Perfil Tacsanamayo Rev. 2

download Perfil Tacsanamayo Rev. 2

of 3

Transcript of Perfil Tacsanamayo Rev. 2

  • 7/24/2019 Perfil Tacsanamayo Rev. 2

    1/3

    02.01 OBRAS PRELIMINARES6,207.88

    02.01.01 TRAZO Y REPLANTEO PRELIMINAR km 2.20 593.931,306.65

    02.01.02 LIMPIEZA DE TERRENO MANUAL m2 4,538.18 1.084,901.23

    02.02 MOVIMIENTO DE TIERRAS 140,290.5102.02.01 EXCAVACION DE ZANA! CON E"UIPO m3 5,451.08 9.33

    50,858.5802.02.02 RELLENO CON MATERIAL PROPIO Y COMPACTADO m3 1,545.45 5#.5#

    88,9#1.5602.02.03 ELIMINACION DE MATERIAL EXCEDENTE $ MA"UINA m3 41.40 11.12

    460.3#02.03 CONCRETO ARMADO 898,617.2102.03.01 CANAL DE CONCRETO ARMADO 263,237.0702.03.01.01 CONCRETO %&'(1#5)*+'m2 m3 649.1# 334.84

    21#,368.0802.03.01.02 CERCA! m2 162.44 #6.69

    12,45#.5202.03.01.03 ACERO %-( 4200 k*+'m2 RADO 60 k* 5,432.#6 6.15

    33,411.4#02.03.02 TAPA PARA CANAL 613,212.2602.03.02.01 CONCRETO %&'(210 k*+'m2 m3 1,184.43 396.64

    469,#92.3202.03.02.02 ENCO/RADO Y DE!ENCO/RADO m2 3,325.52 42.28

    140,602.9902.03.02.03 ACERO %-( 4200 k*+'m2 RADO 60 k* 458.04 6.15

    2,816.9502.03.03 TAPA PARA DESCOLMATACION DEL CANAL 22,167.8802.03.03.01 CONCRETO %&'(210 k*+'m2 m3 40.00 396.64

    15,865.6002.03.03.02 ENCO/RADO Y DE!ENCO/RADO m2 #0.00 42.28

    2,959.60

    02.03.03.03 ACERO %-( 4200 k*+'m2 RADO 60 k* 3#.## 6.15232.29

    02.03.03.04 UNTA ATER !TOP m 1,083.#6 2.8#3,110.39

    02.04 MUROS DE CONTENCION 566,770.7202.04.01 ZAPATAS 105,346.4902.04.01.01 EXCAVAC. DE ZANA CON MA"UINARIA EN TERRENO m 301.1# 8.28

    2,493.69CONLOMERADO A!TA 2.50 M

    02.04.01.02 CONCRETO %&'(1#5)*+'m2 PARA ZAPATAZ m3 30#.1# 334.84102,852.80

    02.04.02 PLACAS 195,470.85

    02.04.02.01 CONCRETO %&'(210 )*+'m2, MURO DE CONTENCION m3 3#5.35 396.64148,8#8.8202.04.02.02 ENCO/RADO Y DE!ENCO/RADO DE MURO! DE m2 616.50 42.28

    26,065.62CONTENCION

    02.04.02.03 ACERO DE RE/UERZO %-(4,200 k*+'m2 k* 3,502.80 5.8620,526.41

    02.04.03 ENROCADO 22,706.5402.04.03.01 EXCAVACION DE UA PARA CIMENTACION m3 3,125.6# 6.62

    20,691.9402.04.03.02 PER/ILADO Y ACAADO DE TALUD m2 58.53 34.42

  • 7/24/2019 Perfil Tacsanamayo Rev. 2

    2/3

    2,014.6002.04.04 ENROCADO DE PROTECCION 211,920.4302.04.04.01 !ELECCION Y ACOPIO DE ROCA NATURAL m3 3,125.6# 4#.#9

    149,3#5.##02.04.04.02 ACOMODO DE ROCA EN UA DE DI"UE m3 3,125.6# 20.01

    62,544.6602.04.05 ESCALERAS 18,557.39

    02.04.05.01 !OLADO DE 4 MEZCLA 112 CEMENTOORMION m2 2.50 194.69486.#302.04.05.02 CONCRETO %&'(210 k*+'m2 m3 20.60 396.64

    8,1#0.#802.04.05.03 ENCO/RADO Y DE!ENCO/RADO m2 12.#9 42.28

    540.#602.04.05.04 ACERO DE RE/UERZO %-(4,200 k*+'m2 k* 1,59#.12 5.86

    9,359.1202.04.06 PASARELA 12,769.0202.04.06.01 EXCAVACION DE ZANA EN LO! APOYO! m3 8.00 29.43

    235.4402.04.06.02 CONCRETO %&'(1#5)*+'m2 m3 16.00 334.84

    5,35#.44

    02.04.06.03 !OLADO (3 m2 2.00 213.8042#.60

    02.04.06.04 CONCRETO %&'(210 k*+'m2 m3 11.20 396.644,442.3#

    02.04.06.05 ENCO/RADO Y DE!ENCO/RADO m2 33.60 42.281,420.61

    02.04.06.06 ACERO DE RE/UERZO %-(4,200 k*+'m2 k* 151.12 5.86885.56

    MEORAMIENTO DE LAS CONDICIONES PAISAISTICAS ! MEDIOAMBIENTALES DE LA "UEBRADA DE

    TACSANAMA!O EN EL DISTRITO DE PU"UIO, PROVINCIA DE LUCANAS #A!ACUC$O%

  • 7/24/2019 Perfil Tacsanamayo Rev. 2

    3/3

    MUNICIPALIDAD PROVINCIAL DE LUCANAS PUQUIO

    COSTO DIRECTO

    3,075,291.97

    GASTOS GENERALES (10.0000%)

    307,529.20

    UTILIDAD (5.0000%)

    153,764.60

    SUBTOTAL

    3,536,585.77

    IGV (18.0000%)

    636,585.44

    PRESUPUESTO TOTAL

    4,173,171.21