1
PRESUPUSTOS: SUELO CON TIERRA DE CHACRA *2 DOSIS THOR GEL = s/140 *1 BARILLA DE COBRE 2.40 METROS = s/240 *10 METRO DE CABLE DE 25 MM = s/100 *2 CONECTORES ANDERSSON 3/4 = s/16 *1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22 *1 CAMIONADA DE TIERRA DE CHACRA = s/120 *3 TUBOS DE LUZ = s/9 *MANO DE OBRA =s/ 500 a s/600 SUELO CON PIEDRA (HORMIGON) *1 BOLSA CEMENTO CONDUCTIVO =s/110 *1 BARILLA DE COBRE 2.40 METROS = s/240 *10 METRO DE CABLE DE 25 MM = s/100 *2 CONECTORES ANDERSSON 3/4 = s/16 *1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22 *1 CAMIONADA DE TIERRA DE CHACRA = s/120 *3 TUBOS DE LUZ = s/9 *MANO DE OBRA =s/ 500 a s/600 ESO ES PARA UN POZO A TIERRA……..
-
Upload
michael-de-la-cruz -
Category
Investor Relations
-
view
376 -
download
1
Transcript of Pozo a tierra
PRESUPUSTOS:SUELO CON TIERRA DE CHACRA
*2 DOSIS THOR GEL = s/140*1 BARILLA DE COBRE 2.40 METROS = s/240*10 METRO DE CABLE DE 25 MM = s/100*2 CONECTORES ANDERSSON 3/4 = s/16*1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22*1 CAMIONADA DE TIERRA DE CHACRA = s/120*3 TUBOS DE LUZ = s/9*MANO DE OBRA =s/ 500 a s/600
SUELO CON PIEDRA (HORMIGON)
*1 BOLSA CEMENTO CONDUCTIVO =s/110*1 BARILLA DE COBRE 2.40 METROS = s/240*10 METRO DE CABLE DE 25 MM = s/100*2 CONECTORES ANDERSSON 3/4 = s/16*1 CAJA DE CONCRETO PARA POZO TIERRA = s/ 22*1 CAMIONADA DE TIERRA DE CHACRA = s/120*3 TUBOS DE LUZ = s/9*MANO DE OBRA =s/ 500 a s/600
ESO ES PARA UN POZO A TIERRA……..