    ndice de Precios de Materiales de Construccin

    Mayo 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    2/49

    AUTORIDADES EQUIPO RESPONSABLE

    JUNTA DIRECTIVA Ruben NarcisoLuis Batz

    Ministerio de Economa Marvin ReyesLic. Sergio de la Torre, Titular

    Lic. Jacobo Rey Sigfrido Lee, Suplente Diagramacin y diseoLigia Morales

    Ministerio de FinanzasLicda. Mara Concepcin Castro, Titular

    Ministerio de Agricultura, Ganadera yAlimentacin

    Ing. Elmer Lpez, TitularIng. Carlos Alfonso Anzueto, Suplente

    Ministerio de Energa y Minas

    Lic. Erick Archila, TitularLicda. Ivanova Ancheta, Suplente

    Secretara de Planificacin yProgramacin de la

    PresidenciaLicda. Ekaterina Arbolievna Parrilla, Titular

    Licda. Dora Marina Coc, Suplente

    Banco de GuatemalaLic. Edgar Barqun Durn, Titular

    Lic. Julio Roberto Surez, Suplente

    Universidad de San Carlos de GuatemalaIng. Murphy Olimpo Paiz, Titular

    Lic. Oscar Ren Paniagua Carrera,Suplente

    Universidades PrivadasDr. Oscar Guillermo Pelez, Titular

    Comit Coordinador de AsociacionesAgrcolas, Comerciales, Industriales y

    Financieras

    Lic. Hermann Federico Girn, TitularLic. Haroldo Zaldvar, Suplente

    GERENCIALic. Rubn Narciso, Gerente

    Lic. Jaime Meja Salguero, SubgerenteTcnico

    Ing. Orlando Monzn, SubgerenteAdministrativo

  • 7/25/2019 Precio de Materiales INE.pdf

    3/49

    FinancieroGuatemala, agosto 2014

    ContenidoPresentacin ...................................................................................................................... 6

    1. ndice Mayo 2014....................................................................................................... 7

    2.

    Principales resultados............................................................................................... 13

    A. ACERO ESTRUCTURAL ............................................................................................ 14

    1. Angular laminado en fro de 20'x 1/8" espesor de 1 1/4" ..................................... 14

    2. Tubo industrial cuadrado de 20' chapa de 20 de 1" ................................................. 14

    3. Tubo de metal corrugado 24"x25 1/2" calibre 16. ..................................................... 14

    4. Alambre de acero de alta resistencia ........................................................................ 14

    5. Lamina de acero galvanizado estructural, troquelada calibre 26 *** ......................... 14

    B. ACCESORIOS PARA BAO ....................................................................................... 14

    1. Inodoro Standard con accesorios ............................................................................. 14

    C. COMBUSTIBLES LUBRICANTES Y DERIVADOS DEL PETROLEO ......................... 15

    1. Aceite Disel ............................................................................................................ 15

    2. Aceite para motor disel ........................................................................................... 15

    3. Gasolina regular ....................................................................................................... 15

    4. Material bituminoso AC 85/100 ................................................................................. 16

    5. Material bituminoso AC 120/150 ............................................................................... 16

    6. Material bituminoso RC 250 ..................................................................................... 16

    7. Material bituminoso (SS-1H) y RS-1 (RS-K) ............................................................. 16

    8. Material bituminoso RS-2K ....................................................................................... 17

    9. Grasa para chasis .................................................................................................... 17

    10. Material bituminoso AC-20 ..................................................................................... 17

    11. Material bituminoso MC-70 ..................................................................................... 18

    D. LAMINA GALVANIZADA ............................................................................................. 18

    1. Lmina galvanizada de 3'x 8' cal. 20 ........................................................................ 18

    E. LAMINA NEGRA ......................................................................................................... 18

    1. Lmina negra, plancha 1/16"x4'x8' ........................................................................... 18

    F. LAMINA ASBESTO-CEMENTO ................................................................................... 19

    1. Lmina AC ondalita y Lmina Perfil 10 ..................................................................... 19

    G. LAMINA PLASTICA .................................................................................................... 19

  • 7/25/2019 Precio de Materiales INE.pdf

    4/49

    1. Lmina plstica (canal pequeo) .............................................................................. 19

    H. MADERA PARA CONSTRUCCION ............................................................................ 19

    1. Madera para encofrados, pino rstico ...................................................................... 19

    2. Madera de pino cepillada ......................................................................................... 20

    3. Madera de cedro, cepillada, tabla de 1"x12"x10' *** ................................................. 20

    4. Tablero de madera aglomerada, de 4'x 8'x 3/4" *** ................................................... 20

    I. MATERIALES PARA AGUA POTABLE O DESAGES ................................................ 21

    I1. GALVANIZADO .......................................................................................................... 21

    1. Tubera de hierro galvanizado de 20' de largo tipo mediano de 1 1/2" ...................... 21

    I2. P.V.C. ......................................................................................................................... 21

    1. Tubera de 1" C. 250 PSI Tubo Vinil 20" ................................................................... 21

    2. Tubera de 1/2" C. 315 PSI Tubo Vinil de 20" ........................................................... 21

    3. Tubera de PVC corrugada de 18" *** ...................................................................... 22

    I3. BRONCE .................................................................................................................... 22

    1. Vlvula de compuerta de 1" ...................................................................................... 22

    I4. COBRE ....................................................................................................................... 22

    1. Tubo de cobre rgido de 1/2" x 20' ............................................................................ 22

    I5. MATERIALES VARIOS ............................................................................................... 23

    1. Tubo de concreto vibro prensado base plana 1 m. largo x 6" dimetro..................... 23

    2. Tubo de concreto vibro prensado base plana 1 m. largo x 12" dimetro ................... 23

    3. Tubo de concreto no reforzado 1 m. largo x 18" dimetro ........................................ 23

    4. Tubo de concreto reforzado 1 m. largo x 42" dimetro ............................................. 24

    5. Tubera perf. concreto simple 10" ............................................................................. 24

    J. MATERIALES PARA CONCRETO Y MAMPOSTERIA ................................................ 24

    1. Varilla de 20' nmero 3 ............................................................................................. 24

    J2. ACERO DE REFUERZO GRADO 60 ......................................................................... 25

    1. Varilla de 20' nmero 3 ............................................................................................. 25

    J3. BLOCKS Y LADRILLOS ............................................................................................. 25

    1. Block de pmez de 20x20x40 cms. .......................................................................... 25

    2. Block de pmez de 15x20x40 cms. .......................................................................... 25

    3. Block de concreto de 19x19x39 cms. ....................................................................... 26

    4. Ladrillo tubular de 6.5x11x23 cms. ........................................................................... 26

    5. Ladrillo tayuyo de 6.5x11x23 cms. ........................................................................... 26

    6. Adoqun de concreto 2500 PSI de 10 cms. ............................................................... 27

    7. Block de concreto de 14x19x39 cms. ....................................................................... 27

  • 7/25/2019 Precio de Materiales INE.pdf

    5/49

    8. Baldosa de barro doble de 5x30x30 cms *** ............................................................. 27

    9. Teja de concreto 42x32 cms, tipo veneciana con color *** ....................................... 28

    10. Muros perimetrales prefabricados, 5 cms. Espesor, concreto 315 kg/cms, lisoambas caras instalado *** ............................................................................................ 28

    J4 MATERIALES VARIOS ............................................................................................... 28

    1. Arena de ro ............................................................................................................. 28

    2. Arena amarilla .......................................................................................................... 29

    3. Concreto de 2500 PSI .............................................................................................. 29

    4. Cal natural o viva (terrn) ......................................................................................... 29

    5. Cal hidratada ............................................................................................................ 30

    6. Cemento (P. Pub.) .................................................................................................... 30

    8. Piedrn de 3/4" (1/2" y 3/8") ...................................................................................... 30

    9. Material selecto, puesto en distribuidora *** ............................................................. 31

    10. Cemento blanco portland, tipo III *** ....................................................................... 31

    K. MATERIALES PARA ELECTRICIDAD ........................................................................ 31

    1. Alambre N. 12 forrado (100 mts.) ............................................................................. 31

    2. Switch sencillo con placa ticino ................................................................................ 32

    3. Tablero monofs. 8 circuitos y 3 lneas .................................................................... 32

    4. Tubo ducton de metal de 1" x 10' largo .................................................................... 32

    L. PISOS Y AZULEJOS ................................................................................................... 33

    1. Azulejos de 10 x 10 cms. .......................................................................................... 33

    2. Piso de granito gris de 30 x 30 cms. ......................................................................... 33

    3. Piso de granito mrmol fondo blanco de 30 x 30 centmetros ................................... 33

    4. Piso cermico nacional 31.6 x 31.6 cms. PEI 4 (transito intenso) *** ....................... 34

    5. Piso vinilico 30 x 30 cms (1.8 mm) *** ...................................................................... 34

    M. VARIOS ...................................................................................................................... 34

    1. Grama (San Agustn) ............................................................................................... 34

    2. Malla de alambre calibre 12 con agujero de 2 1/2" (1.50 mts. alto) ........................... 35

    3. Plywood de cedro 4' x 8' x 3/4" ............................................................................... 35

    4. Flete ......................................................................................................................... 35

    5. Lmpara fluor. de 4 x 40 WR.S s/difusor .................................................................. 36

    6. Llantas para camin (900 x 20) nacional .................................................................. 36

    7. Llantas para vehculo Liv. R.14-6 pliegos convencional, nacional ............................ 36

    8. Perfil de aluminio 1 1/2" x 1/16" ............................................................................... 37

    9. Sellador elstico SIKA-IGAS R ................................................................................. 37

  • 7/25/2019 Precio de Materiales INE.pdf

    6/49

    10. Vidrio claro de 4 mm............................................................................................... 37

    11. Pintura anticorrosiva ............................................................................................... 38

    12. Pint. estructura metlica, color aluminio ................................................................. 38

    13. Pintura de hule de primera ..................................................................................... 38

    14. Pintura de aceite .................................................................................................... 39

    15. Pintura p/seales carretera (fluor.) ......................................................................... 39

    16. Piochas con cabo ................................................................................................... 39

    17. Postes de concreto (40' de alto) ............................................................................. 40

    18. Formica, plancha de 4' x 8' .................................................................................... 40

    19. Abono animal (gallinaza procesada) ....................................................................... 40

    20. rbol de Jacaranda ................................................................................................ 41

    21. Repuestos de origen importado para maquinaria pesada ....................................... 41

    22. Llantas de origen importado para maquinaria pesada ............................................ 41

    23. Maquinaria ............................................................................................................. 42

    24. Alambre espigado calibre 15 *** ............................................................................. 42

    25. Geomallas de 60 knt polietileno de alta densidad *** .............................................. 42

    26. Geotextiles no tejido (150 grs) *** ........................................................................... 43

    27. Sellador elastromico en frio poliuretano *** ............................................................. 43

    28. Puertas prefabricadas de mdf de 0.90 x 2.10 con marco y herraje *** .................... 43

    29. Pintura impermeabilizante acrlica para duracin de 5 aos *** .............................. 44

    30. Almohadillas elastrometricas (sin refuerzo) *** ....................................................... 44

    31. Tablero de yeso de 4'x 8'x 1/2" para interior *** ...................................................... 44

    32. Perfiles de pvc blanco para ventaneria de 80 mm termoacustico *** ...................... 45

    N. MANO DE OBRA Y SALARIOS ............................................................................... 45

    1. Salario ...................................................................................................................... 45

    O. ESPECIALES .......................................................................................................... 45

    1. Energa Elctrica ...................................................................................................... 45

    2. Bunker ...................................................................................................................... 45

    3. Bolsas para emb. cemento ....................................................................................... 46

    4. ndice de Precios al Consumidor (IPC) Repblica, Base diciembre 2000 = 100.0 .... 46

    5. IPC Capital (Regin Metropolitana) base diciembre 1989 = 100.0 _2/ ..................... 46

  • 7/25/2019 Precio de Materiales INE.pdf

    7/49

    Presentacin

    El Instituto Nacional de Estadstica, realiza en forma mensual el Clculo y Publicacin dendices Relativos de Precios de Materiales de Construccin Seleccionados, Mano de obray Salarios en ciudad capital de los artculos que conforman la canasta respectiva, con el

    propsito de presentar a los diferentes usuarios los indicadores que reflejen elcomportamiento de los precios de materiales de construccin representativos en el mercadonacional con el fin de realizar los Clculos de sobrecostos segn lo puntualiza la ley deNormas y Constataciones del Estado.

  • 7/25/2019 Precio de Materiales INE.pdf

    8/49

    1. ndice Mayo 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    9/49

    PUBLICACION DEL INSTITUTO NACIONAL DE ESTADISTICA -INE-INDICE RELATIVO DE PRECIOS DE MATERIALES DE CONSTRUCCION

    SELECCIONADOS, MANO DE OBRA Y SALARIOS, EN LA CIUDAD CAPITAL.Repblica de Guatemala. (Base: febrero- julio 1981=100.0) y (Base: junio-noviembre

    2009=100.0)

    GRUPO Y ARTICULOUNIDAD DE

    MEDIDANDICE MAYO

    2014

    A. ACERO ESTRUCTURAL

    1. Angular laminado en fro de 20'x 1/8" espesor de 1 1/4" Unidad 1,198.16

    2. Tubo industrial cuadrado de 20' chapa de 20 de 1" Unidad 1,234.81

    3. Tubo de metal corrugado 24"x25 1/2" calibre 16. Metro lineal 1,439.36

    4. Alambre de acero de alta resistencia Quintal 924.965. Lamina de acero galvanizado estructural, troqueladacalibre 26 ***

    Unidad 107.07

    B. ACCESORIOS PARA BAO

    1. Inodoro Standard con accesorios Unidad 1,049.99

    C. COMBUSTIBLES LUBRICANTES Y DERIVADOS DELPETROLEO

    1. Aceite Diesel Galn 2,441.13

    2. Aceite para motor diesel Litro 1,559.63

    3. Gasolina regular Galn 1,575.61

    4. Material bituminoso AC 85/100 Galn 1,930.24

    5. Material bituminoso AC 120/150 Galn **

    6. Material bituminoso RC 250 Galn 1,855.20

    7. Material bituminoso (SS-1H) y RS-1 (RS-K) Galn 1,934.388. Material bituminoso RS-2K Galn 1,980.80

    9. Grasa para chasis Libra 1,375.16

    10. Material bituminoso AC-20 Galn 528.28

    11. Material bituminoso MC-70 Galn 561.30

    D. LAMINA GALVANIZADA

    1. Lmina galvanizada de 3'x 8' cal. 20 Unidad 1,530.65

    E. LAMINA NEGRA

    1. Lmina negra, plancha 1/16"x4'x8' Unidad 1,010.40

    F. LAMINA ASBESTO-CEMENTO

    1. Lmina AC ondalita y Lmina Perfil 10 Pie lineal 2,023.81

    G. LAMINA PLASTICA

    1. Lmina plstica (canal pequeo) Pie lineal 890.63

  • 7/25/2019 Precio de Materiales INE.pdf

    10/49

    GRUPO Y ARTICULOUNIDAD DE

    MEDIDANDCE MAYO

    2014

    H. MADERA PARA CONSTRUCCION

    1. Madera para encofrados, pino rstico Pie tabla 1,546.

    2. Madera de pino cepillada Pie tabla 1,554.

    3. Madera de cedro, cepillada, tabla de 1"x12"x10' *** Pie tabla 105.

    4. Tablero de madera aglomerada, de 4'x 8'x 3/4" *** Unidad 103.

    I. MATERIALES PARA AGUA POTABLE O DESAGES

    I1. GALVANIZADO

    1. Tubera de hierro galvanizado de 20' de largo tipo mediano de 1 1/2" I2. P.V.C. Unidad 1,360.

    1. Tubera de 1" C. 250 PSI Tubo Vinil 20" Unidad 3,940.4

    2. Tubera de 1/2" C. 315 PSI Tubo Vinil de 20" Unidad 3,458.

    3. Tuberia de PVC corrugada de 18" *** Tubo de 6 mts 187.

    I3. BRONCE

    1. Vlvula de compuerta de 1" (Japonesa) Unidad 1,191.4

    I4. COBRE

    1. Tubo de cobre rgido de 1/2" x 20' Unidad 2,348.

    I5. MATERIALES VARIOS

    1. Tubo de concreto vibro prensado base plana 1 m. largo x 6" dimetro Unidad 1,575.

    2. Tubo de concreto vibro prensado base plana 1 m. largo x 12" dimetro Unidad 1,706.

    3. Tubo de concreto no reforzado 1 m. largo x 18" dimetro Unidad 1,734.

    4. Tubo de concreto reforzado 1 m. largo x 42" dimetro Unidad 954.2

    5. Tubera perf. concreto simple 10" Metro lineal 1,544.4

    J. MATERIALES PARA CONCRETO Y MAMPOSTERIA

    J1. ACERO DE REFUERZO GRADO 40

    1. Varilla de 20' nmero 3 Quintal 1,691.4

    J2. ACERO DE REFUERZO GRADO 60

    1. Varilla de 20' nmero 3 Quintal 1,712.2

    J3. BLOCKS Y LADRILLOS

    1. Block de pmez de 20x20x40 cms. Ciento 1,111.

    2. Block de pmez de 15x20x40 cms. Ciento 975.

    3. Block de concreto de 19x19x39 cms. Ciento 1,133.

    4. Ladrillo tubular de 6.5x11x23 cms. Ciento 2,046.

    5. Ladrillo tayuyo de 6.5x11x23 cms. Ciento 2,468.

  • 7/25/2019 Precio de Materiales INE.pdf

    11/49

    GRUPO Y ARTICULOUNIDAD DE

    MEDIDANDICE

    MAYO2014

    6. Adoqun de concreto 2500 PSI de 10 cms. Millar 1,125.1

    7. Block de concreto de 14x19x39 cms. Millar 811.58. Baldosa de barrodoble de 5x30x30 cms *** Millar 117.6

    9. Teja de concreto 42x32 cms, tipo veneciana con color *** Metro 112.4

    10. Muros perimetrales prefabricados, 5 cms. Espesor, concreto 315 kg/cms,liso ambas caras instalado ***

    Metro 101.8

    J4 MATERIALES VARIOS

    1. Arena de ro Metro _1/ 1,426.3

    2. Arena amarilla Metro _1/ 1,833.3

    3. Concreto de 2500 PSI Metro 2,300.7

    4. Cal natural o viva (terrn) Bolsa 100 lbs. 1,000.0

    5. Cal hidratada Bolsa 50 lbrs. 1,486.3

    6. Cemento (P. Pub.) Saco 42.5 Kgs. 1,791.9

    8. Piedrn de 3/4" (1/2" y 3/8") Metro 1,543.4

    9. Material selecto, puesto en distribuidora *** Metro 107.9

    10. Cemento blanco portland, tipo III *** Saco 42.5 Kgs. 109.7

    K. MATERIALES PARA ELECTRICIDAD

    1. Alambre N. 12 forrado (100 mts.) Rollo 1,389.8

    2. Switch sencillo con placa ticino Unidad 681.9

    3. Tablero monofs. 8 circuitos y 3 lneas Unidad 1,746.3

    4. Tubo ducton de metal de 1" x 10' largo Unidad 1,453.7

    L. PISOS Y AZULEJOS

    1. Azulejos de 10 x 10 cms. Metro 644.6

    2. Piso de granito gris de 30 x 30 cms. Metro 795.1

    3. Piso de granito mrmol fondo blanco de 30 x 30 centmetros Metro 1,042.9

    4 Piso ceramico nacional 31.6 x 31.6 cms. PEI 4 (transito intenso) *** Metro 113.0

    5 Piso vinilico 30 x 30 cms (1.8 mm) *** Metro 115.5

    M. VARIOS

    1. Grama (San Agustn) Metro 310.92. Malla de alambre calibre 12 con agujero de 2 1/2" (1.50 mts. alto) Metro lineal 1,674.6

    3. Plywood de cedro 4' x 8' x 3/4" Pliego 2,229.1

    4. Flete qq/Km. 4,000.0

    5. Lmpara fluor. de 4 x 40 WR.S s/difusor Unidad 694.0

    6. Llantas para camin (900 x 20) nacional Unidad 1,752.8

    7. Llantas para vehculo Liv. R.14-6 pliegos convencional, nacional Unidad 2,436.3

  • 7/25/2019 Precio de Materiales INE.pdf

    12/49

    GRUPO Y ARTICULOUNIDAD DE

    MEDIDANDICE MAYO

    2014

    8. Perfil de aluminio 1 1/2" x 1/16" Libra 2,137.9

    9. Sellador elstico SIKA-IGAS R Caja 10 Kgs 3,021.710. Vidrio claro de 4 mm. Pie 842.6

    11. Pintura anticorrosiva Galn 2,257.8

    12. Pint. estruct. metlica, color aluminio Galn 3,607.8

    13. Pintura de hule de primera Galn 3,112.1

    14. Pintura de aceite Galn 2,561.9

    15. Pintura p/seales carretera (fluor.) Galn 5,173.0

    16. Piochas con cabo Unidad 1,628.9

    17. Postes de concreto (40' de alto) Unidad 1,286.4

    18. Formica, plancha de 4' x 8' Unidad 458.4

    19. Abono animal (gallinaza procesada) Quintal 1,155.520. Arbol de Jacaranda Unidad 3,200.0

    21. Repuestos de origen importado para maquinaria pesada Sin unidad 1,262.3

    22. Llantas de origen importado para maquinaria pesada Sin unidad 1,725.9

    23. MAQUINARIA Sin unidad 178.8

    24 Alambre espigado calibre 15 *** Rollo 400 varas 100.6

    25 Geomallas de 60 knt polietileno de alta densidad *** Metro 166.0

    26 Geotextiles no tejido (150 grs) *** Metro 103.6

    27 Sellador elastromico en frio poliuretano ***Cartucho de .9

    libras 140.9

    28 Puertas prefabricadas de mdf de 0.90 x 2.10 con marco y herraje *** Unidad92.229 Pintura impermeabilizante acrlica para duracion de 5 aos *** Galn 114.4

    30 Almohadillas elastrometricas (sin refuerzo) *** Unidad 282.0

    31 Tablero de yeso de 4'x 8'x 1/2" para interior *** Unidad 91.0

    32 Perfiles de pvc blanco para ventaneria de 80 mm termoacustico *** Perfil de 6 mts. 79.3

    N. MANO DE OBRA Y SALARIOS

    1. Salario Ayudante 2,417.8

    O. ESPECIALES

    1. Energa Elctrica KWH **2. Bunker Q./G 1,237.7

    3. Bolsas para emb. cemento Unidad 534.24. ndice de Precios al Consumidor (IPC) Repblica, Base diciembre 2000 =100.00 2/

    222.9

    5. IPC Capital (Regin Metropolitana) base diciembre 1989 = 100.0 3/ 810.3

  • 7/25/2019 Precio de Materiales INE.pdf

    13/49

    Notas

    - ndices Relativos Simples no Ponderados- ndices calculados con base en informacin de los Ministerios: de Comunicaciones,Infraestructura y Vivienda; Energa y Minas; y Trabajo y Previsin Social.

    - ndices calculados con precios cotizados en Quetzales._1/ ndices correspondientes a precios puestos en planta._2/ IPC Repblica base diciembre 2010 = 100.00 empalmado a base diciembre 2000 =100.00

    _3/ IPC Ciudad Capital (Regin Metropolitana) base diciembre 2010 = 100.00 empalmadoa base

    diciembre 2000 = 100.00, empalmado a base marzo - abril de 1983 = 100.0, conactualizacin a base diciembre 1989 = 100.0.

    ** Informacin pendiente de Publicacin.*** ndices con base: junio-noviembre 2009=100.0.

    EL MINISTERIO DE COMUNICACIONES, INFRAESTRUCTURA Y VIVIENDA HACESABER A LOS SEORES CONTRATISTAS Y PUBLICO EN GENERAL QUE A PARTIRDE LA PUBLICACION DEL MES DE DICIEMBRE 2009 SE INCORPORARON 20

    ARTICULOS CON BASE JUNIO-NOVIEMBRE 2009=100.0 LOS CUALES APARECENCON TRES ASTERISCOS (***)

  • 7/25/2019 Precio de Materiales INE.pdf

    14/49

    2. Principales resultados

  • 7/25/2019 Precio de Materiales INE.pdf

    15/49

    A. ACERO ESTRUCTURAL

    1. Angular laminado en fro de 20'x 1/8" espesor de 1 1/4"

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,779.66 1,277.12 1.70Febrero 1,751.41 1,267.66 -0.74Marzo 1,694.92 1,245.34 -1.76Abril 1,709.04 1,254.52 0.74Mayo 1,624.29 1,198.16 -4.49Junio 1,550.28 - -Julio 1,482.77 - -Agosto 1,456.92 - -Septiembre 1,439.12 - -Octubre 1,382.06 - -Noviembre 1,313.84 - -Diciembre 1,255.79 - -

    ndiceSerie histrica mensual

    2. Tubo industrial cuadrado de 20' chapa de 20 de 1"

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,377.28 1,166.17 4.77Febrero 1,412.35 1,193.58 2.35Marzo 1,345.68 1,178.02 -1.30Abril 1,312.10 1,180.49 0.21Mayo 1,273.09 1,234.81 4.60Junio 1,241.98 - -Julio 1,186.17 - -Agosto 1,203.95 - -Septiembre 1,167.90 - -Octubre 1,109.38 - -Noviembre 1,164.44 - -Diciembre 1,113.09 - -

    ndiceSerie histrica mensual

    3. Tubo de metal corrugado 24"x25 1/2" calibre 16.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,594.17 1,571.12 -1.75Febrero 1,594.17 1,487.93 -5.29Marzo 1,559.26 1,412.76 -5.05

    Abril 1,594.17 1,373.96 -2.75Mayo 1,594.17 1,439.36 4.76Junio 1,594.17 - -Julio 1,594.17 - -Agosto 1,594.17 - -Septiembre 1,599.15 - -Octubre 1,599.15 - -Noviembre 1,599.15 - -Diciembre 1,599.15 - -

    ndiceSerie histrica mensual

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.0

    1400.01600.0

    1800.0

    2000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    2013 2014

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.0

    1400.0

    1600.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1250.0

    1300.0

    1350.0

    1400.0

    1450.0

    1500.0

    1550.0

    1600.0

    1650.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    16/49

    4. Alambre de acero de alta resistencia

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,007.80 958.31 3.53Febrero 1,008.33 986.04 2.89

    Marzo 1,008.33 972.16 -1.41Abril 1,017.78 924.96 -4.86Mayo 1,022.33 924.96 0.00Junio 994.44 - -Julio 1,000.00 - -Agosto 1,000.00 - -Septiembre 981.49 - -Octubre 977.78 - -Noviembre 933.33 - -Diciembre 925.64 - -

    ndiceSerie histrica mensual

    5. Lamina de acero galvanizado estructural, troquelada calibre 26 ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 117.09 111.45 0.02Febrero 117.09 112.03 0.52Marzo 112.42 114.24 1.97Abril 112.42 109.28 -4.35Mayo 110.53 107.07 -2.02Junio 110.53 - -Julio 110.77 - -Agosto 110.77 - -Septiembre 107.54 - -Octubre 107.54 - -

    Noviembre 112.53 - -Diciembre 111.43 - -

    ndiceSerie histrica mensual

    B. ACCESORIOS PARA BAO

    1. Inodoro Standard con accesorios

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,023.36 1,089.18 3.30Febrero 1,023.36 1,158.39 6.35Marzo 1,046.23 1,153.28 -0.44Abril 1,045.26 1,102.19 -4.43

    Mayo 1,007.30 1,049.99 -4.74Junio 1,019.42 - -Julio 1,069.34 - -Agosto 1,069.34 - -Septiembre 1,104.01 - -Octubre 1,104.01 - -Noviembre 1,054.74 - -Diciembre 1,054.36 - -

    ndiceSerie histrica mensual

    860.0

    880.0

    900.0

    920.0

    940.0

    960.0

    980.0

    1000.0

    1020.0

    1040.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    102.0

    104.0

    106.0

    108.0

    110.0

    112.0

    114.0

    116.0

    118.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    900.0

    950.0

    1000.0

    1050.0

    1100.0

    1150.0

    1200.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M a y

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    17/49

    C. COMBUSTIBLES LUBRICANTES Y DERIVADOS DEL PETROLEO

    1. Aceite Disel

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,535.48 2,486.29 -0.74Febrero 2,668.55 2,459.68 -1.07Marzo 2,473.39 2,404.84 -2.23Abril 2,289.52 2,491.94 3.62Mayo 2,246.77 2,441.13 -2.04Junio 2,299.19 - -Julio 2,461.29 - -Agosto 2,553.23 - -Septiembre 2,500.00 - -Octubre 2,430.65 - -Noviembre 2,523.39 - -Diciembre 2,504.84 - -

    ndiceSerie histrica mensual

    2. Aceite para motor disel

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,609.17 1,559.63 0.00Febrero 1,609.17 1,559.63 0.00Marzo 1,609.17 1,559.63 0.00Abril 1,609.17 1,559.63 0.00Mayo 1,609.17 1,559.63 0.00Junio 1,609.17 - -Julio 1,609.17 - -Agosto 1,609.17 - -

    Septiembre 1,609.17 - -Octubre 1,559.63 - -Noviembre 1,559.63 - -Diciembre 1,559.63 - -

    ndiceSerie histrica mensual

    3. Gasolina regular

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,564.39 1,556.10 -4.58Febrero 1,670.73 1,554.63 -0.09Marzo 1,620.98 1,550.73 -0.25Abril 1,528.29 1,609.27 3.77

    Mayo 1,579.02 1,575.61 -2.09Junio 1,561.46 - -Julio 1,673.66 - -Agosto 1,671.71 - -Septiembre 1,587.32 - -Octubre 1,517.56 - -Noviembre 1,581.95 - -Diciembre 1,630.73 - -

    ndiceSerie histrica mensual

    2000.0

    2100.0

    2200.0

    2300.0

    2400.0

    2500.0

    2600.0

    2700.0

    2800.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1530.0

    1540.0

    1550.0

    1560.0

    1570.0

    1580.0

    1590.0

    1600.0

    1610.0

    1620.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1400.0

    1450.0

    1500.0

    1550.0

    1600.0

    1650.0

    1700.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    18/49

    4. Material bituminoso AC 85/100

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,962.40 1,959.93 -0.17

    Febrero 2,038.26 1,938.49 -1.09

    Marzo 2,033.31 1,929.42 -0.47Abril 2,030.01 1,935.19 0.30

    Mayo 2,027.54 1,930.24 -0.26

    Junio 2,034.96 - -

    Julio 2,036.61 - -

    Agosto 2,053.92 - -

    Septiembre 2,001.98 - -

    Octubre 2,006.93 - -

    Noviembre 2,011.05 - -

    Diciembre 1,963.23 - -

    ndiceSerie histrica mensual

    5. Material bituminoso AC 120/1506. Material bituminoso RC 250

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,885.60 1,883.20 -0.17Febrero 1,959.20 1,862.40 -1.10Marzo 1,954.40 1,854.40 -0.43Abril 1,951.20 1,859.20 0.26Mayo 1,948.80 1,855.20 -0.22Junio 1,956.00 - -Julio 1,957.60 - -Agosto 1,973.60 - -

    Septiembre 1,924.00 - -Octubre 1,928.80 - -Noviembre 1,932.80 - -Diciembre 1,886.40 - -

    ndiceSerie histrica mensual

    7. Material bituminoso (SS-1H) y RS-1 (RS-K)

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,967.19 1,964.06 -0.16Febrero 2,042.97 1,942.19 -1.11Marzo 2,038.28 1,933.59 -0.44Abril 2,035.16 1,939.06 0.28Mayo 2,032.03 1,934.38 -0.24Junio 2,039.84 - -Julio 2,041.41 - -Agosto 2,058.59 - -Septiembre 2,007.81 - -Octubre 2,013.28 - -Noviembre 2,015.63 - -Diciembre 1,967.19 - -

    ndiceSerie histrica mensual

    1860.01880.01900.01920.01940.01960.01980.02000.02020.02040.0

    2060.02080.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1780.01800.01820.01840.01860.01880.01900.01920.01940.01960.01980.02000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1860.01880.01900.01920.01940.01960.01980.0

    2000.02020.02040.02060.02080.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    19/49

    8. Material bituminoso RS-2K

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,014.40 2,011.20 -0.16Febrero 2,092.00 1,988.80 -1.11

    Marzo 2,087.20 1,980.00 -0.44Abril 2,084.00 1,985.60 0.28Mayo 2,080.80 1,980.80 -0.24Junio 2,088.80 - -Julio 2,090.40 - -Agosto 2,108.00 - -Septiembre 2,056.00 - -Octubre 2,061.60 - -Noviembre 2,064.00 - -Diciembre 2,014.40 - -

    ndiceSerie histrica mensual

    9. Grasa para chasis

    Mes ndice Variacin2013 2014 Mensual

    Enero 1,261.46 1,013.38 0.00

    Febrero 1,261.46 1,013.38 0.00

    Marzo 1,261.46 1,013.38 0.00

    Abril 1,261.46 1,375.16 35.70

    Mayo 1,261.46 1,375.16 0.00

    Junio 1,261.46 - -

    Julio 1,261.46 - -

    Agosto 1,261.46 - -

    Septiembre 1,261.46 - -

    Octubre 1,013.38 - -

    Noviembre 1,013.38 - -

    Diciembre 1,013.38 - -

    ndiceSerie histrica mensual

    10. Material bituminoso AC-20

    Mesndice Variacin

    2013 2014 Mensual

    Enero 537.10 536.43 -0.17Febrero 557.92 530.54 -1.10Marzo 556.56 528.05 -0.47Abril 555.66 529.64 0.30Mayo 554.98 528.28 -0.26

    Junio 557.01 - -Julio 557.01 - -Agosto 562.22 - -Septiembre 547.96 - -Octubre 549.32 - -Noviembre 550.45 - -Diciembre 537.33 - -

    ndiceSerie histrica mensual

    1900.0

    1950.0

    2000.0

    2050.0

    2100.0

    2150.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.0

    1400.0

    1600.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    510.0

    520.0

    530.0

    540.0

    550.0

    560.0

    570.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    20/49

    11. Material bituminoso MC-70

    Mesndice Variacin

    2013 2014 Mensual

    Enero 570.92 569.87 -0.15Febrero 592.89 563.60 -1.10

    Marzo 591.42 561.09 -0.45Abril 590.59 562.76 0.30Mayo 589.75 561.30 -0.26Junio 591.84 - -Julio 592.47 - -Agosto 597.49 - -Septiembre 583.26 - -Octubre 584.73 - -Noviembre 584.94 - -Diciembre 570.71 - -

    ndiceSerie histrica mensual

    D. LAMINA GALVANIZADA

    1. Lmina galvanizada de 3'x 8' cal. 20

    Mesndice Variacin2013 2014 Mensual

    Enero 1,912.80 1,627.98 4.39Febrero 1,912.80 1,537.20 -5.58Marzo 1,911.90 1,537.20 0.00Abril 1,911.90 1,569.94 2.13Mayo 1,911.90 1,530.65 -2.50Junio 1,944.94 - -Julio 1,851.85 - -Agosto 1,779.46 - -Septiembre 2,001.31 - -Octubre 1,699.40 - -

    Noviembre 1,619.05 - -Diciembre 1,559.52 - -

    ndiceSerie histrica mensual

    E. LAMINA NEGRA

    1. Lmina negra, plancha 1/16"x4'x8'

    Mesndice Variacin2013 2014 Mensual

    Enero 1,399.55 1,046.93 4.13Febrero 1,373.87 1,034.57 -1.18Marzo 1,306.26 1,048.31 1.33Abril 1,251.85 1,050.40 0.20

    Mayo 1,226.16 1,010.40 -3.81Junio 1,167.16 - -Julio 1,115.89 - -Agosto 1,116.76 - -Septiembre 1,249.76 - -Octubre 1,060.48 - -Noviembre 1,048.22 - -Diciembre 1,005.46 - -

    ndiceSerie histrica mensual

    540.0

    550.0

    560.0

    570.0

    580.0

    590.0

    600.0

    610.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    200.0

    400.0

    600.0800.0

    1000.0

    1200.0

    1400.0

    1600.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    21/49

    F. LAMINA ASBESTO-CEMENTO

    1. Lmina AC ondalita y Lmina Perfil 10

    Mesndice Variacin2013 2014 Mensual

    Enero 2,268.71 2,092.52 0.85

    Febrero 2,251.70 2,006.80 -4.10Marzo 2,282.99 1,921.77 -4.24Abril 2,251.70 1,938.78 0.88Mayo 2,282.99 2,023.81 4.39Junio 2,210.88 - -Julio 2,302.72 - -Agosto 2,282.99 - -Septiembre 2,556.46 - -Octubre 2,251.70 - -Noviembre 2,143.54 - -Diciembre 2,074.83 - -

    ndiceSerie histrica mensual

    G. LAMINA PLASTICA

    1. Lmina plstica (canal pequeo)

    Mesndice Variacin2013 2014 Mensual

    Enero 872.50 872.50 -0.29Febrero 872.50 906.25 3.87Marzo 872.50 937.50 3.45Abril 872.50 937.50 0.00Mayo 868.75 890.63 -5.00Junio 872.50 - -Julio 906.25 - -Agosto 872.50 - -Septiembre 976.25 - -

    Octubre 868.75 - -Noviembre 906.25 - -Diciembre 875.00 - -

    ndiceSerie histrica mensual

    H. MADERA PARA CONSTRUCCION1. Madera para encofrados, pino rstico

    Mesndice Variacin

    2013 2014 MensualEnero 1,505.13 1,435.90 -0.71Febrero 1,484.62 1,443.59 0.54Marzo 1,487.18 1,435.90 -0.53

    Abril 1,528.21 1,505.13 4.82Mayo 1,474.36 1,546.15 2.73Junio 1,492.31 - -Julio 1,492.31 - -Agosto 1,461.54 - -Septiembre 1,656.41 - -Octubre 1,428.21 - -Noviembre 1,435.90 - -Diciembre 1,446.15 - -

    ndiceSerie histrica mensual

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    3000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    800.0

    820.0

    840.0

    860.0

    880.0

    900.0

    920.0

    940.0

    960.0

    980.0

    1000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1300.0

    1350.0

    1400.0

    1450.0

    1500.0

    1550.01600.0

    1650.0

    1700.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    22/49

    2. Madera de pino cepillada

    Mesndice Variacin

    2013 2014 MensualEnero 1,421.43 1,476.19 0.49Febrero 1,440.48 1,502.38 1.77

    Marzo 1,452.38 1,502.38 0.00Abril 1,511.90 1,547.62 3.01Mayo 1,464.29 1,554.76 0.46Junio 1,511.90 - -Julio 1,511.90 - -Agosto 1,511.90 - -Septiembre 1,661.90 - -Octubre 1,483.33 - -Noviembre 1,471.43 - -Diciembre 1,469.05 - -

    ndiceSerie histrica mensual

    3. Madera de cedro, cepillada, tabla de 1"x12"x10' ***

    Mes ndice Variacin2013 2014 Mensual

    Enero 107.42 105.08 0.00Febrero 107.42 100.23 -4.62Marzo 107.42 105.08 4.84Abril 107.42 105.08 0.00Mayo 107.42 105.08 0.00Junio 107.42 - -Julio 105.08 - -Agosto 105.08 - -Septiembre 117.69 - -Octubre 101.83 - -Noviembre 106.21 - -

    Diciembre 105.08 - -

    ndiceSerie histrica mensual

    4. Tablero de madera aglomerada, de 4'x 8'x 3/4" ***

    Mesndice Variacin

    2013 2014 MensualEnero 103.04 94.95 0.16Febrero 103.04 100.10 5.43Marzo 103.78 103.04 2.94Abril 103.78 103.07 0.02Mayo 103.78 103.63 0.55Junio 103.78 - -Julio 103.04 - -Agosto 103.63 - -Septiembre 116.07 - -Octubre 103.04 - -Noviembre 99.51 - -Diciembre 94.80 - -

    ndiceSerie histrica mensual

    1300.0

    1350.0

    1400.0

    1450.0

    1500.0

    1550.0

    1600.0

    1650.0

    1700.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    90.0

    95.0

    100.0

    105.0

    110.0

    115.0

    120.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    120.0

    140.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    23/49

  • 7/25/2019 Precio de Materiales INE.pdf

    24/49

    3. Tubera de PVC corrugada de 18" ***

    Mesndice Variacin

    2013 2014 MensualEnero 174.71 179.13 7.93Febrero 174.71 179.13 0.00

    Marzo 174.71 179.13 0.00Abril 174.71 187.81 4.85Mayo 174.71 187.81 0.00Junio 174.71 - -Julio 174.71 - -Agosto 174.71 - -Septiembre 174.71 - -Octubre 165.97 - -Noviembre 165.97 - -Diciembre 165.97 - -

    ndiceSerie histrica mensual

    I3. BRONCE

    1. Vlvula de compuerta de 1"Mes

    ndice Variacin2013 2014 Mensual

    Enero 924.77 1,029.79 4.45Febrero 924.77 1,085.11 5.37Marzo 924.77 1,136.17 4.71Abril 940.43 1,191.49 4.87Mayo 939.23 1,191.49 0.00Junio 940.43 - -Julio 978.72 - -Agosto 1,004.26 - -Septiembre 1,028.17 - -Octubre 983.06 - -

    Noviembre 983.06 - -Diciembre 985.87 - -

    ndiceSerie histrica mensual

    I4. COBRE1. Tubo de cobre rgido de 1/2" x 20'

    Mesndice Variacin

    2013 2014 MensualEnero 2,246.43 2,279.44 -6.05Febrero 2,246.43 2,264.13 -0.67Marzo 2,246.43 2,363.24 4.38Abril 2,246.43 2,264.47 -4.18

    Mayo 2,246.43 2,348.54 3.71Junio 2,246.43 - -Julio 2,246.43 - -Agosto 2,246.43 - -Septiembre 2,286.59 - -Octubre 2,398.91 - -Noviembre 2,502.72 - -Diciembre 2,426.14 - -

    ndiceSerie histrica mensual

    155.0

    160.0

    165.0

    170.0

    175.0

    180.0

    185.0

    190.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.0

    1400.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    2100.0

    2150.0

    2200.0

    2250.02300.0

    2350.0

    2400.0

    2450.0

    2500.0

    2550.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    25/49

    I5. MATERIALES VARIOS1. Tubo de concreto vibro prensado base plana 1 m. largo x 6" dimetro

    Mesndice Variacin

    2013 2014 MensualEnero 1,535.90 1,665.38 -6.61

    Febrero 1,544.87 1,616.03 -2.96Marzo 1,507.69 1,562.82 -3.29Abril 1,564.10 1,553.21 -0.62Mayo 1,549.36 1,575.64 1.44Junio 1,567.95 - -Julio 1,621.15 - -Agosto 1,687.18 - -Septiembre 1,751.92 - -Octubre 1,703.85 - -Noviembre 1,746.79 - -Diciembre 1,783.33 - -

    ndiceSerie histrica mensual

    2. Tubo de concreto vibro prensado base plana 1 m. largo x 12" dimetro

    Mesndice Variacin

    2013 2014 MensualEnero 1,661.46 1,647.13 -2.08Febrero 1,671.34 1,675.16 1.70Marzo 1,657.32 1,675.16 0.00Abril 1,672.93 1,685.67 0.63Mayo 1,676.43 1,706.37 1.23Junio 1,696.18 - -Julio 1,721.97 - -Agosto 1,759.24 - -Septiembre 1,766.56 - -Octubre 1,707.01 - -

    Noviembre 1,687.26 - -Diciembre 1,682.17 - -

    ndiceSerie histrica mensual

    3. Tubo de concreto no reforzado 1 m. largo x 18" dimetro

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,854.36 1,655.04 -6.19

    Febrero 1,872.48 1,688.69 2.03

    Marzo 1,854.22 1,703.41 0.87

    Abril 1,872.48 1,695.23 -0.48

    Mayo 1,881.20 1,734.33 2.31Junio 1,958.17 - -

    Julio 1,872.48 - -

    Agosto 1,872.48 - -

    Septiembre 1,917.44 - -

    Octubre 1,854.36 - -

    Noviembre 1,764.17 - -

    Diciembre 1,764.17 - -

    ndiceSerie histrica mensual

    1350.0

    1400.0

    1450.0

    1500.0

    1550.0

    1600.0

    1650.0

    1700.01750.0

    1800.0

    1850.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1580.0

    1600.0

    1620.0

    1640.0

    1660.0

    1680.0

    1700.0

    1720.0

    1740.0

    1760.0

    1780.0

    E

    ne

    Feb

    Mar

    Abr

    M

    ay

    Jun

    Jul

    A

    go

    S

    ep

    Oct

    N

    ov

    Dic

    E

    ne

    Feb

    Mar

    Abr

    M

    2013 2014

    1500.0

    1550.0

    1600.0

    1650.0

    1700.0

    1750.01800.0

    1850.0

    1900.0

    1950.0

    2000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    26/49

    4. Tubo de concreto reforzado 1 m. largo x 42" dimetro

    Mesndice Variacin

    2013 2014 Mensual

    Enero 922.27 890.46 -1.93

    Febrero 883.77 934.73 4.97

    Marzo 876.26 934.73 0.00Abril 883.77 941.78 0.75

    Mayo 887.50 954.29 1.33

    Junio 894.29 - -

    Julio 883.77 - -

    Agosto 902.54 - -

    Septiembre 912.71 - -

    Octubre 882.55 - -

    Noviembre 873.13 - -

    Diciembre 907.97 - -

    ndiceSerie histrica mensual

    5. Tubera perf. concreto simple 10"

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,619.66 1,610.51 -2.06

    Febrero 1,689.49 1,582.03 -1.77

    Marzo 1,631.53 1,587.80 0.36

    Abril 1,678.98 1,603.73 1.00

    Mayo 1,692.54 1,544.41 -3.70

    Junio 1,714.92 - -

    Julio 1,714.92 - -

    Agosto 1,714.92 - -

    Septiembre 1,644.41 - -

    Octubre 1,620.00 - -

    Noviembre 1,644.41 - -

    Diciembre 1,644.41 - -

    ndiceSerie histrica mensual

    J. MATERIALES PARA CONCRETO Y MAMPOSTERIA1. Varilla de 20' nmero 3

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,178.53 1,832.47 3.71Febrero 2,078.75 1,750.73 -4.46Marzo 1,985.92 1,666.33 -4.82

    Abril 1,891.45 1,666.33 0.00Mayo 1,896.53 1,691.49 1.51Junio 1,857.55 - -Julio 1,837.02 - -Agosto 1,826.77 - -Septiembre 1,826.77 - -Octubre 1,845.97 - -Noviembre 1,823.61 - -Diciembre 1,766.90 - -

    ndiceSerie histrica mensual

    820.0

    840.0

    860.0

    880.0

    900.0

    920.0

    940.0

    960.0

    980.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1450.0

    1500.0

    1550.0

    1600.0

    1650.0

    1700.0

    1750.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    27/49

    J2. ACERO DE REFUERZO GRADO 601. Varilla de 20' nmero 3

    Mesndice Variacin

    2013 2014 MensualEnero 2,021.64 1,889.35 6.13

    Febrero 2,016.69 1,874.17 -0.80Marzo 1,917.32 1,782.98 -4.87Abril 1,827.00 1,793.46 0.59Mayo 1,758.70 1,712.20 -4.53Junio 1,762.52 - -Julio 1,693.25 - -Agosto 1,616.60 - -Septiembre 1,616.60 - -Octubre 1,667.92 - -Noviembre 1,748.89 - -Diciembre 1,780.21 - -

    ndiceSerie histrica mensual

    J3. BLOCKS Y LADRILLOS1. Block de pmez de 20x20x40 cms.

    Mesndice Variacin

    2013 2014 MensualEnero 1,092.11 1,092.11 0.00Febrero 1,092.11 1,111.84 1.81Marzo 1,092.11 1,111.84 0.00Abril 1,092.11 1,111.84 0.00Mayo 1,092.11 1,111.84 0.00Junio 1,092.11 - -Julio 1,092.11 - -Agosto 1,092.11 - -

    Septiembre 1,092.11 - -Octubre 1,092.11 - -Noviembre 1,092.11 - -Diciembre 1,092.11 - -

    ndiceSerie histrica mensual

    2. Block de pmez de 15x20x40 cms.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 965.42 955.82 0.00

    Febrero 955.82 965.42 1.00

    Marzo 955.82 975.01 0.99

    Abril 955.82 975.01 0.00

    Mayo 955.82 975.01 0.00

    Junio 955.82 - -

    Julio 955.82 - -

    Agosto 955.82 - -

    Septiembre 955.82 - -

    Octubre 955.82 - -

    Noviembre 955.82 - -Diciembre 955.82 - -

    ndiceSerie histrica mensual

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1080.0

    1085.0

    1090.0

    1095.0

    1100.0

    1105.0

    1110.0

    1115.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    945.0

    950.0

    955.0

    960.0

    965.0

    970.0

    975.0

    980.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    28/49

    3. Block de concreto de 19x19x39 cms.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,099.60 1,140.81 -0.72

    Febrero 1,099.60 1,140.81 0.00

    Marzo 1,124.32 1,081.94 -5.16Abril 1,140.81 1,081.94 0.00

    Mayo 1,140.81 1,133.74 4.79

    Junio 1,140.81 - -

    Julio 1,140.81 - -

    Agosto 1,140.81 - -

    Septiembre 1,139.63 - -

    Octubre 1,083.12 - -

    Noviembre 1,137.27 - -

    Diciembre 1,149.05 - -

    ndiceSerie histrica mensual

    4. Ladrillo tubular de 6.5x11x23 cms.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,179.22 2,025.97 0.00

    Febrero 2,084.42 2,025.97 0.00

    Marzo 2,084.42 2,025.97 0.00

    Abril 2,084.42 2,025.97 0.00

    Mayo 2,084.42 2,046.75 1.03

    Junio 2,084.42 - -

    Julio 2,084.42 - -

    Agosto 2,084.42 - -

    Septiembre 2,084.42 - -

    Octubre 1,987.01 - -Noviembre 1,987.01 - -

    Diciembre 2,025.97 - -

    ndiceSerie histrica mensual

    5. Ladrillo tayuyo de 6.5x11x23 cms.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,785.71 2,418.43 -0.73

    Febrero 2,714.29 2,436.29 0.74

    Marzo 2,714.29 2,418.43 -0.73

    Abril 2,604.86 2,436.29 0.74

    Mayo 2,604.86 2,468.00 1.30

    Junio 2,604.86 - -

    Julio 2,547.71 - -

    Agosto 2,442.86 - -

    Septiembre 2,428.57 - -

    Octubre 2,398.14 - -

    Noviembre 2,398.14 - -Diciembre 2,436.29 - -

    ndiceSerie histrica mensual

    1040.0

    1060.0

    1080.0

    1100.0

    1120.0

    1140.0

    1160.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1850.0

    1900.0

    1950.0

    2000.0

    2050.0

    2100.0

    2150.0

    2200.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    2200.0

    2300.0

    2400.0

    2500.0

    2600.0

    2700.0

    2800.0

    2900.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    29/49

    6. Adoqun de concreto 2500 PSI de 10 cms.

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,172.18 1,128.26 1.28

    Febrero 1,195.37 1,125.78 -0.22

    Marzo 1,165.22 1,139.39 1.21Abril 1,135.84 1,136.92 -0.22

    Mayo 1,172.18 1,125.10 -1.04

    Junio 1,165.99 - -

    Julio 1,213.16 - -

    Agosto 1,201.56 - -

    Septiembre 1,193.05 - -

    Octubre 1,166.76 - -

    Noviembre 1,117.74 - -

    Diciembre 1,114.03 - -

    ndiceSerie histrica mensual

    7. Block de concreto de 14x19x39 cms.

    Mesndice Variacin

    2013 2014 MensualEnero 1,036.84 927.63 -0.98Febrero 1,036.84 885.96 -4.49Marzo 1,036.84 841.58 -5.01Abril 1,036.84 835.26 -0.75Mayo 1,036.84 811.58 -2.84Junio 1,036.84 - -Julio 1,036.84 - -Agosto 1,036.84 - -Septiembre 1,036.84 - -

    Octubre 985.53 - -Noviembre 936.84 - -Diciembre 936.84 - -

    ndiceSerie histrica mensual

    8. Baldosa de barro doble de 5x30x30 cms ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 111.96 115.00 0.78

    Febrero 111.96 115.85 0.74

    Marzo 111.96 115.85 0.00

    Abril 111.96 117.68 1.58

    Mayo 112.40 117.68 0.00

    Junio 111.06 - -

    Julio 112.40 - -

    Agosto 111.51 - -

    Septiembre 111.51 - -

    Octubre 111.51 - -

    Noviembre 111.51 - -

    Diciembre 114.10 - -

    ndiceSerie histrica mensual

    1060.0

    1080.0

    1100.0

    1120.0

    1140.0

    1160.0

    1180.0

    1200.0

    1220.0

    1240.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    106.0

    108.0

    110.0

    112.0114.0

    116.0

    118.0

    120.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    30/49

    9. Teja de concreto 42x32 cms, tipo veneciana con color ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 115.46 118.08 -5.09

    Febrero 114.53 114.22 -3.27

    Marzo 115.55 119.77 4.86Abril 114.22 114.22 -4.64

    Mayo 116.87 112.45 -1.55

    Junio 115.55 - -

    Julio 116.87 - -

    Agosto 115.99 - -

    Septiembre 113.77 - -

    Octubre 113.77 - -

    Noviembre 118.65 - -

    Diciembre 124.42 - -

    ndiceSerie histrica mensual

    10. Muros perimetrales prefabricados, 5 cms. Espesor, concreto 315kg/cms, liso ambas caras instalado ***

    Mesndice Variacin

    2013 2014 MensualEnero 125.06 99.64 -5.46Febrero 119.78 98.23 -1.41Marzo 114.06 103.00 4.85Abril 119.47 106.58 3.48Mayo 119.47 101.81 -4.48Junio 119.47 - -Julio 113.89 - -Agosto 108.67 - -

    Septiembre 109.80 - -Octubre 109.80 - -Noviembre 105.38 - -Diciembre 105.38 - -

    ndiceSerie histrica mensual

    J4 MATERIALES VARIOS1. Arena de ro

    Mesndice Variacin

    2013 2014 MensualEnero 1,334.38 1,356.48 0.14Febrero 1,334.92 1,348.84 -0.56

    Marzo 1,334.92 1,411.19 4.62Abril 1,334.92 1,426.33 1.07Mayo 1,343.79 1,426.33 0.00Junio 1,334.92 - -Julio 1,334.92 - -Agosto 1,334.92 - -Septiembre 1,334.92 - -Octubre 1,334.92 - -Noviembre 1,334.92 - -Diciembre 1,354.57 - -

    ndiceSerie histrica mensual

    106.0

    108.0

    110.0

    112.0

    114.0

    116.0

    118.0

    120.0122.0

    124.0

    126.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    120.0

    140.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1280.0

    1300.0

    1320.0

    1340.0

    1360.0

    1380.01400.0

    1420.0

    1440.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    31/49

    2. Arena amarilla

    Mesndice Variacin

    2013 2014 MensualEnero 2,087.72 1,833.33 0.00Febrero 2,087.72 1,833.33 0.00

    Marzo 2,004.39 1,833.33 0.00Abril 1,995.61 1,833.33 0.00Mayo 1,921.40 1,833.33 0.00Junio 1,833.33 - -Julio 1,833.33 - -Agosto 1,833.33 - -Septiembre 1,833.33 - -Octubre 1,833.33 - -Noviembre 1,833.33 - -Diciembre 1,833.33 - -

    ndiceSerie histrica mensual

    3. Concreto de 2500 PSI

    Mesndice Variacin

    2013 2014 MensualEnero 2,130.08 2,318.59 0.78Febrero 2,130.08 2,300.70 -0.77Marzo 2,130.08 2,300.70 0.00Abril 2,130.08 2,300.70 0.00Mayo 2,130.08 2,300.70 0.00Junio 2,207.03 - -Julio 2,300.70 - -Agosto 2,300.70 - -Septiembre 2,300.70 - -Octubre 2,300.70 - -

    Noviembre 2,300.70 - -Diciembre 2,300.70 - -

    ndiceSerie histrica mensual

    4. Cal natural o viva (terrn)

    Mesndice Variacin

    2013 2014 Mensual

    Enero 901.43 1,000.00 0.00

    Febrero 901.43 1,000.00 0.00

    Marzo 901.43 1,000.00 0.00

    Abril 901.43 1,000.00 0.00

    Mayo 901.43 1,000.00 0.00

    Junio 901.43 - -Julio 901.43 - -

    Agosto 901.43 - -

    Septiembre 991.07 - -

    Octubre 1,000.00 - -

    Noviembre 1,000.00 - -

    Diciembre 1,000.00 - -

    ndiceSerie histrica mensual

    1700.0

    1750.0

    1800.0

    1850.0

    1900.0

    1950.02000.0

    2050.0

    2100.0

    2150.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    2000.0

    2050.0

    2100.0

    2150.0

    2200.0

    2250.0

    2300.0

    2350.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    840.0

    860.0

    880.0

    900.0920.0

    940.0

    960.0

    980.0

    1000.0

    1020.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    32/49

    5. Cal hidratada

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,485.36 1,487.34 0.00

    Febrero 1,485.36 1,526.55 2.64

    Marzo 1,527.54 1,490.82 -2.34Abril 1,533.50 1,486.35 -0.30

    Mayo 1,504.71 1,486.35 0.00

    Junio 1,524.57 - -

    Julio 1,523.08 - -

    Agosto 1,488.83 - -

    Septiembre 1,488.83 - -

    Octubre 1,523.08 - -

    Noviembre 1,508.68 - -

    Diciembre 1,487.34 - -

    ndiceSerie histrica mensual

    6. Cemento (P. Pub.)Mes

    ndice Variacin2013 2014 Mensual

    Enero 1,803.17 1,793.17 0.07

    Febrero 1,806.83 1,791.95 -0.07

    Marzo 1,808.78 1,791.95 0.00

    Abril 1,763.41 1,791.95 0.00

    Mayo 1,808.78 1,791.95 0.00

    Junio 1,791.95 - -

    Julio 1,791.95 - -

    Agosto 1,791.95 - -

    Septiembre 1,791.95 - -

    Octubre 1,791.95 - -Noviembre 1,791.95 - -

    Diciembre 1,791.95 - -

    ndiceSerie histrica mensual

    8. Piedrn de 3/4" (1/2" y 3/8")

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,500.49 1,558.58 3.39

    Febrero 1,500.49 1,495.39 -4.05

    Marzo 1,519.26 1,543.45 3.21

    Abril 1,507.52 1,543.45 0.00

    Mayo 1,510.76 1,543.45 0.00Junio 1,507.52 - -

    Julio 1,472.41 - -

    Agosto 1,467.64 - -

    Septiembre 1,460.52 - -

    Octubre 1,467.64 - -

    Noviembre 1,467.64 - -Diciembre 1,507.52 - -

    ndiceSerie histrica mensual

    1460.0

    1470.0

    1480.0

    1490.0

    1500.0

    1510.0

    1520.0

    1530.0

    1540.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1740.0

    1750.0

    1760.0

    1770.0

    1780.0

    1790.0

    1800.0

    1810.0

    1820.0

    En

    e

    Fe

    b

    Mar

    Abr

    Ma

    y

    Ju

    n

    J

    ul

    Ag

    o

    Se

    p

    O

    ct

    No

    v

    D

    ic

    En

    e

    Fe

    b

    Mar

    Abr

    M

    2013 2014

    1400.0

    1420.0

    1440.0

    1460.0

    1480.0

    1500.0

    1520.0

    1540.0

    1560.0

    1580.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    33/49

    9. Material selecto, puesto en distribuidora ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 101.90 97.52 -2.61

    Febrero 104.85 100.13 2.68

    Marzo 104.06 104.06 3.92Abril 104.06 103.42 -0.61

    Mayo 106.02 107.99 4.42

    Junio 106.02 - -

    Julio 104.06 - -

    Agosto 102.10 - -

    Septiembre 100.32 - -

    Octubre 104.06 - -

    Noviembre 99.36 - -

    Diciembre 100.13 - -

    ndiceSerie histrica mensual

    10. Cemento blanco portland, tipo III ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 107.24 109.78 0.00

    Febrero 109.78 109.89 0.10

    Marzo 109.78 109.78 -0.10

    Abril 109.78 109.78 0.00

    Mayo 109.78 109.78 0.00

    Junio 109.78 - -

    Julio 109.78 - -

    Agosto 109.78 - -

    Septiembre 109.78 - -Octubre 109.78 - -

    Noviembre 109.78 - -

    Diciembre 109.78 - -

    ndiceSerie histrica mensual

    K. MATERIALES PARA ELECTRICIDAD1. Alambre N. 12 forrado (100 mts.)

    Mesndice Variacin

    2013 2014 MensualEnero 1,813.36 1,411.57 0.00Febrero 1,873.27 1,359.45 -3.69

    Marzo 1,873.27 1,428.57 5.08Abril 1,792.63 1,428.57 0.00Mayo 1,792.63 1,389.82 -2.71Junio 1,707.19 - -Julio 1,623.78 - -Agosto 1,557.00 - -Septiembre 1,500.05 - -Octubre 1,516.31 - -Noviembre 1,446.96 - -Diciembre 1,411.57 - -

    ndiceSerie histrica mensual

    92.0

    94.0

    96.0

    98.0

    100.0

    102.0

    104.0106.0

    108.0

    110.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    105.5

    106.0

    106.5

    107.0

    107.5

    108.0

    108.5

    109.0

    109.5

    110.0

    110.5

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    200.0

    400.0

    600.0

    800.0

    1000.0

    1200.01400.0

    1600.0

    1800.0

    2000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    34/49

    2. Switch sencillo con placa ticino

    Mesndice Variacin

    2013 2014 MensualEnero 916.74 710.57 -3.82Febrero 907.05 707.93 -0.37

    Marzo 907.05 707.05 -0.12Abril 904.41 707.05 0.00Mayo 911.01 681.94 -3.55Junio 885.02 - -Julio 884.58 - -Agosto 826.87 - -Septiembre 787.67 - -Octubre 797.80 - -Noviembre 759.03 - -Diciembre 738.77 - -

    ndiceSerie histrica mensual

    3. Tablero monofs. 8 circuitos y 3 lneas

    Mes ndice Variacin2013 2014 Mensual

    Enero 2,111.63 1,670.30 -1.50

    Febrero 2,111.63 1,695.72 1.52

    Marzo 2,111.63 1,744.04 2.85

    Abril 2,189.04 1,744.04 0.00

    Mayo 2,189.04 1,746.33 0.13

    Junio 2,098.25 - -

    Julio 1,996.39 - -

    Agosto 1,925.60 - -

    Septiembre 1,859.34 - -

    Octubre 1,772.17 - -Noviembre 1,696.75 - -

    Diciembre 1,695.72 - -

    ndiceSerie histrica mensual

    4. Tubo ducton de metal de 1" x 10' largo

    Mesndice Variacin

    2013 2014 MensualEnero 1,939.70 1,581.41 2.21Febrero 1,939.70 1,501.01 -5.08Marzo 1,939.70 1,432.16 -4.59Abril 1,939.70 1,494.97 4.39Mayo 2,010.05 1,453.77 -2.76

    Junio 1,958.79 - -Julio 1,870.85 - -Agosto 1,794.97 - -Septiembre 1,731.66 - -Octubre 1,662.31 - -Noviembre 1,588.94 - -Diciembre 1,547.24 - -

    ndiceSerie histrica mensual

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0700.0

    800.0

    900.0

    1000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    M

    ay

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    35/49

    L. PISOS Y AZULEJOS

    1. Azulejos de 10 x 10 cms.

    Mesndice Variacin

    2013 2014 MensualEnero 799.29 661.37 3.83

    Febrero 799.29 655.60 -0.87Marzo 799.29 654.09 -0.23Abril 799.29 654.09 0.00Mayo 799.29 644.67 -1.44Junio 799.29 - -Julio 799.29 - -Agosto 799.29 - -Septiembre 721.49 - -Octubre 686.59 - -Noviembre 652.58 - -Diciembre 636.94 - -

    ndiceSerie histrica mensual

    2. Piso de granito gris de 30 x 30 cms.Mes

    ndice Variacin2013 2014 Mensual

    Enero 786.08 792.16 0.03

    Febrero 782.70 795.54 0.43

    Marzo 782.70 791.76 -0.48

    Abril 782.70 798.51 0.85

    Mayo 786.49 795.14 -0.42

    Junio 786.49 - -

    Julio 786.49 - -

    Agosto 786.49 - -

    Septiembre 789.86 - -Octubre 752.43 - -

    Noviembre 782.70 - -

    Diciembre 791.89 - -

    ndiceSerie histrica mensual

    3. Piso de granito mrmol fondo blanco de 30 x 30 centmetros

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,039.15 1,053.46 0.00

    Febrero 1,015.09 1,044.34 -0.87

    Marzo 1,034.91 1,055.35 1.05

    Abril 1,034.91 1,043.40 -1.13Mayo 1,034.91 1,042.92 -0.05

    Junio 1,034.91 - -

    Julio 1,034.91 - -

    Agosto 1,034.91 - -

    Septiembre 1,030.66 - -

    Octubre 1,036.95 - -

    Noviembre 1,046.86 - -Diciembre 1,053.46 - -

    ndiceSerie histrica mensual

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0

    700.0

    800.0

    900.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    720.0

    730.0

    740.0

    750.0

    760.0

    770.0

    780.0

    790.0

    800.0

    810.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    990.0

    1000.0

    1010.0

    1020.0

    1030.0

    1040.0

    1050.0

    1060.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    36/49

    4. Piso cermico nacional 31.6 x 31.6 cms. PEI 4 (transito intenso) ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 113.02 113.02 0.00

    Febrero 113.02 113.09 0.06

    Marzo 113.02 113.02 -0.06Abril 113.02 113.02 0.00

    Mayo 113.09 113.09 0.06

    Junio 113.09 - -

    Julio 115.96 - -

    Agosto 115.96 - -

    Septiembre 113.02 - -

    Octubre 118.10 - -

    Noviembre 113.02 - -

    Diciembre 113.02 - -

    ndiceSerie histrica mensual

    5. Piso vinilico 30 x 30 cms (1.8 mm) ***

    Mesndice Variacin

    2013 2014 Mensual

    Enero 137.92 115.55 0.00

    Febrero 137.92 111.82 -3.23

    Marzo 131.95 108.10 -3.33

    Abril 125.99 111.82 3.45

    Mayo 130.46 115.55 3.33

    Junio 125.80 - -

    Julio 120.77 - -

    Agosto 115.55 - -

    Septiembre 95.13 - -Octubre 115.55 - -

    Noviembre 119.28 - -

    Diciembre 115.55 - -

    ndiceSerie histrica mensual

    M. VARIOS1. Grama (San Agustn)

    Mesndice Variacin

    2013 2014 MensualEnero 324.41 289.29 0.00Febrero 324.41 283.86 -1.88

    Marzo 324.41 283.86 0.00Abril 324.41 298.78 5.26Mayo 324.41 310.95 4.07Junio 324.41 - -Julio 324.41 - -Agosto 324.41 - -Septiembre 328.47 - -Octubre 313.54 - -Noviembre 300.08 - -Diciembre 289.29 - -

    ndiceSerie histrica mensual

    110.0

    111.0

    112.0

    113.0

    114.0

    115.0

    116.0117.0

    118.0

    119.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    120.0

    140.0

    160.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    260.0

    270.0

    280.0

    290.0

    300.0

    310.0320.0

    330.0

    340.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    37/49

    2. Malla de alambre calibre 12 con agujero de 2 1/2" (1.50 mts. alto)

    Mesndice Variacin

    2013 2014 MensualEnero 1,800.00 1,851.85 -6.25Febrero 1,800.00 1,774.69 -4.17

    Marzo 1,800.00 1,697.53 -4.35Abril 1,800.00 1,604.94 -5.45Mayo 1,800.00 1,674.69 4.35Junio 1,800.00 - -Julio 1,800.00 - -Agosto 1,800.00 - -Septiembre 1,975.31 - -Octubre 2,175.93 - -Noviembre 2,067.90 - -Diciembre 1,975.31 - -

    ndiceSerie histrica mensual

    3. Plywood de cedro 4' x 8' x 3/4"

    Mes ndice Variacin2013 2014 Mensual

    Enero 1,393.81 2,098.46 -6.79

    Febrero 1,393.81 2,009.02 -4.26

    Marzo 1,393.81 2,098.46 4.45

    Abril 1,393.81 2,187.91 4.26

    Mayo 1,393.81 2,229.12 1.88

    Junio 1,393.81 - -

    Julio 1,393.81 - -

    Agosto 1,393.81 - -

    Septiembre 1,601.07 - -

    Octubre 1,748.66 - -Noviembre 2,010.81 - -

    Diciembre 2,251.23 - -

    ndiceSerie histrica mensual

    4. Flete

    Mesndice Variacin

    2013 2014 Mensual

    Enero 4,000.00 4,000.00 0.00

    Febrero 4,000.00 4,000.00 0.00

    Marzo 4,000.00 4,000.00 0.00

    Abril 4,000.00 4,000.00 0.00

    Mayo 4,000.00 4,000.00 0.00

    Junio 4,000.00 - -

    Julio 4,000.00 - -

    Agosto 4,000.00 - -

    Septiembre 4,000.00 - -

    Octubre 4,000.00 - -

    Noviembre 4,000.00 - -

    Diciembre 4,000.00 - -

    ndiceSerie histrica mensual

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    M

    ay

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    3000.0

    3500.0

    4000.0

    4500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    38/49

    5. Lmpara fluor. de 4 x 40 WR.S s/difusor

    Mesndice Variacin

    2013 2014 Mensual

    Enero 862.45 836.10 4.66

    Febrero 839.45 794.78 -4.94

    Marzo 839.45 755.22 -4.98Abril 839.45 727.61 -3.66

    Mayo 839.45 694.03 -4.62

    Junio 839.45 - -

    Julio 839.45 - -

    Agosto 802.61 - -

    Septiembre 802.61 - -

    Octubre 763.06 - -

    Noviembre 798.88 - -

    Diciembre 798.88 - -

    ndiceSerie histrica mensual

    6. Llantas para camin (900 x 20) nacional

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,956.17 1,804.71 -6.18

    Febrero 1,956.17 1,721.56 -4.61

    Marzo 1,956.17 1,752.34 1.79

    Abril 1,956.17 1,686.11 -3.78

    Mayo 1,956.17 1,752.88 3.96

    Junio 1,956.17 - -

    Julio 1,956.17 - -

    Agosto 1,956.17 - -

    Septiembre 1,795.04 - -

    Octubre 1,767.64 - -Noviembre 1,773.77 - -

    Diciembre 1,923.62 - -

    ndiceSerie histrica mensual

    7. Llantas para vehculo Liv. R.14-6 pliegos convencional, nacional

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,491.10 2,090.06 0.59

    Febrero 2,491.10 2,135.23 2.16

    Marzo 3,052.29 2,227.62 4.33

    Abril 2,532.17 2,332.33 4.70

    Mayo 2,395.29 2,436.35 4.46

    Junio 2,258.42 - -

    Julio 2,395.29 - -

    Agosto 2,395.29 - -

    Septiembre 2,030.28 - -

    Octubre 2,114.70 - -

    Noviembre 1,806.73 - -Diciembre 2,077.74 - -

    ndiceSerie histrica mensual

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0

    700.0800.0

    900.0

    1000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1550.0

    1600.0

    1650.0

    1700.0

    1750.0

    1800.0

    1850.0

    1900.0

    1950.0

    2000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    3000.0

    3500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    39/49

    8. Perfil de aluminio 1 1/2" x 1/16"

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,103.45 2,034.48 7.27

    Febrero 1,103.45 2,121.38 4.27

    Marzo 1,103.45 2,223.45 4.81Abril 1,103.45 2,155.17 -3.07

    Mayo 1,103.45 2,137.93 -0.80

    Junio 1,103.45 - -

    Julio 1,103.45 - -

    Agosto 1,103.45 - -

    Septiembre 1,265.52 - -

    Octubre 1,448.28 - -

    Noviembre 1,655.17 - -

    Diciembre 1,896.55 - -

    ndiceSerie histrica mensual

    9. Sellador elstico SIKA-IGAS RMes

    ndice Variacin2013 2014 Mensual

    Enero 3,254.22 3,021.78 0.00

    Febrero 3,254.22 3,021.78 0.00

    Marzo 3,254.22 3,021.78 0.00

    Abril 3,254.22 3,021.78 0.00

    Mayo 3,254.22 3,021.78 0.00

    Junio 3,254.22 - -

    Julio 3,254.22 - -

    Agosto 3,254.22 - -

    Septiembre 3,021.78 - -Octubre 3,021.78 - -

    Noviembre 3,021.78 - -

    Diciembre 3,021.78 - -

    ndiceSerie histrica mensual

    10. Vidrio claro de 4 mm.

    Mesndice Variacin

    2013 2014 MensualEnero 839.16 842.66 0.00

    Febrero 839.16 842.66 0.00

    Marzo 839.16 842.66 0.00

    Abril 839.16 842.66 0.00Mayo 842.66 842.66 0.00

    Junio 842.66 - -

    Julio 842.66 - -

    Agosto 842.66 - -

    Septiembre 842.66 - -

    Octubre 842.66 - -

    Noviembre 842.66 - -Diciembre 842.66 - -

    ndiceSerie histrica mensual

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    2900.0

    2950.0

    3000.0

    3050.0

    3100.0

    3150.0

    3200.0

    3250.0

    3300.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    837.0

    838.0

    839.0

    840.0

    841.0

    842.0

    843.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    40/49

    11. Pintura anticorrosiva

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,357.39 2,157.12 -4.06

    Febrero 2,453.42 2,189.19 1.49

    Marzo 2,474.23 2,250.36 2.79Abril 2,474.23 2,330.63 3.57

    Mayo 2,444.95 2,257.84 -3.12

    Junio 2,474.23 - -

    Julio 2,465.14 - -

    Agosto 2,394.14 - -

    Septiembre 2,330.00 - -

    Octubre 2,360.09 - -

    Noviembre 2,362.07 - -

    Diciembre 2,248.38 - -

    ndiceSerie histrica mensual

    12. Pint. estructura metlica, color aluminioMes

    ndice Variacin2013 2014 Mensual

    Enero 3,934.01 3,478.65 -3.51

    Febrero 3,934.01 3,607.40 3.70

    Marzo 3,835.52 3,607.83 0.01

    Abril 3,934.01 3,607.83 0.00

    Mayo 3,835.52 3,607.83 0.00

    Junio 3,680.15 - -

    Julio 3,680.15 - -

    Agosto 3,615.88 - -

    Septiembre 3,604.83 - -

    Octubre 3,604.83 - -

    Noviembre 3,481.01 - -

    Diciembre 3,605.04 - -

    ndiceSerie histrica mensual

    13. Pintura de hule de primera

    Mesndice Variacin

    2013 2014 Mensual

    Enero 3,266.08 3,185.73 7.03

    Febrero 3,366.08 3,223.28 1.18

    Marzo 3,384.48 3,153.07 -2.18

    Abril 3,384.48 3,112.14 -1.30

    Mayo 3,267.21 3,112.14 0.00

    Junio 3,384.48 - -

    Julio 3,384.48 - -

    Agosto 3,267.46 - -

    Septiembre 3,220.28 - -

    Octubre 3,179.97 - -

    Noviembre 3,029.66 - -Diciembre 2,976.47 - -

    ndiceSerie histrica mensual

    1950.02000.02050.02100.02150.02200.02250.02300.02350.02400.0

    2450.02500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    3200.0

    3300.0

    3400.0

    3500.0

    3600.0

    3700.0

    3800.0

    3900.0

    4000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    2700.0

    2800.0

    2900.0

    3000.0

    3100.03200.0

    3300.0

    3400.0

    3500.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    41/49

    14. Pintura de aceite

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,957.98 2,262.44 7.55

    Febrero 1,957.98 2,369.58 4.74

    Marzo 1,957.98 2,488.58 5.02Abril 1,957.98 2,561.91 2.95

    Mayo 1,957.98 2,561.91 0.00

    Junio 1,957.98 - -

    Julio 1,957.98 - -

    Agosto 1,957.98 - -

    Septiembre 1,957.98 - -

    Octubre 1,957.98 - -

    Noviembre 2,054.33 - -

    Diciembre 2,103.66 - -

    ndiceSerie histrica mensual

    15. Pintura p/seales carretera (fluor.)Mes

    ndice Variacin2013 2014 Mensual

    Enero 3,741.81 5,434.99 0.00

    Febrero 3,741.81 5,406.92 -0.52

    Marzo 3,741.81 5,294.67 -2.08

    Abril 3,741.81 5,173.06 -2.30

    Mayo 3,741.81 5,173.06 0.00

    Junio 3,741.81 - -

    Julio 3,741.81 - -

    Agosto 3,741.81 - -

    Septiembre 4,303.09 - -

    Octubre 4,920.49 - -

    Noviembre 5,160.90 - -

    Diciembre 5,434.99 - -

    ndiceSerie histrica mensual

    16. Piochas con cabo

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,530.54 1,772.25 -5.15

    Febrero 2,530.54 1,820.77 2.74

    Marzo 2,443.28 1,743.98 -4.22

    Abril 2,338.57 1,656.89 -4.99

    Mayo 2,268.76 1,628.97 -1.69Junio 2,181.50 - -

    Julio 2,181.50 - -

    Agosto 2,181.50 - -

    Septiembre 2,085.51 - -

    Octubre 1,985.17 - -

    Noviembre 1,896.51 - -

    Diciembre 1,868.41 - -

    ndiceSerie histrica mensual

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    3000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    1000.0

    2000.0

    3000.0

    4000.0

    5000.0

    6000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    500.0

    1000.0

    1500.0

    2000.0

    2500.0

    3000.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    42/49

    17. Postes de concreto (40' de alto)

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,415.27 1,322.20 -4.43

    Febrero 1,383.46 1,322.20 0.00

    Marzo 1,383.46 1,322.20 0.00Abril 1,383.46 1,322.20 0.00

    Mayo 1,383.46 1,286.40 -2.71

    Junio 1,324.58 - -

    Julio 1,324.58 - -

    Agosto 1,328.56 - -

    Septiembre 1,360.38 - -

    Octubre 1,391.41 - -

    Noviembre 1,391.41 - -

    Diciembre 1,383.46 - -

    ndiceSerie histrica mensual

    18. Formica, plancha de 4' x 8'Mes

    ndice Variacin2013 2014 Mensual

    Enero 402.75 497.30 2.53

    Febrero 402.75 472.74 -4.94

    Marzo 402.75 491.16 3.90

    Abril 402.75 474.80 -3.33

    Mayo 402.75 458.40 -3.46

    Junio 402.75 - -

    Julio 402.75 - -

    Agosto 402.75 - -

    Septiembre 466.60 - -

    Octubre 474.80 - -

    Noviembre 483.01 - -

    Diciembre 485.02 - -

    ndiceSerie histrica mensual

    19. Abono animal (gallinaza procesada)

    Mesndice Variacin

    2013 2014 Mensual

    Enero 1,119.11 1,120.00 0.00

    Febrero 1,119.11 1,120.00 0.00

    Marzo 1,119.11 1,120.00 0.00

    Abril 1,119.11 1,120.00 0.00

    Mayo 1,119.11 1,155.56 3.17

    Junio 1,119.11 - -

    Julio 1,120.00 - -

    Agosto 1,120.00 - -

    Septiembre 1,120.00 - -

    Octubre 1,120.00 - -

    Noviembre 1,120.00 - -Diciembre 1,120.00 - -

    ndiceSerie histrica mensual

    1200.0

    1250.0

    1300.0

    1350.0

    1400.0

    1450.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

    1100.0

    1110.0

    1120.0

    1130.0

    1140.0

    1150.0

    1160.0

    Ene

    Feb

    Mar

    Abr

    May

    Jun

    Jul

    Ago

    Sep

    Oct

    Nov

    Dic

    Ene

    Feb

    Mar

    Abr

    M

    2013 2014

  • 7/25/2019 Precio de Materiales INE.pdf

    43/49

    20. rbol de Jacaranda

    Mesndice Variacin

    2013 2014 Mensual

    Enero 2,800.00 3,080.80 6.97

    Febrero 2,880.00 3,240.00 5.17

    Marzo 2,880.00 3,080.80 -4.91Abril 2,880.00 3,200.00 3.87

    Mayo 2,880.00 3,200.00 0.00

    Junio 2,880.00 - -

    Julio 2,800.00 - -

    Agosto 2,800.00 - -

    Septiembre 2,800.00 - -

    Octubre 2,680.00 - -

    Noviembre 2,800.00 - -

    Diciembre 2,880.00 - -

    ndiceSerie histrica mensual

    21. Repuestos de origen importado para maquinaria pesadaMes

    ndice Variacin2013 2014 Mensual

    Enero 1,275.46 1,279.62 -0.02

    Febrero 1,266.76 1,267.50 -0.95

    Marzo 1,265.39 1,260.97 -0.52

    Abril 1,264.70 1,265.49 0.36

    Mayo 1,264.75 1,262.34 -0.25

    Junio 1,268.47 - -

    Julio 1,270.6