE EJES 3-3, 4-4 (CORTE 2-2)3/81.004.002.204.93ESTRIBOS1/21.0015.001.164.35EJE B-BENTRE EJES 1-1, 2-2 (CORTE 1-1)3/81.004.000.651.46ESTRIBOS1/21.006.000.961.44EJE C-CENTRE EJES 4-4, 5-5 (CORTE 1-1)3/81.004.000.851.90ESTRIBOS1/21.007.000.961.68EJE D-DENTRE EJES 2-2, 3-3 (CORTE 2-2)3/81.004.002.906.50ESTRIBOS1/21.0018.001.165.22ENTRE EJES 3-3, 4-4 (CORTE 2-2)3/81.004.002.204.93ESTRIBOS1/21.0015.001.164.35ENTRE EJES 4-4, 5-5 (CORTE 2-2)3/81.004.002.455.49ESTRIBOS1/21.0016.001.164.64ENTRE EJES C-C, D-D.ENTRE EJES 1-1, 2-2 (CORTE 1-1)3/81.004.000.481.08ESTRIBOS1/21.005.000.961.20ENTRE EJES 2-2, 3-3 (CORTE 5-5)3/81.004.000.400.90ESTRIBOS1/21.005.000.961.20EJE 1-1ENTRE EJES A-A, B-B (CORTE 1-1)3/81.004.002.655.94ESTRIBOS1/21.0016.000.963.84EJE 2-2ENTRE EJES B-B, D-D (CORTE 1-1)3/81.004.002.054.59ESTRIBOS1/21.0014.000.963.36EJE 3-3ENTRE EJES B-B, D-D (CORTE 1-1)3/81.004.003.738.36ESTRIBOS1/21.0020.000.964.80EJE 4-4ENTRE EJES A-A, C-C (CORTE 1-1)3/81.004.000.581.30ESTRIBOS1/21.007.000.961.68EJE 5-5ENTRE EJES C-C, D-D (CORTE 1-1)3/81.004.003.708.29ESTRIBOS1/21.0021.000.965.04ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (CORTE 4-4)3/81.004.002.355.26ESTRIBOS1/21.0015.000.963.60

01.04.03.03 ACERO CORRUGADO Fy=4200Kg/cm21435.50KGCOLUMNA C-1REFUERZO LONGITUDINAL5/89.004.006.20357.121/29.002.006.20111.60ESTRIBOS3/89.0047.000.86203.72COLUMNA C-2REFUERZO LONGITUDINAL1/25.006.006.20186.00ESTRIBOS3/85.0047.000.86113.18COLUMNA C-3REFUERZO LONGITUDINAL1/211.004.006.20272.80ESTRIBOS3/811.0047.000.66191.08

01.04.04.03 ACERO CORRUGADO Fy=4200Kg/cm21334.44KGEJE A-AENTRE EJES 1-1, 2-2 (VCH-1)5/82.004.002.9237.38ESTRIBOS1/42.0022.000.768.36ENTRE EJES 2-2, 3-3 (VCH-1)5/82.004.003.1540.32ESTRIBOS1/42.0023.000.768.74ENTRE EJES 3-3, 4-4 (VCH-1)5/82.004.002.7334.94ESTRIBOS1/42.0022.000.768.36ENTRE EJES 1-1, 2-2 (VA-1)3/81.004.002.926.54ESTRIBOS1/41.0022.000.563.08ENTRE EJES 2-2, 3-3 (VA-1)3/81.004.003.157.06ESTRIBOS1/41.0023.000.563.22ENTRE EJES 3-3, 4-4 (VA-1)3/81.004.002.736.12ESTRIBOS1/41.0022.000.563.08EJE B-BENTRE EJES 1-1, 2-2 (VCH-1)5/82.004.003.4243.78ESTRIBOS1/42.0024.000.769.12ENTRE EJES 2-2, 3-3 (VCH-1)5/82.004.003.1540.32ESTRIBOS1/42.0023.000.768.74ENTRE EJES 3-3, 4-4 (VCH-1)5/82.004.002.7334.94ESTRIBOS1/42.0022.000.768.36ENTRE EJES 1-1, 2-2 (VA-1)3/81.004.003.557.95ESTRIBOS1/41.0025.000.563.50EJE C-CENTRE EJES 3-3, 4-4 (VCH-1)5/82.004.002.7334.94ESTRIBOS1/42.0021.000.767.98ENTRE EJES 4-4, 5-5 (VCH-1)5/83.004.002.7051.84ESTRIBOS1/43.0020.000.7611.40EJE D-DENTRE EJES 2-2, 3-3 (VCH-1)5/83.004.003.2862.98ESTRIBOS1/43.0023.000.7613.11ENTRE EJES 3-3, 4-4 (VCH-1)5/83.004.002.7352.42ESTRIBOS1/43.0021.000.7611.97ENTRE EJES 4-4, 5-5 (VCH-1)5/83.004.002.7051.84ESTRIBOS1/43.0020.000.7611.40ENTRE EJES B-B, D-D.ENTRE EJES 1-1, 3-3 (VCH-1)5/83.004.003.8072.96ESTRIBOS1/43.0026.000.7614.82EJE 1-1ENTRE EJES A-A, B-B (VS-1)1/22.004.004.2534.003/82.002.004.259.52ESTRIBOS1/42.0028.000.7610.64ENTRE EJES A-A, B-B (VA-1)3/81.004.001.904.26ESTRIBOS1/41.0017.000.562.38EJE 2-2ENTRE EJES A-A, B-B (VS-1)1/22.004.004.2534.003/82.002.004.259.52ESTRIBOS1/42.0028.000.7610.64ENTRE EJES B-B, D-D (VS-1)1/22.004.005.0040.003/82.002.005.0011.20ESTRIBOS1/42.0032.000.7612.16EJE 3-3ENTRE EJES A-A, B-B (VS-1)1/22.004.004.2534.003/82.002.004.259.52ESTRIBOS1/42.0028.000.7610.64ENTRE EJES B-B, D-D (VS-1)1/22.004.005.0040.003/82.002.005.0011.20ESTRIBOS1/42.0032.000.7612.16EJE 4-4ENTRE EJES A-A, B-B (VS-1)1/22.004.004.2534.003/82.002.004.259.52ESTRIBOS1/42.0028.000.7610.64ENTRE EJES B-B, C-C (VS-1)1/22.004.001.068.483/82.002.001.062.37ESTRIBOS1/42.0019.000.767.22ENTRE EJES C-C, D-D (VS-1)1/23.004.003.6944.283/83.002.005.0016.80ESTRIBOS1/43.0025.000.7614.25ENTRE EJES A-A, B-B (VA-1)3/81.004.004.259.52ESTRIBOS1/41.0028.000.563.92ENTRE EJES B-B, C-C (VA-1)3/81.004.001.062.37ESTRIBOS1/41.0019.000.562.66EJE 5-5ENTRE EJES C-C, D-D (VS-1)1/23.004.003.6944.283/83.002.005.0016.80ESTRIBOS1/43.0025.000.7614.25VOLADIZOSANTES DE EJE 1-1ENTRE EJES A-A, B-B (VA-1)3/83.004.002.3515.79ESTRIBOS1/43.0019.000.567.98ENTRE EJES A-A, B-B (CH-1)5/82.004.000.506.40ESTRIBOS1/42.004.000.761.52ENTRE EJES A-A, B-B (VA-1)3/81.004.000.501.12ESTRIBOS1/41.004.000.560.56ENTRE EJES 1-1, 2-2.ENTRE EJES B-B, D-D (VA-1)3/82.004.002.3010.30ESTRIBOS1/42.0019.000.565.32ENTRE EJES 2-2, 3-3.ENTRE EJES A-A, B-B (VA-1)3/82.004.002.8512.77ESTRIBOS1/42.0021.000.565.88ENTRE EJES 2-2, 3-3.ENTRE EJES C-C, D-D (VA-1)3/81.004.002.405.38ESTRIBOS1/41.0019.000.562.66

01.04.05.04 ACERO CORRUGADO Fy=4200Kg/cm2721.78KGSALAACERO INFERIOR1/22.009.002.5545.90ACERO SUPERIOR1/22.0018.000.8530.60COMEDORACERO INFERIOR1/22.009.005.2594.50ACERO SUPERIOR1/22.0018.003.35120.60HALL ACERO INFERIOR1/22.005.002.9029.00ACERO SUPERIOR1/22.0010.001.8036.00BAOACERO INFERIOR1/22.002.002.7210.88ACERO SUPERIOR1/22.004.001.6012.80COCINAACERO INFERIOR1/23.008.005.05121.20ACERO SUPERIOR1/23.0016.003.10148.80VOLADIZOSACERO INFERIOR1/25.005.000.358.75ACERO SUPERIOR1/25.005.000.358.75ESCALERAACERO INFERIOR1/21.006.003.0018.00ACERO SUPERIOR1/21.0012.003.0036.00

01.04.06.03 ACERO DE REFUERZO Fy=4200 Kg/cm2644.56KGescalera #1 (16 escalones)ACERO LONGITUDINAL1/22.0016.0017.58562.56ACERO TRANSVERSAL1/22.0020.001.0040ACERO TRANSVERSAL3/82.0017.001.0019.04m3ACERO TRANSVERSAL3/82.0016.001.0017.92m2ACERO TRANSVERSAL3/82.003.001.003.36kgACERO TRANSVERSAL3/81.003.001.001.68

01.04.07.03 ACERO DE REFUERZO fy=4,200 kg/cm2 198.2624KGCARAS LATERALESACERO TRANSVERSAL3/84.008.004.0071.68ACERO LONGITUDINAL1/24.0012.003.10148.80CARA ANTERIORACERO LONGITUDINAL3/82.006.002.5016.80ACERO LONGITUDINAL3/82.006.002.2214.92ACERO TRANSVERSAL3/82.008.002.9025.98CARA POSTERIORACERO LONGITUDINAL3/82.006.002.4016.13ACERO LONGITUDINAL3/82.006.002.1214.25ACERO TRANSVERSAL3/82.007.002.9022.74BASEACERO LONGITUDINAL1/22.0012.003.6888.32ACERO TRANSVERSAL1/22.0014.002.1560.20TECHOACERO LONGITUDINAL3/81.0012.000.885.91ACERO TRANSVERSAL3/81.008.002.209.86TAPAACERO LONGITUDINAL3/81.004.000.701.57ACERO TRANSVERSAL3/81.004.000.701.57