METRADO MODULO I.xlsx

106
RESUMEN DE METRADOS 1/10 LOCAL COMUNAL PASHPA RESUMEN DE METRADOS PROYECTO LOCALIDAD PASHPA PROVINCIA HUARAZ DISTRITO TARICA DEPARTAMENTO ANCASH ITEM RESUMEN GENERAL FECHA FEBRERO 2015 ITEM DESCRIPCION UNIDAD CANTIDAD 01.00.00 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD. 01.01.00 ALAMACEN Y GUARDIANIA glob. 214.42 01.02.00 CARTEL DE IDENTIFICACION OBRA 2.40X3.60m unidad 214.42 01.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glob. Err:509 01.04.00 AGUA PARA LA CONSTRUCCION glob. Err:509 01.05.00 SEGURIDAD Y SALUD 01. IMPLEMENTOS DE SEGURIDAD (EPP) glob. Err:509 01. CAPACITACION EN SEGURIDAD Y SALUD glob. Err:509 02.00.00 ESTRUCTURA 02.01.00 OBRAS PRELIMINARES 02. LIMPIEZA DEL TERRENO MANUAL m2 #NAME? 02. TRAZO, NIVELACION Y REPLANTEO (EDIFIC) m2 #NAME? 02.02.00 MOVIMIENTO DE TIERRAS 02. EXCAVACION MANUAL DE PLATAFORMA m3 #NAME? 02. EXCAVACION DE ZANJAS P/ZAPATA m3 152.10 02. EXCAVACION DE ZANJAS P/CIMIENTO m3 #NAME? 02. REFINE Y NIVELACION EN FONDO DE ZAPATA m2 #NAME? 02. REFINE Y NIVELACION EN FONDO DE ZANJA m2 #NAME? 02. RELLENO Y COMPACTADO MANUAL m3 17.13 02. NIVELACION INT. Y COMPACTACION FINAL DEL TERRENO PREVIO AL PISO m2 #NAME? 02. ELIMINACION DE MATERIAL EXCEDENTE D= 30 M m3 161.96 02.03.00 CONCRETO SIMPLE 02. SOLADO PARA ZAPATAS 1:12 C-H, E=4" m2 60.56 02. CONCRETO 1:10 +30% P.G. P/CIMIENTOS CORRIDOS m3 36.39 02. ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 71.00 02. CONCRETO 1:8+25% P.M. P/SOBRECIMIENTOS m3 #NAME? 02.04.00 CONCRETO ARMADO 02.ZAPATAS ACERO DE REFUERZO, F'Y=4200 KG/CM2 - ZAPATAS kg #NAME? CONCRETO f 'c=210 kg/cm2 EN ZAPATAS m3 #NAME? 02.VIGA DE CIMENTACION ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGAS kg #NAME? CONCRETO F'C=210 KG/CM2 - VIGA DE CIMENTACION m3 #NAME? 02.COLUMNAS ACERO DE REFUERZO F'Y=4200 KG/CM2 EN COLUMNAS kg #NAME? ENCOFRADO Y DESENCOFRADO (HABILIT) P/COLUMNAS m2 #NAME? CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 #NAME? 02.VIGAS ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGAS kg #NAME? ENCOFRADO Y DESENCOFRADO EN VIGAS m2 #NAME? CONCRETO F'C=210 KG/CM2 EN VIGAS m3 #NAME? 02.ARCOS ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGAS kg #NAME? ENCOFRADO Y DESENCOFRADO EN VIGAS m2 #NAME? CONCRETO F'C=210 KG/CM2 EN VIGAS m3 #NAME? 02.LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS m2 #NAME? LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO unidad 5531.03 ACERO DE REFUERZO FY=4200KG/CM2 EN LOSAS ALIGERADAS kg 3701.24 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2. m3 #NAME? 02.ESCALERAS ENCOFRADO Y DESENCOFRADO (HABILIT) P/ESCALERAS m2 #NAME? ACERO DE REFUERZO F'Y=4200 KG/CM2 (ESCALERAS) kg #NAME? CONCRETO EN ESCALERA FC=210 KG/CM2 m3 #NAME? 02.COLUMNETAS, VIGUETAS Y DINTELES ACERO DE REFUERZO FY=4200KG/CM2 kg #NAME? ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y VIGAS m2 #NAME? CONCRETO FC=210 KG/CM2 m3 #NAME? 03.00.00 ARQUITECTURA 03.01.00 MUROS Y TABIQUES 03. MURO DE SOGA LADRILLO KK 18 HUECOS C:A 1:4 m2 145.82 03. MURO DE CABEZA LADRILLO KK 18 HUECOS C:A 1:4 m2 179.19 03. ALAMBRE N° 8 REFUERZO HORIZONTAL EN MUROS kg 70.13 03.02.00 REVOQUES, ENLUCIDOS Y MOLDADURAS 03. TARRAJEO EN INTERIORES CON CEMENTO - ARENA m2 432.40 03. TARRAJEO EN EXTERIORES CEMENTO - ARENA m2 199.59 03. TARRAJEO DE SUPERFICIES DE COLUMNAS m2 93.00 03. TARRAJEO DE SUPERFICIES DE VIGAS m2 150.37 03. REVESTIMIENTO DE COLUMNA CIRCULAR C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM. m2 2.56 03. ENCHAPADO DE MURO C/MAYOLICA 0.20 x 0.30m, H=1.20M m2 66.89 03. REVESTIMIENTO DE COLUMNA CIRCULAR CON MARMOL TRAVERTINO E=2CM, H=0.90M m2 2.56 03. VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m 217.94 03.03.00 CIELO RASO 03. CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 X 1.5CM. m2 109.16 "INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

Transcript of METRADO MODULO I.xlsx

RESUMENRESUMEN DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LOCALIDADPASHPAPROVINCIAHUARAZDISTRITOTARICADEPARTAMENTOANCASHITEMRESUMEN GENERALFECHAFEBRERO 2015

ITEMDESCRIPCIONUNIDADCANTIDAD

01.00.00OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.01.01.00ALAMACEN Y GUARDIANIAglob.214.4201.02.00CARTEL DE IDENTIFICACION OBRA 2.40X3.60munidad214.4201.03.00MOVILIZACION Y DESMOVILIZACION DE EQUIPOglob.ERROR:#REF!01.04.00AGUA PARA LA CONSTRUCCIONglob.ERROR:#REF!01.05.00SEGURIDAD Y SALUD01.05.01IMPLEMENTOS DE SEGURIDAD (EPP)glob.ERROR:#REF!01.05.02CAPACITACION EN SEGURIDAD Y SALUDglob.ERROR:#REF!02.00.00ESTRUCTURA02.01.00OBRAS PRELIMINARES02.01.01LIMPIEZA DEL TERRENO MANUALm2ERROR:#REF!02.01.02TRAZO, NIVELACION Y REPLANTEO (EDIFIC)m2ERROR:#REF!02.02.00MOVIMIENTO DE TIERRAS02.02.01EXCAVACION MANUAL DE PLATAFORMAm3ERROR:#REF!02.02.02EXCAVACION DE ZANJAS P/ZAPATAm3152.1002.02.03EXCAVACION DE ZANJAS P/CIMIENTOm3ERROR:#REF!02.02.04REFINE Y NIVELACION EN FONDO DE ZAPATAm2ERROR:#REF!02.02.05REFINE Y NIVELACION EN FONDO DE ZANJAm2ERROR:#REF!02.02.06RELLENO Y COMPACTADO MANUALm317.1302.02.07NIVELACION INT. Y COMPACTACION FINAL DEL TERRENO PREVIO AL PISOm2ERROR:#REF!02.02.08ELIMINACION DE MATERIAL EXCEDENTE D= 30 Mm3161.9602.03.00CONCRETO SIMPLE02.03.01SOLADO PARA ZAPATAS 1:12 C-H, E=4" m260.5602.03.02CONCRETO 1:10 +30% P.G. P/CIMIENTOS CORRIDOSm336.3902.03.03ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOSm271.0002.03.04CONCRETO 1:8+25% P.M. P/SOBRECIMIENTOSm3ERROR:#REF!02.04.00CONCRETO ARMADO02.04.01ZAPATAS02.04.01.01ACERO DE REFUERZO, F'Y=4200 KG/CM2 - ZAPATASkgERROR:#REF!02.04.01.02CONCRETO f 'c=210 kg/cm2 EN ZAPATASm3ERROR:#REF!02.04.02VIGA DE CIMENTACION02.04.02.01ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGASkgERROR:#REF!02.04.02.03CONCRETO F'C=210 KG/CM2 - VIGA DE CIMENTACIONm3ERROR:#REF!02.04.03COLUMNAS02.04.03.01ACERO DE REFUERZO F'Y=4200 KG/CM2 EN COLUMNASkgERROR:#REF!02.04.03.02ENCOFRADO Y DESENCOFRADO (HABILIT) P/COLUMNASm2ERROR:#REF!02.04.03.03CONCRETO f'c=210 kg/cm2 PARA COLUMNASm3ERROR:#REF!02.04.04VIGAS02.04.04.01ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGASkgERROR:#REF!02.04.04.02ENCOFRADO Y DESENCOFRADO EN VIGASm2ERROR:#REF!02.04.04.03CONCRETO F'C=210 KG/CM2 EN VIGASm3ERROR:#REF!02.04.05ARCOS02.04.05.01ACERO DE REFUERZO F'Y=4200 KG/CM2 EN VIGASkgERROR:#REF!02.04.05.02ENCOFRADO Y DESENCOFRADO EN VIGASm2ERROR:#REF!02.04.05.03CONCRETO F'C=210 KG/CM2 EN VIGASm3ERROR:#REF!02.04.06LOSAS ALIGERADAS02.04.06.01ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADASm2ERROR:#REF!02.04.06.02LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOunidad5531.0302.04.06.03ACERO DE REFUERZO FY=4200KG/CM2 EN LOSAS ALIGERADASkg3701.2402.04.06.04CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2.m3ERROR:#REF!02.04.07ESCALERAS02.04.07.01ENCOFRADO Y DESENCOFRADO (HABILIT) P/ESCALERASm2ERROR:#REF!02.04.07.02ACERO DE REFUERZO F'Y=4200 KG/CM2 (ESCALERAS)kgERROR:#REF!02.04.07.03CONCRETO EN ESCALERA FC=210 KG/CM2m3ERROR:#REF!02.04.08COLUMNETAS, VIGUETAS Y DINTELES02.04.08.01ACERO DE REFUERZO FY=4200KG/CM2kgERROR:#REF!02.04.08.02ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y VIGASm2ERROR:#REF!02.04.08.03CONCRETO FC=210 KG/CM2m3ERROR:#REF!03.00.00ARQUITECTURA03.01.00MUROS Y TABIQUES03.01.01MURO DE SOGA LADRILLO KK 18 HUECOS C:A 1:4m2145.8203.01.02MURO DE CABEZA LADRILLO KK 18 HUECOS C:A 1:4m2179.1903.01.03ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROSkg70.1303.02.00REVOQUES, ENLUCIDOS Y MOLDADURAS03.02.01TARRAJEO EN INTERIORES CON CEMENTO - ARENAm2432.4003.02.02TARRAJEO EN EXTERIORES CEMENTO - ARENAm2199.5903.02.03TARRAJEO DE SUPERFICIES DE COLUMNASm293.0003.02.04TARRAJEO DE SUPERFICIES DE VIGASm2150.3703.02.05REVESTIMIENTO DE COLUMNA CIRCULAR C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM.m22.5603.02.06ENCHAPADO DE MURO C/MAYOLICA 0.20 x 0.30m, H=1.20Mm266.8903.02.07REVESTIMIENTO DE COLUMNA CIRCULAR CON MARMOL TRAVERTINO E=2CM, H=0.90Mm22.5603.02.08VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.m217.9403.03.00CIELO RASO03.03.01CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 X 1.5CM.m2109.1603.03.02CIELO RASOS CON BALDOSAS TIPO CELOTEX DE 24"x24"m2113.4003.03.03VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cmm28.1503.04.00PISOS Y PAVIMENTOS03.04.01FALSO PISO DE 4" DE CONCRETO 1:10m2117.3503.04.02CONTRAPISO 2" DE CONCRETO 1:8m2124.9903.04.03PISO DE CERAMICO DE 0.30X0.30m ANTIDESLIZANTEm2242.3403.04.04PISO DE TERRAZO CLARO EN ESCALERASm210.5103.05.00ZOCALOS Y CONTRAZOCALOS03.05.01CONTRAZOCALO DE CERAMICA, h=10 cmm152.5503.05.02ZOCALO DE MARMOL TRAVERTINO BOTICCINO, h= 30 CMm53.3503.05.03ZOCALO TERRAZO EN ESCALERAS h=10 cm.m13.8503.06.00CARPINTERIA METALICA03.06.01PASAMANO DE TUB FF 2" m8.7503.06.02CANTONERA DE ALUMINIO DE 1 1/2"unidad20.0003.06.03REJAS METALICAS P/VENTANASunidad14.0003.07.00ESTRUCTURA DE TECHO Y COBERTURAS04.07.01TIJERAL DE MADERA TORNILLOunidad4.0004.07.02COBERTURA CON TEJA ANDINAm2192.0404.07.03CORREAS DE MADERA 3"x4"unidad136.0004.07.04CUMBRERA CON TEJA ANDINAm19.0003.08.00CARPINTERIA DE MADERA03.08.01PUERTA PRINCIPAL P-01 DE MADERA CAOBA TALLADAunidad1.0003.08.02PUERTA CONTRAPLACADA P-02unidad5.0003.08.03PUERTA CONTRAPLACADA P-03unidad2.0003.08.04PUERTA CONTRAPLACADA P-04unidad6.0003.08.05PUERTA P-05 DE MADERA CAOBA TALLADAunidad1.0003.08.06PUERTA CONTRAPLACADA P-06unidad1.0003.08.07PUERTA CONTRAPLACADA P-07unidad1.0003.08.08PUERTA CONTRAPLACADA P-08unidad1.0003.08.09PUERTA CONTRAPLACADA P-09unidad1.0003.08.10MAMPARA P-10unidad1.0003.08.11VENTANA DE MADERA V-01unidad13.0003.08.12VENTANA DE MADERA V-02unidad1.0003.08.13VENTANA DE MADERA V-03unidad4.0003.08.14VENTANA DE MADERA V-04unidad1.0003.08.15VENTANA DE MADERA V-05unidad1.0003.09.00CERRAJERIA03.09.01CERRADURA DE 3 GOLPESunidad2.0003.09.02CERRADURA P/PUERTA INTERIOR TIPO LIVIANApza17.0003.10.00PINTURA03.10.01PINTURA LATEX EN MUROS INTERIORES (2 MANOS)m2401.5403.10.02PINTURA LATEX EN CIELO RASO (2 MANOS)m2222.5603.10.03PINTURA LATEX EN MUROS EXTERIORES (2 MANOS)m2170.9903.10.04PINTURA LATEX EN VIGAS Y COLUMNAS (2 MANOS)m2123.8303.10.05PINTURA LATEX EN DERRAMES (2 MANOS)m217.9403.11.00VIDRIOS, CRISTALES Y SIMILARES03.11.01VIDRIOS SEMIDOBLES INCOLOROm261.0403.11.02ESPEJOS PARA SS.HH.m222.1303.12.00MOBILIARIO Y EQUIPAMIENTO03.12.01 MODULOS PARA COMPUTADORAunidad4.0003.12.02 MOBILIARIO PARA OFICINAS DE LOCAL MUNICIPALunidad6.0003.12.03 COMPUTADORA DE ESCRITORIOunidad4.0003.12.04 SILLA DE MADERA TAPIZADOunidad6.0003.12.05 PROYECTOR MULTIMEDIA - INCL. ECRANunidad1.0003.12.06 EQUIPO DE SONIDO SONY GENEZI 720Wunidad1.0004.00.00INSTALACIONES ELECTRICAS04.01.00SALIDAS LUMINARIAS04.01.01SALIDA P/CENTRO DE LUZpto18.0004.01.02SALIDA PARA BRAQUETpto9.0004.01.03SALIDA PARA SPOT-LIGHT C/PVCpto4.0004.02.00SALIDAS DE TOMACORRIENTES04.02.01SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES C/PVCpto35.0004.03.00SALIDAS DE INTERRUPTORES04.03.01SALIDA PARA INTERRUPTOR SIMPLE C/PVCpto19.0004.03.02SALIDA PARA INTERRUPTOR TIPLE C/PVCpto1.0004.03.03SALIDA PARA INTERRUPTOR CONMUTACION C/PVCpto1.0004.04.00SALIDAS DE TABLEROS04.04.01SALIDA TABLERO GENERALpto1.0004.04.02SALIDA TABLERO DISTRIBUCIONpto2.0004.05.00ARTEFACTOS DE ALUMBRADO04.05.01FLUORECENTE CIRCULAR 22Wunidad18.0004.05.02FLUORECENTES 2x40 W INCLUYE BRAQUETunidad9.0004.05.03SPOT - LIGHT 22Wunidad4.0004.06.00TOMACORRIENTES04.06.01TOMACORRIENTE BIPOLAR DOBLE C/LNEA A TIERRAunidad35.0004.07.00INTERRUPTORES04.07.01INTERRUPTOR UNIPOLAR SIMPLE unidad19.0004.07.02INTERRUPTOR UNIPOLAR TRIPLEunidad1.0004.07.03INTERRUPTOR DE COMMUTACION UNIPOLARunidad1.0004.08.00TABLEROS DE CONTROL04.08.01TABLERO GENERALunidad1.0004.08.02TABLERO DISTRIBUCION TIPO Iunidad2.0004.09.00CONDUCTOS04.09.01TUBERIA PVC SAP (ELECTRICAS) =3/4"m362.6104.09.02TUBERIA PVC SAP (ELECTRICAS) =1"m16.2504.10.00CABLE ELECTRICO04.10.01CABLE ELECTRICO AWG TW 2,5 MM (14)m362.6104.10.02CABLE ELECTRICO AWG TW 4.0 MM (12)m16.2504.11.00SISTEMA DE PUESTA TIERRA04.11.01POZO DE CONEXIN A TIERRAunidad1.0005.00.00INSTALACIONES SANITARIAS05.01.00SISTEMA DE AGUA FRIA05.01.01SALIDAS DE AGUA FRIA PVC-SAP 1/2" pto11.0005.01.02TUBERIA DISTRIBUCION PVC-SAP DE 1/2"m37.7305.01.03TUBERIA DISTRIBUCION PRINCIAL PVC-SAP DE 3/4" m19.9505.01.04CAJA DE REGISTRO DE 12" X 12" unidad1.0005.01.05VALVULA COMPUERTA ESFERICA DE BRONCE ROSCADA DE 1/2" unidad4.0005.01.06VALVULA COMPUERTA ESFERICA DE BRONCE ROSCADA DE 3/4" unidad1.0005.01.07TUBO FG AHUECADO DE 1/2" PARA URINARIOSm12.0205.02.00SISTEMA DE DESAGUE05.02.01SALIDA DE DESAGUE EN PVC DE 4"pto6.0005.02.02SALIDA DE DESAGUE EN PVC DE 2"pto11.0005.02.03SALIDA DE VENTILACION C/TUB. PVC-SAL 2"pto3.0005.02.04RED DE DERIVACION TUBERIA PVC - SAL 4"m52.1905.02.05RED DE DERIVACION TUBERIA PVC - SAL 2"m28.7605.02.06REGISTRO ROSCADO DE BRONCE 4"unidad2.0005.02.07SUMIDERO ROSCADO DE BRONCE 2"unidad5.0005.02.08CAJA DE REGISTRO DE DESAGUE 12" X 24".unidad1.0005.03.00APARATOS SANITARIOS Y ACCESORIOS05.03.01INODORO DE TANQUE BAJO C/ACCESORIOSunidad6.0005.03.02LAVATORIOS DE PARED C/PEDESTAL unidad4.0005.03.03PAPELERA DE LOSA DE COLOR DE 15 X 15 cmunidad6.0005.03.04JABONERAS DE LOSA COLOR CON ASA DE 15 X 15 cmunidad4.0005.03.05TOALLERA DE PLASTICO 24" DE COLORunidad4.0005.03.06TACHO PARA BASURA PLASTICOunidad4.0005.04.00SISTEMA DE DRENAJE PLUVIAL05.04.01CANAL SEMICIRCULAR PLANCHA GALVANIZADA D=6"m37.0005.04.02SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 4"-6"unidad46.0005.04.03MONTANTE - TUBERIA PVC SAL 4"m29.0005.04.04ABRAZADERA METALICA D=4"unidad28.0005.04.05MURETE DE SUGECION H=1.50unidad4.0006.00.00OBRAS EXTERIORES06.01.00SARDINEL06.01.01LIMPIEZA DEL TERRENO MANUALm261.2306.01.02TRAZO, NIVELACION Y REPLANTEO (EDIFIC)m261.2306.01.03 EXCAVACION DE ZANJA P/SARDINELm37.6506.01.04 ENCOFRADO Y DESENCOFRADO DE SARDINELm122.4206.01.05 SARDINELES DE CONCRETO DE F'C=175 KG/CM2.m5.7806.01.06JUNTAS ASFALTICAS 1"X1"m37.5006.01.07PINTURA ESMALTE SINTETICOm183.6406.02.00VEREDAS 06.02.01 EXCAVACION DE ZANJA P/DENTELLONm35.6706.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDASm56.7006.02.03VEREDA DE CONCRETO DE F'C=175 KG/CM2.m24.8806.02.04JUNTAS ASFALTICAS 1"X1"m12.0806.03.00JARDINERIA Y OTROS06.03.01 PLANTAS ORNAMENTALESunidad5.0006.03.02 TACHOS PARA BASURERO PLASTICOunidad4.5407.00.00PRUEBAS Y ENSAYOS07.01.00ENSAYO DE RESISTENCIA A LA COMPRESIONunidad20.0007.02.00ENSAYO, DENSIDAD DE CAMPOunidad1.0007.03.00MITIGACION AMBIENTALglob.1.0007.04.00PRUEBA ELECTRICA glb1.0007.05.00PRUEBA HIDRAULICAglb1.0008.00.00CAPACITACION08.01CAPACITACION Y ASISTENCIA TECNICAglob.1.0009.00.00FLETE09.01FLETE TERRESTREglob.1.00

&"Arial Narrow,Normal"&10RESUMEN DE METRADOS &P/10&"Arial Narrow,Normal"&10LOCAL COMUNAL PASHPA

T-PRESUSTENTO DE METRADOSPROYECTO

LUGARTARICAPROVINCIAHUARAZFECHADISTRITOTARICADTOANCASHITEMOBRAS PROVICIONALES

1.02MODULO I ( 06 AULAS PRIMARIA INCLUYE ESCALERA DE ACCESO AL SEGUNDO NIVEL)01.02.01TRABAJOS PRELIMINARES01.04.01.01LIMPIEZA DE TERRENO MANUALUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

LIMPIEZA DE TERRENO MANUAL-1.0030.27.1-214.42Metrado Total214.42

01.02.00TRAZO NIVELES Y REPLANTEO PRELIMINARUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

TRAZO NIVELES Y REPLANTEO PRELIMINAR-1.0030.27.1.214.42Metrado Total214.42

Pgina &P/1

ESTRUCTURASUSTENTO DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LUGARPASHPAPROVINCIAHUARAZFECHAFEBRERO 2015DISTRITOTARICADTOANCASHITEMESTRUCTURAS01.02.02MOVIMIENTO DE TIERRAS01.02.02.01EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOSUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

Z-11.008.002.101.701.7048.55Z-21.008.001.601.601.7034.82Z-31.006.001.201.201.7014.69EJE A,E,H,J, ENTRE 12-131.004.004.960.751.0014.88EJE B,C,D,I, ENTRE 12-131.004.004.960.751.0014.88EJE 12,13, ENTRE A-J1.002.0011.210.751.0016.82ESCALERA EJE F, G1.002.003.200.751.004.80ESCALERA EJE C51.001.003.550.751.002.66Metrado Total152.10

01.02.02.02RELLENO DE ZANJAS CON MATERIAL PROPIO SELECCIONADO EN CAPAS DE 0.20 M.UNIDADm3DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A,E,H,J, ENTRE 12-131.004.004.960.500.504.96EJE B,C,D,I, ENTRE 12-131.004.004.960.500.504.96EJE 12,13, ENTRE A-J1.002.0011.210.500.505.61ESCALERA EJE F, G1.002.003.200.500.501.60Metrado Total17.13

01.02.02.03ELIMINACION DE MATERIAL EXCEDENTE C/ MAQUINA D> 5 KMUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

DE EXCAVACION1.20134.97------------------161.96Metrado Total161.96

01.02.02.04NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E=4" C/EQUIPOUNIDADm2DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

AULA 1, 21.001.0017.057.10121.06AULA 31.001.008.357.1059.29ESCALERA1.001.006.004.0024.00Metrado Total204.35

01.02.02.05AFIRMADO DE 4" PARA PISOS INTERIORES Y VEREDASUNIDADm2DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

AULA 1, 21.001.0017.057.10121.06AULA 31.001.008.357.1059.29ESCALERA1.001.006.004.0024.00VEREDAS FRONTAL1.001.0027.602.0055.20VEREDAS POSTERIOR1.001.0051.100.8040.88Metrado Total300.43

01.02.03OBRAS DE CONCRETO SIMPLE01.02.03.01SOLADOS01.02.03.01.01SOLADOS PARA ZAPATAS E=0.10cm CONCRETO MEZCLA 1:12 C-HUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

Z-11.008.002.101.70-------28.56Z-21.008.001.601.60-------20.48Z-31.006.001.201.20-------8.64Metrado Total60.56

01.02.03.02CIMIENTOS CORRIDOS01.02.03.02.01CIMIENTO CORRIDO MEZCLA 1:10 (C:H)+30% P.GUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A,E,H,J, ENTRE 12-131.004.006.070.750.509.11EJE C,ENTRE 12-131.001.006.070.750.502.28EJE 12,13, ENTRE A-J1.002.0024.400.750.5018.30ESCALERA EJE F, G1.002.003.420.750.502.57ESCALERA EJE C51.001.003.550.750.902.40Metrado Total36.39

'01.02.03.03FALSO PISO Y VEREDAS01.02.03.03.01CONCRETO EN FALSO PISO DE E=4" DE 1:8 CEMENTO-HORMIGONUNIDADm2DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VEREDAS FRONTAL1.001.0027.602.0055.20VEREDAS POSTERIOR1.001.0051.100.8040.88Metrado Total96.08

01.02.03.03.02ENCOFRADO Y DESENCOFRADO DE VEREDASUNIDADm2DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VEREDAS FRONTAL1.001.0027.600.154.14VEREDAS POSTERIOR1.001.0051.100.157.67Metrado Total11.81

01.02.03.03.03VEREDA DE CONCRETO f'c= 175 kg/cm2UNIDADm3DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VEREDAS FRONTAL1.001.0027.602.000.158.28VEREDAS POSTERIOR1.001.0051.100.800.156.13Metrado Total14.41

01.02.04OBRAS DE CONCRETO ARMADO01.02.04.01ZAPATAS01.02.04.01.01CONCRETO f'c= 210 kg/cm2 EN ZAPATASUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

Z - 11.008.002.101.700.6017.14Z - 21.008.001.601.600.6012.29Z - 31.006.001.201.200.605.18Metrado Total36.34

01.02.04.01.02ACERO fy=4200 kg/cm2 GRADO 60 EN ZAPATASUNIDADkgDESCRIPCIONN E N pzaL. Pza3/8"1/2"5/8"0.561.001.55Z - 1LONGITUDINAL5/8"8.0011.002.10--------184.80TRANSVERSAL5/8"8.0014.001.70--------190.40Z - 2LONGITUDINAL5/8"8.0011.001.60--------140.80TRANSVERSAL5/8"8.0011.001.60--------140.80Z - 3LONGITUDINAL5/8"6.008.001.20--------57.60TRANSVERSAL5/8"6.008.001.20--------57.60Metrado Parcial (ml)00772.00Metrado Total (kg)1196.6

01.02.04.02VIGAS DE CIMENTACIN01.02.04.02.01ACERO fy=4200 kg/cm2 GRADO 60 EN VIGAS DE CIMENTACIONUNIDADkgDESCRIPCIONN E N pzaL. Pza3/8"1/2"5/8"3/4"0.561.001.552.24VC - 1EJE B,D,I, ENTRE 12-13LONGITUDINAL1/2"3.004.006.1073.20LONGITUDINAL5/8"3.003.006.1054.90LONGITUDINAL3/4"3.003.006.1054.90TRANSVERSAL (ESTRIBOS)3/8"3.0032.002.50240.00VC - 2EJE 12,13 ENTRE A-JLONGITUDINAL1/2"2.004.0024.40195.20TRANSVERSAL (ESTRIBOS)3/8"2.00144.001.70489.60VC - 2EJE A,E,H,J ENTRE 12-13LONGITUDINAL1/2"4.004.006.1097.60TRANSVERSAL (ESTRIBOS)3/8"4.0032.001.70217.60VC - 2ESCALERALONGITUDINAL1/2"2.002.003.9515.80TRANSVERSAL (ESTRIBOS)3/8"2.0025.001.7085.00ESCALERAEJE A - A ENTRE 1 - 6LONGITUDINAL1/2"2.002.005.5022.00TRANSVERSAL (ESTRIBOS)3/8"2.0030.001.70102.00Metrado Parcial (ml)1134.2403.854.9054.90Metrado Total (kg)1247.023

01.02.04.02.02ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACIONUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VC - 1EJE B,D,I, ENTRE 12-133.002.006.100.9032.94VC - 2EJE 12,13 ENTRE A-J2.002.0024.400.5048.80VC - 2EJE A,E,H,J ENTRE 12-134.002.006.100.5024.40VC - 2ESCALERA2.002.003.950.507.90ESCALERA2.002.005.500.5011.00Metrado Total131.29

01.02.04.02.03CONCRETO f'c= 210 kg/cm2 EN VIGAS DE CIMENTACIONUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VC - 1EJE B,D,I, ENTRE 12-133.001.006.100.250.904.12VC - 2EJE 12,13 ENTRE A-J2.001.0024.400.250.506.10VC - 2EJE A,E,H,J ENTRE 12-134.001.006.100.250.503.05VC - 2ESCALERA2.001.003.950.250.500.99ESCALERA2.001.005.500.250.501.38Metrado Total16.42

01.02.04.03SOBRECIMIENTOS ARMADOS01.02.04.03.01CONCRETO f'c= 210 kg/cm2 EN SOBRECIMIENTOS ARMADOSUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A,C,E,H,J ENTRE 12-131.005.006.100.250.403.05EJE 12,13 ENTRE A-J1.002.0024.400.150.402.93ESCALERA1.001.003.950.150.400.24ESCALERA1.001.005.500.150.400.33Metrado Total6.88

01.02.04.03.02ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS ARMADOSUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)CarasAlto (m)Metrado Parcial

EJE A,C,E,H,J ENTRE 12-131.005.006.102.000.4024.40EJE 12,13 ENTRE A-J1.002.0024.402.000.4039.04ESCALERA1.001.003.952.000.403.16ESCALERA1.001.005.502.000.404.40Metrado Total71.00

01.02.04.03.03ACERO fy=4200 kg/cm2 GRADO 60 PARA SOBRECIMIENTOS ARMADOSUNIDADkgDESCRIPCIONN E N pzaL. Pza3/8"1/2"5/8"3/4"0.561.001.552.24EJE A,C,E,H,J ENTRE 12-13LONGITUDINAL1/2"5.002.006.1061.00TRANSVERSAL 1/2"5.0021.000.7578.75EJE 12,13 ENTRE A-JLONGITUDINAL1/2"2.002.0024.4097.60TRANSVERSAL 1/2"2.0082.000.75123.00ESCALERALONGITUDINAL1/2"1.004.006.1024.40TRANSVERSAL 1/2"1.0021.000.7515.75ESCALERALONGITUDINAL1/2"1.002.003.957.90TRANSVERSAL 1/2"1.0013.000.759.75Metrado Parcial (ml)418.1500.000.00Metrado Total (kg)234.164

01.02.04.04COLUMNAS01.02.04.04.01CONCRETO f'c= 210 kg/cm2 EN COLUMNASUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER NIVELC-11.008.000.900.254.257.65C-11.008.000.250.254.252.13C-21.008.000.500.254.254.25C-21.008.000.250.254.252.13C-41.006.000.250.234.251.47C-51.002.000.400.154.250.51SEGUNDO NIVELC-11.008.000.900.253.155.67C-11.008.000.250.253.151.58C-21.008.000.500.253.153.15C-21.008.000.250.253.151.58C-41.006.000.250.233.151.09C-51.002.000.400.153.150.38TECHOC-41.002.000.250.231.150.13Metrado Total33.31

01.02.04.04.02ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)CarasAlto (m)Metrado Parcial

PRIMER NIVELC-11.008.002.801.004.2595.20C-21.008.002.001.004.2568.00C-41.006.003.951.004.25100.73C-51.002.003.951.004.2533.58SEGUNDO NIVELC-11.008.003.951.003.1599.54C-21.008.003.951.003.1599.54C-41.006.003.951.003.1574.66C-51.002.003.951.003.1524.89TECHOC-41.002.005.501.001.1512.65Metrado Total608.79

01.02.04.04.03ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNASUNIDADkgDESCRIPCIONN E N pzaL. Pza1/4"3/8"1/2"5/8"3/4"0.250.561.001.552.24PRIMER NIVELC-1LONGITUDINAL5/8"8.008.006.25400.00LONGITUDINAL3/4"8.008.006.25400.00TRANSVERSAL (ESTRIBOS)3/8"8.0076.002.501520.00C-2LONGITUDINAL5/8"8.006.006.25300.00LONGITUDINAL3/4"8.006.006.25300.00TRANSVERSAL (ESTRIBOS)3/8"8.0064.001.70870.40C-4LONGITUDINAL1/2"6.008.006.25300.00TRANSVERSAL (ESTRIBOS)3/8"6.0026.001.20187.20C-5LONGITUDINAL1/2"2.002.006.2525.00TRANSVERSAL (ESTRIBOS)3/8"2.0026.001.3067.60SEGUNDO NIVELC-1LONGITUDINAL5/8"8.008.003.15201.60LONGITUDINAL3/4"8.008.003.15201.60TRANSVERSAL (ESTRIBOS)3/8"8.0068.002.501360.00C-2LONGITUDINAL5/8"8.006.003.15151.20LONGITUDINAL3/4"8.006.003.15151.20TRANSVERSAL (ESTRIBOS)3/8"8.0056.001.70761.60C-4LONGITUDINAL1/2"6.008.003.15151.20TRANSVERSAL (ESTRIBOS)3/8"6.0022.001.20158.40C-5LONGITUDINAL1/2"2.002.003.1512.60TRANSVERSAL (ESTRIBOS)3/8"2.0024.001.3062.40TECHOC-4LONGITUDINAL1/2"6.008.001.1555.20TRANSVERSAL (ESTRIBOS)3/8"6.0010.001.2072.00Metrado Parcial (ml)0.004987.60488.801052.801052.80Metrado Total (kg)7271.968

01.02.04.05VIGAS01.02.04.05CONCRETO f'c= 210 kg/cm2 PARA VIGASUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER NIVELVP-1011.004.006.100.250.603.66VP-1021.004.006.100.250.402.44VP-1031.0010.002.050.250.552.82VS-1011.002.0024.400.250.404.88VB-1011.001.0024.400.130.451.43VE-1011.001.003.450.250.450.39VE-1021.001.003.450.250.400.35VE41.001.001.950.250.400.20SEGUNDO NIVELVP-2011.004.006.100.250.603.66VP-2021.004.006.100.250.352.14VP-2031.0020.002.050.250.606.15VS-2011.002.0024.400.250.404.88VB-2011.002.0024.400.130.452.85Metrado Total40.15

01.02.04.05.02ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER NIVELVP-1011.004.006.101.4535.38VP-1021.004.006.101.0525.62VP-1031.0010.002.051.3527.68VS-1011.002.0024.401.0551.24VB-1011.001.0024.401.0325.13VE-1011.001.003.451.153.97VE-1021.001.003.451.053.62VE41.001.001.951.052.05SEGUNDO NIVELVP-2011.004.006.101.4535.38VP-2021.004.006.100.9523.18VP-2031.0020.002.051.4559.45VS-2011.002.0024.401.5073.20VB-2011.002.0024.401.0350.26Metrado Total466.16

01.02.04.05.03ACERO fy=4200 kg/cm2 GRADO 60 EN VIGASUNIDADkgDESCRIPCIONN E N pzaL. Pza1/4"3/8"1/2"5/8"3/4"0.250.561.001.552.24PRIMER NIVELVP-101LONGITUDINAL1/2"4.002.006.1048.80LONGITUDINAL5/8"4.002.006.1048.80LONGITUDINAL3/4"4.004.006.1097.60TRANSVERSAL (ESTRIBOS)3/8"4.0038.001.90288.80VP-102LONGITUDINAL5/8"4.002.006.1048.80LONGITUDINAL3/4"4.004.006.1097.60TRANSVERSAL (ESTRIBOS)3/8"4.0038.001.50228.00VP-103LONGITUDINAL5/8"10.004.002.0582.00TRANSVERSAL (ESTRIBOS)3/8"10.0015.001.45217.50VS-101LONGITUDINAL5/8"2.004.0024.40195.20TRANSVERSAL (ESTRIBOS)3/8"2.00196.001.20470.40VB-101LONGITUDINAL1/2"1.004.0024.4097.60TRANSVERSAL (ESTRIBOS)3/8"1.00196.001.30254.80VE-101LONGITUDINAL1/2"1.006.003.4520.70TRANSVERSAL (ESTRIBOS)3/8"1.0028.001.6044.80VE-102LONGITUDINAL1/2"1.006.003.4520.70TRANSVERSAL (ESTRIBOS)3/8"1.0028.001.5042.00VE4LONGITUDINAL1/2"1.004.006.2525.00TRANSVERSAL (ESTRIBOS)3/8"1.0028.001.5042.00SEGUNDO NIVELVP-201LONGITUDINAL1/2"4.004.006.1097.60LONGITUDINAL3/4"4.006.006.10146.40TRANSVERSAL (ESTRIBOS)3/8"4.0068.001.90516.80VP-202LONGITUDINAL1/2"4.002.006.1048.80LONGITUDINAL3/4"4.004.006.1097.60TRANSVERSAL (ESTRIBOS)3/8"4.0068.001.60435.20VP-203LONGITUDINAL5/8"20.006.002.05246.00LONGITUDINAL3/4"20.004.002.05164.00TRANSVERSAL (ESTRIBOS)3/8"20.0027.002.701458.00VS-201LONGITUDINAL5/8"2.004.0024.40195.20TRANSVERSAL (ESTRIBOS)3/8"2.00196.001.50588.00VB-201LONGITUDINAL1/2"2.004.0024.40195.20TRANSVERSAL (ESTRIBOS)3/8"2.00196.001.30509.60Metrado Parcial (ml)0.005367.10684.40824.50603.20Metrado Total (kg)6319.119

01.02.04.06COLUMNETAS Y SOLERAS01.02.04.06.01CONCRETO f'c= 175 kg/cm2 EN COLUMNETAS Y SOLERASUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER NIVELC-31.005.000.250.234.251.22C-A1.0026.000.250.231.502.24SEGUNDO NIVELC-31.005.000.250.233.150.91C-A1.0040.000.250.231.252.88TECHOC-31.005.000.250.231.150.33SOLERAVB-2021.002.004.250.150.300.38VB-2031.002.004.250.150.300.38VQ-2011.004.004.000.170.601.63Metrado Total10.47

01.02.04.06.02ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS Y SOLERASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)CarasAlto (m)Metrado Parcial

PRIMER NIVELC-31.005.003.951.004.2583.94C-A1.0026.003.951.001.50154.05SEGUNDO NIVELC-31.005.003.951.003.1562.21C-A1.0040.003.951.001.25197.50TECHOC-31.005.003.951.001.1522.71SOLERAVB-2021.002.004.250.756.38VB-2031.002.004.250.756.38VQ-2011.004.004.000.9415.04Metrado Total520.41

01.02.04.06.03ACERO fy=4200 kg/cm2 GRADO 60 PARA COLUMNETAS Y SOLERASUNIDADkgDESCRIPCIONN E N pzaL. Pza1/4"3/8"1/2"5/8"3/4"0.250.561.001.552.24PRIMER NIVELC-3LONGITUDINAL5/8"5.004.006.25125.00TRANSVERSAL (ESTRIBOS)3/8"5.0031.000.96148.80C-ALONGITUDINAL3/8"4.002.002.8022.40TRANSVERSAL (ESTRIBOS)1/4"26.0016.001.00416.00SEGUNDO NIVELC-3LONGITUDINAL5/8"5.004.003.1563.00TRANSVERSAL (ESTRIBOS)3/8"5.0027.000.96129.60C-ALONGITUDINAL3/8"40.002.001.25100.00TRANSVERSAL (ESTRIBOS)1/4"40.0012.001.00480.00TECHOC-3LONGITUDINAL5/8"5.004.001.1523.00TRANSVERSAL (ESTRIBOS)3/8"5.0010.000.9648.00SOLERAVB-202LONGITUDINAL5/8"2.004.258.50TRANSVERSAL (ESTRIBOS)3/8"2.0010.000.9619.20VB-203LONGITUDINAL1/2"2.004.004.2534.00TRANSVERSAL (ESTRIBOS)3/8"2.0028.001.1061.60VQ-201LONGITUDINAL1/2"4.006.004.0096.00TRANSVERSAL (ESTRIBOS)3/8"4.0028.001.70190.40Metrado Parcial (ml)896.00720.00130.00219.500.00Metrado Total (kg)873.425

01.02.04.07LOSAS ALIGERADAS01.02.04.07.01CONCRETO f'c= 210 kg/cm2 PARA LOSAS ALIGERADASUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER NIVELVIGUETAS1.0028.0030.100.100.108.43LOSA1.001.0030.109.100.0513.70SEGUNDO NIVELVIGUETAS1.0031.0032.100.100.109.95LOSA1.001.0032.1010.200.0516.37Metrado Total50.87

01.02.04.06.02ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS Y SOLERASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)CarasAncho (m)Metrado Parcial

PRIMER NIVEL1.0028.0030.101.000.20168.56SEGUNDO NIVEL 1.0031.0032.101.000.20199.02Metrado Total367.58

02.04.06.02LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)FactorMetrado Parcial

PRIMER NIVEL1.001.0030.109.108.762399.45SEGUNDO NIVEL 1.001.0032.1010.208.762868.20Metrado Total5531.03

01.02.04.08.03ACERO fy=4200 kg/cm2 GRADO 60 EN LOSA ALIGERADAUNIDADkgDESCRIPCIONN E N pzaL. Pza3/8"1/2"1/4"0.561.000.25PRIMER NIVELVIGETASLONGITUDINAL1/2"28.001.0030.10842.80BASTONES1/2"28.004.002.05229.60BASTONES3/8"28.002.000.8547.60SEGUNDO NIVELVIGETASLONGITUDINAL1/2"28.001.0032.10898.80BASTONES3/8"28.004.002.05229.60BASTONES3/8"28.002.000.8547.60ACERO TEMPERATURAPRIMER NIVELEJE 12-13 ENTRE A-JLONGITUDINAL1/4"37.001.0030.101113.70TRANSVERSAL1/4"121.001.009.101101.10SEGUNDO NIVELEJE 12-13 ENTRE A-JLONGITUDINAL1/4"41.001.0032.101316.10TRANSVERSAL1/4"129.001.0010.201315.80Metrado Parcial (ml)324.801971.24846.7Metrado Total (kg)3,701.24

01.02.04.09ESCALERAS01.02.04.07.01CONCRETO f'c= 210 kg/cm2 PARA ESCALERASUNIDADm3DESCRIPCIONN ElemCantidadArea CadAncho (m)Alto (m)Metrado Parcial

TRAMO I1.001.001.751.652.89TRAMO II1.001.001.201.651.98Metrado Total5.1101.02.04.09.02ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

TRAMO I1.001.005.001.658.25TRAMO I1.009.001.650.172.52TRAMO II1.001.005.901.659.74TRAMO II1.001.001.650.170.28Metrado Total20.79

01.02.04.09.03ACERO fy=4200 kg/cm2 GRADO 60 EN ESCALERASUNIDADkgDESCRIPCIONN E N pzaL. Pza3/8"1/2"1/4"0.561.000.25TRAMO ILONGITUDINAL1/2"1.0011.006.0066.00LONGITUDINAL3/8"28.002.000.8547.60LONGITUDINAL3/8"28.002.000.8547.60TRANSVERSAL3/8"28.002.000.8547.60TRAMO IILONGITUDINAL1/2"28.001.0032.10898.80LONGITUDINAL3/8"28.002.000.8547.60TRANSVERSAL3/8"28.004.002.05229.60Metrado Parcial (ml)420.00964.80Metrado Total (kg)1,320.00

Pgina &P/17

ARQUITECTURASUSTENTO DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LUGARPASHPAPROVINCIAHUARAZFECHAFEBRERO 2015DISTRITOTARICADTOANCASHITEMARQUITECTURA03.00.00ARQUITECTURA03.01.00MUROS Y TABIQUES03.01.01MURO DE SOGA LADRILLO KK 18 HUECOS C:A 1:4UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE 2, ENTRE A -B1.001.002.40------2.506.30EJE 2, ENTRE B-C1.001.002.40------2.506.30EJE 3, ENTRE A-B1.001.003.55------2.509.32EJE 3, ENTRE B'-C1.001.001.20------2.503.15EJE 3', ENTRE A-B1.001.003.63------2.7510.47EJE 4, ENTRE A-B1.001.003.55------2.509.32EJE 5, ENTRE A-B1.001.003.55------2.509.32EJE 5, ENTRE B-C1.001.001.90------2.504.99BAO-MURO BAJO1.002.000.75------2.203.47BAO -MURO URINARIO1.001.000.50------2.751.45EJE B, ENTRE 3-41.002.000.58------2.503.02ESCALERA - DEPOSITO1.001.500.92------2.383.44ESCALERA - LIMPIEZA1.001.002.27------0.852.03EJE B, ENTRE 1 -21.001.003.05------2.508.01EJE B, ENTRE 5 -61.001.001.90------2.504.99EJE B, ENTRE 5 -4 (AREA CAD)1.001.001.00------2.542.67ALMACEN1.001.001.93------2.505.05PATIO, EJE 31.001.001.20------2.503.15PATIO VENTANA1.001.001.85------1.052.04SEGUNDO PISOEJE 3, ENTRE A - B1.001.003.55------2.559.50EJE 2, ENTRE A - B1.001.002.40------2.556.43EJE 2, ENTRE B - C (BAO)1.001.001.95------2.555.22EJE B, ENTRE 1-21.001.003.05------2.558.17BAO - MURO BAJO1.002.001.70------2.207.85BAO MURO SEPARADOR1.001.003.23------3.0010.16Metrado Total145.82

03.01.02MURO DE CABEZA LADRILLO KK 18 HUECOS C:A 1:4UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE A, 1-2,2-3,4-5 Y 5-61.004.003.00------2.5031.50EJE A, ENTRE 3-4 (AREA CAD)1.001.007.32------------7.69EJE C, 1-2,3-4,4-5 Y 5-6 (AREA CAD)1.004.004.33------------18.19EJE 1, ENTRE A-B (AREA CAD)1.001.005.70------------5.99EJE 1, ENTRE B-C1.001.003.55------2.509.32EJE 6, ENTRE A-B (AREA CAD)1.001.005.70------------5.99EJE 6, ENTRE B-C1.001.001.90------2.504.99SEGUDO PISOEJE A, ENTRE 3-4,4-5,5-6 (AREA CAD)1.003.005.85------------18.43EJE A, ENTRE 2-3 (AREA CAD)1.001.007.77------------8.16EJE A, ENTRE 1-2 1.001.002.95------2.557.90EJE C, ENTRE 3-4,4-5,5-6 (AREA CAD)1.003.005.85------------18.43EJE C, ENTRE 1-2 1.001.002.95------2.557.90EJE 1, ENTRE A-B (AREA CAD)1.001.006.60------------6.93EJE 1, ENTRE B-C (AREA CAD)1.001.008.37------------8.79EJE 6, ENTRE A-B, B-C1.002.003.55------2.5519.02Metrado Total179.19

03.01.03ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROSUNIDADkgDESCRIPCIONN E N pzaL. Pza1/4"1/2"5/8"0.251.001.55PRIMER PISOEJE A, 1-2,2-3,3-4,4-5,5-61/4"6.008.000.7536.00--------EJE B, 1-2,2-3,3-4,4-5,5-61/4"6.008.000.7536.00--------EJE C, 1-2,2-3,3-4,4-5,5-61/4"6.008.000.7536.00--------COLUMNETAS1/4"16.004.000.7548.00--------SEGUNDO PISOEJE A, 1-2,2-3,3-4,4-5,5-61/4"6.008.000.7536.00--------EJE B, 1-2,2-3,3-4,4-5,5-61/4"4.008.000.7524.00--------EJE C, 1-2,2-3,3-4,4-5,5-61/4"6.008.000.7536.00--------COLUMNETAS1/4"1.004.000.753.00--------Metrado Parcial (ml)25500Metrado Total (kg)70.13

03.02.00REVOQUES, ENLUCIDOS Y MOLDADURAS03.02.01TARRAJEO EN INTERIORES CON CEMENTO - ARENAUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE 1, ENTRE A-B (ALCALDIA)1.001.003.55-----2.7510.25EJE 1, ENTRE B-C (GERENCIA)1.001.003.55-----2.7510.25EJE 2, ENTRE A-B (ALCALDIA - ESCALERA)1.002.002.40-----2.7513.86EJE 2, ENTRE B-C (GERENCIA - PATIO)1.002.002.40-----2.7513.86EJE 3, ENTRE A-B (ESCALERA - BAO)1.002.003.55-----2.7520.51EJE 3, ENTRE B-C (PATIO - CORREDOR)1.002.001.20-----2.756.93EJE 3', ENTRE A-B (BAO)1.002.003.63-----3.0022.87MURO URINARIO (BAO)1.002.001.40-----0.501.47EJE 4, ENTRE A-B (BAO - REGISTRO CIVIL)1.002.003.55-----2.7520.51EJE 5, ENTRE A-B (REGISTRO CIVIL - TESORERIA)1.002.003.55-----2.7520.51EJE 5, ENTRE B-C (CORREDOR-ALMACEN)1.002.001.90-----2.7510.97EJE 6, ENTRE A-B (TESORERIA)1.001.003.55-----2.7510.25EJE 6, ENTRE B-C (ALMACEN)1.001.001.80-----2.755.20EJE A,ENTRE 1-2,5-61.002.002.95-----2.7517.04EJE A,ENTRE 2-31.002.003.70-----2.7521.37EJE A,ENTRE 4-51.002.003.20-----2.7518.48EJE A,ENTRE 3-41.002.008.28----------17.39BAO MURO BAJO2.002.000.75-----2.206.93BAO MURO URINARIO1.002.000.50-----3.003.15EJE B,ENTRE 1-21.002.003.05-----2.7517.62EJE B,ENTRE 3-4 (BAO)2.002.000.58-----2.756.70EJE B,ENTRE 4-5 (REGISTRO CIVIL)1.002.002.05-----2.7511.84EJE B,ENTRE 5-6 (TESORERIA)1.002.001.90-----2.7510.97ALMACEN1.002.001.93-----2.7511.15PATIO1.002.001.55-----2.758.96ESCALERA - DEPOSITO1.002.002.48-----0.924.79ESCALERA - LIMPIEZA1.002.002.17-----0.853.87VENTANAS BAJAS-1.008.001.75-----1.45-21.32VENTANAS ALTAS-1.002.001.15-----0.30-0.72PUERTAS-1.0010.001.00-----2.75-28.88SEGUNDO PISOEJE 1, ENTRE A-B (AREA CAD)1.001.006.60-----2.5517.67EJE 1, ENTRE B-C (AREA CAD)1.001.008.37----------8.79EJE 2, ENTRE A - B1.002.002.40------2.5512.85EJE 2, ENTRE B-C1.002.001.95------2.5510.45EJE 3, ENTRE A-B1.002.003.55------2.5519.02EJE 6, ENTRE A-B,B-C1.002.003.55------2.5519.02EJE A, ENTRE 1-21.002.003.10------2.5516.60EJE A, ENTRE 2-31.002.003.70------2.5519.81EJE A,C: ENTRE 3-4,4-52.002.003.20------2.5534.27EJE A,C: ENTRE 5-61.002.002.95------2.5515.80VENTANAS BAJAS-1.007.001.751.45-18.65Metrado Total432.4003.02.02TARRAJEO EN EXTERIORES CEMENTO - ARENAUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE A, ENTRE 1-2,3-4,4-5,5-64.001.002.95------2.8034.69EJE A, ENTRE 3-41.001.008.30------------8.72EJE C, ENTRE 1-2,2-3,3-4,4-5,5-65.001.005.80------------30.45EJE 1, ENTRE A-B1.001.007.50------------7.88EJE 1, ENTRE B-C1.001.009.95------------10.45EJE 6, ENTRE A-B1.001.007.50------------7.88EJE 6, ENTRE B-C1.001.005.35------------5.62SEGUNDO PISOEJE A,C: ENTRE 1-21.002.002.95------2.5515.80EJE A, ENTRE 2-31.001.007.78------------8.17EJE A,B: ENTRE 3-4,4-5,5-61.006.005.85------------36.86EJE 1, ENTRE A-B1.001.006.60------------6.93EJE 1, ENTRE B-C1.001.008.37------------8.79EJE 6, ENTRE A-B1.001.007.50------------7.88EJE 6, ENTRE B-C1.001.003.55------2.559.50Metrado Total199.5903.02.03TARRAJEO DE SUPERFICIES DE COLUMNASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISO0.00EJE A, COLUMNA C-41.002.000.90------2.805.29EJE A, COLUMNA C-11.004.000.55------2.806.47EJE B, COLUMNA C-11.001.000.80------2.802.351.001.000.90------2.802.651.001.000.90------2.802.651.001.000.90------2.802.651.001.001.05------2.803.091.001.000.55------2.801.62EJE C, COLUMNA C-41.002.000.90------2.805.29EJE C, COLUMNA C-11.003.000.55------2.804.851.001.000.70------2.802.06COLUMNETA TESORERIA1.001.000.45------2.801.32COLUMNETA REGISTRO1.001.000.45------2.801.32COLUMNETAS BAO EXTERIOR1.002.000.45------2.802.65COLUMNETAS BAO INTERIOR1.002.000.45------2.802.65COLUMNETAS ESCALERA1.002.000.45------2.802.65COLUMNETA ALCALDIA1.001.000.45------2.801.32GERENCIA1.001.000.45------2.801.32COLUMNETA ALCALDIA1.001.000.45------2.801.32COLUMNETA PATIO1.002.000.45------2.802.65COLUMNETA ALMACEN1.001.000.45------2.801.32COLUMNETA ALMACEN 1.001.000.75------2.802.21COLUMNETA ALMACEN EXTERIOR1.001.000.40------2.801.18SEGUNDO PISOEJE A, COLUMNA C-41.002.000.90------2.554.82EJE A, COLUMNA C-11.002.000.70------2.553.751.002.000.55------2.552.95EJE B, COLUMNA C-11.002.001.05------2.555.631.001.000.55------2.551.47EJE C, COLUMNA C-41.002.000.90------2.554.82EJE C, COLUMNA C-11.004.000.70------2.557.50COLUMNETA SERVICIO PUBLICO1.001.000.45------2.551.21Metrado Total93.00

03.02.04TARRAJEO DE SUPERFICIES DE VIGASUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

INTERIORESPRIMER PISOEJE A, ENTRE 1-2,5-61.002.002.95------0.251.55EJE A, ENTRE 2-31.001.003.70------0.451.75EJE A, ENTRE 3-4,4-51.002.003.20------0.251.68EJE B, ENTRE 1-21.001.003.05------0.601.92EJE B, ENTRE 2-31.001.003.70------0.752.92EJE B, ENTRE 3-41.002.000.73------0.600.91EJE B, ENTRE 3-41.002.000.80------0.751.26EJE B, ENTRE 4-51.001.002.20------0.601.39EJE B, ENTRE 3-41.001.001.00------0.750.79EJE B, ENTRE 4-51.001.002.05------0.601.29EJE B, ENTRE 3-41.001.001.00------0.750.79EJE C, ENTRE 1-2,5-61.002.002.95------0.251.55EJE C, ENTRE 2-31.001.003.70------0.501.94EJE C, ENTRE 3-4,4-51.002.003.20------0.251.68EJE 1, ENTRE A-B,B-C1.002.003.55------0.251.87EJE 2, ENTRE A-B1.002.002.55------0.955.09EJE 2, ENTRE A-B,B-C1.002.001.00------0.751.58EJE 3, ENTRE A-B1.001.002.91------0.802.45EJE 3, ENTRE A-B1.001.000.64------0.600.40EJE 3, ENTRE B-C1.001.002.20------0.751.73EJE 3, ENTRE B-C1.001.001.35------0.600.85EJE 4, ENTRE A-B1.001.003.55------0.602.24EJE 4, ENTRE B-C1.001.003.55------0.752.79EJE 5, ENTRE A-B1.001.003.55------0.602.24EJE 5, ENTRE B-C1.001.001.60------0.751.26EJE 5, ENTRE B-C1.001.002.05------0.601.29EJE 6, ENTRE A-B1.001.003.55------0.250.93EJE 6, ENTRE B-C1.001.001.50------0.500.79EJE 6, ENTRE B-C1.001.002.05------0.250.54SEGUNDO PISO0.00EJE A, ENTRE 1-2, 2-3, 3-4,4-5,5-61.005.003.65------0.458.62EJE B, ENTRE 1-21.001.003.65------1.003.83EJE B, ENTRE 2-31.001.004.00------1.154.83EJE C, ENTRE 1-2, 3-4,4-5,5-61.004.003.65------0.456.90EJE 1, ENTRE A-B, B-C1.002.003.55------0.453.36EJE 2, ENTRE A-B1.001.002.55------1.002.68EJE 2, ENTRE A-B - PUERTA1.001.001.00------1.151.21EJE 2, ENTRE B-C - PUERTAS BAOS1.002.000.80------1.151.93EJE 2, ENTRE B-C - BAOS1.001.001.95------1.002.05EJE 3, ENTRE A-B - ESCALERAS1.001.003.85------1.004.04EJE 3, ENTRE B-C - MAMPARA1.001.004.15------1.155.01EJE 6, ENTRE A-B,B-C1.002.003.85------1.159.30EXTERIORESPRIMER PISOEJE A y C, ENTRE 1-61.002.0018.00------0.4517.01EJE 1 Y 6, ENTRE A-C1.002.008.00------0.457.56SEGUNDO PISOEJE A y C, ENTRE 1-61.002.0018.00------0.4517.01EJE 1 Y 6, ENTRE A-C1.002.008.00------0.457.56Metrado Total150.3703.02.05REVESTIMIENTO DE COLUMNA CIRCULAR C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM.UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

COLUMNA CIRCULAR HORNAMENTAL EN PATIO1.001.000.95------2.002.00HORNAMENTO SUPERIORES EN COLUMNA3.002.000.90------0.100.57Metrado Total2.5603.02.06ENCHAPADO DE MURO C/MAYOLICA 0.20 x 0.30m, H=1.20MUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH PRIMER PISO1.002.0012.95------1.2032.63URINARIO1.002.000.55------1.401.62SSHH SEGUNDO PISO1.002.0012.95------1.2032.63Metrado Total66.8903.02.07REVESTIMIENTO DE COLUMNA CIRCULAR CON MARMOL TRAVERTINO E=2CM, H=0.90MUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

COLUMNA CIRCULAR HORNAMENTAL EN PATIO1.001.000.95------2.002.00HORNAMENTO SUPERIORES EN COLUMNA3.002.000.90------0.100.57Metrado Total2.5603.02.08VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS.UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTAS P-1 (1.75*2.55)1.001.001.75------2.556.85PUERTAS P-2 (1.00*2.75)1.005.001.00------2.7532.50PUERTAS P-3 (0.80*2.75)1.002.000.80------2.7512.60PUERTAS P-4 (1.80*0.75)1.006.000.75------1.8026.10PUERTAS P-5 (1.50*2.75)1.001.001.50------2.757.00PUERTAS P-6 (0.75*2.33-TRAPEZOIDAL)1.001.000.75------2.335.41PUERTAS P-7 (0.75*1.34-TRAPEZOIDAL)1.001.000.75------1.343.43PUERTAS P-8 (1.00*2.55)1.001.001.00------2.556.10PUERTAS P-9 (0.80*2.55)1.001.000.80------2.555.90PUERTAS P-10 (3.55*2.55-MAMPARA)1.001.003.55------2.558.65VENTANAS V-1 (1.75*1.45,R=0.30M)1.0013.001.75------1.4583.20VENTANAS V-2 (1.85*1.45,R=0.30M)1.001.001.85------1.454.75VENTANAS V-3 (1.15*0.30)1.004.001.15------0.307.00VENTANAS V-4 (1.15*1.45)1.001.001.15------1.454.05VENTANAS V-5 (1.50*1.45)1.001.001.50------1.454.40Metrado Total217.9403.03.00CIELO RASO03.03.01CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:4 X 1.5CM.UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISO144COLUMNASCOLUMNAS 0.4X0.3-1.004.000.400.30--------0.48COLUMNAS 0.3X0.3-1.0014.000.300.30--------1.26VIGASEJE 1,2,3,4,5,6-1.0010.65----------------------10.65EJE A, B, C-1.0012.05----------------------12.05ESCALERASECCION PRIMER PISO-1.008.85---------------8.85MUROS NO PORTANTESEJE A,B,C, 1,2,3,4,5,6-1.001.55---------------1.55Metrado Total109.16

03.03.02CIELO RASOS CON BALDOSAS TIPO CELOTEX DE 24"x24"UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

BALDOSAS EN SEGUNDO PISO CELOTEX1.001.00113.40------------113.40Metrado Total113.40

03.03.03VESTIDURA DE SUPERFICIE FONDO DE ESCALERA CON MORTERO 1:4 X 1.5 cmUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

TRAMO 1 (INC. DESCANSO)1.001.001.991.00------1.99TRAMO 2 (NO INC. DESCANSO)1.001.001.921.00------1.92TRAMO 3 (INC DESCANSOS)1.001.003.961.07-------4.24Metrado Total8.15

03.04.00PISOS Y PAVIMENTOS03.04.01FALSO PISO DE 4" DE CONCRETO 1:10UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

AREA TOTAL1.001.0018.008.00------144.00COLUMNASCOLUMNAS 0.4X0.3-1.004.000.400.30-------0.48COLUMNAS 0.3X0.3-1.0014.000.300.30-------1.26VIGAS PERIMETRALESEJE 6-1.001.78-------------------1.78EJE 1-1.001.78-------------------1.78EJE C-1.004.00-------------------4.00EJE A-1.004.00-------------------4.00VIGAS INTERNASEJE A,C,B-1.004.26-------------------4.26EJE 1,2,3,4,5,6-1.002.43-------------------2.43VIGAS SIN MURO NI PUERTAEJE A,B,C-1.001.09-------------------1.09EJE 1,2,3,4,5,6-1.001.48-------------------1.48PUERTASP-02,P-03,P-04,P-05-1.001.59-------------------1.59MUROS NO PORTANTESEJE A,B,C, 1,2,3,4,5,6-1.002.50-------------------2.50Metrado Total117.35

03.04.02CONTRAPISO 2" DE CONCRETO 1:8UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

AREA TOTAL SEGUNDO PISO1.001.0018.008.00------144.00SEGUNDO PISOCOLUMNASCOLUMNAS 0.4X0.3-1.004.000.400.30-------0.48COLUMNAS 0.3X0.3-1.0014.000.300.30-------1.26VIGASEJE 1,2,3,4,5,6-1.007.10-------------------7.10EJE A, B, C-1.009.69-------------------9.69MUROS NO PORTANTESEJE A,B,C, 1,2,3,4,5,6-1.000.48-------------------0.48Metrado Total124.99

03.04.03PISO DE CERAMICO DE 0.30X0.30m ANTIDESLIZANTEUNIDADm2DESCRIPCIONN ElemCantidadArea Cad (m2)Ancho (m)Alto (m)Metrado Parcial

DE FALSO PISO 03.04.011.001.00117.35------------117.35DE CONTRAPISO 03.04.021.001.00124.99------------124.99Metrado Total242.34

03.04.04PISO DE TERRAZO CLARO EN ESCALERASUNIDADm2DESCRIPCIONN ElemCantidadArea Cad (m2)Ancho (m)Alto (m)Metrado Parcial

PASO1.001.006.98------------6.98CONTRAPASO1.0020.00----1.050.163.53Metrado Total10.51

03.05.00ZOCALOS Y CONTRAZOCALOS03.05.01CONTRAZOCALO DE CERAMICA, h=10 cmUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE C (INCLUYE C/B)1.00-------20.2--------------20.20EJE B (INCLUYE B/A)1.00-------23.65--------------23.65EJE A1.00-------13.3--------------13.30EJE 6 (INCLUYE 6/5)1.00-------5.8--------------5.80EJE 5 (INCLUYE 5/4)1.00-------11.55--------------11.55EJE 4 (INCLUYE 4/3)1.00-------3.93--------------3.93EJE 3 (INCLUYE 3/2)1.00-------10.5--------------10.50EJE 2 (INCLUYE 2/1)1.00-------7.35--------------7.35EJE 11.00-------7.35--------------7.35SEGUNDO PISO0.00EJE C (INCLUYE C/B)1.00-------10.3--------------10.30EJE B (INCLUYE B/A)1.00-------3.63--------------3.63EJE A1.00-------13.45--------------13.45EJE 6 (INCLUYE 6/5)1.00-------7.5--------------7.50EJE 5 (INCLUYE 5/4)1.00-------0.2--------------0.20EJE 4 (INCLUYE 4/3)1.00-------0.2--------------0.20EJE 3 (INCLUYE 3/2)1.00-------4.25--------------4.25EJE 2 (INCLUYE 2/1)1.00-------5.71--------------5.71EJE 11.00-------3.68--------------3.68Metrado Total152.55

03.05.02ZOCALO DE MARMOL TRAVERTINO BOTICCINO, h= 30 CMUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PERIMETRAL1.001.0048.3--------------48.30PATIO1.001.005.05--------------5.05Metrado Total53.35

03.05.03ZOCALO TERRAZO EN ESCALERAS h=10 cm.UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SECCION 11.001.003.4--------------3.4SECCION 21.001.004.87--------------4.87SECCION 31.001.004.88--------------4.88COLUMNAS1.001.000.70--------------0.70Metrado Total13.85

03.06.00CARPINTERIA METALICA03.06.01PASAMANO DE TUB FF 2" UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PASAMANO DE TUB FF 2" , INCLUYE PARANTES DE FIERRO CON PINTURA ANTICORROSIVA A DOS MANOS Y ACABADO FINAL ESMALTE SINTETICO1.001.008.75------------8.75Metrado Total8.75

03.06.02CANTONERA DE ALUMINIO DE 1 1/2"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

CANTONERA DE ALUMINIO DE 1 1/2" CON ANCLAJE DENTADO, L=1.05 M1.0020.00------------------20.00Metrado Total20.00

03.06.03REJAS METALICAS P/VENTANASUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

REJAS METALICAS CON ANGULO CUADRADO MACISO DE 1/2", INCLUYE ANCLAJE1.0014.00------------------14.00Metrado Total14.00

03.07.00ESTRUCTURA DE TECHO Y COBERTURAS04.07.01TIJERAL DE MADERA TORNILLOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE 21.001.00------------------1.00EJE 31.001.00------------------1.00EJE 41.001.00------------------1.00EJE 51.001.00------------------1.00Metrado Total4.00

04.07.02COBERTURA CON TEJA ANDINAUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PORTERIOR1.001.005.2518------94.50FONTAL1.001.005.2516.00------84.00DETALLE DE FRONTIS0.502.002.854.75------13.54Metrado Total192.04

04.07.03CORREAS DE MADERA 3"x4"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PORTERIOR L=12'5.0014.00------------------70.00FONTAL L=12'4.0014.00------------------56.00DETALLE DE FRONTIS L=12'2.005.00------------------10.00Metrado Total136.00

04.07.04CUMBRERA CON TEJA ANDINAUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

CUMBRERA ESTNDAR TEJA ANDINA1.001.0019.00------------19.00Metrado Total19.00

03.08.00CARPINTERIA DE MADERA03.08.01PUERTA PRINCIPAL P-01 DE MADERA CAOBA TALLADAUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA APANELADA C/DECORACION -INGRESO PRINCIPAL (1.75*2.55)1.001.00------------------1.00Metrado Total1.00

03.08.02PUERTA CONTRAPLACADA P-02UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA 1.00X2.751.005.00------------------5.00Metrado Total5.00

03.08.03PUERTA CONTRAPLACADA P-03UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA 0.80X2.751.002.00------------------2.00Metrado Total2.00

03.08.04PUERTA CONTRAPLACADA P-04UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA 0.75X1.801.006.00------------------6.00Metrado Total6.00

03.08.05PUERTA P-05 DE MADERA CAOBA TALLADAUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA APANELADA 1.20*2.751.001.00------------------1.00Metrado Total1.00

03.08.06PUERTA CONTRAPLACADA P-06UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA CONTRAPLACADA EN ESCALERA 0.75*2.33 M1.001.00------------------1.00Metrado Total1.00

03.08.07PUERTA CONTRAPLACADA P-07UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA CONTRAPLACADA EN ESCALERA 0.75*1.341.001.00------------------1.00Metrado Total1.00

03.08.08PUERTA CONTRAPLACADA P-08UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA CONTRAPLACADA 1.00*2.551.001.00------------------1.00Metrado Total1.00

03.08.09PUERTA CONTRAPLACADA P-09UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTA CONTRAPLACADA CONTRAPLACADA 0.80*2.551.001.00------------------1.00Metrado Total1.00

03.08.10MAMPARA P-10UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

MANPARA DE ALUMINIO CON EXTREMOS FIJOS Y PUERTAS CENTRALS CORREDISAS 3.55*2.55 M1.001.00------------------1.00Metrado Total1.00

03.08.11VENTANA DE MADERA V-01UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VENTANA DE MADERA CON PROTECCION DE FF 1.75*1.45,R=0.30M VERTICES1.0013.00------------------13.00Metrado Total13.00

03.08.12VENTANA DE MADERA V-02UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VENTANA DE MADERA CON PROTECCION DE FF 1.85*1.45,R=0.30M VERTICES1.001.00------------------1.00Metrado Total1.00

03.08.13VENTANA DE MADERA V-03UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VENTANA DE MADERA S/PROTECCION DE FF 1.15*0.301.004.00------------------4.00Metrado Total4.00

03.08.14VENTANA DE MADERA V-04UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VENTANA DE MADERA S/PROTECCION DE FF 1.15*1.45 M1.001.00------------------1.00Metrado Total1.00

03.08.15VENTANA DE MADERA V-05UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

VENTANA DE MADERA S/PROTECCION DE FF 1.50*1.45 M1.001.00------------------1.00Metrado Total1.00

03.09.00CERRAJERIA03.09.01CERRADURA DE 3 GOLPESUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

CERRADURA EN P-011.001.00------------------1.00CERRADURA EN P-051.001.00------------------1.00Metrado Total2.00

03.09.02CERRADURA P/PUERTA INTERIOR TIPO LIVIANAUNIDADpzaDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

P-021.005.00------------------5.00P-031.002.00------------------2.00P-041.006.00------------------6.00P-061.001.00------------------1.00P-071.001.00------------------1.00P-081.001.00------------------1.00P-091.001.00------------------1.00Metrado Total17.00

03.10.00PINTURA03.10.01PINTURA LATEX EN MUROS INTERIORES (2 MANOS)UNIDADm2DESCRIPCIONN ElemArea CadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE C1.0036.22---------------36.22EJE B1.0047.64---------------47.64EJE A1.0039.19---------------39.19EJE 61.0011.98---------------11.98EJE 51.0028.89---------------28.89EJE 41.0027.42---------------27.42EJE 31.0024.45---------------24.45EJE 21.0023.73---------------23.73EJE 11.0016.36---------------16.36SEGUNDO PISO0.00EJE C1.0037.92---------------37.92EJE B1.0011.59---------------11.59EJE A1.0031.75---------------31.75EJE 61.0017.40---------------17.40EJE 51.000.00---------------0.00EJE 41.000.00---------------0.00EJE 31.0017.68---------------17.68EJE 21.0019.48---------------19.48EJE 11.009.84---------------9.84Metrado Total401.54

03.10.02PINTURA LATEX EN CIELO RASO (2 MANOS)UNIDADm2DESCRIPCIONN ElemArea CadLargo (m)N VecesAlto (m)Metrado Parcial

DE PARTIDA 03.03.011.00109.16---------------109.16DE PARTIDA 03.03.021.00113.40---------------113.40Metrado Total222.56

03.10.03PINTURA LATEX EN MUROS EXTERIORES (2 MANOS)UNIDADm2DESCRIPCIONN ElemArea CadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOEJE C1.0020.91---------------20.91EJE A1.0036.04---------------36.04EJE 61.0011.17---------------11.17EJE 11.0015.29---------------15.29SEGUNDO PISOEJE C1.0023.99---------------23.99EJE A1.0030.52---------------30.52EJE 61.0018.11---------------18.11EJE 11.0014.96---------------14.96Metrado Total170.99

03.10.04PINTURA LATEX EN VIGAS Y COLUMNAS (2 MANOS)UNIDADm2DESCRIPCIONN ElemArea CadLargo (m)N VecesAlto (m)Metrado Parcial

PRIMER PISOEJE 61.005.38---------------5.38EJE 51.003.59---------------3.59EJE 41.003.63---------------3.63EJE 31.003.91---------------3.91EJE 21.004.00---------------4.00EJE 11.005.41---------------5.41SECCION C1.0012.23---------------12.23SECCION B1.008.21---------------8.21SECCION A1.0012.93---------------12.93SEGUNDO PISOEJE 61.006.86---------------6.86EJE 51.000.09---------------0.09EJE 41.000.09---------------0.09EJE 31.006.53---------------6.53EJE 21.006.46---------------6.46EJE 11.006.66---------------6.66SECCION C1.0015.75---------------15.75SECCION B1.006.26---------------6.26SECCION A1.0015.84---------------15.84Metrado Total123.83

03.10.05PINTURA LATEX EN DERRAMES (2 MANOS)UNIDADmDESCRIPCIONN ElemCantidadLargo (m)N VecesAlto (m)Metrado Parcial

DE PARTIDA 03.02.081.001.00217.94----------217.94Metrado Total217.94

03.11.00VIDRIOS, CRISTALES Y SIMILARES03.11.01VIDRIOS SEMIDOBLES INCOLOROUNIDADm2DESCRIPCIONFactorCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PUERTAS P-1 (1.75*2.55)1.001.001.75------0.500.92PUERTAS P-2 (1.00*2.75)1.005.001.00------0.502.63PUERTAS P-3 (0.80*2.75)1.002.000.80------0.500.84PUERTAS P-4 (1.80*0.75)1.006.000.75------0.502.36PUERTAS P-5 (1.50*2.75)1.001.001.50------0.500.79PUERTAS P-6 (0.75*2.33-TRAPEZOIDAL)1.001.000.75------0.300.24PUERTAS P-7 (0.75*1.34-TRAPEZOIDAL)1.001.000.75------0.300.24PUERTAS P-8 (1.00*2.55)1.001.001.00------0.300.32PUERTAS P-9 (0.80*2.55)1.001.000.80------0.300.25PUERTAS P-10 (3.55*2.55-MAMPARA)1.001.003.55------2.559.50VENTANAS V-1 (1.75*1.45,R=0.30M)1.0013.001.75------1.4534.64VENTANAS V-2 (1.85*1.45,R=0.30M)1.001.001.85------1.452.81VENTANAS V-3 (1.15*0.30)1.004.001.15------0.301.45VENTANAS V-4 (1.15*1.45)1.001.001.15------1.451.75VENTANAS V-5 (1.50*1.45)1.001.001.50------1.452.29Metrado Total61.04

03.11.02ESPEJOS PARA SS.HH.UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH PRIMER PISO10.762.000.70------0.7011.07SSHH SEGUNDO PISO10.762.000.70------0.7011.07Metrado Total22.13

03.12.00MOBILIARIO Y EQUIPAMIENTO03.12.01 MODULOS PARA COMPUTADORAUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

MODULOS PARA COMPUTADORAS MADERA1.004.00------------------4.00Metrado Total4.00

03.12.02 MOBILIARIO PARA OFICINAS DE LOCAL MUNICIPALUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

MESA Y ESTANTE1.006.00------------------6.00Metrado Total6.00

03.12.03 COMPUTADORA DE ESCRITORIOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

COMPUTADORA COREL I51.004.00------------------4.00Metrado Total4.00

03.12.04 SILLA DE MADERA TAPIZADOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SILLA PARA MOBILIARIIO DE OFICINA1.006.00------------------6.00Metrado Total6.00

03.12.05 PROYECTOR MULTIMEDIA - INCL. ECRANUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PROYECTOR MULTIMEDIA (ECRAN + PROYECTOR)1.001.00------------------1.00Metrado Total1.00

03.12.06 EQUIPO DE SONIDO SONY GENEZI 720WUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EQUIPO DE SONIDO INCLUYE MICROFONO1.001.00------------------1.00Metrado Total1.00

Pgina &P/8

INS.ELECTRICASUSTENTO DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LUGARPASHPAPROVINCIAHUARAZFECHAFEBRERO 2015DISTRITOTARICADTOANCASHITEMINS. ELECTRICA04.00.00INSTALACIONES ELECTRICAS04.01.00SALIDAS LUMINARIAS04.01.01SALIDA P/CENTRO DE LUZUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.001.00------------1.00REGISTRO CIVIL1.001.00------------1.00SSHH MASCULINO1.002.00------------2.00SSHH FEMENINO1.002.00------------2.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.001.00------------1.00GERENCIA1.001.00------------1.00HALL1.001.00------------1.00CORREDOR1.002.00------------2.00ALMACEN1.001.00------------1.00SEGUNDO PISOSERVICIOS PUBLICOS1.001.00------------1.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00ESCALERA1.001.00------------1.00Metrado Total18.0004.01.02SALIDA PARA BRAQUETUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SEGUNDO PISOAUDITORIO1.009.00------------9.00Metrado Total9.00

04.01.03SALIDA PARA SPOT-LIGHT C/PVCUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOPATIO1.001.00------------1.00SEGUNDO PISOHALL1.003.00------------3.00Metrado Total4.00

04.02.00SALIDAS DE TOMACORRIENTES04.02.01SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES C/PVCUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.003.00------------3.00REGISTRO CIVIL1.003.00------------3.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.003.00------------3.00GERENCIA1.003.00------------3.00CORREDOR1.004.00------------4.00ALMACEN1.002.00------------2.00SEGUNDO PISOSERVICIOS PUBLICOS1.003.00------------3.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00AUDITORIO1.008.00------------8.00Metrado Total35.00

04.03.00SALIDAS DE INTERRUPTORES04.03.01SALIDA PARA INTERRUPTOR SIMPLE C/PVCUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.001.00------------1.00REGISTRO CIVIL1.001.00------------1.00SSHH MASCULINO1.002.00------------2.00SSHH FEMENINO1.002.00------------2.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.001.00------------1.00GERENCIA1.001.00------------1.00HALL1.001.00------------1.00ALMACEN1.001.00------------1.00PATIO1.001.00------------1.00SEGUNDO PISOSERVICIOS PUBLICOS1.001.00------------1.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00ESCALERA1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00PASADISO1.001.00------------1.00Metrado Total19.00

04.03.02SALIDA PARA INTERRUPTOR TIPLE C/PVCUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SEGUNDO PISOAUDITORIO1.001.00------------1.00Metrado Total1.00

04.03.03SALIDA PARA INTERRUPTOR CONMUTACION C/PVCUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOCORREDOR1.001.00------------1.00Metrado Total1.00

04.04.00SALIDAS DE TABLEROS04.04.01SALIDA TABLERO GENERALUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOPASADISO HALL1.001.00------------1.00Metrado Total1.00

04.04.02SALIDA TABLERO DISTRIBUCIONUNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISO1.001.00------------1.00SEGUNDO PISO1.001.00------------1.00Metrado Total2.00

04.05.00ARTEFACTOS DE ALUMBRADO04.05.01FLUORECENTE CIRCULAR 22WUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.001.00------------1.00REGISTRO CIVIL1.001.00------------1.00SSHH MASCULINO1.002.00------------2.00SSHH FEMENINO1.002.00------------2.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.001.00------------1.00GERENCIA1.001.00------------1.00HALL1.001.00------------1.00CORREDOR1.002.00------------2.00ALMACEN1.001.00------------1.00SEGUNDO PISOSERVICIOS PUBLICOS1.001.00------------1.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00ESCALERA1.001.00------------1.00Metrado Total18.00

04.05.02FLUORECENTES 2x40 W INCLUYE BRAQUETUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SEGUNDO PISOAUDITORIO1.009.00------------9.00Metrado Total9.00

04.05.03SPOT - LIGHT 22WUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOPATIO1.001.00------------1.00SEGUNDO PISOHALL1.003.00------------3.00Metrado Total4.00

04.06.00TOMACORRIENTES04.06.01TOMACORRIENTE BIPOLAR DOBLE C/LNEA A TIERRAUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.003.00------------3.00REGISTRO CIVIL1.003.00------------3.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.003.00------------3.00GERENCIA1.003.00------------3.00CORREDOR1.004.00------------4.00ALMACEN1.002.00------------2.00SEGUNDO PISOSERVICIOS PUBLICOS1.003.00------------3.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00AUDITORIO1.008.00------------8.00Metrado Total35.00

04.07.00INTERRUPTORES04.07.01INTERRUPTOR UNIPOLAR SIMPLE UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOTESORERIA1.001.00------------1.00REGISTRO CIVIL1.001.00------------1.00SSHH MASCULINO1.002.00------------2.00SSHH FEMENINO1.002.00------------2.00DEPOSITO1.001.00------------1.00LIMPIEZA1.001.00------------1.00ALCALDIA1.001.00------------1.00GERENCIA1.001.00------------1.00HALL1.001.00------------1.00ALMACEN1.001.00------------1.00PATIO1.001.00------------1.00SEGUNDO PISOSERVICIOS PUBLICOS1.001.00------------1.00SSHH MASCULINO1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00ESCALERA1.001.00------------1.00SSHH FEMENINO1.001.00------------1.00PASADISO1.001.00------------1.00Metrado Total19.00

04.07.02INTERRUPTOR UNIPOLAR TRIPLEUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SEGUNDO PISOAUDITORIO1.001.00------------1.00Metrado Total1.00

04.07.03INTERRUPTOR DE COMMUTACION UNIPOLARUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOCORREDOR1.001.00------------1.00Metrado Total1.00

04.08.00TABLEROS DE CONTROL04.08.01TABLERO GENERALUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOPASADISO HALL1.001.00------------1.00Metrado Total1.00

04.08.02TABLERO DISTRIBUCION TIPO IUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISO1.001.00------------1.00SEGUNDO PISO1.001.00------------1.00Metrado Total2.00

04.09.00CONDUCTOS04.09.01TUBERIA PVC SAP (ELECTRICAS) =3/4"UNIDADmDESCRIPCIONN ElemFactorLargo (m)Ancho (m)Alto (m)Metrado Parcial

TOMACORRIENTESPRIMER PISO1.001.5050.68--------76.02SUBIDA22.001.500.50--------16.50SEGUNDO PISO1.001.5038.20--------57.30SUBIDA13.001.500.50--------9.75SPOT LIGHTPRIMER PISO1.001.501.00--------1.50BAJADA1.001.501.00--------1.50SEGUNDO PISO1.001.508.25--------12.38BAJADA1.001.501.00--------1.50BRAQUETSSEGUNDO PISO AUDITORIO1.001.5025.75--------38.63BAJADA1.001.501.00--------1.50CENTRO DE LUZ CIRCULARESPIMER PISO1.001.5057.35--------86.03BAJADA14.001.501.00--------21.00SEGUNDO PISO1.001.5022.00--------33.00BAJADA4.001.501.00--------6.00Metrado Total362.61

04.09.02TUBERIA PVC SAP (ELECTRICAS) =1"UNIDADmDESCRIPCIONN ElemFactorLargo (m)Ancho (m)Alto (m)Metrado Parcial

MEDIDOR - TG1.001.255.00--------6.25TG-TD11.001.252.00--------2.50TD1 -TD21.001.256.00--------7.50Metrado Total16.25

04.10.00CABLE ELECTRICO04.10.01CABLE ELECTRICO AWG TW 2,5 MM (14)UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

TOMACORRIENTESPRIMER PISO1.001.5050.68--------76.02SUBIDA22.001.500.50--------16.50SEGUNDO PISO1.001.5038.20--------57.30SUBIDA13.001.500.50--------9.75SPOT LIGHTPRIMER PISO1.001.501.00--------1.50BAJADA1.001.501.00--------1.50SEGUNDO PISO1.001.508.25--------12.38BAJADA1.001.501.00--------1.50BRAQUETSSEGUNDO PISO AUDITORIO1.001.5025.75--------38.63BAJADA1.001.501.00--------1.50CENTRO DE LUZ CIRCULARESPIMER PISO1.001.5057.35--------86.03BAJADA14.001.501.00--------21.00SEGUNDO PISO1.001.5022.00--------33.00BAJADA4.001.501.00--------6.00Metrado Total362.61

04.10.02CABLE ELECTRICO AWG TW 4.0 MM (12)UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

MEDIDOR - TG1.001.255.00--------6.25TG-TD11.001.252.00--------2.50TD1 -TD21.001.256.00--------7.50Metrado Total16.25

04.11.00SISTEMA DE PUESTA TIERRA04.11.01POZO DE CONEXIN A TIERRAUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

POZO DE TIERRA TERRAGEL INCLUYE ACCESORIOS1.001.00------------1.00Metrado Total1.00

Pgina &P/6

INS.SANITARIASUSTENTO DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LUGARPASHPAPROVINCIAHUARAZFECHAFEBRERO 2015DISTRITOTARICADTOANCASHITEMINS. SANITARIAS05.00.00INSTALACIONES SANITARIAS05.01.00SISTEMA DE AGUA FRIA05.01.01SALIDAS DE AGUA FRIA PVC-SAP 1/2" UNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOSSHH MASCULINO1.003.00------------------3.00SSHH FEMENINO1.002.00------------------2.00SEGUNDO PISOSSHH MASCULINO1.003.00------------------3.00SSHH FEMENINO1.003.00------------------3.00Metrado Total11.00

05.01.02TUBERIA DISTRIBUCION PVC-SAP DE 1/2"UNIDADmDESCRIPCIONN ElemFactorLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOSSHH MASCULINO1.001.259.85------------12.31SSHH FEMENINO1.001.255.25------------6.56SEGUNDO PISOSSHH MASCULINO1.001.257.54------------9.43SSHH FEMENINO1.001.257.54------------9.43Metrado Total37.73

05.01.03TUBERIA DISTRIBUCION PRINCIAL PVC-SAP DE 3/4" UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISORED DISTRIBUCION1.001.258.35------------10.96MONTANTE1.001.254.00------------5.25SEGUNDO PISORED DISTRIBUCION1.001.252.85------------3.74Metrado Total19.95

05.01.04CAJA DE REGISTRO DE 12" X 12" UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

CAJA DE MEDIDOR PREFABRICADO,INCLUYE TAPA1.001.001.00------------1.00Metrado Total1.00

05.01.05VALVULA COMPUERTA ESFERICA DE BRONCE ROSCADA DE 1/2" UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00------------------2.00SSHH-SEGUNDO PISO1.002.00------------------2.00Metrado Total4.00

05.01.06VALVULA COMPUERTA ESFERICA DE BRONCE ROSCADA DE 3/4" UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EN CAJA MEDIDOR - MEDIDOR1.001.00------------------1.00Metrado Total1.00

05.01.07TUBO FG AHUECADO DE 1/2" PARA URINARIOSUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH MASCULINO - PRIMER PISO4.001.0047.700.200.3012.02Metrado Total12.02

05.02.00SISTEMA DE DESAGUE05.02.01SALIDA DE DESAGUE EN PVC DE 4"UNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOSSHH VARONES1.001.00---------------1.00SSHH MUJERES1.001.00---------------1.00SEGUNDO PISOSSHH VARONES1.002.00---------------2.00SSHH MUJERES1.002.00---------------2.00Metrado Total6.00

05.02.02SALIDA DE DESAGUE EN PVC DE 2"UNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOSSHH VARONES1.004.00---------------4.00SSHH MUJERES1.003.00---------------3.00SEGUNDO PISOSSHH VARONES1.002.00---------------2.00SSHH MUJERES1.002.00---------------2.00Metrado Total11.00

05.02.03SALIDA DE VENTILACION C/TUB. PVC-SAL 2"UNIDADptoDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISO1.001.00---------------1.00SEGUNDO PISO1.002.00---------------2.00Metrado Total3.00

05.02.04RED DE DERIVACION TUBERIA PVC - SAL 4"UNIDADmDESCRIPCIONN ElemFactorLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISORED PRINCIPAL1.001.2512.95----------16.19MONTANTE4.001.253.00----------15.00EXTERIORES1.001.2512.30----------15.38SEGUNDO PISOSSHH VARONES1.001.252.25----------2.81SSHH MUJERES1.001.252.25----------2.81Metrado Total52.19

05.02.05RED DE DERIVACION TUBERIA PVC - SAL 2"UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMER PISOLAVADEROS2.001.251.25----------3.13SUMIDERO2.001.252.00----------5.00VENTILACION1.001.256.00----------7.50SEGUNDO PISOLAVADEROS2.001.251.25----------3.13VENTILACION2.001.254.00----------10.00Metrado Total28.76

05.02.06REGISTRO ROSCADO DE BRONCE 4"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00Metrado Total2.00

05.02.07SUMIDERO ROSCADO DE BRONCE 2"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.003.00---------------3.00SSHH - SEGUNDO PISO1.002.00---------------2.00Metrado Total5.00

05.02.08CAJA DE REGISTRO DE DESAGUE 12" X 24".UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PRIMERO PISO1.001.00---------------1.00Metrado Total1.00

05.03.00APARATOS SANITARIOS Y ACCESORIOS05.03.01INODORO DE TANQUE BAJO C/ACCESORIOSUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.004.00---------------4.00Metrado Total6.00

05.03.02LAVATORIOS DE PARED C/PEDESTAL UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.002.00---------------2.00Metrado Total4.00

05.03.03PAPELERA DE LOSA DE COLOR DE 15 X 15 cmUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.004.00---------------4.00Metrado Total6.00

05.03.04JABONERAS DE LOSA COLOR CON ASA DE 15 X 15 cmUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.002.00---------------2.00Metrado Total4.00

05.03.05TOALLERA DE PLASTICO 24" DE COLORUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.002.00---------------2.00Metrado Total4.00

05.03.06TACHO PARA BASURA PLASTICOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SSHH - PRIMER PISO1.002.00---------------2.00SSHH - SEGUNDO PISO1.002.00---------------2.00Metrado Total4.00

05.04.00SISTEMA DE DRENAJE PLUVIAL05.04.01CANAL SEMICIRCULAR PLANCHA GALVANIZADA D=6"UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A-A1.001.0018.50----------18.50EJE C-C1.001.0018.50----------18.50Metrado Total37.00

05.04.02SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 4"-6"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A-A1.0023.00---------------23.00EJE C-C1.0023.00---------------23.00Metrado Total46.0005.04.03MONTANTE - TUBERIA PVC SAL 4"UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A-A1.002.007.25----------14.50EJE C-C1.002.007.25----------14.50Metrado Total29.0005.04.04ABRAZADERA METALICA D=4"UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A-A2.007.00---------------14.00EJE C-C2.007.00---------------14.00Metrado Total28.0005.04.05MURETE DE SUGECION H=1.50UNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE A-A1.002.00---------------2.00EJE C-C1.002.00---------------2.00Metrado Total4.00

Pgina &P/10

OBRAS_EXTSUSTENTO DE METRADOSPROYECTO"INSTALACION DEL LOCAL MUNICIPAL DEL CENTRO POBLADO DE PASHPA, DISTRITO DE TARICA - HUARAZ - ANCASH"

LUGARPASHPAPROVINCIAHUARAZFECHAFEBRERO 2015DISTRITOTARICADTOANCASHITEMOBRAS EXTERIORES06.00.00OBRAS EXTERIORES06.01.00SARDINEL06.01.01LIMPIEZA DEL TERRENO MANUALUNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

LIMPIEZA DE TERRENO SEGN UBICACIN DE CADA MANANTIAL EN SU RESPECTIVO SECTOLIMPIEZADE TERRENO MANUAL1.001.00122.450.50-61.23Metrado Total61.23

06.01.02TRAZO, NIVELACION Y REPLANTEO (EDIFIC)UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

LIMPIEZA DE TERRENO SEGN UBICACIN DE CADA MANANTIAL EN SU RESPECTIVO SECTOLIMPIEZADE TERRENO MANUAL1.001.00122.450.50-61.23Metrado Total61.23

06.01.03 EXCAVACION DE ZANJA P/SARDINELUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EXCACIONES1.001.00122.450.250.257.65Metrado Total7.6506.01.04 ENCOFRADO Y DESENCOFRADO DE SARDINELUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SARDINELEJE-A-A1.001.0029.56--------29.56EJE-C-C1.001.0022.07--------22.07EJE 1-61.001.009.58--------9.58EJE 1-61.001.0061.21--------61.21Metrado Total122.42

06.01.05 SARDINELES DE CONCRETO DE F'C=175 KG/CM2.UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SARDINELEJE-A-A1.001.0029.560.150.301.33EJE-C-C1.001.0022.070.150.300.99EJE 1-61.001.009.580.150.300.43EJE 1-61.001.0061.210.150.302.75Metrado Total5.78

06.01.06JUNTAS ASFALTICAS 1"X1"UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SARDINELEJE-A-A1.0010.000.75--------7.50EJE-C-C1.007.000.75--------5.25EJE 1-61.003.000.75--------2.25EJE 1-61.0020.000.75--------15.00Metrado Total37.50

06.01.07PINTURA ESMALTE SINTETICOUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

SARDINELEJE-A-A1.002.0029.560.75----44.34EJE-C-C1.002.0022.070.75----33.11EJE 1-61.002.009.580.75----14.37EJE 1-61.002.0061.210.75----91.82Metrado Total183.64

06.02.00VEREDAS 06.02.01 EXCAVACION DE ZANJA P/DENTELLONUNIDADm3DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE C1.002.0019.001.000.103.80EJE 6 (ENTRE C/A)1.002.008.000.500.100.80EJE 1 (ENTRE C/A)1.001.008.000.500.100.40EJE A (ENTRE C/A)1.001.008.000.500.100.40Metrado Total5.67

06.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDASUNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE C1.001.0019.00----------19.00EJE 6 (ENTRE C/A)1.001.008.00----------8.00EJE 1 (ENTRE C/A)1.001.008.00----------8.00EJE A (ENTRE C/A)1.001.0019.00----------19.00Metrado Total56.7006.02.03VEREDA DE CONCRETO DE F'C=175 KG/CM2.UNIDADm2DESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE C1.001.0019.001.000.152.85EJE 6 (ENTRE C/A)1.001.008.000.500.150.60EJE 1 (ENTRE C/A)1.001.008.000.500.150.60EJE A (ENTRE C/A)1.001.008.000.500.150.60Metrado Total4.88

06.02.04JUNTAS ASFALTICAS 1"X1"UNIDADmDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

EJE C1.007.001.00----------7.00EJE 6 (ENTRE C/A)1.003.000.50----------1.50EJE 1 (ENTRE C/A)1.003.000.50----------1.50EJE A (ENTRE C/A)1.003.000.50----------1.50Metrado Total12.08

06.03.00JARDINERIA Y OTROS06.03.01 PLANTAS ORNAMENTALESUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial

PLANTAS ORNAMENTALES1.005.001.001.001.005.00Metrado Total5.00

06.03.02 TACHOS PARA BASURERO PLASTICOUNIDADunidadDESCRIPCIONN ElemCantidadLargo (m)Ancho (m)Alto (m)Metrado Parcial