PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y...

20
EJECUCION % de Avance % de Avance respecto respecto al PIM Anual a la inversión viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic 2011 2,600,000 0 0.0% 0.0% 2012 2,418,301 64,500 2.7% 0.1% 21,000 10,500 7,500 25,500 2013 26,134,270 21,500 8.2% 0.0% 7,500 3,000 11,000 2009 79,804 79,804 100.0% 0.4% 79,804 2010 187,676 187,676 100.0% 0.9% 1,468 186,208 2011 0 0 0.0% 0.0% 2012 1,877,395 114,600 6.1% 0.5% 70,600 44,000 2013 25,757,455 10,977,567 42.6% 51.8% 351,318 3,047,342 298,150 400,410 492,944 167,605 0 99,800 4,770,108 1,113,368 236,522 2014 16,686,022 8,815,341 52.8% 41.6% 55,120 975,537 492,676 504,418 659,527 1,588,881 566,031 150,043 374,221 3,448,887 0 0.0% 0.0% 0 0.0% 0.0% 2013 1,479,698 5,250 0.4% 0.2% 0 0 5,250 2014 2,187,395 3,670,644 167.8% 137.6% 28,024 803,024 323,458 436,073 515,092 611,190 374,040 529,811 15,317 0 0.0% 0 0.0% 2014 654,102 5,395 0.8% 1.1% 0 482 0 0 2,665 330 1,918 5 238194 2218353 CREACION DE DIQUES EN LA QUEBRADA LA TORTOLITAS PARA LA PROTECCION DE LA INFRAESTRUCTURA BASICA Y DE PRODUCCION DE LOS CENTROS POBLADOS DE TRAPICHE Y HOGAR DE CRISTO, DISTRITO DE SAN JOSE DE LOS MOLINOS-ICA-ICA. 3,390,745.00 2014 35,750 35,750 100.0% 1.1% 35,750 PETACC 6 154981 2155266 INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ASOCIACION DE VIVIENDA SAN FRANCISCO DE CHIPIONA PALPA.ICA. 571,197.33 2014 38,294 14,488 37.8% 2.5% 0 6,000 8,488 EXPEDIENTE TECNICO EN REVISION 7 195464 2216172 MEJORAMIENTO Y REHABILITACION DE PUENTE DE CONCRETO EN EL CASERIO DE COPACABANA, DISTRITO DE SAN JUAN DE YANAC-CHINCHA-ICA. 688,941.19 2013 5,250 5,250 100.0% 0.8% 0 0 5,250 EXPEDIENTE TECNICO OBSERVADO 0 0.0% 0.0% 0 0.0% 0.0% 2013 39,800 39,800 100.0% 0.4% 0 0 39,800 2014 11,568,344 9,863,467 85.3% 101.4% 723,912 1,070,510 3,092,236 1,908,452 2,145,646 922,711 0 0.0% 0.0% 0 0.0% 0.0% 2013 80,000 80,000 100.0% 0.0% 80,000 0 0 0 0.0% 0.0% 0 0.0% 0.0% 2013 175,000 62,350 35.6% 35.6% 0 0 62,350 8 249723 2185906 INSTALACION DEL SERVICIO DE PROTECCION CONTRA INUNDACIONES EN LOS SECTORES SAN JACINTO (CC.PP. SAN PEDRO, SAN JACINTO, VILLA EL SALVADOR) Y SAN AGUSTIN, RIO ICA (KM 29+600 - 26+500), DISTRITO DE SANTIAGO-ICA-ICA. 9,723,740.00 EN EJECUCION PETACC 2213283 MEJORAMIENTO DEL CAMINO VECINAL SAN JUAN DE YANAC-LLACTAPATA, DISTRITO DE SAN JUAN DE YANAC- CHINCHA-ICA. 484,586.65 9 270773 2184989 MEJORAMIENTO DE LOS SERVICIOS DE SALUD EN EL MARCO DEL PROGRAMA ESTRATEGICO DE PREVENCION Y CONTROL DEL CANCER EN EL HOSPITAL DE APOYO DE NASCA, PROVINCIA DE NASCA Y DEPARTAMENTO DE ICA 80,000.00 EJECUCION A CARGO DE LA DIRECCION REGIONAL DE SALUD 10 EJECUCION A CARGO DE LA DIRECCION REGIONAL DE SALUD 270715 2184991 MEJORAMIENTO DE LOS SERVICIOS DE SALUD EN EL MARCO DEL PROGRAMA ESTRATEGICO DE PREVENCION Y CONTROL DEL CANCER EN EL HOSPITAL SAN JUAN DE DIOS, DISTRITO DE PISCO, PROVINCIA DE PISCO Y DEPARTAMENTO DE ICA 175,000.00 1 2,666,748.00 OBRA CULMINADA 3 240754 2222556 MEJORAMIENTO DE LA PISCINA MUNICIPAL GABY PEREZ DEL SOLAR DEL DISTRITO DE PARCONA-ICA-ICA. 4 209487 2 96490 2094540 AMPLIACION, MEJORAMIENTO Y EQUIPAMIENTO DE LA INFRAESTRUCTURA EN EL HOSPITAL DE APOYO DE NASCA. 21,208,039.00 EN EJECUCION EJECUCION MENSUALIZADA ESTADO DE PIP TOTAL (S/.) (**) SNIP DGPP 142852 2131992 MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA PLANTA CACHICHE- CIUDAD DE ICA. 55,259,815 EJECUCION A CARGO DE LA MUNICIPALIDAD PROVINCIAL DE ICA PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora Item Código Denominación Monto de la Viabilidad Años PIM

Transcript of PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y...

Page 1: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

2011 2,600,000 0 0.0% 0.0%

2012 2,418,301 64,500 2.7% 0.1% 21,000 10,500 7,500 25,500

2013 26,134,270 21,500 8.2% 0.0% 7,500 3,000 11,000

2009 79,804 79,804 100.0% 0.4% 79,804

2010 187,676 187,676 100.0% 0.9% 1,468 186,208

2011 0 0 0.0% 0.0%

2012 1,877,395 114,600 6.1% 0.5% 70,600 44,000

2013 25,757,455 10,977,567 42.6% 51.8% 351,318 3,047,342 298,150 400,410 492,944 167,605 0 99,800 4,770,108 1,113,368 236,522

2014 16,686,022 8,815,341 52.8% 41.6% 55,120 975,537 492,676 504,418 659,527 1,588,881 566,031 150,043 374,221 3,448,887

0 0.0% 0.0%

0 0.0% 0.0%

2013 1,479,698 5,250 0.4% 0.2% 0 0 5,250

2014 2,187,395 3,670,644 167.8% 137.6% 28,024 803,024 323,458 436,073 515,092 611,190 374,040 529,811 15,317

0 0.0%

0 0.0%

2014 654,102 5,395 0.8% 1.1% 0 482 0 0 2,665 330 1,918

5 238194 2218353

CREACION DE DIQUES EN LA QUEBRADA

LA TORTOLITAS PARA LA PROTECCION

DE LA INFRAESTRUCTURA BASICA Y DE

PRODUCCION DE LOS CENTROS

POBLADOS DE TRAPICHE Y HOGAR DE

CRISTO, DISTRITO DE SAN JOSE DE LOS

MOLINOS-ICA-ICA.

3,390,745.00 2014 35,750 35,750 100.0% 1.1% 35,750 PETACC

6 154981 2155266

INSTALACION DE LOS SISTEMAS DE

AGUA POTABLE Y ALCANTARILLADO EN

ASOCIACION DE VIVIENDA SAN

FRANCISCO DE CHIPIONA PALPA.ICA.

571,197.33 2014 38,294 14,488 37.8% 2.5% 0 6,000 8,488

EXPEDIENTE

TECNICO EN

REVISION

7 195464 2216172

MEJORAMIENTO Y REHABILITACION DE

PUENTE DE CONCRETO EN EL CASERIO

DE COPACABANA, DISTRITO DE SAN

JUAN DE YANAC-CHINCHA-ICA.

688,941.19 2013 5,250 5,250 100.0% 0.8% 0 0 5,250

EXPEDIENTE

TECNICO

OBSERVADO

0 0.0% 0.0%

0 0.0% 0.0%

2013 39,800 39,800 100.0% 0.4% 0 0 39,800

2014 11,568,344 9,863,467 85.3% 101.4% 723,912 1,070,510 3,092,236 1,908,452 2,145,646 922,711

0 0.0% 0.0%

0 0.0% 0.0%

2013 80,000 80,000 100.0% 0.0% 80,000 0 0

0 0.0% 0.0%

0 0.0% 0.0%

2013 175,000 62,350 35.6% 35.6% 0 0 62,350

8 249723 2185906

INSTALACION DEL SERVICIO DE

PROTECCION CONTRA INUNDACIONES

EN LOS SECTORES SAN JACINTO (CC.PP.

SAN PEDRO, SAN JACINTO, VILLA EL

SALVADOR) Y SAN AGUSTIN, RIO ICA (KM

29+600 - 26+500), DISTRITO DE

SANTIAGO-ICA-ICA.

9,723,740.00

EN EJECUCION

PETACC

GOBIERNO

REGIONAL

DE ICA

2213283

MEJORAMIENTO DEL CAMINO VECINAL

SAN JUAN DE YANAC-LLACTAPATA,

DISTRITO DE SAN JUAN DE YANAC-

CHINCHA-ICA.

484,586.65

9 270773 2184989

MEJORAMIENTO DE LOS SERVICIOS DE

SALUD EN EL MARCO DEL PROGRAMA

ESTRATEGICO DE PREVENCION Y

CONTROL DEL CANCER EN EL HOSPITAL

DE APOYO DE NASCA, PROVINCIA DE

NASCA Y DEPARTAMENTO DE ICA

80,000.00

EJECUCION A

CARGO DE LA

DIRECCION

REGIONAL DE

SALUD

10

EJECUCION A

CARGO DE LA

DIRECCION

REGIONAL DE

SALUD

270715 2184991

MEJORAMIENTO DE LOS SERVICIOS DE

SALUD EN EL MARCO DEL PROGRAMA

ESTRATEGICO DE PREVENCION Y

CONTROL DEL CANCER EN EL HOSPITAL

SAN JUAN DE DIOS, DISTRITO DE PISCO,

PROVINCIA DE PISCO Y DEPARTAMENTO

DE ICA

175,000.00

1

2,666,748.00OBRA

CULMINADA3 240754 2222556

MEJORAMIENTO DE LA PISCINA

MUNICIPAL GABY PEREZ DEL SOLAR DEL

DISTRITO DE PARCONA-ICA-ICA.

4 209487

2 96490 2094540

AMPLIACION, MEJORAMIENTO Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EN EL HOSPITAL DE

APOYO DE NASCA.

21,208,039.00 EN EJECUCION

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

142852 2131992

MEJORAMIENTO Y AMPLIACION DEL

SISTEMA DE TRATAMIENTO DE AGUAS

RESIDUALES DE LA PLANTA CACHICHE-

CIUDAD DE ICA.

55,259,815

EJECUCION A

CARGO DE LA

MUNICIPALIDAD

PROVINCIAL DE

ICA

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

Page 2: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 220,665 219,038 99.3% 0.6% 23,831 43,924 72,431 10,461 12,217 28,374 8,000 19,800

2012 0 0 0.0% 0.0%

2013 23,311,169 7,118,847 30.5% 20.6% 5,225 4,125 8,335 6,742 6,806 6,614 10,007 7,131 0 0 6,912,677 151,185

2014 26,380,056 26,091,408 98.9% 75.6% 1,243,185 738,583 1,721,678 2,960,824 299,401 2,238,432 2,626,159 3,545,839 5,116,997 1,619,734 3,980,576

2009 552,215 795 0.1% 0.0% 795

2010 9,640,327 569,469 5.9% 1.6% 164,995 164,995 219,993 19,486

2011 16,089,846 7,106,236 44.2% 19.5% 3,203,152 3,190,068 333,556 299,802 79,658

2012 9,611,468 287,077 3.0% 0.8% 86,400 8,000 90,107 77,007 4,000 4,000 9,563 8,000

2013 12,212,545 30,927,244 253.2% 85.0% 5,657,321 0 1,152,934 4,158,625 752,377 4,547,044 7,935,246 1,848,245 1,482,717 3,392,735

2014 14,454,715 9,582,596 66.3% 26.3% 0 0 69,909 6,581,443 1,292,874 0 1,638,370

2012 0 0 0.0% 0.0%

2013 11,182,349 7,031,565 62.9% 44.6% 0 0 7,031,565

2014 11,615,123 10,346,343 89.1% 65.6% 3,651,352 591,060 50,076 789,860 261,013 0 832,596 25,010 1,627,843 1,295,474 1,222,059

2011 300,000 139,400 46.5% 0.8% 8,000 131,400

2012 202,518 199,311 98.4% 1.2% 102,200 87,111 10,000

2013 9,784,000 409,337 4.2% 2.4% 0 29,150 0 0 0 0 0 0 2,725 2,725 260,172 114,565

2014 21,492,729 4,566,992 21.2% 26.9% 5,225 2,725 5,450 0 0 433,625 390,898 659,228 448,240 457,084 576,818 1,587,699

2012 326,663 326,623 100.0% 3.3% 97,987 97,987 130,649

2013 9,042,576 8,574,713 94.8% 86.6% 1,666,059 195,782 1,039,004 1,483,015 1,569,487 981,478 7,755 877,185 663,995 90,953

2014 428,938 413,561 96.4% 4.2% 47,714 0 49,615 0 0 934 2,353 312,945

2012 5,896,815 1,080,040 18.3% 18.6% 4,500 4,500 1,071,040

2013 7,965,463 4,507,534 56.6% 77.7% 222,099 1,316,094 40,526 546,773 1,202,810 992,249 0 60,745 21,750 104,488

2014 2,299,600 2,299,600 100.0% 39.7% 2,299,600

2010 2,551,091 2,491,438 97.7% 268,796 143,631 181,469 137,757 134,772 143,205 342,847 156,747 142,836 158,659 142,767 537,952

2011 2,918,217 2,774,368 95.1% 266,695 151,261 221,508 146,286 142,927 139,104 225,635 140,242 127,457 122,568 188,081 902,604

2012 2,873,338 2,510,304 87.4% 218,673 164,526 177,068 150,150 154,617 176,995 246,341 144,898 184,736 161,449 185,029 545,822

2013 7,740,500 5,406,506 69.8% 281,957 162,602 165,695 197,350 249,167 163,577 401,733 249,098 133,571 233,746 190,206 2,977,804

2014 6,599,203 6,600,376 100.0% 274,643 207,479 197,558 1,123,827 181,539 166,966 279,575 242,219 1,467,599 1,193,379 173,215 1,092,377

2012 0 0 0.0% 0.0%

2013 6,643,195 6,643,195 100.0% 113.9% 1,270,728 1,097,601 513,311 544,335 932,779 0 398,864 1,742,805 63,653

2014 153,370 153,370 100.0% 2.6% 1,950 1,950 0 149,470 0

2012 8,000 8,000 100.0% 0.2% 8,000

2013 6,114,538 4,359,514 71.3% 90.9% 0 0 180,084 682,737 2,284,775 1,211,918

2014 416,060 416,060 100.0% 8.7% 135,659 0 275,471 4,930

0 0.0% 0.0%

0 0.0% 0.0%

0 0.0% 0.0%

2013 164,000 96,694 59.0% 0.0% 6,768 5,025 84,901

0 0.0% 0.0%

0 0.0% 0.0%

0 0.0% 0.0%

2013 570,000 253,388 44.5% 0.0% 0 0 253,388

OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

21 S/C (*) 200-815ESTUDIOS DE PRE-INVERSION

REGION ICA-TRANSPORTES

DIRECCION

REGIONAL DE

TRANSPORTES

20 S/C (*) 100-814ESTUDIOS DE PRE-INVERSION-REGION

ICA-AGRICULTURA.

DIRECCION

REGIONAL DE

AGRICULTURA

19 167862 2159992

REHABILITACION DEL SISTEMA DE

DRENAJE SUPERFICIAL EXISTENTE EN LOS

DISTRITOS DE HUMAY, INDEPENDENCIA,

SAN CLEMENTE, TUPAC AMARU INCA,

SAN ANDRES Y PISCO, PROVINCIA DE

PISCO Y EL CARMEN PROVINCIA DE

CHINCHA, REGION ICA.

(petacc).

4,798,457.00 PETACC

18 94723 2163595

MEJORAMIENTO DE LA CARRETERA

PARA LA INTEGRACION DE LOS CC.PP. DE

LOS DISTRITOS DE SANTIAGO,

PACHACUTEC Y TATE DE LA PROVINCIA

DE ICA.

5,831,098.00OBRA

CULMINADA

17 S/C (*) 2000270GESTION DE PROYECTOS.

(Petacc). -- PETACC

16 43493 2041190CONSTRUCCION DEL RELLENO

SANITARIO PARA LA PROVINCIA DE ICA.5,798,381.00

OBRA

CULMINADA

15 43019 2150293

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE E INSTALACION DEL SISTEMA

DE ALCANTARILLADO EN EL CENTRO

POBLADO SAN MARTIN DE PORRES Y

ANEXOS DEL DISTRITO Y PROVINCIA DE

ICA.

9,904,429.00OBRA

CULMINADA

15,767,697.00 EN EJECUCION

14 63638 2078310

IRRIGACION LISCAY SAN JUAN DE YANAC-

CHINCHA.

(Petacc).

16,976,730.00 PETACC

36,385,792.00

13 152836 2160648

MEJORAMIENTO DE LA CARRETERA

DEPARTAMENTAL IC 113, TRAMO: DV

PANAMERICANA SUR (KM 421)-

SINCCACHI, DISTRITO DE EL INGENIO-

NASCA.

34,493,733.00 PETACC

12 104598 2091554

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DE LOS SERVICIOS DE

SALUD DEL HOSPITAL SAN JOSE DE

CHINCHA-DIRESA-ICA.

(Bonos Soberanos).

11 101558 2113116SISTEMA DE RIEGO LA ACHIRANA.

(Petacc).

Page 3: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 1,050,262 879,835 83.8% 397,538 34,150 28,350 25,000 27,350 346,592 3,520 7,120 10,215

2011 1,390,040 308,422 22.2% 3,600 24,000 32,256 26,009 38,751 20,009 83,763 80,034

2012 1,277,864 550,540 43.1% 110,108 220,216 220,216

2013 6,000,000 2,347,310 39.1% 103,540 163,386 22,834 54,285 212,155 210,517 162,954 227,090 611,448 221,436 357,665

2014 3,034,700 315,525 10.4% 107,264 208,261

2009 1,500,000 427,402 28.5% 1.1% 427,402

2010 14,537,541 1,006,723 6.9% 2.7% 568,000 284,000 148,600 6,123

2011 39,781,349 25,843,637 65.0% 69.2% 3,753,479 3,638,478 2,498,575 2,772,789 4,110,196 2,349,473 1,540,377 2,688,783 2,491,487

2012 13,484,177 4,528,739 33.6% 12.1% 881,338 1,059,364 643,974 8,106 478,837 350,478 448,648 3,500 7,500 646,994

2013 6,000,000 1,298,858 21.6% 3.5% 79,046 3,500 117,754 296,299 7,000 0 602,917 7,000 0 2,500 182,842

2014 8,517,385 7,959,809 93.5% 21.3% 4,245,473 795,857 1,592,947 483,688 0 722,197 59,361 49,786 10,500

2012 5,515,213 10,000 0.2% 0.2% 10,000

2013 5,713,279 5,578,305 97.6% 123.5% 1,094,601 1,901,503 1,343,287 635,803 26,624 521,911 0 0 54,576

2014 24,155 54,214 224.4% 1.2% 0 24,155 0 0 30,059 0

2012 3,808,711 144,546 3.8% 3.2% 43364 43,364 57,818

2013 5,819,078 5,009,067 86.1% 110.8% 1,027,195 1,101,481 550,184 676,070 607,233 377,503 146,797 116,112 11,561 56,148 338,783

2014 611,631 285,670 46.7% 6.3% 233,139 13,199 25,905 2,327 1,300 4,800 5,000

2012 4,526,476 879,307 19.4% 879,307

2013 4,985,613 4,584,157 91.9% 1,397,113 1,132,635 581,800 768,848 240,357 154,824 200,492 0 108,088

2009 456,000 71,667 15.7% 1.8% 551 138 70,978

2010 0 0 0.0% 0.0%

2011 0 0 0.0% 0.0%

2012 4,954,031 913,631 18.4% 22.3% 996 912,635

2013 4,919,031 2,698,293 54.9% 66.0% 1,825,269 138,388 0 132,185 0 383,492 15,007 2,746 185,278 15,628 300

2014 650,419 632,625 97.3% 15.5% 188,486 0 326,215 74,058 0 0 10,000 33,866

2,011 151,216 0 0.0% 0.0%

2,012 351,001 154,330 44.0% 4.6% 45,360 105,840 3,130

2,013 4,220,202 3,453,188 81.8% 102.9% 1,517,669 822,101 1,113,418

2,014 740,686 820,523 110.8% 24.4% 303,321 328,602 0 18,349 22,835 0 0 21,407 126,009

2010 0 0 0.0% 0.0%

2011 0 0 0.0% 0.0%

2012 10,900 0 0.0% 0.0%

2013 3,986,522 531,438 13.3% 22.0% 520,538 0 7,630 3,270

2014 2,481,441 2,256,061 90.9% 93.4% 565,248 317,753 262,918 199,924 16,337 16,882 19,696 13,524 10,347 833,432

2010 5,380 5,379 100.0% 0.0% 4,944 435

2011 0 0 0.0% 0.0%

2012 0 0 0.0% 0.0%

2013 2,329,972 163,702 7.0% 0.3% 10,415 3,570 13,970 44,065 13,970 19,610 4,719 7,103 7,100 5,968 33,212

OBRA

CULMINADA

OBRA

PARALIZADA

GOBIERNO

REGIONAL

DE ICA

4,518,425.00

29

PETACC30 12462 2031222

CONSTRUCCION DE POZAS DE

REGULACION Y CONTROL DE AVENIDAS

DEL RIO ICA.

(Petacc).

141205 2163990

MEJORAMIENTO E INSTALACION DEL

SISTEMA DE AGUA POTABLE Y DESAGUE

DEL C.P. SAN JOSE, DISTRITO EL CARMEN-

CHINCHA-ICA.

2,416,266.00OBRA

PARALIZADA

28 147407 2115900

MEJORAMIENTO DE CARRETERA

VECINAL RUTA IC-576, TRAMO

PROGRESIVA 21+500 A LA PROGRESIVA

60+501.956, DISTRITO DE TIBILLO-

PALPA.

3,357,001.00OBRA

CULMINADA

27 78892 2078063

CONSTRUCCION DEL PUENTE

CARROZABLE Y OBRAS

COMPLEMENTARIAS EN EL SECTOR AJA-

CIUDAD DE NASCA.

4,090,488.00OBRA

PARALIZADA

2148596

MEJORAMIENTO Y CONSTRUCCION DEL

SISTEMA DE AGUA POTABLE Y

ALCANTARILLADO DE LOS PUEBLOS

JOVENES SEÑOR DE LUREN Y ANEXOS

COLINDANTES DEL DISTRITO DE

SUBTANJALLA-ICA.

4,521,513.00OBRA

CULMINADA

26

FICHA

TECNICA

PIP DE

EMERGE

NCIA

S/C (*)

2154690

REHABILITACIÓN DE EMISOR, COLECTOR

PRINCIPAL DE LA AV. LOS MAESTROS,

EMISOR Y COLECTOR SECUNDARIO DE

PROLONGACIÓN AYABACA DEL

DISTRITO, PROVINCIA Y DEPARTAMENTO

DE ICA AFECTADOS POR EL SISMO DEL 30

DE ENERO DEL 2012.

--OBRA

CULMINADA

24 175959 2161496

CONSTRUCCION DEFENSAS RIBEREÑAS

M. I. RIO INGENIO SECT. SAN PABLO-EL

INGENIO-NAZCA, RIO MATAGENTE M. D.

SECT. RONCEROS BAJO-EL CARMEN, RIO

CHICO M. I. SECT. CANYAR-CHINCHA

BAJA, TAMBO DE MORA M. D. Y CRUZ

VERDE M. I. -TAMBO DE MORA-CHINCHA-

REGION ICA.

25 48363

23 83948 2094097

MEJORAMIENTO Y AMPLIACION DE LOS

SISTEMAS DE AGUA POTABLE Y

ALCANTARILLADO DE NASCA Y VISTA

ALEGRE.

37,372,306.00

61,804,405.00

22 S/C (*) 001-813ESTUDIOS DE PRE-INVERSION.

(Sede Central).-- EN EJECUCION

Page 4: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

0 0.0% 0.0%

0 0.0% 0.0%

2013 22,147,051 20,388,175 92.1% 19.4% 0 3,000 20,385,175

2014 3,697,812 1,681,412 45.5% 1.6% 10,750 12,000 13,500 318,138 1,500 789,317 5,000 513,707 10,500 7,000

2011 114,680 0 0.0% 0.0%

2012 114,680 34,404 30.0% 1.0% 34,404

2013 3,362,466 6,700 0.2% 0.2% 4,000 1,700 1,000

33 242869 2225155

MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN LOS PRONOEIS SEÑOR DE

LUREN Y SANTA ROSITA EN LOS SETS MI

LINDO AMANECER Y NIDITO DE AMOR

DEL C.P. MANUEL AREVALO, DISTRITO

DE LA TINGUIÑA-ICA-ICA.

650,547.26 2014 729,562 729,354 100.0% 112.1% 32,923 243,418 151,550 56,863 189,000 12,715 7,000 3,500 2,252 30,133OBRA

CULMINADA

34 225873 2165498

MEJORAMIENTO Y RECUPERACION DE

LOS SERVICIOS TURISTICOS EN EL

CENTRO ADMINISTRATIVOS INCA DE

TAMBO COLORADO EN EL DISTRITO DE

HUMAY-PROVINCIA DE PISCO-

DEPARTAMENTO DE ICA.

4,061,036.00 2014 87,845 8,000 9.1% 0.2% 7,500 0 200 200 100

EXPEDIENTE

TECNICO EN

ELABORACION

35 146354 2116582

SUSTITUCION DE LA INFRAESTRUCTURA

EDUCATIVA I.E. Nº22427 MOLLAQUE

CHICO-DISTRITO Y PROVINCIA DE PALPA.

204,331.47 2014 319,844 290,610 90.9% 142.2% 55,526 3,100 111,649 109,821 0 3,500 0 1,000 2,614 3,400OBRA

CULMINADA

0 0 0.0% 0.0%

2013 21,000 7,350 35.0% 0.6% 0 0 7,350

2014 2,560,926 22,809 0.9% 1.9% 0 5,259 0 0 0 7,050 10,500

2012 4,708,479 1,403,878 29.8% 34.0% 877,800 10,489 4,531 511,058

2013 3,251,441 3,194,798 98.3% 77.3% 203,884 2,000 1,987 700,258 935,357 448,882 281,334 29,164 0 591,932

2010 1,815,101 1,699,383 93.6% 127,178 77,837 69,320 128,592 51,881 36,502 62,970 116,899 109,788 151,387 121,650 645,379

2011 5,016,682 4,921,522 98.1% 75,210 62,476 222,524 113,124 97,705 112,737 72,926 107,702 214,326 347,193 1,359,709 2,135,890

2012 2,831,046 2,220,669 78.4% 82,037 125,239 117,040 169,983 149,842 52,233 144,013 232,042 209,395 193,761 34,895 710,189

2013 3,285,008 3,167,122 96.4% 78,828 96,438 364,377 134,098 118,991 140,877 675,148 445,209 513,388 117,564 117,271 364,933

2014 2,048,615 2,098,841 102.5% 88,797 76,951 76,966 196,294 81,303 109,524 313,366 235,610 277,394 183,558 82,091 376,987

2012 10,218,344 7,745,220 75.8% 77.6% 1,738,858 3,946,223 390,991 359,806 581,198 6,800 721,344

2013 2,564,756 1,573,290 61.3% 15.8% 595,560 37,883 661,160 278,687 0 0 0

2014 47,980 27,236 56.8% 0.3% 0 0 0 0 27,236 0

2013 2,983,044 2,679,778 89.8% 103.8% 8,462 483,696 403,323 19,341 733,639 106,122 96,823 20,467 807,905

2014 317,542 7,092 2.2% 0.3% 7,092

OBRA PARA

PROCESO DE

SELECCIÓN

OBRA

CULMINADA

OBRA EN

EJECUCION

(En proceso de

elaboración de

Expediente

Tecnico)

GOBIERNO

REGIONAL

DE ICA

2157122

CONSTRUCCION DE TROCHA

CARROZABLEDESDE PUENTE LAMBRAS

AL CENTRO POBLADO DE TAMBULLA EN

EL DISTRITO DE SAN PEDRO DE

HUACARPANA PROVINCIA DE CHINCHA-

ICA.

2,581,056.00OBRA

CULMINADA

PETACC

CONSTRUCCION DE PISTAS Y VEREDAS

EN EL AA.HH ACOMAYO ZONA B, TUPAC

AMARU, PP.JJ ANDRES AVELINO

CACERES Y ASOCIACION DE VIVIENDA EL

SAUCE, DISTRITO DE PARCONA-ICA-ICA.

4,134,942.00

105,053,319.00

OBRA

CULMINADA

32

38 S/C (*) 2000351OPERACION Y MANTENIMIENTO.

(Petacc).--

37 152550 2121113

182824 2148053

MEJORAMIENTO DE CARRETERA IC-105;

DV PANAMERICANA SUR KM 303-PROG

13+000 SECTOR LOMA LODULLADO-

DISTRITO DE ICA-PROVINCIA DE ICA-

DEPARTAMENTO DE ICA.

3,477,146.00EN EXPEDIENTE

TECNICO

36 149673 2121916

CONSTRUCCION DE UN PUENTE EN

HUMANPALI, DISTRITO DE ALTO LARAN-

CHINCHA-ICA.

1,176,254.38

9,987,256.00

40

39 102556 2113225

152354

31 162358 2184578

AMPLIACION Y MEJORAMIENTO DEL

SISTEMA DE ABASTECIMIENTO DE AGUA

POTABLE DE LA CIUDAD DE ICA,

PROVINCIA DE ICA-ICA.

MEJORAMIENTO DE LA CARRETERA DE

ACCESO AL VALLE LAS TRANCAS, TRAMO

Dv. PANAMERICANA SUR Km 463-SANTA

LUISA-DISTRITO DE VISTA ALEGRE-

NASCA.

Page 5: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2013 3,269,101 2,533,515 77.5% 157,557 379,959 844,340 1,151,659

2014 615,904 1,378,745 223.9% 205,666 344,710 39,340 0 0 14,700 0 774,329

2012 54,000 54,000 100.0% 2.2% 54,000

2013 2,453,755 2,147,377 87.5% 86.4% 116,503 935,653 352,840 714,510 4,247 0 0 5,460 18,164 0 0

2011 54,441 54,440 100.0% 2.0% 16,332 38,108

2012 3,056,992 800,012 26.2% 30.1% 1,095 996 797,921

2013 2,115,572 2,119,761 100.2% 79.6% 479,501 570,846 457,560 251,368 326,167 0 7,000 0 17,105 0 10,214

2014 6,200 2,000 32.3% 0.1% 0 2,000 0 0

2012 3,948,472 2,349,679 59.5% 62.9% 430,543 452,589 368,315 177,142 183,994 737,096

2013 2,063,484 738,959 35.8% 19.8% 2,498 0 22,351 0 10,320 204,800 498,990

2014 91,228 10,630 11.7% 0.3% 0 0 10,630

45 192497 2206000

CREACION DE PISTAS Y VEREDAS CALLES

LAS AMERICAS, 11 DE SETIEMBRE, LOS

MARTIRES, J.C. MARIATEGUI, SALVADOR

ALLENDE, 28 DE JUNIO, 6 DE DICIEMBRE,

CALLE C Y CALLE B C.P. LA TINGUIÑA-

ZONA BAJA A-1, DISTRITO DE LA

TINGUIÑA-ICA-ICA.

2,201,948.00 2014 3,081,636 5,250 0.2% 0.2% 5,250 OBRA POR INICIAR

46 253395 2196799

MEJORAMIENTO DEL SERVICIO

EDUCATIVO DEL NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

DEL PELA EN EBR-AMPLIACION DE

COBERTURA EN EL I.E.I. Nº322 VISTA

ALEGRE, DISTRITO DE TUPAC AMARU,

PROVINCIA DE PISCO, DEPARTAMENTO

DE ICA.

1,495,646.00 2014 149,565 74,783 50.0% 5.0% 74,783

DIRECCION

REGIONAL DE

EDUCACION

47 76020 2088211

RECONSTRUCCION Y MEJORAMIENTO

DEL SERVICIO EDUCATIVO EN EL

INSTITUTO SUPERIOR TECNOLOGICO

PUBLICO NASCA-ICA.

(Bonos Soberanos).

7,268,410.00 2013 557,500 556,500 99.8% 7.7% 556,500OBRA

CULMINADA

2013 1,813,262 1,778,640 98.1% 121.6% 319,121 862,662 1,087 387,448 65,846 142,476

2014 7,490 7,490 100.0% 0.5% 7,490

3,736,788.00

GOBIERNO

REGIONAL

DE ICA

44 135513 2116356

MEJORAMIENTO DE LA

INFRAESTRUCTURA TECNICO-

PRODUCTIVO Y EQUIPAMIENTO DEL

INSTITUTO SUPERIOR TECNOLOGICO

PALPA, DISTRITO DE RIO GRANDE,

PROVINCIA DE PALPA-ICA.

41 S/C (*) 2022788

GESTION DEL PROGRAMA Y OTROS -

PROGRAMA DE CAMINOS

DEPARTAMENTALES.

(A cargo de la Dirección Regional de

Transportes y Comunicaciones (DRTyC

Ica).

(Provias)

42 150806 2115880

MEJORAMIENTO DE LA CARRETERA DE

ACCESO DESDE EL C.P. OCUCAJE-C.P.

BARRIO NUEVO-C.P LA CAPILLA,

DISTRITO DE OCUCAJE, PROVINCIA DE

ICA.

OBRA

CULMINADA

OBRA

CULMINADA

2,484,461.00

43 157122 2132916

DIRECCION

REGIONAL

TRANSPORTES

MEJORAMIENTO Y REHABILITACION DE

VIA VECINAL VILLA PERIODISTA I - SANTA

ROSA DE CACHICHE - VILLA PERIODISTA

II ENLACE A CAMINO DE HUACACHINA ,

PROVINCIA DE ICA - ICA.

2,661,725.00

OBRA

CULMINADA

OBRA

CULMINADA48 78602 2111849

INSTALACIONES DE SISTEMA DE AGUA

POTABLE PARA LA COMUNIDAD

CAMPESINA SAN ANDRES DE

QUILCANTO Y SAN NICOLAS DE PULPO-

YAUCA DEL ROSARIO-ICA.

1,462,318.00

Page 6: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 27,040 16,223 60.0% 1.4% 16,223

2012 1,046,727 10,816 1.0% 0.9% 10,816

2013 1,661,452 1,363,852 82.1% 114.3% 223,093 176,769 445,205 380,139 102,777 0 0 8,449 8,752 18,668

2014 143,318 317 0.2% 0.0% 317

2013 1,383,299 578,988 41.9% 48.4% 0 56,256 264,609 63,840 194,283

2014 208,976 200,473 95.9% 16.7% 31,386 58,285 0 0 59,688 51,114

51 145334 2163989

INSTALACION DEL SISTEMA DE DESAGUE

DEL C.P. SAN REGIS, DISTRITO DE EL

CARMEN-CHINCHA-ICA.

796,843.00 2013 1,099,641 1,085,136 98.7% 136.2% 15,635 689,229 174,624 120,818 66,462 8,234 0 10,134OBRA

CULMINADA

2012 1,160,236 787,438 67.9% 57.8% 13,800 10,350 10,350 312,000 440,938

2013 1,084,129 973,397 89.8% 71.5% 232,433 123,023 143,036 149,049 10,266 215,955 0 0 935 98,700

2014 22,795 22,795 100.0% 1.7% 11,692 11,103 0 0

53 119214 2113440

AMPLIACION DE LA DEFENSA RIBEREÑA EN

LA MARGEN DERECHA DEL RIO PISCO, CON

FINES DE REDUCIR LA VULNERABILIDAD DE LA

INFRAESTRUCTURA DE CONDUCCION DE

AGUAS CON FINES DE RIEGO EN EL SECTOR

DE MANRIQUE DISTRITO DE INDEPENDENCIA,

PROVINCIA DE PISCO, REGION ICA.

1,499,282.00 2014 1,318,592 233,006 17.7% 15.5% 233,006 PETACC

54 127773 2106284

MEJORAMIENTO DE CARRETERA

DEPARTAMENTAL RUTA IC 105 EMP PE

28 DV SALINAS DE OTUMA-LAGUNA

GRANDE Y ACCESOS, DISTRITO DE

PARACAS, PROVINCIA DE PISCO-ICA.

2,542,736.00 2014 3,025,230 504,694 16.7% 19.8% 0 0 0 0 3,200 0 148,945 54,231 298,318 EN EJECUCION

2011 54,590 54,589 100.0% 16,377 7,315 30,897

2012 2,226,570 1,148,976 51.6% 1,148,976

2013 1,078,595 678,736 62.9% 162,062 111,499 186,090 147,105 16,300 0 55,680

2014 25,523 5,259 20.6% 0 5,259 0

2009 45,000 1,908 4.2% 0.0% 1,908

2010 139,500 98,000 70.3% 1.6% 42,592 55,408

1011 0 0 0.0% 0.0%

2012 6,269,598 4,839,827 77.2% 80.1% 1,072,571 2,150,749 513,610 481,340 621,557

2013 1,376,710 1,103,341 80.1% 18.3% 117,206 181,029 62,790 74,434 0 53,832 8,270 9,868 0 15,550 580,362

2014 312,371 203,260 65.1% 3.4% 128,823 32,948 41,489

2010 200,000 162,335 81.2% 6.7% 162,335

2011 2,500,000 1,759,427 70.4% 73.0% 444,426 896,282 418,719

2012 966,418 100,267 10.4% 4.2% 1,989 0 0 11,740 41,928 42,293 0 0 2,317

2013 1,551,048 224,078 14.4% 9.3% 11,000 11,000 202,078

2014 265,260 242,106 91.3% 10.0% 134,730 23,802 2,750 813 46,433 4,000 5,344 11,273 7,653 5,308

OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

57 112290 2106283

CONSTRUCCION DE PUENTE VEHICULAR

EN MARCCARENCCA KM 32+000 RUTA I-

C 108 EMP PE 1S RIO GRANDE - PALPA -

ICA.

2,410,277.00OBRA

PARALIZADA

56 31196 2092086

MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO EN

EL CENTRO DE SALUD LA TINGUIÑA-ICA.

6,045,380.00OBRA

CULMINADA

52 165218 2148597

MEJORAMIENTO DE INFRAESTRUCTURA

EDUCATIVA Y EQUIPAMIENTO EN DOS

NIVELES EN LA I.E.Nº22446 ISAAC

MONTALVAN NIVEL INICIAL Y PRIMARIA

MENORES, DISTRITO DE INDEPENDENCIA-

PISCO.

1,361,811.00OBRA

CULMINADA

50 132655 2110876

MEJORAMIENTO DE LAS EDIFICACIONES

INTERNAS, EXTERNA E

IMPLEMENTACION DE SERVICIOS,

COMUNICACIONES, SEGURIDAD Y

ORNATO DE LA SEDE CENTRAL DEL

GOBIERNO REGIONAL DE ICA.

1,197,334.47OBRA

CULMINADA

49 165371 2132728

CONSTRUCCION DE INFRAESTRUCTURA Y

EQUIPAMIENTO PARA LA FORMACION

PROFESIONAL DE LAS ESPECIALIDADES

DE MECANICA AUTOMOTRIZ Y DE

PRODUCCION EN EL INSTITUTO

SUPERIOR TECNOLOGICO CATALINA

BUEN DIA DE PECHO - PROVINCIA DE

ICA.

1,192,701.00OBRA

CULMINADA

55FICHA

FORSUR2117126

RECONSTRUCCION Y EQUIPAMIENTO

DEL RESERVORIO DE AGUA DEL SECTOR

EL ALTO COMATRANA DEL DISTRITO,

PROVINCIA Y DEPARTAMENTO DE ICA,

AFECTADO POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

(Forsur).

Page 7: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 2,869,558 193,559 6.7% 7.3% 53,700 134,800 284 3,922 853

2011 2,597,503 2,146,072 82.6% 80.7% 461,762 923,524 229,176 117,469 219,937 19,184 72,681 2,500 2,834 84,094 12,911

2012 2,250,928 1,093,526 48.6% 41.1% 5,360 5,390 8,190 7,200 3,010 4,800 2,400 7,000 1,050,176

2013 958,329 520,397 54.3% 19.6% 45,237 37,852 71,110 79,168 77,691 12,730 0 0 158,327 38,282

2009 111,400 106,045 95.2% 1.9% 98,000 1,045 7,000

2010 0 0 0.0% 0.0%

2011 3,896,953 3,562,933 91.4% 65.2% 1,000 1,130,157 2,431,776

2012 3,424,377 3,084,768 90.1% 56.4% 85,530 4,936 50,101 53,556 179,089 51,828 648,981 1,062,348 685,466 262,933

2013 943,370 876,939 93.0% 16.0% 671,057 9,733 102,720 93,429

2012 2,829,136 1,806,179 63.8% 76.0% 5,260 1,870 75,487 263,180 312,003 646,789 495,593 5,997

2013 887,988 847,560 95.4% 35.6% 4,650 0 702,992 23,418 95,436 21,064

2014 56,024 56,023 100.0% 2.4% 56,023

2010 129,527 129,527 100.0% 6.7% 38,858 90,669

2011 0 0 0.0% 0.0%

2012 2,324,917 1,294,482 55.7% 67.3% 5,000 390,058 673,455 5,000 6,449 214,520

2013 823,785 768,202 93.3% 39.9% 191,722 228,470 138,683 102,280 3,157 71,447 0 1,568 30,875

2014 31,868 31,368 98.4% 1.6% 5,000 5,000 21,368

2012 1,482,384 623,424 42.1% 52.0% 52,419 62,474 508,531

2013 765,162 765,508 100.0% 63.9% 169,385 184,606 13,290 84,410 7,737 0 9,700 104,034 77,946 114,400

2011 3,085,460 80,729 2.6% 2.8% 10,759 69,970

2012 3,154,266 2,537,225 80.4% 89.5% 559,901 324,459 293,367 769,253 172,132 340,726 17,160 35,480 5,000 19,747

2013 669,816 80,300 12.0% 2.8% 48,800 31,500

2013 659,956 346,081 52.4% 34.5% 206,399 128,775 0 0 407 0 0 10,500

2014 774,204 473,765 61.2% 47.2% 0 338,775 0 132,500 2,490

2011 1,173,905 583,492 49.7% 24.2% 3,000 3,000 1,500 482,671 93,321

2012 2,446,530 1,932,729 79.0% 80.2% 860,773 245,248 15,370 207,992 252,813 350,533

2013 601,902 341,428 56.7% 14.2% 340,626 802 0 0 0

2010 10,750 10,750 100.0% 0.9% 10,750

2011 0 0 0.0% 0.0%

2012 1,236,123 674,493 54.6% 58.1% 2,672 236,281 435,540

2013 551,445 301,656 54.7% 26.0% 123,732 0 0 13,962 75,752 10,960 77,250

2009 1,976,117 1,500 0.1% 0.1% 1,500

2010 50,000 0 0.0% 0.0%

2011 3,089,073 40,234 1.3% 2.0% 40,234

2012 2,892,447 2,477,506 85.7% 125.4% 3,801 1,566,746 5,591 188,928 9,465 387,211 315,764

2013 520,803 584,504 112.2% 29.6% 242,192 17,866 0 0 0 0 0 0 16,783 113,256 194,407

GOBIERNO

REGIONAL

DE ICA

64 145336 2163992

INSTALACION DEL SISTEMA DE DESAGUE

DEL C.P. EL GUAYABO, DISTRITO DE EL

CARMEN-CHINCHA-ICA.

67 58627 2087349

CONSTRUCCION Y MEJORAMIENTO DE

LA INFRAESTRUCTURA EDUCATIVA EN LA

I.E. JOSEFINA MEJIA DE BOCANEGRA -

NASCA - ICA.

1,976,117.00OBRA

CULMINADA

66 134712 2131176

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA EN EL

CETPRO CAJUCA-NASCA-ICA.

1,161,642.99

OBRA EN

PROCESO DE

SELECCIÓN

65 54823 2094593

CONSTRUCCION DE MINIPRESAS

LARGASHJA - CHUYA DISTRITO DE

CHAVÍN.

2,411,140.00OBRA

CULMINADA

63 144161 2113082

MEJORAMIENTO DE INFRAESTRUCTURA

EDUCATIVA Y EQUIPAMIENTO EN DOS

NIVELES EN LA I.E INDEPENDENCIA NIVEL

SECUNDARIO MENORES, DISTRITO DE

INDEPENDENCIA - PISCO.

2,835,592.00OBRA

CULMINADA

62 132967 2131175

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA EN EL

CETPRO SR DE LUREN-DISTRITO DE VISTA

ALEGRE-NASCA-ICA.

1,198,281.73OBRA

CULMINADA

61 112254 2094596

CONSTRUCCION DE PUENTE VEHICULAR

EN UCUCHIMPANA KM 37 + 500 RUTA I-

C 108 EMP PE 1S RIO GRANDE - PALPA -

ICA.

1,923,240.00OBRA

CULMINADA

60 136042 2127890

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE Y CONSTRUCCION DEL

SISTEMA DE ALCANTARILLADO EN LOS

CENTROS POBLADOS DEL DISTRITO DE

HUANCANO, PROVINCIA DE PISCO - ICA.

2,377,728.00OBRA

CULMINADA

59 101616 2092499

SISTEMA DE RIEGO MACACONA-

QUILLOAY.

(Petacc).

5,464,628.00 PETACC

58 112324 2094595

CONSTRUCCION DE PUENTE VEHICULAR

EN HUARACCO KM 22+000 RUTA I-C 108

EMP PE 1S RIO GRANDE - PALPA - ICA.

2,659,672.00OBRA

PARALIZADA

1,003,583.00OBRA

PARALIZADA

Page 8: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 1,211,403 753,727 62.2% 65.0% 462 183,496 442,458 100,732 21,138 5,441

2013 516,741 4,998 1.0% 0.4% 0 0 4,998

2014 403,545 8,600 1.0% 0.7% 0 800 7,800

2010 107,630 64,578 60.0% 0.3% 32,289 32,289

2011 1,842,937 42,944 2.3% 0.2% 42,944

2012 13,576,823 262,774 1.9% 1.4% 13,470 21,180 228,124

2013 19,531,783 15,157,198 77.6% 80.0% 145,654 5,686,900 7,000 3,500 7,000 6,641,936 7,000 2,658,208

2014 3,428,278 3,428,277 100.0% 18.1% 3,500 7,000 3,279,220 0 0 84,535 15,774 0 38,248

70 251305 2196786

MEJORAMIENTO DEL SERVICIO

EDUCATIVO DE NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

PELA EN EBR EN LA I.E.I. Nº301 EN EL

CC.PP. QUILLOAY, DISTRITO DE SAN

JUAN BAUTISTA, PROVINCIA DE ICA,

DEPARTAMENTO DE ICA.

464,842.29 2014 46,484 33,662 72.4% 7.2% 33,662

DIRECCION

REGIONAL DE

EDUCACION

71 125735 2143207

RECONSTRUCCION Y EQUIPAMIENTO I.E.

Nº143, ZONA NUEVA, DISTRITO DE

PARCONA-ICA-ICA.

526,761.24 2013 492,214 492,212 100.0% 93.4% 319,061 10,292 157,160 0 5,699 0OBRA

CULMINADA

2012 506,934 91,687 18.1% 17.8% 91,687

2013 415,247 381,593 91.9% 72.4% 155,550 213,537 12,000 0 0 0 263 243

2014 2,127 2,127 100.0% 0.4% 2,127

2010 351,554 350,693 99.8% 25,861 10,140 8,740 5,143 135,809 135,000 30,000

2011 1,426,500 779,999 54.7% 20,000 18,000 53,462 82,915 605,622

2012 860,160 854,033 99.3% 28,499 28,650 110,268 144,453 92,355 103,807 63,324 13,889 43,099 163,925 33,966 27,798

2013 1,304,250 885,550 67.9% 110,000 165,000 58,992 195,000 168,068 55,000 133,490

2012 1,688,650 1,277,821 75.7% 99.1% 242,511 290,756 463,204 156,772 68,711 29,425 6,705 19,737

2013 392,925 16,695 4.2% 1.3% 7,224 0 0 9,471

2014 1,289,574 277,950 21.6% 21.6% 0 277,950 0

75 250203 2196785

2196785: MEJORAMIENTO DEL SERVICIO

EDUCATIVO DEL NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

DEL PELA EN EBR-AMPLIACION DE

COBERTURA EN EL I.E.I. Nº328 EL SIETE,

DISTRITO DE PACHACUTEC-PROVINCIA

DE ICA, DEPARTAMENTO DE ICA.

894,394.00 214 89,439 5,000 5.6% 0.6% 5,000

EXPEDIENTE

TECNICO EN

ELABORACION

76

2228738: CONTROL DE DESBORDES E

INUNDACIONES EN EL RIO ICA Y

QUEBRADA CANSAS/CHANCHAJALLA.

2014 1,542,351 567,558 36.8% 0.0% 0 10,700 0 556,858 PETACC

OBRA

CULMINADA

GOBIERNO

REGIONAL

DE ICA

74 81004 2110497

FORTALECIMIENTO DE LA ATENCION Y

MANEJO INTEGRAL DE PACIENTES CON

TUBERCULOSIS EN EL HOSPITAL

REGIONAL DE ICA-DIRESA ICA.

(Convenio Care Perú).

73 S/C (*) 002-1139ESTUDIOS DE PRE-INVERSION.

(Petacc).PETACC

72 174984 2161495

MEJORAMIENTO DE LA

INFRAESTRUCTURA DEPORTIVA EN LA

I.E. Nº22401 MARIA REICHE NEUMANN,

DISTRITO DE NASCA Y DEPARTAMENTO

DE ICA.

516,311.00OBRA

CULMINADA

69 125735 2114169

MEJORAMIENTO DE LOS SERVICIOS DE

PREVENCION DE LA COMISION DE

DELITOS Y FALTAS EN LA JURISDICCION

DE LA DIRECCION TERRITORIAL DE

POLICIA DE ICA.

18,955,772.00OBRA

PARALIZADA

68 150635 2116994

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE Y ALCANTARILLADO DEL CC.PP

SAN TADEO-HUMAY-PISCO.

1,160,056.16OBRA

PARALIZADA

1,289,574.00

Page 9: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

77 261139 2193712

2193712: INSTALACION DEL SERVICIO

EDUCATIVO DE LA INSTITUCION

EDUCATIVA INICIAL EN EL MARCO DE

AMPLIACION DE COBERTURA DEL PELA

EN PLAZAS VALIDADAS POR EL MED LOS

AÑOS 2009, 2010 Y 2011 EN LA I.E.I.

Nº175 DE LA URBANIZACION SAN

JOAQUIN IV ETAPA DEL DISTRITO DE ICA.

1,199,332.00 2014 29,400 5,000 17.0% 0.4% 5,000

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

78 268926 2188369

MEJORAMIENTO DEL SERVICIO DE

ATENCION DE EMERGENCIAS DE LAS

COMPAÑIAS DE BOMBEROS DE LA

REGION ICA-REGION ICA.

7,993,891.00 2014 8,014,770 130,215 1.6% 1.6% 10,900 119,315

EQUIPOS EN

PROCESO DE

SELECCIÓN

79 270867 2186129

CREACION Y EQUIPAMIENTO DEL

POLIDEPORTIVO DEL DISTRITO DE

PALPA, PROVINCIA DE PALPA Y

DEPARTAMENTO DE ICA.

9,811,614.00 2014 2,112,490 1,759,996 83.3% 17.9% 1,749,096 0 3,900 0 3,500 3,500

OBRA EN

EJECUCION

En proceso de

elaboración de

Expediente

Técnico)

2013 377,599 200,225 53.0% 67.0% 0 102,692 97,533

2014 59,972 47,361 79.0% 15.9% 16,500 30,861 0

0 0.0% 0.0%

2013 1,435,042 764,232 53.3% 68.7% 186 254,682 509,364

2014 364,958 431,181 118.1% 38.8% 187,646 21,574 61,873 0 3,500 6,165 830 149,593

2012 8,889 8,889 100.0% 8,889

2013 375,836 0 0.0%

2009 331,920 77,097 23.2% 1.8% 77,097

2010 0 0 0.0% 0.0%

2011 51,400 51,398 100.0% 1.2% 51,398

2012 4,180,844 3,839,898 91.8% 91.1% 262,645 959,504 424,850 397,856 441,527 490,147 459,020 404,349

2013 340,947 47,359 13.9% 1.1% 12,772 0 34,587 0

2014 48,586 19,369 39.9% 0.5% 19,369

84 107348 2088218

MEJORAMIENTO DEL SISTEMA DE AGUA

POTABLE EN LINEA DE CONDUCCION,

ADUCCION Y RESERVORIO (500M3),

PARA LA COBERTURA DE LOS DISTRITOS

DE PUEBLO NUEVO Y GROCIO PRADO.

5,995,943.00 2014 57,509 24,215 42.1% 0.4% 0 0 0 0 0 0 24,215

EXPEDIENTE

TECNICO EN

ELABORACION

2012 2,274,702 1,801,587 79.2% 77.5% 2,672 1,205,397 593,518

2013 316,454 286,799 90.6% 12.3% 272,092 3,750 0 0 10,957

2227598

CONSTRUCCION Y EQUIPAMIENTO DE

PUESTO DE SALUD PAMPA BLANCA EN

EL DISTRITO DE RIO GRANDE, PROVINCIA

DE PALPA-ICA.

298,629.41

GOBIERNO

REGIONAL

DE ICA

85 187439 2152406

MEJORAMIENTO DE CARRETERA

DEPARTAMENTAL IC-107 TRAMO Dv

PANAMERICANA SUR Km 307-

PROGRESIVA 3+200 PONTON LA

ACHIRANA DISTRITO LOS AQUIJES-

PROVINCIA DE ICA-DEPARTAMENTO DE

ICA.

2,323,591.00OBRA

CULMINADA

83 68869 2086775

CONSTRUCCION DE LINEA DE

CONDUCCION RESERVORIO ELEVADO Y

LINEA DE ADUCCION EN EL DISTRITO DE

SAN ANDRES-PISCO.

4,213,533.00OBRA

CULMINADA

82

FICHA

FORSUR

S/C (*)

2154728

2154728: RECONSTRUCCION,

REHABILITACION Y MEJORAMIENTO

POSTA MEDICA PNP-PISCO-

DEPARTAMENTO ICA, PROVINCIA DE

PISCO, DISTRITO DE PISCO.

(Ficha Forsur).

EXPEDIENTE

TECNICO

APROBADO

81 225319 2229561

INSTALACION DEL SERVICIO DE

ELECTRICIDAD MEDIANTE REDES

PRIMARIA Y SECUNDARIA EN LOS CC.PP.

SAN MARTIN Y CAMACHO EN LAS

PROVINCIAS DE PISCO Y CHINCHA-

DEPARTAMENTO DE ICA.

80 175557

OBRA

CULMINADA1,112,389.26

OBRA

CULMINADA

Page 10: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 413,139 127,543 30.9% 42.6% 3,570 3,570 120,403

2013 284,783 282,117 99.1% 94.2% 284,361 0 0 -2,244

2012 6,103,280 5,822,362 95.4% 111.4% 1,038,717 1,329,779 697,076 614,746 579,133 413,816 247,381 350,680 551,034

2013 325,918 262,823 80.6% 5.0% 2,000 47,815 61,820 0 109,332 41,856

2012 230,480 10,657 4.6% 4.3% 10,557 100

2013 258,173 87,552 33.9% 35.0% 372 83,069 4,111

2014 128,995 159,277 123.5% 63.6% 0 128,995 0 0 0 28,677 1,605 0 0

2010 5,165,000 3,861,044 74.8% 65.4% 5,672 4,883 1,070,928 2,779,561

2011 1,564,815 1,248,721 79.8% 21.2% 1,237,629 9,947 1,060 85

2012 0 0 0.0% 0.0%

2013 251,895 251,895 100.0% 4.3% 235,021 16,874

2013 245,412 3,000 1.2% 0.0% 0 3,000 0

2014 4,010,398 66,844 1.7% 0.7% 59,844 7,000

2012 398,111 153,328 38.5% 53.1% 1,308 4,685 147,335

2013 244,744 243,522 99.5% 84.4% 243,741 -219

91 112995 2115649

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA Y REFERENCIA DE

PACIENTES EN SITUACION DE

EMERGENCIA EN EL CENTRO DE SALUD

CLAS SAN ISIDRO - DISTRITO DE PUEBLO

NUEVO - CHINCHA.

180,680.00 2013 234,950 182,714 77.8% 101.1% 182,714OBRA

CULMINADA

2010 1,227,584 402,511 32.8% 29.4% 379,169 1,206 16,321 5,815

2011 353,759 0 0.0% 0.0%

2012 232,437 0 0.0% 0.0%

2013 232,437 0 0.0% 0.0% 0 0 0

2014 232,437 232,437 100.0% 17.0% 0 0 232,437

2013 228,266 68,551 30.0% 1.0% 0 0 68,551

2014 134,287 134,286 100.0% 1.9% 7,000 0 0 54,551 72,735 0 0

2012 497,783 190,417 38.3% 64.0% 10,000 180,417

2013 225,253 220,667 98.0% 74.2% 222,819 0 0 -2,152

82 225575 2173509

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE PISCO.

9,934,268.00

GOBIERNO

REGIONAL

DE ICA

94 136700 2114738

CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON ENROCADO EN LA

MARGEN DERECHA DEL RIO PISCO,

SECTOR FRANCIA BAJA, DISTRITO DE SAN

CLEMENTE, PROVINCIA DE PISCO,

REGION ICA.

(Petacc).

297,488.00 PETACC

93 226122 2167028

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE ICA.

7,070,218.00 OBRA POR INICIAR

92 24606 2087372

CONSTRUCCION DE TROCHA

CARROZABLE SAN PEDRO DE

HUACARPANA-SANLORENZO EN LA

PROVINCIA DE CHINCHA-ICA.

1,368,309.00OBRA

CULMINADA

90 135246 2162335

REHABILITACION DE DIQUE EN EL RIO

GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR CHILLO,

MARGEN DERECHA, DISTRITO LLIPATA,

PROVINCIA PALPA-REGION ICA.

(Petacc).

288,485.40 PETACC

89 139456 2109937

CONSTRUCCION DE PISTAS Y VEREDAS

EN LA EXPANSION SUR DEL, DISTRITO DE

PARCONA - ICA - ICA.

5,900,582.00OBRA

CULMINADA

88 139752 2113628

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN EL SECTOR I DEL P.V

DAMNIFICADOS DEL FENOMENO DEL

NIÑO DEL DISTRITO DE SUBTANJALLA-

ICA

250,462.07OBRA

CULMINADA

87 138887 2126257

MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO DE

LA I.E VICTOR MANUEL MAURTUA DE

PARCONA, DISTRITO DE PARCONA-ICA-

ICA.

5,228,213.00OBRA

CULMINADA

86 133787 2162336

REHABILITACION DE DIQUE EN EL RIO

GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR FLORITA

ACEQUION, MARGEN DERECHA,

DISTRITO RIO GRANDE, PROVINCIA

PALPA-REGION ICA.

(Petacc).

299,376.56 PETACC

EXPEDIENTE

TECNICO

OBSERVADO

Page 11: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 2,139,272 1,916,108 89.6% 124.4% 10,000 397,854 1,508,254

2013 223,164.00 202,363 90.7% 13.1% 117,131 46,059 35,828 548 0 0 2,797

2013 236,843 239,593 101.2% 3.4% 66,853 3,500 0 10,500 158,540 0 200

2014 7,746,828 7,018,712 90.6% 100.8% 779,489 3,033,713 0 268,581 779,442 788,060 0 309,047 560,384 26,019 473,977

2012 227,761 10,557 4.6% 4.3% 10,557

2013 220,799 217,907 98.7% 88.0% 95,077 104,071 13,775 4,984 0 0

2009 90,300 86,227 95.5% 2.0% 46,000 26,000 14,227

2010 3,423 3,423 100.0% 0.1% 2,773 650

2011 4,877,305 4,821,177 98.8% 111.8% 9,470 942,514 264,235 3,604,958

2012 815,777 689,513 84.5% 16.0% 82,105 42,453 11,711 131,521 29,278 73,752 308,693 10,000

2013 220,000 210,527 95.7% 4.9% 210,527

2009 207,600 177,539 85.5% 12.8% 1,200 2,502 9,450 7,110 9,364 10,486 7,233 6,400 8,395 13,402 86,363 15,634

2010 230,035 119,547 52.0% 8.6% 12,860 6,495 1,350 1,954 8,063 35,811 53,014

2011 254,000 190,136 74.9% 13.7% 1,542 22,371 17,105 21,929 14,904 28,582 83,703

2012 400,000 173,523 43.4% 12.5% 1,080 3,866 1,499 255 31,442 3,555 46,931 1,258 6,069 34,476 43,092

2013 350,817 227,309 64.8% 16.3% 13,500 0 0 25,597 43,029 5,186 24,629 46,749 68,619

2013 219,882 162,226 73.8% 66.3% 159,135 0 2,965 0 126 0 0

2014 48,615 8,810 18.1% 3.6% 8,810

2012 216,509 10,775 5.0% 4.4% 10,542 233

2013 207,156 195,309 94.3% 80.6% 54,039 69,835 43,722 23,929 1,456 0 2,328

2009 872,279 715 0.1% 0.0% 715

2010 3,466,340 114,701 3.3% 2.6% 33,551 78,286 2,864

2011 3,752,236 819,950 21.9% 18.7% 350,404 361,121 3,460 9,217 67,723 28,025

2012 886,146 451,011 50.9% 10.3% 784 2,015 133,453 111,874 202,885

2013 199,981 183,535 91.8% 4.2% 66,600 83,094 73 0 33,768 0

2013 183,500 53,070 28.9% 1.3% 0 53,070 0

2014 271,725 130,170 47.9% 3.3% 51,030 0 0 4,100 0 0 71,540 3,500

105 43386 2057745

SUSTITUCION, AMPLIACION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA DE LA

INSTITUCION EDUCATIVA MARGARITA

SANTA ANA DE BENAVIDES-ICA.

1,666,139.00 2013 172,397 172,396 100.0% 10.3% 172,396OBRA

CULMINADA

OBRA

CULMINADA100 131987 2164046

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DEL PUESTO DE SALUD DE

BELLAVISTA SAN PEDRO DE

HUACARPANA-CHINCHA-ICA.

244,725.28

GOBIERNO

REGIONAL

DE ICA

104 228416 2232188

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE PALPA.

3,943,192.00

EXPEDIENTE

TECNICO

APROBADO

103 71824 2088551

FORTALECIMIENTO DE LA CAPACIDAD

RESOLUTIVA DEL CENTRO DE SALUD

ALTO LARAN - MICRORED PUEBLO

NUEVO- RED PISCO DE LA DIRESA ICA.

4,384,826.00OBRA

CULMINADA

102 139677 2113622

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN A.H MICAELA

BASTIDAS DEL DISTRITO DE PARCONA-

ICA

242,428.69OBRA

CULMINADA

99 59186 2057958

FORTALECIMIENTO DE LAS

CAPACIDADES OPERATIVAS Y TECNICAS

PARA LA DEMARCACION TERRITORIAL

DE LA REGION ICA.

1,390,310.00

EXPEDIENTE

TECNICO

OBSERVADO

98 101572 2092500SISTEMA DE RIEGO AMARA SANTA ANA.

(Petacc).4,312,915.00 PETACC

97 139768 2113623

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN SECTOR SEBASTIAN

BARRANCA DEL DISTRITO DE SANTIAGO-

ICA.

247,556.75OBRA

CULMINADA

96 186229 2159993

CREACION, MEJORAMIENTO E

IMPLEMENTACION DE LA

INFRAESTRUCTURA DEPORTIVA DE

BASQUETBOL Y VOLEIBOL EN LAS

INSTITUCIONES EDUCATIVAS DE LA

PROVINCIA DE ICA, PALPA, NASCA,

PISCO, CHINCHA-REGION ICA.

6,964,455.00OBRA

PARALIZADA

95 127501 2158202

CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON FINES DE REDUCIR LA

VULNERABILIDAD DE LOS CANALES DE

CONDUCCION DE CAUCATO Y FIGUEROA-

EL PUEBLO EN AMBAS MARGENES DEL

RIO PISCO, DISTRITO DE SAN CLEMENTE

Y CERCADO, PROVINCIA DE PISCO-

REGION ICA.

(Petacc).

1,539,859.00 PETACC

Page 12: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 2,720,665 2,529,236 93.0% 102.4% 490,644 426,469 2,240 490,180 841,130 5,250 5,250 268,073

2013 171,459 155,533 90.7% 6.3% 14,848 109,594 31,091

2011 810,095 161,427 19.9% 20.6% 161,427

2012 839,595 618,217 73.6% 78.8% 292,522 323,601 907 1,187

2013 166,938 0 0.0% 0.0% 0 0 0

2013 157,202 2,040 1.3% 0.0% 2,040 0 0

2014 161,613 8,000 5.0% 0.1% 0 4,100 0 3,900 0 0

109 235083 2177933

AMPLIACION Y MEJORAMIENTO DE LOS

SERVICIOS DE AGUA POTABLE Y

ALCANTARILLADO EN LOS CCPP. LOS

JUAREZ, LOS ESPINOS Y ZONAS

ADYACENTES A LA VICTORIA-ICA-ICA-

ICA.

1,042,592.16 2014 48,606 24,831 51.1% 2.4% 0 21,331 3,500

EXPEDIENTE

TECNICO EN

REVISION

110 242131 2173534

MEJORAMIENTO Y RECUPERACION DE

LOS SERVICIOS TURISTICOS DE LA

CIUDAD PERDIDA DE HUAYURI, EN EL

DISTRITO DE SANTA CRUZ, PROVINCIA

DE PALPA, DEPARTAMENTO DE ICA.

2,171,915.00 2014 89,523 53,114 59.3% 2.4% 0 25,057 25,057 3,000

EXPEDIENTE

TECNICO

OBSERVADO

2013 156,042 0 0.0% 0.0%

2014 2,772,561 2,575,764 92.9% 81.6% 477,660 918,690 362,697 14,577 313,791 3,080 74,667 227,646 49,681 133,275

2012 377,590 197,763 52.4% 1,664 76,500 3,500 116,099

2013 153,959 130,325 84.6% 6,875 1,487 0 38,901 0 0 71,208 11,854

2011 1,195,920 90,527 7.6% 8.4% 90,527

2012 1,344,591 1,057,371 78.6% 97.9% 4,044 287,739 281,508 109,119 170,281 104,070 10,530 10,469 12,239 67,372

2013 147,512 192,393 130.4% 17.8% 0 146,670 45,723

2012 228,249 103,094 45.2% 42.4% 10,557 92,537

2013 137,387 115,937 84.4% 47.7% 7,000 108,937 0 0 0

115 216621 2161178

2161178: REHABILITACION POST

DESASTRE DE LOS SERVICIOS

EDUCATIVOS DE LA I. E. JOSE SEBASTIAN

BARRANCA, DISTRITO DE SANTIAGO-ICA-

ICA.

4,974,261.00 2013 150,939 153,689 101.8% 3.1% 40,332 13,500 3,000 0 750 1,650 94,457 OBRA POR INICIAR

EN ELABORACION

DE PERFIL

GOBIERNO

REGIONAL

DE ICA

114 139743 2113624

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN LA ASOCIACION

VIRGEN DEL ROSARIO DEL DISTRITO DE

LOS AQUIJES-ICA.

243,284.34OBRA

CULMINADA

113 176534 2133866

CONSTRUCCION DE AMBIENTES

ADMINISTRATIVOS EN LA SEDE CENTRAL

DEL GOBIERNO REGIONAL DE ICA.

1,080,001.00OBRA

CULMINADA

112 S/C (*) 2154694

REHABILITACION DEL PUENTE COLGANTE

MIRAFLORES, AFECTADO POR LAS

INTENSAS LLUVIAS EN EL CENTRO

POBLADO PANTAYCO, EN EL KM 36.5 DE

LA VIA LOS LIBERTADORES WARI,

DISTRITO DE HUMAY, PROVINCIA DE

PISCO, DEPARTAMENTO DE ICA.

OBRA

CULMINADA

111 142731 2113073

CONSTRUCCION Y EQUIPAMIENTO DEL

NUEVO LOCAL INSTITUCIONAL DE LA

SEDE CENTRAL DE LA UNIDAD DE

GESTION EDUCATIVA LOCAL DE NASCA,

PROVINCIA DE NASCA-ICA.

3,156,042.00OBRA

CULMINADA

107 129853 2110023

INSTALACION DE REDES SECUNDARIAS Y

CONEXIONES DOMICILIARIAS DE

ALCANTARILLADO EN EL AA.HH VISTA

ALEGRE DEL CC.PP URBANO TUPAC

AMARU-PISCO.

784,925.83OBRA

CULMINADA

106 146388 2126563

MEJORAMIENTO DE VIA A NIVEL DE

ASFALTO EN CALIENTE PARA LA

INTEGRACIÓN DE LOS CC.PP PRIMAVERA

PARIÑA GRANDE, CAMINO CHICO LAS

SILVAS , Y PUEBLO NUEVO DEL DISTRITO

DE PUEBLO NUEVO - ICA.

2,468,856.00OBRA

CULMINADA

6,725,041.00108 225132 2173510

MEJORAMIENTO, SUSTITUCION Y

EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE CHINCHA.

Page 13: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 3,583,724 237,000 6.6% 4.4% 71,100 94,800 71,100

2011 5,684,462 5,119,579 90.1% 95.0% 600,000 892,443 481,187 464,830 969,332 511,542 526,955 428,488 244,802

2012 571,112 273,273 47.8% 5.1% 83,046 61,420 1,000 1,000 2,000 124,807

2013 130,718 462,589 353.9% 9.3% 0 462,589 0

2014 36,165 26,368 72.9% 0.5% 0 5,000 21,368

2013 124,179 7,080 5.7% 0.2% 0 3,000 4,080

2014 119,575 74,144 62.0% 2.0% 6,000 0 0 34,072 34,072

2012 1,337,185 1,238,166 92.6% 106.1% 6,231 401,493 245,256 227,098 15,168 240,315 102,605

2013 121,705 22,669 18.6% 1.9% 9,693 12,976 0 0 0

119 S/C (*) 300-816ESTUDIOS DE PRE-INVERSION-REGION

ICA-EDUCACION.2013 117,453 23,591 20.1% 0 0 0 0 21,446 2,145

DIRECCION

REGIONAL

EDUCACION

2013 130,733 3,500 2.7% 0.1% 0 3,500 0

2014 247,430 35,555 14.4% 0.9% 3,500 0 0 32,055

2012 49,210 24,605 50.0% 0.9% 9,842 14,763

2013 104,022 32,105 30.9% 1.2% 4,000 3,000 500 0 0 24,605

2010 3,486,442 1,754,364 50.3% 38.3% 1,754,364

2011 2,841,872 2,650,645 93.3% 57.8% 134,237 293,564 234,392 402,318 473,066 134,957 306,840 1,056 670,215

2012 191,228 36,795 19.2% 0.8% 1,783 13,078 17,585 4,349

2013 102,526 0 0.0% 0.0%

2013 102,048 7,000 6.9% 0.2% 0 0 7,000

2014 98,548 32,014 32.5% 1.1% 3,500 28,514 0 0

2011 1,024,164 428,539 41.8% 43.3% 138,000 290,539

2012 721,088 665,015 92.2% 67.2% 1,265 591,753 15,931 4,235 51,831

2013 97,083 45,538 46.9% 4.6% 40,339 5,199 0 0

125 219270 2183931

CONSTRUCCION DE DEFENSAS

RIBEREÑAS EN EL RIO

MATAGENTE,SECTORES RONCEROS BAJO

Y GANADERO SAN LUIS, DISTRITO DE EL

CARMEN, PROVINCIA DE CHINCHA,

REGION ICA.

2,653,075.00 2014 73,188 10,500 14.3% 0.4% 0 0 3,500 7,000

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

126 218440 2163132

MEJORAMIENTO Y AMPLIACION DE LA

GESTION INTEGRAL DE RESIDUOS

SOLIDOS MUNICIPALES EN EL DISTRITO

DE INGENIO, DISTRITO DE EL INGENIO-

NAZCA-ICA.

2,507,629.00 2013 107,772 65,603 60.9% 2.6% 56,563 3,500 3,500 2,040

EXPEDIENTE

TECNICO EN

ELABORACION

2013 94,627 7,000 7.4% 0.2% 3,500 3,500 0

2014 97,627 55,576 56.9% 2.0% 26,288 0 29,288

127 209719 2165500

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE NASCA, REGION ICA.

2,804,078.00

EXPEDIENTE

TECNICO EN

REVISION

120 209703 2231666

GOBIERNO

REGIONAL

DE ICA

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE ICA, REGION ICA.

148536 2111902

MEJORAMIENTO Y EQUIPAMIENTO DE

INFRAESTRUCTURA DEPORTIVA Y

RECREATIVA EN EL CC.PP URBANO RIO

GRANDE, SECTOR MIRAFLORES,

DISTRITO DE RIO GRANDE- PALPA-ICA.

988,934.20OBRA

CULMINADA

123 209695 2231667

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE PISCO, REGION ICA.

3,041,557.00

EXPEDIENTE

TECNICO EN

REVISION

124

122 146382 2111197

CONSTRUCCION DE PISTAS Y VEREDAS

EN LAS CALLES PRINCIPALES DEL CENTRO

POBLADO SAN CLEMENTE GRUPO 2,

DISTRITO DE SAN CLEMENTE - PISCO -

ICA

4,584,361.00OBRA

CULMINADA

121 187942 2156624

CREACION E IMPLEMENTACION DEL

CENTRO DE EVALUACION PARA EL

OTORGAMIENTO DE LICENCIAS DE

CONDUCIR EN LA REIGION ICA.

2,698,022.00

EXPEDIENTE

TECNICO

APROBADO

118 132257 2111196

MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN LA I.E 22498 FAUSTINO

ROSAS BARBOZA DEL CENTRO POBLADO

TOMA DE LEON DEL DISTRITO DE

INDEPENDENCIA-PISCO-ICA.

1,166,784.92OBRA

CULMINADA

117 209687 2231665

MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE CHINCHA, REGION ICA.

3,749,729.00

EXPEDIENTE

TECNICO EN

REVISION

116 88649 2094601

CONSTRUCCION DE UN COLISEO

DEPORTIVO Y UN GIMNASIO PARA EL

DESARROLLO FISICO DE LOS ALUMNOS

DE LA INSTITUCION EDUCATIVA SAN LUIS

GONZAGA DE ICA EN LA CIUDAD DE ICA

PROVINCIA Y DEPARTAMENTO DE ICA.

5,389,371.00OBRA

CULMINADA

EXPEDIENTE

TECNICO EN

REVISION

3,996,197.00

Page 14: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

128 56943 2163471

MANEJO INTEGRAL CON ENFASIS EN LA

REFORESTACION DE LA PARTE ALTA DEL

DISTRITO DE CHAVIN-CHINCHA.

2,558,632.00 2013 88,996 0 0.0% 0.0%

EXPEDIENTE

TECNICO

OBSERVADO

2013 87,798 0 0.0% 0.0%

2014 87,700 26,310 30.0% 0.6% 0 26,310 0

2013 85,602 0 0.0% 0.0%

2014 95,602 61,362 64.2% 1.3% 0 3,000 31,806 26,556

2013 87,650 87,650 100.0% 2.7% 16,830 42,075 3,500 0 0 0 0 25,245

2014 4,111,983 14,500 0.4% 0.4% 0 0 6,300 8,200

2011 327,332 327,332 100.0% 2.8% 327,332

2012 12,627,741 12,301,367 97.4% 106.0% 6,780,588 258 237,206 1,819,170 982,054 943,603 1,538,488

2013 79,536 71,875 90.4% 0.6% 0 71,875 0

2013 78,500 29,000 36.9% 1.3% 0 3,000 26,000

2014 85,000 58,500 68.8% 2.7% 0 0 22,500 0 30,000 3,000 3,000

2012 59,132 29,566 50.0% 0.9% 14,783 14,783

2013 77,132 27,533 35.7% 0.8% 7,000 3,000 0 0 14,783 2,750

2010 136,493 277 0.2% 277

2011 180,895 117,090 64.7% 8,676 5,465 10,715 11,680 8,100 15,722 53,732 3,000

2012 101,516 59,138 58.3% 40,551 534 18,053

2013 70,837 17,836 25.2% 17,836

2011 20,000 20,000 100.0% 0.6% 20,000

2012 0 0 0.0% 0.0%

2013 68,400 8,200 12.0% 0.2% 3,500 1,300 0 3,400 0

129 234252 2230612

MEJORAMIENTO DE LA PRODUCCION Y

COMERCIALIZACION DE PALTA,

MEDIANTE LA TRANSFERENCIA DE

TECNOLOGIA A LOS PEQUEÑOS

PRODUCTORES, EN ARTICULACION CON

LOS GOBIERNOS LOCALES, DE LAS

PROVINCIAS DE PISCO Y CHINCHA DE LA

REGION ICA.

4,228,380.00

131 170345 2160205 3,232,447.00

130

MEJORAMIENTO DE CANAL DE

IRRIGACION PAMPA DE ÑOCO EN EL

SECTOR RURAL EN LOS DISTRITOS DE

CHINCHA ALTA, PUEBLO NUEVO Y

GROCIO PRADO EN LA PROVINCIA DE

CHINCHA-REGION ICA.

2129698

2129698: MEJORAMIENTO A NIVEL DE

ASFALTADO DE LA CARRETERA PONTON

LA ACHIRANA-LOS AQUIJES-SANTUARIO

DE YAUCA DEL ROSARIO, EN LA

PROVINCIA DE ICA.

11,602,641.00

EXPEDIENTE

TECNICO EN

REVISION

OBRA

CULMINADA

133 228444 2232187

2232187: MEJORAMIENTO,

SUSTITUCION Y EQUIPAMIENTO DE LA

INFRAESTRUCTURA EDUCATIVA

POLIDOCENTE AL AÑO 2010, EN LA

PROVINCIA DE NASCA.

2,204,808.00

132 112338

GOBIERNO

REGIONAL

DE ICA

CONSTRUCCION DE DEFENSA

MARITIMA, SECTOR CRUZ VERDE,

DISTRITO DE TAMBO DE MORA,

PROVINCIA DE CHINCHA, REGION ICA.

136 140422 2130148

DESARROLLO DE CAPACIDADES PARA EL

ORDENAMIENTO TERRITORIAL EN LA

REGION ICA.

3,539,629.00

EXPEDIENTE

TECNICO

APROBADO

EXPEDIENTE

TECNICO

OBSERVADO

135

FICHA

FORSUR

S/C (*)

2113870

2113870: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22346 SAN MARTIN DE

PORRES, CASERIO CASA BLANCA,

DISTRITO DE SANTIAGO, PROVINCIA DE

ICA, AFECTADA POR EL TERREMOTO DEL

15 DE AGOSTO DEL 2007.

OBRA

CULMINADA

134 101512 2105752

MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN EL INSTITUTO SUPERIOR

TECNOLOGICO PUBLICO LUIS FELIPE DE

LAS CASAS EN EL DISTRITO DE MARCONA-

NASCA-ICA.

3,390,295.00

OBRA EN

PROCESO DE

SELECCIÓN

147212 2163472 4,881,491.00

EXPEDIENTE

TECNICO EN

ELABORACION

OBRA POR INICIAR

Page 15: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

137 253402 2196795

MEJORAMIENTO DEL SERVICIO

EDUCATIVO DEL NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

PELA EN LA I.E.I. Nº321 FERMIN

TANGUIS, DISTRITO DE INDEPENDENCIA,

PROVINCIA DE PISCO, DEPARTAMENTO

DE ICA.

1,128,058.00 2014 112,806 56,400 50.0% 5.0% 56,400

DIRECCION

REGIONAL DE

EDUCACION

138 253405 2196794

MEJORAMIENTO DEL SERVICIO

EDUCATIVO DEL NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

DEL PELA EN EBR-AMPLIACION DE

COBERTURA EN EL I.E.I. Nº316 NAZARIO

PALOMINO DISTRITO DE SAN CLEMENTE,

PROVINCIA DE PISCO, DEPARTAMENTO

DE ICA.

1,475,000.00 2014 147,500 73,750 50.0% 5.0% 73,750

DIRECCION

REGIONAL DE

EDUCACION

139 250088 2196789

INSTALACION DEL SERVICIO EDUCATIVO

DEL NIVEL INICIAL EN EL MARCO DE

AMPLIACION DE COBERTURA DEL PELA

EN EBR EN EL I.E.I. Nº327 LOS ROSALES

DEL DISTRITO DE LA TINGUIÑA-ICA-ICA.

1,044,690.52 2014 104,469 5,000 4.8% 0.5% 5,000

EXPEDIENTE

TECNICO EN

ELABORACION

140 250086 2130148

2196788: MEJORAMIENTO DEL SERVICIO

EDUCATIVO DE NIVEL INICIAL EN EL

MARCO DE AMPLIACION DE COBERTURA

DEL PELA EN EBR EN LA I.E.I. Nº305

AA.HH. TEPRO ALTO SAN MARTIN DE

PORRAS, DISTRITO DE SUBTANJALLA,

PROVINCIA DE ICA, DEPARTAMENTO DE

1,186,399.10 2014 118,640 5,000

EXPEDIENTE

TECNICO EN

ELABORACION

141 220042 2222635

MEJORAMIENTO DE LA PRESTACION DE

LOS SERVICIOS EDUCATIVOS DE LA I.E.

RICARDO PALMA DEL CENTRO POBLADO

LA CAPILLA, DISTRITO DE TATE-ICA-ICA.

2,616,011.00 2014 111,308 7,000 6.3% 0.3% 0 0 3,500 3,500

EXPEDIENTE

TECNICO

APROBADO

142 249321 2167471

AMPLIACION, ADECUACION Y

MEJORAMIENTO DE LA CAPACIDAD DE

RESPUESTA DEL CENTRO DE

OPERACIONES DE EMERGENCIA DE LA

REGION ICA.

9,993,544.00 2014 239,548 14,500 6.1% 0.1% 14,500 OBRA POR INICIAR

143 235083 2177933

2177933: AMPLIACION Y

MEJORAMIENTO DE LOS SERVICIOS DE

AGUA POTABLE Y ALCANTARILLADO EN

LOS CCPP. LOS JUAREZ, LOS PINOS Y

ZONAS ADYACENTES A LA VICTORIA-ICA-

ICA-ICA.

1042592.16 2013 59,437 21,692 36.5% 2.1% 3,861 0 17,831 0

EXPEDIENTE

TECNICO EN

REVISION

2013 55,017 6,000 10.9% 0.4% 0 0 6,000

2014 85,900 14,000 16.3% 0.9% 0 0 2,625 4,375 3,500 3,500

2165499: MEJORAMIENTO DEL SERVICIO

EDUCATIVO CON INFRAESTRUCTURA DE

PROTECCION SOLAR EN LAS I.E. DE LA

PROVINCIA DE PALPA, REGION ICA.

1,536,545.00

GOBIERNO

REGIONAL

DE ICA

144 209705 2165499

EXPEDIENTE

TECNICO

OBSERVADO

Page 16: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 403,912 351,685 87.1% 119.3% 10,000 341,685

2013 52,227 46,652 89.3% 15.8% 49,270 -2,618

2011 69,988 20,996 30.0% 0.3% 20,996

2012 48,992 38,493 78.6% 0.6% 17,497 20,996

2013 50,299 22,098 43.9% 0.3% 5,200 3,900 2,500 10,498 0 0

2012 302,523 252,993 83.6% 98.8% 8,300 49,371 112,449 82,873

2013 49,450 22,298 45.1% 8.7% 3,950 17,329 1,019

2012 221,284 173,210 78.3% 101.1% 28,323 27,746 32,780 27,117 57,244

2013 48,074 1,376 2.9% 0.8% 1,376

2010 481,361 450 0.1% 450

2011 548,850 511,395 93.2% 171,481 187,115 23,101 3,894 36,408 2,701 86,695

2012 26,510 333 1.3% 333

2013 43,855 25,041 57.1% 16,899 8,142 0

2012 409,702 367,317 89.7% 123.7% 367,317

2013 41,572 38,926 93.6% 13.1% 40,612 545 -2,231

2010 18,593 18,593 100.0% 1.6% 7,437 11,156

2011 0 0 0.0% 0.0%

2012 10,500 0 0.0% 0.0%

2013 40,500 876,155 2163.3% 74.8% 3,500 0 10,500 0 515 245,390 616,250

2014 560,901 532,042 94.9% 45.4% 104,913 34,000 21,131 94,828 0 12,620 264,550

2013 40,000 53,790 134.5% 1.3% 39,500 0 0 0 14,290 0 0

2014 6,157,806 4,439,049 72.1% 103.9% 1,112,940 2,188,381 37,498 41,968 769,416 167,198 44,556 50,358 26,734

2013 45,680 422,824 925.6% 46.2% 38,680 0 3,500 3,500 169,775 0 207,369

2014 411,173 394,602 96.0% 43.1% 11,089 160,048 0 174,755 0 3,500 0 2,320 42,890

GOBIERNO

REGIONAL

DE ICA

153 137297 2160206

2160206: MEJORAMIENTO DE LA

INFRAESTRUCTURA Y EQUIPAMIENTO EN

EL CETPRO JULIO C. TELLO DEL DISTRITO

DE ICA, PROVINCIA DE ICA, REGION ICA

914,775.50OBRA

CULMINADA

151 125026 2092988

2092988: RECONSTRUCCION E

IMPLEMENTACION DE LA SEDE

INSTITUCIONAL DE LA DIRECCION

REGIONAL DE PRODUCCION ICA EN LA

CIUDAD DE PISCO.

1,171,252.22OBRA

CULMINADA

150 133778 2162337

2162337: REHABILITACION DEL DIQUE

EN EL RIO GRANDE, PARA REDUCIR LA

VULNERABILIDAD DEL SECTOR PERNIL

ALTO, MARGEN DERECHA, DISTRITO RIO

GRANDE, PROVINCIA DE PALPA-REGION

ICA.

(Petacc).

296,885.46 PETACC

149

FICHA

FORSUR

S/C (*)

2113867

2113867: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA ADELA LENGUA CALDERON,

LA VENTA BAJA, DISTRITO DE SANTIAGO,

PROVINCIA DE ICA, AFECTADA POR EL

TERREMOTO DEL 15 DE AGOSTO DEL

2007.

OBRA

CULMINADA

148 151143 2122382

CONSTRUCCION DEL CERCO

PERIMETRICO Y SERVICIOS HIGIENICOS

DE LA I.E. Nº 22374 CAMINO DE REYES

DEL DISTRITO DE SAN JUAN BAUTISTA-

ICA-ICA.

171,377.83OBRA

CULMINADA

147 139761 2113625

2113625: CONSTRUCCION DE MODULO

DE WAWA WASI COMUNAL EN EL

SECTOR LOS SAUCES DEL DISTRITO DE LA

TINGUIÑA-PROVINCIA DE ICA-

DEPARTAMENTO DE ICA.

256,067.51OBRA

CULMINADA

146 72653 2111396

2111396: CONSTRUCCION Y

EQUIPAMIENTO DEL NUEVO LOCAL

INSTITUCIONAL DE LA SEDE CENTRAL DE

LA DIRECCION REGIONAL DE EDUCACION

ICA.

6,890,640.00

EXPEDIENTE

TECNICO

APROBADO

145 136230 2114654

2114654: CONSTRUCCION DE DEFENSAS

RIBEREÑAS CON FINES DE PROTECCION

DE LA TOMA DEL CANAL DE

CONDUCCION Y DRENAJE DOS PALMAS

EN LA MARGEN DERECHA DEL RIO PISCO

SECTOR DOS PALMAS, DISTRITO DE

INDEPENDENCIA, PROVINCIA DE PISCO,

REGION ICA.

(Petacc).

294,708.03 PETACC

152 165292 2162333

2162333: CONSTRUCCION DE DEFENSAS

RIBEREÑAS SECTORES CHIQUERILLO, RIO

GRANDE, PALLASCA, MONTESIERPE, SAN

IGNACIO, FRANCIA Y LA CUCHILLA, PISCO

EN LA REGION ICA.

(Petacc).

4,273,497.00 PETACC

Page 17: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2010 1,575,369 15,000 1.0% 15,000

2011 2,175,553 669,424 30.8% 35,000 10,775 623,649

2012 1,471,131 1,378,248 93.7% 16,183 421,971 415,107 425,788 4,322 43,690 2,000 49,187

2013 34,370 0 0.0%

2012 252,391 223,586 88.6% 91.9% 10,542 280 74,958 137,806

2013 30,249 8,506 28.1% 3.5% 4,000 2,000 1,877 629

2012 3,787,528 3,753,603 99.1% 99.6% 690,245 361,420 291,240 546,262 549,560 569,954 744,922

2013 29,610 23,814 80.4% 0.6% 23,059 0 755

2012 523,423 499,028 95.3% 98.9% 254,993 244,035

2013 27,990 8,610 30.8% 1.7% 0 8,610 0

0 0.0% 0.0%

0 0.0% 0.0%

0 0.0% 0.0%

2013 10,500 7,350 70.0% 2.5% 0 0 7,350

2014 6,650 3,500 52.6% 1.2% 0 0 3,500

2010 437,394 25,000 5.7% 7,500 17,500

2011 597,454 399,710 66.9% 399,710

2012 208,873 87,870 42.1% 66,308 1,188 10,390 9,984

2013 26,280 20,480 77.9% 20,480

2013 25,000 325,047 1300.2% 20.8% 25,000 0 0 300,047

2014 937,680 893,121 95.2% 57.1% 14,567 71,595 87,977 23,301 287,261 161,666 1,159 19,175 226,420

2010 25,288 186 0.7% 186

2011 28,414 16,132 56.8% 2,867 3,588 9,677

2012 26,012 11,983 46.1% 3,311 7,270 1,402

2013 24,459 10,361 42.4% 396 6,336 0 0 3,629

2010 40,590 237 0.6% 237

2011 51,910 43,736 84.3% 3,470 6,498 3,736 8,668 16,996 4,368

2012 26,391 2,179 8.3% 2,179

2013 24,212 8,065 33.3% 7,042 1,023 0 0

GOBIERNO

REGIONAL

DE ICA

162

FICHA

FORSUR

S/C (*)

2113866

2113866: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22348 SANTIAGO

BARRIOS TORREALVA, CASERIO SAN

FELIPE, DISTRITO DE OCUCAJE,

PROVINCIA DE ICA, AFECTADA POR EL

TERREMOTO DEL 15 DE AGOSTO DEL

2007.

OBRA

CULMINADA

161

FICHA

FORSUR

S/C (*)

2113869

2113869: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22352, CASERIO LOS

FLORES, LA VENTA ALTA, DISTRITO DE

SANTIAGO, PROVINCIA DE ICA,

AFECTADA POR EL TERREMOTO DEL 15

DE AGOSTO DEL 2007-(SAGRADO

CORAZON)

OBRA

CULMINADA

160 128677 2162711

2162711: CONSTRUCCION DE DEFENSAS

RIBEREÑAS EN LOS SECTORES DE SAN

JUAN Y CABILDO EN LA MARGEN

DERECHA DEL RIO GRANDE, DISTRITO DE

CHANGUILLO, PROVINCIA DE NASCA,

REGION ICA.

(Petacc).

1,565,377.00 PETACC

159

FICHA

FORSUR

S/C (*)

2113685

2113685: RECONSTRUCCIÓN Y

EQUIPAMIENTO DE LA INSTITUCIÓN

EDUCATIVA Nº 188 "ANGELITOS DEL

DIVINO NIÑO" - HUMAY - PISCO- ICA.

(Forsur).

OBRA

CULMINADA

158 54183 2163234

MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN LA I.E. 22683 BEATA

MELCHORITA, DISTRITO DE GROCIO

PRADO, PROVINCIA DE CHINCHA-ICA.

157 218433 2158290

2158290: INSTALACION PROVISIONAL DE

LOS SERVICIOS DE EDUCACION INICIAL

DE LA I.E. Nº014 MERCEDES DIBOS DE

CAMINO DISTRITO DE ICA, PROVINCIA

DE ICA, DEPARTAMENTO DE ICA.

504,476.36OBRA

CULMINADA

156 128366 2111667MEJORAMIENTO DE LA PLAZA DE ARMAS

DEL DISTRITO DE PACHACUTEC-ICA.3,767,334.00

OBRA

CULMINADA

155 139696 2113626

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN EL CERCADO DEL

DISTRITO DE SUBTANJALLA-ICA

243,293.06OBRA

CULMINADA

154

FICHA

FORSUR

S/C (*)

2113683

2113683 RECONSTRUCCIÓN,

REHABILITACIÓN Y EQUIPAMIENTO DE

LA INFRAESTRUCTURA EN LA IE JULIO C.

TELLO.

(Forsur).

OBRA

CULMINADA

299,655.00

EXPEDIENTE

TECNICO EN

ELABORACION

Page 18: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2011 586,385 513,424 87.6% 41.8% 513,424

2012 751,562 687,262 91.4% 55.9% 7,509 191,630 257,692 151,285 78,995 151

2013 24,141 7,972 33.0% 0.6% 7,972

2012 122,450 98,421 80.4% 85.6% 62,758 31,203 4,460

2013 23,530 0 0.0% 0.0%

2012 1,186,486 1,135,755 95.7% 95.4% 417,836 236,591 481,328

2013 22,924 0 0.0% 0.0%

2009 2,900,306 32,874 1.1% 32,874

2010 3,014,071 2,125,844 70.5% 886 180 565,340 537,280 490,051 532,107

2011 783,590 635,312 81.1% 172,228 236,221 5,857 171,025 6,983 2,727 4,725 29,676 5,870

2012 318,207 295,564 92.9% 295,564

2013 22,643 22,642 100.0% 22,642

2010 107,571 499 0.5% 499

2011 180,861 168,526 93.2% 9,349 6,872 16,951 7,523 84,244 29,558 14,029

2012 28,321 16,820 59.4% 7,819 7,833 1,168

2013 21,931 7,024 32.0% 6,740 0 0 284

2013 20,000 20,000 100.0% 2.7% 20,000 PETACC

2014 1,239,368 208,048 16.8% 27.9% 208,048 PETACC

2012 10,000 10,000 100.0% 4.0% 10,000

2013 20,000 20,000 100.0% #¡DIV/0! 20,000

2014 417,468 253,576 60.7% 100.5% 313 253,263

2012 10,000 10,000 100.0% 3.4% 10,000

2013 20,000 20,000 100.0% 6.8% 20,000

2014 420,446 249,327 59.3% 84.9% 476 248,851

168 123932 2163549

2163549: CONSTRUCCION DE DEFENSAS

RIBEREÑAS EN AMBAS MARGENES DEL

RIO ICA PARA ASEGURAR EL SERVICIO DE

AGUA DE RIEGO, EN LOS SECTORES

AMARA Y SANTA ANA, DISTRITO DE

OCUCAJE, PROVINCIA Y REGION ICA.

(Petacc).

744,445.00

GOBIERNO

REGIONAL

DE ICA

170 132348 2162994

2162994: REHABILITACION DEL DIQUE

EN EL RIO PISCO, CON FINES DE REDUCIR

LA VULNERABILIDAD DEL SECTOR NUÑEZ

CANCHARI-CASALLA-M. I, DISTRITO DE

TUPAC AMARU INCA, PROVINCIA DE

PISCO, REGION ICA.

(Petacc).

293,827.97 PETACC

169 132321 2162747

2162747: REHABILITACION DE DIQUE EN

EL RIO PISCO CON FINES DE REDUCIR LA

VULNERABILIDAD DEL SECTOR BERNALES-

M. IZQUIERDA, DISTRITO DE HUMAY,

PROVINCIA DE PISCO, REGION ICA.

(Petacc).

252428.9 PETACC

167

FICHA

FORSUR

S/C (*)

2113868

2113868: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA Nº 22732, CP SANTA

DOMINGUITA, DISTRITO DE SANTIAGO,

PROVINCIA DE ICA, AFECTADA POR EL

TERREMOTO DEL 15 DE AGOSTO DEL

2007.

OBRA

CULMINADA

166FICHA

FORSUR2090181

RECONSTRUCCION DE LA COMISARIA

PNP CHINCHA ALTA - CHINCHA - ICA,

AFECTADO POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

(Forsur).

OBRA

CULMINADA

165 137111 2111439

2111439: CONSTRUCCION DE PISTAS Y

VEREDAS EN EL CENTRO POBLADO

PAMPANO, DISTRITO DE HUANCANO-

PISCO.

1,190,456.54OBRA

CULMINADA

164 147677 2116133

AMPLIACION DE REDES DE

DISTRIBUCION PRIMARIA EN 22,9 KV

PARA ELECTRIFICAR LOS C.P. SANTA

MONICA, SANTA CRUZ DE VILLACURI I Y

II ETAPA Y VIRGEN DEL ROSARIO DEL C.P

SANTA CRUZ DE VILLACURI DEL DISTRITO

DE SALAS-ICA-ICA

115,011.08OBRA

CULMINADA

163 90884 2112492

2112492: REHABILITACION DEL CAMINO

VECINAL DV PANAMERICANA SUR Km

381+500 PUEBLO NUEVO - EL CARMEN -

ALTO LARAN - LOCARI - ORONGO -

SOTELO.

1,228,442.00OBRA

CULMINADA

Page 19: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 265,490 251,470 94.7% 90.2% 10,542 378 46,262 80,285 114,003

2013 14,860 3,404 22.9% 1.2% 2,310 1,064 0 0 30

172 224063 2231505

MEJORAMIENTO DEL PARQUE INFANTIL

EN EL CENTRO POBLADO RIO GRANDE,

DISTRITO DE RIO GRANDE, PROVINCIA

DE PALPA, REGION DE ICA

380,265.00 2014 529,348 430,202 81.3% 113.1% 46,589 168,618 73,360 62,713 396 0 34,236 0 10,376 33,914OBRA

PARALIZADA

173

2233735: AFIANZAMIENTO HIDRICO DE

LA CUENCA DEL RIO GRANDE-SANTA

CRUZ-PALPA.

2014 568,000 10,400 1.8% 0.0% 10,400 PETACC

174 148903 2163470

2163470: MEJORAMIENTO DEL SERVICIO

EDUCATIVO EN LA I.E. 22290 C.P. EL

GUAYABO, DEPARTAMENTO ICA,

PROVINCIA CHINCHA, DISTRITO

SUNAMPE.

627,239.00 2013 21,816 10,556 48.4% 1.7% 3,000 0 0 7,556

EXPEDIENTE

TECNICO EN

ELABORACION

2010 380,247 4,200 1.1% 4,200

2011 648,055 534,050 82.4% 9,800 194,487 22,216 118,056 10,063 148,350 31,078

2012 21,198 10,398 49.1% 4,728 5,670

2013 10,580 10,580 100.0% 10,580

2013 10,500 2,216,469 21109.2% 22.2% 3,500 3,500 2,209,469

2014 6,009,269 5,116,820 85.1% 51.2% 906,375 0 13,418 0 0 376,372 949,240 760,920 1,254,089 856,406

2013 155,477 35,755 23.0% 34.7% 0 0 35,755

2014 60,330 60,330 100.0% 58.6% 46,430 0 0 13,900

0 0.0% 0.0%

2013 41,268 36,568 88.6% 2.1% 22,846 1,724 11,998

0 0.0% 0.0%

2013 9,500 6,650 70.0% 1.5% 0 0 6,650

2014 6,350 3,500 55.1% 0.8% 3,500

GOBIERNO

REGIONAL

DE ICA

179 157148 2173258

2173258: AMPLIACION Y

MEJORAMIENTO DE LA I.E.I. 235 DE LA

LOCALIDAD DE CONDORILLO ALTO,

DISTRITO DE CHINCHA ALTA-CHINCHA-

ICA

434,094.00

EXPEDIENTE

TECNICO EN

ELABORACION

178 165372 2229977

2229977: MEJORAMIENTO DE LAS

CAPACIDADES DE LOS PRODUCTORES DE

GANADO VACUNO MEDIANTE LA

TRANSFERENCIA DE TECNOLOGIA PARA

EL INCREMENTO DE LECHE EN LOS

DISTRITOS HUANCANO, HUMAY,

INDEPENDENCIA, PISCO, SAN CLEMENTE,

SAN ANDRES Y TUPAC AMARU INCA,

PROVINCIA DE PISCO-ICA.

1,707,266.00

EXPEDIENTE

TECNICO PARA

PROCESO DE

SELECCIÓN

177 229603 2230976

MEJORAMIENTO DE LOS SERVICIOS

EDUCATIVOS DEL CENTRO DE

EDUCACION BASICA ALTERNATIVA TONY

GUBBELS, DISTRITO DE CHINCHA BAJA,

PROVINCIA DE CHINCHA,

DEPARTAMENTO DE ICA.

103,025.92

EXPEDIENTE

TECNICO

APROBADO

176 223187 2229809

2229809: MEJORAMIENTO Y

AMPLIACION DEL SERVICIO DE

COMERCIALIZACION DE PRODUCTOS DE

PRIMERA NECESIDAD DEL MERCADO DE

ABASTO MUNICIPAL, DISTRITO DE

PUEBLO NUEVO-CHINCHA-ICA.

9,986,423.00 EN EJECUCION

175

FICHA

FORSUR

S/C (*)

2113688

2113688 RECONSTRUCCIÓN DE

AMBIENTES Y ADQUISICIÓN DE

EQUIPAMIENTO BIÓMEDICO BÁSICO DEL

PUESTO DE SALUD CONDORILLO ALTO

DEL DISTRITO DE CHINCHA ALTA,

PROVINCIA DE CHINCHA, DPTO DE ICA,

AFECTADOS POR EL SISMO DEL 15 DE

AGOSTO DEL 2007.

(FORSUR).

OBRA

CULMINADA

171 139756 2113627

CONSTRUCCION DE MODULO DE WAWA

WASI COMUNAL EN C.P SAN JOSE DE

LOS MOLINOS DEL DISTRITO DE SAN

JOSE DE LOS MOLINOS-ICA.

278,808.23OBRA

CULMINADA

Page 20: PRESUPUESTO ACUMULADO DE PROYECTOS AL IV … · INSTALACION DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO EN ... PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014 Ejecutora

EJECUCION% de

Avance

% de

Avance

respecto respecto

al PIM

Anual

a la

inversión

viable Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic

EJECUCION MENSUALIZADA ESTADO DE

PIPTOTAL (S/.)

(**)

SNIP DGPP

PRESUPUESTO ACUMULADO DE PROYECTOS AL IV TRIMESTRE DEL 2014

Ejecutora Item

Código

DenominaciónMonto de la

ViabilidadAños PIM

2012 1,211,173 1,178,198 97.3% 102.3% 235,142 594,290 348,766

2013 9,437 9,436 100.0% 0.8% 9,436

2012 26,275 26,275 100.0% 3.4% 10,510 15,765

2013 7,883 0 0.0% 0.0%

2012 423,349 399,881 94.5% 70.6% 49,900 91,198 235,615 3,020 20,148

2013 6,175 1,771 28.7% 0.3% 1,771

2012 828,060 822,860 99.4% 98.5% 366,284 225,280 120,176 108,025 3,095

2013 5,200 0 0.0% 0.0%

2011 378,888 258,348 68.2% 91.5% 258,348

2012 116,725 110,181 94.4% 39.0% 99,164 8,326 2,691

2013 3,861 0 0.0% 0.0%

2012 10,900 10,900 100.0% 1.3% 0 0 10,900

2013 10,500 10,500 100.0% 1.2% 0 0 10,500

2014 1,029,165 811,423 78.8% 95.1% 159,744 382,118 43,256 34,290 157,927 34,088 0 0

2011 1,247,840 663,043 53.1% 46.9% 663,043

2012 717,332 662,753 92.4% 46.9% 11,142 349,439 50,833 1,064 6,936 238,880 4,459

2013 2,350 2,350 100.0% 0.2% 2,350

2010 20,318 165 0.8% 165

2011 20,153 12,727 63.2% 4,666 2,614 3,328 2,119

2012 8,926 858 9.6% 858

2013 1,919 419 21.8% 0 0 419

2011 993,588 969,020 97.5% 89.8% 435,680 94,941 96,087 61,127 74,940 190,450 -335 16,130

2012 24,567 4,304 17.5% 0.4% 4,304

2013 1,584 1,584 100.0% 0.1% 1,584

188

2. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.3 millones de N/S y < o igual a S/.6millones de N/S, la modificación no deberá incrementarlo en mas de 30% respecto de lo declarado viable.

(*) S/C Sin Código - Proyectos que no pasaron por el SNIP

Nota: (**)

De acuerdo al Artículo Nº27 respecto a las Modificaciones de un PIP durante la fase de Inversión, señala:

1. si el monto de inversión total con el que fue declarado viable el PIP es < o igual a S/.3 millones de N/S, la modificación no deberá incrementarlo en mas de 40% respecto de o

2113226: REHABILITACION Y

MEJORAMIENTO DE LAS REDES DE AGUA

POTABLE Y ALCANTARILLADO DEL

CENTRO POBLADO DE SAN IDELFONSO

LA TINGUIÑA-ICA.

1,413,911.00

184 155401 2131991

2131991: SUSTITUCION DE LA LINEA DE

ABASTECIMIENTO DE AGUA POTABLE Y

AMPLIACION DE REDES DE

DISTRIBUCION DE AGUA POTABLE AL

CC.PP LA VICTORIA-LOS JUAREZ,

DISTRITO DE ICA.

282,277.02

3. Si el monto de inversión total con el que fue declarado viable el PIP es > a S/.6 millones de N/S, la modificación no deberá incrementarlo en mas de 20% respecto de lo declarado viable.

188 132459 2113629

2113629: MEJORAMIENTO DE LA

CAPACIDAD RESOLUTIVA PARA LA

OFERTA DE SERVICIOS DEL PUESTO DE

SALUD BERNALES, DISTRITO DE HUMAY-

PISCO-ICA.

1,079,634.97

GOBIERNO

REGIONAL

DE ICA

186 113837 2113226

OBRA

CULMINADA

187

FICHA

FORSUR

S/C (*)

2113865

2113865: RECONSTRUCCION DE

INFRAESTRUCTURA EDUCATIVA Y

EQUIPAMIENTO EN LA INSTITUCION

EDUCATIVA INICIAL Nº 080, CASERIO

SAN JOSE DE PINILLA DISTRITO DE

OCUCAJE, PROVINCIA DE ICA, AFECTADA

POR EL TERREMOTO DEL 15 DE AGOSTO

DEL 2007.

OBRA

CULMINADA

OBRA

CULMINADA

185 172208 2159892

2159892: MEJORAMIENTO DE LA

CALIDAD EDUCATIVA DE LA I.E. Nº91 EN

EL AA.HH. SEÑOR DE LUREN III ETAPA,

DISTRITO, PROVINCIA Y DEPARTAMENTO

DE ICA.

853,425.00OBRA

CULMINADA

OBRA

CULMINADA

183 147690 2117929

AMPLIACION DE REDES DE

DISTRIBUCION SECUNDARIA Y

ALUMBRADO PUBLICO PARA

ELECTRIFICAR LOS C.P. SANTA MONICA,

SANTA CRUZ DE VILLACURI I Y II ETAPA Y

VIRGEN DEL ROSARIO DEL C.P SANTA

CRUZ DE VILLACURI DEL DISTRITO DE

SALAS - ICA-ICA

835,054.70OBRA

CULMINADA

182 149196 2133478

CONSTRUCCION DE ALAMEDA TURISTICA

DEL ANEXO DE HUARACCO-DISTRITO RIO

GRANDE, PROVINCIA DE PALPA-ICA.

566,368.00OBRA

CULMINADA

181 188630 2150903

2150903: MEJORAMIENTO DEL SISTEMA

DE COMUNICACIÓN PARA LA

PREVENCION Y ATENCION DE LAS

EMERGENCIAS DEL GOBIERNO

REGIONAL DE ICA.

775,104.00

EXPEDIENTE

TECNICO

APROBADO

180 143136 2115792

CONSTRUCCION DE PISTAS Y VEREDAS

DE CONCRETO EN LAS PRINCIPALES

CALLES DEL DISTRITO DE SAN PEDRO DE

HUACARPANA-CHINCHA.

1,152,135.49OBRA

CULMINADA