INTRODUCTION
The joint venture INGECONS LIBYA for General Construction, is a com-pany founded in 2009 by:
The main object of this society it’s for the general construction of all typesof civil engineering and residential building.
Our company philosophy is the give the customer a wide range of solutions, so
he choose that best suits your idea, so we have commercial alliances with vari-
ous companies throughout the world, and thus be able to respond effectively and
quickly to the different needs of our customers in each area.
LIBYAN INVESTMENT AND DEVELOPMENT COMPANY with 40% participation.
INGECONS & URBASERVICIOS, S.A. with 60% participation.
-
8/19/2019 Presentacion Ingecons Libya - Red
4/126
4
-
8/19/2019 Presentacion Ingecons Libya - Red
5/126
5
PRESENTATION
Introduction. History
INGECONS & URBASERVICIOS, S.A., is the result of the application of a consolida-tion strategy of several departments, having different activities, united for a common aim:the construction, with the objective to give to the client the maximum satisfaction in allaspects: studies, planning, price, quality, service, delays, etc. Its existence over time fol-lowed the following chronology:
- Department Plumbing & Drainage Installation was deployed in 2000 as a departmentspecializing in hydraulics and plumbing in the construction field, both as a civil build-ing.
- Department Electrical & Air Conditioning was deployed in 2002, specializes in electri-cal installations, air conditioning and home automation in new housing, industries, ho-tels, etc., in 2004, she has definitely broadened its scope by diversifying into two dis-tinct areas, the electrification and automation on one side, and air conditioning/coolingand maintenance of the other reviewers.
- Department Building Engineering was deployed in 2003 as a construction departmentspecializing in large projects and work, both residential as non-residential, character-ized by their magnitude and complexity.
- Department Metal Work & Glazing was deployed in 2000, dedicated to all types offacades, structures, curtain walls, metal coatings, glass and special facades.
The importance given by INGECONS & URBASERVICIOS, S.A. to Human Capital isvery huge. We have a large team of people with high decision-making capacity, technicalknowledge and experience.
Design of the strategic plan
The design of the strategic plan INGECONS & URBASERVICIOS, S.A. consists offollowing steps:
The concept of organization The nature of its activities. The reason of its existence. The group she serves.
Its principles and core values.
-
8/19/2019 Presentacion Ingecons Libya - Red
6/126
6
Areas of Business, Projects
Engineering A great technical multidisciplinary team favors that all the studies and budgets that we
make are perfectly adjusted to the needs of the client. We have a policy of continuous of
our technicians in the latest novelties in the fields of engineering and architecture. The
influence of the Group in all the fields related to the construction facilitates the interaction
of the different techniques and methodologies applicable to the construction, which turns
the technical team of INGECONS & URBASERVICIOS, S.A. into Leader and Technologi-cal Associate in the works contracted with our clients.
Construction The trading area of construction and real estate development is represented by IN-
GECONS & URBASERVICIOS, S.A., which integrally realizes all services related to theconstruction. It was created as an answer to the market need of an integral service, withhigh professional capacity, and a strict control of quality, prices and delays. It was the re-sult of the consolidation of the efforts of its founders and collaborators and their large ex-perience in the construction sector.
INGECONS & URBASERVICIOS, S.A. is a company, which however has a solid expe-rience, then a great part of its professionals have more than 20 years of occupational ac-
tivity. This allows us to be agile and flexible, but at the same time to be solid and rigorous
as the more veteran companies. However, as our critical mass is smaller, we need less
response time to answer the requests of our clients.
Industrial The trading area of industrial automation studies designs and installs industrial automa-
tion systems, which control the heating, air conditioned, alarm, light, blinds, awnings, etc.,
with the most recent technology. All these installations are able to control absolutely allthe systems by cellular phone, if needed, and with a program that allows the most effi-cient energy utilization, and consequently important energy savings and an improvementof environmental protection.
The industrial automation system described below is designed for the control of build-
ing, either of offices and hotels or private houses. It integrates the lighting, air condition-
ing, engines of blinds and curtains, presence and access controls, monitoring and control
from a central control point, etc. All these functions are perfectly coordinated and man-
aged in order to obtain the best rates of comfort, energy saving and safety in the building
or house.
-
8/19/2019 Presentacion Ingecons Libya - Red
7/126
7
-
8/19/2019 Presentacion Ingecons Libya - Red
8/126
8
Areas of Business, Installations
Air Conditionning. Maintenance and service
The trading area of air conditioning was created with a clear technological and ecologi-cal ideology, realising an integral management and control of the installations and ser-vices in the aim of controlling and giving comfort and welfare. We opt for the achievementof the proposed objectives with an unavoidable premise, the environmental protection,and so our air conditioning systems are based on new technologies and ecological gas-es.
The products we install are manufactured by the most important manufacturers in the
world, the controls and automatisms are of latest generation, and allow an important re-duction of the air conditioning costs.
INGECONS & URBASERVICIOS, S.A. in the field of Maintenance and ManagementServices has a primary objective: to achieve the minimum cost and maximum safetypossible for staff, the minimum environmental disturbance, the proper use and operation
of equipment and facilities for clients who have placed their trust.
Electrical installations
The trading area of electrical installations is composed of several areas, which canmake all types of works, as follows:
Electricity Public lighting.
Connections of low and medium voltage. Bypasses in low and medium voltage. Electric transformers. Switchboards. Industrial buildings.
Domestic electrification. Protection against lighting strokes.
Water treatment plants. Desalination plants.
Control and automatisms. Purifying plants. Traffic tunnels. Water pumping. Water management.
-
8/19/2019 Presentacion Ingecons Libya - Red
9/126
9
-
8/19/2019 Presentacion Ingecons Libya - Red
10/126
10
Areas of Business, Installations
Hydraulic installations. Wastewater treatment and sanitation
The trading area of hydraulic installation is dedicated to the realization of hydraulicand fire-fighting installations, either in civil works or building. One of our specializations incivil works is the setting up of all kind of polyethylene pipes. We are certified by the De-partment of Industry, and are in compliance with all the requirements of the certificationfor this type of installations. Is divided into two large areas:
Civil works
Buildings
In this department, the main activity is focused in the construction, operation,maintenance and plant maintenance treatment of wastewater and sanitation.
We have developed new areas of work:
Hydraulic installations of general potable water network. Water pumping. Impulses. Purifying plants. Juntions. Changes in networks. Valves. Industrial parks. Distribution to communities. Irrigation unions.
Plumbing and drainage installations. Fire-fighting installations. Real estate developments. Repairs.
Engineering, implementation of hydraulic works and outfalls. Operation of ater supply stations and water treatment. Waste management and recovery of bio solids in agriculture. Studies and Research, Development and Innovation (R+D+I), in collaboration
institutions. Installation work of simultaneous of electricity and thermal use of biogas.
-
8/19/2019 Presentacion Ingecons Libya - Red
11/126
11
-
8/19/2019 Presentacion Ingecons Libya - Red
12/126
12
Human Resources. Quality and Environment
There are three basic lines of action, on which policy is, based INGECONS & URBAS-ERVICIOS, S.A. RRHH:
The consolidation of these three areas has led to the creation of a large multidiscipli-nary team with wide measure of discretion, expertise and experience, able to provide thebest customer service, and to generate and manage numerous business areas effective-ly and thoroughly.
Of the three basic axes emerge the following pillars of our corporate culture:
INGECONS & URBASERVICIOS, S.A., promotes the generation of opportunities foremployees, along that detect and enhance personal skills of the same, with the ultimateaim of retaining the best professionals.
One of the objectives of the Mission, its employees and business partners of thesame, is to obtain high levels of occupational health and safety and strict adherence tothe LPRL (Spanish Law of Prevention and Safety at work).
Our prevention policy is thus based on the following principles:
Prevention of Occupational Risks. Incorporation of new staff. Training, adaptation and development.
Recruitment, retention and motivation of talented people. Suport and enhance the transfer of training and learning. The implementation of teamwork and quality control as tolos to promo-
te excellence in a job well done. Enhance the personal qualitites of our employees regarding skills, as-
sertiveness, empathy and proactivity. The development of the rejection of the routine, exercise discipline in
the execution of the work and safety control and exercise leadership
and to protect and respect the group.
Integration Principle of preventive action in all positions. Compliance with laws and regulations in force concerning the Prevention of
Occupational Risks. Training of all employees in prevention, developing their human and profes-
sional potential. Periodic compliance reviews of occupational healt. Study and analysis of the risks of each job and its prevention. A detailed study of risks in each of our works, by the appropriate Plan of
Work Safety.
-
8/19/2019 Presentacion Ingecons Libya - Red
13/126
13
As a result, they leave nothing to chance, we get involved to be more effective, we learnand we formed, thereby achieving more aware and more competent in the prevention ofoccupational hazards. A deep involvement with business partners, promotes an extremecoordination with them in the field of prevention of occupational hazards.
The consequence of this is to achieve a strong, trained and sensitized on preventionteam work.
For this reason, INGECONS & URBASERVICIOS, S.A., based his performance as astrategic plan, one of whose pillars is the Social Responsibility to be a fundamental as-pect underpinning this pillar of respect for the environment. Therefore, inculcate valuesand behaviors that respect the environment, teaching and showing good environmentalpractices in each and every one of those members of the Group in the activities of thedifferent areas of the business. To implement these principles, management is proposedas MISSION:
• Take the necessary steps to prevent pollution and, when this is not possible, to minimize
• Systematically reduce waste by recycling wherever possible, and make efficient use o
sources, raw materials and energy.
• Take all necessary measures to ensure compliance with all environmental regulatioble to our activities at State level and Local Autonomy and any requirement that thescribes in the future.
• To establish procedures for periodic review of compliance with environmental poliimplementation of corrective measures before any breaches detected.
• Define and regularly review environmental objectives and targets established in comthis environmental policy, in the process of continuous improvement of our performaspect to the environment.
• Disseminate environmental policy among employees, suppliers, subcontractors andholders.
-
8/19/2019 Presentacion Ingecons Libya - Red
14/126
14
Projects
HOTEL ATRIUM BEACH – Villajoyosa (Alicante)
DESCRIPTION:
Project symbolic of the first order because it is the largest hotel in Europe at the fore-front of beach, with 1470 rooms, and unique thanks to its fun zones as the walk of stars,restaurants, shops, themed areas , area lakes, lazy river, swimming pool with waves, etc.
Built on a plot of 28,000 m2 with 10,000 m
2 of slab foundation, 2 basements (on the se-
cond at 9 m below sea level), a ground floor and 19 floors for a total of 120,000 m2 con-
struction. Management and Construction of all work. Execution of all masonry (900 of1470 rooms have been made) and we are awaiting the resumption of work to finish this
contract once again obtained the permit modification by the owner. Work done in record
time, excavation and foundations in 3 months (in solving problems pumping nearly
3,000,000 litters / day), the structure was completed in 10 months, we worked 24 hours a
day permanently until early last summer.
BUILDING ATRIUM PLAZA – Benidorm (Alicante)
DESCRIPTION:
Project 80 apartments, ground floor commercial and two basements, the second at 12
m. under the sidewalk, made with screen walls and lattice structure with forged and
shaped fan. Total of 8 floors with a total of 15,000 m2 of construction. Engineering Man-
agement and Construction of the full work. Running the entire site in "turnkey". The work
was done on time.
BUILDING MESANA – Altea (Alicante)
DESCRIPTION:
Draft of 63 apartments, front line beach. Total of 8 floors with a total of 15,000 m2 of
construction.
Rebuilding and strengthening the original structure. Execution of all masonry work, in-
stallation and finishing. The site was done on schedule and is currently completing.
-
8/19/2019 Presentacion Ingecons Libya - Red
15/126
15
-
8/19/2019 Presentacion Ingecons Libya - Red
16/126
16
Projects
PARQUER WARNER – San Martín de la Vega (Madrid)
DESCRIPTION:
Draft comprehensive reform paths inside the park, including areas with new gardens
and new access to attractions. Construction Events Centre and the new attraction
Scooby Doo. Technical Management and Construction of all work. Execution of all work.
The work was done in record time, by performing any internal reform in 2 months and the
construction of the Events Centre with all facilities (kitchen, air conditioning, fire protec-
tion, plumbing and electricity) and the attraction Scooby Doo in 3 months.
SPA BLANCAFORT – La Garriga (Barcelona)
DESCRIPTION:
Draft comprehensive reform of the resort centre, including with new electrical, plumb-ing and air conditioning.
Technical Management and Construction of all work. Execution of all facilities as a
"turnkey".
The work was done by providing the technical means (foreman and manager) to coor-
dinate industrial and business plumbing, electricity and air conditioning.
CONECTION FUENTE LIVIANA – Huerta del Marquesado (Cuenca)
DESCRIPTION:
Pipe two new sources to the bottling plant Fuente Liviana
Technical Management and Construction of all work.
Execution of all work.
The work connected issuer made on schedule, facilities were given to the owner
-
8/19/2019 Presentacion Ingecons Libya - Red
17/126
17
-
8/19/2019 Presentacion Ingecons Libya - Red
18/126
18
Other Projects
Viaducts of the Madrid Valencia road
In these projects our technicians have participated in several fields, either directing the
project or working on it.
-
8/19/2019 Presentacion Ingecons Libya - Red
19/126
19
Viaducts of the Madrid Valencia road
-
8/19/2019 Presentacion Ingecons Libya - Red
20/126
20
Other Projects
Viaducts of the Madrid Valencia road
-
8/19/2019 Presentacion Ingecons Libya - Red
21/126
21
Valencia Alicante road
Tunnels of the MadridValencia road
-
8/19/2019 Presentacion Ingecons Libya - Red
22/126
22
-
8/19/2019 Presentacion Ingecons Libya - Red
23/126
23
Introduction. History
The Engineering Department was founded in 2003 and is currently the head ofthe INGECONS & URBASERVICIOS, S.A. construction. In his long business ca-reer, the group has performed a multitude of infrastructure in ports, airports, hos-pitals, roads, waterworks and many other areas that prove their creditworthinessand experience in the construction sector.
At present, we are oriented towards total customer satisfaction, both publicand private, and commitment to represent the pillars of society that is based ondaily work in our company.
We have developed I+D+I to be at the forefront of technical developments in
the sector without forgetting to minimize the environmental impact that our busi-ness generates. Finally, there is always a strong commitment to local employ-ment at any spot where we are developing our business.
Areas of business
The Engineering Department has extensive experience in the field of PublicWorks, with large built infrastructure such as airports, hospitals, universities,
ports, roads, car parks and sewage, among others.
With regard to private work, the Engineering Department is specialized in the
development of housing and residential construction, commercial and leisure
centers, hotels, industrial buildings and large private estates.
-
8/19/2019 Presentacion Ingecons Libya - Red
24/126
24
Ágora, City of the Arts and the Sciences (Valencia)
Budget: 41.991.417 € - UTE Becsa, Rover Alcisa y CyEs.
Termination: Year 2010
Description: The Agora is a plant covered surface 4.800m2 elliptical, being used in itsconstruction more than 7.000 tons of structural steel. The fixed cover reaches a maxi-mum height of 70m and 85m above ground level with open umbrellas. The structure isformed by pointed metal frames of different sizes; they create a domed interior of variableheight. At the top of the deck have two mobile structures “lamas”. The project has been
drafted by D. Santiago Calatrava and his team.
Party Palace (Castellón)
Budget: 17.652.520 €
Termination: Year 2011
Description: The “Palau de la Festa” is located on a plot of approximately 15.000m2, ofwhich the oval-shaped building occupies 2.800 m
2 and four plants in a total built area of
5.800 m2.
The structure is forged nerve reticular interval between 12 and 80 cm. The roofs of thehall and the stage are of sheet metal on metal trusses, the rest of shells are inverted notpassable. The facade is ventilated with colourful ceramic pieces, and the main facadebuilt with ceramic blades that make the role of the curtain wall hood
New Hospital La Fe (Valencia)
Budget: 216.263.000€ - UTE Becsa, Dragados, ACS y Edificaciones Ferrando.
Termination: Year 2011
Description: In the main building there are three common plants: the basement, theground floor and the first floor, where are most central services. On these plants are
raised six towers, four of them for hospitalization and two for External Consultation. This
horizontal design will allow physicians and patients to share and manage resources bet-
ter. The four towers of hospitalization have all the single rooms and some 180 offices.
While the two towers have 195 rooms, External Consultation and 116 local special exami-
nations.
Projects: Public Work. Buildings
-
8/19/2019 Presentacion Ingecons Libya - Red
25/126
25
-
8/19/2019 Presentacion Ingecons Libya - Red
26/126
26
Regional hospital de La Plana (Castellón)
Budget: 21.614.800€ - UTE Becsa, Dragados, y Torrescámara.
Termination: 2003
Description: Complete construction of a building of 24.000 m2, with capacity for 180beds, urbanization and construction of the exterior surface parking
Auditorium, University Jaume I (Castellón)
Budget: 19.300.000€
Termination: 2009
Description: The structure consists of concrete walls 50 cm thick with 10 cm insulation inthe center. Due to the considerable height of the building, its performance has been usedtype climbing formwork. The room is completed with the installation of 658 seats and astage which consists of three levels of galleries, comb and contrapeine. The ventilated
façade is Lammax type of Saloni, both of the stage and the room using 3x1 m parts inblack. Deputy Auditorium was built module toilets with combined curtain wall facade ofglass and white compact material
Building Espaitec, University Jaume I (Castellón)
Budget: 12.206.171€
Termination: 2009
Description: 1.937 m2 building comprising basement aimed to facilities, ground and firstfloor, which houses offices and workshops. Made of solid concrete walls and floor tile
views and hollow core slabs. In the building there are two types of cover, an inverted end
in gravel and the other with photovoltaic glass. The facades are solid concrete walls with
expanded polystyrene in the center which makes the function of isolation. Movinord pre-
fabricated partition type interior, floor tiles and aluminum frames.
Projects: Public Work. Buildings
-
8/19/2019 Presentacion Ingecons Libya - Red
27/126
27
-
8/19/2019 Presentacion Ingecons Libya - Red
28/126
28
Link Enrique Gimeno av. with Round South (Castellón)
Budget: 4.266.170 €
Termination: 2009
Description: Implementation of Link Av. Enrique Gimeno with Ronda Sur, preserving thecurrent route and executing a roundabout with an inner radius and outer 54m of 69.1 m,and three lanes of 4.20 m at the level of Avenue which runs perpendicular to the slopeand round. The work is complemented by two bridges structure, consisting of a board of31 and 26.8 m respectively and a single span of 25m both. For the construction of these
bridges has been used a total of 48 isostatic precast beams of 0.90 m deep 4.2 m apartand connected by a slab of compression of 0.25 m.
Line 2 of the streetcar, section 0 (Alicante)
Budget: 9.204.067 € - UTE Becsa, Tecsa y CHM
Termination: 2011
Description: The works provide for the construction of the section 0 of the tram line 2 of
Alicante, from its junction with line 1 (PK 0 +000) to the square of the source Plá Boule-vard. Construction of a double track tramway platform, with two-way path almost parallelin plan and elevation, except the first few meters of the system linking with Line 1. De-spite being a stretch of not too long, the work includes the construction of various struc-tures along its route: “Salto del Carnero” viaduct, underpass, and manifold mating “BonHivern”.
Urbanitation Benicalap Sur (Valencia)
Budget: 6.011.671 €
Termination: 2004
Description: The lands are located north of the city of Valencia, next to Benicalap neigh-borhood, between two historic axes are the way of Moncada and Burjassot. The surface
of the development is close to a preferential use 200.000m2 residential flats. The distribu-
tion of surfaces is as follows: Plots for residential use: 55.342m2; plots of commercial use:
5.472m2; Plots for school use: 21.987m
2; Green Zone: 25.549m
2; other facilities:
23.100m2; road surface: 64.139m
2.
Projects: Public Work. Urbanization
-
8/19/2019 Presentacion Ingecons Libya - Red
29/126
29
-
8/19/2019 Presentacion Ingecons Libya - Red
30/126
30
Structural rehabilitation of firm Highway A-3 (Valencia)
Budget: 7.045.926 € - UTE Becsa y Rafael Morales
Termination: 2008
Description: The work consists of rehabilitation of the pavement over a length of 21km,including the completion of a groove and the replacement of the current layer of tread isworn to correct structural deficiencies in the firm and the surface deformations with anaverage depth of 6 cm and a hot asphalt mix type S-20. Finally we proceeded to extendan M-10 type mixed across the width of the roadway and its shoulders and wearing
course, 3 cm thick.
Reinforcement of road surface of the road N-340 (Tarragona)
Budget: 5.390.739 €
Termination: 2008
Description: The milling was conducted at a depth of 12cm thick medium and replace-
ment with the application of an asphalt mix type s-20 with conventional bitumen 40/50.The most degraded areas were milling is 30cm thick and the replacement was made witha special asphalt mix called high modulus (Mam) to have a dynamic modulus greaterthan 10,000 km and thus be able to withstand much more burden than a bituminous mix-ture conventional.
Variant of the road CV-128 in Catí (Castellón)
Budget: 2.500.000 €
Termination: 2008
Description: It has built a new track variant for the southern part of the population,3.017m in length, connecting with the existing road illuminated by two roundabouts and
building radio 17m eight works of art, made of concrete frames to save roads and ravines
that cross the new layout. They have enabled two new accesses to the population since
the variant through an underpass and roundabout game. The new road has a width of
9m.
Projects: Public Work. Highway
-
8/19/2019 Presentacion Ingecons Libya - Red
31/126
31
-
8/19/2019 Presentacion Ingecons Libya - Red
32/126
32
New fishing industrial zone Vinaroz Port (Castellón)
Budget: 10.974.648 € - UTE Becsa, Joca Ingeniería y Construcciones y Sixconstructor
Termination: In execution
Description: Construction of different areas for the location of facilities such as the newauction, mooring docks, and roads of interior spaces for sports and industrial activities.Implementation of the dyke of the future industrial zone and the new sports area andgeneral construction services to provide new facilities for urban services necessary fortheir operation, according to the provisions of the Plan of Use of Space Port”.
Extension Castellón's Port (Castellón)
Budget: 51.050.459 € - UTE Becsa y Fcc
Termination: 2004
Description: Making a yard on Hill of 320.000m2 +1.5 delimited by a vertical breakwaterby floating caissons 33.75 m in length and 19.6 m wide. Also dredging was conducted
with a 3.115 million m3 entry.
Platform for containers in the Port (Castellón)
Budget: 29.357.982 € - UTE Becsa y Fcc
Termination: 2005
Description: Construction of a quay length of 410mm and 14 drafts, and a Ro-Ro berth.
Esplanade for collection of containers and general merchandise of 120,000 m2, based ona dredge and fill of 1,300,000 m3 of concrete and asphalt pavements, offices, workshop
and warehouse. Foundations and ways Portainé Panamax cranes, with the entire neces-
sary infrastructure.
Projects: Public Work. Maritimes
-
8/19/2019 Presentacion Ingecons Libya - Red
33/126
33
-
8/19/2019 Presentacion Ingecons Libya - Red
34/126
34
Aircraft parking platform Base Aérea de los Llanos (Albacete)
Budget: 1.357.996 € - UTE Becsa y Rafael Morales
Termination: 2004
Description: Execution of the construction of two concrete platforms 180x100m HP-45for aircraft parking. This work was included in the reforms being made in Los Llanos AirBase motivated by the same choice as the venue for special training for NATO pilots(Tactical Leadership Program, TLP). The work consisted of leveling the cash fund, graded aggregates and a concrete slab 30
cm. thick. In addition, drainage of the platform with two troughs of 200m in length and50cm wide.
New Airport “ AZAHAR “ Coast (Castellón)
Budget: 109.239.692 € - UTE Besca y Fcc
Termination: 2009
Description: Airport facilities consisting of a runway of 2.700 m in length, category I, 4Dkey (B-757 aircraft), upgradeable to 4.000 m, aircraft parking platform for 55.000 m
2 pas-
senger terminal, control tower, building for Fire Fighting Service with all necessary facili-ties for fire, power plant, cargo terminal, airfield, handling, wastewater treatment plant.,emitting center, parking, both for private cars to taxis and buses.
Passengers' terminus of the new airport “ AZAHAR “ Coast (Castellón)
Budget: 12.000.000 € - UTE Becsa y Fcc
Termination: 2009
Projects: Public Work. Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
35/126
35
-
8/19/2019 Presentacion Ingecons Libya - Red
36/126
36
Waste water station, “Font de la Pedra” (Alicante)
Budget: 13.666.468 €
Termination: 2004
Description: This facility has a maximum treatment capacity of 20.000 m3/day and co-vers an area of 27.775 m
2.
EDAR de Vinaroz (Castellón)
Budget: 10.858.568 €
Termination: 2007
Description: Sewage station, the main sewage pumping and interconnection betweenthe outfall and Vinaroz EDAR. The works consisted in the construction of a pumping sta-tion of dirty water, mains sewage discharge from the intermediate pump station, maindrive to the EDAR, wastewater treatment plant and collector, by gravity, until the connec-tion with the outfall. Use of curtain wall and cladding facade. Finish line with the corporate
image of the brand.
Arrangement of the Coastal Front “L’Arbre del Gos” Pinedo (Valencia)
Budget: 9.642.476 € - UTE Becsa y Mediterráneo Servicios Marinos
Termination: 2007
Description: The process provided for beach reclamation consists of healthy, regulariza-tion of the beach, lifting the front elevation and removal of current expense to allow dry
beach a distance of about 65m from the present coastline. Regeneration of the dunes
has been designed by a string of transverse dunes, artificial. The core of dunes formed
and shaped through the transfer of dredged sand, and dune fixation is performed by a
network of "bardissas" consisting of kneeling dry reed (Arundo Dórax) thread link be-
tween rods on which floor.
Projects: Public Work. Environment
-
8/19/2019 Presentacion Ingecons Libya - Red
37/126
37
-
8/19/2019 Presentacion Ingecons Libya - Red
38/126
38
Parking Regional Hospital II (Castellón)
Budget: 10.800.000 €
Termination: 2010
Description: Gran Vía underground parking and ground Tárrega Monteblanco ProvincialHospital. It covers a small area of outdoor parking, main entrance, emergency en-trance ... Capacity 909 seats in three basements. It has two ramps and two exit ramps. The sur-face area is 7.601m
2. Its shape in plan is an irregular polygon of 57ml 126ml long and
wide, and an external ramp 29'7ml x 6ml wide. Within the work performed included thedevelopment of both the garden surface inside the Provincial Hospital and the Gran VíaTárrega and Dr. Clara.
Parking of the Trade fair (Albacete)
Budget: 6.296.490 €
Termination: 2009
Description: This car park will have a total surface 22892.58 m
2, and have a capacity of 422 cars to be parked on two floors. As has become
customary at present the parking will be mixed system, as available in the systemsquares and plazas hourly rate for residents of the area. It will also have large squareswhose minimum size will be 240cm x 475cm, complemented by innovative facilities andhave four pedestrian accesses and two elevators suitable access.
Parking Chile Aragón (Valencia)
Budget: 12.000.000 €
Termination: 2009
Description: The new street parking Chile is located 300 meters from the Mestalla foot-ball field. Parking is mixed for both the rotation and to use by residents, and has a capac-
ity of 531 beds in two floors and a total area 14 500 m2.
Projects: Public Work. Parkings
-
8/19/2019 Presentacion Ingecons Libya - Red
39/126
39
-
8/19/2019 Presentacion Ingecons Libya - Red
40/126
40
Residential buildings “Benicalap Norte” (Valencia)
Budget: 16.340.550 €
Termination: 2009
Description: The work consists of 157 houses, plant offices, shops and a basement in aconstruction area of 19.318,85 m
2.
This is in a basement for parking spaces consisting of 194 parking spaces and 143 stor-age rooms, two apartment buildings (one with three doorways comprising ground floor
plus four heights and another with five doorways floor consists of more eight heights, inwhich the first floor is for offices) and plants available for commercial premises.
Residential buildings “Mariposa” Warsaw (Poland)
Termination: In execution
Description: Building with 105 apartments with surfaces varied from 26 to 103 m2. Polish
Architects architectural renown ARE, directed by Jakub Waclawek have designed thismodern building, distinguished by their pure forms and simple facades. The cozy space will stand out for their perfect finish for all common elements. On theground floor premises will be built and commercial services.
Residential buildings “Ciudad Norte” Campanar (Valencia)
Budget: 37.134.841 €
Termination: 2007
Description: Five blocks of 15 floors, designed to ensure a wide variety of types and thebest views and guidelines of the houses, to maximize natural light. It consists of a land-
scaped area that integrates the common recreation areas. Homes 2-4 bedrooms.
Projects: Private Work: Residential
-
8/19/2019 Presentacion Ingecons Libya - Red
41/126
41
-
8/19/2019 Presentacion Ingecons Libya - Red
42/126
42
Comercial mall “El Corte Inglés” (Castellón)
Budget: 12.354.476 € - UTE Lubasa y Fcc
Termination: 2006
Description: Construction of the lands formerly occupied by the tracks and train station.Construction of a boulevard of 3.080 m long and 30 m wide, resolving intersections withthe perpendicular streets through 7 roundabouts and squares. Extension of Paseo Ribal-ta, rebuilding and restoring the old fencing on the station. Construction of 8.000 m
2 of
places in the environment of the new shopping center El Corte Inglés.
Comercial mall “Puerto Azahar” (Castellón)
Budget: 13.943.481 €
Termination: 2003
Description: Construction of a leisure center in port land which, being adjacent to the ur-
ban area, the Port Authority has changed its use to integrate them into the city. It has aconstructed area of 7.300m
2 in two unique buildings, glass curtain wall finishes and
porcelain tile ventilated facade. Movie house ten rooms, rooms for commercial uses, bars,restaurants, pubs, playgrounds, etc. In the underground and below sea level in an area of13.500 m
2, has built 525 parking spaces.
Hotel NH Puerto Sagunto (Valencia)
Budget: 4.299.402 €
Termination: 2007
Description: Building of 100 rooms hotel, sponsored by the Investment Property Con-crete, and exploitation of the property leased to the chain NH Hoteles. Initially the project had a 3-star hotel and finally, thanks to improvements and modifica-
tions made during execution has been granted the rating of 4 stars. The building compris-
es a basement, ground floor, four floors of hotel and housing.
Projects: Leisure and trade
-
8/19/2019 Presentacion Ingecons Libya - Red
43/126
43
-
8/19/2019 Presentacion Ingecons Libya - Red
44/126
44
Multimark automotion building (Castellón)
Budget: 13.056.000 €
Termination: 2006
Description: Building for industrial use for car dealers, workshops and garage. It is builton a plot of 9.500m
2, consists of two basements, ground floor and two floors. The total
constructed area of 27.000m2. The building is constructed using precast concrete struc-
ture. The facades are made with ventilated curtain wall and facade panels and aluminiumcomposite. The cover serves as a parking lot, so it serves as the waterproofing layer
made for vehicles rolling.
Office building “Intercoop” Almazora (Castellón)
Budget: 1.565.528 €
Termination: 2008
Description: The works consisted of conducting a headquarters.
Intercoop group offices with 990 m2
of floor space in a plant, which has a working area of400m
2, offices, meeting rooms, a classroom, conference room, the Regents, a vending
area and two patios interiors. The structure is being mixed metal pillars and concrete one-way slab with beams hung upside down, the roof is flat, and the facade combines a fullyglazed facade with a thermo cladding, coated with monolayer. Outside you will find theparking and gardens.
Office building “LUBASA” (Castellón)
Budget: 26.000.000 €
Termination: 2006
Description: It has a constructed area of 26.940 m2, distributed over 14.680 m2 for offic-es in basement and three floors, and 12.260 m
2 in a basement with 450 parking spaces.
The facade consists of a combination of self-supporting glass curtain wall and facade
ventilated Saloni porcelain. In the office area 9.000 m2 have been installed under the
technical pavement which runs the electrical, voice and data. The interior lighting is auto-
matically adjusted each time according to natural light.
Projects: Private Work: Industrial Building
-
8/19/2019 Presentacion Ingecons Libya - Red
45/126
45
-
8/19/2019 Presentacion Ingecons Libya - Red
46/126
46
ORIGIN is the common name for the different areas of business which operate Area Con-struction Materials INGECONS & URBASERVICIOS, S.A.. Our company manages theproduction of major raw materials applicable to their entire construction and managementof construction waste and demolition.
Origin, with over 30 years’ experience, began his career in the mining sector, particu-larly in the mining and processing of aggregate in the town of Castellon, then expand anddiversify production to other facilities and other activities, creating:
ORIGIN AGGREGATES consists of various companies engaged in the manufactureand marketing of aggregates. It currently has six farms, among themselves and partici-
pated in the provinces of Castellón, Valencia, Alicante and Teruel. The total productionamounts to 4.5000.000 ORIGIN AGGREGATES T / year.
The first operation that was created is that of Castellón (the Turret Quarry, SAU). It cur-rently has a workforce of about 40 professionals and a production of 2 MM Tons / year. In1991 began the great expansion of facilities ORIGIN AGGREGATES with two new pro-duction facilities, the Turret Quarry in Santa Magdalena de Pulpis (Castellón) and Aggre-gates “Ibañez Andreu” in Alcañiz (Teruel).
From 2002, ORIGIN participates Aggregates “Monte Conto” in Pinoso (Alicante). In2003, Aggregates “Sierra Gorda” is acquired in Xativa (Valencia) and finally in 2005,
“Gravas y Derivados de Castilla La Mancha” (Albacete).
ORIGIN CONCRETE is dedicated to the manufacture of concrete, with six plants in theprovinces of Castellón and Teruel, with a total production of 490.000 m
3/year and about
50 employees in total. The oldest plant is Castellón, created in the 70s, from which timehas been responsible for supplying the province of this material without interruption. Be-hind her, other plants were established as the Grau de Castelló (in the Year 2004) or theadjoining population Almazora. Since 2006, ORIGIN CONCRETE began to exploit Alco-cebre plants, Benicarlo and Alcañiz, which had previously been involved.
Currently plants Castellón, Castellón Grao, Alcocebre, Benicarlo and Alcaniz, workingunder the brand name and plant Hormasa Almazora as a Concrete Mijares (successor ofConcretes Mijares was bought by ORIGIN CONCRETE in 2006).
Our concrete companies known for their expertise, preparation, professionalism and
experience, possessing Quality Certificates "CV-N BRAND CONCRETE" to prove it.
Exploitation and Installations
-
8/19/2019 Presentacion Ingecons Libya - Red
47/126
47
-
8/19/2019 Presentacion Ingecons Libya - Red
48/126
48
ORIGIN MORTAR is dedicated to the manufacture of dry mortar, reaching an annual pro-duction of 220,000 tons.
The supply of the mortar is made by tanker trucks which transported separately rawmaterials that make up the mortar. When it comes to work, the materials are dischargedinto a silo, owned by FROM MORTARS, keeping the materials separate and at the stageof transport. The silo is equipped with a discharge system that performs raw material dos-ing and mixing of materials and water, in quantity, to make the mortar used in the works.This system is known commercially as TECMIX and was developed by ORIGIN in theearly 90s. The burden of raw materials in the tanks is done in modern facilities with im-portant environmental protection measures.
CEMENT ORIGIN is dedicated to the manufacture of cement in its different phases.
At the beginning of year 2009, was launched a clinker grinding plant and cement manu-facturing in the Grau de Castellón.
The ground clinker grinding and cement manufacturing is located on an area of 30,000m2 and located only 300m from the pier bulk of the South Basin of the Port of Castellón.This is a modern, completely organic and in compliance with all legal requirements, as-sisted by a laboratory quality own self.
Investing in it is 40 million and consists of a team of 44 people.
The INGECONS & URBASERVICIOS, S.A. asphalts business has five manufacturingplants spread asphalt agglomerate along the Mediterranean coast. In particular we havetwo plants in the province of Castellón, one in the province of Tarragona, a province ofValencia and one in Albacete province, with an average production capacity of 220 tons /hour each.
The manufacture of asphalt agglomerate is one of the more established businesses toINGECONS & URBASERVICIOS, S.A. with an experience of over 35 years and has sincebeen one of the leading companies in manufacturing, research and development of new
asphalt.
In the Year 2008 with the entry into force of the CE of asphalt mixtures, INGECONS &
URBASERVICIOS, S.A. was the company most mixtures included in the initial certifica-
tion of the marking in the entire national territory, which shows the constant concern of our
company by improving continuing in our processes.
Exploitation and Installations
-
8/19/2019 Presentacion Ingecons Libya - Red
49/126
49
-
8/19/2019 Presentacion Ingecons Libya - Red
50/126
50
Laboratories
INGECONS & URBASERVICIOS, S.A. currently has three laboratories dedicated toself through the finished product analytical and technical assistance work for remedieswork and research and development of new products or alternative solutions to existingones. These laboratories are:
• Lab 1. Concrete, mortar and aggregates • Lab 2. Agglomerate and asphalt • Lab 3. Cement
INGECONS & URBASERVICIOS, S.A. laboratories have been recognized for its quali-ty and actively participation in the System of Innovation Management to get together withother departments of the certificate UNE 166.002.
The laboratory service is basically:
• Self-production of building materials through the analysis of final and intermediateproducts of the process, according to the particular needs of each production center. • Self-Monitoring of the final products, in accordance with the requirements of existinglegislation and regulations required its own distinctive quality of volunteers. Management
and documentation of such monitoring organizations reported (CE) and certification(other products). • Technical assistance in terms of formulation for the manufacture of products, togetherwith production centers responsible for their own research studies and even in collabora-tion with clients.
• Participation in committees as certification authorities.
Laboratories
-
8/19/2019 Presentacion Ingecons Libya - Red
51/126
51
Laboratories
-
8/19/2019 Presentacion Ingecons Libya - Red
52/126
52
Management System I+D+I
Today innovation is not limited only to the development and implementation of newtechnologies. It is a comprehensive strategy that can be included in all key organizationalprocesses: in the company's relationship with the market, customer management / distri-bution channels, management of resources, etc.
For a company to be considered innovative must have a strategy oriented to innova-tion, able to create value by providing new ideas to market and have an internal organiza-tion to the innovation process to manage the knowledge and skills of employees and en-courage their creativity.
The requirement of new buildings and infrastructure, evolving and high technologycomponent, as well as compete in the bidding for works of nationally and internationally inthe best conditions, the company have been put in place a system Management R & D &I Construction Area based on the standard UNE 166.002.
On an annual basis, INGECONS & URBASERVICIOS, S.A. held at its facilities in Cas-tellón the Annual Professional Conference I+D+I, which is evident from this company’scommitment to innovation.
During the same, the company will direct customers showing their ability to provide in-
novative solutions to each of the technical problems that appear in projects and worksthis day has become a professional forum in which to exchange ideas, knowledge andexperiences, between government agencies and companies in the construction sector.
This is where specialists presented INGECONS & URBASERVICIOS, S.A. projectsimplemented during the previous year, which have been certified by his brilliant qualityand innovation.
Management System I+D+I
-
8/19/2019 Presentacion Ingecons Libya - Red
53/126
53
We introduce several important projects executed with some of our partners. They usu-ally work with us, contributing with technology and know-how by creating a synergy thatallows us to face great challenges.
Some typologies of these projects range:
Most of them require large technological and human resources.
private edification buildings
Urban planning
Administrative buildings
Hotels
Purchase center
Airports
Hospitals
Exhibition centers
Car parks
Roadways / Highways
Tunnels
Bridges
Dams and hydropower stations
Harbor
High speed railway
Coastal works
Partnership Projects
-
8/19/2019 Presentacion Ingecons Libya - Red
54/126
54
Hospital La Fe - Valencia
Hospital
-
8/19/2019 Presentacion Ingecons Libya - Red
55/126
55
-
8/19/2019 Presentacion Ingecons Libya - Red
56/126
56
Comercial Hall
-
8/19/2019 Presentacion Ingecons Libya - Red
57/126
57
-
8/19/2019 Presentacion Ingecons Libya - Red
58/126
58
Shoreline Pinedo - Saler
Coast Works
-
8/19/2019 Presentacion Ingecons Libya - Red
59/126
59
Littoral regeneration in T.M. Marzarón Island - Murcia
-
8/19/2019 Presentacion Ingecons Libya - Red
60/126
60
Works in Valencia’s dock – 32nd American’s Cup
Harbor Works
-
8/19/2019 Presentacion Ingecons Libya - Red
61/126
61
Works in Valencia’s dock – 32nd American’s Cup
-
8/19/2019 Presentacion Ingecons Libya - Red
62/126
62
Benicarlo’s harbor extension
Harbor Works
-
8/19/2019 Presentacion Ingecons Libya - Red
63/126
63
Purification works in Canet de Berenguer and L’Almarda - Valencia
Sanitation and Purification
-
8/19/2019 Presentacion Ingecons Libya - Red
64/126
64
Works in the general pluvial drainpipes in Almazora - Castellón
Draining Works
-
8/19/2019 Presentacion Ingecons Libya - Red
65/126
65
Complementary Works
Works in the general pluvial drainpipes in Almazora - Castellón
-
8/19/2019 Presentacion Ingecons Libya - Red
66/126
66
Dams and swamp works
-
8/19/2019 Presentacion Ingecons Libya - Red
67/126
67
-
8/19/2019 Presentacion Ingecons Libya - Red
68/126
68
Integration line 1 Valencia underground
Railway
-
8/19/2019 Presentacion Ingecons Libya - Red
69/126
69
Kayseri northern railway construction works
-
8/19/2019 Presentacion Ingecons Libya - Red
70/126
70
Coordination and construction of high speed railway contracts
Railway
-
8/19/2019 Presentacion Ingecons Libya - Red
71/126
71
High speed line Madrid – Galicia – Section Zamora
-
8/19/2019 Presentacion Ingecons Libya - Red
72/126
72
North – northwest high speed corridor section Madrid – Segovia
Railway Tunnel
-
8/19/2019 Presentacion Ingecons Libya - Red
73/126
73
When a pipeline is built, the construction project not only covers the civil work tolay the pipeline and build the pump/compressor stations, it also has to cover all thework related to the installation of the field devices that will support remote operation.
The pipeline is routed along what is known as a 'right of way'. Pipelines are gener-ally built using the following stages:
We have worked in the construction on the spanish pipeline system. In some ofmost relevant stations in Spain are the following:
Route (right of way) Selection
Surveying the route
Clearing the route
Trenching - Main Route and Crossings (roads, rail, other pipes, etc.)
Installing the pipe
Installing valves, intersections, etc.
Covering the pipe and trench
Tenerife
Cartagena
Castellon
Puertollano
A Coruña
Algeciras
Tarragona
Refinery Pipeline Works
-
8/19/2019 Presentacion Ingecons Libya - Red
74/126
74
Refinery Pipeline Works
-
8/19/2019 Presentacion Ingecons Libya - Red
75/126
75
-
8/19/2019 Presentacion Ingecons Libya - Red
76/126
76
Refinery Pipeline Works
-
8/19/2019 Presentacion Ingecons Libya - Red
77/126
77
-
8/19/2019 Presentacion Ingecons Libya - Red
78/126
78
Refinery Pipeline Works
-
8/19/2019 Presentacion Ingecons Libya - Red
79/126
79
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
80/126
80
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
81/126
81
-
8/19/2019 Presentacion Ingecons Libya - Red
82/126
82
A28 motorway - Portugal
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
83/126
83
A28 motorway - Portugal
-
8/19/2019 Presentacion Ingecons Libya - Red
84/126
84
Mudejar highway A23 motorway - Aragon
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
85/126
85
Cartagena - Vera motorway - Murcia
-
8/19/2019 Presentacion Ingecons Libya - Red
86/126
86
Cartagena - Vera motorway - Murcia
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
87/126
87
A3 Madrid – Valencia highway
-
8/19/2019 Presentacion Ingecons Libya - Red
88/126
88
Vitoria – Eibar motorway
Civil Work Construction
-
8/19/2019 Presentacion Ingecons Libya - Red
89/126
89
A3 Madrid – Valencia highway
-
8/19/2019 Presentacion Ingecons Libya - Red
90/126
90
Hospital 12 October - Madrid
Cars Parks
-
8/19/2019 Presentacion Ingecons Libya - Red
91/126
91
Hospital 12 October - Madrid
-
8/19/2019 Presentacion Ingecons Libya - Red
92/126
92
La Palma airport – Canary Islands
Cars Parks
-
8/19/2019 Presentacion Ingecons Libya - Red
93/126
93
La Palma airport – Canary Islands
-
8/19/2019 Presentacion Ingecons Libya - Red
94/126
94
Asturias airport
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
95/126
95
Asturias airport
-
8/19/2019 Presentacion Ingecons Libya - Red
96/126
96
La Palma airport – Canary Island
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
97/126
97
La Palma airport – Canary Island
-
8/19/2019 Presentacion Ingecons Libya - Red
98/126
98
Barcelona airport
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
99/126
99
Barcelona airport
-
8/19/2019 Presentacion Ingecons Libya - Red
100/126
100
Castellon airport
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
101/126
101
Castellon airport
-
8/19/2019 Presentacion Ingecons Libya - Red
102/126
102
Castellon airport
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
103/126
103
Castellon airport
-
8/19/2019 Presentacion Ingecons Libya - Red
104/126
104
Castellon airport
Airports
-
8/19/2019 Presentacion Ingecons Libya - Red
105/126
105
Castellon airport
-
8/19/2019 Presentacion Ingecons Libya - Red
106/126
106
SCIENCE AND ARTS CITY - VALENCIA
Site:
Architect:
Year:
http://g.co/maps/2rtcn
Santiago Calatrava
1997
Exhibition Centers
http://g.co/maps/2rtcnhttp://g.co/maps/2rtcnhttp://g.co/maps/2rtcn
-
8/19/2019 Presentacion Ingecons Libya - Red
107/126
107
-
8/19/2019 Presentacion Ingecons Libya - Red
108/126
108
PABELLON DE ARAGÓN – EXPO 2008 - ZARAGOZA
Exhibition Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
109/126
109
-
8/19/2019 Presentacion Ingecons Libya - Red
110/126
110
BOXES FORMULA 1TM - VALENCIA
Site:
Architect: Year:
http://g.co/maps/g6xj3
Hermann Tilke 2008
Sport Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
111/126
111
-
8/19/2019 Presentacion Ingecons Libya - Red
112/126
112
Technical Sport Center - Villarreal
Sport Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
113/126
113
Technical Sport Center - Villarreal
Sport Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
114/126
114
MADRID SPORTS CENTER
Sport Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
115/126
115
-
8/19/2019 Presentacion Ingecons Libya - Red
116/126
116
JOSE ZORRILLA STADIUM - VALLADOLID
Sport Centers
-
8/19/2019 Presentacion Ingecons Libya - Red
117/126
117
-
8/19/2019 Presentacion Ingecons Libya - Red
118/126
118
UNIVERSITY OF TELECOMUNICATIONS, UPV - VALENCIA
Site:
Architect:
Year:
http://g.co/maps/mf5zr
Vicente Corell, Joaquín Monfort y José Vicente Palacios
2009
Cultural Centers
http://g.co/maps/mf5zrhttp://g.co/maps/mf5zrhttp://g.co/maps/mf5zr
-
8/19/2019 Presentacion Ingecons Libya - Red
119/126
119
-
8/19/2019 Presentacion Ingecons Libya - Red
120/126
120
TERRA MITICA, BENIDORM - ALICANTE
Site:
Architect:
Year
http://g.co/maps/guumy
GLOBAL ESTUDIOS
2004
Theme Parks
http://g.co/maps/guumyhttp://g.co/maps/guumyhttp://g.co/maps/guumy
-
8/19/2019 Presentacion Ingecons Libya - Red
121/126
121
-
8/19/2019 Presentacion Ingecons Libya - Red
122/126
122
-
8/19/2019 Presentacion Ingecons Libya - Red
123/126
123
-
8/19/2019 Presentacion Ingecons Libya - Red
124/126
124
-
8/19/2019 Presentacion Ingecons Libya - Red
125/126
125
-
8/19/2019 Presentacion Ingecons Libya - Red
126/126