PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10...

12
1100 DEMOLICION Y RETIROS 1101 Demolición techo F°C° m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1102 Demolición techo H°G° m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1103 Demolición mamposteria elev. m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1104 Demolición de pavimentos m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1105 Demolición tabique esp. 0,10 m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1106 Demolición rampas de H°A° m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1107 Demolición de piso de mosaicos m 2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043 1108 Demolición contrapiso de Hormigón de cemento m 2 8,1111 8,1111 8,7633 8,7633 9,2705 9,2705 9,2705 9,6329 9,6329 9,6329 9,6329 10,3043 1109 Retiro de aberturas hasta 2.50 m2 un 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1110 Picado de revoques (enluc. y jaharro) m 2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043 1111 Demolición de losa H°A° m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1112 Demolición piso cemento alisado m 2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043 1113 Rasqueteo de cielorrasos a la cal m 2 7,2152 7,2152 7,7848 7,7848 8,1519 8,1519 8,1519 8,4177 8,4177 8,4177 8,4177 8,9114 1114 Rasqueteo y cepillado de paredes m 2 7,1045 7,1045 7,6716 7,6716 8,0149 8,0149 8,0149 8,2687 8,2687 8,2687 8,2687 8,7313 1115 Retiro de aberturas > 2.50 m2 un 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1116 Picado de mamposteria m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1117 Picado de enlucido m 2 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241 1118 Demolición techo de tejas m 2 8,1141 8,1141 8,7663 8,7663 9,2717 9,2717 9,2717 9,6359 9,6359 9,6359 9,6359 10,3043 1119 Limp. de cub. c/ retiro asf. y brea m 2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775 1120 Limp. y neutraliz. c/ácido muriático m 2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043 1121 Demolición de revest. de azulejos m 2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775 1122 Demolición antepecho granito reconst. m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1123 Demolición cerco alambr. hasta 1.6m de h. ml 8,2778 8,2778 8,9444 8,9444 9,5000 9,5000 9,5000 9,8333 9,8333 9,8333 9,8333 10,5556 1124 Demolición escalera de H°A° m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1125 Demolición columnas H°A°incl.apuntal. m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1126 Demolición vigas H°A°incl. apuntalam. m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1127 Demolición losas H°A°incl. apuntalam. m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1128 Demolición losa cerámica incl. apuntal. m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1129 Demolición mesada H°A° m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1130 Demolición cerco placas H°A°y pilares m 2 8,1154 8,1154 8,7692 8,7692 9,2722 9,2722 9,2722 9,6391 9,6391 9,6391 9,6391 10,3077 1131 Demolición cimiento mamp.lad.comunes m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1132 Demolición zapata y base de H°s/armar m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1133 Demolición zapata y base de H°A° m 3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1134 Demolición cielorraso metal despleg. m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1135 Demolición piso de lajas Mercedes m 2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043 1136 Demolición piso madera Parquet o similar m 2 8,1159 8,1159 8,7681 8,7681 9,2754 9,2754 9,2754 9,6377 9,6377 9,6377 9,6377 10,3043 1137 Demolición contrapiso Hormigón pobre m 2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1138 Demolición escalones de mármol en esc. m 2 8,1118 8,1118 8,7640 8,7640 9,2671 9,2671 9,2671 9,6335 9,6335 9,6335 9,6335 10,3043 1139 Demolición zócalos calcáreos,granít.o simil.. ml 8,1087 8,1087 8,7609 8,7609 9,2609 9,2609 9,2609 9,6304 9,6304 9,6304 9,6304 10,3043 1140 Demolición zócalos y guardacantos madera ml 8,1304 8,1304 8,7826 8,7826 9,2609 9,2609 9,2609 9,6522 9,6522 9,6522 9,6522 10,3043 1141 Demolición mesada c/pileta y accesorios c/u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1142 Retiro artefactos sanitarios c/u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043 1143 Retiro de cabriadas c/u 8,2630 8,2630 8,9026 8,9026 9,4314 9,4314 9,4314 9,8136 9,8136 9,8136 9,8136 10,4976 1144 Demolición cielorraso de madera m 2 8,1123 8,1123 8,7645 8,7645 9,2681 9,2681 9,2681 9,6341 9,6341 9,6341 9,6341 10,3043 1145 Demolición cielorraso metálico m 2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775 1146 Retiro de zinguería-limatones ml 8,1951 8,1951 8,8537 8,8537 9,3659 9,3659 9,3659 9,7317 9,7317 9,7317 9,7317 10,4146 1147 Retiro de canaletas y bajadas de H°G° ml 8,0000 8,0000 8,6429 8,6429 9,1429 9,1429 9,1429 9,5000 9,5000 9,5000 9,5000 10,1429 jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10 DPO Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 1 de 12 www.dpo.gov.ar - [email protected]

Transcript of PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10...

Page 1: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

1100 DEMOLICION Y RETIROS

1101 Demolición techo F°C° m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1102 Demolición techo H°G° m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1103 Demolición mamposteria elev. m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1104 Demolición de pavimentos m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1105 Demolición tabique esp. 0,10 m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1106 Demolición rampas de H°A° m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1107 Demolición de piso de mosaicos m2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043

1108 Demolición contrapiso de Hormigón de cemento m2 8,1111 8,1111 8,7633 8,7633 9,2705 9,2705 9,2705 9,6329 9,6329 9,6329 9,6329 10,3043

1109 Retiro de aberturas hasta 2.50 m2 un 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1110 Picado de revoques (enluc. y jaharro) m2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043

1111 Demolición de losa H°A° m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1112 Demolición piso cemento alisado m2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043

1113 Rasqueteo de cielorrasos a la cal m2 7,2152 7,2152 7,7848 7,7848 8,1519 8,1519 8,1519 8,4177 8,4177 8,4177 8,4177 8,9114

1114 Rasqueteo y cepillado de paredes m2 7,1045 7,1045 7,6716 7,6716 8,0149 8,0149 8,0149 8,2687 8,2687 8,2687 8,2687 8,7313

1115 Retiro de aberturas > 2.50 m2 un 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1116 Picado de mamposteria m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1117 Picado de enlucido m2 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241

1118 Demolición techo de tejas m2 8,1141 8,1141 8,7663 8,7663 9,2717 9,2717 9,2717 9,6359 9,6359 9,6359 9,6359 10,3043

1119 Limp. de cub. c/ retiro asf. y brea m2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775

1120 Limp. y neutraliz. c/ácido muriático m2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043

1121 Demolición de revest. de azulejos m2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775

1122 Demolición antepecho granito reconst. m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1123 Demolición cerco alambr. hasta 1.6m de h. ml 8,2778 8,2778 8,9444 8,9444 9,5000 9,5000 9,5000 9,8333 9,8333 9,8333 9,8333 10,5556

1124 Demolición escalera de H°A° m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1125 Demolición columnas H°A°incl.apuntal. m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1126 Demolición vigas H°A°incl. apuntalam. m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1127 Demolición losas H°A°incl. apuntalam. m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1128 Demolición losa cerámica incl. apuntal. m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1129 Demolición mesada H°A° m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1130 Demolición cerco placas H°A°y pilares m2 8,1154 8,1154 8,7692 8,7692 9,2722 9,2722 9,2722 9,6391 9,6391 9,6391 9,6391 10,3077

1131 Demolición cimiento mamp.lad.comunes m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1132 Demolición zapata y base de H°s/armar m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1133 Demolición zapata y base de H°A° m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1134 Demolición cielorraso metal despleg. m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1135 Demolición piso de lajas Mercedes m2 8,1087 8,1087 8,7609 8,7609 9,2717 9,2717 9,2717 9,6304 9,6304 9,6304 9,6304 10,3043

1136 Demolición piso madera Parquet o similar m2 8,1159 8,1159 8,7681 8,7681 9,2754 9,2754 9,2754 9,6377 9,6377 9,6377 9,6377 10,3043

1137 Demolición contrapiso Hormigón pobre m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1138 Demolición escalones de mármol en esc. m2 8,1118 8,1118 8,7640 8,7640 9,2671 9,2671 9,2671 9,6335 9,6335 9,6335 9,6335 10,3043

1139 Demolición zócalos calcáreos,granít.o simil.. ml 8,1087 8,1087 8,7609 8,7609 9,2609 9,2609 9,2609 9,6304 9,6304 9,6304 9,6304 10,3043

1140 Demolición zócalos y guardacantos madera ml 8,1304 8,1304 8,7826 8,7826 9,2609 9,2609 9,2609 9,6522 9,6522 9,6522 9,6522 10,3043

1141 Demolición mesada c/pileta y accesorios c/u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1142 Retiro artefactos sanitarios c/u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1143 Retiro de cabriadas c/u 8,2630 8,2630 8,9026 8,9026 9,4314 9,4314 9,4314 9,8136 9,8136 9,8136 9,8136 10,4976

1144 Demolición cielorraso de madera m2 8,1123 8,1123 8,7645 8,7645 9,2681 9,2681 9,2681 9,6341 9,6341 9,6341 9,6341 10,3043

1145 Demolición cielorraso metálico m2 8,0925 8,0925 8,7399 8,7399 9,2428 9,2428 9,2428 9,6069 9,6069 9,6069 9,6069 10,2775

1146 Retiro de zinguería-limatones ml 8,1951 8,1951 8,8537 8,8537 9,3659 9,3659 9,3659 9,7317 9,7317 9,7317 9,7317 10,4146

1147 Retiro de canaletas y bajadas de H°G° ml 8,0000 8,0000 8,6429 8,6429 9,1429 9,1429 9,1429 9,5000 9,5000 9,5000 9,5000 10,1429

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 1 de 12 www.dpo.gov.ar - [email protected]

Page 2: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

1148 Extracción de arboles a mano con hacha y machetes u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1149 Desmalezamiento de cubierta revestida con cerámica gl 6,7279 6,7279 7,0989 7,0989 7,3852 7,3852 7,3852 7,5936 7,5936 7,5936 7,5936 7,9753

1150 Limp. desobs. Caños de desag. , fijación, limp. de cámara u 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1151 Limp. de paramentos C/hidrolavadora m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1152 Retiro de vidrios m2 8,1159 8,1159 8,7681 8,7681 9,2754 9,2754 9,2754 9,6377 9,6377 9,6377 9,6377 10,3043

1153 Limp. desobs. Caños de desag. ml 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241

1155 Retiro de columna de madera gl 8,1127 8,1127 8,7649 8,7649 9,2689 9,2689 9,2689 9,6345 9,6345 9,6345 9,6345 10,3043

1156 Limpieza de aberturas c/ removedor m2 8,0489 8,6304 8,8967 8,8967 9,0870 9,0870 9,0870 9,2228 9,2228 9,2228 9,2228 9,4728

1157 Rasqueteo de aberturas m2 7,4561 7,4561 8,0526 8,0526 8,4561 8,4561 8,4561 8,7544 8,7544 8,7544 8,7544 9,2982

1159 Retiro de membrana y carpeta de nivelación m2 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241

1163 Recolocación de adoquines m2 8,4419 8,4419 9,0664 9,0664 9,6245 9,6245 9,6245 10,0270 10,0270 10,0270 10,0270 10,7282

1164 Corte de árboles con motosierra y transporte un 7,4739 7,4812 7,9082 8,0032 8,3532 8,4123 8,4184 8,6575 8,6575 8,6641 8,6754 9,0901

1166 Demolición Cerco, tejido, placas H°A°y pilar intermedio m2 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1167 Retiro de cableado en inst. electr. comp. Etc. En desuso m2 8,4792 8,4792 9,1042 9,1042 9,6667 9,6667 9,6667 10,0833 10,0833 10,0833 10,0833 10,7708

1168 Demolicion y retiro baranda H°G° ml 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241

1169 Limpieza y desobstrucción de canaletas de HºGº ml 8,1304 8,1304 8,7826 8,7826 9,2609 9,2609 9,2609 9,6522 9,6522 9,6522 9,6522 10,3043

1170 Limpieza y desobstrucción de caños de bajada pluvial ml 8,1159 8,1159 8,7681 8,7681 9,2754 9,2754 9,2754 9,6377 9,6377 9,6377 9,6377 10,3043

1171 Retiro de rejas de cerco perimetral - H = 1.80m ml 8,1159 8,1159 8,7681 8,7681 9,2754 9,2754 9,2754 9,6377 9,6377 9,6377 9,6377 10,3043

1172 Demolición cordon de ladrillos ml 8,1951 8,1951 8,8537 8,8537 9,3659 9,3659 9,3659 9,7317 9,7317 9,7317 9,7317 10,4146

1174 Fumigación m2 8,7143 8,7143 9,2857 9,2857 10,0000 10,0000 10,0000 10,2857 10,2857 10,2857 10,2857 11,1429

1175 Demolición cielorraso de placas m2 8,0517 8,0517 8,6897 8,6897 9,1897 9,1897 9,1897 9,5517 9,5517 9,5517 9,5517 10,2241

1176 Demolición cielorraso aplicado m2 8,1159 8,1159 8,7681 8,7681 9,2681 9,2681 9,2681 9,6377 9,6377 9,6377 9,6377 10,3043

1200 MOVIMIENTO DE SUELOS

1201 Limp.terreno c/extrac.arboles/maleza m2 8,1118 8,1118 8,7640 8,7640 9,2671 9,2671 9,2671 9,6335 9,6335 9,6335 9,6335 10,3043

1202 Desmonte y nivelación m3 8,1068 8,1068 8,7593 8,7593 9,2635 9,2635 9,2635 9,6282 9,6282 9,6282 9,6282 10,2977

1203 Terraplenes y nivelación c/compactación a pisón manual m3 8,1051 8,1051 8,7556 8,7556 9,2606 9,2606 9,2606 9,6242 9,6242 9,6242 9,6242 10,2949

1204 Sub-Base para pavimento articulado m3 6,2530 6,2530 6,4952 6,4952 6,6921 6,6921 6,6921 6,8342 6,8891 6,8891 6,8891 7,2960

1205 Retiro de tierra hasta 100 m m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1206 Carga manual s/camión m3 8,1111 8,1111 8,7633 8,7633 9,2705 9,2705 9,2705 9,6329 9,6329 9,6329 9,6329 10,3043

1207 Excavación de zanjas m3 8,1125 8,1125 8,7647 8,7647 9,2698 9,2698 9,2698 9,6343 9,6343 9,6343 9,6343 10,3043

1208 Excavación p/base m3 8,1132 8,1132 8,7654 8,7654 9,2699 9,2699 9,2699 9,6349 9,6349 9,6349 9,6349 10,3043

1209 Excav. p/pilotines (suelo normal) m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1210 Excavación de sótanos m3 8,1124 8,1124 8,7646 8,7646 9,2699 9,2699 9,2699 9,6342 9,6342 9,6342 9,6342 10,3043

1211 Excavación de pozos (8 m prof.) m3 8,1130 8,1130 8,7652 8,7652 9,2696 9,2696 9,2696 9,6348 9,6348 9,6348 9,6348 10,3043

1212 Relleno de arena m3 7,8366 7,8366 8,2320 8,2320 8,3584 8,3584 8,3584 8,4499 8,4499 8,4499 8,4499 8,7386

1213 Relleno de cascotes de ladrillos m3 3,4243 3,4671 3,7451 3,7451 3,8121 3,8121 3,8121 3,8607 3,9855 3,9855 3,9855 4,1289

1214 Compactación especial manual a máquina C/transporte de tierra m3 7,1899 7,2025 7,4367 7,6139 7,8639 7,9778 7,9873 8,1329 8,1329 8,1329 8,1519 8,3797

1217 Cama de arena y ladrillos m2 7,6553 7,6553 8,2696 8,3447 8,8089 8,8805 8,8089 9,0956 9,1263 9,1468 9,1468 9,6860

2100 HORMIGON ARMADO

2101 HºAº p/Zapata o base de columna de HºAº m3 6,9206 6,9520 7,2240 7,2240 7,4320 7,4670 7,5601 7,7212 7,7599 7,7599 7,7599 8,1197

2102 HºAº p/Fustes para columnas no a la vista m3 7,1669 7,1943 7,5251 7,5251 7,7620 7,8017 7,9072 8,0911 8,1203 8,1203 8,1203 8,4906

2103 HºAº p/Vigas de Fundación m3 7,3669 7,3891 7,7604 7,7604 8,0613 8,0891 8,1632 8,3891 8,4171 8,4171 8,4171 8,8566

2104 HºAº p/Columnas simples no a la vista m3 7,1669 7,1943 7,5251 7,5251 7,7620 7,8017 7,9072 8,0911 8,1203 8,1203 8,1203 8,4906

2105 HºAº p/Columnas simples a la vista m3 7,1842 7,2113 7,5457 7,5457 7,7868 7,8260 7,9303 8,1169 8,1458 8,1458 8,1458 8,5204

2106 HºAº p/Vigas no a la vista m3 7,3190 7,3504 7,6658 7,6658 7,9044 7,9566 8,0957 8,2851 8,3066 8,3066 8,3066 8,6653

2107 HºAº p/Vigas a la vista m3 7,3589 7,3891 7,7158 7,7158 7,9660 8,0163 8,1503 8,3474 8,3681 8,3681 8,3681 8,7392

2108 HºAº p/Losas nervuradas simples m3 7,2689 7,2921 7,6635 7,6635 7,9402 7,9717 8,0553 8,2653 8,2973 8,2973 8,2973 8,7018

2109 HºAº p/Losas simples a la vista m3 7,2633 7,2856 7,6576 7,6576 7,9283 7,9624 8,0533 8,2597 8,2880 8,2880 8,2880 8,6869

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 2 de 12 www.dpo.gov.ar - [email protected]

Page 3: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

2110 HºAº p/Losas simples no a la vista m3 7,1911 7,2145 7,5746 7,5746 7,8286 7,8645 7,9600 8,1549 8,1846 8,1846 8,1846 8,5670

2111 HºAº p/Losas nervuradas cruzadas m3 7,3219 7,3459 7,7152 7,7152 7,9961 8,0297 8,1191 8,3328 8,3625 8,3625 8,3625 8,7698

2112Losas de viguetas pretensadas - Sobrecarga: 200 kg/m2 -

Luz máxima= 4,00m - Viguetas tipo Tensolite o similarm

2 6,6892 6,6947 7,0771 7,0771 7,4041 7,4145 7,4185 7,6499 7,7031 7,7031 7,7031 8,1398

2113Losas de viguetas pretensadas (Serie E) - Sobrecarga: 350 kg/m2 -

Luz máxima= 7,20 m - Viguetas tipo Tensolite o similarm

2 6,4494 6,4550 6,7648 6,7648 7,0289 7,0394 7,0405 7,2260 7,3038 7,3038 7,3038 7,6752

2114 HºAº p/Barandas a la vista m3 7,4735 7,4915 7,9092 7,9092 8,2300 8,2558 8,3243 8,5639 8,5878 8,5878 8,5878 9,0435

2115 HºAº p/Tanque rectangular a la vista m3 7,5178 7,5379 7,9443 7,9443 8,2674 8,2977 8,3782 8,6211 8,6424 8,6424 8,6424 9,0975

2116 HºAº p/Cordones ml 7,2189 7,2374 7,6022 7,6022 7,8861 7,9134 7,9856 8,1989 8,2302 8,2302 8,2302 8,6512

2117 HºAº p/Cordon cuneta c/encofrado de madera ml 6,7256 6,7621 7,0764 7,0764 7,2572 7,2799 7,3392 7,4770 7,5354 7,5354 7,5354 7,8532

2118 HºAº p/Escaleras a la vista:losa y escalones m3 7,6027 7,6179 8,0563 8,0563 8,4170 8,4368 8,4895 8,7559 8,7789 8,7789 8,7789 9,2751

2119 HºAº p/Escaleras no a la vista:losa y escalon m3 7,5619 7,5785 8,0079 8,0079 8,3604 8,3813 8,4371 8,6980 8,7223 8,7223 8,7223 9,2102

2120 HºAº p/Encadenado Superior m3 7,1563 7,1809 7,5214 7,5214 7,7742 7,8070 7,8941 8,0872 8,1199 8,1199 8,1199 8,5084

2121 HºAº p/Pilotines - D: 0,20m m3 6,9007 6,9442 7,1423 7,1423 7,2879 7,3489 7,5117 7,6366 7,6674 7,6674 7,6674 7,9518

2122 HºAº p/Dinteles m3 7,5205 7,5372 7,9625 7,9625 8,3008 8,3249 8,3891 8,6409 8,6648 8,6648 8,6648 9,1347

2123 HºAº p/Platea de fundación m3 7,1932 7,2255 7,5339 7,5339 7,7819 7,8200 7,9215 8,1126 8,1436 8,1436 8,1436 8,5331

2124 HºAº p/Pavimento de 12cm de espesor m2 6,1837 6,2217 6,4502 6,4502 6,5884 6,5934 6,6071 6,7086 6,7814 6,7814 6,7833 7,0841

2125 HºAº p/Pavimento de 18 cm de espesor m2 6,3988 6,4312 6,6999 6,6999 6,8810 6,8853 6,8970 7,0297 7,0945 7,0945 7,0967 7,4403

2127 HºAº P/Capa Compresión c/malla s/losa m3 5,9022 5,9372 6,1397 6,1397 6,2383 6,2398 6,2437 6,3152 6,4020 6,4020 6,4020 6,6787

2128 HºAº P/Encadenados b/T. Natural m3 7,3006 7,3257 7,6834 7,6834 7,9857 8,0081 8,0681 8,2932 8,3277 8,3277 8,3277 8,7744

2129 Hº sin armar de piedra m3 5,8794 5,9105 6,1195 6,1195 6,2297 6,2297 6,2297 6,3086 6,3969 6,3969 6,3969 6,6915

2130 Columna reticulada de hierro redondo M 7,9837 8,0054 8,4505 8,4505 8,8467 8,8761 8,9543 9,2495 9,2527 9,2527 9,2527 9,7739

2131 Viga reticulares rectangular de hierro redondo M 7,8510 7,8818 8,2535 8,2535 8,5873 8,6355 8,7636 9,0196 9,0222 9,0222 9,0222 9,4750

2132 Viga reticulares forma T de hierro redondo M 7,9925 8,0129 8,4705 8,4705 8,8773 8,9017 8,9668 9,2685 9,2719 9,2719 9,2719 9,8061

2133 Viga reticulares triangular de hierro redondo M 7,9868 8,0097 8,4457 8,4457 8,8392 8,8701 8,9525 9,2471 9,2500 9,2500 9,2500 9,7677

2134 Pavimento de Hº esp.: 18 cm con equipo mediano s/malla m2 6,0447 6,0715 6,2395 6,2737 6,3895 6,4219 6,4355 6,5171 6,5886 6,6154 6,6237 6,8732

2136 Escalera de hierro c/protección ml 7,9366 7,9617 8,3800 8,3800 8,7557 8,7896 8,8800 9,1621 9,1652 9,1652 9,1652 9,6652

2143 Cemento de contacto para hormigón (Hºviejo/Hºnuevo) m2 5,0936 5,0936 5,3486 5,3486 5,5770 5,5770 5,5770 5,7413 5,7413 5,7413 5,7413 6,0280

2145 Viga de Fundación m3 7,2767 7,3171 7,6467 7,6467 7,9137 7,9530 8,0599 8,2654 8,2901 8,2901 8,2901 8,6774

2146 Contrafuerte de Hº Aº m3 7,1084 7,1491 7,4678 7,4678 7,6961 7,7383 7,8527 8,0312 8,0593 8,0593 8,0593 8,4066

3100 MAMPOSTERIA

3101 Ladrillos comunes en sub-muración m3 6,5370 6,5370 7,0168 7,2024 7,6328 7,8123 7,6328 7,8138 7,9044 7,9643 7,9643 8,3373

3102 Ladrillos comunes en cimiento m3 6,2326 6,2326 6,7676 7,0542 7,5404 7,8176 7,5404 7,6913 7,8101 7,9025 7,9025 8,1995

3103 Ladrillos comunes en elevación (< 10m de altura) m3 6,5389 6,5389 7,0881 7,3371 7,8342 8,0751 7,8342 8,0191 8,1219 8,2022 8,2022 8,5530

3104 Ladrillos comunes en elevación (> 10m de altura) m3 6,7573 6,7573 7,3123 7,5359 8,0431 8,2593 8,0431 8,2529 8,3452 8,4173 8,4173 8,8063

3105 Ladrillos comunes en panderete m2 6,8848 6,8848 7,4160 7,6016 8,0896 8,2688 8,0896 8,3120 8,3920 8,4512 8,4512 8,8720

3106 Pilares Ladrillos comunes m3 6,5235 6,5235 7,0251 7,2418 7,7025 7,9160 7,7171 7,8995 8,0019 8,0718 8,0718 8,4199

3107 Ladrillos comunes p/enchapados m2 6,4628 6,4628 6,9564 7,1670 7,6044 7,8131 7,6279 7,8040 7,9074 7,9746 7,9746 8,3049

3108 Ladrillos de máquinas (6x11,5x25) m3 5,3461 5,6315 5,9492 6,0342 6,2386 6,2405 6,2455 6,3935 6,4019 6,4019 6,4019 6,6740

3109 Ladrillos refractarios m3 3,0033 3,0033 3,0367 3,0367 3,0668 3,0668 3,0668 3,0886 3,0886 3,0886 3,0886 3,1263

3110 Ladrillos cerámicos en panderete (esp. 10cm) m2 5,5166 5,5166 5,6956 5,6956 5,8580 5,8580 5,8580 5,9740 6,0804 6,0804 6,0804 6,3438

3111 Bloques decorativos de hormogón m2 5,2179 5,2179 5,4278 5,4278 5,6181 5,6181 5,6181 5,7569 5,8349 5,8349 5,8349 6,1158

3112 Ladrillos comunes reforzado c/hierro m3 6,4657 6,4779 6,9222 7,1104 7,5127 7,7046 7,5501 7,7123 7,8023 7,8630 7,8630 8,1913

3113 Ladrillos comunes p/muro calado 30cm esp. m3 7,0199 7,0199 7,5785 7,7560 8,2574 8,4293 8,2574 8,4951 8,5696 8,6269 8,6269 9,0669

3114 Bloques de cemento 15x15x30cm m2 5,2179 5,2179 5,4278 5,4278 5,6181 5,6181 5,6181 5,7569 5,8349 5,8349 5,8349 6,1158

3115 Ladrillo cerámico hueco de 12x18x25 m2 6,8729 6,8729 7,1368 7,1368 7,3632 7,3632 7,3632 7,5278 7,6165 7,6165 7,6165 7,9829

3116 Ladrillos Huecos cerámicos 0.18x0.18x0.25 m2 6,8052 6,8052 7,0899 7,0899 7,3228 7,3228 7,3228 7,4914 7,5835 7,5835 7,5835 7,9416

3117 Ladrillos Huecos 0.08x0.18x0.25 m2 6,3087 6,3087 6,6044 6,6044 6,8484 6,8484 6,8484 7,0259 7,1017 7,1017 7,1017 7,4612

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 3 de 12 www.dpo.gov.ar - [email protected]

Page 4: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

3118 Ladrillos comunes a la vista m3 6,6373 6,6373 7,1927 7,4365 7,9440 8,1799 7,9440 8,1398 8,2397 8,3183 8,3183 8,6829

3119 Cordon de ladrillos comunes revocado m3 5,4822 5,4822 5,9768 6,3595 6,8158 7,1862 6,8158 6,8778 7,0371 7,1603 7,1603 7,3149

3122 Ladrillos comunes reforzado c/hierro c/junta enrasada m3 6,6554 6,6664 7,1281 7,2981 7,7154 7,8889 7,7493 7,9345 8,0158 8,0707 8,0707 8,4349

3123 Ladrillos comunes reforzado c/malla de hierro m3 6,6527 6,6549 7,1433 7,3232 7,7646 7,9394 7,7678 7,9611 8,0472 8,1052 8,1052 8,4905

3200 REVOQUES

3201 Revoque Exterior a la cal c/hidrofugo term. al fieltro m2 7,9830 7,9830 8,4957 8,4957 8,9645 8,9688 8,9815 9,3196 9,3395 9,3395 9,3409 9,9474

3202 Revoque Interior a la cal completo term al fieltro m2 7,8949 7,8949 8,3923 8,3923 8,8410 8,8487 8,8718 9,1974 9,2205 9,2205 9,2205 9,8000

3203 Revoque de Cem.alis.c/hidróf. m2 7,4000 7,4000 7,8070 7,8070 8,1859 8,1859 8,1859 8,4593 8,4955 8,4955 8,5015 9,0442

3204 Azotado c/hidrof.y jaharro Bajo revest. m2 7,2690 7,2690 7,6549 7,6549 7,9918 7,9973 8,0136 8,2527 8,2935 8,2935 8,2962 8,7880

3205 Revoque term. al yeso s/metal desplegado m2 7,7795 7,8054 8,3017 8,3017 8,6557 8,6828 8,7542 9,0190 9,0380 9,0380 9,0380 9,5060

3206 Reposición placa de yeso m2 7,8550 7,8550 8,3177 8,3177 8,7335 8,7377 8,7505 9,0533 9,0789 9,0789 9,0789 9,6759

3207 Cemento alisado p/pizarrones m2 7,6381 7,6381 8,0953 8,0953 8,5058 8,5117 8,5292 8,8268 8,8541 8,8541 8,8560 9,4047

3208 Revoque refractario m2 5,3320 5,3320 5,5521 5,5521 5,7575 5,7575 5,7575 5,9056 5,9056 5,9056 5,9056 6,1597

3209 Revoque a la bolsa m2 7,4426 7,4426 7,8634 7,8634 8,2404 8,2514 8,2732 8,5464 8,5792 8,5792 8,5792 9,1038

3210 Buña ml 8,7460 8,7460 9,3492 9,3492 9,9524 9,9524 9,9524 10,3810 10,3810 10,3810 10,3810 11,1111

3211 Tomado de junta m2 8,4971 8,4971 9,0838 9,0838 9,6495 9,6495 9,6495 10,0571 10,0590 10,0590 10,0590 10,7619

3212 Rev. comun salpicado s/metal desplegado m2 8,0035 8,0722 8,5225 8,5225 8,9295 8,9401 8,9692 9,2670 9,2793 9,2793 9,2802 9,8159

3213 Carpeta de asentamiento (esp. 2 cm) m2 7,3333 7,3333 7,7198 7,7198 8,0767 8,0767 8,0767 8,3333 8,3628 8,3628 8,3628 8,8968

3214 Azotado c/hidrófugo. m2 7,5313 7,5313 7,9609 7,9609 8,3438 8,3438 8,3438 8,6250 8,6641 8,6641 8,6719 9,2188

3215 Jaharro - M: 1/4:1:3 m2 7,6617 7,6617 8,1194 8,1194 8,5274 8,5373 8,5672 8,8657 8,8955 8,8955 8,8955 9,4478

3216 Revoque interior completo term. al yeso m2 7,8098 7,8098 8,2685 8,2685 8,6734 8,6779 8,6913 8,9843 9,0067 9,0067 9,0067 9,5884

3217 Completo a Maquina m2 7,6025 7,6025 8,0582 8,0582 8,4557 8,4582 8,4658 8,7519 8,7747 8,7747 8,7747 9,3316

3218 Enlucido Iggam Salpicado m2 6,2134 6,2134 6,4937 6,4937 6,7615 6,7615 6,7615 6,9498 6,9498 6,9498 6,9498 7,4477

3219 Enlucido Iggam Peinado m2 6,9187 6,9187 7,2990 7,2990 7,6555 7,6555 7,6555 7,9139 7,9139 7,9139 7,9139 8,4737

3220 Enlucido Salpicrete m2 6,2134 6,2134 6,4937 6,4937 6,7615 6,7615 6,7615 6,9498 6,9498 6,9498 6,9498 7,4477

3221 Enlucido a la cal (M: 1/8:1:3) m2 8,1659 8,1659 8,7175 8,7175 9,2197 9,2242 9,2332 9,5919 9,6054 9,6054 9,6054 10,2377

3222 Enlucido c/mezcla preelaborada con tratamiento m2 8,0307 8,0410 8,5836 8,5836 9,0922 9,0922 9,0922 9,4608 9,4608 9,4608 9,4608 10,1126

3225 Reparac. de fisuras en mampostería m2 8,1079 8,1093 8,6799 8,6799 9,1716 9,1760 9,1890 9,5431 9,5510 9,5510 9,5510 10,1897

3300 CIELORRASOS

3301 Cielorraso de yeso aplicado b/losa m2 8,0337 8,0337 8,5440 8,5440 9,0000 9,0026 9,0130 9,3446 9,3627 9,3627 9,3627 10,0026

3302 Aplicado b/losa completo ter. a la Cal m2 6,6504 6,6504 6,9306 6,9306 7,1815 7,1912 7,2168 7,4032 7,4592 7,4592 7,4592 7,8770

3303 Enlucido a la Cal b/losa sin engrasado m2 7,7401 7,7401 8,2232 8,2232 8,6525 8,6610 8,6864 8,9972 9,0226 9,0226 9,0226 9,5819

3304 Cielorraso de madera machimbr. b/entram. de mad. C/aisl de poliestireno expandido m2 6,3709 6,4082 6,8474 6,8474 7,0452 7,0868 7,1946 7,3535 7,4445 7,4445 7,4445 7,6965

3305 A la cal s/metal desplegado term. al fieltro m2 8,1880 8,2380 8,7681 8,7681 9,1524 9,1548 9,1614 9,4392 9,4572 9,4572 9,4572 9,9524

3306 De chapadur s/entram. de mad. m2 6,8080 6,8567 7,2737 7,2737 7,5439 7,5439 7,5439 7,7401 7,8121 7,8121 7,8121 8,1516

3307 Cielorraso al yeso b/metal despl. c/estruct. de madera s/aislacion m2 8,1965 8,2364 8,7688 8,7688 9,1460 9,1460 9,1460 9,4178 9,4355 9,4355 9,4355 9,9424

3308 Tipo Phonex m2 4,1939 4,2185 4,3692 4,3692 4,4888 4,5271 4,6277 4,7283 4,7494 4,7494 4,7494 4,8980

3309 De placa de yeso DurloK junta cerrada m2 5,2358 5,2909 5,4197 5,4197 5,4919 5,5524 5,7114 5,7874 5,8348 5,8348 5,8348 5,9263

3310 A la cal reforzado con malla t/Sima term. al fieltro m2 7,7361 7,7522 8,2009 8,2009 8,5946 8,6041 8,6298 8,9179 8,9311 8,9311 8,9311 9,4509

3311 Cielorraso de madera machiembrada s/entram. de mad. S/aislación m2 7,0508 7,0508 7,5620 7,5620 7,8100 7,8621 7,9974 8,1966 8,2704 8,2704 8,2704 8,5864

3312 Cielorraso de placa de yeso c/estr. de Al. c/aislacion de poliestireno expandido m2 4,1939 4,2185 4,3692 4,3692 4,4888 4,5271 4,6277 4,7283 4,7494 4,7494 4,7494 4,8980

3314 Cielorraso a la cal s/metal desplegado term. al fieltro C/aislacc de lana de vidrio m2 8,1648 8,2157 8,7448 8,7448 9,1270 9,1300 9,1396 9,4158 9,4338 9,4338 9,4338 9,9263

3315 Cielorraso de madera machimbrada s/entram. de mad. S/aislación m2 7,3742 7,3742 7,7807 7,7807 7,9858 8,0256 8,1298 8,2930 8,4043 8,4043 8,4043 8,6656

3316 De madera machimbrada s/entram. de mad. C/lana de vidrio 3mm c/papel m2 7,0321 7,0334 7,5436 7,5436 7,7902 7,8426 7,9803 8,1784 8,2518 8,2518 8,2518 8,5659

3317 Goteron en cieloraso aplicado b/losa ml 8,4419 8,4419 9,0664 9,0664 9,6245 9,6245 9,6245 10,0270 10,0270 10,0270 10,0270 10,7282

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 4 de 12 www.dpo.gov.ar - [email protected]

Page 5: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

3318 Cielorraso de placa de yeso t/París C/Estr. de perfiles y Aislac. de Poliet. 2" m2 4,7527 4,8168 4,8702 4,8702 4,8702 4,9397 5,1229 5,1491 5,2032 5,2032 5,2032 5,2032

3319 Cielorraso de tablillas de PVC c/aisl de Poliestireno expandido 50 mm m2

3400 CAPAS AISLADORAS

3401 Capa aisladora horiz. y vert. de concreto 2cm m2 6,6131 6,6131 6,8796 6,8796 7,1131 7,1131 7,1131 7,2774 7,3321 7,3321 7,3394 7,7518

3402 Capa aisladora horizontal asfáltica de 1,5cm de esp. m2 4,8860 4,8860 4,9115 4,9115 4,9348 4,9348 4,9348 4,9518 5,0539 5,0539 5,1475 5,2788

3403 Capa aisladora vertical asfáltica incluido panderete m2 6,2498 6,2498 6,5484 6,6256 6,8998 6,9743 6,8998 7,0438 7,1260 7,1510 7,1969 7,5031

3404Capa aisladora horiz. en piso sub-suelo de concreto con SIKA -1 y Sellador

impermeablem

2 5,1471 5,1471 5,3461 5,3461 5,5250 5,5250 5,5250 5,6539 5,6636 5,6636 5,6649 5,9106

3405 Capa aisladora horizontal de piso concreto con SIKA -1 y Sellador imperm. m2 5,7299 5,7299 6,0337 6,0845 6,3692 6,4186 6,3692 6,5392 6,5657 6,5819 6,5819 6,8927

3406 Aislación c/doblado de ladrillos comunes m2 6,7594 6,7741 7,1992 7,2575 7,6102 7,7354 7,8574 8,0964 8,1334 8,1519 8,1530 8,5449

3407 Membrana de P.V.C. Sika normal m2 4,9955 5,0101 5,2237 5,2237 5,3747 5,4407 5,6152 5,7483 5,7483 5,7483 5,7483 5,9374

3408 Aislación p/losas c/Membrana de P.V.C. SIKA NORMAL m2 4,9955 5,0101 5,2237 5,2237 5,3747 5,4407 5,6152 5,7483 5,7483 5,7483 5,7483 5,9374

3409 Aislación p/losas Tipo IMPERMUR Aluminio m2 6,1709 6,2101 6,5350 6,5350 6,6947 6,9160 7,4958 7,6947 7,6947 7,6947 7,6947 7,8936

3410 Aislación p/losas Tipo IMPERMUR Normal m2 5,7041 5,7456 6,0562 6,0562 6,2249 6,4112 6,8994 7,0917 7,0917 7,0917 7,0917 7,3018

3411 Techado asf. en frio b/piso 9 capas m2 5,8835 5,9153 6,1282 6,1282 6,3082 6,3129 6,3282 6,4612 6,5247 6,5247 6,5824 6,8729

3412 Techado asf. en frio b/piso 7 capas m2 5,8587 5,8971 6,0983 6,0983 6,2704 6,2750 6,2842 6,4117 6,4762 6,4762 6,5346 6,8157

3413 Tipo IMPERMUR Aluminio antiterm. 5mm m2 5,2224 5,2362 5,4966 5,4966 5,6276 5,7948 6,2328 6,3879 6,3966 6,3966 6,3966 6,5603

3414 Restitución de capa aisladora horizontal M 8,3623 8,3623 8,9710 8,9710 9,5217 9,5217 9,5217 9,9130 9,9203 9,9203 9,9203 10,6159

3415 Aislación Térmica de Lana de Vidrio c/papael Kraft m2 8,0762 8,0952 8,6952 8,6952 9,2000 9,2095 9,2476 9,6286 9,6286 9,6286 9,6286 10,2762

3416 Techado asf. en frio b/piso 5 capas m2 5,6026 5,7024 5,9704 5,9704 6,1201 6,1738 6,3179 6,4455 6,4861 6,4861 6,5231 6,7486

3417 Aplicación de sellador junta de 25mm ml 3,4890 3,4890 3,5165 3,5165 3,5368 3,5368 3,5368 3,5533 3,5533 3,5533 3,5533 3,5809

3418 Aplicación de sellador junta c/esp. de poliuretano ml 3,5810 3,5845 3,6268 3,6268 3,6585 3,6585 3,6585 3,6796 3,6813 3,6813 3,6813 3,7236

3419 Capa aisladora horizontal asfáltica de 2,5cm de esp. ml 9,1198 9,1198 9,6719 9,6719 10,1719 10,1719 10,1719 10,5313 10,5313 10,5313 10,5365 11,1563

3420 Babeta Aluminio antiterm. 4mm ml 7,1435 7,1620 7,6389 7,6389 8,0139 8,1019 8,3287 8,6296 8,6296 8,6296 8,6296 9,0972

3500 PISOS

3501 Losetas de Hormigon 40x40 m2 4,7700 4,7700 5,0067 5,0067 5,1701 5,2046 5,2924 5,4231 5,4316 5,4316 5,4316 5,6465

3502 Mosaicos graníticos 30x30. M:1/2:1:3:1 m2 4,3892 4,3892 4,5955 4,5955 4,7182 4,7210 4,7278 4,8170 4,8881 4,8881 4,8881 5,1250

3503 Mosaicos graníticos calib. 30x30 m2 3,9662 3,9662 4,1380 4,1380 4,2239 4,2258 4,2306 4,2930 4,3690 4,3690 4,3690 4,5650

3504 Mosaicos Granítico 15x15 m2 4,3588 4,3588 4,5606 4,5606 4,6835 4,6858 4,6913 4,7810 4,8525 4,8525 4,8525 5,0874

3505 Mosaicos Calcáreos 20x20 m2 5,5420 5,5420 5,8187 5,8187 6,0150 6,0522 6,1477 6,3033 6,3156 6,3156 6,3156 6,7126

3506 Mosaicos Calcáreos 20x20 p/veredas m2 5,5606 5,5606 5,8382 5,8382 6,0345 6,0716 6,1680 6,3236 6,3360 6,3360 6,3360 6,7347

3507 Piso de cemento alisado M: 1: 3 m2 6,9607 6,9607 7,2864 7,2864 7,5797 7,5797 7,5797 7,7898 7,8337 7,8337 7,8383 8,3118

3508 Piso de cemento rodillado m2 7,2557 7,2557 7,6412 7,6412 7,9835 7,9835 7,9835 8,2330 8,2639 8,2639 8,2639 8,7856

3509 Losetas de Hormigon 60x40 y 4,2cm m2 4,6350 4,6350 4,8449 4,8449 4,9757 5,0200 5,1345 5,2457 5,2524 5,2524 5,2524 5,4241

3510 Lajas Mercedes 30x30 c/junta tomada s/manto de arena m2 6,2157 6,2157 6,4992 6,4992 6,7555 6,7565 6,7587 6,9434 6,9509 6,9509 6,9509 7,2872

3511 Pulido a Piedra Fina m2 8,7371 8,7371 9,3362 9,3362 9,9397 9,9397 9,9397 10,3793 10,3793 10,3793 10,3793 11,1078

3512 Lustre de piso granitico a plomo m2 8,7400 8,7400 9,3367 9,3367 9,9433 9,9433 9,9433 10,3800 10,3800 10,3800 10,3800 11,1100

3513 Piso de ceramico esmaltado 10x20 c/adhesivo m2 5,2759 5,3797 5,6617 5,6617 5,8624 5,8962 5,9842 6,1429 6,1429 6,1429 6,1429 6,4165

3514 Piso de ceramico esmaltado 20x20 c/adhesivo m2 4,7249 4,8368 5,0722 5,0722 5,2266 5,2623 5,3601 5,4842 5,4842 5,4842 5,4842 5,6972

3515 Piso de ceramico rojo 20x20 c/adhesivo m2 5,9214 6,0576 6,2742 6,2742 6,4742 6,5389 6,7083 6,8760 6,8760 6,8760 6,8760 7,1520

3516 Piso de ceramico 15x15 c/adhesivo m2 4,3209 4,3937 4,6295 4,6353 4,8073 4,8073 4,8073 4,9317 4,9897 4,9897 4,9897 5,2242

3517 Piso de goma dimensiones varias. M: 1:3 c/adhesivo m2 3,6602 3,6602 3,7838 3,7838 3,8979 3,8979 3,8979 3,9796 3,9796 3,9796 3,9796 4,1216

3518 Rasqueteo y lustre de piso de madera m2 4,9440 4,9440 5,2773 5,2773 5,5369 5,5369 5,5369 5,7286 5,7286 5,7286 5,7286 6,0737

3519 Mosaicos calcáreos 15x15 m2 5,7965 5,7965 6,0721 6,0721 6,2534 6,2985 6,4173 6,5637 6,5748 6,5748 6,5748 6,9913

3520 Mosaicos graníticos 40x40. M:1/2:1:3:1 m2 4,5452 4,5452 4,7631 4,7631 4,9059 4,9085 4,9149 5,0190 5,0873 5,0873 5,0873 5,3443

3521 Piso de ladrillos comunes, c/contrapiso m2 6,3376 6,3458 6,7951 6,9122 7,2809 7,4016 7,3092 7,4959 7,5819 7,6203 7,6203 7,9707

3522 Piso de parquet a bastón roto, incl rasqueteo y lustre m2 4,9907 4,9907 5,3049 5,3049 5,4440 5,4533 5,4782 5,5822 5,6068 5,6068 5,6068 5,7831

3523 Piso de pino machimbrado (1"x4")s/losa m2 6,2229 6,2229 6,7012 6,7012 6,8914 6,8914 6,8914 7,0278 7,1143 7,1143 7,1143 7,3543

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 5 de 12 www.dpo.gov.ar - [email protected]

Page 6: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

3524 Piso de Cemento alisado M: 1: 3 c/junta de dilat. m2 6,6994 6,6994 6,9877 6,9877 7,2474 7,2474 7,2474 7,4335 7,4847 7,4847 7,4990 7,9305

3525 Piso de Alfombra c/adhesivo m2 5,2308 5,2308 5,3924 5,3924 5,5417 5,5417 5,5417 5,6486 5,6486 5,6486 5,6486 5,8344

3526 Piso de Cemento alisado con Canto rodado m2

3527 Entrepiso de madera m2 7,3356 7,3356 7,4570 7,4570 7,5621 7,5621 7,5621 7,6375 7,8094 7,8094 7,8094 7,9422

3528 Ceramico rojo antideslizante 25x25 c/adhesivo m2 5,4547 5,5516 5,8397 5,8478 6,0553 6,0553 6,0553 6,2038 6,2065 6,2065 6,2065 6,5553

3530 Ceramico rojo antideslizante 40X40 c/adhesivo m2 4,5005 4,6194 4,8313 4,8363 4,9617 4,9617 4,9617 5,0515 5,0531 5,0531 5,0531 5,3061

3531 Loseta de Hº 40x40. m2 4,7102 4,7102 4,9427 4,9427 5,1021 5,1370 5,2261 5,3542 5,3625 5,3625 5,3625 5,5714

3532 Porcelanato de 30x30 sin pulir - colocac. s/piso existente m2 4,5736 4,7043 4,7647 4,7663 4,7780 4,7780 4,7780 4,7866 4,7871 4,7871 4,7871 5,0106

3533 Porcelanato de 30x30 sin pulir m2 3,8022 3,9635 4,0915 4,0947 4,1197 4,1197 4,1197 4,1377 4,1388 4,1388 4,1388 4,1866

3534 Piso de madera: reparación, pulido y encerado m2 7,3356 7,3356 7,4570 7,4570 7,5621 7,5621 7,5621 7,6375 7,8094 7,8094 7,8094 7,9422

3536 Piso de cemento fratazado c/malla Sima m2 7,1791 7,2119 7,5358 7,5358 7,8224 7,8358 7,8716 8,0851 8,1075 8,1075 8,1075 8,5313

3537 Piso de ceramico esmaltado 30x30 c/adhesivo m2 4,8156 4,9446 5,1741 5,1741 5,3135 5,3561 5,4687 5,5843 5,5843 5,5843 5,5843 5,7766

3538 Piso de ceramico esmaltado 40x40 c/adhesivo m2 4,5048 4,6366 4,8429 4,8429 4,9589 5,0030 5,1196 5,2190 5,2190 5,2190 5,2190 5,3791

3600 CONTRAPISO

3601 Hº de Cascote s/losa de 8cm de esp. m2 6,5764 6,5870 6,9895 6,9895 7,2935 7,3040 7,3304 7,5536 7,6081 7,6081 7,6081 8,0316

3602 Hº de Cascote s/losa 3 a 5cm de esp. m2 6,5530 6,5629 6,9702 6,9702 7,2781 7,2848 7,3113 7,5331 7,5894 7,5894 7,5894 8,0166

3603 Hº de Cascote s/terr. nat. 12cm de esp. m2 6,1472 6,1603 6,5219 6,5219 6,7741 6,7857 6,8163 7,0029 7,0685 7,0685 7,0685 7,4344

3604 Hº de Cascote s/local sanit. s/losa (Esp. 18 cm) m2 6,0832 6,0975 6,4508 6,4508 6,6964 6,7076 6,7391 6,9208 6,9898 6,9898 6,9898 7,3462

3605 Manto de concreto p/piso de madera (2cm esp., M: 1:3) m2 6,8934 6,8934 7,2169 7,2169 7,4926 7,4926 7,4926 7,6912 7,7316 7,7316 7,7316 8,1912

3606 Hº de Cascote s/terr. Nat. 12cm C/cemento albañilería M: 1:3:10 m2 6,3534 6,3645 6,7417 6,7417 7,0158 7,0158 7,0158 7,2139 7,2599 7,2599 7,2599 7,6846

3700 ZOCALOS

3701 Zocalo de cemento rehundido: altura 10cm M 8,1010 8,1010 8,6465 8,6465 9,1414 9,1414 9,1414 9,5051 9,5152 9,5152 9,5152 10,1515

3702 Zocalo calcáreo 10x30 cm. M 3,9465 3,9465 4,1129 4,1129 4,2495 4,2515 4,2554 4,3545 4,4238 4,4238 4,4238 4,5960

3703 Zocalo ceramico esmaltado 10x20 cm c/ adhesivo M 4,5727 4,6746 4,8655 4,8764 5,0260 5,0260 5,0260 5,1345 5,2213 5,2213 5,2213 5,4143

3704 Zocalo granítico 10x30 cm. M 3,8570 3,8570 3,9923 3,9923 4,0894 4,0907 4,0920 4,1635 4,2235 4,2235 4,2235 4,4138

3705 Zocalo granítico 7x30 cm. M 4,1227 4,1227 4,2938 4,2938 4,4326 4,4346 4,4406 4,5412 4,5956 4,5956 4,5956 4,8229

3706 Zocalo granítico calibrado 10x30 cm. M 4,2333 4,2333 4,3577 4,3577 4,4462 4,4474 4,4513 4,5154 4,5949 4,5949 4,5949 4,7872

3707 Zocalo gres ceramico 8x16 cm. M 4,9466 5,0449 5,2753 5,2753 5,4691 5,4691 5,4691 5,6096 5,6882 5,6882 5,6882 5,9382

3708 Zocalo de madera (con pegamento) M 8,8125 8,8125 8,9648 8,9648 9,0977 9,0977 9,0977 9,1992 9,2617 9,2617 9,2617 9,4531

3709 Zocalo ceramico 10x20 cm c/adhesivo M 4,9110 5,0026 5,2277 5,2408 5,4215 5,4215 5,4215 5,5524 5,6309 5,6309 5,6309 5,8639

3710 Guarda Flor de Lis de 7x20cm M

3800 REVESTIMIENTO

3801 Azulejos t/San Lorenzo blanco c/adhesivo m2 5,9339 6,0399 6,3653 6,3653 6,6107 6,6107 6,6107 6,7872 6,8025 6,8025 6,8025 7,1264

3802 Azulejos t/San Lorenzo color c/adhesivo m2 5,7359 5,8458 6,1542 6,1542 6,3807 6,3807 6,3807 6,5436 6,5597 6,5597 6,5597 6,8586

3803 Listel (San Lorenzo) c/adhesivo M 5,1026 5,1051 5,2026 5,2026 5,2897 5,2897 5,2897 5,3564 5,5026 5,5026 5,5026 5,6205

3804 Revestimiento de Granít. calib. 25x25 h=1,00 m2 4,9532 4,9532 5,2238 5,2238 5,4170 5,4177 5,4189 5,5581 5,6166 5,6166 5,6166 5,9274

3805 Revestimiento de Granito Sierra Chica 2,5cm (Nac.) m2 2,9606 3,0437 3,0796 3,0796 3,1120 3,1121 3,1123 3,1357 3,2112 3,2112 3,2112 3,2526

3806 Revestimiento de Granito Rojo Dragon 2,5cm m2 3,3067 3,4006 3,4375 3,4375 3,4707 3,4708 3,4710 3,4950 3,5807 3,5807 3,5807 3,6232

3807 Revestimiento de baldosa cerámica 10x20cm. C/ adhesivo m2 5,9349 6,0182 6,3698 6,3698 6,6478 6,6752 6,7464 6,9574 6,9574 6,9574 6,9574 7,3181

3808 Revestimiento de baldosa cerámica 20x20cm. C/adhesivo m2 5,2153 5,3137 5,5987 5,5987 5,8092 5,8408 5,9273 6,0906 6,0906 6,0906 6,0906 6,3655

3809 Revestimiento de cemento alisado (incluso p/pizarrones) m2 7,4264 7,4264 7,8376 7,8376 8,2203 8,2203 8,2203 8,4964 8,5320 8,5320 8,5371 9,0843

3810 Revestimiento de cemento alisado p/interior de tanques m2 7,4112 7,4112 7,8233 7,8233 8,2056 8,2056 8,2056 8,4800 8,5172 8,5172 8,5237 9,0670

3811 Revestimiento de mosaicos calcareos 20x20 m2 6,0309 6,0309 6,3718 6,3718 6,6380 6,6697 6,7519 6,9548 6,9608 6,9608 6,9608 7,4186

3812 Revestimiento de Marmol Travertino m2 3,8244 3,9452 3,9928 3,9928 4,0356 4,0358 4,0360 4,0670 4,1644 4,1644 4,1644 4,2192

3813 Revestimiento de granito reconstituido esp. 3 cm m2 3,2565 3,2565 3,3330 3,3330 3,4018 3,4020 3,4024 3,4522 3,5173 3,5173 3,5173 3,6053

3814 Revestimiento de madera mach. s/entram. de mad. S/cornisa m2 6,3741 6,3741 6,8460 6,8460 7,0760 7,1481 7,3366 7,5291 7,6130 7,6130 7,6130 7,9023

3815 Revestimiento de cerámico imitación ladrillo c/adhesivo m2 5,4031 5,5034 5,7876 5,7876 5,9993 6,0314 6,1144 6,2805 6,2805 6,2805 6,2805 6,5714

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 6 de 12 www.dpo.gov.ar - [email protected]

Page 7: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

3816 Cornisa de mad. P/revest. En pared ml 8,0997 8,0997 8,6276 8,6276 9,1224 9,1311 9,1538 9,5157 9,5332 9,5332 9,5332 10,1434

3817 Revestimiento de máyolicas españolas c/adhesivo lisa m2 7,6092 7,6183 8,1111 8,1111 8,5725 8,5725 8,5725 8,9046 8,9150 8,9150 8,9150 9,5216

3818 Revestimiento de máyolicas españolas c/adhesivo decorada m2 7,1291 7,1374 7,5841 7,5841 8,0024 8,0024 8,0024 8,3033 8,3199 8,3199 8,3199 8,8697

3819 Revestimiento de baldosa cerámica 20x20cm. Esmalt. C/adhesivo m2 4,7995 4,9094 5,1572 5,1572 5,3211 5,3564 5,4530 5,5843 5,5843 5,5843 5,5843 5,8055

3820 Guarda canto de aluminio color ml 7,6394 7,8310 8,1803 8,1803 8,2648 8,4282 8,8592 8,9831 8,9831 8,9831 8,9831 9,0873

3821 Revestimiento de losetas atermicas m2

3822 Guarda de cerámica 7x20cm. Flor de Lis ml

3823 Revestimiento de placas de plomo m2 5,4182 5,4182 5,4390 5,4390 5,4578 5,7387 6,4762 6,5950 6,5950 6,5950 6,5950 6,6185

3900 UMBRALES, ESCALONES Y CORDONES

3901 Umbrales y escalones de cemento alisado m2 7,7830 7,7830 8,2558 8,2558 8,6960 8,6960 8,6960 9,0136 9,0325 9,0325 9,0325 9,6310

3902 Umbrales y escalones de baldosas cerámicas m2 5,3174 5,4122 5,6853 5,6880 5,8982 5,9269 6,0054 6,1679 6,1690 6,1690 6,1690 6,4594

3903 Umbrales y escalones de ladrillos de máquinas m2 6,8531 6,9548 7,3694 7,3997 7,7467 7,7525 7,7679 8,0202 8,0409 8,0409 8,0409 8,5019

3904 Cordon de ladrillos de maquinas M 6,6860 6,7974 7,1897 7,2229 7,5488 7,5552 7,5713 7,8071 7,8296 7,8296 7,8296 8,2669

3905 Cordon y solias de ladrillos en sardinel c/jumta tomada M 7,3993 7,3993 7,8843 7,9455 8,3904 8,4572 8,4138 8,6930 8,7397 8,7597 8,7597 9,2714

3906 Escalón y contraescalón de mosaico granítico m2 5,5799 5,5799 5,9097 5,9097 6,1629 6,1634 6,1649 6,3481 6,3972 6,3972 6,3972 6,7745

3907 Revestimiento granítico de zócalos p/escaleras 7x30cm. ml 3,9103 3,9103 4,0573 4,0573 4,1728 4,1728 4,1744 4,2575 4,3164 4,3164 4,3164 4,5249

3908 Umbrales y escalones de cemento alis. c/PNL guardacanto m2 7,8891 7,8891 8,3819 8,3819 8,8138 8,8138 8,8138 9,1244 9,1490 9,1490 9,1743 9,7472

3909 Antepechos de baldosas cerámicas 20x20 m2 5,5487 5,6365 5,9478 5,9478 6,1874 6,2149 6,2892 6,4728 6,4728 6,4728 6,4728 6,7954

3910 Umbral de Marmol m2 3,7730 3,8958 3,9364 3,9364 3,9732 3,9732 3,9732 3,9997 4,0975 4,0975 4,0975 4,1471

3911 Antepecho y Solias de Marmol m2 3,8010 3,9231 3,9674 3,9674 4,0077 4,0077 4,0077 4,0368 4,1340 4,1340 4,1340 4,1873

3912 Umbrales de Lajas de Mercedes m2 6,1920 6,2043 6,4717 6,4717 6,7208 6,7208 6,7208 6,9005 6,9005 6,9005 6,9005 7,2541

3913 Umbrales y escalones de Granito rojo dragon 2,5 cm. esp. m2 3,2635 3,3588 3,3902 3,3902 3,4186 3,4186 3,4186 3,4391 3,5250 3,5250 3,5250 3,5634

3914 Mesada Marmol Gr. Rojo 5cm m2 3,2635 3,3588 3,3902 3,3902 3,4186 3,4186 3,4186 3,4391 3,5250 3,5250 3,5250 3,5634

3915 Umbrales y escalones de granito reconstituido m2 3,1657 3,1673 3,2328 3,2328 3,2922 3,2922 3,2922 3,3351 3,4002 3,4002 3,4002 3,4803

3916 Umbrales y escalones de Marmol Blanco m2 7,5171 7,5414 7,9714 7,9714 8,3657 8,3657 8,3657 8,6500 8,6657 8,6657 8,6657 9,2443

3917 Umbrales y escalones de losetas atermicas. m2

4100 PINTURA

4101 Pintura Interior al Agua m2 7,6686 7,7616 8,2442 8,2442 8,6453 8,6453 8,6453 8,9360 8,9360 8,9360 8,9360 9,4360

4102 Pintura al Agua p/cielorraso m2 7,9574 8,0255 8,5404 8,5404 8,9957 8,9957 8,9957 9,3234 9,3234 9,3234 9,3234 9,8894

4103 Pintura Exterior al Agua m2 7,3953 7,4111 7,8300 7,8300 8,1937 8,1937 8,1937 8,4585 8,5059 8,5059 8,5059 9,0198

4104 Pintura a base de Siliconas en muros m2 7,1818 7,2257 7,5799 7,5799 7,8934 7,8934 7,8934 8,1191 8,1411 8,1411 8,1411 8,6207

4105 Pintura Latex s/muros p/interior s/enduído m2 7,6151 7,6687 8,1032 8,1032 8,5119 8,5218 8,5496 8,8492 8,8651 8,8651 8,8651 9,3651

4106 Pintura Latex p/cielorraso previo enduido m2 7,4773 7,5114 7,9747 7,9747 8,3813 8,4015 8,4571 8,7563 8,7664 8,7664 8,7664 9,2588

4107 Pintura Latex s/muro p/interior previo enduido m2 7,3868 7,4232 7,8787 7,8787 8,2695 8,2911 8,3504 8,6415 8,6523 8,6523 8,6523 9,1280

4108 Esmalte sintético s/madera m2 6,5914 6,6266 7,0235 7,0235 7,3538 7,3851 7,4700 7,7193 7,7193 7,7193 7,7193 8,1201

4109 Esmalte sintético en cielorraso de madera m2 6,6612 6,6953 7,0986 7,0986 7,4374 7,4678 7,5499 7,8053 7,8053 7,8053 7,8053 8,2174

4110 Antióxido en chapa ondulada existente m2 7,6546 7,7080 8,1908 8,1908 8,6298 8,6336 8,6450 8,9618 8,9618 8,9618 8,9618 9,5019

4111 Esmalte sintético s/metal m2 6,3495 6,3700 6,7504 6,7504 7,0529 7,0881 7,1836 7,4156 7,4156 7,4156 7,4156 7,7856

4112 Aislación Hidráulica Rakodray m2 7,2125 7,2500 7,6500 7,6500 7,9750 7,9750 7,9750 8,2094 8,2281 8,2281 8,2281 8,7219

4113 Cementolite m2 7,3009 7,3009 7,7389 7,7389 8,1106 8,1106 8,1106 8,3805 8,4027 8,4027 8,4027 8,9248

4114 Barníz en muro de ladrillos vistos m2 6,8428 7,1830 7,4845 7,4845 7,7423 7,7474 7,7629 7,9510 7,9510 7,9510 7,9510 8,2680

4115 Barníz s/madera en carpinterias m2 7,7549 7,7549 8,2575 8,2575 8,6785 8,6980 8,7496 9,0604 9,1563 9,1563 9,1563 9,6679

4116 Barníz en cielorraso de madera m2 7,8322 7,8322 8,3356 8,3356 8,7695 8,7881 8,8373 9,1576 9,2492 9,2492 9,2492 9,7746

4117 Pintura Plástica p/exteriores t/Rakoton termin. liso m2 6,8806 6,9645 7,3290 7,3290 7,6516 7,6516 7,6516 7,8839 7,8839 7,8839 7,8839 8,3290

4118 Pintura Plástica p/exteriores t/Rakoton termin. granulado fino m2 6,9373 7,0057 7,3650 7,3650 7,6996 7,6996 7,6996 7,9411 7,9411 7,9411 7,9411 8,4125

4119 Pintura Plástica p/exteriores t/Rakoton termin. granulado medio m2 6,6544 6,7279 7,0434 7,0434 7,3372 7,3372 7,3372 7,5492 7,5492 7,5492 7,5492 7,9866

4120 Pintura Plástica p/exteriores termin. granulado grueso/rayé/espatulado m2 6,4330 6,5104 6,7917 6,7917 7,0536 7,0536 7,0536 7,2426 7,2426 7,2426 7,2426 7,6533

4121 Pintura Especial p/pizarrón m2 5,4883 5,5074 5,7742 5,7742 5,9505 5,9766 6,0446 6,1812 6,2074 6,2074 6,2074 6,4912

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 7 de 12 www.dpo.gov.ar - [email protected]

Page 8: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

4122 Enduído Plástico en cielorraso m2 7,8468 7,8468 8,4036 8,4036 8,8814 8,8995 8,9489 9,3015 9,3015 9,3015 9,3015 9,8830

4123 Rasq. y Lustre a maquina en piso de madera m2 4,9440 4,9440 5,2773 5,2773 5,5369 5,5369 5,5369 5,7286 5,7286 5,7286 5,7286 6,0737

4124 Pizarrón Completo 1.5 x 5.8 m. u. 6,3879 6,3999 6,6862 6,6862 6,9146 6,9302 6,9713 7,1417 7,1650 7,1650 7,1650 7,5048

4125 Enduído Plástico en moldura de cielorraso m2 6,9186 6,9186 7,4118 7,4118 7,7602 7,8009 7,9005 8,1629 8,1629 8,1629 8,1629 8,5792

4126 Pintura Latex s/muros exteriores s/enduído (t/Albafrent, Muralba o similar) m2 7,6291 7,6883 8,1224 8,1224 8,5315 8,5315 8,5315 8,8260 8,8547 8,8547 8,8547 9,3939

4127 Pintura Latex s/muros exteriores previo enduido(t/Albafrent, Muralba o similar) m2 7,3837 7,4251 7,8770 7,8770 8,2647 8,2794 8,3195 8,6056 8,6257 8,6257 8,6257 9,1257

4128 Pintura Asfáltica m2 7,4628 7,5081 7,9741 7,9741 8,3592 8,3592 8,3592 8,6375 8,6667 8,6667 8,6667 9,1521

4129 Recubrimiento plástico p/techos m2 7,1263 7,1263 7,5354 7,5354 7,8106 7,8497 7,9533 8,1667 8,3927 8,3927 8,3927 8,7298

4130 Antioxido s/metal m2 7,6396 7,6817 8,1712 8,1712 8,6096 8,6156 8,6336 8,9520 8,9520 8,9520 8,9520 9,4865

4131 Pintura Latex s/muros p/interior s/enduído (Tersuave o simil) m2 7,9954 7,9954 8,5057 8,5057 8,9771 8,9771 8,9771 9,3181 9,3272 9,3272 9,3272 9,9428

4132 Pintura Latex s/muros p/exterior s/enduído (Tersuave o simil) m2 8,0065 8,0065 8,5098 8,5098 8,9760 8,9760 8,9760 9,3115 9,3355 9,3355 9,3355 9,9455

4133 Esmalte sintético s/madera Tersuave o simil. m2 7,2805 7,2922 7,7485 7,7485 8,1163 8,1483 8,2326 8,5102 8,5102 8,5102 8,5102 8,9767

4134 Esmalte sintético s/metal - Tersuave o simil. m2 7,2281 7,2659 7,7033 7,7033 8,0566 8,0943 8,1938 8,4648 8,4648 8,4648 8,4648 8,8971

4135 Barníz sintético s/madera en carpinterias - Tersuave o simil. m2 7,9737 7,9737 8,4962 8,4962 8,9417 8,9455 8,9568 9,2801 9,3590 9,3590 9,3590 9,9511

4136 Pizarrón Completo c/aglomerado y fenólica 5,10X1,10m u. 6,8945 6,9014 7,3159 7,3159 7,6052 7,6142 7,6379 7,8500 7,8951 7,8951 7,8951 8,2937

4139 Pintura para demarcación en pisos m2 6,6980 6,6980 7,1111 7,1111 7,4366 7,4392 7,4444 7,6797 7,7242 7,7242 7,7242 8,1203

4144 Barniz Poliuretanico s/madera en carpinteria m2 7,5433 7,5433 8,0238 8,0238 8,4048 8,4286 8,4913 8,7749 8,8918 8,8918 8,8918 9,3571

4151 Pulido sellado y plastificado de piso de madera m2 6,8277 6,8277 7,2357 7,2357 7,4946 7,5240 7,6035 7,8008 7,9731 7,9731 7,9731 8,3197

4200 VIDRIOS

4201 Vidrio doble transp. c/masilla s madera o metal m2 3,1798 3,2615 3,3548 3,3548 3,4216 3,4558 3,5457 3,6063 3,6063 3,6063 3,6063 3,6894

4202 Vidrio triple transp. c/masilla s madera o metal m2 3,0667 3,1527 3,2329 3,2329 3,2865 3,3228 3,4177 3,4693 3,4693 3,4693 3,4693 3,5361

4203 Vidrio Blindex c/masilla s madera o metal m2 2,5902 2,6832 2,7241 2,7241 2,7397 2,7788 2,8813 2,9070 2,9070 2,9070 2,9070 2,9264

4204 Vidrio Armados c/masilla s madera o metal m2 2,9328 3,0273 3,0886 3,0886 3,1230 3,1627 3,2669 3,3062 3,3062 3,3062 3,3062 3,3484

4205 Vidrio tipo Granitex c/masilla s madera o metal m2 3,2206 3,3113 3,3947 3,3947 3,4505 3,4886 3,5888 3,6426 3,6426 3,6426 3,6426 3,7120

4206 Vidrio Traslucido c/masilla s madera o metal m2 4,2412 4,3742 4,4665 4,4665 4,5200 4,5758 4,7227 4,7815 4,7815 4,7815 4,7815 4,8481

4207 Restauración de Vitreaux m2 9,1297 9,1297 9,6994 9,6994 10,3568 10,3577 10,3600 10,8379 10,8388 10,8388 10,8388 11,5893

5000 C U B I E R T A S

5001 H°G° Nº24 s/reticulado de hierro redondo s/aislación m2 7,1090 7,1654 7,5944 7,5944 7,8831 7,8925 7,9211 8,1327 8,1346 8,1346 8,1346 8,4966

5002 H°G° Nº24 s/tiranteria de madera s/aislación m2 6,7376 6,7672 7,2376 7,2462 7,4440 7,4440 7,4440 7,5867 7,5997 7,5997 7,5997 7,8508

5003 Babetas H°G° Nº24 ml 4,9898 5,2719 5,5190 5,5190 5,5870 5,6111 5,6754 5,7332 5,7332 5,7332 5,7332 5,8187

5004 Cupertina H°G° Nº24 x1.20 m2 4,9898 5,2719 5,5190 5,5190 5,5870 5,6111 5,6754 5,7332 5,7332 5,7332 5,7332 5,8187

5005 Tejas francesas asent. s/losa de hº m2 5,4493 5,5495 5,9690 5,9690 6,0920 6,0937 6,0978 6,1869 6,3515 6,3515 6,3515 6,6245

5006 Tejas francesas sobre entablonado m2 6,7005 6,7333 7,0012 7,0012 7,0988 7,1122 7,1477 7,2232 7,3771 7,3771 7,3771 7,5387

5007 Tejas francesas sobre tejuelas m2 5,0124 5,0473 5,3669 5,3669 5,5113 5,5121 5,5140 5,6186 5,7129 5,7129 5,7129 5,9414

5008 Tejas españolas asent. s/losa de hº m2 7,8408 7,9932 8,1762 8,1762 8,3320 8,3354 8,3449 8,4593 8,6938 8,6938 8,6938 9,0542

5009 Tejas españolas sobre entablonado m2 7,6670 7,7146 7,9131 7,9131 8,0171 8,0319 8,0711 8,1519 8,3304 8,3304 8,3304 8,5141

5010 Tejas españolas sobre tejuelas m2 5,7312 5,7793 6,0143 6,0143 6,1627 6,1646 6,1702 6,2778 6,3913 6,3913 6,3913 6,6381

5011 Cubierta t/Mini khala de chapa galvanizado m2 7,4830 7,8119 8,3122 8,3122 8,5390 8,5450 8,5617 8,7258 8,7258 8,7258 8,7258 9,0100

5012 Canaleta cuadrada de HºGº ml 5,1911 5,1911 5,5130 5,5130 5,7160 5,7322 5,7765 5,9287 5,9287 5,9287 5,9287 6,1847

5013 Cumbrera de chapa de HºGº Nº24 ml 2,9253 2,9253 3,1180 3,1180 3,1640 3,1833 3,2480 3,2887 3,2887 3,2887 3,2887 3,3460

5014 Chapa Trapezoidal Autoportante m2 7,2523 7,6270 8,1157 8,1157 8,2766 8,2850 8,3060 8,4241 8,4241 8,4241 8,4241 8,6245

5015 Colocación Chapas de H°G° Nº24 s/tirantería existente m2 5,8493 5,8964 6,2723 6,2860 6,4272 6,4272 6,4272 6,5291 6,5291 6,5291 6,5291 6,7115

5016 Bajada pluvial de chapa diam. 0,100 ml 7,1029 7,1291 7,4583 7,4583 7,6408 7,6816 7,7854 7,9320 7,9320 7,9320 7,9320 8,1621

5017 Canaleta de HºGº Nº 27 c/desborde ml 6,3450 6,3602 6,6661 6,6661 6,8159 6,8741 7,0247 7,1554 7,1554 7,1554 7,1554 7,3442

5019 Canaleta de HºGº c/desborde - Reparación y Recolocación ml 6,6782 6,6818 7,1000 7,1000 7,4418 7,4473 7,4636 7,7127 7,7127 7,7127 7,7127 8,1436

5020 Cenefa de HºGº (Flor de Lis) recolocación ml 8,4933 8,4933 9,1267 9,1267 9,5867 9,5867 9,6400 9,9733 9,9733 9,9733 9,9733 10,5467

5022 Cubierta de chapa de H°G° Nº24 s/chapa doblada C c/aislación m2 5,5297 5,5587 5,8394 5,8394 5,9841 6,0127 6,0860 6,2006 6,2022 6,2022 6,2022 6,3858

5023 Cubierta de FºCº s/tiranteria de madera m2 6,8310 6,8310 7,2449 7,2449 7,6158 7,6158 7,6158 7,8829 7,9356 7,9356 7,9356 8,4014

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 8 de 12 www.dpo.gov.ar - [email protected]

Page 9: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

5024 Reparación Cubierta de Cobre en cúpula - Chapas de 5mm - En altura m2 9,3589 9,3589 9,7960 9,7960 10,1926 10,1926 10,1926 10,4784 10,4784 10,4784 10,4784 10,9740

5025 Reparación canaleta de cobre en cúpula - Chapas de 5mm - 2M altura ml 10,0547 10,0547 10,3413 10,3413 10,5925 10,5925 10,5925 10,7738 10,7738 10,7738 10,7738 11,0917

5028 Cubierta de chapa de H°G° Nº24 s/reticulado de hierro redondo c/aislación m2 6,9607 6,9909 7,4440 7,4440 7,7367 7,7679 7,8552 8,0777 8,0796 8,0796 8,0796 8,4466

5032 Cenefa H°G° Nº24 ml 6,0564 6,2818 6,5754 6,5754 6,6972 6,7405 6,8558 6,9594 6,9633 6,9633 6,9633 7,1166

5034 Recolocación de canaleta de HºGº existente ml 6,8592 6,8592 7,2898 7,2898 7,6735 7,6735 7,6735 7,9510 7,9510 7,9510 7,9510 8,4347

5035 Cubierta de chapa de H°G° Nº24 trapez. Prepintada s/madera c/aislac. m2 6,3773 6,3804 6,6624 6,6662 6,7539 6,7862 6,8702 6,9455 7,0002 7,0002 7,0002 7,1117

5039 Viga reticulada rectangular (40x20) de hierro redondo ml 7,5137 7,5610 7,8147 7,8147 8,0307 8,1026 8,2930 8,4721 8,4754 8,4754 8,4754 8,8072

5043 Rejilla ventilación de cieloraso un 8,1133 8,1133 8,5768 8,5768 8,8465 8,8465 8,8465 9,0416 9,0416 9,0416 9,0416 9,3816

5044 Canaleta de HºGº Nº24 c/desborde ml 5,6257 5,8482 6,1314 6,1314 6,2641 6,2938 6,3715 6,4788 6,4788 6,4788 6,4788 6,6462

5047 Cubierta de chapa de H°G° Nº24 s/correas de chapa doblada s/aisl. m2 5,5676 5,5993 5,8794 5,8794 6,0329 6,0349 6,0394 6,1510 6,1527 6,1527 6,1527 6,3516

5049 Cubierta de H°G° Nº 24 s/tiranteria de madera - Reemplazo de chapas m2 6,4457 6,5226 6,7963 6,8117 7,0480 7,0797 7,1623 7,3439 7,4659 7,4659 7,4659 7,7675

5051 Cubierta Ch. simil teja c/aislación - Reemplazo de chapas y entablonado m2 5,3436 5,3469 5,5545 5,5586 5,6521 5,6875 5,7804 5,8612 5,9238 5,9238 5,9238 6,0425

5052 Recolocación de Cumbrera de chapa de HºGº Nº24 ml 7,8636 7,8636 8,3693 8,4602 8,8523 8,8523 8,8523 9,1364 9,1364 9,1364 9,1364 9,6648

5053Cubierta de chapa Trap. de H°G° Nº 24 prepintadas s/correas de chapa doblada

c/aislaciónm

2 4,5631 4,5748 4,8120 4,8120 4,8965 4,9429 5,0636 5,1416 5,1420 5,1420 5,1420 5,2482

5054 Repaso de cubierta de CH. Nº24 s/tiranteria de madera m2 8,1947 8,1947 8,7684 8,8105 9,2737 9,2737 9,2737 9,6105 9,6132 9,6132 9,6132 10,2132

5056 Bajada de P.V.C. Diam. 0,110 ml 6,8930 7,0368 7,4292 7,4292 7,6456 7,7722 8,1001 8,3015 8,3015 8,3015 8,3257 8,5984

5100 VARIOS

5101 Alambrado h.=1,5m c/poste olímpico ml 5,9644 6,0793 6,2168 6,2168 6,3350 6,3358 6,3366 6,4223 6,4223 6,4223 6,4223 6,5955

5102 Arco madera p/acceso a localidades gl 5,0795 5,0807 5,3669 5,3669 5,5431 5,5435 5,5449 5,6720 5,6944 5,6944 5,6944 5,9143

5103 Alambrado h.=2,50m c/poste olímpico ml 5,9644 6,0793 6,2168 6,2168 6,3350 6,3358 6,3366 6,4223 6,4223 6,4223 6,4223 6,5955

5107 Reja de o,40 p/desague M 8,1610 8,1741 8,7050 8,7050 9,0923 9,1070 9,1453 9,4299 9,4613 9,4613 9,5283 10,0096

5108 Reja de o,60 p/desague M 8,1393 8,1592 8,6725 8,6725 9,0415 9,0622 9,1177 9,3914 9,4237 9,4237 9,4925 9,9511

5109 Chapa de Policarbonato s/marco perfil L de hierro m2 3,4597 3,4775 3,5965 3,5965 3,6179 3,6535 3,7479 3,7765 3,8052 3,8052 3,8052 3,8320

5110 Escalera tipo marinera de HºGº ml 8,2115 8,2115 8,3769 8,3769 8,5273 8,5273 8,9630 9,0714 9,0724 9,0724 9,0724 9,2622

5111 Escalera tipo marinera de HºGº c/protección ml 8,2156 8,2156 8,3331 8,3331 8,4352 8,4352 8,9188 8,9923 8,9940 8,9940 8,9940 9,1229

5112 PROVISION Y COLOCACION PILOTES Y CORDON FRONTAL PUERTO c/u 5,6765 5,6775 5,8367 5,8454 5,9001 5,9181 5,9562 6,0017 6,0303 6,0305 6,0319 6,0977

5114 Ascensor 2 paradas un 1,4518 1,4510 1,4701 1,4719 1,4843 1,4893 1,4919 1,4983 1,4983 1,5013 1,5013 1,5218

5125 Matafuegos y balde P/extinción de focos de incendio gl 2,8230 2,8230 2,8454 2,8454 2,8655 2,8958 2,9751 3,0009 3,0424 3,0424 3,0424 3,1777

5170 Mástil completo - S/pilar 0,60x0,60x0,80 - vereda perim. 0,60 un. 7,2916 7,3151 7,6109 7,6385 7,8731 7,8959 8,0421 8,1951 8,2336 8,2411 8,2413 8,5608

5171 Equipamiento para mataderos de excepción global 7,4705 7,5302 7,6715 7,6715 7,8146 7,9221 8,2087 8,3474 8,3474 8,3474 8,3474 8,5913

5172 Corral rural - postes c/2m - 1,60m de altura - alambre 11 hilos ml 3,9162 3,9399 4,0896 4,0896 4,1827 4,1827 4,1832 4,2491 4,2538 4,2538 4,2538 4,3746

5173 Tranquera 3mx1,40m c/u 6,5024 6,5060 6,6710 6,6710 6,7368 6,7499 6,7861 6,8387 6,8444 6,8444 6,8444 6,9274

5174 Mangas para lavaderos/mataderos de ganado vacuno ml 6,8595 6,8595 7,1765 7,1765 7,3591 7,3714 7,4056 7,5426 7,5660 7,5660 7,5660 7,8015

5175 Conductos de inyección/retorno A.A. Central 100Kg 5,5714 5,8181 6,2152 6,2152 6,4122 6,4389 6,5127 6,6655 6,6655 6,6655 6,6655 6,9068

5176 Prov. y Coloc. Equipo de A.A. Central Roof-Top YORK 20 TR (60.000FS) - FRIO SOLO c/u 6,1427 6,1987 6,4857 6,5148 6,5965 6,6402 6,6402 6,6929 6,7769 6,8495 6,8644 6,9438

5177 Equipamiento para mataderos global 4,9792 5,1867 5,3341 5,3341 5,4153 5,4239 5,4463 5,5078 5,5120 5,5120 5,5120 5,6133

5178 Cartel indicador de chapa negra Nº 18 abulonado a muro m2 6,8147 6,8370 7,2058 7,2058 7,4656 7,4987 7,5873 7,7882 7,7882 7,7882 7,7882 8,0845

6000 INSTALACION SANITARIA

6001 Pozo absorbente (d: 1,20 m, prof.12 m) u 6,9994 7,0007 7,4829 7,5793 7,9943 8,0888 7,9987 8,2315 8,2887 8,3197 8,3197 8,7788

6002 Pozo absorbente (d: 1,50 m, prof.12 m) u 7,2841 7,2854 7,8103 7,8812 8,3185 8,3883 8,3227 8,5896 8,6322 8,6550 8,6550 9,1685

6003 Pozo absorbente (d: 2,00 m, prof.12 m) u 7,5025 7,5042 8,0847 8,1722 8,6632 8,7491 8,6677 8,9617 9,0033 9,0315 9,0315 9,5676

6004 Camara septica - 1.05 x 2.25 x 1.20 u 6,9174 6,9200 7,3716 7,4817 7,8846 7,9944 7,8964 8,1112 8,1744 8,2099 8,2099 8,6278

6005 Camara septica - 1.20 x 2.55 x 1.20 u 6,9245 6,9272 7,3739 7,4781 7,8768 7,9811 7,8892 8,1051 8,1673 8,2010 8,2010 8,6222

6006 Camara septica - 1.20 x 2.55 x 1.35 u 6,9013 6,9040 7,3501 7,4574 7,8555 7,9625 7,8674 8,0808 8,1443 8,1789 8,1789 8,5971

6007 Camara septica - 1.35 x 2.70 x 1.35 u 6,9404 6,9431 7,3924 7,4956 7,8972 8,0004 7,9094 8,1280 8,1899 8,2232 8,2232 8,6498

6008 Camara septica - 1.35 x 3 x 1.35 u 6,9931 6,9959 7,4533 7,5541 7,9630 8,0637 7,9747 8,2003 8,2605 8,2930 8,2930 8,7292

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 9 de 12 www.dpo.gov.ar - [email protected]

Page 10: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

6009 Boca de desagüe tapada - 20 x 20 x 50 u 6,9665 6,9677 7,3892 7,4601 7,8229 7,8930 7,8288 8,0421 8,0838 8,1067 8,1067 8,5112

6010 Boca de desagüe tapada - 30 x 30 x 70 u 6,8888 6,8901 7,3145 7,3975 7,7681 7,8498 7,7729 7,9826 8,0343 8,0613 8,0613 8,4721

6011 Boca de desagüe abierta - 20 x 20 x 50 u 6,9031 6,9047 7,3168 7,3924 7,7482 7,8229 7,7545 7,9597 8,0042 8,0285 8,0285 8,4175

6012 Boca de desagüe abierta - 30 x 30 x 50 u 6,8845 6,8862 7,3019 7,3778 7,7374 7,8126 7,7436 7,9508 7,9993 8,0238 8,0238 8,4243

6013 Boca de desagüe abierta - 40 x 40 x 50 u 5,6943 5,6949 6,2178 6,5833 7,0701 7,4246 7,0730 7,1692 7,3203 7,4382 7,4382 7,6258

6014 Pileta de patio tapada - 20 x 20 x 50 u 6,9444 6,9457 7,3709 7,4479 7,8137 7,8893 7,8188 8,0299 8,0726 8,0974 8,0974 8,4944

6015 Pileta de patio abierta - 20 x 20 x 50 u 6,5841 6,5856 6,9487 7,0401 7,3545 7,4444 7,3606 7,5246 7,5780 7,6074 7,6074 7,9325

6016 Camara de inspeccion - 60 x 60 x 1.20 u 6,7187 6,7205 7,1354 7,2490 7,6067 7,7182 7,6126 7,7921 7,8572 7,8938 7,8938 8,2542

6017 Camara de inspeccion - 60 x 1.05 x 2.00 u 6,6724 6,6737 7,1028 7,2252 7,5964 7,7160 7,6009 7,7838 7,8538 7,8933 7,8933 8,2684

6018 Cañeria Cloacal M 7,9293 7,9487 8,5439 8,5439 8,9692 8,9863 9,0296 9,3444 9,3444 9,3444 9,3501 9,9282

6019 Bateria de Baños Comunitarios p/Damas u 3,3627 3,4847 3,6494 3,6494 3,7174 3,8006 4,0187 4,0989 4,1271 4,1271 4,1463 4,2664

6020 Bateria de Baños Comunitarios p/Caballeros u 3,4698 3,5881 3,7527 3,7527 3,8252 3,9059 4,1176 4,2002 4,2302 4,2302 4,2508 4,3789

6021 Baño Comun u 3,3429 3,4309 3,5854 3,5854 3,6254 3,7414 4,0457 4,1181 4,1343 4,1343 4,1453 4,2157

6022 Cocina Comun u 4,3572 4,5774 4,6580 4,6580 4,6979 4,7093 4,7395 4,7727 4,8071 4,8071 4,8071 4,8569

6023 Instalación de Cañeria de Agua M 6,5508 6,6737 7,0593 7,0593 7,2966 7,3008 7,3263 7,4958 7,5042 7,5042 7,5042 7,8136

6024 Cañeria Cloacal y pluvial de 0,110 M 7,4028 7,4941 7,9843 7,9843 8,2777 8,3564 8,5618 8,8049 8,8049 8,8049 8,8316 9,2305

6025 Baño discapacitados u 2,5108 2,7112 2,8080 2,8080 2,8084 2,8214 2,8558 2,8610 2,8838 2,8838 2,8838 2,9486

6026 Cañeria de Agua Hidro 3 (Polipropileno) de 0,019 M 5,9748 6,1262 6,4574 6,4574 6,6341 6,6498 6,6909 6,8202 6,8265 6,8265 6,8265 7,0568

6027 Cañeria de Agua Hidro Bronz de 0,019 M 9,4142 9,4142 9,8328 9,8328 9,9157 10,3802 11,6095 11,8432 11,8462 11,8462 11,8462 11,9541

6038 Mesada granitico reconst. 3,00X0,6 bacha de Ac. Inox. un 4,0129 4,1818 4,1843 4,1843 4,1864 4,1864 4,1865 4,1880 4,2435 4,2435 4,2435 4,2463

6043 Cañeria Cloacal y pluvial de 0,160 ml 7,9635 8,1352 8,5973 8,5973 8,8065 8,9736 9,4128 9,6276 9,6276 9,6276 9,8671 10,1514

6046 Cañeria Cloacal y pluvial de 0,110 c/malla p/vereda M 7,1018 7,2285 7,6324 7,6324 7,8349 7,9398 8,2139 8,4019 8,4019 8,4019 8,4361 8,7175

6054 Piletón Lavamanos de 0,40x0,45x2,00 u 4,9653 5,0053 5,2303 5,2303 5,3732 5,4339 5,5942 5,7192 5,7395 5,7395 5,7399 5,9449

6055 Perforación c/equipo de bombeo sumerg. y tablero - H/30m de prof. gl 6,3418 6,3480 6,5084 6,5084 6,5873 6,5873 6,8145 6,8714 6,9019 6,9019 6,9019 7,0028

6056 Instalacion Sanitaria mataderos un 6,9349 6,9893 7,4224 7,4823 7,8094 7,9229 7,9838 8,1896 8,2273 8,2491 8,3021 8,6458

7000 INSTALACION ELÉCTRICA

7001 Instalación Eléctrica s/artefactos - incl/Caños, Cables, llaves y tomas Boca 7,6440 7,8259 8,2344 8,2344 8,5171 8,5697 8,6778 8,8811 9,1172 9,1206 9,2425 9,6289

7002 Prov. y coloc. Ventilador de Techo t/Abon Garden blanco 1,2m u. 4,1772 4,1772 4,2148 4,2148 4,2489 4,2489 4,2489 4,2734 4,2734 4,2734 4,2734 4,3160

7003 Prov. y coloc. Ventilador de Pared Imperio paleta met. 25" u. 3,2165 3,2165 3,2383 3,2383 3,2576 3,2576 3,2576 3,2715 3,2715 3,2715 3,2715 3,2959

7004 Tablero General Mediano u. 7,6440 7,8259 8,2344 8,2344 8,5171 8,5697 8,6778 8,8811 9,1172 9,1206 9,2425 9,6289

7005 Tablero Chico o deSala de Jardin u. 7,6440 7,8259 8,2344 8,2344 8,5171 8,5697 8,6778 8,8811 9,1172 9,1206 9,2425 9,6289

7006 Prov y Coloc. Artef. P/Fluorec. Doble t/Celtia de Philips 2 x 36W u. 2,3870 2,4667 2,6198 2,6198 2,6459 2,6900 2,8054 2,8408 2,8408 2,8408 2,8408 2,8733

7007 Prov y Coloc. De Artef. T/Tortuga XULUX APL-D 27 u. 3,8548 3,9637 4,2156 4,2156 4,2921 4,3515 4,5077 4,5842 4,5842 4,5842 4,5842 4,6793

7008 Prov. y coloc. de termotanque eléctrico 130 lts. Rhem o similar. u. 2,4376 2,4376 2,4422 2,4422 2,4464 2,4464 2,4464 2,4493 2,4987 2,4987 2,4987 2,5040

7009 Extractor de aire en pared 3/4 HP monof. - prov. y colocación u. 8,3968 8,3968 9,0251 9,0251 9,5758 9,5758 9,5758 9,9732 9,9732 9,9732 9,9732 10,6700

7010 Tablero general para 10 ITM - 1 ID u. 5,2316 5,3340 5,5552 5,5552 5,7434 5,7503 5,7548 5,8880 5,9353 5,9353 5,9429 6,2214

7011 Tablero general para 5 ITM - 1 ID u. 4,8090 4,9291 5,0954 5,0954 5,2278 5,2402 5,2461 5,3368 5,3947 5,3947 5,4053 5,6173

7019 Cable subterráneo de 4x16 mm2 c/compac. manual de suelo ml 9,1287 9,7714 10,2709 10,2935 10,4840 10,5324 10,6097 10,7137 10,7333 10,7487 10,9969 11,4181

7080 Termotanque electrico 130 lts. - prov. y colocación u. 2,5652 2,5652 2,5830 2,5830 2,5989 2,5989 2,5989 2,6104 2,6588 2,6588 2,6588 2,6788

8000 CARPINTERÍA

8001 Prov. y coloc.de Puerta ext. madera algarrobo 0,80 x 2,00 u. 4,5706 4,7209 4,9304 4,9304 4,9725 5,1023 5,4438 5,5229 5,5245 5,5245 5,5245 5,5819

8002 Prov. y coloc. de Puerta interior placa u. 4,9351 5,0807 5,3172 5,3172 5,3841 5,4474 5,6133 5,6851 5,8272 5,8272 5,8272 5,9189

8003 Prov. y coloc. de Ventana de mad. Algarrobo u. 4,0918 4,2270 4,2740 4,2740 4,3117 4,3679 4,5159 4,5643 4,5655 4,5655 4,5655 4,6164

8004 Prov. y coloc. de Ventana metalica corrediza c/celosía 1.50 x 0.90 u. 3,9376 4,0031 4,1803 4,1803 4,2148 4,2705 4,4164 4,4620 4,4636 4,4636 4,4636 4,5109

8005 Prov. y Coloc. de Ventiluz metálico c/mosquitero reja, y vidrio 0.70 x 0.50. u. 3,8505 3,9078 4,0896 4,0896 4,1408 4,2137 4,4051 4,4692 4,4715 4,4715 4,4715 4,5416

8006 Prov. y coloc. Puerta ext. madera algarrobo 1,60 x 2,00 u. 4,3777 4,5369 4,7280 4,7280 4,7482 4,8858 5,2475 5,3137 5,3145 5,3145 5,3145 5,3422

8007 Ajuste y acondicionamiento de aberturas de madera un 4,7561 4,9148 5,1366 5,1366 5,1895 5,2582 5,4387 5,5024 5,6546 5,6546 5,6546 5,7200

8008 Prov. y Coloc. de Ventana de AL. Color 1,50x1,00 corred. vidriada u. 5,6486 5,7889 6,0473 6,0473 6,1010 6,1813 6,3919 6,4608 6,4625 6,4625 6,4625 6,5341

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 10 de 12 www.dpo.gov.ar - [email protected]

Page 11: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

8009 Prov. y Coloc. de Puerta de AL. Color 0,80x2,10 1/4 vidriada u. 5,5316 5,6876 5,9241 5,9241 5,9424 6,0761 6,4272 6,4904 6,4910 6,4910 6,4910 6,5153

9000 INFRAESTRUCTURA

9001 Flete (Inc. Manipuleo) km 7,3896 7,3976 7,7390 7,8715 8,1847 8,2651 8,2731 8,4779 8,4779 8,4819 8,4940 8,8313

9002 Distribución de Terraplén y Compactación Manual (Esp.:20 cm) m2 6,5000 6,5118 6,7706 6,9118 7,1118 7,1882 7,2000 7,3647 7,3647 7,4059 7,4294 7,6235

9003 Distribución de Terraplén y Compactación Especial (Esp.: 20 cm) m2 6,9737 6,9737 7,2105 7,3421 7,6053 7,6842 7,6842 7,8421 7,8421 7,9211 7,9211 8,1316

9004 Trasporte de Suelo Distancia Media 15 km. m3 6,8477 6,8642 7,0658 7,2469 7,4588 7,5617 7,5741 7,7099 7,7099 7,7140 7,7366 7,9033

9005 Relleno de Zanja con Equipo m3 6,5273 6,5394 6,7939 6,9333 7,1394 7,2000 7,2121 7,3939 7,3939 7,4000 7,4242 7,6000

9006 Excavación y coloc. de Caño Ø : 0.40 m m 5,6821 5,6837 5,8335 5,8469 5,8916 5,8970 5,8984 5,9335 6,1443 6,1446 6,2432 6,2957

9007 Excavación y coloc. de Caño Ø : 0.60 m m 5,4280 5,4294 5,5746 5,5858 5,6295 5,6340 5,6352 5,6689 5,8707 5,8709 5,9881 6,0411

9008 Excavación y coloc. de Caño Ø : 0.80 m m 4,7476 4,7487 4,8684 4,8772 4,9070 4,9106 4,9116 4,9348 5,1193 5,1195 5,2265 5,2616

9009 Excavación y coloc. de Caño Ø : 1.00 m m 4,9876 4,9888 5,1123 5,1208 5,1494 5,1529 5,1538 5,1760 5,3727 5,3730 5,4868 5,5210

9010 Base de Arena Cemento m3 5,6465 5,6473 5,7195 5,7278 5,7430 5,7479 5,7484 5,7596 5,8266 5,8282 5,8295 6,0558

9100 RED DISTRIBUIDORA DE AGUA POTABLE

9101 Prueba Hidráulica m 7,0563 7,0563 7,5352 7,5352 7,9437 7,9718 7,9718 8,2817 8,2817 8,4225 8,4366 8,9718

9102 Excavación para Zanjeo (c/ equipo) m3 6,7452 6,7596 7,0625 7,1827 7,4375 7,4856 7,5000 7,6971 7,6971 7,7019 7,7260 7,9760

9103 Prov., acarreo y coloc. de cañeria de Ø : 0,075 m 6,8625 6,9930 7,2890 7,3566 7,5035 7,6620 7,9930 8,1422 8,1422 8,1469 8,3287 8,4802

9104 Prov., acarreo y coloc. de cañeria de Ø : 0,160 m 7,6089 7,8257 8,1422 8,1869 8,2741 8,5057 9,0539 9,1938 9,1938 9,1950 9,4977 9,5860

9105 Válvula Esclusa Ø:0,075 c/u 4,4558 4,5925 4,7949 4,8079 4,8596 4,8722 4,8596 4,8878 4,9938 4,9980 5,1810 5,2462

9106 Válvula Esclusa Ø:0,160 c/u 4,5071 4,6732 4,8666 4,8710 4,8886 4,8929 4,8886 4,8983 5,0178 5,0192 5,0672 5,0895

9107 Hidrante a Resorte c/u 4,4788 4,6122 4,8174 4,8317 4,8884 4,9095 4,9149 4,9487 5,0477 5,0523 5,1862 5,2577

9108 Piezas Especiales para Nudos c/u 4,7337 4,8963 5,0985 5,0985 5,1241 5,2631 5,6277 5,6983 5,7047 5,7047 5,8517 5,8964

9109 Conexiones Domiciliarias c/u 4,7549 4,8684 5,1022 5,1217 5,2238 5,2409 5,2652 5,3462 5,4080 5,4085 5,4767 5,5951

9200 RED COLECTORA CLOACAL

9201 Exc de zanjeo y tapado con compactación m3 6,9341 6,9480 7,2101 7,3544 7,6100 7,6910 7,7029 7,8834 7,8834 7,8992 7,9209 8,1607

9202 Prov., acarreo y coloc. de cañeria de Ø : 0,160 m 7,5984 7,7775 8,1135 8,1649 8,3085 8,5044 8,9504 9,1161 9,1161 9,1161 9,3644 9,5168

9203 Prueba Hidráulica Cloacal m 7,1493 7,1493 7,5970 7,5970 7,9925 8,0373 8,0373 8,3657 8,3657 8,5597 8,5896 9,0970

9204 Construcción Boca de Registro c/u 5,7467 5,8124 6,0888 6,1176 6,2847 6,3078 6,3074 6,4239 6,4837 6,4882 6,5144 6,7602

9205 Construcción Domiciliaria L = 8,5 m c/u 6,9867 7,1087 7,4671 7,4884 7,6792 7,7921 8,0659 8,2464 8,2517 8,2522 8,4120 8,6621

9222 Prov., acarreo y coloc. de cañeria de Ø : 0,200 m 6,2457 6,3981 6,6740 6,7138 6,8250 6,9911 7,3727 7,5058 7,5058 7,5058 7,7186 7,8367

9300 RED CONEXIÓN ELÉCTRICA

9301 Conección Eléctrica Domiciliaria (Inc. Alumbrado) c/viv. 8,7593 9,0121 9,5856 9,5856 9,7478 9,7936 9,9143 10,0484 10,0484 10,0484 10,1187 10,3847

9400 OBRAS VIALES

9401 TRANSPORTE DE SUELO - DMT 10KM - 20C/D de 5m3/C m3 6,1387 6,1513 6,3445 6,5000 6,7059 6,8025 6,8109 6,9412 6,9412 6,9454 6,9622 7,1429

9402 TRANSPORTE DE SUELOS - DMT 50KM - 4C/D de 5m3/C m3 6,1454 6,1580 6,3493 6,5034 6,7141 6,8068 6,8166 6,9473 6,9473 6,9493 6,9668 7,1463

9403 PROVISIÓN DE RIPIO (Puesto sobre Camión) m3 5,4845 5,4969 5,6770 5,8012 5,9565 6,0373 6,0435 6,1677 6,1677 6,2360 6,2609 6,4037

9404 TERRAPLENAMIENTO C/RIPIO, COMPACTACION Y NIVELADO m3 6,0831 6,0970 6,3187 6,4527 6,6697 6,7413 6,7529 6,9053 6,9053 6,9261 6,9492 7,1455

9405 PROVISION, TRANSPORTE Y TERRAPLENAMIENTO C/RIPIO - DMT 50KM m3 6,0630 6,0760 6,2742 6,4200 6,6269 6,7128 6,7227 6,8586 6,8586 6,8721 6,8919 7,0723

9406 PROVISION, TRANSPORTE Y TERRAPLENAMIENTO C/RIPIO - DMT 10KM m3 5,9832 5,9964 6,2019 6,3401 6,5421 6,6226 6,6322 6,7728 6,7728 6,7981 6,8197 7,0012

9407 EXCAVACIÓN PARA APERTURA DE CAJA P/ENRIPIADO m3 6,4286 6,4454 6,7269 6,8445 7,1008 7,1765 7,1849 7,3571 7,3571 7,3697 7,3866 7,6597

9408 SANEAMIENTO B/CORD. CUNETA (DE BASE DE ASIENTO C/COMPACTACION) m3 6,3053 6,3148 6,5794 6,6973 6,9436 7,0199 7,0286 7,2003 7,2003 7,2324 7,2498 7,5030

9409 EXCAVACIÓN PARA EJECUCION DE CORDON CUNETA m3 6,8690 6,8767 7,2296 7,3174 7,6456 7,6995 7,7057 7,9368 7,9368 7,9553 7,9692 8,3313

9410 CORDÓN CUNETA DE HORMIGON ARMADO m3 6,1762 6,2079 6,4741 6,4776 6,6392 6,6431 6,6466 6,7635 6,8420 6,8438 6,8451 7,1744

9411 FABRICACION DE BLOQUES PARA PAVIMENTO m3 5,5294 5,5294 5,7059 5,7059 5,7647 5,7941 5,7941 5,8235 5,9118 5,9412 5,9412 6,2059

9412 CONSTRUCCIÓN DE SUELO CEMENTO m3 5,2818 5,2854 5,3492 5,3983 5,4543 5,4846 5,4888 5,5285 5,5860 5,6001 5,6090 5,8129

9413 COLOCACION DE BLOQUES PARA PAVIMENTO S/CAMA ARENA 10CM m3 7,1708 7,1708 7,5552 7,5872 7,8399 7,8612 7,8648 8,0534 8,0641 8,0854 8,0961 8,4733

9414 ESTABILIZACION DE SUB-BASE GRANULAR POR TRITURACIÓN DE CAPAS GRANULARES EXISTENTES (V.S.R >40) C/APORTE PETREO 30% DE 85%m3 5,3701 5,4424 5,6475 5,6992 5,7529 5,7773 5,7822 5,8281 5,9336 5,9375 5,9473 6,0625

9415 PROVISIÓN DE SUELO SELECCIONADO m3 3,4805 3,4870 3,5584 3,6104 3,7662 3,7857 3,7922 3,8896 3,9481 3,9870 4,0260 4,0714

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 11 de 12 www.dpo.gov.ar - [email protected]

Page 12: PLANILLA de INDICES de COSTOS DPO · 2013-05-30 · jul-10 ago-10 sep-10 oct-10 nov-10 dic-10 PLANILLA de INDICES de COSTOS Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10

jul-10 ago-10 sep-10 oct-10 nov-10 dic-10

PLANILLA de INDICES de COSTOS

Cod. Trabajo ( Items.) unid. ene-10 feb-10 mar-10 abr-10 may-10 jun-10

DPO

9416 RETIRO Y RECOLOC. CAÑOS DE Hº Aº 80CM P/ACCESOS - 30% REPOS. c/u 6,0940 6,0978 6,4073 6,4419 6,6672 6,6857 6,6889 6,8552 6,9368 6,9443 6,9975 7,2707

9417 COLOCACIÓN DE CABEZALES DE HºAº PREFABRICADOS P/CAÑO 80CM c/u 4,7715 4,7938 4,8943 5,0072 5,1339 5,1774 5,1795 5,2415 5,3453 5,3874 5,5139 5,6499

9418 TRANSPORTE DE CAÑOS Y CABEZALES - 27TN/CICLO - 1 C/DIA TN 5,5841 5,5950 5,7468 5,8900 6,0469 6,1511 6,1600 6,2636 6,2636 6,3408 6,3672 6,4952

9419 SEÑALIZACION VERTICAL m2 6,9621 7,0650 7,2084 7,2431 7,3253 7,3639 7,4064 7,4964 7,6592 7,7345 7,8986 8,1110

Av. 3 de Abril 1250 - Corrientes - Tel (3783) 476333 Página 12 de 12 www.dpo.gov.ar - [email protected]