Transcript of Precios Unitarios DRENAJES

  • 7/23/2019 Precios Unitarios DRENAJES

    1/18

    PROYECTO:

    Act iv idad:

    Unidad: M3

    Cantidad: 1.00

    Moneda: Bs.

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVO

    COSTO TOTAL

    1 0.00

    2 0.00

    3 0.00

    4 0.00

    5 0.00

    6 0.00

    7 0.00

    0.00

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Capataz h. 0.014 35.63 0.49

    2 Pen h. 0.055 16.88 0.93

    3 0.00

    4 0.00

    5 0.00

    6 0.00

    1.42

    55.00% 0.7814.94% 0.33

    1.11

    2.53

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Excavadora CATERPILLAR 320C h. 0.028 730.80 20.15

    2 Volqueta 15 m3 h. 0.022 210.00 4.63

    3 0.00

    4 0.00

    5 0.00

    6 0.00

    7 0.00

    5.00% 0.13

    24.91

    COSTO TOTAL

    9.00% 2.472.47

    COSTO TOTAL

    UTILIDAD=(% DE 1+2+3+4) 5.00% 1.50

    1.50

    COSTO TOTAL

    3.09% 0.97

    0.97

    32.3832.38

    Nota:El proponente declara que el Formulario ha sido llenado de acuerdo con las especificaciones tcnicas,

    aplicando las leyes sociales y tributarias vigentes, y es consistente con el formulario B-3.

    1. MATERIALES

    FORMULARIO B-2

    ANALISIS DE PRECIO UNITARIO

    DATOS GENERALES

    MEJORAMIENTO Y CONSTRUCCIN DEL TRAMO SAN BUENAVENTURA-IXIAMAS

    EXCAVACION NO CLASIF. PARA OBRAS DE DRENAJE

    4. GASTOS GENERALES Y ADMINISTRATIVOS

    TOTAL MATERIALES

    2. MANO DE OBRA

    SUBTOTAL MANO DE OBRA

    CARGAS SOCIALES=(% DEL SUBTOTAL DE MANO DE OBRA)

    IMPUESTOS IVA MANO DE OBRA=(% MANO DE OBRA+CARGAS SOCIALES)

    SUBTOTAL CARGAS SOCIALES E IMPUESTOS

    TOTAL MANO DE OBRA

    3. EQUIPO, MAQUINARIA Y HERRAMIENTAS

    HERRAMIENTAS=(% DEL TOTAL DE MANO DE OBRA)

    TOTAL EQUIPO, MAQUINARIA Y HERRAMIENTAS

    TOTAL IMPUESTOS

    TOTAL PRECIO UNITARIO (1+2+3+4+5+6) =

    TOTAL PRECIO UNITARIO ADOPTADO (Con dos decimales )

    GASTOS GENERALES=(% DE 1+2+3)TOTAL GASTOS GENERALES Y ADMINISTRATIVOS

    5. UTILIDAD

    TOTAL UTILIDAD

    6. IMPUESTOS

    IMPUESTOS IT=(% DE 1+2+3+4+5)

  • 7/23/2019 Precios Unitarios DRENAJES

    2/18

    PROYECTO:

    Act iv idad:

    Unidad: ML

    Cantidad: 1.00

    Moneda: Bs.

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVO

    COSTO TOTAL

    1 Tubo HA m. 1.000 1317.08 1,317.08

    2 Mortero cem. gris m3 0.200 60.45 12.09

    3 0.00

    4 0.00

    5 0.00

    6 0.00

    7 0.00

    1,329.17

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Capataz h. 0.333 35.63 11.88

    2 Oficial h. 0.667 19.38 12.92

    3 Pen h. 2.000 16.88 33.76

    4 0.00

    5 0.00

    6 0.00

    58.56

    55.00% 32.2114.94% 13.56

    45.77

    104.32

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Camion Grua QY30 h. 0.133 280.00 37.33

    2 Rodillo vibrante manual 8 HP h. 0.333 40.00 13.33

    3 0.00

    4 0.00

    5 0.00

    6 0.00

    7 0.00

    5.00% 5.22

    55.88

    COSTO TOTAL

    9.00% 134.04134.04

    COSTO TOTAL

    5.00% 81.17

    81.17

    COSTO TOTAL

    3.09% 52.67

    52.67

    1,757.261,757.26

    Nota:El proponente declara que el Formulario ha sido llenado de acuerdo con las especificaciones tcnicas,

    aplicando las leyes sociales y tributarias vigentes, y es consistente con el formulario B-3.

    1. MATERIALES

    FORMULARIO B-2

    ANALISIS DE PRECIO UNITARIO

    DATOS GENERALES

    MEJORAMIENTO Y CONSTRUCCIN DEL TRAMO SAN BUENAVENTURA-IXIAMAS

    ALCANTARILLA SIMPLE TUBO DE H A D=1.50 M TIPO I A

    GASTOS GENERALES=(% DE 1+2+3)

    TOTAL MATERIALES

    2. MANO DE OBRA

    SUBTOTAL MANO DE OBRA

    CARGAS SOCIALES=(% DEL SUBTOTAL DE MANO DE OBRA)IMPUESTOS IVA MANO DE OBRA=(% MANO DE OBRA+CARGAS SOCIALES)

    SUBTOTAL CARGAS SOCIALES E IMPUESTOS

    TOTAL MANO DE OBRA

    3. EQUIPO, MAQUINARIA Y HERRAMIENTAS

    HERRAMIENTAS=(% DEL TOTAL DE MANO DE OBRA)

    TOTAL EQUIPO, MAQUINARIA Y HERRAMIENTAS

    4. GASTOS GENERALES Y ADMINISTRATIVOS

    TOTAL IMPUESTOS

    TOTAL PRECIO UNITARIO (1+2+3+4+5+6) =

    TOTAL PRECIO UNITARIO ADOPTADO (Con dos decimales )

    TOTAL GASTOS GENERALES Y ADMINISTRATIVOS

    5. UTILIDAD

    UTILIDAD=(% DE 1+2+3+4)

    TOTAL UTILIDAD

    6. IMPUESTOS

    IMPUESTOS IT=(% DE 1+2+3+4+5)

  • 7/23/2019 Precios Unitarios DRENAJES

    3/18

    PROYECTO:

    Act iv idad:

    Unidad: ML

    Cantidad: 1.00

    Moneda: Bs.

    DESCRIPCIN UNIDAD CANTIDAD PRECIOPRODUCTIVO

    COSTO TOTAL

    1 bls. 33.00 60.00 1,980.00

    2 m3 2.10 40.78 85.63

    3 m3 2.15 69.65 149.75

    4 gal 0.35 66.83 23.26

    5 m2 0.47 750.00 349.74

    6 m2 0.45 780.00 351.06

    7 l. 0.02 19.00 0.35

    8 kg 0.07 15.00 1.04

    9 kg 2.28 13.00 29.67

    10 kg 450.00 9.30 4,185.00

    11 m3 0.51 72.59 36.68

    12 -

    13 -

    14 -

    MATERIALES 7,192.18

    2. MANO DE MANO DE OBRA

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Capataz h. 0.150 35.63 5.35

    2 Operario h. 1.501 25.50 38.27

    3 Oficial h. 3.002 19.38 58.17

    4 Pen h. 6.003 16.88 101.33

    5 0.00

    6 0.00

    203.12

    55.00% 111.72

    14.94% 47.04

    158.75

    361.87

    3. EQUIPO, MEQUIPO, MAQUINARIA Y HERRAMIENTAS

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Autob. Hormig. h 1.201 150.00 180.09

    2 Mixer h 1.501 210.00 315.17

    3 Vibrador h 3.002 40.00 120.06

    4 0.00

    5 0.00

    6 0.00

    5.00% 18.09

    633.42

    4. GASTOS GENERALES Y ADMINISTRATIVOSCOSTO TOTAL

    9.00% 736.87

    736.87

    5. UTILIDADCOSTO TOTAL

    5.00% 446.22

    446.22

    6. IMPUESTOS COSTO TOTAL

    3.09% 289.55

    289.55

    9,660.11

    9,660.11

    Nota:El proponente declara que el Formulario ha sido llenado de acuerdo con las especificaciones tcnicas,

    aplicando las leyes sociales y tributarias vigentes, y es consistente con el formulario B-3.

    SUBTOTAL MANO DE OBRA

    CARGAS SOCIALES=(% DEL SUBTOTAL DE MANO DE OBRA)

    IMPUESTOS IVA MANO DE OBRA=(% MANO DE OBRA+CARGAS SOCIALES)

    SUBTOTAL CARGAS SOCIALES E IMPUESTOS

    TOTAL MANO DE OBRA

    HERRAMIENTAS=(% DEL TOTAL DE MANO DE OBRA)

    TOTAL EQUIPO, MAQUINARIA Y HERRAMIENTA

    GASTOS GENERALES=(% DE 1+2+3)

    TOTAL PRECIO UNITARIO (1+2+3+4+5+6) =

    TOTAL PRECIO UNITARIO ADOPTADO (Con dos decimales)

    TOTAL IMPUESTOS

    TOTAL GASTOS GENERALES Y ADMINISTRATIVOS

    UTILIDAD=(% DE 1+2+3+4)

    TOTAL UTILIDAD

    IMPUESTOS IT=(% DE 1+2+3+4+5)

    Tabln de madera

    Desencofrante

    Puntas

    Alambre atar 1,30 mm.

    Acero FY=4200 kg/cm2

    Agua

    Aditivo curador

    Encofrado panel metal.

    Piedra Chancada

    FORMULARIO B -2

    ANALISIS DE PRECIO UNITARIO

    DATOS GENERALESMEJORAMIENTO Y CONSTRUCCIN DEL TRAMO SAN BUENAVENTURA-IXIAMAS

    ALCANTARILLA CAJN DE 1 C 2 X 2 M TIPO II B

    1. MATERIALES

    Cemento

    Arena Gruesa

  • 7/23/2019 Precios Unitarios DRENAJES

    4/18

    PROYECTO:

    Act iv idad:

    Unidad: ML

    Cantidad: 1.00

    Moneda: Bs.

    DESCRIPCIN UNIDAD CANTIDAD PRECIOPRODUCTIVO

    COSTO TOTAL

    1 bls. 71.00 60.00 4,260.00

    2 m3 4.50 40.78 183.49

    3 m3 4.60 69.65 320.39

    5 gal 0.62 66.83 41.30

    6 m3 1.03 750.00 774.36

    7 m3 0.78 780.00 610.58

    8 l. 0.03 19.00 0.63

    9 kg 0.12 15.00 1.85

    10 kg 4.55 13.00 59.15

    11 kg 920.00 9.30 8,556.00

    12 m3 0.90 72.59 65.33

    13 -

    14 -

    15 -

    14,873.08

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Capataz h. 0.205 35.63 7.30

    2 Operario h. 2.048 25.50 52.23

    3 Oficial h. 4.097 19.38 79.40

    4 Pen h. 8.194 16.88 138.31

    5 0.00

    6 0.00

    277.24

    55.00% 152.48

    14.94% 64.20

    216.68

    493.92

    DESCRIPCIN UNIDAD CANTIDADPRECIO

    PRODUCTIVOCOSTO TOTAL

    1 Autob. Hormig. h 2.048 150.00 307.26

    2 Mixer h 2.048 210.00 430.16

    3 h 6.145 40.00 245.81

    4 0.00

    5 0.00

    6 0.00

    5.00% 24.70

    1,007.93

    COSTO TOTAL

    9.00% 1,473.74

    1,473.74

    COSTO TOTAL

    5.00% 892.43

    892.43

    COSTO TOTAL

    3.09% 579.10

    579.10

    19,320.21

    19,320.21

    Nota:El proponente declara que el Formulario ha sido llenado de acuerdo con las especificaciones tcnicas,

    aplicando las leyes sociales y tributarias vigentes, y es consistente con el formulario B-3.

    IMPUESTOS IT=(% DE 1+2+3+4+5)

    TOTAL IMPUESTOS

    TOTAL PRECIO UNITARIO (1+2+3+4+5+6) =

    TOTAL PRECIO UNITARIO ADOPTADO (Con dos decimal es)

    6. IMPUESTOS

    HERRAMIENTAS=(% DEL TOTAL DE MANO DE OBRA)

    TOTAL EQUIPO, MAQUINARIA Y HERRAMIENTAS

    4. GASTOS GENERALES Y ADMINISTRATIVOS

    GASTOS GENERALES=(% DE 1+2+3)

    TOTAL GASTOS GENERALES Y ADMINISTRATIVOS

    5. UTILIDAD

    UTILIDAD=(% DE 1+2+3+4)

    TOTAL UTILIDAD

    Vibrador

    SUBTOTAL MANO DE OBRA

    CARGAS SOCIALES=(% DEL SUBTOTAL DE MANO DE OBRA)

    IMPUESTOS IVA MANO DE OBRA=(% MANO DE OBRA+CARGAS SOCIALES)

    SUBTOTAL CARGAS SOCIALES E IMPUESTOS

    TOTAL MANO DE OBRA

    3. EQUIPO, MAQUINARIA Y HERRAMIENTAS

    TOTAL MATERIALES

    2. MANO DE OBRA

    Agua

    Aditivo curador

    Encofrado panel metal.

    Tabln de madera

    Desencofrante

    Puntas

    Alambre atar 1,30 mm.

    Acero FY=4200 kg/cm2

    Piedra Chancada

    FORMULARIO B -2

    ANALISIS DE PRECIO UNITARIO

    DATOS GENERALESMEJORAMIENTO Y CONSTRUCCIN DEL TRAMO SAN BUENAVENTURA-IXIAMAS

    ALCANTARILLA CAJN DE 2 C 2 X 2 M