7
ZAPATAS & PEDESTALES 4.00 ZAPATAS 4.00 EXCAVACIÓN RELLENO LONGITUD 0.50 LONGITUD 0.50 ANCHO 0.50 ANCHO 0.50 ALTO 0.80 ALTO 0.10 VOLUMEN (m3) 0.80 VOLUMEN (m3) 0.10 PEDESTALES 4.00 RELLENO LONGITUD 0.50 LONGITUD 0.50 ANCHO 0.50 ANCHO 0.50 ALTO 0.50 ALTO 0.20 VOLUMEN 0.50 VOLUMEN (m3) 0.20 VOLUMEN (m3) 0.42 CARAS 4.00 AREA X CARA 0.04 LONGITUD 0.20 AREA PEDESTAL 0.16 ANCHO 0.20 SUMA M2 0.64 ALTO 0.50 VOLUMEN (m3) 0.08 AREA DE TABLAS 1"*12"*5vrs 1.23 CANTIDAD TABLAS 0.52 Cantidad de Materiales Proporción 1: 2 : 3 (1 Bls Cem, 3 Balds Arena, 4 Balds Piedrin) Cant/m³ Desp Cant Total Total Concreto (m3) 0.28 Cemento (bls) : 8.4 5.0% 2.52 Arena (m³ ) : 0.64 20.0% 0.22 Piedrín (m³ ) : 0.85 10.0% 0.27 4.00 4.00 unit total unit total 10.00 0.50 5.00 4.00 0.95 3.80 SUMA (m) 20.00 SUMA (m) 15.20 Peso (lb/m) 1.23 Peso (lb/m) 1.23 Acero φ3/8" (lbs) 24.60 Acero φ3/8" (lbs) 18.70 QQ 0.25 QQ 0.19 ZAPATAS / ACERO REFUERZO elementos longitud PEDESTAL / REFUERZO elementos longitud PRESUPUESTO CASA ZAPATAS CONCRETO PEDESTAL CONCRETO FORMALETA / PEDESTAL

Transcript of Presupuesto 1

Page 1: Presupuesto 1

ZAPATAS & PEDESTALES 4.00 ZAPATAS 4.00

EXCAVACIÓN RELLENO

LONGITUD 0.50 LONGITUD 0.50

ANCHO 0.50 ANCHO 0.50

ALTO 0.80 ALTO 0.10

VOLUMEN (m3) 0.80 VOLUMEN (m3) 0.10

PEDESTALES 4.00

RELLENO

LONGITUD 0.50 LONGITUD 0.50

ANCHO 0.50 ANCHO 0.50

ALTO 0.50 ALTO 0.20

VOLUMEN 0.50 VOLUMEN (m3) 0.20

VOLUMEN (m3) 0.42

CARAS 4.00

AREA X CARA 0.04 LONGITUD 0.20

AREA PEDESTAL 0.16 ANCHO 0.20

SUMA M2 0.64 ALTO 0.50

VOLUMEN (m3) 0.08

AREA DE TABLAS

1"*12"*5vrs1.23

CANTIDAD TABLAS 0.52 Cantidad de Materiales

Proporción 1: 2 : 3 (1 Bls Cem, 3 Balds Arena, 4 Balds Piedrin)

Cant/m³ Desp Cant Total

Total Concreto (m3) 0.28

Cemento (bls) : 8.4 5.0% 2.52

Arena (m³ ) : 0.64 20.0% 0.22

Piedrín (m³ ) : 0.85 10.0% 0.27

4.00 4.00

unit total unit total

10.00 0.50 5.00 4.00 0.95 3.80

SUMA (m) 20.00 SUMA (m) 15.20

Peso (lb/m) 1.23 Peso (lb/m) 1.23

Acero φ3/8" (lbs) 24.60 Acero φ3/8" (lbs) 18.70

QQ 0.25 QQ 0.19

ZAPATAS / ACERO REFUERZO

elementoslongitud

PEDESTAL / REFUERZO

elementoslongitud

PRESUPUESTO CASA

ZAPATAS

CONCRETO

PEDESTAL

CONCRETO

FORMALETA / PEDESTAL

Page 2: Presupuesto 1

PRESUPUESTO CASA

4.00

elementos longitud

unit total

10.00 0.45 4.50

SUMA (m) 18.00

Peso (lb/m) 0.55

Acero φ1/4" (lbs) 9.90

QQ 0.10

VIGA ASÍSMICA

EXCAVACIÓN

LONGITUD 0.00 LONGITUD 10.00

ANCHO 0.00 ANCHO 0.15

ALTO 0.00 ALTO 0.20

VOLUMEN (m3) 0.00 VOLUMEN (m3) 0.30

Cantidad de Materiales

CARAS 2.00 Proporción 1: 2 : 2 (1 Bls Cem, 3 Balds Arena, 3 Balds Piedrin)

AREA X CARA 2.00 Cant/m³ Desp Cant Total

AREA VIGA ASISM 4.00 Total Concreto (m3) 0.30

SUMA M2 4.00 Cemento (bls) : 8.4 5.0% 2.7

Arena (m³ ) : 0.64 20.0% 0.24

AREA DE TABLAS

1"*12"*5vrs1.23

Piedrín (m³ ) : 0.85 10.0% 0.29

CANTIDAD TABLAS 3.25

elementos/ML longitud

unit total unit total

4.00 10.00 40.00 13.00 0.50 6.50

0.00 0.00 0.00 SUMA (m) 65.00

SUMA (m) 40.00 Peso (lb/m) 0.55

Peso (lb/m) 1.23 Acero φ1/4" (lbs) 35.75

Acero φ3/8" (lbs) 49.20 QQ 0.36

QQ 0.49

VIGA ASÍSMICA

CONCRETO

PEDESTAL / ESTRIBOS

VIGA ASÍSMICA / ESTRIBOS

FORMALETA / VIGA ASÍSMICA

VIGA ASÍSMICA / ACERO REFUERZO

elementoslongitud

Page 3: Presupuesto 1

PRESUPUESTO CASA

VIGA INTERMEDIA

EXCAVACIÓN

LONGITUD 0.00 LONGITUD 10.00

ANCHO 0.00 ANCHO 0.15

ALTO 0.00 ALTO 0.15

VOLUMEN (m3) 0.00 VOLUMEN (m3) 0.23

Cantidad de Materiales

CARAS 2.00 Proporción 1: 2 : 2 (1 Bls Cem, 3 Balds Arena, 3 Balds Piedrin)

AREA X CARA 1.50 Cant/m³ Desp Cant Total

AREA VIGA ASISM 3.00 Total Concreto (m3) 0.23

SUMA M2 3.00 Cemento (bls) : 8.4 5.0% 2.03

Arena (m³ ) : 0.64 20.0% 0.18

AREA DE TABLAS

1"*12"*5vrs1.23

Piedrín (m³ ) : 0.85 10.0% 0.22

CANTIDAD TABLAS 2.44

elementos/ML longitud

unit total unit total

3.00 10.00 30.00 13.00 0.40 5.20

SUMA (m) 30.00 SUMA (m) 52.00

Peso (lb/m) 1.23 Peso (lb/m) 0.55

Acero φ3/8" (lbs) 36.90 Acero φ1/4" (lbs) 28.60

QQ 0.37 QQ 0.29

VIGA CORONA

EXCAVACIÓN

LONGITUD 0.00 LONGITUD 10.00

ANCHO 0.00 ANCHO 0.15

ALTO 0.00 ALTO 0.15

VOLUMEN (m3) 0.00 VOLUMEN (m3) 0.23

Cantidad de Materiales

CARAS 2.00 Proporción 1: 2 : 2 (1 Bls Cem, 3 Balds Arena, 3 Balds Piedrin)

AREA X CARA 1.50 Cant/m³ Desp Cant Total

AREA VIGA ASISM 3.00 Total Concreto (m3) 0.23

SUMA M2 3.00 Cemento (bls) : 8.4 5.0% 2.03

Arena (m³ ) : 0.64 20.0% 0.18

AREA DE TABLAS

1"*12"*5vrs1.23

Piedrín (m³ ) : 0.85 10.0% 0.22

CANTIDAD TABLAS 2.44

elementoslongitud

VIGA CORONA

CONCRETO

FORMALETA / VIGA CORONA

VIGA INTERMEDIA

CONCRETO

FORMALETA / VIGA INTERMEDIA

VIGA INTERMEDIA / ACERO REFUERZO VIGA INTERMEDIA / ESTRIBOS

Page 4: Presupuesto 1

PRESUPUESTO CASA

elementos/ML longitud

unit total unit total

3.00 10.00 30.00 13.00 0.40 5.20

SUMA (m) 30.00 SUMA (m) 52.00

Peso (lb/m) 1.23 Peso (lb/m) 0.55

Acero φ3/8" (lbs) 36.90 Acero φ1/4" (lbs) 28.60

QQ 0.37 QQ 0.29

COLUMNAS 5.00 Cantidad de Materiales

Proporción 1: 2 : 2 (1 Bls Cem, 3 Balds Arena, 3 Balds Piedrin)

LONGITUD 2.80 Cant/m³ Desp Cant Total

ANCHO 0.15 Total Concreto (m3) 0.32

ALTO 0.15 Cemento (bls) : 8.4 5.0% 2.84

VOLUMEN (m3) 0.32 Arena (m³ ) : 0.64 20.0% 0.25

Piedrín (m³ ) : 0.85 10.0% 0.31

CARAS 2.00

AREA X CARA 0.42

AREA COLUMNA 0.84

SUMA M2 4.20

AREA DE TABLAS

1*12*51.23

CANTIDAD TABLAS 3.41

5.00 5.00

elementos/ML longitud

unit total unit total

4.00 2.80 11.20 13.00 0.45 5.85

SUMA (m) 56.00 SUMA (m) 81.90

Peso (lb/m) 1.23 Peso (lb/m) 0.55

Acero φ3/8" (lbs) 68.88 Acero φ1/4" (lbs) 45.05

QQ 0.69 QQ 0.45

VIGA CORONA / ACERO REFUERZO VIGA CORONA / ESTRIBOS

elementoslongitud

CONCRETO

COLUMNAS / ACERO REFUERZO COLUMNAS / ESTRIBOS

elementoslongitud

FORMALETA / COLUMNAS

Page 5: Presupuesto 1

PRESUPUESTO CASA

MAMPOSTERÍA / M2 20.50

Tamaño del Ladrillo : 0.00079875

Ancho (m) : 0.15 Cantidad por 1 m ² : 46

Alto (m) : 0.060 Volumen junta (m³ ) por unidad: 0.00079875

Largo (m) : 0.28

Junta : LADRILLO (UNID) 943

Espesor (m) : 0.015

Cantidad de Materiales

Proporción 1: 4 (1 Bls Cemento, 7 Baldes Arena)

Cant/m³ Desp Cant Total

TOTAL MORTERO (m3) 0.75

Cemento (bls) : 7.45 5.0% 6.01

Arena (m³ ) : 1.4 20.0% 1.3

Page 6: Presupuesto 1

PRESUPUESTO CASA

MAMPOSTERÍA / M2 0.00

Tamaño de Piedra Cantera : 0.00294

Ancho (m) : 0.15 Cantidad por 1 m ² : 4.2

Alto (m) : 0.38 Volumen junta (m³ ) por unidad: 0.00294

Largo (m) : 0.58

Junta : PIEDRA CANTERA (UNID) 0

Espesor (m) : 0.02

Cantidad de Materiales

Proporción 1: 4 (1 Bls Cemento, 5 Baldes Arena)

Cant/m³ Desp Cant Total

TOTAL MORTERO (m3) 0.00

Cemento (bls) : 9.76 5.0% 0

Arena (m³ ) : 1.35 20.0% 0

REPELLO CORRIENTE / M2 0.00

Espesor (m) : 0.015

Cantidad de Materiales

Proporción 1: 4 (1 Bls Cemento, 4 Baldes Arena)

Cant/m³ Desp Cant Total

TOTAL MORTERO (m3) 0.00

Cemento (bls) : 9.76 5.0% 0

Arena (m³ ) : 1.35 20.0% 0

FINO CORRIENTE / M2 0.00

Espesor (m) : 0.005

Cantidad de Materiales

Proporción 1: 3 (1 Bls Cemento, 4 Baldes Arena)

Cant/m³ Desp Cant Total

TOTAL MORTERO (m3) 0.00

Cemento (bls) : 11.93 5.0% 0

Arena (m³ ) : 1.27 20.0% 0

VIGA VM HORIZONTAL PARA TECHO VIGA VM DIAGONAL PARA TECHO

Largo (m) : VM 4" * 6" * 1/8" 3.50 Largo (m) : VM 4" * 6" * 1/8" 3.60

CANTIDAD VIGAS 2.00 CANTIDAD VIGAS 4.00

Page 7: Presupuesto 1

PRESUPUESTO CASA

CANTIDAD DE PERLINES 2.33 CANTIDAD DE PERLINES 4.80

CUBIERTA DE ZINC

CANTIDAD 10.00 LARGO TOTAL 3.60

LONGITUD 3.50 LAMINAS DE 12' LARGO 2.00 6.60

LONGITUD TOTAL 35.00 LAMINAS DE 10' LARGO 0.00 0.00

CANTIDAD DE PERLINES 5.83 LONGITUD TOTAL 6.60

ANCHO TOTAL 3.50

CANTIDAD DE FIJADORES 40.00 ANCHO EFECTIVO 0.70

CANTIDAD DE ANGULARES 0.50 CANTIDAD LAMINAS 10.00

CANTIDAD 2.00 CANTIDAD 4.00

LONGITUD 3.60 LONGITUD 5.10

LONGITUD TOTAL 7.20 LONGITUD TOTAL 20.40

Peso (lb/m) 2.20 Peso (lb/m) 2.20

Acero φ1/2" (lbs) 15.84 Acero φ1/2" (lbs) 44.88

QQ 0.16 QQ 0.45

PINTURA/ PERLINES 2"*4" GOLOSOS DE 2"

DESARROLLO (PLG) 9.00 CANT CLAVADORES 10.00

ÁREA DE PERLIN 1.37 CANT LÁMINAS 10.00

CANTIDAD PERLINES 12.97 CANTIDAD GOLOSOS P/LÁMINA 17.00

ÁREA A CUBRIR 35.57 CANTIDAD DE GOLOSOS (UND) 170.00

CANTIDAD DE PINTURA (GLN) 1.78

CLAVADORES 2" * 4" * 1/16"

SAG ROD φ 1/2" TENSORES φ 1/2"